1,008
1,135
1,565
1,135
50mm service zone behind boiler for pipework
WF6
DF10
RWP
Second bedroom window to south elevation only
WF5
SVP
FORT STREET MOTHERWELL
1,227
562
GP
1,135
50
2,600
Bedroom 2
SD
Isolator for future shower
P
Door bell chimes at high level
FDS30 P
553
DF5
600
DF9
552
DF2
910
P
WF3
DF3 min. 300mm
Attic hatch
DF1
DF8
FDS30
1,000
DW or TD
75mm acoustic quilt to all bathroom walls.
DF4
FDS30
P
900
CO positioned to manufacturer's instructions
Service zone to full length of party wall.
WF4
3,013
1,895
P
1,135
F
W
2,100 Box in pipework
PSV PSV
2,700
GP
1,227
FDS30
DF6 2,715 Service zone to full length of party wall.
Bedroom 1
DF7
P
P
P1
DB
TV
RWP
WF1
440
1,922
553
CAIRN HOUSING ASSOCIATION
4,050
3,362
P
P4
WF2
676
1,585
2,690
Cottage flats plan - Upper Floor
8,432 1,227
1,135
1,227
1,135
1,565
1,135
Brick dimensions
Refer to detail 19
50mm service zone behind boiler for pipework 1.8x1.2 platt
Boxing out of pipework
WG4
WG5 B
SVP
DG 10 W
P
P2
Shaver point
Bedroom 2
Storage.
FDS30
DG3
2
2
1,000
DG 9 2
FDS30 2 P
DG5
1,400 Service zone to full length of party wall.
DG8
1,436
450 BT
P4
SD
min. 300mm FDS30
DG7 EM
DG4 Isolator for future shower
SD
Service zone to party wall
Soundblock fire wall to underside of stair.
4,315
Brick dimensions
DG2
P
300
1.2x1.2 platt
1,265
DG1
RWP
DW or TD
339
DB
P
1,498
3,362
337
P5
CO positioned to manufacturer's instructions
P1
P
DG6
1,022
2
2,100
Door chimes at door head height
2,015
75mm acoustic quilt to all bathroom walls.
1,795
2,600
2,700
P2
F
For fence position see dwg no. P/06
9,767
KGP GPK
RWP
P
GM
5,052
Bedroom 1
WG2
400
RWP
TV
450
900
P1
EM
DG11
327 GM
BT
1,218 22
440
460
WG3
max 2m
low level radiator
Brick dimensions
667
1,022 2,240
RWP
Refer to detail 19
WG1 1,585
552
TV
676 552
1,922
440
Brick dimensions
2,710
2,915
568
DALLMAN JOHNSTONE Cottage flats plan - Ground Floor
ARCHITECTURE PROJECT MANAGEMENT REGENERATION
1,452
1,135
1,453
1,135 SVP
RWP
WF3
FORT STREET MOTHERWELL
Refer to detail 19
Box out pipework
WF4 50 2,245
450 75mm acoustic quilt to all bathroom partition walls
PSV
PSV
P
P
Shaver point
3,990
Tiled shelf
PSV
DF4 Intermediate switch
DF7
PSV 3
3
DF3
Bedroom 3
792 Future Stair lift provision
Attic hatch
Isolater for bathroom shower
1,305
3,298
P
Attic hatch
PSV
2,481
P
DF5
1,300
P
1,190 3
SD
DF2
DF6
Sunpipe
Bedroom 1
Sunpipe
DF1
CAIRN HOUSING ASSOCIATION
P
DF8 75mm acoustic quilt to bedroom partition walls
2,934
Bedroom 2
4,097
Bedroom 2
3,397
P
P
2,663
WF2 1,585
1,463
893
3,037 Brick sizing dimensions
WF1 1,002
1,360
782
3,145
Refer to detail 19
Brick sizing dimensions
Typical house plan - Upper Floor 6,182 overall size RE
1,360
2,128
1,022
Brick sizing dimensions
400
N
1,452
RE RE
RE
WG6
SVP
RWP
P2
W
DW
P1
659
P5
4,299
Refer to detail 19
DG8
CO positioned to manufacturer's instructions
DG5
2
2
4,131
P
P
P
EM
P2
75mm acoustic quilt to wc partition wall
DG7
F
2
DG4
2
P
1,009
75mm acoustic quilt to wc partition wall PSV
PSV
1,603
PSV
WG5
TD
Gas connection for cooker
X
P
400 DB
Service zone to inner leaf of external kitchen wall to accommodate services. Extends to 50mm behind boiler
SVP
RE
DG6
TV
P
STORAGE
1,000
SD
3 2
DG 3
2 2
WG4
2
2 P
P
DG1
Refer to detail 26
WG1
1,022
MK grid plus metal clad front plate
D.I.C.
immediately inside curtilage
2 2
DG 2
445
1,523
1,200
RE
3
Door chimes at door head height
300
252
1,401 BT
WG3
WG2
GM
min. 300mm
2
1,851
Provision for future stair lift
P
D.I.C.
STORAGE
P
4,152
All pipework to be enclosed and not to perforate external walls or party walls. No perforations of any kind through party walls.
TV
P
770
For fence position see dwg no. P/06
Refer to detail 19, 26 and 40
Brick sizing dimensions
778
1,810 3,037
890
685
440
1,022
557
3,145
Typical house plan - Ground Floor
DALLMAN JOHNSTONE ARCHITECTURE PROJECT MANAGEMENT REGENERATION
2
1
ARCHITECT: Dallman Johnstone Architects
Allander Surgery W:17
1,600 700
600
600
Consultants Room 5
Treatment Room
34TV
35
36
A
794
MJ
W:11
FES. D:28
1,012
2,023
896 173
780 672
6,853 1,500
FES.
D:26
Administration
14.87 m2
4,885
FDS30
D:12
52.48
1 T. @ 350 mm
MJ
3
52.47
Manager
5,253
4,675
2,430
Shower room 2.83 m2 1,790
MJ 52.55
2 R. @ 110 mm
990
2.30 m2
52.55
1,500
52.825
D:15
10.87 m2
D:19
1,500
6,211
866 D:01
FDS30 D:13 866
FDS30
Boiler room
2,578
33
1,955
2,475
Storage
D:31
5,695
32
Disabled toilet
1,615
FDS30
1,340
Staff Room
8
7
552
30
D:10
D:25 FDS30 866
685
400
31
15L/s
Male toilet 1,000 2,000
W:12
600
29
300
6
1
D:20
comm
F
60L/s
4
9
5
1
W:03
2,070
D:11
60L/s
Female T.
600
857
2,240
400
D:21
15L/s 1,000
1,135
MJ
4
38
MJ
4,950
694
D:22 FDS30 866
D:18
910
2 27 28
Cleaner's
waiting area 36 persons
37
FDS30
D:23
4,700
(suspended ceiling)
W:13
1,453
Storage
B
52.55
3 F.F.L. 52.825
Disabled toilet
1800mm turning circle
10
25
1,095 694
910
W:25
694
D:24
11
26
min. 2000mm
3
12
780
13
573
14
What the patients need: - Easy orientation - Provision of privacy & dignity - Comfortable environment - Natural light - Calm building - Healthy materials
1,473
15
173
16
W:02
17
18
19
173
20
21
24
52.51
685
23
Storage
22
Storage Space
1,500
1800mm turning circle
1,013
MJ
D:27
Circulation
2
W:01
866 D:04 FDS30
D/04
1,796
866 D:05 FDS30
E
D:17
866 D:06 FDS30
E
1,600
E
1,600
800
E
D/04
Position of CWS above.
Meeting Room
W:21
Consultants Room 3
FES.
5
2,915
1,600
4,837
700
800
80 0
1,560
MJ
1,840 700
1,272
1,235
800
D:34 FES.
300
844 D:30 FES.
EXIT
1,452
FDS30 D:09 866
52.54
E
3,456 1,600
910
W:15
1,115
866 D:07 FDS30
MJ
E
910
1,600
600
4,735
600
1,600
Consultants Room 3
E
866
52.55
1,840
E
800
D:08 FDS30
2,127
W:19
E
3,456
MJ
860
W:20
Dado trunking
Sill 900
Consultants Room 2
E
Dado trunking
1,840
1,840
700
144
Consultants Room 1
1,022
3,437
W:18
1,840
1,840
1,600
700
1,590
173
Dado trunking
600
600
E
1,600 3,365
3,426
staff
910
0 S3 FD 866 03 : D
future expansion
3,815
173 MJ
W:16
F
ched)
3,426
E
TV
r future Extension m2
910
MJ
52.55
W:15
1,565
173
EXIT
MJ
public
910
D:16 FDS30
1,147
3,430
Dado trunking
52.55
3,815
173
What the doctors need: - Healthy building - Low maintenance - Flexible for future change - Sustainable - Energy efficient - A functional building - Good working environment - Safe for staff & patients
1,115
910
CONTRACTOR: David H Allan
866 D:02
1,565
173
QUANTITY SURVEYOR: Doig & Smith
D:14
910
STRUCTURAL ENGINEER: Roy Easton & Company
900 1,500
doctors
3,000
2,265
What does the Health Board Need: - A building that promotes good health not dis-ease - Good value for money - Low maintenance - Flexible enough to allow for change - Sustainable - Energy efficient which allows for cost savings year after year
15L/s
W:10
W:09
W:08
MJ
W:07
W:06
W:05
W:04
MJ
52.55
- Through careful planning circulation reduced to 12.5% (32% allowed) this allowed more space for working at records A and also a spacious meeting room B within the overall area allowed by the Health Board.
We can walk you through the space with a 3600 3D image.
4
T: 0141 942 3025 F: 0141 942 8777 E: studio@dallmanjohnstone.co.uk W: dallmanjohnstone.co.uk The Studio, 24 New Kirk Road Bearsden Cross Glasgow G61 3SL
5
Gniewosz Plucinski
Private Houses
Before Tyvek sarking membrane 18mm sarking board Marley Eternit continuous rafer roll Tilting fillet Marley Eternit felt support tray 325mm strip of BS8747 Type 5U or equivalent UV durable underlay dressed into gutter Marley ludlow major eaves clip Marley Eternit 25mm over fascia strip ventilator
Protan sealant Protan termination bar
Gutters temporary removed for access
200mm rafters Fastener with weatherproof washer min. 150mm
10mm plywood
Protan fleece 40mm weld
Protan cover strip
Protan membrane 40mm weld
Protan membrane 40mm weld Protan membrane
Protan restraint bar & fastener
Protan cord Protan restraint bar & fastener Protan cover strip 40mm weld
After - visualization 50mm Kingspan TR21LPC/FM or Quinntherm QF Protan vapour control layer 10mm plywood 150mm Kingspan K7 or Quinntherm QW 12.5mm plasterboard
timber joists, heights vary to form water fall
150
150mm rafter ties
See spec. par. 6. Single ply membrane gutter & 150mm upstand
see spec. par. 6.
see spec. p. 6.15.
new fanlight
insulated wall see spec. p.4.6.
Sunroom
Utility
Garage
Gound level to be lowered by 150mm & gravelled
Insulated door & draught seals
see spec. par. 4.
see spec. p. 3.10. timber finish new concrete foundation
telescopic air vent see spec. p. 3.15. speaker point (ceiling height) speaker point (floor level)
assumed line of existing drainage
Existing hearth
one way switch two way switch
new gas fire & vent through floor-min.10cm2 air vent size
dimmer switch light fitting All new fixed light fittings installed to be low energy type. Internal Kosnic 4W LED GU10 lights. 4000K Cool white.
GM
gas meter existing floor hatch removed
Door re-hung
F
V
light fitting with move detector light wall fitting
Fz
low level double socket with high level switch
extractor fan placed at min.1,7m height
non combustible hearth min. 125mm thick concrete slab
V
high level double socket pop-up 3 point power point
150
underfloor ventilation duct
new partitions
V
telephone point
Kitchen
TV RE
V
150
existing fire place opened
wall infilled
SD
V
Study/bedroom 3
V
SD
Aga cooker mains supply connect point with high level switched fuse
new walls
PIR TV
new floor hatch
wc
V
V
V
telescopic air brick ventilators 215x65mm
WP telescopic air brick ventilator 215x65mm
WP
new fanlight
smoke detector sub floor access below doors
new rooflight
wall removed
door removed, wall infilled wall infilled door removed opening widened, new glazed doors TV & power point eye level mounted
ventilation extract fan
V
activity space 800x1100
TV point rodding eye
150
B
AGA Total Control comply with AGA installation guide
PIR
A
pipe chase under wall units lights
50mm insulated door with 10mm ply facing & draught sealed
3x100x250
-0.300 window infilled & new door
TV
A
existing stone retained below worktop height
A
Sun room
DW
new rooflights
RWP
RE
Utility
RE
W
RWP existing walls removed
Âą0.000 window removed wall infilled with stone & lime mortar to match existing
existing drainage pipes cut below floor & sealed existing lathe & plaster removed new insulation & plasterboard fitted, see spec. point 4.2.
Garage
-0.440
-0.300
Broom cupboard
V
F/Fz
House Extension, Bearsden
SVP tap repositioned
-0.300
-0.540
B
A
RE
RE
900
folding sliding doors see spec 10.1. Cill to be fixed
DALLMAN JOHNSTONE ARCHITECTURE
PROJECT MANAGEMENT
INTERIOR DESIGN
Gniewosz Plucinski
Private Houses After
A63
Before
brick sizes
3,712
TO TURN OUT Sub floor ventilation extended by 100mm dia. duct
3712
Sub floor ventilation extended by 100mm dia. duct
Sub floor ventilation extended by 100mm dia. duct
450
brick sizes
2,372
890 A62
B
A
A62
existing boundary Sub floor ventilation extended by 100mm dia. duct
RWP
RWP
rooflights over kitchen worktops
RE
1,180
floor sockets existing drainage extended to new rodding eye PIR existing utility removed
new dining
existing conservatory removed
V
new kitchen
4,152
3,900
new sitting room
F
SVP
brick sizes
PIR
New rooflights
C
C
wall removed
Sub floor ventilation extended by 100mm dia. duct
cupboard removed
O
Sub floor ventilation extended by 100mm dia. duct
O
new study 910
new larder
V
existing svp removed
new boiler position activity space
new
vent grille above door manouvering space
Fz
TV room new beams
D01
V
Sub floor ventilation extended by 100mm dia. duct
797
manouvering space
walls removed
1,678
utility
DW
hall
Sub floor ventilation extended by 100mm dia. duct
W
A
TTO
wall removed
1,126
en-suite
V
RWP
150
SVP
150mm lead upstand
Refer to specification paragraph 5.
14째
kitchen
larder
Smooth red engineering bullnose brick cill
Existing sub floor ventilation extended via new flat ducts through floating floor construction.
Refer to specification paragraph 3.
House Extension, Bearsden
DALLMAN JOHNSTONE ARCHITECTURE
PROJECT MANAGEMENT
INTERIOR DESIGN
Gniewosz Plucinski
Private Houses
Visualization
Code 5 lead to roof
Code 8 lead to gutter 200
185 142
124 220x47 C16 joist 00
min overlap 75mm
20mm ply for painting. Primed prior to installation.
200x75x23 PFC
25mm continuous eaves vent insect screen vent
Code 8 lead to gutter 200
185 142
min overlap 75mm 42
220x47 C16 joist
75
Code 5 lead to roof
220x75 timber beam bolted back to steelwork 15mm painted ply panelled soffit. Primed prior to installation. Plasterboard ceiling
00
Code 5 lead cladding Geotextile felt underneath lead to LSA's recommendations Min overlap 75mm
200x75x23 PFC
Plasterboard 12.5mm Vapour control Layer 150x75 PFC 150x50 timber
25mm vent insect screen vent
Fillets @ 400mm
25mm continuous eaves vent insect screen vent 220x75 timber beam bolted back to steelwork Painted ply panelled soffit. Primed prior to installation. Plasterboard ceiling
Direct glazing
Eternit grey cill 165mm
Code 5 lead cladding Geotextile felt underneath lead to LSA's recommendations
DPC
Min overlap 75mm
195x50 timber
cavity barriers giving 30 minute fire resistance wrapped in DPC Vapour control Layer
insect screen vent
REFLEX vapour permeable membrane (with a vapour resistance of no more than 0.25 MN. s/g)
Lead (code 5) on geo textile layer to LSA's recommendations 20mm ply min 50mm ventilated space to be maintained throughout tapered battens min of 50mm at low end to allow for ventilation Breather membrane 100mm Kingspan TP10 Vapour control layer Roof deck Roof structure to engineer's recommendations
Roof vent
Code 5 lead flashing with min150mm upstand raggled into existing wall
Lead (code 8) to gutter
D02
New plasterboard ceiling Walls to be strapped and lined
Existing door New FFL to be 170mm below existing living room FFL 300
D03
DPC Perp vents at 900ctr
DPC
DPM linked to DPC
Floor brought to single level (existing loggia steps removed). Break out floor to incorporate new underfloor heating system
150mm Hardcore 50mm sand blinding 100mm concrete slab min 150mm ventilated space beam and block floor system 75mm Kingspan TF70
Dwarf wall to hold beam end Existing foundation extended to incorporate dwarf wall All new timber windows to achieve u-value of 1.8W/m2K
75mm area for under floor heating stone floor
Garden room, Bearsden
DALLMAN JOHNSTONE ARCHITECTURE
PROJECT MANAGEMENT
INTERIOR DESIGN
Gniewosz Plucinski
Private Houses
Before
After - visualization
Refer to Specification, point 7.2.
Kingspan Nilvent Breathable sarking membrane. Horizontal lap between runs of breathable sarking membrane with 75mm wide double sided acrylic adhesive tape.
Refer to Specification, Paragraph 5.
Glazing to south gable
New timber trusses stained black
LV cable lighting
2x25mm Kingspan K7 insulation inside steel beam 1x25mm Kingspan K18 insulated plasterboard to inside face of steel flanges Galvanized steel beam exposed 1x25mm Kingspan K18 insulated plasterboard to inside face of steel columns
2,560
Wall re-built Roughcast
DPC injection
Refer to Specification, paragraph 2.
Granite sets bedded on mortar
Garden room, Clahan of Campsie
DALLMAN JOHNSTONE ARCHITECTURE
PROJECT MANAGEMENT
INTERIOR DESIGN
Gniewosz Plucinski
Private Houses
Before
After - visualization
RWP
Boiler RWP
WP
F
Phone socket removed & power points removed
DW
W
R Bathroom
Kitchen
new boiler
R
R
Bedroom
R
E 350
350
350
R
electric meter & fusebox repositioned
SVP
1,000 activity space
E
V SD
Power point removed
door re-hung
Hall new beam, refer to engineer's drawing
R
walls removed
Dining
350
door removed wall infilled
new beam
RWP
min.840 150 300
SD
150
R
350
RWP
R min.840
Bedroom E
Existing stove & hearth repositioned. Hearth - min.125mm thick con Non combustible solid decorative finish arround stove. New double wall flue - distance of min.25mm is required between fl and any combustible material where flue penetrates roof & ceiling Spillage test required to living/kitchen/dining after works completed to determine the internal/external pressure difference which caused various thermal outputs. The test to be carried out in accordance with BRE paper IP 7/94.
Living room
RWP TV
Renew aerial
350
U-value 1.8 W/m2K
E
Stair ballustrade replaced
LED light fitting LED wall light fitting
timber deck
3,100
LED floor light fitting 1 gang 1 way switch 1 gang 2 way switch low level double socket high level double socket V
extract fan
E
external lights on a solar controller time clock with PIR & switchable over-ride
6,150
smoke detector phone socket
House Extension, Strachur
DALLMAN JOHNSTONE
TV point
outside tap
ARCHITECTURE
PROJECT MANAGEMENT
INTERIOR DESIGN
Gniewosz Plucinski
Private Houses 120mm TW55 Kinspan Thermawall
Breather membrane/Tyvek Reflex
25mm air space
Brick tie Cullen B50/304 SS with SS nails
9.5mm Ply Sheathing 12.5mm/60mm Kooltherm K17
12mm Ply Sheathing Bottom rail Locator plate specified
Skirting board Seal 18mm floor decking Vapour control layer 110 mm Kingspan Thermafloor TF70
Insect mesh to ventilation of timber cladding Header joist
18mm ply decking
perpend vent @ 900 crs
200mm Mineral wool
Sole plate
Floor joist
Periscope vent
Netlon
Min.150mm
DPC
100 mm concrete slab DPM
Flashing
Sarnafill mechanically fastened
E-02 A
Insulated rainwater\ outlet
Garage demolished
Sarnafill mechanically fastened
RE Sarnatherm 160mm
Vapour control layer Plywood Kooltherm K7 75mm
6,600
Rafters Kooltherm K18 20mm/12.5mm
2,162
622
750
622
930
New utility room R
750
R
660 750
New Garden Room
TRAP
Ceramic tiled floor
SVP
RWP
New kitchen
Ceramic tiled floor Extract
R F
Door moved Existing hall
Assumed line of existing combined drainage
L
900
D03
TRAP
Boundary line
A
Wall removed New steel beam
House Extension, Bearsden
Durgo automatic air admittance valve
New toilet R
RWP
Existing living room
Ceramic tiled floor
E-08
4,350 RE
E-09
1,730
W
660
750
TD
Timber parquet flooring
DALLMAN JOHNSTONE ARCHITECTURE
PROJECT MANAGEMENT
INTERIOR DESIGN
Gniewosz Plucinski
Conservation
Before
After - visualization
All service perforations greater than 40mm through 60min protected zone (floor or ceiling) to have 60mm fire protection with Promat Promoseal or equal and approved.
77.5mm K17 insulated plasterboard mechanically fixed. 2x100mm TW55 Kingspan insulation on existing ties
D08
Reopen vent to gable See specification paragraph 3.5.
Raised ties
Envirograf Intumescent non - fibrous fire-stop 60 mins blocks SIB1
D10
plasterboard on dabs.
2,500
D02 steel stair to both
Going 250mm
60 min FR ceiling
60 min FR ceiling 60 min FR partitions
Refer to detail D07
2,410
flights.
Pitch 33.8 deg.
D/13
30 min FR ceiling 30 min FR partition
After - visualization
50mm ventilation gap
vent details
60 min FR partition
Non combustible
Riser 167mm
See elevations for
D10 72.5mm K17 insulated
2,280
1,100
2,280
Refer to detail D08
2m min headroom
60 min FR ceiling
70mm Kingspan K7 insulation between existing rafters 70mm Kingspan K18 insulated core under rafters 120mm Kingspan TW55 between existing studs Existing steelwork
2x100mm Kingspan TW55 insulation
60 mins fire resistant ceiling
2 layers of 12.5mm FireLine.
British Gypsum ref.: C106053 Refer to detail D08
Church alterations, Stirling
DALLMAN JOHNSTONE ARCHITECTURE
PROJECT MANAGEMENT
INTERIOR DESIGN
Gniewosz Plucinski
Industrial
Kingspan KS1000 RW Internal closure flashing 100mm thick PIR board insulation used to fill gaps, if required. Alfas C foam seal
15mm Expansion joint
Drip flashing DPM linked to DPC
DPC min 225mm above F.G.L. Insulation
DPC min 225mm above F.G.L.
200mm Concrete slab
F.G.L. Varies
F.G.L. Varies
50mm thermal insulation achieving λ-value of 0.023W/mK DPM
50mm thermal insulation achieving λ-value of 0.021W/mK. Insulation fixed by mechanical fasteners
50mm sand Hardcore
expanding foam insulation 12.5mm plasterboard
140
134
Door Rail
100
100mm thermal insulation achieving λ-value of 0.021W/mK
102
50
2mm Polyester Powder coated steel ingo
100mm thermal insulation achieving λ-value of 0.021W/mK
70mm thermal insulation achieving λ-value of 0.021W/mK
RE
7m to kerb
50mm thermal insulation achieving λ-value of 0.021W/mK
220
GM
V
140
2,252
Future shower
Accessible/ Female
Kitchen
SD
A
SVP
3,478
3,292
SD CO
FDS30
140
1,500
SD
350
Block partition
V
B
D18 1,478
Mezzanine above
SD
Landlord's electric supply Incoming service pop ups 4x150 o
1,150
Refer to specification paragraph 3.10.
Meter store
1,918
14,940
Working/Maintenance Pit from "Premier Pits" http://www.premierpits.com/full_range.php, Tel: 01775 821 222
16 x 170 = 2.720 m
2,500
Wheelchair platform space
C
1,920
skylights
1,226 1,800
FDS30 300
250
2,153
3,837
15,740
12,250
SD
SD
FES
Air compressor
existing drainage
2,007
1,4m deep
350
Male
2,007
Refer to specification paragraph 3.
350
1,832
350
V
80
RWP
GM
5
Gas meter
1,415
Drain pop up
Future gas meter
GM
4
1,844
350
Incoming service pop ups 4x150 o/
3
1,575
Existing building demolished 600mm thick hardcore
350
Future gas meter
350
1,100 SD
New fence
RWP
GM
1m bench
350
2,710
Existing ground turned over & made good
2
Future gas meter
D02
350
Existing manhole
RE
Demolished building line
Incoming service pop ups 4x150 o/
1,240
1
o100mm / Service duct air, electrics
910
215
block sizes
1,115
910
215
RWP
1:8
1,115
1:8
block sizes
1:8
1:8
FES RWP
D08
6,000 1,790
1,247
6,000
3,835
4,100
A12
D.I.C.
YARD
910
A
675
2,240
653
D
Bollards
RE
New fence line
Future door space
FES
D11
block sizes
D01
Future door space
900
1,240
o100mm Spigot /
1,322
6,000
3,835
2,240
block overall size
24,740
4,100
578
Garage workshops, Glasgow
1,397
3,835
4,100
6,000 1,115
503
3,835
347
440
4,100
910
1,553
665 block sizes
steelwork sizes
FES
DALLMAN JOHNSTONE ARCHITECTURE
PROJECT MANAGEMENT
INTERIOR DESIGN
Gniewosz Plucinski
Conceptions E7
E5
Surface water drainage to loch
LIVING ROOM 28.30 m2
EN-SUITE
4.27 m2
BEDROOM 1 13.03 m2 HALL 26.42 m2
00 3,5
UNHEATED BUFFER ZONE
UTILITY 5.29 m2
DINING/KITCHEN 29.77 m2
6,500
BEDROOM 3
UNHEATED BUFFER SPACE
BEDROOM 1
TOILET 3.40 m2
EN-SUITE
Low energy house, St Catherine's
Innerleithen Bike Park
DALLMAN JOHNSTONE ARCHITECTURE
PROJECT MANAGEMENT
INTERIOR DESIGN