Architecture Portfolio 2018, Geoffroy Griveaud

Page 1

PORTFOLIO Geoffroy Griveaud



Summary PROFESSIONAL WORK

5

01. Sikh Temple, Barking

6

02. VILLIERS MARKET HALL

12

ACADEMIC WORK

19

01. “THE SPINE”: éVRY 2025-2050

20

02. “METAMORPHOSIS”: AN EXTRAPOLATION OF ABU DHABI

26

03. HAITI: A CONCRETE-BLOCK FACTORY

34

04. HAITI: A TECHNICAL SCHOOL

38

Workshops & EXHIBITIONS

43

01. “HELTER SHELTER”

44

02. EARTH[PLAY]GROUND

46

03. VENETIAN STORIES

50

3


4


PROFESSIONAL WORK

5


01. SIKH TEMPLE, BARKING

1

2

3

4 > Barking Gurdwara 1. view of the main façade from the street 2. view of the north wing from the street 3. aerial view of the project & existing building 4. “Sach Kand”, the main entrance of the building

6


01. SIKH TEMPLE, BARKING Agenda 21 architects studio - Summer 2013 Site 100 North Street, Barking, Essex, UK Size / Budget 3310m2 / £7,000,000 Stage Feasibility studies to planning application Brief Design of a new-build “gurdwara” (sikh temple), adjacent the existing one (Gurdwara Singh Sabha London East). It must contain: a large “langar” (dining hall), three “diwans” (assembly halls), classrooms, educational and day-care facilities, congregation halls, residential areas for visiting priests and musicians, a small library and a shop.

7


01. SIKH TEMPLE, BARKING

8


> Plan Sikh temple, ground floor Project Although it may appear as traditional at first glance, the building is designed with a strong modern spirit in terms of proportions, typology and space layouts. The proposal seeks to reconcile the varying

aspirations of the community and thus the interior is designed to take advantage of the comfort and flexibility offered by modern layouts, construction and technology. 9


01. SIKH TEMPLE, BARKING

> Plan Sikh temple, 1st floor

> Plan Sikh temple, 2nd floor 10


> Cross section

> north elevation The classic recognisable features of the Sikh temple are reinterpreted and its architectural principles (no floor above the sacred book, no room using water above the “diwanâ€? etc.) are respected. In keeping with traditional Sikh architecture, the façades will be clad entirely in intricately carved white marble, featuring elaborate cornices and balustrades created by specialist Indian craftsmen.

> Detail of the entrance

More numerous and refined with each new level, the ornaments and decorations reference the birth place of Sikhism and the many ornate and delicate Gurdwaras to be found in the Punjab and elsewhere in India. 11


© Patrick Tourneboeuf- Tendance floue

02. VILLIERS MARKET HALL

> Photograph of the built project, east façade 12


02. VILLIERS MARKET HALL LDRP architecture & design - Spring 2014 Site Villiers-sur-Marne, France Size / Budget 2500m2 / 750.000â‚Ź Stage Concept design to tender action Brief Refurbish the ageing market hall of Villiers-sur-Marne and bring up to standard the existing infrastructure: provide better accessibility for disabled people around and inside the market, better fire safety, better hygiene (through waste management and waste water management), better adapted lighting system, better signage system etc.

13


02. VILLIERS MARKET HALL

2 14

© Patrick Tourneboeuf- Tendance floue

© Patrick Tourneboeuf- Tendance floue

1

3 > Villiers market hall 1. rendering of the future project 2. photograph of the built project, south entrance 3. photograph of the built project, panels detail


Reprise de béton sur les marches + pose d'une peinture de sol antidérapante avec nez de marches contrastés D

Pose d'une peinture de sol antidérapante

Local sécurité

Vestiaires

(84.86)

A

Local EDF

(84.39) de (84.70) siphon sol

(84.47)

C

C

(84.86)

959

H.s.p:2.75

(84.84) conteneur à déchets 125/78

(84.74) E

F

conteneur à déchets 120/78

(84.84)

Encombrement enrouleur tuyaux

conteneur à déchets 120/78

(84.69) (84.88)

(84.38)

(84.90)

Pose de bandes podotactile (haut escalier)

(84.57)

(84.44)

H.s.po:2.64

H.s.po:3.33

Reprise de béton + remplacement des becquets

(84.15)

Primeur

Café (projeté) (84.12)

(84.74) (83.90) (83.83)

Primeur

(84.88)

Local

(84.69)

(84.20)

non visité

Allée B :

H.s.p:3.60

H.s.p:3.92

H.s.p:4.18

148

Local non visité

(84.95)

(84.62)

(84.41)

H.s.po:3.76

H.s.po:3.51

(84.20)

(84.85)

(84.44)

460

(84.71)

466

(84.21)

conteneur à déchets 125/78

Allée A : H.s.p:3.27

E

(84.87) Local poubelles

(84.82)

(84.46)

H.s.p:3.49

siphon de sol Reprise de béton sur les marches + pose d'une peinture de sol antidérapante avec nez de marches contrastés

conteneur à déchets 125/78

(84.39)

(84.22)

(84.20)

(84.09) (84.13)

Reprise du pied de poteau

Poissonnerie

(84.46)

(84.89)

H.s.f.p: 2.50m

145

Café

F

(84.81)

conteneur à déchets 125/78

Pose de bandes podotactile

(84.86)

(84.72)

Encombrement enrouleur tuyaux

H.s.po:3.02

conteneur à déchets 125/78

(84.64)

(83.73)

Boucher

(83.74)

Primeur

Poissonnerie (84.21)

siphon de sol (84.25)

Allée C :

(84.42)

(84.14)

(84.46)

(83.83)

(84.88)

(84.88) (84.88)

(84.88) (84.88)

ETAT (84.65) PROJETE | DETAIL FACADE

H.s.po:3.60

(84.80)

469

(84.20)

(85.12)

siphon de sol

H.s.p:3.51 (84.69)

(84.63)

(84.48)

H.s.p:3.99

(83.90)

Spécialités portugaises

139

Be rn ier

(83.79)

(84.93)

Produit portugais (83.92)

ile EmEm

Allée 1

Allée 2

Allée 3

(84.63)

H.s.p:3.36

(84.70)

(84.88) (84.88)

Allée 5

H.s.po:3.70

(84.22)

Allée D :

H.s.p:4.10

(84.48)

Allée 4

H.s.po:3.93

(83.49)

(84.87)

(84.41)

(84.21)

(83.67)

(83.62)

Rotisserie siphon de sol

Primeur

Charcuterie

(84.15) H.s.p:4.16

H.s.p:4.40

134

(83.88)

H.s.p:4.73

Allée 6

(84.70)

Allée 7

(84.47)

(84.94)

H.s.po:3.70

H.s.po:3.93

Habillage des m aluminium laqué ( Références Nat

461

(83.63)

5 596

Volailler

Réfection des becquets

(83.86)

Boucher

Primeur

(83.52)

Boucher

Poissonnerie

Charcuterie

Primeur

Poissonnerie

(84.27) (84.21)

(84.15)

(83.88)

H.s.p:4.49

(83.70)

(83.63) (83.46)

Primeur

siphon de sol siphon de sol

H.s.p:4.49

(84.41)

(84.47)

Allée E :

H.s.p:3.90

(84.63)

(84.93) (84.88)

(84.70)

Boucherie

AvAv enen ueue

(84.94)

(84.69)

(84.47)

H.s.po:3.83

NCS 1502-Y

H.s.p:3.90

H.s.po:3.83

(83.37)

142

(83.44)

Charcuterie

(84.88)

Boucherie

466

Primeur

(83.50)

NCS 4000-N

(84.15)

Primeur

Primeur

H.s.p:5.20 (83.35)

B B

H.s.p:4.43

H.s.p:4.89

Fromager

Traiteur

(84.15)

H.s.p:4.13

(84.90)

H.s.p:3.31

H.s.po:4.04

H.s.po:3.01

H.s.po:4.04

H.s.po:3.01

(84.23)

Boucher

Triperie

H.s.p:4.71

Allée G' :

NCS 5030-Y

Primeur

siphon de sol siphon de sol

H.s.p:3.43

(84.43)

(83.67)

H.s.p:5.21

(84.63)

(84.46)

H.s.p:4.42 (84.16)

H.s.p:4.71

Primeur

Boucher

H.s.p:4.42

(83.94)

Allée G :

H.s.p:5.21

NCS 4010-Y

B B

(84.73)

Triperie

Fromager

Traiteur (83.31)

89 modules verticaux

(84.87)

H.s.p:3.31

(83.87)

(83.29)

H.s.p:3.43

(84.89)

H.s.po:4.30

H.s.po:3.76

H.s.po:4.53

H.s.po:4.30

H.s.po:3.76

(84.88)

(84.88)

Primeur H.s.po:4.53

(84.89)

NCS 2570-Y

Primeur 560

neur matériaux

Boulangerie

(84.70)

(84.63)

(83.62) H.s.po:4.64

(83.69)

Eclairage public pour raccordement

H.s.p:4.13

464

ume Budé

Produits Italiens Allée F :

(84.47)

(84.39) (84.22)

(84.15)

H.s.p:4.43

(83.94)

Boulangerie

Produits Italiens

Primeur

(83.88)

H.s.p:4.89

139

2 462 2 462

H.s.po:4.64

142

Primeur

Primeur

Primeur (83.37) H.s.p:5.20

(83.69)

Primeur

(83.33)

(83.94)

Primeur Charcuterie

Volailler

(83.64)

(83.50)

Volailler (83.44)

A A

110

110

691

110

Ascenseur

(84.54)

(84.30)

(83.94)

(83.84)

691

Ascenseur

(84.85)

(84.47)

(84.30)

(84.06)

(83.80)

110

(84.73)

Fromager

Poissonnerie

(83.96)

NCS 1570-Y

Fromager

Poissonnerie

(83.23)

Charcuterie

(83.88)

Allée H :

(83.57)

303

e de chantier. Refectoire RDC + bureau étage

690 110 692 110 88 modules verticaux 690 110: mise en place de 692caniveaux en béton 110 OPTION

(84.40)

689

Reprise ciment suite à dépose au droit des caniveaux 689 Reprise béton à prévoir sur tous les pieds et têtes de poteaux extérieur

ETAT PROJETE | IMPLANTATION FACADE

Rue Guillaume Budé

25

7

Av en ue

1

OJETE | PLAN DES SOLS echelle 1/200e

Alimentation eau

(83.52)

50

(84.27) (83.70)

(84.15)

(83.88)

H.s.p:4.49

(84.21)

89

H.s.po:4.64

90

(83.35)

H.s.p:4.89

(83.62)

+83.16

1 085

(84.15)

H.s.p:4.43

(83.94)

(84.22)

245

s

(84.69)

Conteneur matériaux BUR EAU 400x240

Baraque de chantier. Refectoire RDC + bureau étage

Produits Italiens

REFE VEST CTOIRE IAIR E / WC 240x600

(84.47)

(84.39) 643

530

628

(83.88)

(84.47)

84.54

(

(84.63)

Allée F :

H.s.p:4.13

3 204

44 50

94

526

Primeur

Primeur

Primeur

655

745

RUE EMILE BERNIER

25 647

760 (83.37) 915 H.s.p:5.20

(84.15)

+88.5

WC 120x140

Rue des F auve tte

77

+90.8

113

50

+83.18

2 WC chimiques

H.s.po:3.83

(83.50)

370

102 25 51 25 55 50 20

RUE GUILLAUME BUDE

+88.5

WC 120x140

Prévoir une alimentation eau protégée jusqu'au cabanes de chantier

(83.37)

13

+90.8

H.s.p:3.90

(84.63)

Eclairage public pour raccordement +93.25

25 25

+93.25

Allée E :

Rue Guillaume Budé (84.41) (84.47)

siphon de sol

Plaque évacuation des eaux usées

(83.46)

CON TAIN 500X ER 240

25 26

(83.63)

H.s.po:4.04

(83.69)

8

7

(83.87)

6

5

4

(83.29)

25

Traiteur

57

62

21

ETAT PROJETE

Boucher

(84.63)

(84.46)

(83.94)

Allée G :

251

2

(84.73)

Allée G' :

(84.16)

H.s.p:3.43

(84.43)

TIERS

(Médiathèque)

303

367

(83.88)

425

20 191 (83.57)

190

1 018

388

190

598

(83.80)

ETAT PROJETE | COUPE LONGITUDINALE BB

(83.84)

3

TIERS (Parking)

1 920

(83.96)

182 Allée H :

Fromager

Poissonnerie

(83.23)

806

1 340

604 183

(84.06) 5 961 (83.94)

(84.47)

360

176

10

199 25

606

197

803

(84.30)

162

9

8

(84.30)

363

583+83.18 (84.54)

1 271

(84.40)

7

RUE EMILE BERNIER

369

+88.5

Charcuterie

Volailler

(83.64)

113

64

+84.89

+90.8

(83.94)

647

Primeur

+87.03

760

391

(83.69)

+93.25

H.s.po:3.76

244

H.s.po:4.30

H.s.po:4.53

(83.50)

(83.44)

+88.5 +87.9 +86.77

1,406 m 2

370

+88.5 +87.9 +86.77

RUE GUILLAUME BUDE

(83.33)

RUE EMILE BERNIER

25 25 25 34 50

413

H.s.po:3.01

0

H.s.p:4.42

(83.67)

755

50 647 95 25

277 364

60108 25 95

54

1 (84.23)

50

RUE GUILLAUME BUDE

H.s.p:5.21

2 6 509

Triperie H.s.p:4.71

(83.31) 521

3

(84.15)

50

+83.57

Fromager

ETAT PROJETE | FACADE EST RUE GULLAUME BUDE

50 208

+88.5 +87.9 +86.77

INSTALLATION CHANTIER

463

47

25

5

6

5

4

2 632

OJETE | PLAN DES SOLS / DETAIL echelle 1/100e ETAT PROJETE | FACADE SUD RUE EMILE BERNIER

208

+88.5 +87.9 +86.77

+83.57

Maître d'ouvrage :

TIERS

Groupe DADOUN 127 boulevard du général Giraud 94100 Saint-Maur des Fossés

(Parking)

178

199

404

208

389

212

400

364

(Médiathèque)

108

ETAT PROJETE | HABILLAGE MUR RIDEAU FACADE EST RUE GUILLAUME BUDE

TIERS

647

The main aim of the project is to improve the visitors’ experience and the market public image by making it more attractive and lively. Therefore, LDRP’s proposal includes a façade cladding made of bright-coloured lacquered aluminium panels blending better with the context. 202

399

132

36

100 20

755

1. floor plan 1/500 2. east elevation 1/500 , rue Guillaume Budé 3. 3D detail of the panels 4. south elevation 1/500, rue émile Bernier

277

Project RUE GUILLAUME BUDE

> Technical drawings

Site :

Marché couvert Avenue Emile Bernier 94350 Villiers-sur-Marne

Tel : 01.45.11.71.11 Fax : 01.45.11.71.12

2 880

ETAT PROJETE | COUPE TRANVERSALE AA

Désignation :

15

ETAT PROJETE | FACADES Niveau : RDC Echelle : 1/200e

RUE EMILE BERNIER

ETAT PROJETE

Equip

Archit LDRP 99 rue 93100 Tel 01 Fax 0 ldrp.a www.l

ETAT PROJETE |


Primeur

Av en ue

H.s.p:3.90

siphon de sol

H.s.p:4.49

02. VILLIERS MARKET HALL

(R

Poissonnerie

Primeur

Charcuterie

Boucher

Boucherie

H.s.po:3.83

Primeur

Primeur

Primeur

Boulangerie

Produits Italiens

H.s.p:5.20

2 462

H.s.po:4.64

H.s.p:4.43

H.s.p:4.89

B

H.s.p:4.13

H.s.p:3.31

H.s.po:4.04

Fromager

Traiteur

Boucher

Triperie

Primeur

H.s.p:4.42

H.s.p:4.71 H.s.p:5.21

89 modules verticaux

B

H.s.po:3.01

siphon de sol

H.s.p:3.43

Primeur H.s.po:4.30

H.s.po:4.53

H.s.po:3.76

Primeur

A

110

691

110

88 modules verticaux 690

Fromager

Poissonnerie

Charcuterie

Volailler

110

692

110

Ascenseur

689

ETAT PROJETE | IMPLANTATION FACADE

245

© Patrick Tourneboeuf- Tendance floue

+93.25

643

628

530

655

745

+88.5

84.54

90

RUE EMILE BERNIER

+90.8

+83.16

8

1 085

7

3 204

6

5

4

3

2

1

0

1

6 509

ETAT PROJETE | FACADE EST RUE GULLAUME BUDE

TIERS

(Médiathèque) +88.5 +87.9 +86.77

244

303

463

369

1,406 m 2

391

RUE EMILE BERNIER

+88.5 +87.9 +86.77

+84.89

+87.03

TIERS (Parking)

191

190

1 018

190

598

182

806

2

176

604

199

606

197

803

583

5 961

ETAT PROJETE | COUPE LONGITUDINALE BB

ETAT PROJETE | HABILLAGE MUR RIDEAU FACADE EST RUE GUILLAUME BUDE

Maître d'ouvrage :

Site :

Groupe DADOUN 127 boulevard du général Giraud 94100 Saint-Maur des Fossés

Marché couve Avenue Emile B 94350 Villiers-s

Tel : 01.45.11.71.11 Fax : 01.45.11.71.12

Désignation :

ETAT PROJETE | FACADES Niveau : RDC Echelle : 1/200e Date de création :

06 mai 2014

Modifié le : 23/05/2014

3 16


© Patrick Tourneboeuf- Tendance floue

D TEL

D

Vest.

Vest.

Vestiaires

SSI + BAIE SONO

TEL

Local sécurité

(84.47)

(84.39)

EDF

(84.70)

C

H.s.p:2.75

conteneur à déchets 125/78 93

1

93

Poissonnerie

145

Allée A : 16 réglettes

conteneur à déchets 120/78

(84.88)

959 93

1

93

1

Encombrement enrouleur tuyaux

conteneur à déchets 120/78

(84.90)

(84.57)

(84.44)

(84.21)

1 15

(84.87) Local poubelles

(84.69)

(84.38)

84.69) (84.90)

H.s.p:3.27

(84.84)

Poub

(84.82)

(84.46)

H.s.p:3.49

(84.20)

(84.09) (84.13)

F H.s.f.p: 2.50m

203

(84.39)

(84.22)

1

15

1

Encombrement enrouleur tuyaux

conteneur à déchets 120/78

E 182

WC

(84.89)

145

182

conteneur à déchets 125/78

(84.87) Local poubelles

H.s.po:2.64

H.s.po:3.33

466

(84.88)

F

(84.81)

1 195

Café

203

(84.46)

(84.84)

Poub

conteneur à déchets 120/78

(84.86)

(84.72)

F H.s.f.p: 2.50m

conteneur à déchets 125/78

conteneur à déchets 125/78

H.s.po:3.02

E

conteneur à déchets 125/78

1

(84.89)

conteneur à déchets 125/78

conteneur à déchets 125/78

959

conteneur à déchets 125/78

Encombrement enrouleur tuyaux

F

E

conteneur à déchets 125/78

conteneur à déchets 125/78

WC

E

(84.81)

(84.74)

Encombrement enrouleur tuyaux

(84.74)

WC

(84.84)

Dalles lumineuses type "lumière du jour"

WC

(84.84)

195

C

(84.86)

(84.82)

C

(84.86) C

H.s.p:2.75

(84.86)

Local sécurité

(84.86)

Local EDF

(84.86)

Local EDF

EDF

SSI + BAIE SONO

TEL

TEL

466

H.s.po:2.64

Primeur

Primeur

(83.88)

464

466

(84.73)

Boucher

3,289 m2

148 460

2,821 m2

Primeur

(84.63)

(84.46)

(84.93)

110

0,370 m2

2,872 m2

0,370 m2

1,975 m2

303

Allée E : 33 réglettes

Fromager

Poissonnerie

0

(84.89) (84.88)

110

692

148 460

91

5

93

11

(84.89)

4

2,284 m2

2,919 m2

1,207 m2

0

Ascenseur

(84.85)

15 14 3,289 13m2 12 11 10 9 8 7 6 5 4 3 2 1

(84.88)

1,142 m2

Allée H : 20 réglettes

Compact ep 8mm Formica teinte 2001

Accès local TGBT (porte CF 2H à créer plaquée stratifié Formica teinte 2081 689 Boucherie

110

(84.94)

Compact ep 8mm Formica teinte 2081

Compact ep 8mmep 8mm Compact Formica teinteteinte 2001 2001 Formica

(84.88)

Coupure d'urgence

2,821 m2

617

607 92 54

129

0,370 m2

2,872 m2

48 110

130

3,289 m2

3,300 m2

1,975 m2

VESTIAIRES

2,284 m2

Compact ep 8mm Formica teinte 2001

Compact ep 8mm Formica teinte 2001

extincteur à eau pulvérisée 6L mini

Composition panneau 20 Accès local TGBT (porte CF 2H àdu créer plaquée: stratifié Formica teinte 2081 flèches 11x 27 cm

1,218 m2

2,0

Compact ep 8mm Formica teinte 2001 Compact ep 8mm Compact ep 8mm Formica teinte 2081 Formica teinte 1834

Coupure d'urgence Accès local Vestiaire (porte existante a laquer)

PLAN ET ELEVATION ETAT PROJETE | MUR LOCAL POUBELLE / ACCES WC

> Elevations of the technical facilities walls 1/500 130

25 3,289 m2

4 +2.75

100

VH 150

150

110

téléphone

209

SSI+Baie Sono téléphone urbain situé à moins de 1.3m du sol alarme dans le placard CF 1/2h

1. Interior of the market hall Rue Guillaume Budé 2. Longitudinal section 1/400 3. 3D detail of the cable tray covers

tableau consignes de sécurité

Compact ep 8mm Formica teinte 2001

VB

VB Compact ep 8mm Formica teinte 2001

+0.00

+0.00

47

+0.00

(84.40)

689

Element vitré

extincteur à eau pulvérisée 6L mini

Composition du panneau : 20 flèches 11x 27 cm

SSI+Baie Sono

téléphone SSI+Baie Sono Accès local TGBT (porte CF 2H à créer plaquée stratifié Formica teinte 2081 téléphone urbain situé mpact ep 8mm téléphone urbain situé Coupure d'urgence à moins de 1.3m du sol rmica teinte 2001 à moins de 1.3m du sol tableau consignes de sécurité Accès local Vestiaire (porte existante a laquer) coupure manuelle de l'alarme sonore alarme dans le placard CF 1/2h

mpact ep 8mm rmica teinte 2001 tableau consignes de sécurité

téléphone urbain situé à moins de 1.3m du sol

DETAIL SIGNALETIQUE

coupure manuelle de l'alarme sonore

PLAN ETAT PROJETE | ELEVATION MUR LOCAL TGBT ET VESTAIRES ELEVATION INTERIEUR LOCAL SSI

ELEVATION INTERIEUR LOCAL SSI

SSI+Baie Sono

coupure manuelle de l'alarme sonore

ELEVATION FACADE LOCAL SSI

ELEVATION FACADE LOCAL SSI 15

221 161

221 25

+2.75

45

100

+2.75

127

> Colour chart of the project 27

692

303

(84.54)

(84.30)

Compact ep 8mm Formica teinte 1834

90

Allée H : 20 réglettes

(84.30)

VESTIAIRES

63

209

(84.47)

)

102

30

0

Ascenseur

127

47

(84.85)

221

100

133

(84.73)

25

+2.75

2

102

TGBT

Element vitré

560

Fromager

Poissonnerie

45

+2.75 1,975 m

VH

(84.88)

H.s.po:3.76

(83.23)

0,370 m2

200

Primeur

(84.89)

2,872 m2

95

(84.89)

(84.88)

0,370 m2

142

H.s.p:3.43

127

2,821 m2

110

221 161

200

Primeur

(84.63)

(84.46)

Allée G' : 13 réglettes

(84.43)

54

15

Maître d'ouvrage : Groupe DADOUN 127 boulevard du général Giraud 94100 Saint-Maur des Fossés Tel : 01.45.11.71.11 Fax : 01.45.11.71.12

Site :

Marché couvert Avenue Emile Bernier Element 94350 Villiers-sur-Marne vitré

VH

Equipe de maîtrise d'oeuvre : 150

102

Architectes mandataire : LDRP architecture et design 99 rue de Stalingrad 93100 Montreuil Tel 01 43 63 14 67 Fax 01 43 63 11 46 ldrp.architecture@yahoo.fr www.ldrparchitecture.com

142

Boucher

H.s.p:4.42

églettes (84.16)

129

63

VB

Ingénieur BET / Economiste : FACEA 10 avenue du Val de Fontenay 94120 Fontenay-sous-Bois Tel 01 49 74 12 68 Fax 01 49 74 12 69

Maître d'ouvrage :

17

Groupe DADOUN 127 boulevard du gén 94100 Saint-Maur de Tel : 01.45.11.71.11 Fax : 01.45.11.71.12

30 133

45

(84.73)

54

221

27

130

27

15

(84.23)

464

221 161

27

5

H.s.po:3.01

91

11

66

Rue Guillaume Budé H.s.p:3.31

607

Finally, the signage design isB also transformed in order to provide a easier orientation of the public within the market.

H.s.po:4.04

DETAIL SIGNALETI

Formica teinte 1834

(84.90)

209

WC

90

H.s.p:4.13

(84.87)

200

(84.22)

PLAN ETAT PROJETE | ELEVATION MUR LOCAL TGBT ET VESTAIRES

(84.70)

(84.63)

139

(84.15)

H.s.p:4.43

WC Allée F : 34 réglettes

PLAN ETAT PROJETE | ELEVATION MUR LOCAL TGBT ET VESTAIRES DETAIL SIGNALETIQUE Compact ep 8mm

66

Produits Italiens (84.47)

(84.39)

142

Boulangerie

Compac Formica te

Accès local poubelles (porte à créer plaquée stratifié Formica teinte 208

Accès local Vestiaire (porte existante a laquer)

Primeur

11

130

0,370 m2 35

TGBT

Compact ep 8mm Formica teinte 1834

Compact ep 8mm Formica teinte 2081

Compact ep 8mm Formica teinte 1834

extincteur à eau pulvérisée 6L mini

Accès WC (porte existante) 130 54

130

(84.47)

(84.88) (84.40)

(84.30)

(84.70)

(84.69)

42

VESTIAIRES

(84.73)

Compact ep 8mm (84.54) (84.93) Formica teinte 1834

(84.30)

H.s.p:3.90

(84.63)

88 modules verticaux 690

110

(84.88)

(84.94)

Poissonnerie

(84.47)

134

H.s.p:3.36

(83.23)

(84.47) (83.94)

139

54

TGBT

Comp Form

PLAN ET ELEVATION ETAT PROJETE | MUR LOCAL POUBELLE / ACCES WC

B

129

Primeur

(84.87)

WC

+0.00

Compact ep 8mm Formica teinte 2001

Compact ep 8mm Formica teinte 1834

118

54

H.s.p:3.43

Allée G' : 13 réglettes Rotisserie

(84.43)

Compact ep 8mm Compact ep 8mm Formica teinte 2001 Formica teinte 2081 Compact ep 8mm Compact ep 8mm Compact ep 8mm Formica teinte 2081 ep 8mm Formica teinte 1834 Formica teinte 2001 Compact Formica teinte 1834

(84.90)

WC

(84.88)

(84.06)

(84.41) (83.84)

(84.87)

H.s.p:3.31

(84.88)

(83.80)

691

195

(84.88)

(83.96)

Primeur

(84.27)

607

2,040 m2

Adhésifs (cf détails)

Compact ep 8mm Formica teinte 1834

130

H.s.po:3.01

(84.88)

(84.70)

Charcuterie

Ascenseur

(84.85)

(84.21)

130

(84.88)

4

Primeur

(84.63)

(84.70)

(84.73)

Boucherie (84.88)

464

(84.88)

H.s.po:3.76

Allée D : 32 réglettes

Volailler

3.57)

(85.12)

5

(84.23)

139

Charcuterie

WC

H.s.p:4.10

(84.48)

(84.47) (83.64)

(84.70)

(84.80)

(83.94)

H.s.po:3.70

(84.63) les 190 réglettes dans

WCallées

1,626 m2

Accès local poubelles (porte à créer plaquée stratifié Formica teinte 2081

560

(84.41)

(84.21)

(84.47)

1,358 m2

1,218 m2

Compact ep 8mm Formica teinte 2081 Compact ep 8mm Formica teinte 2001

PERSPECTIVE SIGNALETIQUE SUR CHEMIN DE CABLES

(84.94)

461

H.s.po:4.30

(84.88)

Boulangerie

Allée F : 34 réglettes

H.s.p:4.13

(83.94)

(84.89)

(84.88)

(84.93)

Compact ep 8mm Formica teinte 2081

The asphalt on the market alleys floor is replaced with tiles, in order to improve hygiene by providing a surface easy to wash and clean and a better water evacuation system.

(84.89) Produit portugais (84.88)

(84.69)

2,284 m2

2,284 m2 3,300 m2

+2.04

27

134 461 142 466 142

(84.22)

Allée G' : 17 réglettes (84.16)

(83.67)

H.s.po:3.83

non visité

H.s.p:4.42

H.s.p:4.71

(84.15) H.s.po:4.53

(84.65)

(84.70)

Produits Italiens

H.s.p:3.51 (84.69)

(84.15)

Triperie

H.s.p:3.90

ep 8mm CapotageCompact Alu 10/10 Formica teinte 1834 214 pièces de 148x40

Spécialités portugaises

(84.63)

Allée C : 25 réglettes

(84.46)

(84.94)

139

(84.42)

Fromager

2,919 m2

(84.70)

1,142 m2

3,289 m2

2,919 m2

1,207 m2

(84.95)

(84.15)

(84.48)

H.s.p:3.99

110

WC

H.s.po:4.04

(84.25) (83.87)

(84.14)

(84.15)

Local

(84.39)

Primeur

(84.88)

Poissonnerie

(84.85)

H.s.p:4.43

(83.94)

H.s.po:3.60

Charcuterie

(84.88)

(84.47)

WC

(84.90)

WC Poissonnerie

Encombrement enrouleur tuyaux

1,207 m2

conteneur à déchets 120/78

Compact ep 8mm Compact ep 8mm (84.63) (84.41) (84.47) : 33 réglettes Formica teinte 2081Allée EFormica teinte 2001

(83.88)

(84.87)

H.s.p:4.89

WC

H.s.p:3.36

142

(84.44)

H.s.p:3.31

Primeur H.s.p:4.16

2,284 m2

(84.70)

1

PLAN ET ELEVATION ETAT PROJETE MUR LOCAL POUBELLE / ACCES WC Capotage| Alu 10/10 18 pièces de 148x45

Primeur

Primeur

(83.62)

Traiteur

Primeur

(84.62)

(84.41)

(84.15)

(84.20)

1,142 m2

(84.63)

93

469

(84.88)

1

Primeur

(84.21)

(84.69) H.s.po:3.83

Allée B : 22 réglettes Boucherie H.s.p:3.60

(84.94)

93

H.s.po:2.64

(84.15)

WC

(84.20)

H.s.p:3.92

1

(84.84)

(84.90)

(84.88)

Charcuterie

(84.88) Café (projeté)

(84.21)

H.s.p:4.10

(84.69)

(84.27)

Boucher

Primeur

145

conteneur à déchets 120/78

(84.47)

(83.88) (84.93)

H.s.p:4.49

(83.70)

H.s.po:4.64

F

15

Poub

(84.82)

H.s.p:3.27

(84.57)

Boucher

Poissonnerie

)

4.70)

WC

Allée D : 32 réglettes

(84.87) Local poubelles

H.s.po:3.70

(84.22)

Allée A : 16 réglettes

(84.38)

(84.48)

203

(84.46)

H.s.p:3.49

.52)

PrimeurH.s.po:3.51 (84.20) Boulangerie

E H.s.f.p: 2.50m

66

conteneur à déchets 125/78

(84.41)

(84.21)

(84.39)

H.s.po:3.93

(84.12)

(84.89)

Charcuterie

0,690 m2

15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

90

conteneur à déchets 125/78

(84.15) H.s.p:4.16

Poissonnerie

(84.46)

(83.86)

(84.44)

Primeur

conteneur à déchets 125/78

466

(84.22)

(84.09) (84.13) (84.20) (84.94)

84.70)

conteneur à déchets 125/78

Accès WC (porte existante)

+2.75

218

50

E

Compact ep 8mm Formica teinte 2081

93 130

95

F WC Produit portugais (84.81)

(84.80)

617

42

130

5 596

WC

(84.65)

Along with the project, a colour analysis of the buildings surrounding the market hall was done by a professional colour expert, resulting in the selection of a precise colour chart for the panels, light covers and signage. B

WC Café (84.88)

(84.88)

(83.63)

(84.86)

WC

(84.86)

(84.87) H.s.p:4.40

(84.88)

C

5 596

(83.92)

(83.88)

(84.74)

(84.72)

15 14 13 12 11 (84.93) 10 Rotisserie 9 (84.87) 8 7 (84.88) 6 5 4 3 2 1

(84.88)

48

469

(84.48)

C

H.s.p:2.75

182

469

3) Primeur

Primeur H.s.po:3.33

EDF

92

(84.88) (84.88)

H.s.p:3.51 (84.69)

(84.63)

Allée C : 25 réglettes

Encombrement enrouleur tuyaux

(84.93) Volailler Rotisserie

(84.21)

H.s.p:3.99

(84.46)

H.s.po:3.02

(83.67) (83.62) H.s.p:3.36

(84.42)

(84.84)

s lumineuses type "lumière du jour"

H.s.p:4.73

(84.25)

H.s.po:3.60

(84.20)

(84.88)

118

Accès WC (porte existante)

(85.12)

93

134

(84.70)

Spécialités portugaises

42

959

(84.39)

Primeur

118

Local sécurité

(84.86)

Local EDF

(84.14)

139

(84.47)

(84.88) (83.83)

TEL

Vest.

1

(84.88)

(84.88) (83.90)

(84.88)

(84.80)

84.70)

Poissonnerie

Vestiaires

(84.21)

SSI + BAIE SONO

461

460

Boucher

TEL

Adhésifs (cf détails)

190 réglettes dans les allées

D

(85.12)

(84.88)

Capotage Alu 10/10 18 pièces de 148x45

(84.85)

Adhésifs (cf détails)

(84.44)

conteneur à déchets 125/78

(83.74)

Spécialités portugaises

H.s.po:3.51

> Signage design for the exits

PERSPECTIVE SIGNALETIQUE SUR CHEMIN DE CABLES

Capotage Alu 10/10 214 pièces de 148x40

non visité (84.95)

(84.41)

(84.20)

190 réglettes dans les allées

(83.73)

.51 84.69)

WC

(84.62)

142

Capotage Alu 10/10 18 pièces de 148x45

H.s.po:3.76

(83.79)

Local

WC

Allée B : 22 réglettes

H.s.p:3.60

The lighting system in the market aisles, is decorated following the same principle, by covering with the existing cable trays.

(84.64)

(84.85)

(84.88)

PERSPECTIVE SIGNALETIQUE SUR CHEMIN DE CABLES (84.69)

(84.20)

466

(84.95)

(84.12)

H.s.p:3.92

142

(83.83)

560

non visité

139

WC Capotage Alu 10/10 (83.90) 214 pièces de 148x40 H.s.p:4.18

Local (84.74)

WC

Primeur

303

(84.88)

Café (projeté)

148

(84.71)

Primeur

4.69)

Primeur

Local non visité

5 596

(84.15)

27

Vestiaires

facea@faceagroup.com Désignation :


18


ACADEMIC WORK

19


02. “THE SPINE”: éVRY 2025-2050

> Masterplan

20


01.

“THE SPINE”: éVRY 2025-2050 Platane Bérès studio - Autumn 2011 - Semester 6

Site Communauté d’agglomération Évry Centre Essonne. Merger of six towns (Bondoufle, Courcouronnes, évry, Lisses, Ris-Orangis and Villabé) forming a community of municipalities. Brief Define a common identity for the entire community of municipalities of Evry for 2025-2050.

> Masterplan 21


02. “THE SPINE”: éVRY 2025-2050

1

2

tram station

tram station

3

4 22

5


> Existing site Project Merger of six towns, the community of municipalities has many different aspects but the cities are all isolated and don’t really interact with each other. 1

2 Concept

3

<

1. finding enclosed areas in the city 2. creating a structural axis 3. generating new interactions

Urban principles to transform évry 1. project generated around perspectives creating squares and buildings 2. pedestrian movement influenced by the shape of the buildings 3. boulevard distended for tram stations 4. fields extended to the other side of the road 5. canal made entirely visible

The A6 highway, lined with industrial and economic areas, divides this heterogeneous territory. The site, located at the border between évry and Courcouronnes, along the highway, is composed of private housing estates, of a lake along an express way, of a farm in the middle of an interchange, of a small forest, of an enormous car park, of a small business district, and, in the centre, of a deserted area. The project revolves around the definition of an urban boulevard, a “spine” acting as a showcase for the different identities of the conurbation, displaying their own qualities, creating a rhythm, with its breaks and its elements of surprise, as you go along. Taking into consideration the future project of a tram line along this axis, with its several stations, as well as the different types of existing buildings, perspectives take shape and organise the space. 23


02. “THE SPINE”: éVRY 2025-2050

1

2

3 24


4

5 > The different identities of ĂŠvry 1. promenade along the canal 2. a new economic hub 3. city entrance and its convention centre 4. walkway in the middle of the woods 5. the “Bois Briardâ€? farm and its wheat fields

Interchange transformed into a real node, business centre, promenades along the canal, in the middle of the woods & through the wheat fields facing the cultural centre, more efficient vehicle lanes in the housing estate area, all of them contribute to reassert the value of this place. 25


03. “METAMORPHOSIS”: AN EXTRAPOLATION OF ABU DHABI

> Detail of Abu Dhabi ‘s “extrapolation” drawing 26


02.

“METAMORPHOSIS”: AN EXTRAPOLATION OF ABU DHABI Reza Azard studio - Autumn 2014 - Semester 8 published in “Extrapolations Métropolitaines”, Le Cabanon, 2015 Site Abu Dhabi, United Arab Emirates Brief Do an “extrapolation” of a city, based on research and initial presentation at the beginning of the semester. The “extrapolated” city should present the original city’s unique characteristics in a more exaggerated, poetic, critical and graphic manner. The process is divided in three steps: 1. Analyse the actual city and make a detailed drawing of its “extrapolated” version 2. In this newly created context, examine and reinvent some architectural archetypes: an observatory, a necropolis and a theatre 3. Select one of these archetypes and create a scenography for an exhibition about the city, in the context of the Venice Architecture Biennale. 27


03. “METAMORPHOSIS”: AN EXTRAPOLATION OF ABU DHABI

1

2 3

4

5 28

6


<

Characteristics Taking Abu Dhabi as the precedent, the project looks into trends of the city and analyse them. The following step is to identify unique characteristics that pertain to the image of an imaginative version of the city. Small drawings are made on the themes of: 1. city materials : recycling 2. surface, size & height: dizziness 3. mobility & transport: speed 4. population & density: concentration 5. climate, geology & ecosystem: desert 6. plan, grid & organisation: topography Extrapolation

>

“Its birth remains a mystery. Some say it has been existing for centuries but that yesterday there was nothing. Some say it is fond of its past, but that today everything is gone. Lost in the desert, visible from the sea. Lost in the trees, visible from the skies. To enter, only one road leads to her . To leave it, you cannot walk. If you ask its inhabitants what it looks like, some say it is made of twigs and fabric, some talk about domes and marble, some, finally, see it drowning in a cloud of glass and steel. Some even say sometimes that it is a monolith, that the whole population lives in the same space, that the inside and the outside blend together, that everything is mixed, that everything is separated. Some say it is always moving, that it changes shape indefinitely, that, day and night, mechanical arms are shaking frenetically, that pieces of the city grow overnight, that it is continuously destroyed to be rebuilt again. Every time I go back I discover her again, always a bit different, always a bit the same. You can admire or despise it, you can adore or hate it, but everybody is looking for its place. Some live in the sky, others on the earth. Some live on the sea, others on the sand.� 29


03. “METAMORPHOSIS”: AN EXTRAPOLATION OF ABU DHABI

1

2

3

4 30


< The observatory In this new context, of a bustling vertical metropolis that never rests and where private space is a rare commodity for many, the observatory give the inhabitants the chance to isolate themselves, and quietly contemplate their city away from all the stress and activity.

5

During this entirely solo experience, the viewer can sit in a middle of a small cabin made of glass attached to a crane that can move in every direction, rotate around its axis, be lowered down or lifted up. This way, one can see and appreciate the diversity of the “extrapolated” Abu Dhabi in all of its complexity. 1. Plan 2. Section 3. Axonometry 4. View from the cabin

The necropolis

>

The necropolis of the “extrapolated” Abu Dhabi is a reinterpretation of “towers of silence” used in the old Persian religion of Zoroastrianism. They believed human bodies where impure and thus couldn’t be buried without damaging the earth. Therefore, the corpses were left exposed to the open air in circular enclosed spaces where scavenging birds would come to eat the flesh until only the bones remained. Only then, the dead could be put into a ossuary pit at the centre of the tower.

6

Here, within the main structural elements of the city can also be found the final resting place of the dead. The bodies are left hanging inside of open boxes made of adobe, to decompose, until the remaining skeletons are pushed into the central void at the bottom of the tower when space is needed for new corpses. 5. Section 6. Plan

31


03. “METAMORPHOSIS”: AN EXTRAPOLATION OF ABU DHABI

MÉTAMORPHOSES

D’APRÈS D’ABU DHABI

THÉÂTRE ET MISE EN SCÈNE D

B

C

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

1 A

A

“A dance of shadows” AXONOMETRIE

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

D

Far from the “extrapolated” Abu Dhabi, this open theatre is located in the middle of the desert. The public seats on carpets on the sand to watch the show. The movements of the dancers on the stage are projected onto the screen as silhouettes telling the story of the city.

B

PLAN SCENE 1/150

2

RANVERSALE CC 1/200

C

PLAN 1/200

1. Axonometry of the theatre 2. Detailed plan of the stage 3. Longitudinal section 4. Plan

MÉTAMORPHOSES

D’APRÈS D’ABU DHABI

THÉÂTRE ET MISE EN SCÈNE COUPE TRANVERSALE DD 1/200

COUPE TRANVERSALE BB 1/200 D

B

C COUPE LONGITUDINALE AA 1/200

3

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

A

A

D

B

C

4

PLAN 1/200

32


300

300

350

2,000

1,350

65

995

500

63

710

500

14,275

2,167

5,575

5

6

7 21,167 2,962

1,204

5,833

1,167

5,833

1,000 1,000

A

1,000

1,000

1,000

5,667

1,000 803

1,000

1,000

5,500

B

333

5. People discovering the exhibition 6. Cross section 7. Longitudinal 8. Plan

1,000

1,000

1,000

19,667

A

1,167

Compiling ideas of previous projects, this architectural installation brings out the essence of Abu Dhabi, including sand, shadows, carpets, movement, mirrors, reflections and illusions, to give the visitors a feel of the fictional city.

1,000

1,167

1,000

1,000

1,000

1,000

5,500

1,000

1,000

863

333

Taking place within the context of the Architecture Biennale in Venice Italy, this project is the scenography for an exhibition about the “extrapolated” Abu Dhabi.

3,000

B

8

“Mirage”: an exhibition for Abu Dhabi

1,167

59

2,000

2,000

2,000

2,000

2,000

2,000

2,000

2,000

2,000

2,000

59

33


B

04. HAITI: A CONCRETE-BLOCK PRODUCTION UNIT

3,53

Accès bureau et public

Bureau 16,8 m2

Espace extérieur de production de parpaings

Stockage parpaings 60 m2

77 m2

5,49

7,67

7,00

Stockage d'eau de pluie 8m3 17 jours de production

3,05

2,40

2,96

Stockage d'eau de pluie 8m3 17 jours de production

A

2,40

Nef de production de parpaings

140 m2

140 m2

2,96

2,40

2,40

2,40

Nef de production de parpaings

22,73

2,40

2,40

A

Stockage d'eau de pluie 8m3 17 jours de production

Stockage d'eau de pluie 8m3 17 jours de production

porte basculante

porte basculante

porte basculante

porte basculante

porte basculante

Espace extérieur

2,96

77 m2

Vestiaires

5,93

5,04

16,8 m2 x 2

Stockage Gravier

Stockage Sable

12 m2

2,96

Stockage Ciment

24 m2

0,20

24 m2

0,51

2,96

2,40

2,40 13,13

2,40

7,00

2,90

2,96 10,41

B

Accès ouvriers

> Plan of the concrete-block factory

34


03.

HAITI: A CONCRETE-BLOCK PRODUCTION UNIT Fabienne Bulle studio - Spring 2012 - Semester 7

Site A plot near Titanyen, Haiti. Brief Design a concrete block production unit capable of producing 256 blocks per day. The construction pattern is simply a frame made by the repetition of the same module (buildable in 5 days) in order to reach the right surface. It includes: two production warehouses (70m2 each), a concrete block storage space (60m2), a raw materials storage space (60m2), toilets and changing rooms (15m2) and an office (15m2).

35


2,40

Nef de production de parpaings

140 m2

140 m2

2,96

2,40

2,40

2,40

Nef de production de parpaings

22,73

2,40

KÖRNIËR

04. HAITI: A CONCRETE-BLOCK PRODUCTION UNIT

Stockage d'eau de pluie 8m3 17 jours de production

Stockage d'eau de pluie 8m3 17 jours de production

porte basculante

porte basculante

porte basculante

porte basculante

porte basculante

Espace extérieur 77 m2

2,96

Couverture

Vestiaires 16,8 m2 x 2

Stockage Gravier

Stockage Sable

12 m2

Visserie :

24 m2

24 m2

- 32 cornières de 12 cm section 6*6 - 16 tubes carrés de 3 m section 6*6 - 12 tôles dimensions 1.2*2.4 m

2,96

Stockage Ciment

- 80 bo

0,20

Materiaux :

5,93

5,04

5

2,40

2,40

2,40

7,00

2,90

2,96

13,13

10,41

Accès ouvriers

B

2,96

0,51

4

> Axonometry of a module

Poutre

Geoffro Jean-Christo Ate

Mise en oeuvre des tôles : - dans la longeur : recouverement de 45 cm - dans la largeur : recouvrement de deux vagues

Détail de fixation La cornière qui tient la panne s’appelle «l’échantignole» Lorsqu’elles mesurent 6 cm, elles se fixent sur la le dessus de Détail assemblage poutre treillis sur le mur pignon la poutre.

1

> Cross section

2

Détail assemblage poutre treillis entre deux poteaux

> Assembly details: 1. putting the roof together 2. connecting the beam to the main frame structure 36


e taille maximale 1m és 2.4m*1.2m

Poutre Stockage d'eau de pluie 8m3 17 jours de production

Visserie :

- 2 cornières de 0.90; 0.78; 0.66; 0.54; 0.43; 0.32; 0.20 m - 1 cornière de 7.68 mètres section 6*6 - 1 cornière de 7.13 mètres section 6*6 Espace extérieur - 1 plat 5 cm de 0.60; 1; 1.30 m - 2 plats 1.20 m - 3 plats de 1.05 m porte basculante

porte basculante

porte basculante

porte basculante

porte basculante

Stockage d'eau de pluie 8m3 17 jours de production

- 16 boulons / 16 écrous / 32 rondelles

2,96

77 m2

Vestiaires 16,8 m2 x 2

5,93

5,04

Stockage Gravier

Stockage Sable

12 m2

2,96

Stockage Ciment

24 m2

24 m2

: selôt sed ervueo ne esiM mc 54 ed tnemerevuocer : ruegnol al snad seugav xued ed tnemervuocer : ruegral al snad 0,51

2,96

2,40

2,40

2,40

13,13

2,96

7,00

2,90

10,41

Accès ouvriers

B

Materiaux :

0,20

4

elbmesne’d euV

> Beams & roof structural elements

9

Remplissage

Visserie : Materiaux :

- rien - Beaucoup de branches de taille maximale 1m - 8 plaques de contreplaqués 2.4m*1.2m

> Longitudinal section - rien

Visserie :

Project

The whole structure is buildable using only one element, steel angles irons. This way, it can be built fast and using only one technique. To create the walls, a dent is made on each end of a log, which is then placed by hand between two pillars. Logs are then stacked on top each other to fill the space. Détail : fer plat en position «ouvert» pour la Détail :instead fer plat en position «ouvert» walls are filled with plywood mise en place et le remplacement desThe bran exterior mise en place et le remplacement de ches de remplissage to offer more security. Finally, the roof ches is made of de remplissage corrugated iron. > Filling techniques: logs (left) plywood (right)

The exterior corridors provide sheltered circulation for the workers as well as a larger surface to collect the rain water and channel it towards the water tanks. 37

Des plaques de contreplaqués sont boulonnées à la structure à l’avant et l’arrière du module.


05. HAITI: A Technical school

1

2

3 > The technical school 1. the market under the mango trees 2. the tiers and the stadium 3. the tree lined walkway

38


04.

HAITI: A TECHNICAL SCHOOL Fabienne Bulle studio - Spring 2012 - Semester 7

Site A large plot (320m x 80m) near Titanyen, Haiti. Brief Design a self-sufficient technical school. It must contain: a church, a stadium, an internet cafĂŠ, a canteen, classrooms, a concrete-block production unit, a wood/steel workshop, a textile workshop, an agricultural workshop, cultivated land and a small market to sell the school production and crops. The construction span is around 30 years, depending on the money gathered by the different workshops. It will be divided into 10 steps, each one following the next in a logical way.

39


05. HAITI: A Technical school

6

4 5

7

2

8 3

10

1

> Masterplan:

9

1. entrance 2. wash-house 3. tiers & football field 4. church 5. amphitheatre 6. classrooms 7. canteen 8. radio 9. internet café 10. spirulina production Project The main concept, and first step, is to plant trees, in order to generate a “shadow line“ protecting the inhabitants from the sun . Dividing the width of the plot in two, it will become a reference line to place other elements on the land such as buildings and plants. It will also act as a main axis for pedestrians and the water system. Diverse species of trees will also create different atmospheres. At the entrance, people can climb up to the church to attend mass or relax on the tiers, under colourful flamboyant trees, while watching a football match. Along the road, the lot is bordered by moringa trees for a more discreet path. Close to the classrooms, a majestic elephant ear tree, shelters the outdoor amphitheatre also used for some classes.

> detailed plan of the textile & moringa workshops 40

Passed the internet café and the canteen, the line becomes narrower, indicating the more private part of the site: we‘re now under the mango-tree lined walkway, a secret orchard.


11 14

15 12 16

17

18

19

13

11. niebe field 12. concrete factory 13. carpentry workshop 14. moringa field 15. moringa workshop 16. textile workshop & shop 17. moringa & spirulina shop 18. fruit market 19. well & fresh water shop

Between the tree trunks, one can take a peek at the rural landscape, the niebe and moringa fields while the long wall of the concrete factory, emphasize the perspective on the agricultural workshops. Finally, near the end, the line breaks, gets closer to the road and hosts a market, a meeting point where is sold the school production of goods and materials.

1

> Workshops 1. west elevation moringa workshop 2. south elevation workshops 3. cross section

3

2

41


42


WORKSHOPS & EXHIBITIONS

43


01. “HELTER SHELTER”

1

2

4

3

5 > The shelter 1. Enter on the side or in the middle, pulling the lid 2. Street façade 3. Kids discovering the shelter 4. Breakfast after a night sleeping inside the shelter 5. Main entrance

44


01. “HELTER SHELTER� Sami Rintala workshop - Spring 2011 - Semester 5 Site Boulevard Raspail, Paris XIVth arrondissement Brief Design and build a cheap shelter in a short amount of time (3 days) that can resist to wind and rain while giving some intimacy to its occupants. Project The goal is to build a shelter of a comfortable size with as less material as possible, as well as a space to sit and have lunch. It has to be very cheap, all the materials used are either found on the street or garages: wood boards, chipboards, old sand bags used on construction sites, pallets, trash lid, mosquito net.

45


02. EARTH[PLAY]GROUND

> Shadow analysis of the project

46


02. EARTH[PLAY]GROUND Paolo Cascone studio - Spring 2010 - Semester 3 (featured in MARK #29) Site Village of Sourgoubila, Burkina Faso Brief Conceive a 80m pavilion, acting as a playground for kids and a resting space, using only local materials such as adobe bricks and laterite (stone). 2

Project Built with the local population and construction partner: “La Voûte Nubienne”, the project consists of 5 small pavilions. Their structure is made of equilateral arches built with adobe bricks, with a height varying from 1,2 to 3,6m. The arches are linked together by wood beams on top of which are fixated braided straw panels that create shadow and allow the inside to remain cool. The ground is also shaped with cement to create different places to sit, lay down or rest.

47


02. EARTH[PLAY]GROUND

> Construction process 48


> Project’s progress upon leaving Burkina Faso: 2 pavilions built out of 5 49


03. “Venetian DANCE”

> Exhibition “Venetian Dance” during the Venice Biennale of Architecture 50


03. “VENETIAN DANCE” Reza Azard studio - Autumn 2014 - Semester 8 Site Arsenale, Venice Architecture Biennale 2014, Italy Brief Create a photonovel about the “dérive” of a person from our fictional city discovering the streets and canals of Venice for the first time. This will be greatly inspired by Ralph Rumney’s situationist photonovel: “The leaning tower of Venice”, borrowing the same layout and aesthetic style. An exhibition entitled “Venetian Stories” presenting the studio’s photonovels from the workshop as well as the “extrapolated” city drawings will then take place from 14th -21th November 2014 in the Arsenale, during the Venice Architecture Biennale.

51


03. “Venetian DANCE”

> Exhibition “Venetian Dance” during the Venice Biennale of Architecture Project

>

A dancer from the “shadow dance” theatre in “extrapolated” Abu Dhabi, travels to Venice for the first time. She discovers the city looking at its reflections on the water from the canals and puddles. Little by little, she realises these reflections change all the time and move as if they were dancing. She is then able to communicate with the city and dance with it.

> Exhibition “Atlas, dessein de villes” at Ecole Spéciale d’Architecture Exhibitions & book After the success of “Venetian Stories”, two other exhibitions showing the “extrapolated” cities drawings were held and a book was published: - “Atlas, dessein de villes” from 3rd- 30th April 2015 at Ecole Spéciale d’Architecture, Paris - “Extrapolis”, from 2nd November - 23rd December 2016 held by Recycl’art, at Bruxelles-Congrès metro station, Brussels - “Extrapolations Métropolitaines”, (Le Cabanon, 2015) 52

All the pictures taken are upsidedown, bringing the image in the reflection at the top of the frame. Inverted like this, they give the sense that the reflection is now the “true” image, an alternate reality.


Une pièce au sol dont la représentation se déroule en six actes. Les danseurs se déplacent avec délicatesse, ils suivent une chorégraphie inspirée par la houle.

Une danse vénitienne : le clapotis donne la cadence. Ressac et averses, quelques accords. Une mélodie somptueuse qui nous berce les yeux. Flaques, canaux et lagune plantent le décor.

Tours, ponts, rues, allées et arcades, s’agitent et se contorsionnent avec aisance.

> Boards 1 & 2 of the photonovel “Venetian Dance” 53


03. “Venetian DANCE”

> Boards 3 & 4 of the photonovel “Venetian Dance” 54


> Boards 5 & 6 of the photonovel “Venetian Dance” 55


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.