1 minute read

PUMPS & VALVES Building revamp repositions KSB for the future

Amajor renovation is underway to transform KSB Pumps and Valves’ (KSB’s) building in Activia Park, Germiston, into a modern and collaborative workspace.

Advertisement

“First occupied in 1970, the multistorey building was originally designed as a stores building and was not completely suitable as an office space. We realised the need to bring our admin staff together in one building and create a workspace that aligns with the future of work,” explains Terence Barkhuizen, facilities development manager, KSB, adding that the construction programme is due for completion by the end of April 2024.

“We are moving away from the traditional cellular office environment and incorporating contemporary ergonomic and flexible desks, kitchenettes, printing areas and quiet spaces on each floor,” he continues.

The revamped building will feature four floors, covering approximately 2 890 m², and accommodate around 100 staff members. Furthermore, the renovation project aligns with KSB’s commitment to sustainability and energy efficiency. In this respect, the fully glazed outer skin, along with a maintenance walkway acting as a shading device, will minimise glare and solar exposure. “We will also collect roof water for pump testing and capture rainwater run-off for landscaping, water features and irrigation," Barkhuizen continues.

KSB is still finalising the exact opening date and will keep stakeholders informed as the company progresses towards this exciting milestone. “We cannot wait to see our revitalised building come to life and witness the positive impact it will have on our employees and customers," Barkhuizen concludes.

Welding offers numerous benefits, such as providing a seamless and reliable joint, improving pipe strength and durability, and reducing the risk of leaks and failures

This article is from: