Mistakes To Avoid During A Shower Remodel Project In Aliso Viejo

Page 1

MISTAKES TO AVOID DURING A SHOWER REMODEL PROJECT IN ALISO VIEJO


MISTAKES TO AVOID DURING A SHOWER REMODEL PROJECT IN ALISO VIEJO • A PROPER PLAN IS VERY IMPORTANT IF YOU ARE PLANNING FOR A SHOWER REMODEL PROJECT IN ALISO VIEJO. BECAUSE THIS PROJECT CAN BE COSTLY, YOU CANNOT AFFORD TO APPROACH IS HAPHAZARDLY. YOU NEED TO SELECT THE BEST DESIGN, MATERIALS AND HIRE THE RIGHT PROFESSIONALS IF YOU WANT TO GET GREAT VALUE FOR YOUR MONEY FROM THIS PROJECT. FAILURE TO HAVE A PROPER PLAN CAN RESULT INTO UNEXPECTED COSTS THAT MAY SPIRAL OUT OF CONTROL AND LEAD TO DISAPPOINTING RESULTS. • THERE ARE VARIOUS MISTAKES YOU WILL NEED TO AVOID DURING A SHOWER REMODEL ALISO VIEJO PROJECT. THE FIRST ONE IS MOVING BATHROOM FIXTURES. IN A BATHROOM REMODEL PROJECT, ONE OF THE MOST EXPENSIVE ITEMS IS THE COST OF NEW PLUMBING. FOR INSTANCE, WHEN YOU DECIDE TO MOVE A SHOWER OR SINK FROM ITS ORIGINAL LOCATION, YOU AUTOMATICALLY INCREASE YOUR TOTAL RENOVATION COSTS. SO BEFORE YOU MOVE ANY FIXTURES IN YOUR BATHROOM YOU NEED TO FIGURE OUT WHETHER IT IS A TRUE NECESSITY THAT WILL HAVE A HUGE IMPACT ON THE VALUE OF YOUR BATHROOM.


MISTAKES TO AVOID DURING A SHOWER REMODEL PROJECT IN ALISO VIEJO • THE SECOND MISTAKE THAT YOU CANNOT MAKE DURING A SHOWER REMODEL ALISO VIEJO PROJECT IS STARTING WITHOUT HAVING A CLEAR REMODELING PLAN. IN CASE THE PROJECT WILL INVOLVE MOVING FIXTURES, WALLS AND SO ON, IT IS A GOOD IDEA TO LOOK FOR A PROFESSIONAL DESIGNER TO HELP YOU DRAW A CLEAR PLAN THAT INCLUDES EVERYTHING THAT YOU WANT. YOUR PLAN SHOULD TAKE INTO ACCOUNT PLUMBING, ELECTRIC WIRING, WINDOWS AND DOORS. WITHOUT A PROPER PLAN, YOU MAY RUSH INTO THE SHOWER REMODEL PROJECT, TEAR DOWN WALLS, AND LATER ON REALIZE THAT THINGS ARE NOT LOOKING EXACTLY AS YOU EXPECTED. • LAST BUT NOT LEAST, YOU SHOULD NOT MAKE THE MISTAKE OF HIRING A SHOWER REMODEL ALISO VIEJO CONTRACTOR WITHOUT AGREEING TO A FIXED FEE. WITH EACH PROSPECTIVE SHOWER REMODELER, YOU NEED TO DISCUSS AND PUT IN WRITING A DETAILED CONTRACT THAT SPECIFIES THE ITEMIZED LIST OF TASKS AND THEIR COSTS, A CLEAR CHANGE-ORDER POLICY, AND AN ITEMIZED LIST OF MATERIALS AND THEIR COSTS.


MISTAKES TO AVOID DURING A SHOWER REMODEL PROJECT IN ALISO VIEJO • FOR MORE INFORMATION ON THE MISTAKES TO AVOID DURING A SHOWER REMODEL PROJECT IN ALISO VIEJO, VISIT OUR WEBSITE AT HTTPS://WWW.DURACAREBATHS.COM/


MISTAKES TO AVOID DURING A SHOWER REMODEL PROJECT IN ALISO VIEJO


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.