2012 Work Sample: Geoffrey Elander

Page 1

GEOFFREY S. ELANDER Selected Works 2012

Professional Portfolio copyright Geoffrey S. Elander 2012, fourth edition printed in the United States This is the creative work of the author and all parties noted within. All rights to ownership are entitled. No unauthorized copy, duplication, or publication in any form is allowed without prior consent of the author. All images & photography are copyright of: Geoffrey S. Elander 2407 W. Moffat #1 Chicago, IL 60647 310.739.6031 www.andromeda-design.com


Concerto

w/ Destefano + Partners

Principal In Charge: Douglas Hanson Project Manager: McShane Murnane Design Team: Geoffrey Elander duration: 1.5 years

Concerto is a multi-phased, dual-tower 30 story Mixed-Use tower in downtown Los Angeles. It’s design features a number of pedestrian grade experiences that attempt to integrate the mass of the tower into it’s urban context. Some of these features include a public park at the intersection of Flower and 9th Streets, Retail amenities at Flower Street, and multiple exterior canopies that relate the mass of the tower to the human scale. Architecturally, the design includes a perforated and triangulated metal panel at the curtain wall that is operable from the interior of the tower’s units and a central urban park at the 4th level of the design. My responisibilities were primarily within the Construction Administration phase of the project, which included Coordinating Architectural drawings with MEP, reviewing and marking up shop drawings, responding to RFI’s (1000 total), issuing Architectural Bulletins (1-20), as well as attending site visits and producing field reports (25). As I became more involved within the project, my duties also included that coordination and rationalization of some of the more complex geometric areas of the project, which included a large zinc-faceted area of the Loft building. Other areas that I worked on, more specifically, were the coordination of the design at the urban park on the 4th level, review and mark up of shop drawings prior to each concrete pour, the coordination of interior finishes for the kitchens and baths for 27 unit types, and the re-design and rationalization of both the tower and loft lobby spaces.

Concerto: Podium Level Plan


General Notes

# 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

STEEL LENGTHS 31' - 10" 7' - 4" 9' - 1" 13' - 4" 8' - 8" 24' - 4" 1' - 4"

8

8' - 9" 19' - 6"

9

19' - 6" 5' - 7"

10

9' - 4" 17' - 3" 11' - 7"

11

14 WORKPOINT A

12

12' - 4" WORKPOINT B

STEEL LENGTHS

13

SCALE: 1 :STEEL 1 LENGTHS ARE *NOTE: MEASURED FROM THE CENTERLINE OF STEEL. DIMENSIONS ARE THEREFORE ROUGH-CUTS AT POINTS OF CONNECTION.

15

5 WORKPOINT E WORKPOINT A

6

WORKPOINT B

7 1 WORKPOINT C

2 3 4

H6 SCALE:

Concerto: Loft “Action Piece” Steel

WORKPOINT D

LOFT-NORTHEAST VIEW


Loft: “Action Piece” steel construction


Concerto: Loft Detail

Concerto: Loft Section

Concerto: Loft Detail

Concerto: Loft Section Detail


Concerto: Street Perspective @ Loft


CLIMA RESIDENCE

w/ PROJECT m PLUS

Principal In Charge: McShane Murnane Project Manager: Geoffrey Elander duration: 1 year (2010-11)

A major house renovation in Echo Park for a family of 2 + dog. A demolition of bedroom space and addition of two bedrooms and bath with multiple entry points. An interior/exterior fireplace system. Steam shower Size: 836 existing sf - 145 sf demolition + 628 sf addition with one off-street parking space. 1319 total sf Exterior: Stucco and wood siding (vertical and horizontal) Windows: Anodized aluminum windows at wood siding, wood windows at stucco siding. Doors: Anodized aluminum doors at wood siding, wood doors at stucco siding Surveyor: M&M&Company Structural Engineer: Grimm and Chen Engineering Mechanical Engineer: City Printing Center Contractor: Artisian Building Contractors

Clima: Existing

Clima: Perspective

Clima: Phase Diagram


Clima: Roof Plan

Clima: Floor Plan

Clima: Perspective


Clima: Front Yard

Clima: Sectiion / Elevation

Clima: Interior


PLANT RESIDENCE

w/ PROJECT m PLUS

Principal In Charge: McShane Murnane Project Manager: Geoffrey Elander duration: 1 year (2009-10)

A major house renovation in Los Feliz for a family of 5. In an attempt to rethink living in a typical LA bungalow we added square footage for the growing family, including roof terraces to utilize out door space and views of Los Angeles. Size: 1184 existing sf + 641 sf first floor addition + 541 sf second floor addition with no change to parking. 2366 total sf Exterior: Stucco and coated corrugated metal siding. Windows: Anodized aluminum windows and doors Surveyor: M&M&Company Structural Engineer: Grimm and Chen Engineering Mechanical Engineer: City Printing Center Contractor: Mario

Plant: Site Plan

Plant: Front Entrance


Plant: Ground Floor Plan

Plant: Second Floor Plan

Plant: Aerial Perspective


Plant: Rear Yard Perspective

Plant: Aerial Perspective


MURNANE RESIDENCE

w/ PROJECT m PLUS

Principal In Charge: McShane Murnane Project Manager: Geoffrey Elander duration: 3 years (2009-present)

UNDER CONSTRUCTION A new hillside home in Silver Lake for a family of 4 + dog. Size: 2300 sf house, 450 sf detached, 2-stall garage Exterior: Stucco and wood siding Windows: Anodized Aluminum Features: - ‘Wind catcher’ for natural air movement. - Local materials - Reclaimed wood - Solar panel ready - Native, drought resistant planting Surveyor: M&M&Company Arborist: Arbor Essence Soils Engineer: Grover Hollingsworth Structural Engineer: Grimm and Chen Engineering Shoring Engineer: Grimm and Chen Engineering Mechanical Engineer: Donald F Dickerson & Associates Contractor: Owner/Builder

Murnane: Site Plan

Murnane: Street Perspective


Murnane: Section

Murnane: Front Yard Perspective


Murnane: Upper Level

Murnane: Construction


Graduate Thesis: Assembled Surfaces + Interwoven Materiality The Los Angeles Fueling Station as Social, Material and Tectonic Transformer Prototype 02: Sunset Blvd. // 101 Freeway

Exterior Perspective: Aerial View

Base Site Grid and Pump Spacing

Base Site Grid and Pump Spacing

Grid - Surface Relationship

Linework Generation Based on Pump Spacing

Driven Surface Development Based on Linework

Linework Generation Based on Pump Spacing

Driven Surface Tectonic Description

Driven Surface Development Based on Linework


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.