Portfolio Gniewosz Plucinski

Page 1

1,008

1,135

1,565

1,135

50mm service zone behind boiler for pipework

WF6

DF10

RWP

Second bedroom window to south elevation only

WF5

SVP

FORT STREET MOTHERWELL

1,227

562

GP

1,135

50

2,600

Bedroom 2

SD

Isolator for future shower

P

Door bell chimes at high level

FDS30 P

553

DF5

600

DF9

552

DF2

910

P

WF3

DF3 min. 300mm

Attic hatch

DF1

DF8

FDS30

1,000

DW or TD

75mm acoustic quilt to all bathroom walls.

DF4

FDS30

P

900

CO positioned to manufacturer's instructions

Service zone to full length of party wall.

WF4

3,013

1,895

P

1,135

F

W

2,100 Box in pipework

PSV PSV

2,700

GP

1,227

FDS30

DF6 2,715 Service zone to full length of party wall.

Bedroom 1

DF7

P

P

P1

DB

TV

RWP

WF1

440

1,922

553

CAIRN HOUSING ASSOCIATION

4,050

3,362

P

P4

WF2

676

1,585

2,690

Cottage flats plan - Upper Floor

8,432 1,227

1,135

1,227

1,135

1,565

1,135

Brick dimensions

Refer to detail 19

50mm service zone behind boiler for pipework 1.8x1.2 platt

Boxing out of pipework

WG4

WG5 B

SVP

DG 10 W

P

P2

Shaver point

Bedroom 2

Storage.

FDS30

DG3

2

2

1,000

DG 9 2

FDS30 2 P

DG5

1,400 Service zone to full length of party wall.

DG8

1,436

450 BT

P4

SD

min. 300mm FDS30

DG7 EM

DG4 Isolator for future shower

SD

Service zone to party wall

Soundblock fire wall to underside of stair.

4,315

Brick dimensions

DG2

P

300

1.2x1.2 platt

1,265

DG1

RWP

DW or TD

339

DB

P

1,498

3,362

337

P5

CO positioned to manufacturer's instructions

P1

P

DG6

1,022

2

2,100

Door chimes at door head height

2,015

75mm acoustic quilt to all bathroom walls.

1,795

2,600

2,700

P2

F

For fence position see dwg no. P/06

9,767

KGP GPK

RWP

P

GM

5,052

Bedroom 1

WG2

400

RWP

TV

450

900

P1

EM

DG11

327 GM

BT

1,218 22

440

460

WG3

max 2m

low level radiator

Brick dimensions

667

1,022 2,240

RWP

Refer to detail 19

WG1 1,585

552

TV

676 552

1,922

440

Brick dimensions

2,710

2,915

568

DALLMAN JOHNSTONE Cottage flats plan - Ground Floor

ARCHITECTURE PROJECT MANAGEMENT REGENERATION


1,452

1,135

1,453

1,135 SVP

RWP

WF3

FORT STREET MOTHERWELL

Refer to detail 19

Box out pipework

WF4 50 2,245

450 75mm acoustic quilt to all bathroom partition walls

PSV

PSV

P

P

Shaver point

3,990

Tiled shelf

PSV

DF4 Intermediate switch

DF7

PSV 3

3

DF3

Bedroom 3

792 Future Stair lift provision

Attic hatch

Isolater for bathroom shower

1,305

3,298

P

Attic hatch

PSV

2,481

P

DF5

1,300

P

1,190 3

SD

DF2

DF6

Sunpipe

Bedroom 1

Sunpipe

DF1

CAIRN HOUSING ASSOCIATION

P

DF8 75mm acoustic quilt to bedroom partition walls

2,934

Bedroom 2

4,097

Bedroom 2

3,397

P

P

2,663

WF2 1,585

1,463

893

3,037 Brick sizing dimensions

WF1 1,002

1,360

782

3,145

Refer to detail 19

Brick sizing dimensions

Typical house plan - Upper Floor 6,182 overall size RE

1,360

2,128

1,022

Brick sizing dimensions

400

N

1,452

RE RE

RE

WG6

SVP

RWP

P2

W

DW

P1

659

P5

4,299

Refer to detail 19

DG8

CO positioned to manufacturer's instructions

DG5

2

2

4,131

P

P

P

EM

P2

75mm acoustic quilt to wc partition wall

DG7

F

2

DG4

2

P

1,009

75mm acoustic quilt to wc partition wall PSV

PSV

1,603

PSV

WG5

TD

Gas connection for cooker

X

P

400 DB

Service zone to inner leaf of external kitchen wall to accommodate services. Extends to 50mm behind boiler

SVP

RE

DG6

TV

P

STORAGE

1,000

SD

3 2

DG 3

2 2

WG4

2

2 P

P

DG1

Refer to detail 26

WG1

1,022

MK grid plus metal clad front plate

D.I.C.

immediately inside curtilage

2 2

DG 2

445

1,523

1,200

RE

3

Door chimes at door head height

300

252

1,401 BT

WG3

WG2

GM

min. 300mm

2

1,851

Provision for future stair lift

P

D.I.C.

STORAGE

P

4,152

All pipework to be enclosed and not to perforate external walls or party walls. No perforations of any kind through party walls.

TV

P

770

For fence position see dwg no. P/06

Refer to detail 19, 26 and 40

Brick sizing dimensions

778

1,810 3,037

890

685

440

1,022

557

3,145

Typical house plan - Ground Floor

DALLMAN JOHNSTONE ARCHITECTURE PROJECT MANAGEMENT REGENERATION


2

1

ARCHITECT: Dallman Johnstone Architects

Allander Surgery W:17

1,600 700

600

600

Consultants Room 5

Treatment Room

34TV

35

36

A

794

MJ

W:11

FES. D:28

1,012

2,023

896 173

780 672

6,853 1,500

FES.

D:26

Administration

14.87 m2

4,885

FDS30

D:12

52.48

1 T. @ 350 mm

MJ

3

52.47

Manager

5,253

4,675

2,430

Shower room 2.83 m2 1,790

MJ 52.55

2 R. @ 110 mm

990

2.30 m2

52.55

1,500

52.825

D:15

10.87 m2

D:19

1,500

6,211

866 D:01

FDS30 D:13 866

FDS30

Boiler room

2,578

33

1,955

2,475

Storage

D:31

5,695

32

Disabled toilet

1,615

FDS30

1,340

Staff Room

8

7

552

30

D:10

D:25 FDS30 866

685

400

31

15L/s

Male toilet 1,000 2,000

W:12

600

29

300

6

1

D:20

comm

F

60L/s

4

9

5

1

W:03

2,070

D:11

60L/s

Female T.

600

857

2,240

400

D:21

15L/s 1,000

1,135

MJ

4

38

MJ

4,950

694

D:22 FDS30 866

D:18

910

2 27 28

Cleaner's

waiting area 36 persons

37

FDS30

D:23

4,700

(suspended ceiling)

W:13

1,453

Storage

B

52.55

3 F.F.L. 52.825

Disabled toilet

1800mm turning circle

10

25

1,095 694

910

W:25

694

D:24

11

26

min. 2000mm

3

12

780

13

573

14

What the patients need: - Easy orientation - Provision of privacy & dignity - Comfortable environment - Natural light - Calm building - Healthy materials

1,473

15

173

16

W:02

17

18

19

173

20

21

24

52.51

685

23

Storage

22

Storage Space

1,500

1800mm turning circle

1,013

MJ

D:27

Circulation

2

W:01

866 D:04 FDS30

D/04

1,796

866 D:05 FDS30

E

D:17

866 D:06 FDS30

E

1,600

E

1,600

800

E

D/04

Position of CWS above.

Meeting Room

W:21

Consultants Room 3

FES.

5

2,915

1,600

4,837

700

800

80 0

1,560

MJ

1,840 700

1,272

1,235

800

D:34 FES.

300

844 D:30 FES.

EXIT

1,452

FDS30 D:09 866

52.54

E

3,456 1,600

910

W:15

1,115

866 D:07 FDS30

MJ

E

910

1,600

600

4,735

600

1,600

Consultants Room 3

E

866

52.55

1,840

E

800

D:08 FDS30

2,127

W:19

E

3,456

MJ

860

W:20

Dado trunking

Sill 900

Consultants Room 2

E

Dado trunking

1,840

1,840

700

144

Consultants Room 1

1,022

3,437

W:18

1,840

1,840

1,600

700

1,590

173

Dado trunking

600

600

E

1,600 3,365

3,426

staff

910

0 S3 FD 866 03 : D

future expansion

3,815

173 MJ

W:16

F

ched)

3,426

E

TV

r future Extension m2

910

MJ

52.55

W:15

1,565

173

EXIT

MJ

public

910

D:16 FDS30

1,147

3,430

Dado trunking

52.55

3,815

173

What the doctors need: - Healthy building - Low maintenance - Flexible for future change - Sustainable - Energy efficient - A functional building - Good working environment - Safe for staff & patients

1,115

910

CONTRACTOR: David H Allan

866 D:02

1,565

173

QUANTITY SURVEYOR: Doig & Smith

D:14

910

STRUCTURAL ENGINEER: Roy Easton & Company

900 1,500

doctors

3,000

2,265

What does the Health Board Need: - A building that promotes good health not dis-ease - Good value for money - Low maintenance - Flexible enough to allow for change - Sustainable - Energy efficient which allows for cost savings year after year

15L/s

W:10

W:09

W:08

MJ

W:07

W:06

W:05

W:04

MJ

52.55

- Through careful planning circulation reduced to 12.5% (32% allowed) this allowed more space for working at records A and also a spacious meeting room B within the overall area allowed by the Health Board.

We can walk you through the space with a 3600 3D image.

4

T: 0141 942 3025 F: 0141 942 8777 E: studio@dallmanjohnstone.co.uk W: dallmanjohnstone.co.uk The Studio, 24 New Kirk Road Bearsden Cross Glasgow G61 3SL

5


Gniewosz Plucinski

Private Houses

Before Tyvek sarking membrane 18mm sarking board Marley Eternit continuous rafer roll Tilting fillet Marley Eternit felt support tray 325mm strip of BS8747 Type 5U or equivalent UV durable underlay dressed into gutter Marley ludlow major eaves clip Marley Eternit 25mm over fascia strip ventilator

Protan sealant Protan termination bar

Gutters temporary removed for access

200mm rafters Fastener with weatherproof washer min. 150mm

10mm plywood

Protan fleece 40mm weld

Protan cover strip

Protan membrane 40mm weld

Protan membrane 40mm weld Protan membrane

Protan restraint bar & fastener

Protan cord Protan restraint bar & fastener Protan cover strip 40mm weld

After - visualization 50mm Kingspan TR21LPC/FM or Quinntherm QF Protan vapour control layer 10mm plywood 150mm Kingspan K7 or Quinntherm QW 12.5mm plasterboard

timber joists, heights vary to form water fall

150

150mm rafter ties

See spec. par. 6. Single ply membrane gutter & 150mm upstand

see spec. par. 6.

see spec. p. 6.15.

new fanlight

insulated wall see spec. p.4.6.

Sunroom

Utility

Garage

Gound level to be lowered by 150mm & gravelled

Insulated door & draught seals

see spec. par. 4.

see spec. p. 3.10. timber finish new concrete foundation

telescopic air vent see spec. p. 3.15. speaker point (ceiling height) speaker point (floor level)

assumed line of existing drainage

Existing hearth

one way switch two way switch

new gas fire & vent through floor-min.10cm2 air vent size

dimmer switch light fitting All new fixed light fittings installed to be low energy type. Internal Kosnic 4W LED GU10 lights. 4000K Cool white.

GM

gas meter existing floor hatch removed

Door re-hung

F

V

light fitting with move detector light wall fitting

Fz

low level double socket with high level switch

extractor fan placed at min.1,7m height

non combustible hearth min. 125mm thick concrete slab

V

high level double socket pop-up 3 point power point

150

underfloor ventilation duct

new partitions

V

telephone point

Kitchen

TV RE

V

150

existing fire place opened

wall infilled

SD

V

Study/bedroom 3

V

SD

Aga cooker mains supply connect point with high level switched fuse

new walls

PIR TV

new floor hatch

wc

V

V

V

telescopic air brick ventilators 215x65mm

WP telescopic air brick ventilator 215x65mm

WP

new fanlight

smoke detector sub floor access below doors

new rooflight

wall removed

door removed, wall infilled wall infilled door removed opening widened, new glazed doors TV & power point eye level mounted

ventilation extract fan

V

activity space 800x1100

TV point rodding eye

150

B

AGA Total Control comply with AGA installation guide

PIR

A

pipe chase under wall units lights

50mm insulated door with 10mm ply facing & draught sealed

3x100x250

-0.300 window infilled & new door

TV

A

existing stone retained below worktop height

A

Sun room

DW

new rooflights

RWP

RE

Utility

RE

W

RWP existing walls removed

Âą0.000 window removed wall infilled with stone & lime mortar to match existing

existing drainage pipes cut below floor & sealed existing lathe & plaster removed new insulation & plasterboard fitted, see spec. point 4.2.

Garage

-0.440

-0.300

Broom cupboard

V

F/Fz

House Extension, Bearsden

SVP tap repositioned

-0.300

-0.540

B

A

RE

RE

900

folding sliding doors see spec 10.1. Cill to be fixed

DALLMAN JOHNSTONE ARCHITECTURE

PROJECT MANAGEMENT

INTERIOR DESIGN


Gniewosz Plucinski

Private Houses After

A63

Before

brick sizes

3,712

TO TURN OUT Sub floor ventilation extended by 100mm dia. duct

3712

Sub floor ventilation extended by 100mm dia. duct

Sub floor ventilation extended by 100mm dia. duct

450

brick sizes

2,372

890 A62

B

A

A62

existing boundary Sub floor ventilation extended by 100mm dia. duct

RWP

RWP

rooflights over kitchen worktops

RE

1,180

floor sockets existing drainage extended to new rodding eye PIR existing utility removed

new dining

existing conservatory removed

V

new kitchen

4,152

3,900

new sitting room

F

SVP

brick sizes

PIR

New rooflights

C

C

wall removed

Sub floor ventilation extended by 100mm dia. duct

cupboard removed

O

Sub floor ventilation extended by 100mm dia. duct

O

new study 910

new larder

V

existing svp removed

new boiler position activity space

new

vent grille above door manouvering space

Fz

TV room new beams

D01

V

Sub floor ventilation extended by 100mm dia. duct

797

manouvering space

walls removed

1,678

utility

DW

hall

Sub floor ventilation extended by 100mm dia. duct

W

A

TTO

wall removed

1,126

en-suite

V

RWP

150

SVP

150mm lead upstand

Refer to specification paragraph 5.

14째

kitchen

larder

Smooth red engineering bullnose brick cill

Existing sub floor ventilation extended via new flat ducts through floating floor construction.

Refer to specification paragraph 3.

House Extension, Bearsden

DALLMAN JOHNSTONE ARCHITECTURE

PROJECT MANAGEMENT

INTERIOR DESIGN


Gniewosz Plucinski

Private Houses

Visualization

Code 5 lead to roof

Code 8 lead to gutter 200

185 142

124 220x47 C16 joist 00

min overlap 75mm

20mm ply for painting. Primed prior to installation.

200x75x23 PFC

25mm continuous eaves vent insect screen vent

Code 8 lead to gutter 200

185 142

min overlap 75mm 42

220x47 C16 joist

75

Code 5 lead to roof

220x75 timber beam bolted back to steelwork 15mm painted ply panelled soffit. Primed prior to installation. Plasterboard ceiling

00

Code 5 lead cladding Geotextile felt underneath lead to LSA's recommendations Min overlap 75mm

200x75x23 PFC

Plasterboard 12.5mm Vapour control Layer 150x75 PFC 150x50 timber

25mm vent insect screen vent

Fillets @ 400mm

25mm continuous eaves vent insect screen vent 220x75 timber beam bolted back to steelwork Painted ply panelled soffit. Primed prior to installation. Plasterboard ceiling

Direct glazing

Eternit grey cill 165mm

Code 5 lead cladding Geotextile felt underneath lead to LSA's recommendations

DPC

Min overlap 75mm

195x50 timber

cavity barriers giving 30 minute fire resistance wrapped in DPC Vapour control Layer

insect screen vent

REFLEX vapour permeable membrane (with a vapour resistance of no more than 0.25 MN. s/g)

Lead (code 5) on geo textile layer to LSA's recommendations 20mm ply min 50mm ventilated space to be maintained throughout tapered battens min of 50mm at low end to allow for ventilation Breather membrane 100mm Kingspan TP10 Vapour control layer Roof deck Roof structure to engineer's recommendations

Roof vent

Code 5 lead flashing with min150mm upstand raggled into existing wall

Lead (code 8) to gutter

D02

New plasterboard ceiling Walls to be strapped and lined

Existing door New FFL to be 170mm below existing living room FFL 300

D03

DPC Perp vents at 900ctr

DPC

DPM linked to DPC

Floor brought to single level (existing loggia steps removed). Break out floor to incorporate new underfloor heating system

150mm Hardcore 50mm sand blinding 100mm concrete slab min 150mm ventilated space beam and block floor system 75mm Kingspan TF70

Dwarf wall to hold beam end Existing foundation extended to incorporate dwarf wall All new timber windows to achieve u-value of 1.8W/m2K

75mm area for under floor heating stone floor

Garden room, Bearsden

DALLMAN JOHNSTONE ARCHITECTURE

PROJECT MANAGEMENT

INTERIOR DESIGN


Gniewosz Plucinski

Private Houses

Before

After - visualization

Refer to Specification, point 7.2.

Kingspan Nilvent Breathable sarking membrane. Horizontal lap between runs of breathable sarking membrane with 75mm wide double sided acrylic adhesive tape.

Refer to Specification, Paragraph 5.

Glazing to south gable

New timber trusses stained black

LV cable lighting

2x25mm Kingspan K7 insulation inside steel beam 1x25mm Kingspan K18 insulated plasterboard to inside face of steel flanges Galvanized steel beam exposed 1x25mm Kingspan K18 insulated plasterboard to inside face of steel columns

2,560

Wall re-built Roughcast

DPC injection

Refer to Specification, paragraph 2.

Granite sets bedded on mortar

Garden room, Clahan of Campsie

DALLMAN JOHNSTONE ARCHITECTURE

PROJECT MANAGEMENT

INTERIOR DESIGN


Gniewosz Plucinski

Private Houses

Before

After - visualization

RWP

Boiler RWP

WP

F

Phone socket removed & power points removed

DW

W

R Bathroom

Kitchen

new boiler

R

R

Bedroom

R

E 350

350

350

R

electric meter & fusebox repositioned

SVP

1,000 activity space

E

V SD

Power point removed

door re-hung

Hall new beam, refer to engineer's drawing

R

walls removed

Dining

350

door removed wall infilled

new beam

RWP

min.840 150 300

SD

150

R

350

RWP

R min.840

Bedroom E

Existing stove & hearth repositioned. Hearth - min.125mm thick con Non combustible solid decorative finish arround stove. New double wall flue - distance of min.25mm is required between fl and any combustible material where flue penetrates roof & ceiling Spillage test required to living/kitchen/dining after works completed to determine the internal/external pressure difference which caused various thermal outputs. The test to be carried out in accordance with BRE paper IP 7/94.

Living room

RWP TV

Renew aerial

350

U-value 1.8 W/m2K

E

Stair ballustrade replaced

LED light fitting LED wall light fitting

timber deck

3,100

LED floor light fitting 1 gang 1 way switch 1 gang 2 way switch low level double socket high level double socket V

extract fan

E

external lights on a solar controller time clock with PIR & switchable over-ride

6,150

smoke detector phone socket

House Extension, Strachur

DALLMAN JOHNSTONE

TV point

outside tap

ARCHITECTURE

PROJECT MANAGEMENT

INTERIOR DESIGN


Gniewosz Plucinski

Private Houses 120mm TW55 Kinspan Thermawall

Breather membrane/Tyvek Reflex

25mm air space

Brick tie Cullen B50/304 SS with SS nails

9.5mm Ply Sheathing 12.5mm/60mm Kooltherm K17

12mm Ply Sheathing Bottom rail Locator plate specified

Skirting board Seal 18mm floor decking Vapour control layer 110 mm Kingspan Thermafloor TF70

Insect mesh to ventilation of timber cladding Header joist

18mm ply decking

perpend vent @ 900 crs

200mm Mineral wool

Sole plate

Floor joist

Periscope vent

Netlon

Min.150mm

DPC

100 mm concrete slab DPM

Flashing

Sarnafill mechanically fastened

E-02 A

Insulated rainwater\ outlet

Garage demolished

Sarnafill mechanically fastened

RE Sarnatherm 160mm

Vapour control layer Plywood Kooltherm K7 75mm

6,600

Rafters Kooltherm K18 20mm/12.5mm

2,162

622

750

622

930

New utility room R

750

R

660 750

New Garden Room

TRAP

Ceramic tiled floor

SVP

RWP

New kitchen

Ceramic tiled floor Extract

R F

Door moved Existing hall

Assumed line of existing combined drainage

L

900

D03

TRAP

Boundary line

A

Wall removed New steel beam

House Extension, Bearsden

Durgo automatic air admittance valve

New toilet R

RWP

Existing living room

Ceramic tiled floor

E-08

4,350 RE

E-09

1,730

W

660

750

TD

Timber parquet flooring

DALLMAN JOHNSTONE ARCHITECTURE

PROJECT MANAGEMENT

INTERIOR DESIGN


Gniewosz Plucinski

Conservation

Before

After - visualization

All service perforations greater than 40mm through 60min protected zone (floor or ceiling) to have 60mm fire protection with Promat Promoseal or equal and approved.

77.5mm K17 insulated plasterboard mechanically fixed. 2x100mm TW55 Kingspan insulation on existing ties

D08

Reopen vent to gable See specification paragraph 3.5.

Raised ties

Envirograf Intumescent non - fibrous fire-stop 60 mins blocks SIB1

D10

plasterboard on dabs.

2,500

D02 steel stair to both

Going 250mm

60 min FR ceiling

60 min FR ceiling 60 min FR partitions

Refer to detail D07

2,410

flights.

Pitch 33.8 deg.

D/13

30 min FR ceiling 30 min FR partition

After - visualization

50mm ventilation gap

vent details

60 min FR partition

Non combustible

Riser 167mm

See elevations for

D10 72.5mm K17 insulated

2,280

1,100

2,280

Refer to detail D08

2m min headroom

60 min FR ceiling

70mm Kingspan K7 insulation between existing rafters 70mm Kingspan K18 insulated core under rafters 120mm Kingspan TW55 between existing studs Existing steelwork

2x100mm Kingspan TW55 insulation

60 mins fire resistant ceiling

2 layers of 12.5mm FireLine.

British Gypsum ref.: C106053 Refer to detail D08

Church alterations, Stirling

DALLMAN JOHNSTONE ARCHITECTURE

PROJECT MANAGEMENT

INTERIOR DESIGN


Gniewosz Plucinski

Industrial

Kingspan KS1000 RW Internal closure flashing 100mm thick PIR board insulation used to fill gaps, if required. Alfas C foam seal

15mm Expansion joint

Drip flashing DPM linked to DPC

DPC min 225mm above F.G.L. Insulation

DPC min 225mm above F.G.L.

200mm Concrete slab

F.G.L. Varies

F.G.L. Varies

50mm thermal insulation achieving λ-value of 0.023W/mK DPM

50mm thermal insulation achieving λ-value of 0.021W/mK. Insulation fixed by mechanical fasteners

50mm sand Hardcore

expanding foam insulation 12.5mm plasterboard

140

134

Door Rail

100

100mm thermal insulation achieving λ-value of 0.021W/mK

102

50

2mm Polyester Powder coated steel ingo

100mm thermal insulation achieving λ-value of 0.021W/mK

70mm thermal insulation achieving λ-value of 0.021W/mK

RE

7m to kerb

50mm thermal insulation achieving λ-value of 0.021W/mK

220

GM

V

140

2,252

Future shower

Accessible/ Female

Kitchen

SD

A

SVP

3,478

3,292

SD CO

FDS30

140

1,500

SD

350

Block partition

V

B

D18 1,478

Mezzanine above

SD

Landlord's electric supply Incoming service pop ups 4x150 o

1,150

Refer to specification paragraph 3.10.

Meter store

1,918

14,940

Working/Maintenance Pit from "Premier Pits" http://www.premierpits.com/full_range.php, Tel: 01775 821 222

16 x 170 = 2.720 m

2,500

Wheelchair platform space

C

1,920

skylights

1,226 1,800

FDS30 300

250

2,153

3,837

15,740

12,250

SD

SD

FES

Air compressor

existing drainage

2,007

1,4m deep

350

Male

2,007

Refer to specification paragraph 3.

350

1,832

350

V

80

RWP

GM

5

Gas meter

1,415

Drain pop up

Future gas meter

GM

4

1,844

350

Incoming service pop ups 4x150 o/

3

1,575

Existing building demolished 600mm thick hardcore

350

Future gas meter

350

1,100 SD

New fence

RWP

GM

1m bench

350

2,710

Existing ground turned over & made good

2

Future gas meter

D02

350

Existing manhole

RE

Demolished building line

Incoming service pop ups 4x150 o/

1,240

1

o100mm / Service duct air, electrics

910

215

block sizes

1,115

910

215

RWP

1:8

1,115

1:8

block sizes

1:8

1:8

FES RWP

D08

6,000 1,790

1,247

6,000

3,835

4,100

A12

D.I.C.

YARD

910

A

675

2,240

653

D

Bollards

RE

New fence line

Future door space

FES

D11

block sizes

D01

Future door space

900

1,240

o100mm Spigot /

1,322

6,000

3,835

2,240

block overall size

24,740

4,100

578

Garage workshops, Glasgow

1,397

3,835

4,100

6,000 1,115

503

3,835

347

440

4,100

910

1,553

665 block sizes

steelwork sizes

FES

DALLMAN JOHNSTONE ARCHITECTURE

PROJECT MANAGEMENT

INTERIOR DESIGN


Gniewosz Plucinski

Conceptions E7

E5

Surface water drainage to loch

LIVING ROOM 28.30 m2

EN-SUITE

4.27 m2

BEDROOM 1 13.03 m2 HALL 26.42 m2

00 3,5

UNHEATED BUFFER ZONE

UTILITY 5.29 m2

DINING/KITCHEN 29.77 m2

6,500

BEDROOM 3

UNHEATED BUFFER SPACE

BEDROOM 1

TOILET 3.40 m2

EN-SUITE

Low energy house, St Catherine's

Innerleithen Bike Park

DALLMAN JOHNSTONE ARCHITECTURE

PROJECT MANAGEMENT