1 minute read

Fig. 132: Road Network Analysis Module [1

Next Article
Abbreviations

Abbreviations

y Property Taxation:

Æ Map view of all Geo-tagged properties available along with information like Owner name, usage, property type, self/tenant, assessment, and outstanding tax amount if any.

Æ GIS system integration with the Property tax system to pull the real-time data. y Town Planning:

Æ Enablement of Planning schemes and policies.

Æ Monitoring of unauthorized constructions and encroachment using change detection.

Æ Search option to view municipal plot details.

Æ Provision for DSS system for future expansion for any city base infrastructure. y Road Management:

Æ Asset Management for road-related infrastructure

Æ Routing support to find out alternative routes in case of Jam, or emergency.

Æ Shortest path analysis from one location to another location based on network line.

Fig. 132: Road Network Analysis Module [1]

y Streetlights:

Æ Spatial analysis to get information on several streetlights within a buffer or boundary.

Æ Customized query for identification of streetlights, traffic signals etc… y Water Supply:

Æ Analysis and optimization of the water supply network to cater to the maximum area.

Æ Spatial analysis using buffer along with details like water pipeline, valve, junctions, booster pumping station, tube-wells etc.

Æ Search water treatment plant using installed capacity, year of commissioning or any other available attributes. y Sewerage:

Æ Customized query for identification of streetlights, and traffic signals

Æ On-the-fly tracing capability of network for maintenance purposes.

Æ Application of network analysis to find out the bypass line for support. y Storm Water Drainage:

Æ Thematic map view of town-level drainage data, based on the types.

Æ Extraction of maintenance schedule data for effective tracking. y Capital Project Monitoring:

Æ Marking the area of project development on the map, and monitoring the project.

Æ Dashboard showing the pie graph of the projects completed work in progress, work planned, and various filter options over the dashboard

This article is from: