Giulia Pastore architect _ portfolio 2019

Page 1

portfolio

giulia pastore


Name Address Phone E-mail Nationality Date of birth

Giulia Pastore Bethlehemstraat 3B, 3061 GA, Rotterdam (NL) 0031 647949344 giulia.pastore.email@gmail.com Italian 22/02/1983

Education May 2009

Master degree in Architecture at “Sapienza” University of Rome Score: 110/110 cum laude and publication of graduation thesis

June 2010

Architecture licence Professional qualification obtained passing the national state exam as Architect

Professional experience

Jan 2012 current

architect at NL Architects Experience in projects ranging from architectural design to interior design, from the conceptual design to design development, up to interior construction drawings. As an intern I got involved both in international competitions and commissions, joining all the stages of the design, but developing particular skills in the presentation phase, in particolar in the production of visualizations. Over the years - as I got further with the knowledge of the dutch language - my field of action shifted more and more towards commissions. The recent years were particularly crucial in my professional development, getting the opportunity to work on a big public building with an increasing degree of responsability, and in particular in the interior design, which sparkled a special interest that I would like to investigate in the coming years.

Main projects:

Groninger Forum, cultural facility in Groningen _ commission Check of working drawings (supporting role), studies for the concept of the interior design of the whole building (supporting role), interior design of the auditorium and the entrance desk (main responsible)

Spielbudenplatz, urban block in Hamburg (DE) _ competition

Concept design (supporting role), concept design of a housing block (main responsible)

”Het is nooit af”, housing block in Amersfoort _ commission

Concept design studies (supporting role), preliminary design (main responsible)

OCC Spuikwartier, cultural facility in den Haag _ competition Concept design studies (as a team member) and visualizer in the competition phase, concept interior design in the preliminary phase (supporting role)

Schiphol Holland Boulevard, design of a terminal in Schiphol _ competition Concept design studies (as a team member) and visualizer in the competition phase

Supermarket in Sanya Lake Holiday Park (CH) _ commission Design development (main responsible)

Bike parking at station den Haag HS_ commission Concept and preliminary design studies, design development studies (supporting role)

“De Flat”, renovation of the housing block Kleiburg in Amsterdam Bijlmermeer_ commission _ Winner of Mies van der Rohe Awards 2017 Concept and preliminary design studies, design development studies (supporting role), visualizer


“NUK II”, public library in Ljubliana (SLO) _ competition

Concept design of one of the two submitted proposals (main responsible)

”Columnar towers”, apartment towers in Hackney, London _ competition

Concept design studies, facade studies, landscape design studies (as a team member), visualizer

”Qube”, office building in Amsterdam Houthavens _ commission Concept and preliminary design studies, design development studies (supporting role), visualizer

June 2010 Intern at MONOLAB architects Nov 2010 (sponsored by the Leonardo Program) Mostly open competitions and research projects, always as a team member:

AirBaltic new terminal for the airport in Riga (LV) _ competition Downtown Fargo (USA), design of an urban block _ competition Sept. 2009 March 2010

Intern

at

2A+P/A

associates

Mostly open competitions and research projects, always as a team member. Main projects:

New UGM - New Maribor Art Gallery (SLO) _ design competition (in collaboration with Andrea Branzi)

Taipei Pop Music Center (RC) _ design competition

(in collaboration with Stefano Boeri and Salottobuono)

“Condominio Produttivo” (IT) _ research project in matter of co-housing

June 2009 Trainee at FP+BGB associates May 2010 Mostly refurbishment of private houses and interior design, occasionally collaboration for engineering projects, always in a role of support for the main architect / engineer:

Refurbishment of private houses in Aprilia and Rome (IT) _ commissions Interior design of a bar in Aprilia (IT) _ commission Design of a roundabout in Aprilia (IT) _ commission IBM demo centre in Rome (IT) _ commission Studies on feasibility, fire escapes, accessibility for the disabled Project of a sewer plant in Aprilia (IT) _ commission

Computer skills main:

Autocad Rhinoceros 3ds Max with vray Revit Navisworks Photoshop Illustrator InDesign

... and:

advanced user (15 years) advanced user (10 years) independent user (7 years) basic user (2 years) intermediate user (3 years) independent user (9 years) independent user (9 years) independent user (7 years)

Microsoft Excel Microsoft Words Sketchup Cinema 4d Arch+ 3dViz SAP2000

independent user independent user basic user basic user basic user basic user basic user

Congress Centre in Rome (IT) _ proposal Feasibility studies

Additional information 2014 - 2018 Home refurbishment (not to be underestimated as work experience!) 2009 Publication of my graduation thesis http:// www.vg-hortus.it/index.php?option=com_ content&view=article&id=588:la-chiesa-di-sangelo-del-pino-a-serra-san-quirico&catid=3:ilraccolto&Itemid=4 2004 Publication of an academic project: Esperienze didattiche sull’abitazione: Roma “Valle Giulia” (p.110-111), in “HoUse - spazio-ricerca” n°4 – Kappa Edition, december 2004

Language skills Italian Native speaker English Advanced IELTS certification: Proficiency Dutch Upper Intermediate (Staatsexamen NT2 II)

Effective

Operational



5

The design of the Groninger Forum was assigned to NL Architects through an invited competition in 2007. Throughout the years the project survived several crises, such as a referendum to promote the cancellation of the building and a recalculation of the structure due to a new earthquake risk in the area of Groningen. At the moment the building is finally under construction. NL Architects and ABT review the construction drawings. My role in the project: review of the working drawings.

Groninger Forum

type: review and supervision of construction drawings program: cultural facility year: 2016 - ongoing project: NL Architects and ABT Nederland


314 315

Tekeningnummer:

A3

Formaat:

Schaal:

Formaat:

A3

Schaal:

1:50

1:50

02 D

Auditorium, binnenaanzicht

Voorwand

Tekeningnummer:

301

Datum:

Datum:

15 03 2018

+7080

NL Architects

7080

300

Auditorium, binnenaanzicht

300 0

15 03 2018

NL Architects

Zijwand West

303

311

NL Architects

15 03 2018

312

Achterwand

Auditorium, binnenaanzicht

Datum:

Formaat:

A2

A3

1:50

Formaat:

Schaal:

Tekeningnummer:

1:50

Auditorium, verd. 02W

Schaal:

101

15 03 2018

Datum:

Tekeningnummer:

NL Architects

plattegrond

projectieruimte W_225

NL Architects

Tekeningnummer:

313 Datum:

Pakket voor en zijwanden 15 03 2018 Auditorium, detail doorsnede

Schaal:

1:5

Formaat:

A3

Tekeningnummer:

NL Architects

324

Achterwand

15 03 2018

Auditorium, detail doorsnede

Schaal:

1:10

Formaat:

A3

Tekeningnummer:

Tekeningnummer:

NL Architects

314

Merford deur

15 03 2018

Auditorium, detail doorsnede

Schaal:

Formaat:

1:5

A3

Datum:

NL Architects

330

Plafond pakket 1

15 03 2018

Auditorium, detail langsdoorsnede

Schaal:

Formaat:

1:10

A3

Datum:

Datum:

Tekeningnummer:

NL Architects

332

Plafond pakket 3

15 03 2018

Auditorium, detail langsdoorsnede

Schaal:

1:10

Formaat:

A3

Tekeningnummer:

NL Architects

333

Plafond pakket 2

15 03 2018

Auditorium, detail dwarsdoorsnede

Schaal:

Formaat:

1:10

A3

Datum:

Datum:


7

The auditorium of the Groninger Forum consists of a multifunctional room that will be used for different events, such as lectures, concerts, markets, dinners, theater plays and movies. An all-round projection system will be the special feature that can bring any possible scenario into the space. The challenge is to make the space flexible enough to be able to switch from a black box into a white box in order to serve such a big variety of functions. My role in the project: main responsible of the design, from concept design to execution drawings.

auditorium in the Groninger Forum

type: assignment program: interior design of an multifuncional space year: 2017 - ongoing project: NL Architects



057

9

ungninekeT

:mutaD

0.52

:laahcS

02:1

stcetihcrA LN

BB edensrooD

eitpo tiz ,dnorg enageB eilaB

The auditorium foyer features a double height space - The images in these pages are just meant as a sample dominated by the spiral stair coming up from the ground to show the way I usually approach the design in NL Architects: using renders as a tool to carry on our floor, and materialized as a treasure cabinet in its studies, in order to understand better the spaciality all - round bamboo cladding - and a lower space, where and the materiality of our ideas, but also to have a the concrete structural walls of the facade will show their common, visual ground for discussion in the team. My role in the project: main responsible for the design presence. Amongst others, we got the assignment to of the auditorium foyer, co-designer of the entrance design the main entrance desk, which is still fully ongoing. desk.

auditorium foyer and main entrance desk in the Groninger Forum

type: assignment program: interior design of the auditorium foyer and main entrance desk year: 2017 - ongoing project: NL Architects



11

Back in 2014 NL Architects pitched for the interior design of the Groninger Forum. In the design of the building the atrium is seen as a vertical version of the interstitial public space that the urban tissue of cities is made of: a series of squares, vertically stacked and reachable by a continuum of escalators. Behind, in the so called “chunks“, the ticketable functions such as cinema, auditorium, museum - intuitively take place in the enclosed spaces of the building.

Our proposal for the interior desing goes hand in hand with this concept and materializes the atrium as a neutral frame where the program - which is usually a preview of what happens in the “chunks“- takes the shape of loose objects, while the enclosed spaces will be much more expressive and materialized in an overwhelming way, so to generate a total experience. My role in the project: support by the concept design and visuals.

Groninger Forum Interior design

type: pitch program: interior design concept year: 2014 project: NL architects



zorg 32.5 m²

zorg 42.5 m²

doorzon 73.7 m²

doorzon 61.0 m²

doorzon 51.5 m²

zorg 32.5 m²

zorg 42.5 m²

doorzon 73.7 m²

doorzon 61.0 m²

doorzon 51.5 m²

zorg 38.5 m²

zorg 42.5 m²

doorzon 79.7 m²

doorzon 66.9 m²

doorzon 57.4 m²

zorg 42.5 m²

zorg 42.5 m²

doorzon 79.7 m²

doorzon 66.9 m²

doorzon 57.4 m²

doorzon 99.9 m²

doorzon 81.2 m²

doorzon 66.9 m²

doorzon 100.6 m²

doorzon 81.2 m²

doorzon 66.9 m²

doorzon 73.7 m²

doorzon 61.0 m²

doorzon 51.5 m²

doorzon 116.1 m²

doorzon 92.4 m²

doorzon 75.7 m²

gemeentschappelijke ruimte 95.6 m² entreehal 43.2 m²

13

personeel 42.5 m²

commercieel 645.9 m²

gemeentschappelijke ruimte 95.6 m² zorg 32.5 m² zorg 45.3 m²

zorg 42.5 m²

zorg 79.4 m²

Totaal 7892m2

GO 50,7 m²

WTW

WM/WD

WTW

WM/WD

WTW

WM/WD

GO 59,9 m²

GO 72,1 m²

GO 35,9 m²

GO 36,5 m²

WTW

WM/WD

WM/WD

WTW

This housing block is located in the most prominent position of the redevelopped, former industrial area De nieuwe stad, in Amersfoort, and is meant to work as a billboard for the urban project. Our proposal aims to make the industrial vocation of the area immediatly recognizable through the materialization - bare concrete - and the compositional language elaborated by studying archetypical industrial typologies. My role in the project: main responsible for the concept and preliminary design.

“Het is nooit af“ in Nieuwe Stad, Amersfoort

type: assignment program: housing block year: 2016-2017 project: NL architects



15

ST.PAULI MUSEUM

THEATER

Hotel

P.G

CafĂŠ

The competition was intitiated by a neighborhood campaign, that, after the eviction of the tennants of the plot in 2013, promoted their return on the same site, and collected their inputs through a participative design process. Our proposal is to divide the assigned plot of land into smaller parcels, so to guaranty diversity, and to organize them around a new pedestrian street, creating new room for activity. The rooftops get activated as well and form a landscape of public space on a higher level. My role in the project: concept studies, visuals

Spielbudenplatz, Hamburg, St. Pauli

type: competition, 1st prize program: urban plan for the plot of the former Esso Häuser year: 2015 project: NL architects and BeL


A

A

A

A

Zugang Parkfiction

Zugang Parkfiction

2 Zi.Whg. 56m2

c

c

2 Zi.Whg. 56m2

2 Zi.Whg. 53m2

c

2 Zi.Whg. 53m2

c c

2 Zi.Whg. 43m2 c

2 Zi.Whg. 43m2

c

Essi Kiosk Lager

2 Zi.Whg. 39m2

Zugang Wohnen

Zugang Wohnen

2 Zi.Whg. 41m2

2 Zi.Whg. 39m2

Eingang Wohnungen 55m2 Patio 150m2

1 Zi.Whg. 23,6m2

1 Zi.Whg. 23,6m2

1 Zi.Whg. 24,4 m2

1 Zi.Whg. 24,4 m2

35 m

2 Zi.Whg. 41m2

2 Zi.Whg. 29m2

2 Zi.Whg. 29m2


17

A

A

Dachterrasse 2 Zi.Whg. 43m2

2 Zi.Whg. 43m2

c

c

c Sauna

2 Zi.Whg. 29m2

2 Zi.Whg. 29m2

Following up the competition won in 2015, the team of NL Architects and BeL gets to compete again for the assignment of the single buildings.The Lüttich is a housing block dedicated to the young professionals. Particular attention is reserved to the relation with the street level: the big, sculptural canopy formed by the bowwindowed Wintergärten, and the insertion of a kiosk at the ground level, revives the role of the former Esso gas station as one of the main meeting points for the locals. My role in the project: designer of the housing block

Lüttich block, Spielbudenplatz

type: competition program: concept design of a housing block year: 2017 project: NL Architects


OCC_Indiening_H3_002zondercover.indd 8

28-06-15 20:42


19

This new cultural facility in the Hague hosts four cultural institutions, each one with its own venue and enclosed program: we propose to organize this program as a ring around the venues, to get the maximum grade of transparency in the facade. The groundfloor and first floor, dedicated to the public program, takes the shape of an articulated landscape made of height differences, voids and a stepped open theater, where the halls appear as floating or landing volumes.

OCC Spuikwartier den Haag

type: design and build tender, 1st prize program: international education and culture cluster year: 2015 project: aterlier HH and NL Architects in collaboration with Jo Coenen


dakrand 4 38700 +P dakrand 3 37200 +P dakrand 2 36700 +P dakrand 1 34380 +P Laag 6 30600 +P

Laag 5 26460 +P

Laag 4 21780 +P

Laag 3 16560 +P

Laag 2 12510 +P Laag 2 11520 +P

Laag 2

6120 +P

Laag 1

4500 +P

_Indiening_H3_002zondercover.indd 19

0

S=1:400

19

28-06-15 20:43


Gevelstudies

21

20

OCC_Indiening_H3_002zondercover.indd 20

28-06-15 20:43

The facade configurates itself as an open curtain, evoking the red curtains of theaters, and inviting the people in. The tree-shaped concrete elements it is made of, are structural, and form the exoskeleton that holds the program organized so compactly together. The result is a very open facade on the groundfloor, with a continuous terrace on the first floor that runs along the Turfmarkt and the Spui square (stadsbalkon). My role in the project: concept studies, visuals (as a team member).

28-06-15 20:43


B'

D' KC-081-03

KC-081-04

KC-081-06

KC-081-08

KC-074-08

25.0 m²

18.0 m²

18.0 m²

18.0 m²

18.0 m²

18.0 m²

18.0 m²

18.0 m²

18.0 m²

18.0 m²

18.0 m²

18.0 m²

18.0 m²

18.0 m²

18.0 m²

18.0 m²

24.0 m²

24.0 m²

24.0 m²

24.0 m²

24.0 m²

25.0 m²

>18 m² / 2,6 m studieruimtes middel *

>18 m² / 2,6 m studieruimtes middel *

>18 m² / 2,6 m studieruimtes middel *

>18 m² / 2,6 m studieruimtes middel *

>18 m² / 2,6 m studieruimtes middel *

>18 m² / 2,6 m studieruimtes middel *

>18 m² / 2,6 m studieruimtes middel *

>18 m² / 2,6 m studieruimtes middel *

>18 m² / 2,6 m studieruimtes middel *

>18 m² / 2,6 m studieruimtes middel *

>18 m² / 2,6 m studieruimtes middel *

>18 m² / 2,6 m studieruimtes middel *

>18 m² / 2,6 m studieruimtes middel *

>18 m² / 2,6 m studieruimtes middel *

>18 m² / 2,6 m studieruimtes middel *

>24 m² / 2,6 m studieruimtes groot *

>24 m² / 2,6 m studieruimtes groot *

>24 m² / 2,6 m studieruimtes groot *

>24 m² / 2,6 m studieruimtes groot *

>24 m² / 2,6 m studieruimtes groot *

>25 m² / 2,6 m leskamers, klein (gewoon) *

>25 m² / 2,6 m leskamers, klein (gewoon) *

KC-081-05

KC-081-07

KC-081-09

KC-081-10

KC-081-11

KC-081-12

KC-081-13

KC-081-15

18.0 m² >18 m² / 2,6 m studieruimtes middel *

KC-081-14

KC-081-16

KC-081-17

KC-082-01

KC-082-02

KC-082-03

KC-082-04

KC-082-05

KC-074-10 25.0 m²

DMC-62-6 6.8 m²

ALG-12 5.4 m²

SER ruimte

werkkast

8

>25 m² / 2,6 m leskamers, klein (gewoon) *

KC-074-11 25.0 m²

A'

>25 m² / 2,6 m leskamers, klein (gewoon) * 3

2

5

4

8

7

6

A'

1

9

10

12

25.4 m²

11

KC-074-32 >25 m² / 2,6 m leskamers, klein (gewoon) *

KC-074-12 25.0 m²

personenlift kooimaat 1650x2570 schachtmaat 2350x3150

goederenlift klasse B kooi/schachtmaat 2780x3900 min 2000x3000

MIVA

6

26460+P

schacht e-kast

schacht schacht e-kast

personenlift kooimaat 1650x2570 schachtmaat 2350x3150

personenlift kooimaat 1650x2570 schachtmaat 2350x3150

schacht

personenlift kooimaat 1650x2570 schachtmaat 2350x3150

e-kast

>25 m² / 2,6 m leskamers, klein (gewoon) *

7

MIVA

7´ KC-074-13 27.6 m² >25 m² / 2,6 m leskamers, klein *

KC-074-22

5

25.0 m²

KC-074-28

>25 m² / 2,6 m leskamers, klein (gewoon) *

30.8 m²

>25 m² / 2,6 m leskamers, klein (gewoon) *

KC-074-14 25.2 m² >25 m² / 2,6 m leskamers, klein (gewoon) *

KC-074-23 25.0 m² >25 m² / 2,6 m leskamers, klein (gewoon) *

KC-074-29 25.5 m²

KC-074-15

>25 m² / 2,6 m leskamers, klein (gewoon) *

KC-patio

25.2 m²

>25 m² / 2,6 m leskamers, klein (gewoon) *

298.1 m² Stuurkast

Stuurkast

KC-074-24

G'

G'

25.0 m²

4

>25 m² / 2,6 m leskamers, klein (gewoon) *

KC-080-11 14.0 m² >14 m² / 2,6 m studieruimtes klein *

KC-080-12

25.5 m²

25.4 m² >25 m² / 2,6 m leskamers, klein (gewoon) *

25.0 m² >25 m² / 2,6 m leskamers, klein

KC-074-31

roostervloer

KC-074-26

14.1 m² >14 m² / 2,6 m studieruimtes klein *

25.0 m²

Lierenkamer

Lierenkamer

KC-080-14

>25 m² / 2,6 m leskamers, klein (gewoon) *

>25 m² / 2,6 m leskamers, klein (gewoon) *

schacht parkeergarage

KC-074-18 goederenlift klasse A kooi/schachtmaat 6000x2500 mm 6800x3900 mm

KC-074-27

25.8 m²

goederenlift klasse A kooi/schachtmaat 6000x2500 mm 6800x3900 mm

>25 m² / 2,6 m leskamers, klein (gewoon) *

>25 m² / 2,6 m leskamers, klein (gewoon) *

14.1 m² >14 m² / 2,6 m studieruimtes klein *

KC-074-19

Stuurkast

Voedingskast

25.8 m² >25 m² / 2,6 m leskamers, klein (gewoon) *

26460+P

SER ruimte

personenlift kooimaat 1600x2300 schachtmaat 2300x2800

KC-080-03

KC-077-01

27.2 m²

1

personenlift kooimaat 1600x2300 schachtmaat 2300x2800

schacht e-kast

KC-074-21

KC-077-02

KC-077-03

KC-076-01

KC-077-04

KC-076-02

KC-075-02

KC-075-03

KC-075-04

KC-075-05

KC-075-06

50.8 m²

50.1 m²

50.8 m²

50.8 m²

40.0 m²

40.0 m²

31.5 m²

31.5 m²

31.5 m²

31.5 m²

31.4 m²

>50 m² / 2,6 m leskamers groot

>50 m² / 2,6 m leskamers groot

>50 m² / 2,6 m leskamers groot

>50 m² / 2,6 m leskamers groot

>40 m² / 2,6 m leskamers, middelgroot

>40 m² / 2,6 m leskamers, middelgroot

>30 m² / 2,6 m leskamers, middel

>30 m² / 2,6 m leskamers, middel

>30 m² / 2,6 m leskamers, middel

>30 m² / 2,6 m leskamers, middel

>30 m² / 2,6 m leskamers, middel

*

>25 m² / 2,6 m leskamers, klein (gewoon) *

25.0 m²

KC-080-15

DMC-62-7 8.2 m²

25.2 m²

>25 m² / 2,6 m leskamers, klein (gewoon) *

koffiecorner

>14 m² / 2,6 m studieruimtes klein *

Rollenzoldervloer 23.000+toneelvloer

c-profielen vloer

14.0 m²

KC-074-17

26.2 m²

*

KC-080-13

2

KC-074-16

>25 m² / 2,6 m leskamers, klein (gewoon) *

KC-074-25

3200

14.0 m² >14 m² / 2,6 m studieruimtes klein *

3

KC-074-30

ALG-12 3.6 m²

ondercover.indd 31

10´

KC-074-09 KC-081-02

9

*

*

*

*

*

*

*

*

*

KC-080-04

KC-080-05

KC-080-06

14.0 m²

14.0 m²

14.4 m²

>14 m² / 2,6 m studieruimtes klein *

>14 m² / 2,6 m studieruimtes klein *

>14 m² / 2,6 m studieruimtes klein *

KC-080-07

KC-080-08

KC-080-09

KC-080-10

25.3 m² >25 m² / 2,6 m leskamers, klein (gewoon) *

14.6 m²

14.0 m²

14.3 m²

14.0 m²

>14 m² / 2,6 m studieruimtes klein *

>14 m² / 2,6 m studieruimtes klein *

>14 m² / 2,6 m studieruimtes klein *

>14 m² / 2,6 m studieruimtes klein *

SER ruimte

ALG-12 15.7 m²

KC-074-20

werkkast

*

DMC-62-8 7.4 m²

14.3 m² >14 m² / 2,6 m studieruimtes klein *

C

D

E

F

G

H

I

J

K

L

verkeersruimte

N

5m

10m

M

N

O

P

Q

B'

B

D'

A

verblijfsruimtes

N

publieke openbare ruimte

OCC Commercial

Theaterzaal

vides

RO

KC

Techniek

CL6 Muziekvakonderwijs

Pp nieuw

Fietsenstalling

DMC/FoH/ Foyer

Concertzaal

Ensemblezaal

CL8 Sonologie

CL1 ensemblezaal

Techniek

Beheerdersruimte

DMC/BoH

NDT

DMC (officespace)

CL5 SvJT

CL9 Kantoren

Trappenhuis/lift

Ruimte door derden

Commercial

CL7 Dansvakopleiding

Pp oud

Loopzone / voetgangersbied

1:500

Onbenoemd 5m

Opslagruimte

15m

31

28-06-15 20:46

10m

15m


23

Following up the tender phase, Atelier HH and NL Architects got the assignment to make interior design studies (beeldkwaliteitsplan). In our proposal the halls are treated as instrument cases: hard on the outside, soft and acoustically absorbent on the inside. Each one envelopped in a recognizable volume and materialized in its own peculiar way. Besides that NL Architects is in charge of the DO design of the Royal Conservatoir. My role in the project: layout studies (as a team member), visuals.

OCC beeldskwaliteitplan

type: DO program: international education and culture cluster year: 2015 project: NL architects



25

The refurbishment of the Holland Boulevard, in the airport of Schiphol, consisted in the reorganization of the waiting area and the design - amongst others - of a new venue for the Rijksmuseum branch in Schiphol, in a new configuration that would represent the dutch identity to the tourists just landing at the airport. The waiting rooms had to be organized in two

distinct

areas: a lounge area and an “active seating� area.

Schiphol Holland Boulevard

type: competition program: refurbishment of an airport terminal year: 2014 project: NL architects



27

Our proposal is to place the lounge area behind the facade - in visual connection with the landing strip - and to give it a green, clear polder configuration. The active seating area, instead, takes shape in a cluster living rooms with a cozy caracter, but still visually connected to the more public areas. The Rijksmuseum is hosted in a black mysterious box, that through a sensor systems reveals the content with unexpected, informal transparencies, following the esthetics of the candlelight chiaroscuro, typical of the dutch painting technique. My role in the project: concept design and visuals


03

08

14

09

210

14a

4

10

400

2

floor

void

5

1

180

100

1140

1

500

1

320

1

7 outside

30

50

231

x < 100

50

2


1250

1250

60

50 12

16

60

16 60

1250

16 60

16 30

1420

18

30

18

Structural principles: overview

00 1420

14 00

14 00

29

1420

14 00

14

Family A: cantilevers

70

70

16

0 mm

70

.Principle 04

16

1480

.Principle 01

1420

16

90

12 90

12

1480

Cold restaurant 3 206 m²

90

12

0

26

52

90 1480

17 90

17

1480

90

17

40

14

1480

40

14

40

14

1480

40

14 40

14

1480

30

18 30

1480

18

30

13 30

1540

13

30

13 50

.Principle 05

1540

14 50

14

1540

50

14 50

14

1580

50

12

1250

1580

Cold restaurant 1 638 m²

1250

1580

1580

Entrance hall 138 m²

15

52260

.Principle 02

14

50

0 mm 12

1580

50 10

70

19

1580

- 50 mm

70 18

1580

10

.Principle 03

18

.Principle 06

10

15

1580

40 15

40 15

1400

40

17

40 17

1400

40 17

12

0

1400

50

29

16

20 16

1400

30 16

30 14

1490

50 14

50 14

15

20

1490

Cold restaurant 2 94 m²

50 15

1490

1490

20

-150 mm

0 mm

1490

.Principle 07 11

62

1490

1490

0

12

50 12

1490

50 12

50

13

80 13

1250

80

11

13

52

0

80 13

80

12 50

20

30

1250

B

1250

1000

7

600 3900

1500 2350

2490

1500 620

2380

2400

1300

1000 1500 1500 2350

5400

5400

1500

A

8660

:

0

87

53

SUPERMARKET, ANCILLARY SPACES

5030

SUPERMARKET, SALES AREA

R2400

en tran stre ce et from leve l

-4500 mm

10

02

50

15

16

1 1

7 4

concrete column

42

43

The supermarket is the culminating point of the green spine that runs through a big resort area in the chinese province of Hainan. Due to its position, the choise of turning it into a chunck of landscape, with its lush green roof, came quite natural. The stepping roof has also been the main challenge of the project, as the budget was limited and we had to study a way to turn its organic shape into a systematic, simple and effordable structure. My role in the project: main architect in the definitive design phase, visuals.

Supermarket in Sanya lake park

type: assignment program: retail year: 2013 project: NL architects



31

The masterplan proposed is an interconnected and dynamic system where a double dune belt constitute a first level of protection against flooding, while a hilly landscape ensures a second layer of protection for the permanent settlements. A mixed use hub connects the area to the NY subway: around this point bike and walking routes unravel over the dunes, and a bunch of seasonal cabins takes place in the summer to disappear in the winter. My role in the project: concept design studies (supporting role), visuals.

FAR ROC

type: competition program: housing, commercial year: 2013 project: NL architects, WHITE architecture, LOLA landscape architects, POSAD


A2

B

C

D

E

F

G


33

The buidling is located on the backside of the station Den Haag HS and hosts 2500 parking places for bikes and 800 sqm for retail. The program is articulated around a slab: bike racks on the roof, retail under the roof. Positiong the bike entrance to the left end of the building, and the pedestrian entrance to the right end, creates a perfect loop and prevents the two traffic flows to cross each other, making room for a pleasant square and sunny terraces at street level. My role in the project: support for the design studies of the SO, VO, DO design stages, and visuals.

Bike parking for Den Haag HS type: commission program: retail, housing year: 2013 project: NL architects



35

Resulting the density demands in a rather stocky volumetry, we chose to fragmentate the mass in a bundle of smaller towers. This choice leads also to the generation of multiple rooftops (which can be deputated to neighbourhood activities), and a better integration with the surrounding. My role in the project: design of the facade, design of the public space on the groundfloor, visuals.

columnar towers Colville

type: invited competition program: housing year: 2012 project: NL architects, What architecture



37

Kleiburg was the last flat to be renovated in the Bijlmermeer, in Amsterdam. When the crisis hit after 2008, the housing corporation that owned the building decided, under pressure of the local government and the citens’ initiatives of �Bijlmer believers�, to set aside the plan of demolishing it and sell it, instead, for the symbolic price of 1 Euro. This raised the interest of many initiatives, of which Consortium De Flat was believed to be the most valid: the idea was to deliver unfinished apartments that the tennants would have

had to complete themselves. This would mean to minimize the initial investment of the developer, producing effordable housing in one of the deepest points of the crisis in the Netherlands, but also to make the units adaptable to any possible target group, generating the social mix that the Bijlmer lacked. The DIY apartments (kluswoningen) were quickly sold out, reviving the same pioneering spirit that originally inspired the first Bijlmer believers in the 70s. The project was awarded in 2017 with the Mies van der Rohe prize.

renovation of Kleiburg

type: commission, winner of the Mies van der Rohe Award 2017 program: housing renovation year: 2011-2012 project: NL architects and XVW Architectuur


additional elevators placed in the 80s: disruptive verticality

concrete additions removed: new elevators placed inside the existing cores

stacked ‘streets in the sky’, horizontal continuity: BLISS

many small underpasses: limited in height by the ‘interior street’ at + 3meter

interior street obsolete: regrouping of underpasses to create larger openings

new perforations: scenic and generous

impenetrable storage spaces on ground level: ‘dead zone’ at the foot of the building

relocating storage spaces to upper levels: ground level free for more interactive inhabitation

plinth activated, dwellings and workspaces at ground level: friendly interface


39

The most radical change had to happen in order to restore the relationship with the street level: the storages that occupied the groundfloor were moved on the upper floors, making room for maisonette units destinated to work-living. On the exterior, instead, it was chosen to embrace the esthaetics of the building block: the external liftcases added in the 70 were removed in order to restore horizontality and the concrete surfaces brought back to life.


original unit

delivered unit

H# 132

Apartments

Circulation

Co

Live / work units

Interior “street”

Bi

Apartments

Circulation

Co

Live / work units

Interior “street”

Bi

H# 230

H# 735

original unit

delivered unit

H# 138

H# 526

H# 803

H# 906


BALCONY SIDE

GALLERY SIDE

41

original windows: closed panels new standard: original frames all glass

additional options

window options

The units were not only customizable in the layout and in the finishes, but could also be combined vertically or horizontally. On top of that the buyer could choose whether to keep the old facade module (restored and made more transparent), or go for other types they could pick out of a catalogue. The result is a differentiated overall facade that is still hold up by the monumentality of the whole: the building as an interface for urban diversification. My role in the project: assistant architect for the SO, VO, DO design, designer of the entrance halls, visuals.



43

Ljubljana’s plans for its new library were quite special: the building will rise over the roman settlement of Emona. The location is unique, but the program super dense for the maximum height requested. That is why NL Architect decided to enter with two proposals: a “safe“ one, that complies the regulations, and a more radical one. I was assigned to carry on the first one, which in principle consists in a bold extrusion of the site boundary, divided into four blocks by the Cardo and Decumanus, forming a spacious atrium that brings air and light in.

NUK II Library in Ljubljana type: competition program: public library year: 2012 project: NL architects



45

The four resulting blocks are excavated to make room for reading indoor terraces, and are connected through elegant bridges and stairs between each other and with the groundfloor. By doing so the central atrium turns the archeological site on street level into a superdinamic, interconnected galleria. The enclosed functions, instead, are mainly oriented towards the outside, but interior openings ensure the visual connection with the atrium. My role in the project: main responsible of one of the two submitted proposals, visuals.

NUK II Library in Ljubliana type: competition program: public library year: 2012 project: NL architects


Ring-A10 Houthaven

15 m in en ut

Westerpark Ring-A10

CS Anne Frank Huis Dam

Museumplein

Vergezicht West

Vergezicht Oost

Kraan actie


47

The project is located in a portual area under development: Houthavens, in Amsterdam. The design provides the building maximum flexibility inside through a column-free space. Green outdoor spaces are assured in every floor to keep always a visual contact with the water and the lively harbour activity of the area. My role in the project: concept and preliminary design studies, physical models, production of presentation material (renderings, diagrams, images).

QUBE

type: commission program: office year: 2010-2012 project: NL architects



49

7 6 5 4 3 2 1

1 2 3 4 5

mailboxes

6 7

The general concept is to keep the concrete structure of the office space as naked as possible, giving it a row industrial harbour - like character, while the cores enclose a green “treasure“ which unveals in the entrance hall. My role in the project: concept design and visuals.

QUBE interior design type: commission program: office year: 2012 project: NL architects


65%


51

100%

The school hosts a nursery and a primary school. In our proposal the required multifunctional hall gets a central role in the building: turning almost into an indoor square. By organizing the program in separate volumes joined at the center, the classrooms get maximum contact surface with the outside. The specific requirements needed to get the passive house certification (as demanded from the

client), are implemented as much as possible in the shaping of the volume: in this way the need for natural ventilation generates a volcano at the center of the primary school, and the facade exposed to direct sunlight get an arcade all around which also constitute a second playground for the kids. My role in the project: mainly visuals, some technical drawings in the design development phase.

School in Knokke-Heist

type: competition (1st prize) program: nursery, primary school year: 2011 project: NL architects


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

18m

By raising the floorheight to 4.5 m, daylight gets deeper into the building, that’s why we can make longer apartments. By making narrow apartments, 50% more apartments fit on one floor. The solution with narrow apartments


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODU

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODU

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODU

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODU

RODUCED BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCT

RODUCED BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCT

RODUCED BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCT

apartments, and doesn’t need big spaces. The block has to provide two sizes of housing unit : a small one of 14 sqm and a bigger one of 21 sqm. The first two floors are dedicated to retail and the rest (supposely three floors) is dedicated to housing. According to the building code of the area the floor surface has to be reduced of the 22%. Our strategy is to skip one floor of housing, gaining space in high. Compared

to the traditional solution of the inner courtyard, this configuration would cut the costs, having less facade and structure. he remarkable height of the ceilings on one hand compensates the pronounced depth of the apartments, allowing the daylight to shine deeper, on the other paves the way to a multitude of new configurations. My role in the project: layout studies of the housing units.

hallway house in Beijing

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCT

The project is part of the NAI Matchmaking programme with a joint venture of Chinese and Dutch architectural offices and the Chinese developer Vanke. This first specific joint project consists in the development of a large number of low cost housing units near Beijin. The typical user of the units is a young professional who needs to live in the city but cannot efford average

53

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCT

type: commission program: retail, housing year: 2011 project: NL architects



55

This proposal for the Airbaltic airport in Riga is articulated in two elements: a cartesian forest-like transparent box containing all the public functions of the airport -amongst which spaces for cultural events- and an organic shaped organism which invades the indoor space, welcoming the passangers and directing them to the launch pads. My role in the project: program studies, circulation studies, floorplans development.

Riga international airport

type: idea competition program: new airport in Riga (LV) year: 2010 project: Monolab



57

Fargo is the typical example of car driven - extensive urbanism. The aim of the competition is to create a downtown feeling in the plot under development. The strategy we chose to achieve this was to free up the street level from the cars by bringing the parking underground and create a dense, mixed-use urban tissue, with retails on the groundfloor (shopping street), offices on the first floor, housing on the upper levels, and a square and a cultural core in the hearth of the plot. My role in the project: program studies, visuals.

urban block in Fargo

type: competition program: design of an urban block year: 2010 project: Monolab



59

An urban void along the river Drava will host the new UGM gallery in Maribor, Slovenia. The intervention here presented aims to generate a high density architectonical space permeable to urban flows: the museum presents itself as an architectural wood from the ground level on, while underground is arranged as a composition of cellar spaces perforated by small and big green courts. The trees

of the wood have been conceived as devices for energy control and capitalization of renewable energies. Some of their manes act as supports for photovoltaic panels while others, designed as funnels, are the collector system of meteoric waters used for the irrigation of the green halls. Some pillars are structured as chimneys providing natural ventilation for the underground areas while others constitute lightpipes for the daylighting.

The entire project aspires to create a naturally controlled microclimate. The choice itself of an underground space wants to take the greatest advantage of the more stable climate of the underground areas taking favour from the huge thermal mass of the ground. My role in the project: floorplans design, 3d model (Rhinoceros), some of the visuals.

“art wood�, new UGM art gallery in Maribor type: design competition program: museum year: 2010 project: 2A+P/A, Andrea Branzi


SOLAR PANELS MINIWIND

PLAYGROUND AND RELAX AREAS

VEGETABLE PLOTS AND GARDENS

GREENHOUSES

HOUSING

VEGETABLE PLOTS AND SHARED FACILITIES

Parking

Gardens

Terraces

Gardens

Terraces

Gardens

Terraces

Gardens

Storages

Housing type “A”

Housing type “A”

Housing type “A”

Housing type “A”

Housing type “A”

Housing type “A”

Housing type “A”

Shared facilities

Housing type “B”

Housing type “B”

Housing type “B”

Housing type “B”

Housing type “B”

Housing type “B”

Housing type “B”

Housing type “C”

Housing type “C”

Housing type “C”

Housing type “C”

Housing type “C”

Housing type “C”

Housing type “C”

Shared facilities Retail

Greenhouses

Greenhouses

Green houses Resources


61

This research investigates housing prototypes for suburban areas, where the boundary between intensive urban tissue and extensive sprawl becomes weak. A medium density structure, generated by the melting of single housing units, and integrated with shared facilities and productive spaces, proved to be the best compromise in matter of cost-benefits. The program

was conceived and examined in such a way that the inhabitants of the condo could work as an autonomous and human scale community: playgrounds, plazas, shared facilities, greehouses, leisure and vegetable gardens are located on each level, while bigger facilities as bycicle and car parking, didactic farm, meeting rooms and sport playgrounds are gathered in the groundlevel. The roof is the privileged place for leisure but also for the

collection of renewable energies through photovoltaic panels and wind power devices. The structure consists of a primary concrete structure and a secondary steel structure for the singular units. Due to this dual structural typology, this model could be potentially used to renovate dismissed or incomplete buildings. My role in the project: program studies, production of presentation material.

condominio produttivo

type: research project program: social housing year: 2009 project: 2A+P/A



635

P

1

1

1

1

6 1

The given site is located in a complex area, undergoing a radical process of reconversion of industrial clusters, and encircled by massive tall buildings. The increasing need for open and public spaces in Taipei led to the choice of minimizing the built presence of the project, resulting in an urban void that generates new space for public users. The program is mainly developed underground,

3

2 1

consisting of concert areas, commercial activity, offices and spaces dedicated to the music industry. A high density slab is created, where highly characterized plazas and spaces for spectacle spread intensity through the whole of the area, and connectivity is provided through autowalks and escalators. My role in the project: accessibility studies of the area, design of the underground auditorium.

1

6

3 1

6 1

1

1

5

5

5

1

Taipei Pop Music Centre

type: design competition program: music industry year: 2009 project: 2A+P/A, Stefano Boeri Architects, Salottobuono

6 1


3,15

16,45

0 , 72 37 0,56 0, 0, 9 41 0,5

4

16

1

5

2,8

0,99

2,2 8

15 2,82 1,5

9 0,55

0,65

14

0,67

4

6

1,2

4

0,24

0,4

0,30

13

1,87

3,3 4 3,

1,04 1,70

12

45

4,

0,24

11 0

0,8

13

0,30

1,02

6,55

0,64

10

0,24

0,97

2,88

9

8

2,13

98

5,

7

0,97

6

0,24

2

1,9

0,30

5

0,67

0,24

4

0,32 1,11 1,76

3 1,94

2 3,6

0,32

0,24

3,8 1

2

3 3,11

2,6

0,30

3,7

1

10

1

0

2,88

8

39

99 4,

4,08

1,10

3,33

3,4

0,98

0,30

4, 23 3,7 1 0,98

0,76

0,13

0,76

18

1,95

0,72 1,46

1

4,3

8

2

10

3,

3, 10

1,3 7

18

5,

0, 73

6 3,4 3

0,7 6

0,98

7

6, 5,03

0,47

5

0,7

0,46 5

2

3,1

2, 68

0,7 3 1,26

3,13 3,23

2,1 9 3,36

9 0,98

4,2

2, 45

2,02

5

3,9

0,13

0,30

0,75

4,0 0

3,75

3,54

0,30

03

1,82 8 1,4

1,87

97 1,

5,41

0,41

4

2,24

10

7 3,5

37

4,

3,59

3,

15

1

0

5,

6 1,2

0,30

1,0

45

1,

1

0,24

4,

17

5

0,98

8

9

3

5,1

,6 11

2

32

5,

1,18

5,6 4

2,08 ,76 1

3,75

9

3,6

0,30

3

3,

0,6 7

1, 12

91

3,44

1,0 6

22

5

0,98

5

1,0

4

3,7

5

1,

12 6,

0,67

3

6

20 1,

0,98

0,13

0,00

8

4,9

3,8

0

0,9

7

17

6,

1,00

5,

75

8 04

1,

20 6,

0,00

6

0,98

0,98

8

0,8

02

1,

1,00

3,6

2,

9

0,00 0,2 6

1

3,2

0,30

3,8

1,9

0,00

11

3,91

0,19

8

0,3

0,67

6,

0,67

10

0,69

3,81

90 5,

11

6, 12

0,

50

12

47 4,

10

38

5

6

5, 31

0,01

1,8

9

1

3,4

3,93

1,83

60

0,54 0,9

1,01

13 0, 85

96 4,

0,00

8

4,21 1 2,6

2

2,

1,83

0

9

0,69

93

0,

3,7

0,79

0,67

3 2,6

5 ,2

0

1,61

0,33

0,68

7

1,9 2

88 0,

4,2

0,52

0,88

1,2 9

1

1,2

14 0, 84

1, 73 2

1,0

0,8 9

5 1, 55

2

3,9 3,60

3,69

3,63 2,92

2

0,27

1, 35

16

5,

1,8 8

4,1 7

0

4

53

2 0, 32

6

2, 4

1 1,03

7

6

1,41

14,73

7 1,8 8 2,4

2 2,03

1,4

1

2,39

1,6

4,

1 2,2

7

1, 94

4

2, 29

1,01

6

3,33

1,86

0,30

1,84

2,0

3 0,8 0,67

5 88

0,8 6 0,

10

1,03

6

2,53

1 2,22

4

12

0

73

5

2,8 1

2,38

9

4

03

080

5,04

8

00

2,

3,71

0

7

2,7

6

1,8 2,2 2

4

1,

3,06

74

1,

1 ,7

1,07

2,3

5,22 2,1

1,08

2, 49

1,69

2 7,3

4,

0,56

62

3

15,27 14,85

0,00

2,35

1,93

6

3 2

0

1

0

3,7

030 e Es

7

1,07 6

1,03

2,12

1

0,59

0 ,74

4

1,55 1,6

8

SS76

0,80 5

8 0,9 1,7

7

2

1,2

2,

SS1 6

65

8 1,1

2

1,0

1,30

6 4,5

2

3,50 4,43

0,48

3,91

6

3,6 2,45

8 0,9 1,83

2 0,7

000 1,34

3,23

010

2,17

8 1,3

3

0

1,1

FABRIANO

4,0

020 4,7

5 37 3,

90

ino

80

040 3,9

Grotte di Frasassi

5

3,43

0,47

INDAGINE MICROSCOPICA

4,

050

5 2,0

8

1

060

1,85

Gola della Rossa

4 1,0

1 1,36 1, 14

0

4

3,8

4

4,

02

100 090 0

2 3,7 2 23

0,5

4,0

0,5

2

3,83

0,7 4,

2,80

5

3,04 2,2

4 5

0 2

3

6

1 4,1

2

5 1, 95

6,

0,8

6 21

7

13

1

2

0,7

1,63

0,62

0

3,8

JESI

5

2,87 2,1

3,14

1,7

4 3 ,4 0,9

1,1 1,

0,6

6 5 0,82 4 1

2 10 0

070 4,21

SERRA SAN QUIRICO

2 0,4

1 0

6 0

2,09

1,8

7 0,7

4,24

2,92

0

1,14

1,

0,7

4

0,83

1,54 0,7 7

5

A B C D E F G H I L M N

0

3,67

5 1,5

0,6

2,43

iaria rrov a a fe n Line a-Anco Rom

3,6

3,52

1,

fium

0,87 0,

69

8

8,98

1,2 1,89 0

ANCONA

3,03

6 3,1

6,24

3,62

0,5 6

0

0,60

0,6 8

0,6 5

0,08

4,22

0,08

3

1,2


S. Angelo del pino is a dismissed religious complex in a valuable area of the medieval centre of Serra San Quirico (AN). The aim of the intervention is to reactivate the complex in order to halt the deterioration of the building, integrating at the same time the structure within the network of cultural facilities provided by the local municipality: the church would turn into a Sacred Art museum, while the rest of the complex would host a house and a private workshop, ideal for an artist who could take up the management of the museum and its didactic workshop. The project, consisting of a conservative intervention and an infill, follows a series of preparatory studies, and diagnostic investigations, resulting in a critic analysis of the building and its stratification which led to an aware use of contemporary architectural language and techniques respecting the principles of distinguishability and reversibility in matter of new infill in historical urban tissues.

65

historical study, reuse and restoration of S. Angelo del pino religious complex

type: final degree thesis program: museum, housing year: 2009 professor: prof. arch G. Palmerio



67

The project consists of a spiritual centre just outside the city of Rome. The program includes a large shopping mall, religious and spiritual buildings, leisure facilities and outdoor spaces for mass events. Places of cult and culture are integrated with commercial and exhibition areas. In a way that the complexity of the historical medieval tissues - which in the course of time proved to be successful in terms of liveableness - can be reproduced in order to turn the centre into a crucial metropolitan area. This represents the

multi-ethnic Roman society expressing the tensions animating urban communities. Religious and spiritual buildings constitute punctual, condensed interventions which shift within the extensive commercial program, generating contemplative outdoor spaces, and turning the hit-and-go mall into a rich, spiritual and stimulating environment.

spiritual centre in Rome

type: building design workshop program: commercial, exhibition, cultural, leisure year: 2007 professor: prof. arch. F. Purini



69 passer/by anchorage

metallic profile supporting barrisol ceiling and ring lighting

ring lighting row fabric

bubble chair

1 2 3 4 5 6 hairy pillow

7 8 9 10 11 12

ground lead: chain

1 2 3 4 5 6

guarnizione per il fissaggio del telo di rivestimento tubolare in acciaio a sezione quadrata, spessore 2 mm piastra bullonata in acciaio, spessore 2 mm scocca in I-mec imbottitura telo elastico di rivestimento, rimovibile e lavabile

illuminazione integrata a fibre ottiche,

7 alloggiata alla base del modulo 8 parquet in listoni inchiodato 9 sottostruttura parquet in listelli da 3x4 mm 10 moquette "Haiti" 11 parquet in listoni incollato 12 isolante acustico

CONSTRUCTION DETAIL: THE BED BOX

This intervention proposes the reuse of a restaurant into a design hotel. Due to the small size of the building, the leading idea was to design a cozy space, configuring the architectural envelope as a third skin for the user: a suspended ceiling runs all over the rooms, wearing out as an elastic tissue; masonries are mostly hidden by raw white fabric, but episodically reveal themselves showing a coarse, irregular texture, emphasized by a thin black overcoat. The whole furnishing is made of raw materials and evokes the human body. For the suite, the concept budded from the position of the room, which overlooks to the inner

court: a massive red rock seems to invade the space, revealing its presence through the windows to the outside.The element is a bed box, consisting of an I-mec body, structured with a steel frame, padded and enveloped by a soft elastic fabric. The rest of the furnishing and decorations are all in grey scale, in order to emphasize the massive presence of the red element.

hotel in Trastevere, Rome

type: interior design workshop program: hotel year: 2007 professor: prof. arch. A. Benedetti



71

The genius loci suggested to conceive a non impositive architecture, which could be perceived as a natural, spontaneous superfetation of the site. An ancient tunnel structure located in the area, made of masonry vaults, suggested the idea of a rib cage for a church: the structure which in the human body is meant to contain vital organs and

support breathing movements, turns architecturally into an intimate space, which leads the religious community to participate spiritually and emotionally. As the building is an expression of organic architecture, the project materials are traditional, eventhough construction techniques are contemporary: glued laminated timber for the structure, wooden panels for the architectural

envelope, masonry for the basement walls. The typology for the structural joints was chosen in order to recall the connections between vertebras and ribs. Natural light filters from above through the “vertebras�, illuminating punctually the altar and the central space, and laterally from the gallerias, refracting from the masonry walls and diffusing through the whole indoor space.

church in Monte Cavo, Rome

type: building design workshop program: catholic church year: 2006 professor: prof. arch. P. Portoghesi


Giulia Pastore e-mail: giulia.pastore.email@gmail.com mobile phone: 0031647949344 address: Bethlehemstraat 3b 3061GA, Rotterdam


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.