My Portfolio, 2015

Page 1




















NOTES

Item

Sanitaryware and WC Accessories Schedule - B1.W.076 Item No. IAAF Req FIFA Req Qty Notes

LOW FEET/BOOTS BASIN MIXER LOW FEET/BOOTS BASIN SHOWER SHOWER CUBICLE FLOOR DRAIN

BATH SHOWER N10/32 SHOWER

Item

N10/22 N03/22 N10/32 Z01/04 N03/50

0 0 10 10 N/I

1 1 11 11 N/I

1 1 10 10 10

10 Showers + 1 Accessible Shower

N/I N/I

N/I N/I

2 2

1%

2

F02/16 - CERAMIC FLOOR TILING 5X5cm

5

F02/04 - CERAMIC FLOOR TILING NON SLIP 33x33cm

AA-74-034

1%

1%

1%

1%

1%

1%

4

ЛЮБЫЕ НЕСООТВЕТСТВИЯ ДОЛЖНЫ СООБЩАТСЯ АРХИТЕКТОРУ ДО НАЧАЛА ОСУЩЕСТВЛЕНИЯ ЛЮБЫХ РАБОТ.

F02/16 - CERAMIC FLOOR TILING 5X5cm

Item

N10/34 BATH

B1.W.076 30 m² Changing Room 3 Showers

3

ПРИМЕЧАНИЯ

BENCH (WITHOUT LOCKER) HOOK

N10/22 LOW FEET/BOOTS BASIN MIXER

HOOK

N03/22 LOW FEET/BOOTS BASIN

Item

Furniture Schedule - B1.W.079 Item No. IAAF Req FIFA Req Qty Z09/04 Z10/02

N/I N/I

N/I N/I

1 2

Furniture Schedule - B1.W.076 Item No. IAAF Req FIFA Req Qty Z10/02

N/I

N/I

4

Notes

НАСТОЯЩИЙ ЧЕРТЕЖ НЕЛЬЗЯ МАСШТАБИРОВАТЬ ЧТОБЫ ОБЕСПЕЧИТЬ ЧТО ЛЮБЫЕ РАЗМЕРЫ СООТВЕТСТВОВАЛИ ТОЛЬКО РАСЧИТАННЫМ РАЗМЕРАМ. НАСТОЯЩИЙ ЧЕРТЕЖ НЕЛЬЗЯ ВОСПРОИЗВОДИТЬ БЕЗ ПРЕДВАРИТЕЛЬНОГО ПИСЬМЕННОГО РАЗРЕШЕНИЯ АФЛ ЛТД.

Notes

NOTES: . FOR ACCESSIBLE SANITARY DETAILS REFER TO AA-74-042. . SKIRTING BOARDS TO BE CONSIDERED AT ALL ROOMS THAT DON'T HAVE A VINYL FLOOR AND/OR TILED WALLS . FIFA RECOMMENDS 2 ADDITIONAL CHANGING ROOMS, THESE HAVE BEEN INCLUDED WITH CORE FACILITIES AT ROOMS B1.W.051 AND B1.W.050

1%

1%

1%

Z09/04 BENCH (WITHOUT LOCKER)

B1.W.079 7 m² Changing Room 3 Bathing room

THIS DRAWING SHALL NOT BE SCALED TO ASCERTAIN ANY DIMENSIONS WORK TO FIGURED DIMS ONLY

ВСЕ РАЗМЕРЫ И УРОВНИ ДОЛЖНЫ БЫТЬ ПРОВЕРЕНЫ НА МЕСТЕ.

N10/32 SHOWER

N03/50 FLOOR DRAIN

ANY DISCREPANCIES ARE TO BE REPORTED TO THE ARCHITECT BEFORE ANY WORK COMMENCES

THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT EXPRESS WRITTEN PERMISSION FROM AFL LTD.

Sanitaryware and WC Accessories Schedule - B1.W.079 Item No. IAAF Req FIFA Req Qty Notes N10/34 N10/32

ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE

B

10W

11W

Plan

6

1 : 50

3D View

rev date/intls description Изменение Дата / инициалы

Описание

project / Проект

KN 125 – 08 AOC New Stadium Стадион г. Ашгабат location / Расположение

Ashgabat, Turkmenistan Туркменистан

C03/30 - GYPSUM BOARD SUSPENDED CEILING

C03/30 - GYPSUM BOARD SUSPENDED CEILING

C03/30 - GYPSUM BOARD SUSPENDED CEILING

W02/04 - CERAMIC WALL CLADDING 100x300mm

B1.W.076 30 m² Changing Room 3 Showers

Z01/04 SHOWER CUBICLE

B1.W.079 7 m² Changing Room 3 Bathing room

N10/32 SHOWER Z09/04 BENCH (WITHOUT LOCKER)

N10/34 BATH

Level B1 273020

2

W02/04 - CERAMIC WALL CLADDING 100x300mm

C03/30 - GYPSUM BOARD SUSPENDED CEILING

B1.W.079 7 m² Changing Room 3 Bathing room

Z10/02 HOOK

Room Elevation 2

N10/22 LOW FEET/BOOTS BASIN MIXER

Polimeks Полимекс

B1.W.076 30 m² Changing Room 3 Showers

N03/22 LOW FEET/BOOTS BASIN

Level B1 273020

4

1 : 50

client / Заказчик

AFL Architects 1st Floor St Georges House 56 Peter Street Manchester UK M2 3NQ

t: +44(0)161 236 6263 f: +44(0)161 236 6484

Room Elevation 4 1 : 50

w: www.afl-uk.com e: mail@afl-uk.com Liverpool office t: +44(0)151 231 6200 key plan / Пояснительный чертеж

N C03/30 - GYPSUM BOARD SUSPENDED CEILING

B1.W.076 30 m² Changing Room 3 Showers

N10/32 SHOWER

C03/30 - GYPSUM BOARD SUSPENDED CEILING

W02/04 - CERAMIC WALL CLADDING 100x300mm

B1.W.076 30 m² Changing Room 3 Showers

N10/32 SHOWER Z01/04 SHOWER CUBICLE

N10/22 LOW FEET/BOOTS BASIN MIXER

drawing title / Наименование чертежа

DETAIL ROOM LAYOUT - B1.W.076 N03/22 LOW FEET/BOOTS BASIN

Level B1 273020

Level B1 273020

dwg purpose / Чертеж - предложение

Room Elevation 3 1 : 50

5

Room Elevation 5 1 : 50

PRELIMINARY scale / Масштаб

1 : 50

@ sheet size A1 / Литст формат А1

131522

job number / Номер работы

Pr og re ss

3

drawn / Начертить

RO

rev date / Дата изменения

AA-74-034

In

1

drawing number / Номер чертежа

checked / Проверил

MR

03/10/2014

P1

revision / Изменение


NOTES ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE ANY DISCREPANCIES ARE TO BE REPORTED TO THE ARCHITECT BEFORE ANY WORK COMMENCES THIS DRAWING SHALL NOT BE SCALED TO ASCERTAIN ANY DIMENSIONS WORK TO FIGURED DIMS ONLY THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT EXPRESS WRITTEN PERMISSION FROM AFL LTD.

ПРИМЕЧАНИЯ ВСЕ РАЗМЕРЫ И УРОВНИ ДОЛЖНЫ БЫТЬ ПРОВЕРЕНЫ НА МЕСТЕ.

Item

WAITING ROOM CHAIR

Furniture Schedule - B1.G.109 Item No. IAAF Req FIFA Req Qty Z05/20

16

N/A

16

ЛЮБЫЕ НЕСООТВЕТСТВИЯ ДОЛЖНЫ СООБЩАТСЯ АРХИТЕКТОРУ ДО НАЧАЛА ОСУЩЕСТВЛЕНИЯ ЛЮБЫХ РАБОТ.

Notes

НАСТОЯЩИЙ ЧЕРТЕЖ НЕЛЬЗЯ МАСШТАБИРОВАТЬ ЧТОБЫ ОБЕСПЕЧИТЬ ЧТО ЛЮБЫЕ РАЗМЕРЫ СООТВЕТСТВОВАЛИ ТОЛЬКО РАСЧИТАННЫМ РАЗМЕРАМ. НАСТОЯЩИЙ ЧЕРТЕЖ НЕЛЬЗЯ ВОСПРОИЗВОДИТЬ БЕЗ ПРЕДВАРИТЕЛЬНОГО ПИСЬМЕННОГО РАЗРЕШЕНИЯ АФЛ ЛТД.

Z05/20 WAITING ROOM CHAIR

NOTES: . FOR ACCESSIBLE SANITARY DETAILS REFER TO AA-74-042. . SKIRTING BOARDS TO BE CONSIDERED AT ALL ROOMS THAT DON'T HAVE A VINYL FLOOR AND/OR TILED WALLS . FIFA RECOMMENDS 2 ADDITIONAL CHANGING ROOMS, THESE HAVE BEEN INCLUDED WITH CORE FACILITIES AT ROOMS B1.W.051 AND B1.W.050

2 B1.G.109 5 20 m² Station for Medical Services Waiting Room

AA-74-091

3 F02/16 - CERAMIC FLOOR TILING 5X5cm

4

C

22W

23W

Plan

1

1 : 50

6

3D View

rev date/intls description Изменение Дата / инициалы

Описание

project / Проект

KN 125 – 08 AOC New Stadium Стадион г. Ашгабат location / Расположение

C03/33 - GYPSUM BOARD SUSPENDED CEILING (WR-ANTIBACTERIAL PAINTED)

C03/33 - GYPSUM BOARD SUSPENDED CEILING (WR-ANTIBACTERIAL PAINTED)

B1.G.109 20 m² Station for Medical Services Waiting Room

Polimeks Полимекс

W04/01 - PLASTER + PAINT

B1.G.109 20 m² Station for Medical Services Waiting Room

Z05/20 WAITING ROOM CHAIR

2

W04/01 - PLASTER + PAINT

Z05/20 WAITING ROOM CHAIR

Level B1 273020

Level B1 273020

Room Elevation 2

3

1 : 50

Ashgabat, Turkmenistan Туркменистан client / Заказчик

AFL Architects 1st Floor St Georges House 56 Peter Street Manchester UK M2 3NQ

Room Elevation 3

t: +44(0)161 236 6263 f: +44(0)161 236 6484

1 : 50

w: www.afl-uk.com e: mail@afl-uk.com Liverpool office t: +44(0)151 231 6200 key plan / Пояснительный чертеж

N C03/33 - GYPSUM BOARD SUSPENDED CEILING (WR-ANTIBACTERIAL PAINTED)

C03/33 - GYPSUM BOARD SUSPENDED CEILING (WR-ANTIBACTERIAL PAINTED)

B1.G.109 20 m² Station for Medical Services Waiting Room

Level B1 273020

4

Level B1 273020

Room Elevation 4 1 : 50

5

Room Elevation 5 1 : 50

Z05/20 WAITING ROOM CHAIR

drawing title / Наименование чертежа

DETAIL ROOM LAYOUT - B1.G.109

dwg purpose / Чертеж - предложение

PRELIMINARY scale / Масштаб

1 : 50

@ sheet size A1 / Литст формат А1

131522

job number / Номер работы

Pr og re ss

B1.G.109 20 m² Station for Medical Services Waiting Room

Z05/20 WAITING ROOM CHAIR

drawn / Начертить

RO

rev date / Дата изменения

AA-74-091

In

W04/01 - PLASTER + PAINT

drawing number / Номер чертежа

checked / Проверил

MR

03/10/2014

P1

revision / Изменение


G(1) H(1) A B

20S

01-808 Maintenance Store 1 4 m²

01-303 Kitchen 13 m²

01-804 Laundry 39 m²

01-222 Showers 16 m²

01-221 Toilet 21 m²

Pitch Irrigation 01-910& Heating PlantRoom 73 m²

01-108 Stewards Office 39 m² 01-023 Corridor 39 m²

01-807 Groundsman 69 m² 01-249 Changing 5 m²

01-219 Away Team 94 m²

C

01-250 Toilet/Shower 5 m²

01-803 Kit Room 22 m²

01-503 Team Warm Up 83 m²

01-109 Stewards 29 m²

01-113 Office 9 m²

01-024 Lobby 25 m²

01-220 Massage 10 m²

01-021 Delivery 14 m²

01-223 Baths 11 m²

D

01-226 Shower 4 m²

01-907 Comms Room 10 m²

01-110 Security 19 m²

01-228 Ball Kids 2 19 m²

01-227 Toilets 18 m²

D' D''

01-909 Boiler Room 76 m²

01-805 Clean Linen Store 16 m²

01-224 Coaches Away 13 m² 01-224 Coaches Away 13 m²

01-225 Toilet 2 m²

19S

01-020 Tunnel 108 m²

01-111 Kitchen In 27 m²

01-809 Bulk Storage 40 m²

01-112 Office 7 m²

01-114 Security 11 m²

01-806 Dirty Linen 11 m²

01-302 Drinks 1 m²

01-006 Corridor 55 m²

01-007 Corridor 77 m²

18S

E' E

01-802 Store 5 m²

01-247 Mens WC 19 m²

01-104 TV Interview 10 m²

01-008 Lift Lobby 5 m²

01-105 TV Interview 10 m²

01-009 Lobby 15 m²

01-904 UPS 17 m²

01-402 Mixed Use Area 83 m²

01-248 Dis WC 6 m²

01-905 Battery Room 26 m²

01-903 Switch Room 35 m²

01-R15 Riser 2 m²

01-L5 Lift 5 4 m²

01-R16 Dry Riser 1 m²

01-908 Waste Management 38 m²

01-017 Corridor 38 m²

01-S4 Stair 4 41 m²

01-902 Switch Room 18 m²

01-106 Reception 9 m²

01-911 Plant 90 m²

01-R11 Dry Riser 1 m²

01-906 ? 19 m²

01-019 Corridor 29 m²

01-022 Lobby 11 m²

01-L4 Lift 4 5 m²

17W

01-S5 Stair 5 35 m²

01-107 Office 14 m²

F

01-R12 E Riser 2 m²

01-016 Lobby 33 m²

01-015 Lobby 9 m²

K

10W

11W

12W

13W

14W

15W

16W

FLOOR FINISHES TYPE KEY FL-120

VINYL NON-SLIP

FL-121

VINYL SAFETY FLOOR

FL-122

RUBBER STUD TILE

FL-125

RUBBER STUD TILE WITH INTEGRATED END TRIMS STAIR TREAD/RISER (SCREED MAY BE REQUIRED FOR LEVELING)

HEAVY DUTY SAFETY FLOOR

FLH-201

FLOWCRETE DECK SHIELD ID RESIN FLOOR PAINT. NON SLIP

FL-191

FLS-154

PRESS ROOMS CARPET TILES (SINGLE COLOUR 915 FOR CORRIDOR AS PER INTERNAL FINISHES SPECIFICATION)

FLH-502

PORCELAIN TILE - 1190x1190x12

CONCRETE FLOOR SEAL

FLS-151

GENERAL CARPET TILES

FLS-155

RESIDENTIAL TOWER CARPET TILES

FLH-503

PORCELAIN STAIR TREAD

FLA-701

BARRIER MATTING 16.5mm THICK

FLS-152

EXECUTIVE OFFICE CARPET TILES

FLS-156

BEDROOM CARPET TILES

FLH-504

PORCELAIN TILE - 594x594x12

FLF-150

POLYURETHANE RESIN SYSTEM

FLS-153

VIP BOX CARPET TILES

FLH-501

PORCELAIN TILE - 296x296x8.5 NON SLIP

FLH-505

PORCELAIN TILE 296x296x8.5 NON SLIP

SPORT AND PERFORMANCE FLOOR

AFL Architects 1st Floor St Georges House 56 Peter Street Manchester UK M2 3NQ

ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE. ANY DISCREPANCIES ARE TO BE REPORTED TO THE ARCHITECT BEFORE ANY WORK COMMENCES. THIS DRAWING SHALL NOT BE SCALED TO ASCERTAIN ANY DIMENSIONS WORK TO FIGURED DIMS ONLY. THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT EXPRESS WRITTEN PERMISSION FROM AFL LTD. NOTES

rev

date/intls

description

rev

date/intls

description

T1 31/07/2014 HD

Tender Issue to Client

P3 16.06.14 AG P2 22/08/2013 HD

Floor Finish Amendments in Line With Latest Architectural GAs Floor Finish Amendments in Line With Latest Architectural GAs

P1 15/11/2012 TZ

Stage D Report

rev

date/intls

description

key plan

client

FC Gabala

N

FL-123

FL-129

drawing title

STADIUM, FLOOR FINISHES, LEVEL1, ZONE1.2

t: +44(0)161 236 6263 f: +44(0)161 236 6484 w: www.afl-uk.com e: mail@afl-uk.com

dwg purpose

London office t: +44 (0)20 7490 3545

TENDER project

FC Gabala Sports Complex

location

Gabala, Azerbaijan

scale

1 : 100

@ sheet size A1

111504 job number

drawn HD rev date

checked IM

31/07/2014

AL-02-43-011.2

drawing number

T1

revision



       

 



 

 









 







 



FC Gabala Sports Complex 

Gabala, Azerbaijan 

FC Gabala

 

     

      



N



STADIUM, SANITARY LAYOUTS, ROOMS 01-206, 01-207, 01-208



Stage D Report

 





1 : 20



111504





GS





MR

21/11/2012

AL-02-74-004



P1




NOTES ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE ANY DISCREPANCIES ARE TO BE REPORTED TO THE ARCHITECT BEFORE ANY WORK COMMENCES THIS DRAWING SHALL NOT BE SCALED TO ASCERTAIN ANY DIMENSIONS WORK TO FIGURED DIMS ONLY

C

THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT EXPRESS WRITTEN PERMISSION FROM AFL LTD.

2

Duct Access Panel system - PAN-210 19mm Laminated MDF Refer to spec section K32.1205

923

928

909

580

834

886

886

886

886

886

886

873

1200

882

1207

Cubicle panel system - PAN 201 13mm solid grade laminate Refer to spec section K32.1202

WC- SAN-231

02-218 Female WC 66 m²

Vanity Unit- PAN-224

D

T1 31/07/2014 HD

Tender Issue to Client

P2 24.06.14 AG P1 21/11/2012 TZ

Updated in-line with latest General Arrangements Stage D Report

rev

date/intls

description

project

FC Gabala Sports Complex location

Gabala, Azerbaijan

8W

R8

9W

client

FC Gabala

1

Room 02-218 1 : 20

AFL Architects 1st Floor St Georges House 56 Peter Street Manchester UK M2 3NQ

Suspended Ceiling

t: +44(0)161 236 6263 f: +44(0)161 236 6484 w: www.afl-uk.com e: mail@afl-uk.com Liverpool office t: +44(0)151 231 6200

N

2400

2400

2265

key plan

drawing title

390

STADIUM, SANITARY LAYOUTS, ROOMS 02-218

D

2

Section 1 : 20

dwg purpose

TENDER

3

Room 02-218 3D View

scale

1 : 20

@ sheet size A1

drawn

GS

rev date

checked

IM

31/07/2014

111504

AL-02-74-015

T1

job number

drawing number

revision




NOTES VE RN ON

CITY HALL VIEW

ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE

ST RE

ANY DISCREPANCIES ARE TO BE REPORTED TO THE ARCHITECT BEFORE ANY WORK COMMENCES

ET

E VIL SA CO UR T

ED

T T LITTLE QUE EN S TREE

T

ET

S DO CK

RE ST

CHAPEL S TREE

EXISTING CAR PARK

QUEEN

D

EXISTING STREETS

U EN AV

MAIN BUILDING

E

PARAGON SQUARE

THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT EXPRESS WRITTEN PERMISSION FROM AFL LTD.

P osts

AR W

S OUTH S TREET

Hull Paragon HULL PARAGON INTERCHANGE Interchange. (RAIL & BUS) (Rail & Bus)

G KIN

ES ON J AM

EE S TR

S AVILE S TREET

THIS DRAWING SHALL NOT BE SCALED TO ASCERTAIN ANY DIMENSIONS WORK TO FIGURED DIMS ONLY

N

NE

PARAGON STREET

W

CR

OS

S

RE ST

ET

R ALF

P ARAGON STREET

ED

DE R G EL

S TR

EET

Posts

Y FER ENS WA

Posts

CHARIOT S TREET

HULL CITY HALL

Posts

CARR LANE Posts

LANE CARR

ROAD ANLABY

Posts

STATION VIEW ROAD ANLABY NE AM LA LE NH

STRE ET ANNE

US E LANE WATERHO

AVE NUE

OS BO

TR EE RNE S

T

CAR PARK 1

HOUS

P RINCE'S DOCK STREET

S TREET

NG HAM CO TTI

MIDLAND

UR T DG E CO OWBRI

TRIN ITY

E YA RD

P1

PO S TER

NGATE

05.02.15 GS

Rev No.

PRINCES QUAY SHOPPING CENTRE

Rev Date

ELECTRONIC ISSUE

Rev By

Description

project

Hull Music & Events Arena location

N MYTO

Hull

MELVILLE S TREET

TR

ET STRE

UN

client

P RINC E

DL

E

RE ST

DAGGER LANE

ET STRE

ER RO P

ET

CAR PARK 2

S TR EET

ROBINS ON ROW

AFL Architects 1st Floor St Georges House 56 Peter Street Manchester UK M2 3NQ

t: +44(0)161 236 6263 f: +44(0)161 236 6484 w: www.afl-uk.com e: mail@afl-uk.com

UP PE

London office t: +44(0)20 7490 3545

R UNION

MELVILLE S TREET

EAST SIDE

S TREET

key plan

Posts

S TR EE T

GR

T EA

SS PA

E AG

S TR

EE T

E CAS TL

CAS TLE S TREE T

S TRE ET

NG A TE

SEA VIEW

STR EET ADELAIDE

MY TO

TH SUN PA drawing title

Posts

HU

COG AN S

S EWE R LANE

SITE ANALYSIS

E MB

dwg purpose

R

PRELIMINARY

DO

TRE ET

MY TO N GA TE

NEW MICHAE L

NPS Group

CK RE ST

scale

As indicated

@ sheet size A1 A1

drawn

GS

rev date

checked

MR

05.02.15

ET

141510 job number

ASK-001-001 drawing number

P1 revision


NOTES ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE ANY DISCREPANCIES ARE TO BE REPORTED TO THE ARCHITECT BEFORE ANY WORK COMMENCES THIS DRAWING SHALL NOT BE SCALED TO ASCERTAIN ANY DIMENSIONS WORK TO FIGURED DIMS ONLY

N THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT EXPRESS WRITTEN PERMISSION FROM AFL LTD.

PEDESTRIANS FLOWS PEDESTRIANS ACCESS VEHICLE ACCESS

P1

05.02.15 GS

Rev No.

CAR PARK 1

Rev Date

ELECTRONIC ISSUE

Rev By

Description

project

Hull Music & Events Arena location

Hull client

NPS Group

CAR PARK 2

AFL Architects 1st Floor St Georges House 56 Peter Street Manchester UK M2 3NQ

t: +44(0)161 236 6263 f: +44(0)161 236 6484 w: www.afl-uk.com e: mail@afl-uk.com London office t: +44(0)20 7490 3545 key plan

drawing title

EXISTING VIABILITY

dwg purpose

PRELIMINARY scale

As indicated

@ sheet size A1 A1

141510 job number

drawn

GS

rev date

checked

MR

05.02.15

ASK-001-002 drawing number

P1 revision


CHARIOT S TREET

Y FER ENS WA

NOTES ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE ANY DISCREPANCIES ARE TO BE REPORTED TO THE ARCHITECT BEFORE ANY WORK COMMENCES Posts

THIS DRAWING SHALL NOT BE SCALED TO ASCERTAIN ANY DIMENSIONS WORK TO FIGURED DIMS ONLY

CARR LANE

N THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT EXPRESS WRITTEN PERMISSION FROM AFL LTD.

Posts

LANE CARR

ROAD ANLABY

NE AM LA LE NH

OS

WATERHO

US E LANE

STRE ET ANNE

FUTURE DEVELOPMENT

EE E S TR BO RN

T

CAR PARK 1 PUBLIC PLAZA

N MYTO ET STRE

HULL MUSIC ARENA

PUBLIC PLAZA

UP PE

P1

S TR EE R UNION

HULL MUSIC ARENA - OPT 3000 SEATS (90mX42m)

T

GR

T EA

SS PA

E AG

S TR

E CAS TL

ELECTRONIC ISSUE

Rev By

Description

Hull Music & Events Arena

FUTURE DEVELOPMENT

S TRE ET

Rev Date

project

PUBLIC PLAZA EE T

05.02.15 GS

Rev No.

HULL MUSIC ARENA - OPT 5000 SEATS (102mX48m)

Posts

location

Hull

ACCESS client Path

NPS Group

OPTION 3 1 1 : 1000

10,000 m

t: +44(0)161 236 6263 f: +44(0)161 236 6484

18,000 m

w: www.afl-uk.com e: mail@afl-uk.com

5,000 m 3,200 m

28,000 m

AFL Architects 1st Floor St Georges House 56 Peter Street Manchester UK M2 3NQ

London office t: +44(0)20 7490 3545 key plan

15,500 m 12,000 m 12,000 m

9,000 m 14,500 m 15,000 m

6,000 m 8,500 m

9,000 m

9,000 m

drawing title

OPTION 3

6,000 m 6,000 m

dwg purpose

PRELIMINARY scale

As indicated

@ sheet size A1 A1

141510 job number

drawn

GS

rev date

checked

MR

05.02.15

ASK-001-030 drawing number

P1 revision


NOTES ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE ANY DISCREPANCIES ARE TO BE REPORTED TO THE ARCHITECT BEFORE ANY WORK COMMENCES

SPACE FOR BARS AND SERVICES

BACK STAGE

STAGE NOTIONAL SPACE 500 sqm

900 SEATS 580 sqm

20700

THIS DRAWING SHALL NOT BE SCALED TO ASCERTAIN ANY DIMENSIONS WORK TO FIGURED DIMS ONLY

SPACE FOR BARS AND SERVICES

THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT EXPRESS WRITTEN PERMISSION FROM AFL LTD.

800 SEATS 530 sqm

800 SEATS 530 sqm

18900

18900

BACK STAGE

STAGE NOTIONAL SPACE 500 sqm

SEATS Capacity based on 1.8p/sqm 2750 STANDING 1110 sqm

39600

FOYER

800 SEATS 530 sqm

18900

STANDING AREA Capacity based on 4p/sqm (range 2.7p/sqm-5.4p/sqm) EXHIBITION FOYER

SPACE FOR BARS AND SERVICES

SPACE FOR BARS AND SERVICES

FOYER

FOYER

58500 800 SEATS - 2750 STANDING

2500 SEATS + 800 SEATS (THEATRE) - 0 STANDING

TOT. 3550 SPECTATORS

TOT. 2500 +800 SPECTATORS

1

OPTION 3A - 2500 CAPACITY

3

1 : 500

OPTION 3C - 3500 CAPACITY 1 : 500

SPACE FOR BARS AND SERVICES

P2 P1

SPACE FOR BARS AND SERVICES

30.01.15 GS 27.01.15 GS

Rev No.

Rev Date

FIRST ISSUE - UPDATE FIRST ISSUE

Rev By

Description

project

BACK STAGE

STAGE NOTIONAL SPACE 500 sqm

1500 STANDING 600 sqm

22000

700 SEATS 460 sqm

16400

CONFERENCE ROOM 800 SEATS 530 sqm

800 SEATS 530 sqm

18900

BACK STAGE

EXHIBITION HALL 2140 sqm

Hull Music & Events Arena location

Hull

18900

client

NPS Group

FOYER

FOYER

SPACE FOR BARS AND SERVICES

SPACE FOR BARS AND SERVICES

AFL Architects 1st Floor St Georges House 56 Peter Street Manchester UK M2 3NQ

t: +44(0)161 236 6263 f: +44(0)161 236 6484

FOYER

CONFERENCE ROOM

w: www.afl-uk.com e: mail@afl-uk.com London office t: +44(0)20 7490 3545 key plan

76500

76500 1500 SEATS + 1500 STANDING

800 SEATS (CONF. ROOM) - 0 STANDING

TOT. 3000 SPECTATORS

2

OPTION 3B - 3000 CAPACITY 1 : 500

TOT. 800 SPECTATORS

4

OPTION 3D - 800 CAPACITY 1 : 500

drawing title

CAPACITY - OPTION 3

dwg purpose

PRELIMINARY scale

As indicated

@ sheet size A1 A1

141510

job number

drawn

GS

rev date

checked

MR

30.01.15

ASK-002-013

drawing number

P2

revision






















Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.