OVERVIEW
Water A new dam is to be built on the Crocodile River.
R
apid growth in the Ehlanzeni District Municipality has led the Provincial Government of Mpumalanga to decide to build a new dam on the Crocodile River in the City of Mbombela. Citizens of the Thembisile Hani Municipality will get more immediate relief from water shortages with the construction of a treatment plant on the Moses River. Acting on a disturbing report published by the Centre for Environmental Rights on the way some mining companies are using water, a provincial Environmental Management Committee has been appointed to conduct environmental impact analysis and assess climate change threats. NuWater was contracted to reduce waste at the water treatment plant for Emalahleni Municipality. An ultra-filtration technology was used to reduce waste from 20Ml/day. A total of 327 water infrastructure projects benefiting 350 259 households have been completed, with a further 165 sanitation projects finalised. A bulk water supply system connecting villages within the Bushbuckridge area has been completed. National government has subsequently disbanded the Bushbuckridge Water Board and Rand Water has taken over its operations. A joint project with Eskom related to rain-water harvesting will also create jobs. The Siyasebenza Job Creation Initiative is intended to create 900 jobs in the Nkangala District Municipality. The Komati Basin Water Authority (KOBWA) is an important agency
ONLINE RESOURCES De Hoop Dam: www.dhcw.co.za Inkomati-Usuthu Catchment Management Agency: www.iucma.co.za Komati Basin Water Authority: www.kobwa.co.za National Department of Water and Sanitation: www.dws.gov.za
35
SECTOR INSIGHT An Environmental Management Committee has been established. in controlling water resources in the region. Formed out of a cooperation agreement between South African and Swaziland, the agency has built two large dams and is responsible for their upkeep. The Imkomati-Usuthu Catchment Management Agency covers Mpumalanga, parts of Limpopo and part of the Kingdom of Swaziland and is responsible for water usage issues relating to the following river catchment areas: Sabie-Sand, Crocodile, Komati, Nwaswitsontso and Nwanedzi. T h e D e H o o p D a m is t h e centrepiece in the large Olifants River Water Resource Development Project (ORWRDP) which is transforming the water environment for industrial, commercial and private users. As the catchment area for this huge scheme is to the north of Mpumalanga, the spinoff effect on the province is significant.
MPUMALANGA BUSINESS 2017/18 MPUMALANGA BUSINESS 2019/20