Operational Plan
2017-2018
central coast.nsw.gov.au
Contents Part 1 – Operational Plan Introduction About this Plan Introduction Central Coast at a Glance Fast Facts The Community of 100 People Welcome to Central Coast Council
Page 05 06 08 09 10 12
Operational Activities Community Environment Economy Governance and Leadership
16 21 25 29
Capital Works Program Capital Works Program Overview Revenue Funded Capital Projects Grant Funded Capital Projects Capital Projects subject to Grant Funding
36 39 94 97
Part 2 – Financial Information Financial Overview Long Term Financial Plan
99 107
Part 3 – Statement of Revenue Statement of Revenue Ordinary Rates and Special Rates Rating Categories and Structure Annual Charges Developer Contributions Charges for Works Carried out on Private Land by Council Statement of Proposed Borrowing Fees and Charges
114 114 114 138 151 151 151 151
Part 4 – Fees and Charges Fees and Charges
154
Acknowledgement of Country We acknowledge the Traditional Custodians and First Peoples of this Land and pay our respects to Elders, both past and present.
About this Plan The Central Coast Council Operational Plan 2017-2018 outlines the programs and projects Central Coast Council intends to carry out in 2017-2018. It integrates the operational and capital budget, capital works program, statement of revenue, and fees and charges. The programs and projects reflect the two former Councils’ Community Strategic Plans. Local Government elections for the Central Coast will be held in September 2017, and from 2018-2019 the newly elected councillors will be charged with setting the direction for the Central Coast, in consultation with the community. This will include a new Community Strategic Plan, Resourcing Strategy (comprising of the Long Term Financial Plan, Workforce Management Plan, and Asset Management Strategy), and a three-year Delivery Program and Operational Plan. This will come into effect on 1 July 2018. Over the past 12 months we have reviewed the Operational Plan to better reflect the structure of Central Coast Council. This has resulted in some changes to how actions, programs, and projects are set out in this Operational Plan. The Central Coast Council Operational Plan 2017-2018 is comprised of four parts: •
Part 1:
•
Part 2:
• •
Part 3: Part 4:
Introduction, Operational Activities for 2017-2018 in line with the quadruple bottom line (Community, Environment, Economy, and Governance and Leadership), and Capital Works Program Financial Overview, and the Long Term Financial Plan Statement of Revenue Fees and Charges
5
Introduction A new council
Phase 1:
The Central Coast Council was formed by the NSW Government on 12 May 2016. The new council is comprised of five wards, which will be represented by a total of fifteen councillors, following the council election on 9 September 2017. The new wards are:
From commencement of the new Central Coast Council to September 2017, when the new councillors are elected. This phase is being led by the Administrator and Chief Executive Officer.
Phase 2:
From September 2017, the newly elected Council will take over from the role of the Administrator to lead the organisation through the next phase.
• • • • •
Budgewoi Ward; Gosford West Ward; Gosford East Ward; The Entrance Ward; and Wyong Ward.
Guiding principles The NSW Government has provided merged councils with Guidelines to ensure a smooth transition through the merger process and inform planning and operational activities. Activities during the merger period (which ends following the election of Council in September 2017) are governed by the following principles: Service:
Maintain seamless service delivery to communities.
Opportunity: Embrace opportunities to improve services and infrastructure for communities. Cohesion:
Bring together and build on the strengths of strategies, structures, staff and systems.
Engagement: Inform and involve communities, staff and other partners, including industry unions in planning and implementing change.
Governance arrangements Mr Ian Reynolds was appointed Administrator, with the role of governing the Central Coast Council until the first meeting of the Council elected on 9 September 2017. He is responsible for the functions of the Mayor and Councillors until that time.
Integrity:
Ensure ethical, open and accountable governance and administration.
Respect:
Value the knowledge and contributions of staff, communities and other partners.
Integrated Planning and Reporting
Mr Rob Noble was appointed as the Interim General Manager of the new Central Coast Council. His title was changed by the Administrator to ‘Chief Executive Officer’ to manage the day to day operations and lead the organisation through the implementation process.
The Operational Plan is prepared in accordance with the Integrated Planning and Reporting (IPR) framework, introduced in 2009 under the Local Government Act 1993.
The process of implementing the new Central Coast Council will occur in two key phases:
6
Environment
The IPR framework promotes vertical integration with community based objectives informed by state-level plans and cascading down through to implementation and horizontal integration, across council traditional functional areas.
Within the theme of Environment the focus is on streamlining and enhancing planning processes by updating Vegetation and Wildlife Corridor mapping, and mitigating bush fire risk by updating Bush Fire Prone Lands Mapping.
IPR necessitates a 'whole-of-council' approach to long, medium and short term planning and is comprised of the following key elements: • • • • • •
Central Coast Council will continue to deliver efficient and effective waste services with a focus on diverting greater than 45% of domestic waste from landfill sites, and providing clean, safe drinking water that meets the regulated/targeted water quality requirements.
Community Strategic Plan; Long Term Resourcing Strategy; Delivery Program; Annual Operational Plan; Annual Report; and End of Term Report.
Environmental plans under the spotlight include a Recreational Strategy for Natural Areas, certification of Coastal Zone Management Plans, review of the Gosford Coastal Lagoons Entrance Management Plan review and design of coastal protection works for Umina and Ocean Beach.
The Operational Plan is a sub-plan of the Delivery Program, and showcases projects and activities that will be undertaken in a particular financial year. It also allocates responsibilities for each project, and establishes suitable performance measures to determine the effectiveness of project outcomes.
Economy Within the theme of Economy there is an emphasis on long-term major projects, including the design of a new regional library in Gosford, capitalising on the Central Coast airport, and public domain improvements in Terrigal.
The document also contains the Annual Budget, including the estimated income and expenditure, Capital Works Program, and Statement of Revenue, including information on rates and Fees and Charges.
Enhancements to commuter car parking at Tuggerah, Warnervale and Lisarow will proceed into early design stage. We are committed to ensuring 90% of roads and drainage capital projects are completed as planned.
The Operational Plan sets out how council resources will be used to ensure the outcomes of the existing Gosford 2025 and Wyong 2030 Community Strategic Plans are achieved.
Economic development actions include commencing an expression of interest for licensing of mobile food vans, supporting commercial development in the main township of Budgewoi, and managing Central Coast Stadium as the premier venue for sports and outdoor entertainment on the Coast.
The Operational Plan focuses on the delivery of key projects, along with ongoing services such as providing water and sewer services, maintaining roads and footpaths, waste collection, and maintenance of the assets Council holds to deliver services to the community.
Governance and Leadership
Operational highlights
Governance and Leadership continues to be a major focus with 19 Transformation and Business Performance projects planned across the organisation. These projects are designed to ensure Central Coast Council is an efficient and effective organisation with energised and passionate staff.
Community Within the theme of Community we are proud to implement year-one actions from the Central Coast Council Disability Inclusion Action Plan, whilst focusing on increasing accessibility and inclusivity of Council owned community facilities.
The year ahead will see the preparation of a Central Coast Local Environmental Plan, commencement of north and south growth scenarios, and masterplans for Long Jetty and Woy Woy and we are supporting development through more efficient assessment processes.
We are investing in our customers by defining what matters to them and reviewing our complaints and feedback policy. Delivering high quality community infrastructure is important to us, as are efficient sport, recreation, aquatic and public toilet facilities that meet the community’s needs.
Delivering on capital works is an important theme as is undertaking targeted service delivery reviews. The incoming Central Coast Council will also adopt the Central Coast Community Strategic Plan supported by strategies ensuring our services are aligned with community needs.
Supporting our lifeguards and marketing for the tourism industry are important features of this plan, as well as maintaining our outstanding library services and facilities, speech therapy service, and beach and waterway education and safety programs.
7
Central Coast at a Glance
Yarramalong
Toukley Wyong
Mangrove Mountain
The Entrance Somersby
Ourimbah
Gosford Erina
Terrigal
Woy Woy
Copyright © 2016 Central Coast Council Copyright © 2012 Land and Property Information
8
Fast Facts 2
1,651 km Area
11
334,857 Population
120
8
Education and Care Centres
73
Libraries
Community Facilities
Sporting Fields
15
242
21
Beaches
Play Spaces
Skate Parks
44
63
4
Boat Ramps
737kms
Shared Pathways
Off Leash Areas
BMX Tracks
2,176kms 2,248kms Roads 9
Water and Sewer Mains
The Community of 100 People
10
1
Welcome to the Central Coast so we need to invest now in our essential roads and water services so we can meet the needs of our community now and well into the future. There is also a strong focus on investing in new and regionally significant assets that will drive investment, growth and tourism to the Central Coast. The first stage of the Tuggerah Regional Sporting Complex will be finished in the next year with the final $16.5 million needed allocated within this Operational Plan. We will
ADMINISTRATOR
also be working on the Central Coast Airport and
Ian Reynolds
into a thriving aviation hub. There is a focus on arts and
Masterplan process so we can turn this significant asset learning with funding to progress the Regional Performing Arts Centre in Gosford, as well as the
One of the priorities of the new Central Coast Council
regional library. These are significant projects that will
has been to build a solid foundation in preparation for
deliver the jobs and opportunities our growing
the newly elected Council. We are well underway. Our
community needs.
organisation is being transformed but we have maintained our commitment and focus on ensuring we
As a significant regional council in our own right with a
continue to deliver the services the residents of the
large and growing population we have a strong voice at
Coast need, want and value. That is a credit to our
the lobbying table to secure increased State and Federal
dedicated staff, the majority of whom live here too and
government support to deliver even more infrastructure
want to see this area thrive and prosper.
for our community. As one example, we have 2,200km of roads we need to maintain. This is a key priority for
Our finances are sound and strong. We have significant
Council, and we would be keen to discuss with other
buying power now as one Council, representing one
levels of Government the possibility of additional
region. We are directly investing in upgrading our
funding to improve our road network further, delivering
essential infrastructure, particularly our road network
better connections and improving the quality of life of
and improving our service delivery to the community.
our residents. Our budget already includes $43.5 million in operating grants and contributions for specific
We will deliver the largest capital works program yet -
significant projects and essential service delivery and we
$207.9 million – a 13.7% increase on last year’s plan.
will look to build on this in the future.
Nearly three quarters of that will be spent on key areas the community has told us they want us to focus on –
I am pleased to be able to present Council’s Operational
roads, transport and drainage, water and sewer and
Plan for 2017-18. Delivering this plan together will
open space and recreation. Our population is set to
ensure the Central Coast can continue to be the very
grow by more than 70,000 over the next fifteen years -
best it can be now and into the future.
12
This year Council will roll out a record capital works program of $207.9 million to tackle our infrastructure backlog and deliver in our key focus areas: • • • •
$72.0 million on roads, transport and drainage $53.6 million on water and sewer $27.1 million on open space and recreation $17.1 million on information technology
There will be significant investment in our IT systems this coming year as we continue to streamline and
CHIEF EXECUTIVE OFFICER
integrate our information management, finance, asset
Rob Noble
both former Councils had planned significant
I am pleased and privileged to be able to present our Operational Plan for 2017-18 which delivers on our corporate vision to create a vibrant and sustainable Central Coast. The secret to our success is the dedication of our passionate staff who strive every day to deliver the valuable services that strengthen and support our growing community. This is the first fully integrated Operational Plan for the Central Coast. It is a balance between delivering the priority areas the community has told us they want and more big picture regional projects that will benefit the entire Central Coast. The 2017-18 budget projects total operating expenditure of $551 million with a surplus of $1.9 million. The NSW Government’s rate path freeze policy means Council must maintain the rate path that was in place before the merger. While the rate path is frozen, we are able, and have applied the 1.5% rate peg approved by the Independent Pricing and Regulatory Tribunal.
and library management systems. Both former councils’ IT systems were in desperate need of an upgrade, and investment in IT upgrades. So this is a great opportunity to deliver a modern and responsive IT system for staff and the community. Residents will benefit from improved online, self-service access allowing them to lodge service requests, report issues and contact us 24 hours a day. This will ensure we are the modern, responsive and inclusive organisation our community expects us to be and we are well on the way to getting there. The following pages set out in detail our major programs, projects and estimates as well as a detailed budget for the next year. This program will continue when the new Council is elected in September and provides a solid foundation for the continued success of Central Coast Council. I am confident that our organisation has the capacity, discipline, passion and commitment to deliver on time and on budget. I believe the Central Coast community will see improvements in the standard of our roads, water supply, sewerage treatment, waste management, parks, playgrounds, libraries, lakes and the many other facilities and services Council delivers which enhances the quality of life we all enjoy here on the Central Coast.
13
Operational Activities
Community This theme relates to community wellbeing, social connection, feeling included and valued, a sense of community and cultural vitality. The objectives and strategies respond to many aspects of living in and being part of our community with a focus on public safety, local history, culture and diversity, access and participation, health and wellbeing. In accordance with the direction from the NSW Department of Premier and Cabinet for merged councils, the following objectives respond to the Community Strategic Plans and the Delivery Programs of the former Gosford City and Wyong Shire Councils. After September 2017 the newly elected Central Coast Council will need to adopt a ten-year Community Strategic Plan and three-year Delivery Program (2018/19 to 2020/21) by 30 June 2018. Objectives • •
•
•
Develop community partnerships, promote local history, culture and diversity Manage Visual and Performing Arts programs and support local community groups to coordinate a range of community and cultural projects and events Facilitate community grants and sponsorship programs, lease and licenses for access to council facilities, and provide community information services Provide participatory Youth and Senior’s Services including implementing the Positive Ageing Strategy, and deliver Child Care Services to meet legislative requirements
•
•
• •
Manage library services, implement Library Infrastructure Plans, and provide a range of educational and recreational programs Manage and maintain aquatic infrastructure, public toilets, parks, playgrounds, sportsgrounds and facilities, foreshores and access to waterways Implement the Graffiti Management Strategy and Crime Safety Plan Review Customer Experience Strategy by June 2018, providing consistent, high quality contact point for customers, enabling enquiries to be answered in an effective and timely manner
How can you help us make it happen? • • • • • •
Get to know your neighbours Support local community events and festivals Utilise public spaces Keep an eye out for others Observe the speed limit, especially in local neighbourhood streets Walk or ride around your neighbourhood
• • • • • • •
16
Promote multiculturalism As a community, celebrate our successes Learn about local history Join a community group Become a volunteer Keep your neighbourhood tidy Get involved in sporting and recreational activities
Community Action Number
Operational Plan Action / Target
Outcome
Unit
2017-18/COM/001
Review the Customer Complaint and Feedback Policy by 30 November 2017
Community Engagement
2017-18/COM/002
Implement 90% of the year one Customer Experience Actions by 30 June 2018 Manage year one delivery of tourism marketing and industry services
Ensure complaints are being addressed and feedback is being actioned against service levels Define what matters for customers and deliver an improved customer experience Actions contribute to success of Central Coast Destination Management Plan and increases the visitor economy Provision of Speech Therapy within the northern education and care centres
Increased awareness of beach safety on our Central Coast beaches
Leisure and Lifestyle Unit
Increased awareness of beach safety on our Central Coast beaches
Leisure and Lifestyle Unit
Efficient delivery of community facilities that meets the community needs
Leisure and Lifestyle Unit
Efficient delivery of community facilities that meets the community needs
Leisure and Lifestyle Unit
Efficient delivery of community facilities that meets the community needs
Leisure and Lifestyle Unit
Efficient delivery of community facilities that meets the community needs
Leisure and Lifestyle Unit
Efficient delivery of community facilities that meets the community needs
Leisure and Lifestyle Unit
Providing an outstanding quality and cultural experience at Gosford Regional Art Gallery through programs and exhibitions Customer feedback will assist with the development of future programs and exhibitions
Leisure and Lifestyle Unit
Large range of cultural productions meeting the varied demographics and interests of the Central Coast
Leisure and Lifestyle Unit
2017-18/COM/003
2017-18/COM/004
2017-18/COM/005
2017-18/COM/006
2017-18/COM/007
2017-18/COM/008
2017-18/COM/009
2017-18/COM/010
2017-18/COM/011
2017-18/COM/012
2017-18/COM/013
2017-18/COM/014
Provide speech therapy services to identified children in the northern education and care services meeting the annual grant requirements Beach and waterway safety, education and messaging provided throughout the year through partnerships with community groups Seasonal (September to April) lifeguard services are provided at 15 beach locations across the Central Coast. Develop an operational business plan for Lake Haven Recreation Centre by 30 June 2018, to provide a baseline for future benchmarking and enable a cost recovery setting Develop an operational business plan for Wyong Pool by 30 June 2018, to provide a baseline for future benchmarking and enable a cost recovery setting Develop an operational business plan for Toukley Pool by 30 June 2018, to provide a baseline for future benchmarking and enable a cost recovery setting Delivery of a high quality leisure facility and program at Peninsula Leisure Centre that achieves 85% cost recovery rate by 30 June 2018 Delivery of a high quality leisure facility and program at Gosford Olympic Pool that achieves 80% cost recovery rate by 30 June 2019 The Gosford Regional Art Gallery programs and exhibitions reach 200,000 people by 30 June 2018 The Gosford Regional Art Gallery programs and exhibitions achieve an 85% customer satisfaction rate by 30 June 2019 Deliver 260 varied cultural productions for a range of demographics and interests at Laycock Street Community Theatre by 30 June 2018
18
Community Engagement Community Engagement
Learning and Education
Leisure and Lifestyle Unit
Action Number
Operational Plan Action / Target
Outcome
Unit
2017-18/COM/015
Develop accessibility audit program for Council owned community facilities to inform related works program and prioritise improvements/upgrades by 30 June 2019 Develop a community rental subsidy policy by 30 June 2019
Increase accessibility and inclusivity of Council owned community facilities
Leasing and Asset Management
To increase transparency on Council's contributions to community groups through subsidised rent and building outgoings Clean accessible public facility for the community New accessible public toilet facility for the community
Leasing and Asset Management
Sustainable works program developed through prior planning and costing
Facilities Management
Sustainable works program developed through prior planning and costing
Facilities Management
New accessible public facility for the community
Facilities Management
Site plan, detailed design, engineering investigations to be completed in order to have more accurate costings for construction Ability to show piece the Milligan Memorabilia
Facilities Management
Loans for print and resources are maintained A higher level of customer service staff are available within libraries
Library Services Library Services
Increased opportunities for people with disabilities and their family to fully participate in community life.
Community Engagement
2017-18/COM/016
2017-18/COM/017 2017-18/COM/018
2017-18/COM/019
2017-18/COM/020
2017-18/COM/021
2017-18/COM/022
2017-18/COM/023
2017-18/COM/024 2017-18/COM/025
2017-18/COM/026
Refurbishment of the Toukley Gardens public toilets by 30 June 2018 Construction of a new public toilet block at Boat Harbour, Summerland Point by 30 June 2018 Investigation and design for a public toilet block replacement at Benavie Reserve, MacMasters Beach by 30 June 2018 Investigation and design for a public toilet block at Kalakau Ave, Forresters Beach by 30 June 2018 Construction of a new public toilet facility at Werrina Parade, Blue Bay by 30 June 2018 Investigation and design for a public toilet block replacement at Victoria Street, East Gosford by 30 June 2018 Refurbishment of Woy Woy Library Spike Room to include an exhibition space by 30 April 2018 (subject to grant funding) Maintain annual library loans at 1.5 million 70% of the annual library loans are issued using self service facilities held within Councils libraries Implement relevant year one actions within Central Coast Council Disability Inclusion Action Plan by 30 June 2018
19
Facilities Management Facilities Management
Library Services
Environment This theme relates to valuing and appreciating the natural environment, environmental protection and the sustainable use of resources. The objectives and strategies respond to many aspects of caring for our natural environment, with a focus on biodiversity, access to natural areas, responsible resource use, minimising pollution, and promoting the benefits of the natural environment. In accordance with the direction from the NSW Department of Premier and Cabinet for merged councils, the following objectives respond to the Community Strategic Plans and the Delivery Programs of the former Gosford City and Wyong Shire Councils. After September 2017 the newly elected Central Coast Council will need to adopt a ten-year Community Strategic Plan and three-year Delivery Program (2018/19 to 2020/21) by 30 June 2018. Objectives •
•
•
Undertake water management and maintenance projects and implement the Lakes Improvement Strategy Develop and implement a Biodiversity Strategy, Natural Resource Strategy and Plans of Management for natural areas under Council’s care and control Manage and maintain Council assets associated with natural open space, including Coastal Open Space System (COSS), wetlands, bushland coastal lagoons, beaches, dunes, riparian and estuarine environments
• •
• •
•
Provide Carbon and Energy Management services to Council and the community Provide residents with efficient domestic waste and public litter collection services, and remove over 700 tonnes of gross pollutants from Gross Pollutant Traps per year Monitor recreational water quality, investigate air, water and noise issues Undertake environmental education programs, supporting schools and the community to understand the benefits of the natural environment Provide clean, safe drinking water and sewer services that meet the needs of our population
How can you help us make it happen? • • • • • •
Recycle and reuse resources Use public transport Car pool Consider your impact on others and the environment Become a volunteer e.g. council’s Bushcare program Buy local
• • • • • • •
21
Support green businesses Pick up your rubbish Participate in clean up days Eradicate introduced weeds Plant a vegetable garden Ride your bike or walk Buy good energy rated appliances
Environment Action Number
Operational Plan Action / Target
Outcome
Unit
2017-18/ENV/001
Develop vegetation and wildlife corridor mapping for the Central Coast Local Government Area by 30 June 2018 Develop a new bush fire prone lands map for the Central Coast Local Government Area by 30 June 2018
Ecological mapping will streamline and enhance private and public project planning
Natural and Environmental Assets
Updated bush fire prone lands mapping will support development assessment and help mitigate bush fire risk in the Central Coast Local Government Area A Recreational Strategy for Natural Areas will better promote appropriate utilisation of Council's Natural Assets
Natural and Environmental Assets
The Central Coast waste facilities are fully compliant
Waste services and Business Development
An effective and efficient public litter bin services is provided across the whole Central Coast region
Waste services and Business Development
A reliable, safe, cost effective and environmentally responsible domestic waste collection is provided to the Central Coast region.
Waste services and Business Development
Diversion of domestic waste from Central Coast Council landfill sites through resource recovery resulting in best value and environmentally responsible waste collection services The delivery of a new waste collection contract and specifications for the whole of the Central Coast region Data is reported and published annually as part of the Tuggerah Lakes Ecological Report Card and Health of the Waterways Reporting.
Waste services and Business Development
Amend Draft Coastal Zone Management Plans where necessary, to ensure that the community has a clear and strategic direction that adjusts to a changing environment Implementation of adopted Coastal Zone Management Plans (CZMP) high priority actions
Waterways and Coastal Protection
2017-18/ENV/002
2017-18/ENV/003
2017-18/ENV/004
2017-18/ENV/005
2017-18/ENV/006
2017-18/ENV/007
2017-18/ENV/008
2017-18/ENV/009
2017-18/ENV/010
2017-18/ENV/011
Develop a Recreation Strategy for Natural Areas by 30 June 2018 to engage the community to better utilise natural areas throughout the Central Coast Waste Facilities are operated in accordance with NSW Environmental Protection Legislation including; 100% compliance with Environmental Protection Authority licence requirements and the waste levy section 88 reporting 100% compliance annually, with the contract conditions for public litter bin collections for waste and recoverable resources 100% compliance with the contract conditions for domestic waste collection to ensure the community annually receives a reliable, safe, cost effective and environmentally responsible domestic waste collection Greater than 45% diversion of domestic waste from the Central Coast Council landfill sites annually
Tender and award a new waste collection and recyclable processing contract by 31 December 2017 Undertake an annual program of water quality and ecological health sampling in Tuggerah Lakes, Southern Lake Macquarie, Brisbane Water and the Coastal Lagoons in accordance with the NSW Monitoring, Evaluation and Reporting guidelines and the Estuary Management Plans. Certification of Coastal Zone Management Plans (CZMP) for the Central Coast by the Minister by 30 June 2018. (Subject to Coastal Panel Review and amendments) Completion of the Gosford Coastal Lagoons Entrance Management Review by 30 June 2018
22
Natural and Environmental Assets
Waste services and Business Development Waterways and Coastal Protection
Waterways and Coastal Protection
Action Number
Operational Plan Action / Target
Outcome
Unit
2017-18/ENV/012
Prepare a technical brief and engage specialist consultants to design and undertake environmental assessment to enable construction of coastal protection works at Umina and Ocean Beach by 30 June 2018 (3 year project subject to Grant Funding) Provide clean, safe drinking water that meets the regulated/targeted water quality parameters
Implementation of adopted Coastal Zone Management Plans (CZMP) high priority actions.
Waterways and Coastal Protection
Average frequency of unplanned interruptions per 1000 properties <151.8
2017-18/ENV/014
Annual sewer mains breaks and chokes per 100km of main is less than 35.6
Minimise sewage overflows to meet the regulated environmental objectives
2017-18/ENV/015
Complete water supply and sewerage servicing strategies for Gosford Central Business District redevelopment by 30 June 2018 Complete the Bateau Bay Sewage Treatment Plant Capacity Assessment by 30 June 2018
Identification of asset requirements and capital works strategy to support the growth of Gosford Central Business District Identification of asset requirements and capital works strategy to support future growth
Water Technical Services and System Control Water Technical Services and System Control Water Planning and Development
2017-18/ENV/013
2017-18/ENV/016
23
Water Construction and Project Management
Economy This theme relates to economic vitality and local employment with a focus on revitalising city and commercial centres, developing skills and knowledge, links between home and work, services and facilities. The objectives and strategies respond to the many aspects of what makes a diverse and robust economy. In accordance with the direction from the NSW Department of Premier and Cabinet for merged councils, the following objectives respond to the Community Strategic Plans and the Delivery Programs of the former Gosford City and Wyong Shire Councils. After September 2017 the newly elected Central Coast Council will need to adopt a ten-year Community Strategic Plan and three-year Delivery Program (2018/19 to 2020/21) by 30 June 2018.
Objectives •
•
•
Identify, activate and facilitate programs and projects focused upon improving the sustainability of City Centres Development of key iconic sites to increase economic and sustainable development, and facilitate new business start-ups and relocations Invest in education and learning opportunities through strategic partnerships
•
•
Enhance links between our homes, places of work, services and facilities by managing current and future road transport networks, and establishing options for telecommuting Establish relationships with the government and private sector to support a range of efficient public transport options for the Central Coast community
How can you help us make it happen? • • •
Promote local business and industry Encourage others to support local business and industry Tell others how great the Central Coast is and encourage them to visit
• • • •
25
Employ local people Join local business groups Set up a new business Buy local
Economy Action Number
Operational Plan Action / Target
Outcome
Unit
2017-18/ECO/001
Investigate and design a multi storey carpark at Tuggerah train station by 30 June 2019
To improve commuter car parking for residents using public transport at Tuggerah
2017-18/ECO/002
Investigate and design a carpark at Lisarow train station by 30 June 2020
To improve commuter car parking for residents using public transport at Lisarow
2017-18/ECO/003
Construction of an additional car parking level to the Wilson Road carpark at Terrigal by 31 December 2017 Design and construct a new library and commercial building at the Parkside building in Gosford by 30 June 2020
To provide additional parking for Terrigal residents and visitors near Terrigal Beach
Economic Development and Project Delivery Economic Development and Project Delivery Economic Development and Project Delivery Economic Development and Project Delivery Economic Development and Project Delivery Economic Development and Project Delivery Economic Development and Project Delivery Economic Development and Project Delivery Economic Development and Project Delivery
2017-18/ECO/004
To provide the community with a new purpose built library and associated community facilities plus commercial office space Provide access to higher education for the local community
2017-18/ECO/005
Facilitate the establishment of a university presence in the north of the Central Coast by 30 June 2020.
2017-18/ECO/006
Design and undertake public consultation for Terrigal public domain improvements works by 30 June 2020
Deliver an upgraded public domain with improved car parking and traffic movements in Terrigal
2017-18/ECO/007
Develop a masterplan for Central Coast Airport by 31 March 2018
2017-18/ECO/008
Develop the eastern side of the Central Coast Airport by 30 June 2025
2017-18/ECO/009
Commence an expression of interest for the licensing of mobile food vans on the Central Coast by 30 June 2018
2017-18/ECO/010
Construct a new access road to the relocated Budgewoi sports field by 30 June 2018
2017-18/ECO/011
Obtain approval and construct a new community facility building at Margaret Street Wyong by 30 June 2019 90% of the Roads and Drainage, Business Development and Technical Services unit capital expenditure projects are completed within scope and budget annually Manage the monthly Local Traffic Committee in conjunction with local Police, Local Members of Parliament, Roads and Martine services and local bus service providers
To develop the Central Coast Airport into a General Aviation Hub that stimulates the local economy through the aviation industry To develop the Central Coast Airport into a General Aviation Hub that stimulates the local economy through the aviation industry To improve the local economy and activate un-serviced areas of the Central Coast through the structures licensing of mobile food vans on the central Coast Relocate the Budgewoi sporting fields to Colongra to enhance sporting / recreation options in Budgewoi, and allow further commercial development within the main township of Budgewoi To provide additional community facilities for Wyong
2017-18/ECO/012
2017-18/ECO/013
Capital expenditure projects are completed as planned
Consistent approach across all levels of government on the management of Local Traffic Matters
26
Economic Development and Project Delivery Economic Development and Project Delivery Business Development and Technical Services Business Development and Technical Services
Action Number
Operational Plan Action / Target
Outcome
Unit
2017-18/ECO/014
Deliver improvements to the Central Coast Stadium to attract major events that meet the current and future needs of the community Deliver improvements to Central Coast Holiday Parks (Toowoon Bay, Norah Head, Budgewoi, Canton Beach and Patonga) Deliver improvements to Cemeteries (Jilliby, Noraville, Wamberal and Point Clare)
To provide a premier venue for sports and entertainment on the Central Coast
Business Enterprise
To attract visitors to holiday on the Central Coast
Business Enterprise
To provide beautiful well-tended places of rest available for the community and families
Business Enterprise
2017-18/ECO/015
2017-18/ECO/016
27
Governance and Leadership This theme relates to good governance and leadership, regulatory responsibility and accountability, and ensuring our infrastructure is well managed and maintained. The objectives and strategies respond to our duty to ensure that our day-to-day decision making and delivery of services are undertaken in accordance with the best interests of current and future generations of the Central Coast Community. In accordance with the direction from the NSW Department of Premier and Cabinet for merged councils, the following objectives respond to the Community Strategic Plans and the Delivery Programs of the former Gosford City and Wyong Shire Councils. After September 2017 the newly elected Central Coast Council will need to adopt a ten-year Community Strategic Plan and three-year Delivery Program (2018/19 to 2020/21) by 30 June 2018. Objectives •
• • •
•
•
Manage the Councillor induction process, administer the civic functions of the Mayor and Councillors, and ensure the Council meetings and agendas comply with statutory requirements Deliver sound financial management Provide professional contract, tendering and project management services Ensure all Public Officer requirements under the Local Government Act, the Government Information (Public Access) Act and the Privacy and Personal Information Protection Act are completed in accordance with legislative requirements Review Asset Management Plans annually and implement maintenance plans to ensure assets are cost effectively maintained in line with community expectations Provide advice, gather information and make decisions on matters related to planning for social,
•
•
•
environmental, coastal and estuary, flooding and drainage land use, transport and infrastructure Assess and determine development applications and provide advice to Council, ensuring median processing times for residential development application is 40 working days, and 10 working days for Complying Development (based on current resources and workload) Undertake statutory environmental health inspections ensuring 100% compliance with NSW Environmental Protection Authority requirements, and ranger services and companion animal functions in accordance with the relevant legislation Manage Council’s statutory obligations to emergency services including State Emergency Services and the Rural Fire Service, and develop and maintain a 10-year plan for maintaining Rural Fire Service buildings
How can you help make it happen? • • •
Vote at elections Provide feedback to government on policies and plans Try to consider the needs of others when decisions are being made
• •
29
Attend a Council meeting Advocate to elected representatives and government
Governance and Leadership Action Number
Operational Plan Action / Target
Outcome
Unit
2017-18/GOV/001
Develop a suite of standard reports for the organisation aligned to the key focus areas of the business (Human Resources, Finance and Assets) by 30 June 2018 Provide Geospatial Information Systems ensuring systems are accessible and operational during core hours of 8am to 5pm, Monday to Friday Provide Geospatial and Land Information Services, ensuring the reliability and accuracy of geospatial and property based data used within Council Achieve a median processing time for Development Applications of less than 40 days
Standard reporting provides basic entry level to analytics across all business units
Digital Information Services
Enables and promotes open and transparent geospatial and property information for Council's internal and external customer base
Digital Information Services
Accurate and reliable information base to support Council's core business operations and decision making processes
Digital Information Services
To support development and investment on the Central Coast through efficient customer focused assessment processes Establishment of a single Central Coast Local Environmental Plan
Development Assessment
Establish the northern corridors as key growth areas
Strategic Planning
Establish the southern corridors as key growth areas
Strategic Planning
Integrated approach to the funding of infrastructure to meet the needs of the Central Coast population Ensure the existing masterplan for Long Jetty reflects and supports existing growth of Long Jetty as an emerging cultural centre New urban planning and urban design approach to develop the Woy Woy Town Centre as a major growth centre To ensure compliance with the statutory requirement and promote transparency and accountability
Strategic Planning
To support Councillors in effective decision making and promote transparency and accountability To support Councillors in effective decision making and promote transparency and accountability To ensure ongoing contract management with NSW Electoral Commission as providers of the 2017 Local Government Election Faster determination of housing development applications
Governance and Business Services Governance and Business Services Governance and Business Services
2017-18/GOV/002
2017-18/GOV/003
2017-18/GOV/004
2017-18/GOV/005
2017-18/GOV/006
2017-18/GOV/007
2017-18/GOV/008
2017-18/GOV/009
Prepare and lodge a planning proposal to develop a Central Coast Local Environmental Plan by 30 June 2018 Prepare a structure plan for the Northern Economic Corridor by 30 June 2019 Prepare a structure plan for the Southern Economic Corridor by 30 June 2019 Develop a new suite of Contribution Plans for the Central Coast Region by 31 March 2019 Review the masterplan for Long Jetty Town Centre by 30 June 2018
2017-18/GOV/010
Develop masterplan for Woy Woy Town Centre by 30 June 2020
2017-18/GOV/011
Ensure 100% compliance by Governance and Business Services unit with statutory reporting deadlines and the register is maintained All agenda documents are circulated to Councillors at least three days prior to each Council Meeting No instances of substantive changes to recorded Council Meeting Minutes
2017-18/GOV/012
2017-18/GOV/013
2017-18/GOV/014
2017-18/GOV/015
Engage the contract services of NSW Electoral Commission to provide the 2017 Local Government Election in September 2017 Determine 90% of development applications for houses within 40 days as per the Premierâ&#x20AC;&#x2122;s priority targets for amalgamated Councils
30
Strategic Planning
Strategic Planning
Strategic Planning Governance and Business Services
Environment and Certification
Action Number
Operational Plan Action / Target
Outcome
Unit
2017-18/GOV/016
All public health complaints are actioned in accordance with the Service Delivery Charter as adopted by Council All environmental complaints are actioned in accordance with the Service Delivery Charter as adopted by Council All land use compliance complaints are actioned in accordance with the Service Delivery Charter as adopted by Council Develop and adopt a Service Delivery Charter for the Central Coast Building Certification South unit by 31 March 2018 Develop and adopt a Service Delivery Charter for the Community Safety South unit by 31 March 2018 Development of the Workforce Management Strategy by 31 December 2017 Conduct Service Delivery Reviews to ensure council services are aligned to community needs, and deliver high quality and cost effective outcomes to the community by 30 June 2019 Development of a Central Coast Community Strategic Plan (CSP) including Corporate and Community engagement by 30 June 2018
All requests are managed to the Service Delivery Charter as adopted by Council
Environment and Certification
All requests are managed to the Service Delivery Charter as adopted by Council
Environment and Certification
All requests are managed to the Service Delivery Charter as adopted by Council
Environment and Certification
All requests are managed to the Service Delivery Charter as adopted by Council
Environment and Certification
All requests are managed to the Service Delivery Charter as adopted by Council Council is equipped to deliver against the Community Strategic Plan
Environment and Certification People Planning and Operations Corporate Strategy and Performance
2017-18/GOV/017
2017-18/GOV/018
2017-18/GOV/019
2017-18/GOV/020
2017-18/GOV/021
2017-18/GOV/022
2017-18/GOV/023
2017-18/GOV/024
BR-01-000
BR-02-000
Develop a range of plans and strategies that meet the Integrated Planning and Reporting guidelines including a Resourcing Strategy, Delivery Program (3 year) and annual Operational Plan by 30 June 2018 Corporate Strategy Work Stream: To develop user-friendly corporate strategy frameworks that support the Central Coast Council to deliver efficient and effective integrated planning and reporting, business intelligence, project management and business improvement by 30 April 2020 Customer and Community Relations Work Stream: To work with our community and partners to connect and understand, to ensure that appropriate engagement forms part of our everyday business by 30 June 2020
31
An understanding by Council of the service levels, performance outcomes, quality and cost standards developed in consultation with local communities and key stakeholders Meet legislative Integrated Planning and Reporting guidelines and direction for newly merged Councils from State Government. Adopt an innovative approach to engagement across the Central Coast Region and ensure diverse stakeholder groups provide input into the new Community Strategic Plan. Meet legislative Integrated Planning and Reporting guidelines and direction for newly merged Councils from State Government. Support the delivery of services in line with the Community Strategic Plan Supports the integrated planning and delivery of services to the community
Improved engagement with all Central Coast customers
Corporate Strategy and Performance
Corporate Strategy and Performance
Transformation and Business Performance
Transformation and Business Performance
Action Number
Operational Plan Action / Target
Outcome
Unit
BR-03-000
Emergency Planning and Response Work Stream: Enabling resilient Central Coast communities with the capacity to reduce the effects of hazards and disasters through preparedness, planning, response and recovery activities by 31 August 2018 Information Management and Technology Work Stream: Enabling business empowerment through the strategic utilisation of technology by 31 October 2018 Legal and Corporate Compliance Work Stream: To ensure long-term sustainable value for our community through transparent, consistent, quality assured management of public funds and assets by 31 August 2019 Workforce Management Work Stream: Building an organisation of energised and passionate people by enabling a positive employment experience by 31 July 2019 Asset Management Work Stream: To provide best value with the level of service and quality of assets to meet our community's current and future needs by 30 September 2018 Financial Management Work Stream: To build a financially agile and resilient business through strong partnering and operational support by 31 October 2017 Procurement and Contract Management Work Stream: To achieve the highest standard of professional public procurement through integrity, trust and ethical practices by 31 December 2019 Plant and Fleet Work Stream: To ensure Councils plant and fleet assets meet the needs of the organisation and are managed and maintained efficiency and readily accessible by 29 February 2020 Town Planning Work Stream: To establish best practice town planning policies and strategies, to support growth in Central Coast cities, towns and villages, whilst ensuring positive sustainable outcomes are considered and achieved by 31 January 2021 Waste Management Work Stream: To manage and deliver sustainable waste management services and facilities, with the capability to implement business solutions that enhance our commercial return by 30 June 2019
The Central Coast region is better prepared for hazards and disasters
Transformation and Business Performance
Improved use of technology to enable improved service delivery
Transformation and Business Performance
The community has confidence that Central Coast Council is managed in the communities best interests
Transformation and Business Performance
Positive employment results in positive service delivery to the community
Transformation and Business Performance
Assets that are fit for purpose
Transformation and Business Performance
Financial sustainability that meets the Central Coast current and future needs
Transformation and Business Performance
Best practice procurement and contact management
Transformation and Business Performance
Internal plant and fleet requirements ensures timely service delivery to the community
Transformation and Business Performance
Best practice town planning now and into the future
Transformation and Business Performance
Sustainable waste management that focuses on less for more
Transformation and Business Performance
BR-04-000
BR-05-000
BR-06-000
BR-07-000
BR-08-000
BR-09-000
BR-10-000
BR-11-000
BR-12-000
32
Action Number
Operational Plan Action / Target
Outcome
Unit
BR-13-000
Development Assessment and Regulation Work Stream: To ensure effective and efficient development assessment and regulatory processes that meet customer and community needs, legislative requirements and industry best practice by 31 August 2018 Libraries Work Stream: To create a vibrant and sustainable, customerfocused library service for the recreation and enrichment of the Central Coast by 30 April 2020 Community Planning Development and Education Work Stream: To build a shared philosophy and practice to enable Council to work alongside the community to enhance a sense of belonging and to act on their common priorities by 28 February 2019 Sport and Recreation Work Stream: To align the functions, services and maintenance of our recreational grounds, parks and facilities and the processes and values in managing the environment that sustains our community by 31 October 2019 Transport and Drainage Infrastructure Work Stream: To provide safe, effective, efficient transport and drainage infrastructure by adopting best practice procedures and processes to support the interests of the Central Coast community by 31 October 2018 Water and Sewerage Work Stream: Develop an effective and efficient water and sewerage business that operates under best practice, whist delivering regulatory and reporting requirements by 30 June 2019 Economic Development and Property Work Stream: To develop best practice management of property assets to enable a wide range of community services and provide effective strategies to attract business to create local growth and employment by 30 November 2019
A clear and consistent approach to development assessment and regulatory processes throughout the Central Coast
Transformation and Business Performance
Libraries on the Central Coast are alive and educating
Transformation and Business Performance
Council and the community working together to achieve common objectives
Transformation and Business Performance
Providing a framework for the provision of diverse, quality and accessible services and faculties to the community into the future
Transformation and Business Performance
Improved transport and drainage systems that meets the demands
Transformation and Business Performance
Providing best practice essential services
Transformation and Business Performance
Targeted economic and property management that results in local growth and employment
Transformation and Business Performance
BR-14-000
BR-15-000
BR-16-000
BR-17-000
BR-18-000
BR-19-000
33
Capital Works Program
Capital Works Program Overview Council has budgeted to invest $207.9 million on assets in 2017-18 to improve and add to the asset portfolio, which has a gross replacement cost of over $9.5 billion. This capital works program represents a 13.7% increase on 2016-17 ($183 million). A detailed listing of 2017-18 projects follows this overview.
Capital Works Program by Business Unit The following business units within Council will be responsible for delivering the capital works program. Capital Works Program Summary by Unit Assets, Infrastructure and Business Business Enterprise Economic Development and Project Delivery Facilities Management Leasing and Asset Management Natural and Environmental Assets Open Space and Recreation Plant and Fleet Roads Asset Planning and Design Sewer Waste Services and Business Development Water Waterways and Coastal Protection Chief Financial Officer Finance Chief Information Officer Chief Technology Officer Digital Information Services Technology and Customer Services Connected Communities Community Engagement Community Partnerships Learning and Education Leisure and Lifestyle Libraries Connected Communities Management Governance Procurement and Projects Transformation and Business Performance Corporate Strategy and Performance Transformation and Business Performance Total
2017-18 Budget $185,819,436 $2,885,000 $10,931,887 $1,597,360 $3,033,996 $2,729,515 $28,862,500 $7,031,211 $70,519,106 $32,966,217 $2,605,994 $19,791,650 $2,865,000 $65,000 $65,000 $2,711,380 $976,000 $350,000 $1,385,380 $5,893,719 $119,320 $1,154,650 $456,500 $2,566,920 $1,416,329 $180,000 $430,000 $430,000 $13,028,464
Capital Works by Expenditure Type The capital works program is targeted at renewal and upgrade works to existing assets. 73% ($153 million) of the capital budget is focussed on renewals and upgrades. This allocation allows Council to maintain and renew existing assets and to aggressively tackle the asset backlog. Capital Works Program Summary by Expenditure Type New Renew / Replace Special Rate Variation (former Wyong Council only) Upgrade Assets Regional, Income Generating and Strategic Total
2017-18 Budget $28,816,156 $67,004,728 $9,987,000 $75,547,482 $26,592,633 $207,947,999
In June 2013 the former Wyong Shire Council was successful in gaining approval from the Independent Pricing and Regulatory Tribunal (IPART) for a Special Rate Variation (SRV) to address infrastructure asset backlog. The final year of the IPART approved rate increase was 2016-17; however Council has an ongoing obligation to allocate $10 million per annum to SRV projects. The works undertaken will improve the condition of roads, bridges, footpaths, buildings, sports facilities and information management systems in the North of the region to ensure they are â&#x20AC;&#x2DC;satisfactoryâ&#x20AC;&#x2122; in terms of being safe and fit for community use. Council will continue to determine a list of works to be undertaken on an annual basis with the SRV funds in accordance with its Asset Management Strategy. Projects directly supported by SRV funds are identified in the capital works program tables in the following pages.
$130,000 $12,898,464 $207,947,999
36
The following table shows the funding sources for the capital works program by expenditure type. Capital Works Program Summary by Funding Source Grants Restricted Revenue Developer Contributions General Revenue Total
Expenditure Type New Renew / Replace
Budget 2017-18
SRV
Upgrade Assets
$24,930,453 $5,341,765
$1,301,000 $492,186
$5,986,038 $1,004,150
$60,000 $0
$8,469,627 $3,845,429
Income Generating, Strategic and Regional $9,113,788 $0
$7,233,820
$710,000
$70,000
$0
$6,453,820
$0
$170,441,961 $207,947,999
$26,312,970 $28,816,156
$59,944,540 $67,004,728
$9,927,000 $9,987,000
$56,778,606 $75,547,482
$17,478,845 $26,592,633
Capital Works Program by Ward
Capital Works Program by Asset Type
The capital works program is reasonably evenly distributed between wards when regionally significant assets are considered.
The capital works program is targeted at areas considered high priority by the community - 74% in top 3 community priorities of Roads, Transport and Drainage (RTD), Water and Sewer, and Open Space and Recreation.
Capital Works Program Summary by Ward/Region Region Wide Local Scale Projects Budgewoi Gosford East Gosford West The Entrance Wyong Subtotal Local Scale Projects Total
2017-18 Budget $128,303,840 $18,083,013 $12,018,946 $18,376,122 $19,156,819 $12,009,259 $79,644,159 $207,947,999
A region wide project is one that provides benefit to the whole Central Coast community and is not suburb specific. It includes all Water and Sewer projects, as while they are undertaken in individual suburbs the works contribute to the overall running of the water and sewer network across the region. It also includes income generating, strategic and regional focussed projects including Central Coast Stadium, regional sporting facilities, airport development works, performing arts centre and a regional library that can be enjoyed by people all over the Central Coast, not just in the suburb in which they are located.
37
Capital Works Program Summary by Asset Type Airport Bridges Buildings Bus Facilities Car Parks Footpaths Furniture and Fittings Information Technology Library Books Natural Assets Open Space Assets Other Assets Other Structures Plant and Equipment Roads Sewerage Network Shared Pathway Sporting Facility Stormwater Drainage Swimming Pools Traffic Facilities Waste Management Water Supply Network Total
2017-18 Budget
Percentage of Total
$6,000,000 $2,475,778 $10,828,968 $424,953 $1,634,135 $1,944,741 $1,050,579 $17,097,164
2.9% 1.2% 5.2% 0.2% 0.8% 0.9% 0.5% 8.2%
$790,000 $1,497,515 $6,685,000 $90,000 $5,799,700 $8,475,071 $55,033,401 $33,095,683 $2,118,906 $20,455,000 $8,549,386 $132,000 $1,140,000 $2,080,494 $20,549,525
0.4% 0.7% 3.2% 0.0% 2.8% 4.1% 26.5% 15.9% 1.0% 9.9% 4.1% 0.1% 0.5% 1.0% 9.9%
$207,947,999
100.0%
Capital Works by Quadruple Bottom Line The capital works program is detailed on the following pages and is grouped by Councilâ&#x20AC;&#x2122;s quadruple bottom line categories of; Community, Environment, Economy and Governance and Leadership. The table below provides a summary of the proposed budget by category and the percentage of the total budget allocated to each category. Capital Works Program Summary by Quadruple Bottom Line Community Environment Economy Governance and Leadership TOTAL
2017-18 Budget
Percentage of Total
$39,387,575 $60,958,376 $84,335,993 $23,266,055
18.9% 29.3% 40.6% 11.2%
$207,947,999
100.0%
The following sections detail the individual capital works projects included in the $207.9 million program and is split between revenue and grant funded projects. Council has also included a list of capital works projects which we are awaiting confirmation of external grant funding before the capital works projects can be included in the capital works program.
38
Revenue Funded Capital Projects 2017-18 Ref No.
Project
Community COM.001 Upgrade of customer service counter (North) COM.002 Upgrade of customer queue management system COM.003 Upgrade of customer experience management system COM.004 Install CCTV
Suburb
Ward / Region
Funding Source
Responsible Unit
Budget
Region Wide
Region Wide Region Wide
General Revenue General Revenue
Community Engagement Community Engagement
$30,000
Region Wide
Region Wide
General Revenue
Community Engagement
$56,380
Ettalong Beach
Gosford West Gosford West Gosford West Gosford East Gosford East Gosford East
General Revenue General Revenue General Revenue General Revenue General Revenue Restricted Asset
Community Partnerships Community Partnerships Community Partnerships Community Partnerships Community Partnerships Community Partnerships
$15,000
Erina
Gosford East
General Revenue
Community Partnerships
$25,000
Toukley
Budgewoi
General Revenue
Community Partnerships
$30,000
Erina
Gosford East
General Revenue
Community Partnerships
$30,000
The Entrance
The Entrance
General Revenue
Community Partnerships
$35,000
Region Wide
Region Wide The Entrance
General Revenue General Revenue
Community Partnerships Community Partnerships
$50,000
Toukley
Budgewoi
General Revenue
Community Partnerships
$90,000
Wyong
Wyong
General Revenue
Community Partnerships
$90,000
The Entrance
The Entrance
General Revenue
Community Partnerships
$90,000
The Entrance
The Entrance
General Revenue
Community Partnerships
$100,000
The Entrance
The Entrance
General Revenue
Community Partnerships
$210,000
Region Wide
COM.005
Install CCTV
Terrigal
COM.006
Install CCTV
Gosford
COM.007
Upgrade of CCTV
Kincumber
COM.008
Kincumber Youth Centre - replace gutter Terrigal Leisure and Learning Centre replace carpet Erina Youth Centre relacquering of timber floor Toukley Town Centre install no parking and directional signage Erina Youth Centre relacquering of timber floor The Entrance Town Centre - replacement of rubbish bins Replace signage at various town centres The Entrance Town Centre - upgrade of street furniture Toukley Town Centre design and planning for Village Green precinct Wyong Town Centre install heritage and directional signage The Entrance Town Centre - upgrade of public domain area The Entrance Town Centre - upgrade of barbecue area The Entrance Town Centre - design and install new roof over
Kincumber
COM.009
COM.010
COM.011
COM.012
COM.013
COM.014 COM.015
COM.016
COM.017
COM.018
COM.019
COM.020
Terrigal
The Entrance
39
$32,940
$15,000 $15,000 $15,000 $18,000 $21,650
$55,000
Ref No.
COM.021
COM.022
COM.023
COM.024
COM.025
COM.026
COM.027 COM.028 COM.029 COM.030 COM.031
COM.032
COM.033 COM.034 COM.035 COM.036 COM.037 COM.038 COM.039
COM.040 COM.041 COM.042
Project
Suburb
Ward / Region
Funding Source
Responsible Unit
Budget
Ourimbah
Wyong
Developer Contributions
Community Partnerships
$250,000
Wyong
Region Wide
General Revenue
$180,000
Purchase aerial surveillance unit van fit out Investigate and design toilet block at Victoria Street Investigate and design toilet block at Kalakau Avenue Investigate and design toilet block at Benavie Reserve Refurbish toilet at Toukley Gardens Purchase aerial surveillance unit Construction of toilet block at Boat Harbour Construction of toilet block at Blue Bay Supply and install backflow devices to public toilets at various locations Long Jetty Depot - refit of trades workshop and storage Purchase of two drones
Region Wide
Region Wide
General Revenue
Connected Communities Management Facilities Management
East Gosford
Gosford West
General Revenue
Facilities Management
$50,000
Forresters Beach
The Entrance
General Revenue
Facilities Management
$50,000
MacMasters Beach
Gosford East
General Revenue
Facilities Management
$50,000
Toukley
Budgewoi Region Wide Budgewoi The Entrance Gosford West
Facilities Management Facilities Management Facilities Management Facilities Management Facilities Management
$80,000
Region Wide
Special Rate Variation General Revenue General Revenue General Revenue General Revenue
Region Wide
Region Wide
General Revenue
Facilities Management
$264,000
Region Wide Kanwal
General Revenue General Revenue General Revenue General Revenue General Revenue General Revenue General Revenue
Facilities Management Learning and Education Learning and Education Learning and Education Learning and Education Learning and Education Learning and Education
$550,000
Child Care Centre replace front door Child Care Centre replace furniture Child Care Centre upgrade of deck Child Care Centre upgrade of kitchen wall Child Care Centre upgrade of playground Child Care Centre upgrade of all-weather area Road Safety Program purchase of bicycles Child Care Centres replace signage Child Care Centre upgrade of bathroom tiling
Region Wide Wyong
General Revenue General Revenue General Revenue
Learning and Education Learning and Education Learning and Education
$15,000
main stage Investigation and implementation of a local multi-purpose community centre The Art House - install green room and lift
Summerland Point Blue Bay Gosford
Umina Beach San Remo
Gosford West Budgewoi
Kanwal
Wyong
Terrigal Niagara Park
Gosford West Wyong
Palmdale
Wyong
Region Wide
Region Wide Gosford East
Terrigal
40
$50,000
$88,360 $110,000 $130,000 $175,000
$5,000 $10,000 $12,000 $13,000 $15,000 $15,000
$20,000 $20,000
Ref No.
Project
Suburb
COM.043
Child Care Centre upgrade of bathroom tiling Child Care Centre replace fencing Child Care Centre upgrade of playground Child Care Centre upgrade of playground Child Care Centre upgrade of playground Alison Homestead repair carpark drainage
Kariong
COM.049
COM.050
COM.044 COM.045 COM.046 COM.047 COM.048
COM.051
COM.052
COM.053
COM.054
COM.055
COM.056
COM.057
COM.058
COM.059
COM.060
Ward / Region Gosford East
Funding Source General Revenue
Responsible Unit Learning and Education
Toukley
Budgewoi
Niagara Park
Wyong
Gosford West Gosford West Gosford West Wyong
General Revenue Restricted Asset Restricted Asset General Revenue General Revenue
Sewer upgrade to Gravity Youth Centre
Lake Haven
Budgewoi
General Revenue
San Remo Neighbourhood Centre - install disabled access ramp Mangrove Mountain replace locks and door handles Long Jetty Depot replace roller door to stores Chain Valley Bay Community Hall install new air conditioner The Entrance Community Centre install new air conditioner to block A Watanobbi Community Centre - install new air conditioner to Meeting Room Long Jetty Depot upgrade of wash bay oil separator system Toowoon Bay Lifeguard Tower - replace roof
San Remo
Budgewoi
General Revenue
Learning and Education Learning and Education Learning and Education Learning and Education Leasing and Asset Management Leasing and Asset Management Leasing and Asset Management
Mangrove Mountain
Gosford West
General Revenue
Region Wide
Region Wide
General Revenue
Chain Valley Bay
Budgewoi
Special Rate Variation
The Entrance
The Entrance
Special Rate Variation
Leasing and Asset Management
$10,000
Watanobbi
Wyong
Special Rate Variation
Leasing and Asset Management
$10,000
Region Wide
Region Wide
General Revenue
$10,000
The Entrance
The Entrance
General Revenue
The Entrance Community Centre install new air conditioner to block C Woy Woy Depot upgrade to security system The Entrance Life Guard Tower - replace roof
The Entrance
The Entrance
Special Rate Variation
Leasing and Asset Management Leasing and Asset Management Leasing and Asset Management
Region Wide
Region Wide
General Revenue
$15,000
Toowoon Bay
The Entrance
General Revenue
Leasing and Asset Management Leasing and Asset Management
Umina Beach Toukley
41
Leasing and Asset Management Leasing and Asset Management Leasing and Asset Management
Budget $20,000
$27,000 $55,000 $67,500 $162,000 $4,200
$4,200
$5,000
$5,000
$6,000
$10,000
$15,000
$15,000
$20,000
Ref No.
Project
Suburb
COM.061
The Entrance Community Centre install new air conditioner to block D Watanobbi Community Centre - install new air conditioner to Activity Room Charmhaven Depot upgrade to wash bay oil separator system Woy Woy Depot replace locks and door handles Lighthouse Early Learning Centre replace soft-fall Woy Woy Depot install CCTV network
The Entrance
COM.062
COM.063
COM.064
COM.065
COM.066
COM.067
COM.068
COM.069
COM.070
COM.071
COM.072
COM.073
COM.074
COM.075
COM.076
Ward / Region The Entrance
Funding Source Special Rate Variation
Responsible Unit Leasing and Asset Management
Watanobbi
Wyong
Special Rate Variation
Leasing and Asset Management
$20,000
Region Wide
Region Wide
General Revenue
$20,000
Region Wide
Region Wide
General Revenue
Berkeley Vale
The Entrance
General Revenue
Region Wide
Region Wide
General Revenue
Wyong Administration Building - replace various wall mounted split air conditioner systems Mannering Park Community Hall upgrade of meeting room Mannering Park Community Hall install new gate and fence Colongra Bay Community Hall install new air conditioner Mannering Park Community Hall replace entry door Blue Haven Community Centre - install new air conditioner Wyong Administration Building - install CCTV network Erina Depot - replace locks and door handles
Region Wide
Region Wide
General Revenue
Leasing and Asset Management Leasing and Asset Management Leasing and Asset Management Leasing and Asset Management Leasing and Asset Management
Mannering Park
Budgewoi
General Revenue
Leasing and Asset Management
$29,000
Mannering Park
Budgewoi
General Revenue
Leasing and Asset Management
$30,000
Colongra
Budgewoi
Special Rate Variation
Leasing and Asset Management
$30,000
Mannering Park
Budgewoi
General Revenue
$32,200
Blue Haven
Budgewoi
Special Rate Variation
Region Wide
Region Wide
General Revenue
Region Wide
Region Wide
General Revenue
Wyong Administration Building - replace chairs in Function Room Wyong Administration Building - replace building D air conditioner
Region Wide
Region Wide
General Revenue
Region Wide
Region Wide
General Revenue
Leasing and Asset Management Leasing and Asset Management Leasing and Asset Management Leasing and Asset Management Leasing and Asset Management Leasing and Asset Management
42
Budget $20,000
$20,000
$23,200
$25,000
$26,000
$40,000
$40,000
$40,000
$44,000
$45,000
Ref No.
Project
Suburb
Ward / Region Region Wide
Funding Source General Revenue
COM.077
Wyong Administration Building - refurbish Council Chambers Gosford Administration Building - refurbish Council Chambers Lighthouse Early Learning Centre replace roof Charmhaven Depot replace roller doors to stores Wyong Administration Building - replace carpet in various areas Erina Depot - install CCTV network
Region Wide
Region Wide
Region Wide
General Revenue
Berkeley Vale
The Entrance
General Revenue
Region Wide
Region Wide
General Revenue
Region Wide
Region Wide
General Revenue
Region Wide
Region Wide
General Revenue
Coast Lifetime Learning Centre - upgrade of outdoor facilities Wyong Administration Building - replace level 5 air conditioner Wyong Administration Building - upgrade and install fire and smoke detection system The Berkeley Centre repair retaining wall and fence Ted Doyle Oval upgrade of facilities
Ourimbah
Wyong
General Revenue
Region Wide
Region Wide
General Revenue
Region Wide
Region Wide
General Revenue
Glenning Valley
The Entrance
General Revenue
Glenning Valley
The Entrance
General Revenue
Charmhaven Depot replace fence along western and southern boundary Long Jetty Depot replace fence along western, eastern and northern boundary Erina Depot - replace security system
Region Wide
Region Wide
General Revenue
Region Wide
Region Wide
General Revenue
Leasing and Asset Management
$108,000
Region Wide
Region Wide
General Revenue
$110,000
COM.091
Surf Life Saving Club replace roof
Copacabana
Gosford East
General Revenue
COM.092
Charmhaven Depot purchase and install prefabricated amenities block Erina Depot - replace fence along southern and eastern boundaries
Region Wide
Region Wide
General Revenue
Leasing and Asset Management Leasing and Asset Management Leasing and Asset Management
Region Wide
Region Wide
General Revenue
Leasing and Asset Management
$165,500
COM.078
COM.079
COM.080
COM.081
COM.082
COM.083
COM.084
COM.085
COM.086
COM.087
COM.088
COM.089
COM.090
COM.093
43
Responsible Unit Leasing and Asset Management Leasing and Asset Management Leasing and Asset Management Leasing and Asset Management Leasing and Asset Management Leasing and Asset Management Leasing and Asset Management Leasing and Asset Management Leasing and Asset Management Leasing and Asset Management Leasing and Asset Management Leasing and Asset Management
Budget $50,000
$50,000
$60,000
$60,000
$70,000
$70,000
$80,000
$82,500
$87,896
$88,000
$100,000
$106,000
$125,000
$157,300
Ref No.
Project
Suburb
COM.094
Bateau Bay Police Citizen Youth Club (PCYC) - replace roof and gutter Charmhaven Depot design and construct access driveway Wyong Olympic Pool replace fencing Purchase of four beach wheelchairs Gosford Regional Gallery - replace external entry doors The Entrance Ocean Baths - upgrade of shade sails Toukley Aquatic Centre - retile Laycock Street Theatre - install an elevated work platform Install lifeguard radio transmitters Wyong Olympic Pool retile and install new filtration system Feasibility study for new leisure facility Peninsula Leisure Centre - purchase of lockers Upgrade of beach safety signage Peninsula Leisure Centre - upgrade of gym equipment Peninsula Leisure Centre - upgrade of change rooms Recreation Centre replace roof sheeting Gwandalan Library replace air conditioner Toukley Library upgrade of Program Room Bateau Bay Library upgrade of entry way Upgrade of library window graphics and signage Upgrade of library window graphics and signage New library management system
Bateau Bay
COM.095
COM.096 COM.097 COM.098
COM.099
COM.100 COM.101
COM.102 COM.103
COM.104 COM.105
COM.106 COM.107
COM.108
COM.109 COM.110 COM.113
COM.115 COM.116
COM.117
COM.118
Ward / Region The Entrance
Funding Source General Revenue
Responsible Unit Leasing and Asset Management
Region Wide
Region Wide
General Revenue
Wyong
Wyong
Region Wide
Region Wide Gosford West
General Revenue General Revenue General Revenue
Leasing and Asset Management Leisure and Lifestyle Leisure and Lifestyle Leisure and Lifestyle
The Entrance
The Entrance
General Revenue
Leisure and Lifestyle
$30,000
Toukley
Budgewoi Wyong
Leisure and Lifestyle Leisure and Lifestyle
$37,000
North Gosford
General Revenue General Revenue
Region Wide
General Revenue General Revenue
Leisure and Lifestyle Leisure and Lifestyle
$60,000
Wyong
Region Wide Wyong
Warnervale
Wyong Gosford West
Leisure and Lifestyle Leisure and Lifestyle
$95,000
Woy Woy
General Revenue General Revenue
Region Wide
Region Wide Gosford West
General Revenue General Revenue
Leisure and Lifestyle Leisure and Lifestyle
$120,000
Woy Woy
Gosford West
General Revenue
Leisure and Lifestyle
$130,000
Gorokan
Budgewoi Budgewoi
Leisure and Lifestyle Libraries
$178,920
Gwandalan Toukley
Budgewoi
General Revenue General Revenue General Revenue
Libraries
$12,000
Bateau Bay
The Entrance Region Wide
General Revenue General Revenue
Libraries
$29,400
Libraries
$30,000
Region Wide
Region Wide
Special Rate Variation
Libraries
$30,000
Region Wide
Region Wide
General Revenue
Libraries
$75,000
East Gosford
Woy Woy
Region Wide
44
Budget $250,000
$600,000
$10,000 $11,000 $25,000
$50,000
$95,000
$100,000
$125,000
$3,500
Ref No.
Project
Suburb
COM.119
Gosford Library refurbishment Replacement of RadioFrequency Identification (RFID) equipment Woy Woy Library upgrade of mobile shelving units Purchase of library resources Pine Avenue - install barbecue and shelter Deerubin Reserve upgrade of boat ramp Trafalgar Avenue upgrade of playground Improvements to Warnervale Athletics Field Couche Park - upgrade of access stairs Terrigal Haven - replace synthetic wicket Colongra Bay Reserve design and construction of a dog park Terrigal Rotary Park upgrade shelters and furniture Lady Laurel Drive upgrade of playground Cutrock Park - upgrade of playground Craigie Park - upgrade of playground Buff Point Oval upgrade of playground Owen Avenue upgrade of playground Shyhawk Avenue upgrade of playground Bellbird Park - upgrade of playground Resurface two tennis courts Renew boundary fence at Watanobbi Knoll and Myrtle Brush Park Upgrade of barbecues, shelters and benches at various parks and reserves Yarram Road - upgrade of playground Replacement of damaged equipment at various sportsgrounds
Gosford
COM.120
COM.121
COM.123 COM.124 COM.125 COM.126 COM.127
COM.128 COM.129 COM.130
COM.131
COM.132 COM.133 COM.134 COM.135 COM.136 COM.137 COM.138 COM.139 COM.140
COM.141
COM.142 COM.143
Ward / Region Gosford West Region Wide
Funding Source General Revenue General Revenue
Responsible Unit Libraries
$100,000
Libraries
$100,000
Woy Woy
Gosford West
Restricted Asset
Libraries
$181,429
Region Wide
Region Wide Gosford East Gosford West Gosford West Wyong
General Revenue General Revenue General Revenue General Revenue General Revenue
Libraries
$790,000
Open Space and Recreation Open Space and Recreation Open Space and Recreation Open Space and Recreation
$20,000
Gosford East Gosford East Budgewoi
General Revenue General Revenue General Revenue
Open Space and Recreation Open Space and Recreation Open Space and Recreation
$35,000
Terrigal
Gosford East
General Revenue
Open Space and Recreation
$60,000
Blue Haven
Budgewoi Wyong
Kanwal
Wyong
Buff Point
Budgewoi
Wyong
Wyong
Hamlyn Terrace Terrigal
Wyong Gosford East Region Wide The Entrance
Open Space and Recreation Open Space and Recreation Open Space and Recreation Open Space and Recreation Open Space and Recreation Open Space and Recreation Open Space and Recreation Open Space and Recreation Open Space and Recreation
$70,000
Ourimbah
Special Rate Variation Special Rate Variation Special Rate Variation Special Rate Variation Special Rate Variation Special Rate Variation General Revenue General Revenue General Revenue
Region Wide
Region Wide
General Revenue
Open Space and Recreation
$100,000
Bensville
Gosford East Region Wide
General Revenue General Revenue
Open Space and Recreation Open Space and Recreation
$100,000
Region Wide
Davistown Mooney Mooney Umina Beach Warnervale
Koolewong Terrigal Lake Munmorah
Region Wide Berkeley Vale
Region Wide
45
Budget
$25,000 $30,000 $30,000
$35,000 $40,000
$70,000 $70,000 $70,000 $70,000 $70,000 $80,000 $80,000 $90,000
$100,000
Ref No.
Project
Suburb
COM.144
Upgrade of carparks at various sportsgrounds Upgrade of amenities at various sportsgrounds Wadalba Oval - install subsoil drainage Installation of fencing at various sportsgrounds Hylton Moore upgrade of car park Upgrade of jetty
Region Wide
COM.145
COM.146 COM.147
COM.148 COM.149 COM.150 COM.151
COM.152 COM.153
COM.154 COM.155
COM.156
COM.157 COM.158 COM.159 COM.160 COM.161
COM.162
COM.163
COM.164
COM.165
Mitchell Park - upgrade of playground Hylton Moore - install baseball diamond and nets Terrigal Rotary Park upgrade of playground Upgrade of irrigation system at various sportsgrounds Investigation and design of skate park Colongra Bay Recreation Facility investigation and design of stage 1 Mannering Park Shared Pathway - design and construction Alan Davidson Oval upgrade of playground Baker Park - upgrade of flood lighting Rogers Park - install drainage and irrigation Umina Oval - upgrade of flood lighting Design and construction of a new district level playspace Austin Butler Oval install drainage and irrigation Alan Davidson Oval install drainage and irrigation Rebuild amenities at Entrance District Sporting and Community Centre (EDSACC) Boat Harbour - upgrade of carpark and fencing
Ward / Region Region Wide Region Wide
Funding Source General Revenue General Revenue
Responsible Unit Open Space and Recreation Open Space and Recreation
Wadalba
Wyong Region Wide
Open Space and Recreation Open Space and Recreation
$120,000
Region Wide
Special Rate Variation General Revenue
East Gosford
Gosford West Budgewoi
Open Space and Recreation Open Space and Recreation Open Space and Recreation Open Space and Recreation
$120,000
$160,000
Region Wide
Budget $100,000 $107,500
$120,000
East Gosford
Gosford West
General Revenue Special Rate Variation General Revenue General Revenue
Terrigal
Gosford East Region Wide
General Revenue General Revenue
Open Space and Recreation Open Space and Recreation
Lake Munmorah Halekulani
Budgewoi
General Revenue General Revenue
Open Space and Recreation Open Space and Recreation
$185,000
Mannering Park
Budgewoi
General Revenue
Open Space and Recreation
$200,000
Wyoming
Wyong Wyong
Woy Woy
Gosford West Gosford West Budgewoi
Open Space and Recreation Open Space and Recreation Open Space and Recreation Open Space and Recreation Open Space and Recreation
$200,000
Wyong
General Revenue General Revenue General Revenue General Revenue Special Rate Variation
Chain Valley Bay Narara
Region Wide
Umina Beach Mannering Park
Wyong
Budgewoi
$150,000 $150,000 $150,000
$170,000
$200,000
$200,000 $210,000 $220,000 $270,000
Woy Woy
Gosford West
General Revenue
Open Space and Recreation
$310,000
Wyoming
Wyong
Restricted Asset
Open Space and Recreation
$349,000
Bateau Bay
The Entrance
General Revenue
Open Space and Recreation
$350,000
Summerland Point
Budgewoi
General Revenue
Open Space and Recreation
$469,000
46
Ref No.
Project
COM.166
Suburb
Ward / Region Gosford West
Funding Source General Revenue
Responsible Unit Open Space and Recreation
Magenta
Region Wide
General Revenue
Open Space and Recreation
$500,000
Region Wide
Region Wide Budgewoi
General Revenue Restricted Asset Restricted Asset
Open Space and Recreation Open Space and Recreation Open Space and Recreation
$520,000
Upgrade of Lemongrove Netball Courts COM.167 Magenta Shared Pathway - design and construction of stage 2 COM.168 Plant and equipment upgrade of mowers COM.169 San Remo BMX Facility - upgrade of amenities COM.170 Austin Butler Oval upgrade of amenities and carpark Total Community Environment ENV.001 Install culverts, erosion prevention devices, and other infrastructure at three Council reserves ENV.002 Install signage at three Council reserves
Ettalong Beach
ENV.003
San Remo Woy Woy
Gosford West
Budget $500,000
$640,000 $900,000
$17,775,575 Region Wide
Region Wide
General Revenue
Natural and Environmental Assets
$10,000
Region Wide
Region Wide
General Revenue
$20,000
Upgrade of Asset Protection Zone
Berkeley Vale
Budgewoi
Special Rate Variation
ENV.004
Restoration of reserve along Pollock Avenue
Wyong
Wyong
General Revenue
ENV.005
Emergency Operations Centre - upgrade of equipment (North) Emergency Operations Centre - upgrade of equipment (South) Emergency Management - upgrade to Council website Upgrade of Asset Protection Zone
Region Wide
Region Wide
General Revenue
Region Wide
Region Wide
General Revenue
Region Wide
Region Wide
General Revenue
Watanobbi
Budgewoi
Special Rate Variation
ENV.009
Upgrade of Pleasant Valley Fire Trail
Glenning Valley
The Entrance
Special Rate Variation
ENV.010
Upgrade and replace tablets (Natural and Environmental Assets Unit) Upgrade of Asset Protection Zone
Region Wide
Region Wide
General Revenue
Natural and Environmental Assets Natural and Environmental Assets Natural and Environmental Assets Natural and Environmental Assets Natural and Environmental Assets Natural and Environmental Assets Natural and Environmental Assets Natural and Environmental Assets Natural and Environmental Assets
Chain Valley Bay
Budgewoi
Special Rate Variation
$65,000
ENV.012
Upgrade of Asset Protection Zone
Glenning Valley
Budgewoi
Special Rate Variation
ENV.013
Upgrade of Wadalba Wildlife Corridor
Wadalba
Wyong
Developer Contributions
Natural and Environmental Assets Natural and Environmental Assets Natural and Environmental Assets
ENV.006
ENV.007
ENV.008
ENV.011
47
$30,000
$30,000
$30,000
$30,000
$45,000
$45,000
$50,000
$52,000
$75,000
$75,000
Ref No.
Project
Suburb
ENV.014
Yarramalong Rural Fire Service Station upgrade of fire trail and drying pole Upgrade of fire trail at Mount Alison Reserve Fencing and access control on Council reserves Upgrade to pedestrian access into Kincumber Mountain Bush Fire Risk Mitigation Plan upgrade of fire trails Katandra Reserve upgrade of lower section of Toomeys Trail Replacement of various sewer system pressure pumps (design)
ENV.015
ENV.016
ENV.017
ENV.018
ENV.019
ENV.020
ENV.021
Cadonia Road upgrade of sewer pump station (design)
ENV.022
Sonoma Avenue upgrade of sewer pump station (design) Upgrade of various sewer mains (design) Replacement of various sewer odour vents (design) Upgrade of various sewer manholes (design) Refurbishment of sewer treatment plant (design) Upgrade of sewer rising mains (design) Upgrade of sewer rising mains (design) Upgrade of sewer rising mains (design) Upgrade of sewer rising mains (design) Erina Depot - upgrade of storage and safety facility Upgrade of various sewer gravity mains (design)
ENV.023 ENV.024
ENV.025
ENV.026
ENV.027 ENV.028 ENV.029 ENV.030 ENV.031
ENV.032
Yarramalong
Ward / Region Wyong
Funding Source General Revenue
Responsible Unit Natural and Environmental Assets
Jilliby
Wyong
Special Rate Variation
Budgewoi
Budgewoi
General Revenue
Kincumber
Gosford East
General Revenue
Region Wide
Region Wide
General Revenue
Holgate
Gosford East
General Revenue
Natural and Environmental Assets Natural and Environmental Assets Natural and Environmental Assets Natural and Environmental Assets Natural and Environmental Assets
Mooney Mooney, Cheero Point, Narara, Bensville Tuggerawong
Region Wide
General Revenue
Sewer
$1,000
Region Wide
Sewer
$5,000
Budgewoi
Region Wide
Developer Contributions and General Revenue General Revenue
Sewer
$5,000
Region Wide
Region Wide Region Wide
General Revenue General Revenue
Sewer
$10,000
Sewer
$15,000
Region Wide
Region Wide
General Revenue
Sewer
$15,000
Kincumber
Region Wide
General Revenue
Sewer
$15,040
Terrigal
Region Wide Region Wide Region Wide Region Wide Region Wide
General Revenue General Revenue General Revenue General Revenue General Revenue
Sewer
$18,125
Sewer
$18,125
Sewer
$18,125
Sewer
$18,125
Sewer
$20,000
Region Wide
General Revenue
Sewer
$20,000
Region Wide
Wamberal Woy Woy East Gosford Region Wide
Region Wide
48
Budget $85,000
$110,000
$116,000
$147,000
$285,000
$332,850
Ref No.
Project
Suburb
ENV.033
Upgrade of various sewer odour controls Upgrade of various sewer odour controls Upgrade of various sewer odour controls Upgrade of various sewer odour controls Upgrade of various sewer odour controls Replacement of pumps at sewer treatment plant Upgrade of various sewer rising mains, critical valve replacements Installation of flow monitoring devices at sewer treatment plant Installation of flow monitoring devices at sewer treatment plant Upgrade mobile devices and software Upgrade of South Tacoma low pressure sewer system (design) Upgrade of foul drainage pump at sewer treatment plant Upgrade of various sewer rising mains Upgrade of various sewer rising mains Upgrade of various sewer rising mains Upgrade of various sewer rising mains Refurbishment of sewer treatment plant, Building Refurbishment Upgrade of bridge bearing at sewer treatment plant Upgrade of bolt down covers at sewer pump station (design) Gavenlock Road upgrade of sewer pump station (design)
Bateau Bay
Refurbishment of lime silo at sewer treatment plant Upgrade of digester at sewer treatment plant
ENV.034 ENV.035 ENV.036 ENV.037 ENV.038
ENV.039
ENV.040
ENV.041
ENV.042 ENV.043
ENV.044
ENV.045 ENV.046 ENV.047 ENV.048 ENV.049
ENV.050
ENV.051
ENV.052
ENV.053
ENV.054
Ward / Region Region Wide Region Wide Region Wide Region Wide Region Wide Region Wide
Funding Source General Revenue General Revenue General Revenue General Revenue General Revenue General Revenue
Responsible Unit Sewer
$24,500
Sewer
$24,500
Sewer
$24,500
Sewer
$24,500
Sewer
$25,000
Sewer
$25,000
Region Wide
Region Wide
General Revenue
Sewer
$25,000
Kincumber
Region Wide
General Revenue
Sewer
$25,000
Woy Woy
Region Wide
General Revenue
Sewer
$25,000
Erina
Region Wide Region Wide
General Revenue General Revenue
Sewer
$30,000
Sewer
$35,000
Kincumber
Region Wide
General Revenue
Sewer
$36,000
Terrigal
Region Wide Region Wide Region Wide Region Wide Region Wide
General Revenue General Revenue General Revenue General Revenue General Revenue
Sewer
$44,375
Sewer
$44,375
Sewer
$44,375
Sewer
$44,375
Sewer
$45,080
Kincumber
Region Wide
General Revenue
Sewer
$47,060
Kincumber
Region Wide
General Revenue
Sewer
$55,000
Tuggerah
Region Wide
Sewer
$56,000
Kincumber
Region Wide
Developer Contributions and General Revenue General Revenue
Sewer
$60,000
Kincumber
Region Wide
General Revenue
Sewer
$60,000
Mannering Park Toukley Charmhaven Kincumber Kincumber
Wyong
Wamberal Woy Woy East Gosford Woy Woy
49
Budget
Ref No.
Project
Suburb
ENV.055
Upgrade of various sewer technical control networks Refurbishment of sewer treatment plant, Building Refurbishment Upgrade of various sewer odour controls (design) Upgrade of sewer siphon system Replacement of effluent pipework at sewer treatment plant Pateman Road upgrade of sewer gravity main Replacement of various sewer pump station valves Replacement of various sewer pump station pedestals Avoca Drive - upgrade of rising main Victory Parade upgrade of sewer pump station Cowper Road - upgrade of sewer pump station Replacement of various sewer odour vents Upgrade of final settling tank at sewer treatment plant Gosford Town Centre upgrade of sewer infrastructure (design)
Region Wide
Sonoma Avenue upgrade of sewer pump station Lakeside Drive upgrade of sewer pump station Replacement of various sewer system pressure pumps
ENV.056
ENV.057
ENV.058 ENV.059
ENV.060
ENV.061
ENV.062
ENV.063 ENV.064
ENV.065 ENV.066 ENV.067
ENV.068
ENV.069
ENV.070
ENV.071
ENV.072
ENV.073 ENV.074
Glenrock Parade upgrade of sewer pump station Upgrade of sewer major pump station Riverside Park upgrade of sewer pump station and main
Ward / Region Region Wide
Funding Source General Revenue
Responsible Unit Sewer
$64,750
Kincumber
Region Wide
General Revenue
Sewer
$74,960
Region Wide
Region Wide
General Revenue
Sewer
$87,200
Erina
Region Wide Region Wide
General Revenue General Revenue
Sewer
$95,000
Sewer
$100,000
Erina
Region Wide
General Revenue
Sewer
$100,000
Region Wide
Region Wide
General Revenue
Sewer
$100,000
Region Wide
Region Wide
General Revenue
Sewer
$100,000
Avoca Beach
Region Wide Region Wide
General Revenue General Revenue
Sewer
$107,000
Sewer
$107,000
Region Wide Region Wide Region Wide
General Revenue General Revenue General Revenue
Sewer
$116,000
Sewer
$118,000
Sewer
$120,000
Gosford
Region Wide
Sewer
$121,000
Budgewoi
Region Wide
Developer Contribution and General Revenue General Revenue
Sewer
$123,000
MacMasters Beach
Region Wide
General Revenue
Sewer
$129,000
Mooney Mooney, Cheero Point, Narara, Bensville Tascott
Region Wide
General Revenue
Sewer
$129,000
Region Wide
General Revenue
Sewer
$136,000
Kincumber
Region Wide Region Wide
General Revenue General Revenue
Sewer
$140,000
Sewer
$140,000
Woy Woy
Tascott
Umina Beach Region Wide Woy Woy
West Gosford
50
Budget
Ref No.
Project
Suburb
ENV.075
Wairakei Road upgrade of sewer pump station Upgrade of various sewer technical control networks Manns Road - upgrade of sewer pump station Upgrade of various sewer manholes Upgrade of sewer major pump station Pine Tree Lane upgrade of vehicle access to sewer pump station Upgrade of various submersible pumps Upgrade of South Tacoma sewer system Replacement of various sewer rising mains Minnesota Road upgrade of sewer pump station Warnervale Road upgrade of sewer pump station Upgrade of sewer siphon system Upgrade of clarifier at sewer treatment plant Upgrade of various sewer gravity mains Upgrade of sewer treatment plant Upgrade of odour controls at sewer treatment plant Upgrade of cross connection pipeline at sewer treatment plant Sparks Road - upgrade of sewer main Upgrade of bolt down covers at major sewer pump station Upgrade of sewer treatment plant
Wamberal
Upgrade sewer vacuum system Kincumber Sewer Treatment Plant - install a public waste disposal point
ENV.076
ENV.077 ENV.078 ENV.079 ENV.080
ENV.081 ENV.082 ENV.083 ENV.084
ENV.085
ENV.086 ENV.087 ENV.088 ENV.089 ENV.090
ENV.091
ENV.092 ENV.093
ENV.094
ENV.095 ENV.096
Ward / Region Region Wide
Funding Source General Revenue
Responsible Unit Sewer
$160,000
Region Wide
Region Wide
General Revenue
Sewer
$171,750
West Gosford
Region Wide Region Wide Region Wide Region Wide
General Revenue General Revenue General Revenue General Revenue
Sewer
$184,500
Sewer
$185,000
Sewer
$200,000
Sewer
$200,000
Region Wide Region Wide Region Wide Region Wide
General Revenue General Revenue General Revenue Developer Contributions
Sewer
$200,000
Sewer
$215,000
Sewer
$245,000
Sewer
$246,510
Hamlyn Terrace
Region Wide
Developer Contributions
Sewer
$246,510
Erina
Region Wide Region Wide Region Wide Region Wide Region Wide
General Revenue General Revenue General Revenue General Revenue General Revenue
Sewer
$280,000
Sewer
$280,000
Sewer
$330,000
Sewer
$331,533
Sewer
$432,500
Kincumber
Region Wide
General Revenue
Sewer
$440,000
Warnervale
Region Wide Region Wide
Developer Contributions General Revenue
Sewer
$460,000
Sewer
$495,000
Wyong
Region Wide
Sewer
$500,000
Tacoma
Region Wide Region Wide
Developer Contributions and General Revenue General Revenue General Revenue
Sewer
$525,000
Sewer
$612,046
Region Wide Kincumber Terrigal
Region Wide Wyong Region Wide Charmhaven
Woy Woy Region Wide Woy Woy Kincumber
Kincumber
Kincumber
51
Budget
Ref No.
Project
Suburb
ENV.097
Upgrade of sewer pump station fleet
Region Wide
ENV.098
Upgrade of sewer treatment plant Upgrade of various sewer pump station kiosks Upgrade of thickener unit at sewer treatment plant Upgrade of various sewer mains Upgrade of various sewer pump station control switchboards Gosford Town Centre upgrade of sewer infrastructure
Charmhaven
Region Wide Region Wide
Funding Source Developer Contributions and General Revenue Developer Contributions General Revenue
Kincumber
Region Wide
General Revenue
Sewer
$870,000
Region Wide
Region Wide Region Wide
General Revenue General Revenue
Sewer
$890,000
Sewer
$911,496
Gosford
Region Wide
Sewer
$1,000,000
Ocean Parade upgrade of sewer pump station
The Entrance
Region Wide
Sewer
$1,300,000
ENV.105
Gavenlock Road upgrade of sewer pump station
Tuggerah
Region Wide
Sewer
$1,368,000
ENV.106
The Entrance Road upgrade of sewer pump station Upgrade of various sewer pump station kiosks Railway Crescent upgrade of sewer pump station Carrington Street upgrade of sewer pump station Cadonia Road upgrade of sewer pump station Upgrade of various sewer odour controls Clarke Road - upgrade of sewer pump station
Forresters Beach
Region Wide
Developer Contributions and General Revenue Developer Contributions and General Revenue Developer Contributions and General Revenue General Revenue
ENV.104
Sewer
$1,500,000
Region Wide
Region Wide
General Revenue
Sewer
$1,708,800
Woy Woy
Region Wide
General Revenue
Sewer
$1,889,183
Narara
Region Wide
General Revenue
Sewer
$1,892,000
Tuggerawong
Region Wide
Developer Contributions
Sewer
$1,910,800
Region Wide
Region Wide Region Wide
Sewer
$2,197,499
Sewer
$3,041,000
Buttonderry Waste Management Facility investigate and design new weighbridge and office Buttonderry Waste Management Facility upgrade to signage
Jilliby
Region Wide
General Revenue Developer Contributions and General Revenue General Revenue
Waste Services and Business Development
$15,000
Jilliby
Region Wide
General Revenue
Waste Services and Business Development
$30,000
ENV.099
ENV.100
ENV.101 ENV.102
ENV.103
ENV.107
ENV.108
ENV.109
ENV.110
ENV.111 ENV.112
ENV.113
ENV.114
Region Wide
Region Wide
Noraville
Ward / Region Region Wide
52
Responsible Unit Sewer
Budget $700,000
Sewer
$800,000
Sewer
$836,000
Ref No.
Project
Suburb
ENV.115
Woy Woy Waste Management Facility â&#x20AC;&#x201C; replacement of sediment dam pump Buttonderry Waste Management Facility expansion of irrigation system Woy Woy Waste Management Facility upgrade to leachate pump stations Buttonderry Waste Management Facility construct access road to community recycling facility Buttonderry Waste Management Facility investigate and construct access road to Area 5 Woy Woy Waste Management Facility road and drainage upgrade to access road on Nagari Road Buttonderry Waste Management Facility upgrade to powerlines Buttonderry Waste Management Facility upgrade of access road to cell 4.3 and 4.4 Buttonderry Waste Management Facility construct litter fencing at northern end of Area 4 Replacement of public litter bin hutches
Woy Woy
Buttonderry Waste Management Facility develop a community recycling facility Woy Woy Waste Management Facility construct cell and cover material Upgrade of water control centre (design) Install pressure monitoring station (design) Install various permanent pressure loggers (design)
ENV.116
ENV.117
ENV.118
ENV.119
ENV.120
ENV.121
ENV.122
ENV.123
ENV.124
ENV.125
ENV.126
ENV.127 ENV.128
ENV.129
Ward / Region Region Wide
Funding Source General Revenue
Responsible Unit Waste Services and Business Development
Jilliby
Region Wide
General Revenue
Waste Services and Business Development
$67,244
Woy Woy
Region Wide
General Revenue
Waste Services and Business Development
$88,000
Jilliby
Region Wide
General Revenue
Waste Services and Business Development
$100,000
Jilliby
Region Wide
General Revenue
Waste Services and Business Development
$105,000
Woy Woy
Region Wide
General Revenue
Waste Services and Business Development
$111,000
Jilliby
Region Wide
General Revenue
$120,000
Jilliby
Region Wide
General Revenue
Waste Services and Business Development Waste Services and Business Development
Jilliby
Region Wide
General Revenue
Waste Services and Business Development
$200,000
Region Wide
Region Wide
Restricted Asset
$300,000
Jilliby
Region Wide
Woy Woy
Region Wide
Restricted Asset and General Revenue General Revenue
Waste Services and Business Development Waste Services and Business Development
Somersby
Region Wide Region Wide
General Revenue General Revenue
Water
$1,200
Water
$9,000
Region Wide
General Revenue
Water
$10,000
Region Wide
Region Wide
53
Waste Services and Business Development
Budget $61,500
$153,000
$350,000
$905,250
Ref No.
Project
Suburb
ENV.130
Upgrade of fire trails (design) Install water reservoir mixing units (design) Bryant Drive - replace scour valve Replace chlorine heaters at water treatment plant Install filter tile chamber covers at water treatment plant Install clearwater tank overflow flap valve at water treatment plant Replacement of various water meters (design) Replace fluoride day tank at water treatment plant Install chlorine dosing meters at water treatment plant Upgrade of water control centre Replace hose down water pump at water treatment plant Exterior repairs reservoir Upgrade of chlorine drums at water treatment plant Upgrade of mobile devices and software Upgrade of storage shed at water treatment plant Repair internal wall of balance tank (design) Replacement of water reservoir ladder Installation of various water catchment gauging (design) Refurbishment of laboratory and office at water treatment plant (design) Installation of various chlorine units Replace system mixers at water treatment plant
Mangrove Mountain Region Wide
ENV.131 ENV.132 ENV.133
ENV.134
ENV.135
ENV.136 ENV.137
ENV.138
ENV.139 ENV.140
ENV.141 ENV.142
ENV.143 ENV.144
ENV.145 ENV.146 ENV.147
ENV.148
ENV.149 ENV.150
Ward / Region Region Wide Region Wide Region Wide Region Wide
Funding Source General Revenue General Revenue General Revenue General Revenue
Responsible Unit Water
$10,000
Water
$10,000
Water
$15,000
Water
$15,000
Somersby
Region Wide
General Revenue
Water
$15,000
Somersby
Region Wide
General Revenue
Water
$15,000
Region Wide
Region Wide Region Wide
General Revenue General Revenue
Water
$15,000
Water
$15,545
Somersby
Region Wide
General Revenue
Water
$15,545
Somersby
Region Wide Region Wide
General Revenue General Revenue
Water
$18,800
Water
$20,000
Region Wide Region Wide
General Revenue General Revenue
Water
$24,000
Water
$27,204
Region Wide Region Wide
General Revenue General Revenue
Water
$30,000
Water
$30,000
Region Wide Region Wide Region Wide
General Revenue General Revenue General Revenue
Water
$30,000
Water
$30,000
Water
$30,100
Somersby
Region Wide
General Revenue
Water
$33,130
Region Wide
Region Wide Region Wide
General Revenue General Revenue
Water
$34,000
Water
$35,000
Tuggerah Somersby
Somersby
Somersby
Green Point Somersby
Erina Somersby
Somersby Tuggerah Region Wide
Somersby
54
Budget
Ref No.
Project
Suburb
ENV.151
Replacement of trunk main valve and associated pit and fittings at railway station Upgrade of safety equipment at various reservoirs Replace and remediate upstream wall face Glennie Street - install reservoir lining Replace spillway wall joints Mooney Dam upgrade of access road Install motorised valve at water pump station Gavenlock Road - reline trunk main Upgrade of raw water balance tanks Install leakage management flow meters Upgrade of water pump station Install tank linings at water treatment plant Install various reservoir level sensors Replace water trunk main Upgrade of water servers and network Install pressure monitoring station Install water quality monitoring equipment Replacement of fluoride bulk storage tank at water treatment plant Upgrade of pump starter at water pump station Replacement of stop valves Replacement of Toukley Bridge valve Upgrade of aeration pipework Replace soda ash-lime slurry dosing system mixers at water treatment plant Replacement of various defective stop valves
Tuggerah
ENV.152
ENV.153 ENV.154 ENV.155 ENV.156 ENV.157 ENV.158 ENV.159 ENV.160
ENV.161 ENV.162 ENV.163 ENV.164 ENV.165 ENV.166 ENV.167 ENV.168
ENV.169
ENV.170 ENV.171 ENV.172 ENV.173
ENV.174
Ward / Region Region Wide
Funding Source General Revenue
Responsible Unit Water
$35,000
Region Wide
Region Wide
General Revenue
Water
$35,000
Mooney Mooney Gosford
Region Wide Region Wide Region Wide Region Wide Region Wide Region Wide Region Wide Region Wide
General Revenue General Revenue General Revenue General Revenue General Revenue General Revenue General Revenue General Revenue
Water
$38,000
Water
$40,000
Water
$40,000
Water
$40,000
Water
$45,000
Water
$50,000
Water
$50,000
Water
$50,000
Region Wide Region Wide Region Wide Region Wide Region Wide Region Wide Region Wide Region Wide
General Revenue General Revenue General Revenue General Revenue General Revenue General Revenue General Revenue General Revenue
Water
$50,000
Water
$51,128
Water
$52,000
Water
$64,500
Water
$64,750
Water
$66,000
Water
$68,011
Water
$70,000
Ourimbah
Region Wide
General Revenue
Water
$70,000
Wadalba
Region Wide Region Wide Region Wide Region Wide
General Revenue General Revenue General Revenue General Revenue
Water
$72,000
Water
$80,000
Water
$85,000
Water
$85,499
Region Wide
General Revenue
Water
$90,000
Mangrove Mountain Somersby Wyong Tuggerah Somersby Region Wide
Avoca Beach Somersby Region Wide Gosford Region Wide Region Wide Mooney Mooney Somersby
Toukley Mooney Mooney Somersby
Region Wide
55
Budget
Ref No.
Project
Suburb
ENV.175
Install various permanent pressure loggers Remedial works to spillway Upgrade of safety equipment at various reservoirs Refurbishment of reservoir Install lime clarifier at water treatment plant Install LPG gas generators Install LPG gas generators Reduce excess pressure and leakages Investigation and design of structural platforms and equipment at various water reservoirs Refurbishment of water pump station Refurbishment of laboratory and office at water treatment plant Replacement of Mooney to Mangrove water pump Refurbishment of system and dosing room at water treatment plant Refurbishment of Boomerang Creek Tunnel Replacement of foundation core shed Upgrade of recirculation facility at water treatment plant (design) Construction of clear water tank baffles Replacement of reservoir valves Install various reservoir mixer units Replace air blower at water treatment plant Refurbishment of water pump station Upgrade various water trunk mains Install reservoir mixer unit
Region Wide
ENV.176 ENV.177
ENV.178 ENV.179 ENV.180 ENV.181 ENV.182 ENV.183
ENV.184 ENV.185
ENV.186
ENV.187
ENV.188
ENV.189 ENV.190
ENV.191 ENV.192 ENV.193 ENV.194 ENV.195 ENV.196 ENV.197
Ward / Region Region Wide
Funding Source General Revenue
Responsible Unit Water
$90,000
Mangrove Creek Region Wide
Region Wide Region Wide
General Revenue General Revenue
Water
$90,000
Water
$90,000
West Gosford
Region Wide Region Wide Region Wide Region Wide Region Wide Region Wide
General Revenue General Revenue General Revenue General Revenue General Revenue General Revenue
Water
$100,000
Water
$100,000
Water
$100,000
Water
$100,000
Water
$100,000
Water
$100,000
Forresters Beach Somersby
Region Wide Region Wide
General Revenue General Revenue
Water
$100,000
Water
$100,050
Mooney Mooney
Region Wide
General Revenue
Water
$115,957
Somersby
Region Wide
General Revenue
Water
$116,590
Yarramalong
Region Wide
General Revenue
Water
$120,000
Kulnura
Region Wide Region Wide
General Revenue General Revenue
Water
$120,000
Water
$120,000
Region Wide Region Wide Region Wide Region Wide Region Wide Region Wide Region Wide
General Revenue General Revenue General Revenue General Revenue General Revenue General Revenue General Revenue
Water
$125,000
Water
$135,000
Water
$140,000
Water
$150,000
Water
$150,000
Water
$150,500
Water
$160,000
Somersby Springfield Blackwall Region Wide Region Wide
Somersby
Mardi Tuggerah Region Wide Somersby MacMasters Beach Gosford Kangy Angy
56
Budget
Ref No.
Project
Suburb
ENV.198
Gosford Town Centre upgrade of water infrastructure (design)
Gosford
ENV.199
Upgrade of water pump station Upgrade of water servers and network Glennie Street - install reservoir lining Installation of eel screen Replace flow control and guard valve of water treatment plant Wallarah Road - replace fittings and valves Install various chlorine units Rechlorination of reservoir Replace water pump station kiosk Exterior repairs to reservoir Upgrade of various reservoir security systems Upgrade of various water mains Upgrade of various water catchment gauges Upgrade of fire trails
Avoca Beach
ENV.200 ENV.201 ENV.202 ENV.203
ENV.204 ENV.205 ENV.206 ENV.207 ENV.208 ENV.209
ENV.210 ENV.211
ENV.212 ENV.213 ENV.214 ENV.215
ENV.216
ENV.217 ENV.218
ENV.219 ENV.220 ENV.221
Repair internal wall of balance tank Replacement of various water meters (South) Sparks Road construction of water main Upgrade of recirculation facility at water treatment plant Upgrade of water treatment plant Construction of Mardi to Warnervale trunk water pipeline (design) Replacement of various water meters (North) Replacement of various water mains Upgrade of various pressure reduction valves
Responsible Unit Water
$165,000
Region Wide Region Wide Region Wide Region Wide Region Wide
Funding Source Developer Contributions and General Revenue General Revenue General Revenue General Revenue General Revenue General Revenue
Water
$170,000
Water
$171,750
Water
$185,000
Water
$192,000
Water
$200,000
Region Wide Region Wide Region Wide Region Wide Region Wide Region Wide
General Revenue General Revenue General Revenue General Revenue General Revenue General Revenue
Water
$201,900
Water
$216,000
Water
$225,000
Water
$240,000
Water
$251,000
Water
$300,000
Region Wide Region Wide
General Revenue General Revenue
Water
$312,500
Water
$318,100
Region Wide Region Wide Region Wide Region Wide
General Revenue General Revenue General Revenue General Revenue
Water
$320,000
Water
$350,000
Water
$360,000
Water
$460,000
Somersby
Region Wide
General Revenue
Water
$561,000
Mardi
Region Wide Region Wide
General Revenue General Revenue
Water
$574,000
Water
$770,000
Region Wide Region Wide Region Wide
General Revenue General Revenue General Revenue
Water
$826,424
Water
$937,500
Water
$1,000,000
Region Wide Gosford Mangrove Mountain Somersby
Gorokan Region Wide Kangy Angy Killarney Vale Green Point Region Wide
Region Wide Region Wide
Mangrove Mountain Somersby Region Wide Warnervale
Warnervale
Region Wide Region Wide Region Wide
Ward / Region Region Wide
57
Budget
Ref No.
Project
Suburb
Ward / Region Region Wide
Funding Source General Revenue
Responsible Unit Water
ENV.222
Upgrade of sludge lagoon at water treatment plant Gosford Town Centre upgrade of water infrastructure
Somersby
$1,450,000
Gosford
Region Wide
Water
$1,480,967
Construction of Mardi to Warnervale trunk water pipeline Fairport Avenue design and investigation of beach access stair replacement Captain Cook Memorial Reserve - construct seawall Install beach safety signage
Warnervale
Region Wide
Developer Contributions and General Revenue General Revenue
Water
$3,000,000
The Entrance
The Entrance
General Revenue
Waterways and Coastal Protection
$30,000
Green Point
Gosford East
General Revenue
$30,000
Region Wide
Gosford East
General Revenue
ENV.228
Araluen Drive construct seawall
Hardys Bay
Gosford East
General Revenue
ENV.229
Upgrade of beach access at various northern locations Upgrade of beach access at various southern locations Install safety fence
Region Wide
Region Wide
General Revenue
Region Wide
Region Wide
General Revenue
Norah Head
Budgewoi
General Revenue
ENV.232
Patonga Creek construct seawall
Patonga
Gosford West
General Revenue
ENV.233
Upgrade to Forresters Beach access
Forresters Beach
The Entrance
General Revenue
ENV.234
Upgrade to Blue Lagoon access
Bateau Bay
The Entrance
General Revenue
Soldiers Beach
Budgewoi
General Revenue
Tacoma
Wyong
General Revenue
Mannering Park
Budgewoi
Restricted Asset
Region Wide
Region Wide
Restricted Asset
Waterways and Coastal Protection Waterways and Coastal Protection Waterways and Coastal Protection Waterways and Coastal Protection Waterways and Coastal Protection Waterways and Coastal Protection Waterways and Coastal Protection Waterways and Coastal Protection Waterways and Coastal Protection Waterways and Coastal Protection Waterways and Coastal Protection Waterways and Coastal Protection Waterways and Coastal Protection
ENV.223
ENV.224
ENV.225
ENV.226
ENV.227
ENV.230
ENV.231
ENV.235
Soldiers Beach upgrade of dunes and fencing ENV.236 Wyong River rehabilitation of streambank ENV.237 Lake Macquarie Catchment - upgrade to Gross Pollutant Traps ENV.238 Tuggerah Lakes Catchment - upgrade to Gross Pollutant Traps Total Environment
Budget
$40,000
$60,000
$90,000
$90,000
$105,000
$160,000
$220,000
$260,000
$400,000
$400,000
$470,000
$510,000
$59,861,711
58
Ref No. Economy ECO.001
ECO.002
ECO.003
ECO.004
ECO.005
ECO.006
ECO.007
ECO.008
ECO.009 ECO.010
ECO.011
ECO.012
ECO.013
ECO.014
ECO.015
ECO.016
ECO.017
Project
Suburb
Ward / Region
Funding Source
Responsible Unit
Budget
Patonga Camping Ground - install a Dump Point for caravans Jilliby Cemetery upgrade to cemetery entrance and signage Jilliby Cemetery upgrade to Jilliby Road and provision of a designated parking area Noraville Cemetery install additional memorial sites Patonga Camping Ground - construct and repair access road Central Coast Stadium upgrade to directional signage Norah Head Holiday Park - replace main playground Patonga Camping Ground - upgrade to one amenity block Budgewoi Holiday Park - construct ensuite site Canton Beach Holiday Park - construct ensuite site Toowoon Bay Holiday Park - construct ensuite site Norah Head Holiday Park - replace street lighting and posts Central Coast Stadium upgrade to food outlet on the concourse Central Coast Stadium upgrade to sound system Central Coast Stadium upgrade of two new change rooms Central Coast Stadium upgrade of the public amenities on the east and west side Central Coast Stadium install two new screen / scoreboard
Patonga
Gosford West
General Revenue
Business Enterprise
$25,000
Jilliby
Wyong
Restricted Asset
Business Enterprise
$30,000
Jilliby
Wyong
Restricted Asset
Business Enterprise
$40,000
Noraville
Budgewoi
Restricted Asset
Business Enterprise
$50,000
Patonga
Gosford West
General Revenue
Business Enterprise
$60,000
Gosford
Region Wide
General Revenue
Business Enterprise
$80,000
Norah Head
Budgewoi
Restricted Asset
Business Enterprise
$80,000
Patonga
Gosford West
General Revenue
Business Enterprise
$90,000
Budgewoi
Budgewoi Budgewoi
Business Enterprise Business Enterprise
$100,000
Canton Beach
Restricted Asset Restricted Asset
Toowoon Bay
The Entrance
Restricted Asset
Business Enterprise
$100,000
Norah Head
Budgewoi
Restricted Asset
Business Enterprise
$180,000
Gosford
Region Wide
General Revenue
Business Enterprise
$200,000
Gosford
Region Wide
General Revenue
Business Enterprise
$250,000
Gosford
Region Wide
General Revenue
Business Enterprise
$300,000
Gosford
Region Wide
General Revenue
Business Enterprise
$300,000
Gosford
Region Wide
General Revenue
Business Enterprise
$900,000
59
$100,000
Ref No.
Project
Suburb Wyong
Ward / Region Wyong
Funding Source General Revenue
ECO.018
Cost of rezoning 7 Wyong Road to rezoning to industrial / commercial Colongra Sporting Complex - construct access road
Colongra
Budgewoi
General Revenue
Planning and investigations for car parking options at Lisarow Planning and investigations for car parking options at Tuggerah Railway Station Planning and investigations for car parking options at Warnervale Upgrade of Terrigal carpark
Lisarow
Wyong
General Revenue
Tuggerah
The Entrance
General Revenue
Warnervale
Wyong
General Revenue
Terrigal
Gosford East
General Revenue
Investigations into Terrigal Town Centre public domain improvements Commence development of Regional Library and Commercial Area (Gosford CBD, Parkside Building) Central Coast North UNI, integrated Education and Business Precinct Construction of community building on Margaret Street
Terrigal
Gosford East
General Revenue
Gosford
Region Wide
General Revenue
Warnervale
Region Wide
General Revenue
Wyong
Wyong
General Revenue
ECO.028
Development of Central Coast Airport
Warnervale
Region Wide
General Revenue
ECO.029
Woodbine Close Lane road reseal
Lisarow
Wyong
General Revenue
ECO.030
Mikes Place - road reseal
Lisarow
Wyong
General Revenue
ECO.031
Koolong Road upgrade of bus stop
Green Point
Gosford East
General Revenue
ECO.032
Koolong Road upgrade of bus stop
Green Point
Gosford East
General Revenue
ECO.019
ECO.020
ECO.021
ECO.022
ECO.023
ECO.024
ECO.025
ECO.026
ECO.027
60
Responsible Unit Economic Development and Project Delivery Economic Development and Project Delivery Economic Development and Project Delivery Economic Development and Project Delivery Economic Development and Project Delivery Economic Development and Project Delivery Economic Development and Project Delivery Economic Development and Project Delivery
Economic Development and Project Delivery Economic Development and Project Delivery Economic Development and Project Delivery Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $41,500
$140,000
$147,375
$309,380
$309,380
$525,000
$565,000
$614,870
$734,383
$1,544,999
$6,000,000
$475
$625
$1,000
$1,000
Ref No.
Project
Suburb
Ward / Region Wyong
Funding Source General Revenue
ECO.033
Carina Close - road reseal
Wyoming
ECO.034
Finch Place - road reseal
Point Clare
Gosford West
General Revenue
ECO.035
Christopher Close road reseal
Wyoming
Wyong
General Revenue
ECO.036
Andra Close - road reseal
Wyoming
Wyong
General Revenue
ECO.037
Brie Close - road reseal
Lisarow
Wyong
General Revenue
ECO.038
Sycamore Close - road reseal
Springfield
Gosford East
General Revenue
ECO.039
Crestview Place - road reseal
Lisarow
Wyong
General Revenue
ECO.040
Parry Place - road reseal
Point Clare
Gosford West
General Revenue
ECO.041
Fountains Road - road reseal
Narara
Wyong
General Revenue
ECO.042
Harris Lane - road reseal
Point Clare
Gosford West
General Revenue
ECO.043
Yellow Book Close road reseal
Terrigal
Gosford East
General Revenue
ECO.044
Cypress Close - road reseal
Springfield
Gosford East
General Revenue
ECO.045
Peat Place - road reseal
Point Clare
Gosford West
General Revenue
ECO.046
John Howe Place - road reseal
Point Clare
Gosford West
General Revenue
ECO.047
Takari Avenue - road reseal
Point Clare
Gosford West
General Revenue
ECO.048
Ewing Lane - road reseal
Glenning Valley
The Entrance
General Revenue
ECO.049
Tegal Place - road reseal
Point Clare
Gosford West
General Revenue
ECO.050
Guides Close - road reseal
Kanwal
Wyong
General Revenue
ECO.051
Dundee Close - road reseal
Green Point
Gosford East
General Revenue
61
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $1,102
$1,401
$1,480
$1,497
$1,708
$2,032
$2,195
$2,294
$2,352
$2,479
$2,525
$2,613
$2,618
$2,628
$3,010
$3,181
$3,237
$3,420
$3,428
Ref No.
Project
Suburb
Ward / Region Gosford East
Funding Source General Revenue
ECO.052
Curtis Close - road reseal
Green Point
ECO.053
Nottingham Close road reseal
Terrigal
Gosford East
General Revenue
ECO.054
Fagans Road - road reseal
Lisarow
Wyong
General Revenue
ECO.055
Nicholii Close - road reseal
Springfield
Gosford East
General Revenue
ECO.056
Woodbine Close - road reseal
Lisarow
Wyong
General Revenue
ECO.057
Wells Street - upgrade of bus stop
Springfield
Gosford West
General Revenue
ECO.058
Irwin Place - road reseal
Green Point
Gosford East
General Revenue
ECO.059
Minton Street - road reseal
East Gosford
Gosford West
General Revenue
ECO.060
Owen Close - road reseal
Terrigal
Gosford East
General Revenue
ECO.061
Kurrajong Close - road reseal
Springfield
Gosford East
General Revenue
ECO.062
Uwa Street - road reseal
Budgewoi
Budgewoi
General Revenue
ECO.063
Woods Avenue - road reseal
San Remo
Budgewoi
General Revenue
ECO.064
Pamela Close - road reseal
Bateau Bay
The Entrance
General Revenue
ECO.065
Kurrajong Close - road reseal
Springfield
Gosford East
General Revenue
ECO.066
Oxley Place - road reseal
Point Clare
Gosford West
General Revenue
ECO.067
Dewrang Road - road reseal
Terrigal
Gosford East
General Revenue
ECO.068
Bapaume Avenue road reseal
Umina Beach
Gosford West
General Revenue
ECO.069
Wattle Crescent - road reseal
Phegans Bay
Gosford West
General Revenue
ECO.070
Fagans Road - road reseal
Lisarow
Wyong
General Revenue
62
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $3,458
$3,477
$3,595
$3,614
$3,694
$3,729
$3,900
$3,929
$3,961
$4,041
$4,088
$4,133
$4,137
$4,142
$4,154
$4,175
$4,258
$4,421
$4,452
Ref No.
Project
Suburb
Ward / Region Gosford East
Funding Source General Revenue
ECO.071
Poplar Close - road reseal
Springfield
ECO.072
Kuch Place - road reseal
Kariong
Gosford West
General Revenue
ECO.073
Lingi Street - road reseal
Erina
Gosford East
General Revenue
ECO.074
Peverill Street - road reseal
Mannering Park
Budgewoi
General Revenue
ECO.075
Casa Place - road reseal
Copacabana
Gosford East
General Revenue
ECO.076
Valley View Road - road reseal
Wyoming
Wyong
General Revenue
ECO.077
Fagans Road - road reseal
Lisarow
Wyong
General Revenue
ECO.078
Websdale Place - road reseal
Point Clare
Gosford West
General Revenue
ECO.079
Sandringham Close road reseal
Terrigal
Gosford East
General Revenue
ECO.080
Oberton Road - road reseal
Kincumber
The Entrance
General Revenue
ECO.081
Gordon Road construction of bus stop Small Street - road reseal
Empire Bay
Gosford East
General Revenue
Wyoming
Wyong
General Revenue
ECO.083
Colin Street - road reseal
Berkeley Vale
The Entrance
General Revenue
ECO.084
Dunleigh Street - road reseal
Toukley
Budgewoi
General Revenue
ECO.085
Moir Place - road reseal
Green Point
Gosford East
General Revenue
ECO.086
Kaystone Crescent road reseal
Bateau Bay
The Entrance
General Revenue
ECO.087
Empire Bay Drive construction of bus stop Wells Street - upgrade of bus stop
Empire Bay
Gosford East
General Revenue
East Gosford
Gosford West
General Revenue
Valley View Road - road reseal
Wyoming
Wyong
General Revenue
ECO.082
ECO.088
ECO.089
63
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $4,473
$4,714
$4,716
$4,722
$4,759
$4,774
$4,790
$4,826
$4,832
$4,999
$5,010
$5,136
$5,354
$5,600
$5,608
$5,609
$5,757
$5,757
$5,791
Ref No.
Project
Suburb Halekulani
Ward / Region Budgewoi
Funding Source General Revenue
ECO.090
Susan Close - road reseal
ECO.091
Darlene Close - road reseal
Halekulani
Budgewoi
General Revenue
ECO.092
Rawsthorne Crescent road reseal
Bateau Bay
The Entrance
General Revenue
ECO.093
Jirramba Avenue construction of bus stop Belina Avenue - road reseal
Saratoga
Gosford East
General Revenue
Wyoming
Wyong
General Revenue
ECO.095
Rolls Avenue - road reseal
Toowoon Bay
The Entrance
General Revenue
ECO.096
Woodview Avenue road reseal
Lisarow
Wyong
General Revenue
ECO.097
Larbonya Avenue road reseal
Wyoming
Wyong
General Revenue
ECO.098
Hanson Close - road reseal
Kariong
Gosford West
General Revenue
ECO.099
Kareel Close - road reseal
Erina
Gosford East
General Revenue
ECO.100
Fraser Road - road reseal
Killcare
Gosford East
General Revenue
ECO.101
Lana Avenue - road reseal
Wyoming
Wyong
General Revenue
ECO.102
Maitland Street - road reseal
Norah Head
Budgewoi
General Revenue
ECO.103
Glenbrook Street - road reseal
Long Jetty
The Entrance
General Revenue
ECO.104
Julie Street - road reseal
Berkeley Vale
The Entrance
General Revenue
ECO.105
Hampton Close - road reseal
Terrigal
Gosford East
General Revenue
ECO.106
Pollock Avenue - road reseal
Kariong
Gosford West
General Revenue
ECO.107
Pineridge Close - road reseal
Lisarow
Wyong
General Revenue
ECO.108
Conden Place - road reseal
Canton Beach
Budgewoi
General Revenue
ECO.094
64
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $5,831
$5,923
$5,962
$6,000
$6,016
$6,080
$6,360
$6,423
$6,480
$6,480
$6,491
$6,564
$6,597
$6,604
$6,631
$6,693
$6,702
$6,752
$6,814
Ref No.
Project
Suburb
Ward / Region Gosford West
Funding Source General Revenue
ECO.109
Wharf Street - road reseal
East Gosford
ECO.110
Hughes Street - road reseal
Point Clare
Gosford West
General Revenue
ECO.111
Lisarow Street - road reseal
Lisarow
Wyong
General Revenue
ECO.112
Michele Avenue - road reseal
Noraville
Budgewoi
General Revenue
ECO.113
Schnapper Road construction of bus stop Wells Street - upgrade of bus stop
Ettalong Beach
Gosford West
General Revenue
East Gosford
Gosford West
General Revenue
ECO.115
Lowe Place - road reseal
Kariong
Gosford West
General Revenue
ECO.116
Nalkari Avenue - road reseal
Wyoming
Wyong
General Revenue
ECO.117
Gregory Street - road reseal
Wyoming
Wyong
General Revenue
ECO.118
Bakali Road - road reseal
Tumbi Umbi
The Entrance
General Revenue
ECO.119
Belshaw Place - road reseal
Bateau Bay
The Entrance
General Revenue
ECO.120
Singleton Road - road reseal
Point Clare
Gosford West
General Revenue
ECO.121
Adelaide Avenue - road reseal
Umina Beach
Gosford West
General Revenue
ECO.122
Wagtail Place - road reseal
Green Point
Gosford East
General Revenue
ECO.123
Rickard Road construction of bus stop Schnapper Road construction of bus stop Mulhall Street - road reseal
Empire Bay
Gosford East
General Revenue
Ettalong Beach
Gosford West
General Revenue
Wagstaffe
Gosford East
General Revenue
ECO.126
Melbourne Street road reseal
East Gosford
Gosford West
General Revenue
ECO.127
Terence Avenue - road reseal
Lake Munmorah
Budgewoi
General Revenue
ECO.114
ECO.124
ECO.125
65
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $6,849
$6,905
$6,968
$6,983
$7,000
$7,000
$7,051
$7,144
$7,210
$7,500
$7,548
$7,576
$7,630
$7,734
$7,749
$7,749
$7,858
$7,906
$7,933
Ref No.
Project
Suburb St Huberts Island
Ward / Region Gosford East
Funding Source General Revenue
ECO.128
Helmsman Boulevarde construction of bus stop Helmsman Boulevarde construction of bus stop Blackwall Road upgrade of carpark
St Huberts Island
Gosford East
General Revenue
Woy Woy
Gosford West
General Revenue
Victoria Street upgrade of traffic facilities Casula Place - road reseal
East Gosford
Gosford West
General Revenue
Ourimbah
Wyong
General Revenue
ECO.133
Singleton Road - road reseal
Point Clare
Gosford West
General Revenue
ECO.134
Ruby Street - road reseal
Gorokan
Budgewoi
General Revenue
ECO.135
Corrella Avenue - road reseal
Green Point
Gosford East
General Revenue
ECO.136
Advance Street - road reseal
Lake Haven
Budgewoi
General Revenue
ECO.137
Thompson Vale Road road reseal
Doyalson
Budgewoi
General Revenue
ECO.138
Newman Close - road reseal
Green Point
Gosford East
General Revenue
ECO.139
Myrna Road - road reseal
Wyongah
Wyong
General Revenue
ECO.140
Gross Avenue - road reseal
Umina Beach
Gosford West
General Revenue
ECO.141
Brundell Avenue - road reseal
San Remo
Budgewoi
General Revenue
ECO.142
Crestside - road reseal
Terrigal
Gosford East
General Revenue
ECO.143
Walker Road - road reseal
Wyoming
Wyong
General Revenue
ECO.144
Webster Avenue - road reseal
Budgewoi
Budgewoi
General Revenue
ECO.145
Gum Leaf Close - road reseal
Erina
Gosford East
General Revenue
ECO.146
Michele Avenue - road reseal
Noraville
Budgewoi
General Revenue
ECO.129
ECO.130
ECO.131
ECO.132
66
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $8,000
$8,000
$8,000
$8,000
$8,006
$8,012
$8,124
$8,165
$8,166
$8,345
$8,379
$8,452
$8,463
$8,550
$8,613
$8,709
$8,753
$8,822
$9,182
Ref No.
Project
Suburb Noraville
Ward / Region Budgewoi
Funding Source General Revenue
ECO.147
Gomul Street - road reseal
ECO.148
Georgia Avenue - road reseal
Wyoming
Wyong
General Revenue
ECO.149
Blackett Street - road reseal
West Gosford
Gosford West
General Revenue
ECO.150
Giselle Avenue - road reseal
Wyoming
Wyong
General Revenue
ECO.151
Giselle Avenue - road reseal
Wyoming
Wyong
General Revenue
ECO.152
Oberon Road - road reseal
Chittaway Bay
The Entrance
General Revenue
ECO.153
Yeddenba Avenue road reseal
Blue Bay
The Entrance
General Revenue
ECO.154
Lalla Place - road reseal
Umina Beach
Gosford West
General Revenue
ECO.155
Nichols Avenue - road reseal
Gorokan
Budgewoi
General Revenue
ECO.156
Pacific Highway - road reseal
Doyalson
Budgewoi
General Revenue
ECO.157
Ulana Avenue - road reseal
Halekulani
Budgewoi
General Revenue
ECO.158
Carmel Crescent design of footpath
Kariong
Gosford West
General Revenue
ECO.159
Carrak Road - design of footpath
Kincumber
Gosford East
General Revenue
ECO.160
Racecourse Road design of footpath
Gosford
Gosford West
General Revenue
ECO.161
Parson Road - upgrade of traffic facilities
Lisarow
Wyong
General Revenue
ECO.162
The Esplanade upgrade of traffic facilities O'Donnell Crescent road reseal
Umina Beach
Gosford West
General Revenue
Lisarow
Wyong
General Revenue
ECO.164
Maitland Street - road reseal
Norah Head
Budgewoi
General Revenue
ECO.165
Nioka Avenue - road reseal
Point Clare
Gosford West
General Revenue
ECO.163
67
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $9,185
$9,223
$9,289
$9,306
$9,306
$9,474
$9,543
$9,752
$10,000
$10,000
$10,000
$10,000
$10,000
$10,000
$10,000
$10,000
$10,010
$10,014
$10,047
Ref No.
Project
Suburb
Ward / Region Wyong
Funding Source General Revenue
ECO.166
Cottam Road - road reseal
Wyongah
ECO.167
Mahogany Place - road reseal
Springfield
Gosford East
General Revenue
ECO.168
Lillian Street - road reseal
Noraville
Budgewoi
General Revenue
ECO.169
Manly View Road road reseal
Killcare Heights
Gosford East
General Revenue
ECO.170
Elissa Crescent - road reseal
Wyoming
Wyong
General Revenue
ECO.171
Seaview Parade - road reseal
Blue Bay
The Entrance
General Revenue
ECO.172
Telopea Street - road reseal
Booker Bay
Gosford West
General Revenue
ECO.173
Winani Road - road reseal
Erina
Gosford East
General Revenue
ECO.174
Akora Road - road reseal
Wyoming
Wyong
General Revenue
ECO.175
Meadow Road - road reseal
Springfield
Gosford East
General Revenue
ECO.176
Bay Street - road reseal
Patonga
Gosford West
General Revenue
ECO.177
Georgia Avenue - road reseal
Wyoming
Wyong
General Revenue
ECO.178
Fagans Road - road reseal
Lisarow
Wyong
General Revenue
ECO.179
Arnold Close - road reseal
Halekulani
Budgewoi
General Revenue
ECO.180
Thurling Avenue - road reseal
Kariong
Gosford West
General Revenue
ECO.181
Gregory Street - road reseal
Wyoming
Wyong
General Revenue
ECO.182
Myrna Road - road reseal
Wyongah
Wyong
General Revenue
ECO.183
Rene Avenue - road reseal
Wyongah
Wyong
General Revenue
ECO.184
North Scenic Road road reseal
Forresters Beach
The Entrance
General Revenue
68
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $10,195
$10,281
$10,289
$10,292
$10,365
$10,462
$10,588
$10,590
$10,594
$10,608
$10,637
$10,734
$10,805
$10,855
$10,877
$11,023
$11,112
$11,178
$11,326
Ref No.
Project
Suburb
ECO.185
Gannet Close - road reseal
Berkeley Vale
ECO.186
Pacific Highway construction of footpath Lowry Close - road reseal
ECO.187
Ward / Region The Entrance
Funding Source General Revenue
Lake Munmorah
Budgewoi
General Revenue
Kariong
Gosford West
General Revenue
ECO.188
Bathurst Street - road reseal
Umina Beach
Gosford West
General Revenue
ECO.189
Copacabana Drive road reseal
Copacabana
Gosford East
General Revenue
ECO.190
Terrigal Drive - replace bus shelter
Terrigal
Gosford East
General Revenue
ECO.191
Discombe Avenue road reseal
Kanwal
Wyong
General Revenue
ECO.192
Rushby Street - road reseal
Bateau Bay
The Entrance
General Revenue
ECO.193
Parkside Avenue - road reseal
Bateau Bay
The Entrance
General Revenue
ECO.194
Apanie Close - road reseal
Summerland Point
Budgewoi
General Revenue
ECO.195
Cooper Road - road reseal
Green Point
Gosford East
General Revenue
ECO.196
Teralba Street - road reseal
Lisarow
Wyong
General Revenue
ECO.197
Terence Avenue - road reseal
Lake Munmorah
Budgewoi
General Revenue
ECO.198
McKellar Close - road reseal
Point Clare
Gosford West
General Revenue
ECO.199
Winbin Crescent - road reseal
Gwandalan
Budgewoi
General Revenue
ECO.200
Armidale Street - road reseal
The Entrance
The Entrance
General Revenue
ECO.201
Smithy Street - road reseal
Killcare Heights
Gosford East
General Revenue
ECO.202
Singleton Road - road reseal
Point Clare
Gosford West
General Revenue
ECO.203
Old Pacific Highway road reseal
Watanobbi
Wyong
General Revenue
69
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $11,543
$11,550
$11,563
$11,731
$11,744
$11,880
$12,026
$12,056
$12,282
$12,378
$12,424
$12,429
$12,488
$12,586
$12,687
$12,763
$12,776
$12,858
$12,869
Ref No.
Project
Suburb
Ward / Region Budgewoi
Funding Source General Revenue
ECO.204
Werepi Street - road reseal
Noraville
ECO.205
Bathurst Street - road reseal
Umina Beach
Gosford West
General Revenue
ECO.206
Watership Downs Close - road reseal
Terrigal
Gosford East
General Revenue
ECO.207
Christine Avenue - road reseal
Halekulani
Budgewoi
General Revenue
ECO.208
Jackson Street - road reseal
Kariong
Gosford West
General Revenue
ECO.209
Windemere Drive road reseal
Terrigal
Gosford East
General Revenue
ECO.210
Fairscene Crescent road reseal
Avoca Beach
Gosford East
General Revenue
ECO.211
Charmhaven Avenue road reseal
Charmhaven
Budgewoi
General Revenue
ECO.212
Yeddenba Avenue road reseal
Blue Bay
The Entrance
General Revenue
ECO.213
Digby Road - road reseal
Springfield
Gosford East
General Revenue
ECO.214
Central Avenue - road reseal
Phegans Bay
Gosford West
General Revenue
ECO.215
Fairscene Crescent road reseal
Avoca Beach
Gosford East
General Revenue
ECO.216
Samara Close - road reseal
Fountaindale
The Entrance
General Revenue
ECO.217
Cutler Drive - install bus shelter
Wyong
Wyong
General Revenue
ECO.218
Johnson Road - install bus shelter
Tuggerah
The Entrance
General Revenue
ECO.219
Rotherham Street install bus shelter
Bateau Bay
The Entrance
General Revenue
ECO.220
Woodview Avenue road reseal
Lisarow
Wyong
General Revenue
ECO.221
Woodview Avenue road reseal
Lisarow
Wyong
General Revenue
ECO.222
Tracey Lea Close - road reseal
Jilliby
Wyong
General Revenue
70
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $12,931
$12,954
$12,963
$13,156
$13,194
$13,236
$13,373
$13,510
$13,524
$13,599
$13,691
$13,808
$13,843
$14,000
$14,000
$14,000
$14,112
$14,138
$14,284
Ref No.
Project
Suburb Lisarow
Ward / Region Wyong
Funding Source General Revenue
ECO.223
Teralba Street - road reseal
ECO.224
Saturday Street - road reseal
Tuggerawong
Wyong
General Revenue
ECO.225
Sotherby Avenue - road reseal
Terrigal
Gosford East
General Revenue
ECO.226
Oberton Road - road reseal
Chittaway Bay
The Entrance
General Revenue
ECO.227
Marlborough Close road reseal
Terrigal
Gosford East
General Revenue
ECO.228
Wisemans Ferry Road road reseal
Somersby
Gosford West
General Revenue
ECO.229
Third Avenue - road reseal
Toukley
Budgewoi
General Revenue
ECO.230
Willowin Close - road reseal
Green Point
Gosford East
General Revenue
ECO.231
Uliganda Street upgrade of bus stop
Ettalong Beach
Gosford West
General Revenue
ECO.232
Restella Avenue upgrade of carpark
Davistown
Gosford East
General Revenue
ECO.233
Brush Creek Road road reseal
Cedar Brush Creek
Wyong
General Revenue
ECO.234
Reynolds Road - road reseal
Noraville
Budgewoi
General Revenue
ECO.235
The Ridgeway - design of footpath
Lisarow
Wyong
General Revenue
ECO.236
Tuggerah Street design of footpath
Lisarow
Wyong
General Revenue
ECO.237
Foster Close - road reseal
Kariong
Gosford West
General Revenue
ECO.238
Winbourne Street road reseal
Gorokan
Budgewoi
General Revenue
ECO.239
Wondaboyne Avenue road reseal
Charmhaven
Budgewoi
General Revenue
ECO.240
Parkside Avenue - road reseal
Bateau Bay
The Entrance
General Revenue
ECO.241
Eden Grove - road reseal
Erina
Gosford East
General Revenue
71
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $14,398
$14,414
$14,606
$14,608
$14,654
$14,836
$14,873
$14,909
$15,000
$15,000
$15,000
$15,000
$15,000
$15,000
$15,136
$15,178
$15,197
$15,296
$15,387
Ref No.
Project
Suburb
Ward / Region Gosford East
Funding Source General Revenue
ECO.242
Willow Glen Close road reseal
Green Point
ECO.243
Dunalban Avenue road reseal
Woy Woy
Gosford West
General Revenue
ECO.244
Waverley Road - road reseal
Mannering Park
Budgewoi
General Revenue
ECO.245
Patonga Drive - road reseal
Patonga
Gosford West
General Revenue
ECO.246
Bayview Avenue - road reseal
Rocky Point
Wyong
General Revenue
ECO.247
Dunalban Avenue road reseal
Woy Woy
Gosford West
General Revenue
ECO.248
Burns Road replacement of bus shelter The Entrance Road replacement of bus shelter The Entrance Road replacement of bus shelter Cotswolds Close - road reseal
Avoca Beach
Gosford East
General Revenue
Forresters Beach
The Entrance
General Revenue
Forresters Beach
The Entrance
General Revenue
Terrigal
Gosford East
General Revenue
ECO.252
Winbin Crescent - road reseal
Gwandalan
Budgewoi
General Revenue
ECO.253
Priestman Avenue road reseal
Umina Beach
Gosford West
General Revenue
ECO.254
Jessina Street - road reseal
Kariong
Gosford West
General Revenue
ECO.255
Liza Close - road reseal
Fountaindale
The Entrance
General Revenue
ECO.256
Winbin Crescent - road reseal
Gwandalan
Budgewoi
General Revenue
ECO.257
Onslow Avenue - road reseal
Woy Woy
Gosford West
General Revenue
ECO.258
Terence Avenue - road reseal
Lake Munmorah
Budgewoi
General Revenue
ECO.259
Oyster Shell Road road reseal
Lower Mangrove
Gosford West
General Revenue
ECO.260
Billabourie Road - road reseal
Gwandalan
Budgewoi
General Revenue
ECO.249
ECO.250
ECO.251
72
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $15,709
$16,236
$16,249
$16,694
$16,888
$16,956
$17,000
$17,000
$17,000
$17,139
$17,219
$17,272
$17,297
$17,475
$17,647
$17,659
$17,672
$17,772
$17,795
Ref No.
Project
Suburb
Ward / Region Gosford East
Funding Source General Revenue
ECO.261
Sherwood Drive - road reseal
Bateau Bay
ECO.262
Graham Street - road reseal
Long Jetty
The Entrance
General Revenue
ECO.263
Riatta Street - road reseal
Erina
Gosford East
General Revenue
ECO.264
Merideth Place - road reseal
Green Point
Gosford East
General Revenue
ECO.265
Trelawney Street - road reseal
Killarney Vale
The Entrance
General Revenue
ECO.266
Darri Road - road reseal
Wyongah
Wyong
General Revenue
ECO.267
Park Lane - road reseal
Tumbi Umbi
The Entrance
General Revenue
ECO.268
Oyster Shell Road road reseal
Lower Mangrove
Gosford West
General Revenue
ECO.269
Waverley Road - road reseal
Mannering Park
Budgewoi
General Revenue
ECO.270
Terence Avenue - road reseal
Lake Munmorah
Budgewoi
General Revenue
ECO.271
Meadow Road - road reseal
Springfield
Gosford East
General Revenue
ECO.272
Coolaran Avenue - road reseal
Point Clare
Gosford West
General Revenue
ECO.273
Greviliea Crescent road reseal
Berkeley Vale
The Entrance
General Revenue
ECO.274
Kalang Avenue - road reseal
Buff Point
Budgewoi
General Revenue
ECO.275
Oyster Shell Road road reseal
Lower Mangrove
Gosford West
General Revenue
ECO.276
Arden Avenue - road reseal
Avoca Beach
Gosford East
General Revenue
ECO.277
Cadell Street - road reseal
Terrigal
Gosford East
General Revenue
ECO.278
Driftwood Avenue road reseal
Narara
Wyong
General Revenue
ECO.279
Tapestry Way - road reseal
Umina Beach
Gosford West
General Revenue
73
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $17,879
$18,211
$18,238
$18,394
$18,442
$18,608
$18,883
$18,886
$18,994
$19,026
$19,086
$19,102
$19,105
$19,171
$19,398
$19,555
$19,665
$19,702
$19,753
Ref No.
Project
Suburb
Ward / Region The Entrance
Funding Source General Revenue
ECO.280
Gossimer Close - road reseal
Killarney Vale
ECO.281
Barralong Road drainage upgrade
Erina
Gosford East
General Revenue
ECO.282
Amber Lane - road reseal
Wyong Creek
Wyong
General Revenue
ECO.283
Dooralong Road - road reseal
Lemon Tree
Wyong
General Revenue
ECO.284
Evans Road - road reseal
Canton Beach
Budgewoi
General Revenue
ECO.285
Frederick Street - road reseal
Point Frederick
Gosford East
General Revenue
ECO.286
Jarret Street - road reseal
North Gosford
Wyong
General Revenue
ECO.287
Kathleen Street - road reseal
Woy Woy
Gosford West
General Revenue
ECO.288
Empire Drive - design of footpath
Empire Bay
Gosford East
General Revenue
ECO.289
Kurrawa Avenue design of footpath
Point Clare
Gosford West
General Revenue
ECO.290
Nowack Avenue - road reseal
Umina Beach
Gosford West
General Revenue
ECO.291
Lincoln Close - road reseal
Bateau Bay
The Entrance
General Revenue
ECO.292
Bay Street - road reseal
Patonga
Gosford West
General Revenue
ECO.293
Norah Avenue - road reseal
Charmhaven
Budgewoi
General Revenue
ECO.294
Elewa Avenue - road reseal
Bateau Bay
The Entrance
General Revenue
ECO.295
Macauley Road - road reseal
Bateau Bay
The Entrance
General Revenue
ECO.296
Coonanga Avenue road reseal
Budgewoi
Budgewoi
General Revenue
ECO.297
Wandewoi Avenue road reseal
San Remo
Budgewoi
General Revenue
ECO.298
Sherwood Drive - road reseal
Springfield
Gosford East
General Revenue
74
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $19,947
$20,000
$20,000
$20,000
$20,000
$20,000
$20,000
$20,000
$20,000
$20,000
$20,059
$20,090
$20,200
$20,403
$20,420
$20,442
$20,468
$20,468
$20,539
Ref No.
Project
Suburb
Ward / Region Gosford West
Funding Source General Revenue
ECO.299
Singleton Road - road reseal
Point Clare
ECO.300
Charlton Street - road reseal
Toowoon Bay
The Entrance
General Revenue
ECO.301
Lynwood Avenue - road reseal
The Entrance
The Entrance
General Revenue
ECO.302
Sherwood Drive - road reseal
Springfield
Gosford East
General Revenue
ECO.303
Sherwood Drive - road reseal
Springfield
Gosford East
General Revenue
ECO.304
Burdett Place - road reseal
Umina Beach
Gosford West
General Revenue
ECO.305
Killarney Street - road reseal
Killarney Vale
The Entrance
General Revenue
ECO.306
Noorong Avenue - road reseal
Forresters Beach
The Entrance
General Revenue
ECO.307
Bodalla Road - road reseal
Lake Munmorah
Budgewoi
General Revenue
ECO.308
Old Pacific Highway road reseal
Watanobbi
Wyong
General Revenue
ECO.309
Ocean Street - road reseal
Budgewoi
Budgewoi
General Revenue
ECO.310
Ocean Street - road reseal
Budgewoi
Budgewoi
General Revenue
ECO.311
Erudgeree Street - road reseal
Budgewoi
Budgewoi
General Revenue
ECO.312
Tapestry Way - road reseal
Umina Beach
Gosford West
General Revenue
ECO.313
Panonia Road - road reseal
Wyong
Wyong
General Revenue
ECO.314
Oberton Street - road reseal
Kincumber
Gosford East
General Revenue
ECO.315
Rushby Street - road reseal
Bateau Bay
The Entrance
General Revenue
ECO.316
Oberton Street - road reseal
Kincumber
Gosford East
General Revenue
ECO.317
John Street - road reseal
Forresters Beach
The Entrance
General Revenue
75
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $20,604
$20,704
$20,725
$20,742
$20,744
$20,870
$20,892
$20,996
$21,049
$21,127
$21,147
$21,147
$21,167
$21,203
$21,883
$21,908
$22,408
$22,432
$22,728
Ref No.
Project
Suburb Wyong
Ward / Region Wyong
Funding Source General Revenue
ECO.318
Warner Avenue - road reseal
ECO.319
Michele Avenue - road reseal
Noraville
Budgewoi
General Revenue
ECO.320
Surf Rider Avenue road reseal
North Avoca
Gosford East
General Revenue
ECO.321
Carpenters Lane - road reseal
Mardi
Wyong
General Revenue
ECO.322
Beckford Road - road reseal
Ourimbah
Wyong
General Revenue
ECO.323
North Scenic Road road reseal
Forresters Beach
The Entrance
General Revenue
ECO.324
Yuruga Avenue - road reseal
San Remo
Budgewoi
General Revenue
ECO.325
Oyster Shell Road road reseal
Lower Mangrove
Gosford West
General Revenue
ECO.326
Cottam Road - road reseal
Wyongah
Wyong
General Revenue
ECO.327
Terence Avenue - road reseal
Lake Munmorah
Budgewoi
General Revenue
ECO.328
McKenzie Reserve upgrade to footbridge
Budgewoi
Budgewoi
General Revenue
ECO.329
Levitt Street - drainage upgrade
Wyong
Wyong
General Revenue
ECO.330
Terence Avenue drainage upgrade
Lake Munmorah
Budgewoi
General Revenue
ECO.331
Kala Avenue - road reseal
Halekulani
Budgewoi
General Revenue
ECO.332
Anita Avenue - upgrade of traffic facilities
Lake Munmorah
Budgewoi
General Revenue
ECO.333
Flakelar Crescent - road reseal
Terrigal
Gosford East
General Revenue
ECO.334
Yethonga Avenue road reseal
Blue Bay
The Entrance
General Revenue
ECO.335
Ilya Avenue - road reseal
Erina
Gosford East
General Revenue
ECO.336
Ruby Street - road reseal
Gorokan
Budgewoi
General Revenue
76
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $22,895
$22,958
$23,064
$23,150
$23,483
$23,771
$24,033
$24,132
$24,531
$24,612
$25,000
$25,000
$25,000
$25,000
$25,000
$25,124
$25,260
$25,269
$25,396
Ref No.
Project
Suburb
Ward / Region Gosford West
Funding Source General Revenue
ECO.337
Station Street - road reseal
Woy Woy
ECO.338
Seaview Avenue - road reseal
Wamberal
The Entrance
General Revenue
ECO.339
Dickson Road - road reseal
Jilliby
Wyong
General Revenue
ECO.340
Monterey Street - road reseal
Mannering Park
Budgewoi
General Revenue
ECO.341
Government Road road reseal
Summerland Point
Budgewoi
General Revenue
ECO.342
Cynthia Street - road reseal
Bateau Bay
The Entrance
General Revenue
ECO.343
Paton Street - road reseal
Woy Woy
Gosford West
General Revenue
ECO.344
Fuchsia Street - road reseal
Wyoming
Wyong
General Revenue
ECO.345
Wandewoi Avenue road reseal
San Remo
Budgewoi
General Revenue
ECO.346
Illawong Road - road reseal
Summerland Point
Budgewoi
General Revenue
ECO.347
Courigal Avenue - road reseal
Kincumber
Gosford East
General Revenue
ECO.348
Third Avenue - road reseal
Toukley
Budgewoi
General Revenue
ECO.349
Yuruga Avenue - road reseal
San Remo
Budgewoi
General Revenue
ECO.350
Warner Avenue - road reseal
Wyong
Wyong
General Revenue
ECO.351
Windemere Drive road reseal
Terrigal
Gosford East
General Revenue
ECO.352
Robina Parade - road reseal
Springfield
Gosford East
General Revenue
ECO.353
Fountains Road - road reseal
Narara
Wyong
General Revenue
ECO.354
Karangal Crescent road reseal
Buff Point
Budgewoi
General Revenue
ECO.355
Sonoma Road - road reseal
Budgewoi
Budgewoi
General Revenue
77
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $25,454
$25,773
$26,100
$26,242
$26,326
$26,389
$26,544
$26,962
$27,034
$27,096
$27,167
$27,243
$27,518
$27,592
$28,046
$28,291
$28,509
$28,724
$28,855
Ref No.
Project
Suburb Charmhaven
Ward / Region Budgewoi
Funding Source General Revenue
ECO.356
Charmhaven Avenue road reseal
ECO.357
Darri Road - road reseal
Wyongah
Wyong
General Revenue
ECO.358
Costa Avenue - road reseal
San Remo
Budgewoi
General Revenue
ECO.359
Basford Road - road reseal
Doyalson North
Budgewoi
General Revenue
ECO.360
Mundoora Avenue road reseal
Yattalunga
Gosford East
General Revenue
ECO.361
Billabourie Road - road reseal
Gwandalan
Budgewoi
General Revenue
ECO.362
Winbin Crescent - road reseal
Gwandalan
Budgewoi
General Revenue
ECO.363
Weatherly Parade road reseal
St Huberts Island
Gosford East
General Revenue
ECO.364
Wisemans Ferry Road road reseal
Somersby
Gosford West
General Revenue
ECO.365
Yarramalong Road road reseal
Wyong Creek
Wyong
General Revenue
ECO.366
Palmer Street - road reseal
Rocky Point
Wyong
General Revenue
ECO.367
Karuk Road - drainage upgrade
Bensville
Gosford East
General Revenue
ECO.368
Kincumber Crescent road reseal
Davistown
Gosford East
General Revenue
ECO.369
Phyllis Avenue - road upgrade
Kanwal
Wyong
Special Rate Variation
ECO.370
Avoca Drive construction of footpath Mann Street - design of shared pathway
Avoca Beach
Gosford East
General Revenue
Gosford
Gosford West
General Revenue
Wellington Street upgrade of traffic facilities Upgrade of survey equipment
Umina Beach
Gosford West
General Revenue
Region Wide
Region Wide
General Revenue
Augusta Street - road reseal
Umina Beach
Gosford West
General Revenue
ECO.371
ECO.372
ECO.373
ECO.374
78
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $28,947
$29,012
$29,071
$29,148
$29,150
$29,261
$29,424
$29,563
$29,644
$29,698
$29,864
$30,000
$30,000
$30,000
$30,000
$30,000
$30,000
$30,000
$30,171
Ref No.
Project
Suburb
Ward / Region Gosford East
Funding Source General Revenue
ECO.375
Beveridge Drive - road reseal
Green Point
ECO.376
Glenrock Parade - road reseal
Koolewong
Gosford East
General Revenue
ECO.377
Gavenlock Road construction of footpath Donnison Street upgrade to bus stop
Tuggerah
The Entrance
General Revenue
West Gosford
Gosford West
General Revenue
ECO.379
Rembrae Drive - road reseal
Green Point
Gosford East
General Revenue
ECO.380
Catherine Street - road reseal
Mannering Park
Budgewoi
General Revenue
ECO.381
Parkridge Drive - road reseal
Jilliby
Wyong
General Revenue
ECO.382
Onslow Avenue - road reseal
Woy Woy
Gosford West
General Revenue
ECO.383
Carmel Avenue - road reseal
Halekulani
Budgewoi
General Revenue
ECO.384
Wyndora Avenue - road reseal
San Remo
Budgewoi
General Revenue
ECO.385
Wandewoi Avenue road reseal
San Remo
Budgewoi
General Revenue
ECO.386
Trelawney Street - road reseal
Killarney Vale
The Entrance
General Revenue
ECO.387
Yowie Close - road reseal
Bensville
Gosford East
General Revenue
ECO.388
Coonanga Avenue road reseal
Halekulani
Budgewoi
General Revenue
ECO.389
Gumnut Close - road reseal
Glenning Valley
The Entrance
General Revenue
ECO.390
Charmhaven Avenue road reseal
Charmhaven
Budgewoi
General Revenue
ECO.391
Hope Street construction of footpath Winbin Crescent - road reseal
Wyong
Wyong
General Revenue
Gwandalan
Budgewoi
General Revenue
Heador Street - road reseal
Toukley
Budgewoi
General Revenue
ECO.378
ECO.392
ECO.393
79
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $30,291
$30,420
$30,800
$31,322
$31,518
$31,672
$32,918
$33,412
$33,572
$33,638
$34,084
$34,790
$34,804
$35,000
$35,390
$35,564
$35,613
$35,879
$35,955
Ref No.
Project
Suburb Gorokan
Ward / Region Budgewoi
Funding Source General Revenue
ECO.394
Clucas Avenue - road reseal
ECO.395
Panonia Road - road reseal
Wyong
Wyong
General Revenue
ECO.396
Reconstruction of Wamberal carpark
Wamberal
The Entrance
General Revenue
ECO.397
Mataram Road - road reseal
Woongarrah
Budgewoi
General Revenue
ECO.398
Copacabana Drive road reseal
Copacabana
Gosford East
General Revenue
ECO.399
Wirigi Street - road reseal
Berkeley Vale
The Entrance
General Revenue
ECO.400
Brooklyn Road - road reseal
Saratoga
Gosford East
General Revenue
ECO.401
Wisemans Ferry Road road reseal
Lower Mangrove
Gosford West
General Revenue
ECO.402
Adelaide Street - road reseal
Umina Beach
Gosford West
General Revenue
ECO.403
Adelaide Street - road reseal
Umina Beach
Gosford West
General Revenue
ECO.404
Darri Road - road reseal
Wyongah
Wyong
General Revenue
ECO.405
Dalton Avenue - road reseal
Kanwal
Wyong
General Revenue
ECO.406
Gamban Road - road reseal
Gwandalan
Budgewoi
General Revenue
ECO.407
The Ridgeway - road reseal
Lisarow
Wyong
General Revenue
ECO.408
Patonga Drive - road reseal
Patonga
Gosford West
General Revenue
ECO.409
Berrys Lane - road reseal
Fountaindale
The Entrance
General Revenue
ECO.410
Coonanga Avenue road reseal
Budgewoi
Budgewoi
General Revenue
ECO.411
Blue Bell Drive - road reseal
Wamberal
The Entrance
General Revenue
ECO.412
Blue Bell Drive - road reseal
Wamberal
The Entrance
General Revenue
80
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $36,036
$36,177
$36,194
$36,217
$36,306
$36,324
$36,328
$36,600
$36,603
$36,603
$36,717
$36,816
$37,036
$37,080
$37,559
$37,885
$37,936
$38,001
$38,018
Ref No.
Project
Suburb
Ward / Region Gosford West
Funding Source General Revenue
ECO.413
Lace Avenue - road reseal
Umina Beach
ECO.414
Sandra Street - road reseal
Jilliby
Wyong
General Revenue
ECO.415
Winbin Crescent - road reseal
Gwandalan
Budgewoi
General Revenue
ECO.416
Lake Street - drainage upgrade
Budgewoi
Budgewoi
General Revenue
ECO.417
Hillcrest Avenue drainage upgrade
Bateau Bay
The Entrance
General Revenue
ECO.418
Louisiana Road drainage upgrade
Hamlyn Terrace
Wyong
Developer Contributions
ECO.419
Coast Road - road reseal
North Avoca
Gosford East
General Revenue
ECO.420
Rosemount Avenue road reseal
Lake Munmorah
Budgewoi
General Revenue
ECO.421
Gerda Road - road reseal
Macmasters Beach
Gosford East
General Revenue
ECO.422
Morton Crescent - road reseal
Davistown
Gosford East
General Revenue
ECO.423
Karangal Crescent road reseal
Buff Point
Budgewoi
General Revenue
ECO.424
Winbin Crescent - road reseal
Gwandalan
Budgewoi
General Revenue
ECO.425
Newcastle Street - road reseal
Springfield
Gosford East
General Revenue
ECO.426
Catherine Street - road reseal
Mannering Park
Budgewoi
General Revenue
ECO.427
Woolunga Avenue road reseal
Terrigal
Gosford East
General Revenue
ECO.428
Anembo Avenue - road reseal
Summerland Point
Budgewoi
General Revenue
ECO.429
Fishermens Bend - road reseal
Bateau Bay
The Entrance
General Revenue
ECO.430
Yarramalong Road road reseal
Wyong Creek
Wyong
General Revenue
ECO.431
Rushby Street - road reseal
Bateau Bay
The Entrance
General Revenue
81
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $38,780
$39,089
$39,412
$40,000
$40,000
$40,000
$40,000
$40,000
$40,206
$40,260
$40,360
$41,018
$41,233
$41,304
$41,704
$41,798
$42,011
$42,068
$42,142
Ref No.
Project
Suburb
Ward / Region Wyong
Funding Source General Revenue
ECO.432
Yarramalong Road road reseal
Wyong Creek
ECO.433
Pozieres Avenue - road reseal
Umina Beach
Gosford West
General Revenue
ECO.434
Winbin Crescent - road reseal
Gwandalan
Budgewoi
General Revenue
ECO.435
Beulah Road - road reseal
Noraville
Budgewoi
General Revenue
ECO.436
Lindsey Street - road reseal
North Gosford
Wyong
General Revenue
ECO.437
Fortune Crescent - road reseal
Lake Munmorah
Budgewoi
General Revenue
ECO.438
Diamond Head Drive road upgrade
Budgewoi
Budgewoi
Special Rate Variation
ECO.439
Kilpa Road - road upgrade
Wyongah
Wyong
Special Rate Variation
ECO.440
Railway Road - road reseal
Warnervale
Wyong
General Revenue
ECO.441
Church Street construction of footpath Coonanga Avenue road reseal
Wyong
Wyong
General Revenue
Budgewoi
Budgewoi
General Revenue
ECO.443
Patricia Street - road reseal
Killarney Vale
The Entrance
General Revenue
ECO.444
The Esplanade - road reseal
Ettalong Beach
Gosford West
General Revenue
ECO.445
Yarramalong Road road reseal
Wyong Creek
Wyong
General Revenue
ECO.446
Rowena Street - road reseal
Noraville
Budgewoi
General Revenue
ECO.447
Webb Street - road reseal
East Gosford
Gosford West
General Revenue
ECO.448
Adelaide Street - road reseal
East Gosford
Gosford West
General Revenue
ECO.449
Cowper Road - road reseal
Umina Beach
Gosford West
General Revenue
ECO.450
The Ridgeway - road reseal
Lisarow
Wyong
General Revenue
ECO.442
82
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $42,441
$43,622
$43,663
$43,767
$43,877
$44,580
$45,000
$45,000
$45,000
$45,410
$45,471
$45,833
$45,956
$46,329
$47,581
$48,395
$49,071
$49,648
$49,932
Ref No.
Project
Suburb
Ward / Region Gosford East
Funding Source General Revenue
ECO.451
Copacabana Park drainage upgrade
Copacabana
ECO.452
Terry Oval - drainage upgrade
East Gosford
Gosford West
General Revenue
ECO.453
Walu Avenue drainage upgrade
Halekulani
Budgewoi
General Revenue
ECO.454
Hobart Avenue upgrade to traffic facilities Terrigal Drive - upgrade to traffic facilities
Umina Beach
Gosford West
General Revenue
Terrigal
Gosford East
General Revenue
ECO.456
Pearson Street - road reseal
Narara
Wyong
General Revenue
ECO.457
Mackillop Road - road reseal
Kincumber South
Gosford East
General Revenue
ECO.458
Station Street - road reseal
Woy Woy
Gosford West
General Revenue
ECO.459
The Ridgeway - road reseal
Lisarow
Wyong
General Revenue
ECO.460
Pacific Highway construction of shared pathway Clarence Street - road reseal
Tuggerah
The Entrance
General Revenue
Lake Munmorah
Budgewoi
General Revenue
ECO.462
Wiowera Road - road reseal
Kanwal
Wyong
General Revenue
ECO.463
Catherine Street - road reseal
Mannering Park
Budgewoi
General Revenue
ECO.464
Oyster Shell Road road reseal
Lower Mangrove
Gosford West
General Revenue
ECO.465
Manooka Road - road reseal
Point Clare
Gosford West
General Revenue
ECO.466
Ada Avenue - road reseal
Noraville
Budgewoi
General Revenue
ECO.467
Waratah Road - road reseal
Mangrove Mountain
Gosford West
General Revenue
ECO.468
Beulah Road - road reseal
Noraville
Budgewoi
General Revenue
ECO.469
Dudley Street - road reseal
Gorokan
Budgewoi
General Revenue
ECO.455
ECO.461
83
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $50,000
$50,000
$50,000
$50,000
$50,000
$50,020
$50,152
$50,175
$50,863
$51,975
$52,088
$52,506
$52,757
$53,978
$54,146
$56,475
$56,568
$57,658
$57,764
Ref No.
Project
Suburb
Ward / Region Gosford East
Funding Source General Revenue
ECO.470
Lenora Avenue - road reseal
Davistown
ECO.471
River Street - road reseal
Springfield
Gosford East
General Revenue
ECO.472
Warner Avenue - road reseal
Wyong
Wyong
General Revenue
ECO.473
Upgrade of CCTV at various locations
Region Wide
Region Wide
General Revenue
ECO.474
Carlton Road - road upgrade
Holgate
Gosford East
General Revenue
ECO.475
George Hely Crescent road upgrade
Killarney Vale
The Entrance
General Revenue
ECO.476
Mayfair Street - road upgrade
Long Jetty
The Entrance
General Revenue
ECO.477
Sandra Street - road reseal
Jilliby
Wyong
General Revenue
ECO.478
Birrerik Road - road upgrade
Wamberal
The Entrance
General Revenue
ECO.479
Peats Ridge Road road reseal
Peats Ridge
Gosford West
General Revenue
ECO.480
Lillicrapps Road - road reseal
Mangrove Mountain
Gosford West
General Revenue
ECO.481
Masons Parade - road reseal
Point Frederick
Gosford East
General Revenue
ECO.482
Hillcrest Street - road reseal
Terrigal
Gosford East
General Revenue
ECO.483
Dunn Street - road upgrade
Point Frederick
Gosford East
General Revenue
ECO.484
Lauren Close - road upgrade
Green Point
Gosford East
General Revenue
ECO.485
Brougham Street - road reseal
East Gosford
Gosford West
General Revenue
ECO.486
Webb Street - road upgrade
East Gosford
Gosford West
General Revenue
ECO.487
McKellar Boulevarde road reseal
Blue Haven
Budgewoi
General Revenue
ECO.488
Paton Street - road reseal
Woy Woy
Gosford West
General Revenue
84
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $57,910
$59,402
$59,733
$60,000
$60,000
$60,000
$60,000
$60,449
$60,752
$61,013
$62,431
$63,289
$65,783
$66,545
$66,958
$67,238
$67,259
$68,243
$70,365
Ref No.
Project
Suburb
Ward / Region Gosford West
Funding Source General Revenue
ECO.489
Bourke Road - road reseal
Umina Beach
ECO.490
Dudley Street - road reseal
Gorokan
Budgewoi
General Revenue
ECO.491
Gertrude Place - road reseal
Gosford
Gosford West
General Revenue
ECO.492
Minnamurra Road road reseal
Gorokan
Budgewoi
General Revenue
ECO.493
Kallaroo Road - road upgrade
Bensville
Gosford East
General Revenue
ECO.494
Priestly Parade - road upgrade
Point Clare
Gosford West
General Revenue
ECO.495
Matcham Road - road reseal
Matcham
Gosford East
General Revenue
ECO.496
Matcham Road - road reseal
Matcham
Gosford East
General Revenue
ECO.497
Ocean Parade drainage upgrade
The Entrance
The Entrance
General Revenue
ECO.498
Illawong Road - replace footbridge
Summerland Point
Budgewoi
General Revenue
ECO.499
Tuggerawong Road drainage upgrade
Tuggerawong
Wyong
General Revenue
ECO.500
McKellar Boulevarde road reseal
Blue Haven
Budgewoi
General Revenue
ECO.501
Shelly Beach Road construction of shared pathway Patonga Drive - road reseal
Shelly Beach
The Entrance
General Revenue
Patonga
Gosford West
General Revenue
ECO.503
Brougham Street - road upgrade
East Gosford
Gosford West
General Revenue
ECO.504
Donald Avenue - road upgrade
Kanwal
Wyong
Special Rate Variation
ECO.505
Load assessment of timber bridges
Region Wide
Region Wide
General Revenue
ECO.506
Fraser Road - road rehabilitation
Killcare
Gosford East
General Revenue
ECO.507
Brougham Street - road reseal
East Gosford
Gosford West
General Revenue
ECO.502
85
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $70,659
$70,731
$70,808
$71,173
$71,904
$73,440
$73,692
$73,692
$75,000
$75,000
$75,000
$75,678
$77,000
$78,898
$78,910
$80,000
$80,000
$81,715
$81,846
Ref No.
Project
Suburb
Ward / Region The Entrance
Funding Source General Revenue
ECO.508
Premier Way - road reseal
Bateau Bay
ECO.509
Paraweena Road - road reseal
Gwandalan
Budgewoi
General Revenue
ECO.510
Reservoir Road - road reseal
Somersby
Gosford West
General Revenue
ECO.511
Coburg Street - road upgrade
East Gosford
Gosford West
General Revenue
ECO.512
Narambi Road - road reseal
Charmhaven
Budgewoi
General Revenue
ECO.513
Crack sealing program at various locations
Gosford
Gosford West
General Revenue
ECO.514
Moss Avenue construction of footpath Peats Ridge Road road reseal
Toukley
Budgewoi
General Revenue
Peats Ridge
Gosford West
General Revenue
ECO.515
ECO.516
Bushells Road - road reseal
Peats Ridge
Gosford West
General Revenue
ECO.517
Riou Street - road upgrade
Gosford
Gosford West
General Revenue
ECO.518
Premier Way - road reseal
Bateau Bay
The Entrance
General Revenue
ECO.519
Penrose Crescent - road reseal
Erina
Gosford East
General Revenue
ECO.520
Colorado Drive upgrade of streetlights
Blue Haven
Budgewoi
General Revenue
ECO.521
Gamban Road - road reseal
Gwandalan
Budgewoi
General Revenue
ECO.522
Gamban Road - road reseal
Gwandalan
Budgewoi
General Revenue
ECO.523
Peats Ridge Road road reseal
Peats Ridge
Gosford West
General Revenue
ECO.524
Peats Ridge Road road reseal
Peats Ridge
Gosford West
General Revenue
ECO.525
Peach Avenue - road upgrade
Tumbi Umbi
The Entrance
General Revenue
ECO.526
Murrawal Road - road upgrade
Wyongah
Wyong
General Revenue
86
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $82,201
$82,225
$83,642
$83,959
$84,509
$84,668
$85,085
$85,832
$86,879
$88,118
$89,421
$89,612
$90,000
$90,674
$92,074
$92,126
$94,390
$95,000
$95,000
Ref No.
Project
Suburb
Ward / Region Gosford West
Funding Source General Revenue
ECO.527
Showground Road road reseal
Gosford
ECO.528
Gamban Road - road reseal
Gwandalan
Budgewoi
General Revenue
ECO.529
Narambi Road - road reseal
Buff Point
Budgewoi
General Revenue
ECO.530
Audie Road - drainage upgrade
Berkeley Vale
The Entrance
General Revenue
ECO.531
Balmoral Drive drainage upgrade
Gorokan
Budgewoi
General Revenue
ECO.532
Oak Road - drainage upgrade
Matcham
Gosford East
General Revenue
ECO.533
Peak Street - road upgrade
Bateau Bay
The Entrance
Special Rate Variation
ECO.534
Kerns Road stabilisation of embankment Peel Street construction of footpath Panonia Road - road reseal
Kincumber
Gosford East
General Revenue
Toukley
Budgewoi
General Revenue
Wyong
Wyong
General Revenue
ECO.537
Reconstruction of Wamberal carpark
Wamberal
The Entrance
General Revenue
ECO.538
Mackillop Road - road upgrade
Kincumber South
Gosford East
General Revenue
ECO.539
The Corso - road reseal
Gorokan
Budgewoi
General Revenue
ECO.540
Hallards Road - road upgrade
Central Mangrove
Gosford West
General Revenue
ECO.541
Old Maitland Road road reseal
Mardi
Wyong
General Revenue
ECO.542
Strickland Road - road upgrade
Killarney Vale
The Entrance
General Revenue
ECO.543
Yangoora Street construction of shared pathway Gamban Road - road reseal
Bateau Bay
The Entrance
General Revenue
Gwandalan
Budgewoi
General Revenue
Yimbala Street - road upgrade
Killarney Vale
The Entrance
General Revenue
ECO.535
ECO.536
ECO.544
ECO.546
87
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $95,141
$96,028
$98,238
$100,000
$100,000
$100,000
$100,000
$100,000
$100,485
$104,795
$106,521
$106,705
$110,693
$110,772
$111,598
$115,000
$115,000
$118,819
$120,000
Ref No.
Project
Suburb
Ward / Region Budgewoi
Funding Source Special Rate Variation
ECO.547
Nirringa Road - road r upgrade
Summerland Point
ECO.548
Paroo Road - road upgrade
Holgate
Gosford East
General Revenue
ECO.549
Old Maitland Road road reseal
Mardi
Wyong
General Revenue
ECO.550
Wakehurst Drive - road upgrade
Wyong
Wyong
Special Rate Variation
ECO.551
Rain Forest Road - road upgrade
Wyoming
Wyong
General Revenue
ECO.552
Neola Place - replace footbridges
Budgewoi
Budgewoi
General Revenue
ECO.553
Webb Street - road upgrade
East Gosford
Gosford West
General Revenue
ECO.554
McKellar Boulevarde road reseal
Blue Haven
Budgewoi
General Revenue
ECO.555
Trafalgar Avenue - road reseal
Umina Beach
Gosford West
General Revenue
ECO.556
Birrabang Avenue road upgrade
Summerland Point
Budgewoi
Special Rate Variation
ECO.557
Malvina Parade - road upgrade
Gorokan
Budgewoi
Special Rate Variation
ECO.558
Gavenlock Road construction of footpath Bannerman Road - road rehabilitation and reseal Bluefish Crescent - road rehabilitation and reseal Bourke Road - road reseal
Tuggerah
The Entrance
General Revenue
Lisarow
Wyong
General Revenue
Tascott
Gosford West
General Revenue
Umina Beach
Gosford West
General Revenue
ECO.562
Woy Woy Bay Road road upgrade
Woy Woy Bay
Gosford West
General Revenue
ECO.563
Cape Street North road upgrade
Gosford
Gosford West
General Revenue
ECO.564
Fountains Road - road upgrade
Narara
Wyong
General Revenue
ECO.565
Taylor Road - road reseal
Lisarow
Wyong
General Revenue
ECO.559
ECO.560
ECO.561
88
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $120,000
$120,000
$134,463
$135,000
$136,884
$140,000
$140,943
$142,640
$145,165
$150,000
$160,000
$168,823
$171,772
$177,083
$178,516
$182,677
$184,005
$186,340
$190,000
Ref No.
Project
Suburb
Ward / Region Gosford East
Funding Source General Revenue
ECO.566
Del Monte Place - road upgrade
Copacabana
ECO.567
Replacement of Mangrove Creek bridge
Lower Mangrove
Gosford West
General Revenue
ECO.568
Improvement to bus stops at various locations The Boulevarde replacement of the seawall Malkana Avenue - road rehabilitation and reseal The Ridgeway - road upgrade
Region Wide
Region Wide
General Revenue
Woy Woy
Gosford West
General Revenue
Forresters Beach
The Entrance
General Revenue
Lisarow
Wyong
General Revenue
ECO.573
Glenrock Parade - road reseal
Koolewong
Gosford East
General Revenue
ECO.574
Ventura Avenue - road upgrade
Bateau Bay
The Entrance
Special Rate Variation
ECO.575
Harbour Street drainage upgrade
Bateau Bay
The Entrance
General Revenue
ECO.576
John Whiteway Drive road upgrade
Gosford
Gosford West
General Revenue
ECO.577
Dicksons Road - road reseal
Durren Durren
Wyong
Special Rate Variation
ECO.578
Budgewoi Road retaining wall construction Tarragal Glen drainage upgrade
Noraville
Budgewoi
General Revenue
Erina
Gosford East
Restricted Asset
ECO.570
ECO.571
ECO.572
ECO.579
ECO.580
Carpenter Road drainage upgrade
Umina Beach
Gosford West
Restricted Asset
ECO.582
Heavy road patching at various locations
Region Wide
Region Wide
General Revenue
ECO.583
Albany Street - road upgrade
Point Frederick
Gosford East
General Revenue
ECO.584
West Street - road upgrade
Umina Beach
Gosford West
General Revenue
ECO.585
Ernest Street - upgrade to roundabout and school entry Jarrah Drive - drainage upgrade
Erina
Gosford East
General Revenue
Kariong
Gosford West
General Revenue
ECO.586
89
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $197,292
$200,000
$200,000
$200,000
$200,385
$201,033
$205,454
$220,000
$221,000
$222,214
$229,250
$230,000
$242,186
$250,000
$255,093
$285,600
$290,400
$300,000
$300,000
Ref No.
Project
Suburb
ECO.587
McLachlan Avenue drainage upgrade
Long Jetty
ECO.588
Upgrade of traffic facilities at various locations Gascoigne Road drainage upgrade
ECO.589
Ward / Region The Entrance
Funding Source General Revenue
Region Wide
Region Wide
General Revenue
Gorokan
Budgewoi
General Revenue
ECO.590
Wilson Road - road upgrade
Terrigal
Gosford East
General Revenue
ECO.591
Debra Anne Drive road upgrade
Bateau Bay
The Entrance
General Revenue
ECO.592
Gascoigne Road - road upgrade
Gorokan
Budgewoi
Special Rate Variation
ECO.593
Dell Road - road upgrade
West Gosford
Gosford West
General Revenue
ECO.594
George Evans Road road upgrade
Killarney Vale
The Entrance
Special Rate Variation
ECO.595
Melville Street - road upgrade
Kincumber
Gosford East
General Revenue
ECO.596
Terrigal Town Centre road upgrade
Terrigal
Gosford East
Restricted Asset
ECO.597
Wisemans Ferry Road road upgrade
Mangrove Mountain
Gosford West
General Revenue
ECO.598
Ourimbah Creek Road road upgrade
Palm grove
Wyong
Special Rate Variation
ECO.599
Eloora Road - road upgrade
Long Jetty
The Entrance
Special Rate Variation
ECO.600
Avoca Drive - drainage upgrade
Avoca Beach
Gosford East
General Revenue
ECO.601
Emma James Street drainage upgrade
East Gosford
Gosford West
General Revenue
ECO.602
Dudley Street - road upgrade
Gorokan
Budgewoi
Special Rate Variation
ECO.603
Harbour Street - road upgrade
Bateau Bay
The Entrance
General Revenue
ECO.604
Eastern Road - road upgrade
Bateau Bay
The Entrance
Special Rate Variation
ECO.605
Pavement testing and design and various locations
Region Wide
Region Wide
General Revenue
90
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $300,000
$300,000
$320,000
$338,899
$350,000
$350,000
$357,036
$360,000
$368,396
$375,000
$379,623
$379,750
$390,000
$400,000
$400,000
$400,000
$440,000
$475,000
$480,000
Ref No.
Project
Suburb
Ward / Region Budgewoi
Funding Source General Revenue
ECO.606
Lilo Avenue - drainage upgrade
Halekulani
ECO.607
Hastings Road - road upgrade
Terrigal
Gosford East
General Revenue
ECO.608
Lilo Avenue - road upgrade
Halekulani
Budgewoi
Special Rate Variation
ECO.609
Tumbi Creek Road drainage upgrade
Berkeley Vale
The Entrance
General Revenue
ECO.610
Pacific Street - road upgrade
Long Jetty
The Entrance
Special Rate Variation
ECO.611
Brisbane Water Drive construction of footpath McLachlan Avenue road upgrade
Point Clare
Gosford West
General Revenue
Long Jetty
The Entrance
Special Rate Variation
Drainage improvements at various locations (minor drainage improvement program) Lake Road - drainage upgrade
Region Wide
Region Wide
General Revenue
Tuggerah
The Entrance
General Revenue
ECO.616
Davistown Road - road upgrade
Saratoga
Gosford East
General Revenue
ECO.617
Old Gosford Road road upgrade
Wamberal
The Entrance
General Revenue
ECO.618
Road improvements at various locations (minor transport improvement program) Elouera Avenue - road upgrade
Region Wide
Region Wide
General Revenue
Buff Point
Budgewoi
Special Rate Variation
Heavy road patching at various southern locations Blenheim Avenue road upgrade
Region Wide
Region Wide
General Revenue
Berkeley Vale
The Entrance
Special Rate Variation
ECO.622
Elouera Avenue drainage upgrade
Buff Point
Budgewoi
General Revenue
ECO.623
Heavy road patching at various northern locations Tumbi Creek Road road upgrade
Region Wide
Region Wide
General Revenue
Tumbi Umbi
The Entrance
General Revenue
ECO.612
ECO.613
ECO.615
ECO.619
ECO.620
ECO.621
ECO.624
91
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $500,000
$500,000
$500,000
$600,000
$600,000
$600,000
$650,000
$690,000
Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
$800,000
Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
$1,050,000
$800,000
$800,000
$875,000
$1,077,300
$1,172,000
$1,175,000
$1,183,123
$1,300,000
Ref No.
Project
Suburb
ECO.625
Chain Valley Bay Road bridge upgrade
Chain Valley Bay
ECO.655
Ward / Region Budgewoi
Funding Source General Revenue
Old Pacific Highway construction of footpath ECO.656 Lowana Avenue construction of footpath ECO.665 York Street construction of footpath Total Economy Governance and Leadership GOV.001 Upgrade of document stamping
Tuggerah
The Entrance
General Revenue
Charmhaven
Budgewoi
General Revenue
Gosford
Gosford West
General Revenue
Region Wide
Region Wide
General Revenue
GOV.002
Upgrade of SharePoint Forms
Region Wide
Region Wide
General Revenue
GOV.003
Install electronic signature capability
Region Wide
Region Wide
General Revenue
GOV.004
Business Applications upgrades
Region Wide
Region Wide
Special Rate Variation
GOV.005
Upgrade of time and attendance system
Region Wide
Region Wide
General Revenue
GOV.006
Upgrade of document management system
Region Wide
Region Wide
General Revenue
GOV.007
Upgrade of in-field technology
Region Wide
Region Wide
General Revenue
GOV.008
Upgrade of corporate reporting tool / system
Region Wide
Region Wide
General Revenue
GOV.009
Upgrade of cadastral base
Region Wide
Region Wide
General Revenue
GOV.010
Upgrade of IBIS rates modelling software Upgrade of rating system (Pathway) Upgrade of water billing system (Pathway) Annual trailers replacement program Annual tools of trade replacement program Annual light vehicles replacement program Annual small plant equipment replacement program
Region Wide
Region Wide Region Wide Region Wide Region Wide Region Wide Region Wide Region Wide
General Revenue General Revenue General Revenue General Revenue General Revenue General Revenue General Revenue
GOV.011 GOV.012 GOV.013 GOV.014 GOV.015 GOV.016
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $1,767,170
$582,000
$534,906
$625,000
$61,887,706
Region Wide Region Wide Region Wide Region Wide Region Wide Region Wide
92
Chief Technology Officer Chief Technology Officer Chief Technology Officer Chief Technology Officer Chief Technology Officer Chief Technology Officer Chief Technology Officer Corporate Strategy and Performance Digital Information Services Finance
$30,000
$40,000
$120,000
$136,000
$150,000
$200,000
$300,000
$130,000
$350,000
$15,000
Finance
$15,000
Finance
$35,000
Plant and Fleet
$252,485
Plant and Fleet
$505,675
Plant and Fleet
$636,294
Plant and Fleet
$776,204
Ref No.
Project
Suburb
Ward / Region Region Wide
Funding Source General Revenue
Responsible Unit Plant and Fleet
GOV.017
Annual plant equipment replacement program Annual light and heavy truck replacement program Charmhaven Depot replace bulk yard security gates and fencing Long Jetty Depot install inventory storage racking systems Erina Depot - install inventory storage racking systems Woy Woy Depot remove unleaded fuel storage and reinstatement works Erina Depot - remove unleaded fuel storage and reinstatement works Charmhaven Depot install inventory storage racking systems Erina Depot - office fitout Charmhaven Depot office fit-out Replacement of Border Router Infrastructure
Region Wide
$2,018,973
Region Wide
Region Wide
General Revenue
Plant and Fleet
$2,841,580
Region Wide
Region Wide
General Revenue
Procurement and Projects
$22,500
Region Wide
Region Wide
General Revenue
Procurement and Projects
$29,500
Region Wide
Region Wide
General Revenue
Procurement and Projects
$30,000
Region Wide
Region Wide
General Revenue
Procurement and Projects
$34,000
Region Wide
Region Wide
General Revenue
Procurement and Projects
$40,500
Region Wide
Region Wide
General Revenue
Procurement and Projects
$43,500
Region Wide
Region Wide Region Wide Region Wide
General Revenue General Revenue General Revenue
Region Wide
Region Wide
General Revenue
Upgrade of firewall infrastructure
Region Wide
Region Wide
General Revenue
GOV.030
Upgrade of Switching Infrastructure (North)
Region Wide
Region Wide
Special Rate Variation
GOV.031
Upgrade of Routing Infrastructure
Region Wide
Region Wide
Special Rate Variation
GOV.032
Upgrade of network storage area
Region Wide
Region Wide
Special Rate Variation
GOV.033
Upgrade (consolidation) of firewall infrastructure Upgrade of Server Infrastructure (Virtual)
Region Wide
Region Wide
General Revenue
Region Wide
Region Wide
Special Rate Variation
Renewal of IT Infrastructure
Region Wide
Region Wide
General Revenue
Procurement and Projects Procurement and Projects Technology and Customer Services Technology and Customer Services Technology and Customer Services Technology and Customer Services Technology and Customer Services Technology and Customer Services Technology and Customer Services Technology and Customer Services Technology and Customer Services
GOV.028
Upgrade of Switching infrastructure (South)
GOV.029
GOV.018
GOV.019
GOV.020
GOV.021
GOV.022
GOV.023
GOV.024
GOV.025 GOV.026 GOV.027
GOV.034
GOV.035
Region Wide Region Wide
93
Budget
$114,500 $115,500 $5,500
$20,000
$25,000
$50,000
$50,000
$50,000
$120,000
$140,000
$150,000
Ref No.
Project
Suburb
Ward / Region Region Wide
Funding Source General Revenue
GOV.036
Upgrade of Core Switching Infrastructure
Region Wide
GOV.037
Upgrade of Data Centre Environmentals
Region Wide
Region Wide
Special Rate Variation
GOV.038
Replacement of Switching Infrastructure
Region Wide
Region Wide
General Revenue
Implement new Enterprise Resource Planning (ERP) system Total Governance and Leadership
Region Wide
Region Wide
General Revenue
GOV.039
Responsible Unit Technology and Customer Services Technology and Customer Services Technology and Customer Services Transformation and Business Performance
Budget $200,000
$200,000
$374,880
$12,898,464
$23,266,055
NB: Where projects are listed twice it is because they are split between an investigation and design phase and a construction phase.
Grant Funded Capital Projects 2017-18 Ref No.
Project
Community COM.171 Design of Regional Performance Arts and Conference Centre COM.172 Upgrade of library resources (Local Priority) COM.173 Install boat ramp, jetty, fish cleaning table and formalise trailer parking COM.174 Upgrade of skate park
Suburb
Ward / Region
Funding Source
Responsible Unit
Region Wide
Region Wide
External Grant
Leisure and Lifestyle
Region Wide
Region Wide
External Grant
Libraries
San Remo
Budgewoi
Open Space and Recreation
$317,000
Terrigal
Gosford East Gosford East
External Grant and General Revenue External Grant
Open Space and Recreation Open Space and Recreation
$500,000
Open Space and Recreation
$2,000,000
Open Space and Recreation
$16,500,000
COM.175
Koolewong Foreshore upgrade of carpark
Koolewong
COM.176
Adcock Park upgrade
West Gosford
Region Wide
Tuggerah Regional Sport and Recreation Complex - construction of stage 1 Total Community Environment ENV.239 Chittaway Rural Fire Service Station preliminary works for station replacement ENV.240 Upgrade of Mount Alison Trail
Tuggerah
Region Wide
ENV.241
ENV.242
COM.177
External Grant and General Revenue External Grant and General Revenue External Grant and General Revenue
Budget
$1,500,000
$65,000
$730,000
$21,612,000 Chittaway Bay
The Entrance
External Grant and General Revenue
Natural and Environmental Assets
$60,000
Jilliby
Wyong
Warnervale
Wyong
Improvements to Rural Fire Service Station
Berkeley Vale
The Entrance
Natural and Environmental Assets Natural and Environmental Assets Natural and Environmental Assets
$106,665
Replacement of Rural Fire Service Station
External Grant and General Revenue External Grant
Total Environment
External Grant and General Revenue
$450,000
$480,000
$1,096,665
94
Ref No.
Project
Suburb
Ward / Region
Funding Source
Responsible Unit
Budget
Davis Street - road upgrade
Booker Bay
Gosford West
Ryans Road - road upgrade
Umina Beach
Gosford West
ECO.626
Tall Timbers Road construction of footpath Wisemans Ferry Road upgrade of sewer pump
Lake Munmorah
Budgewoi
Somersby
Region Wide
Wisemans Ferry Road upgrade sewer gravity main Gindurra Road upgrade sewer main
Somersby
Region Wide
Somersby
Region Wide
ECO.630
Peach Street - replace footbridge
Tumbi Umbi
The Entrance
ECO.631
Sohier Park - replace timber bridge
Ourimbah
Wyong
ECO.632
Kangoo Road drainage upgrade
Somersby
Region Wide
ECO.633
Elgata Street - road upgrade
Bateau Bay
The Entrance
ECO.634
Boronia Road upgrade of traffic facilities Belford Avenue - road upgrade
Wyong
Wyong
Bateau Bay
The Entrance
External Grant
ECO.636
Edith Street - road upgrade
Gorokan
Budgewoi
ECO.637
Patricia Street - road upgrade
Killarney Vale
The Entrance
External Grant and General Revenue External Grant
ECO.638
Ocean Beach Road road upgrade
Umina Beach
Gosford West
ECO.639
Wella way - road upgrade
Somersby
Region Wide
ECO.640
Sabrina Avenue - road upgrade
Bateau Bay
The Entrance
ECO.641
Balmoral Drive - road upgrade
Gorokan
Budgewoi
ECO.642
Installation of CCTVs
Terrigal
Gosford East
Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
$1,150,000
ECO.614
External Grant and General Revenue External Grant and General Revenue External Grant
Economy ECO.581
ECO.627
ECO.628
ECO.629
ECO.635
95
External Grant and General Revenue External Grant and General Revenue External Grant and General Revenue External Grant and General Revenue External Grant and General Revenue External Grant and General Revenue External Grant and General Revenue External Grant
External Grant and General Revenue External Grant and General Revenue External Grant and General Revenue External Grant
External Grant
$1,500,000
$50,000
$60,000
$60,423
$64,843
$68,616
$120,000
$147,000
$155,000
$162,000
$170,000
$190,000
$200,000
$201,000
$204,000
$230,000
$250,000
$251,000
Ref No.
Project
Suburb
Ward / Region Gosford East
Funding Source External Grant
ECO.644
Installation of CCTVs
Copacabana
ECO.645
Debenham Road - road upgrade
Somersby
Region Wide
Debenham Road water main upgrade
Somersby
Region Wide
ECO.647
Crystal Crescent - road upgrade
Wyong
Wyong
External Grant and General Revenue External Grant and General Revenue External Grant
ECO.646
ECO.648
Chetwynd Road drainage upgrade
Erina
Gosford East
ECO.649
Tumbi Road - road upgrade
Tumbi Umbi
The Entrance
ECO.650
Ocean View Road road upgrade
Wamberal
The Entrance
ECO.651
Cape Three Points Road - road upgrade
Avoca Beach
Gosford East
ECO.652
Ocean View Drive road upgrade
Wamberal
The Entrance
ECO.653
Lone Pine Avenue road upgrade
Umina Beach
Gosford West
ECO.654
Ocean Beach Road road upgrade
Woy Woy
Gosford West
ECO.657
Morgans Road - road upgrade
Wendoree Park
Gosford West
ECO.658
Mount Ettalong Road road upgrade
Umina Beach
Gosford West
External Grant
ECO.659
Lake Haven Drive road upgrade
Lake Haven
Budgewoi
External Grant
ECO.660
Old Pacific Highway road upgrade
Somersby
Region Wide
ECO.661
Piles Road - road upgrade
Somersby
Region Wide
ECO.662
Debenham Road North - road upgrade
Somersby
Region Wide
ECO.663
Wisemans Ferry Road road upgrade
Somersby
Region Wide
ECO.664
Somersby Fall Road road upgrade
Somersby
Region Wide
External Grant and General Revenue External Grant and General Revenue External Grant and General Revenue External Grant and General Revenue External Grant and General Revenue
96
External Grant and General Revenue External Grant and General Revenue External Grant and General Revenue External Grant and General Revenue External Grant
External Grant and General Revenue External Grant and General Revenue External Grant
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Budget $300,000
$330,000
$367,875
$380,000
$400,000
$428,104
$444,241
$445,000
$493,547
$500,000
$501,000
$600,000
$600,000
$700,000
$800,000
$816,250
$994,950
$1,044,800
$1,246,888
Ref No.
Project
Suburb
Ward / Region Gosford West
ECO.666
Springwood Street road upgrade
Umina Beach
ECO.667
Kangoo Road - road upgrade
Somersby
Region Wide
ECO.668
Lake Road - road upgrade
Tuggerah
The Entrance
ECO.669
The Ridgeway - road upgrade
Lisarow
Wyong
Funding Source External Grant and General Revenue External Grant and General Revenue External Grant
External Grant and General Revenue
Responsible Unit Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
Total Economy
Budget $1,260,000
$1,356,750
$1,500,000
$1,705,000
$22,448,287
Capital Projects subject to Grant Funding 2017-18 The following table includes projects that are currently awaiting formal external grant funding approval. They are not included as part of the $207.9 million capital budget for 2017-18. If the grant funding is subsequently approved the project/s will be incorporated into the capital works program for 2017-18. Ref No.
Project
Suburb
Pending.001
Rural Fire Service vehicle/equipment replacement program Wattle Tree Road â&#x20AC;&#x201C; road upgrade with kerb and gutter and footpath Blenheim Avenue drainage upgrade with road reconstruction Glenrock Parade - road upgrade with kerb and gutter, footpath and pavement works Audie Parade drainage upgrade with road reconstruction Pacific Highway / Tall Timbers Road - shared pathway construction Audie Parade - road upgrade with drainage
Region Wide
Langford Drive / Woy Woy Road intersection Upgrade Oceano Street - road upgrade with drainage, kerb and gutter, footpath and pavement works York Street construction of footpath
Pending.002
Pending.003
Pending.004
Pending.005
Pending.008
Pending.009
Pending.010
Pending.011
Pending.012
Ward / Region Region Wide
Funding Source External Grant
Holgate
Gosford East
External Grant
Berkeley Vale
The Entrance
External Grant
Koolewong
Gosford East
External Grant
Berkeley Vale
The Entrance
External Grant
Lake Munmorah
Budgewoi
External Grant
Berkeley Vale
The Entrance
External Grant
Kariong
Gosford West
External Grant
Copacabana
Gosford East
External Grant
Gosford
Gosford West
External Grant and General Revenue
Total
Responsible Unit Natural and Environmental Assets Roads Asset Planning and Design
Pending Budget $1,207,790
$300,000
Roads Asset Planning and Design Roads Asset Planning and Design
$550,000
Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design Roads Asset Planning and Design
$750,000
Roads Asset Planning and Design
$700,000
$933,000
$1,250,000
$1,675,000
$2,000,000
$625,000
$9,990,790
97
Part 2
Financial Information 2017-2018
Central Coast Council Financial Overview 2017-18 Income Statement During 2017-18 Council will spend $551 million on essential services and a further $207.9 million on assets. The table below provides a summary of the Central Coast Council budget for 2017-18, with more detailed information provided in this section of the Operational Plan. Key Financial Information
552.9 551.0 1.9
Annual Budget 2016-17 $’m 550.0 539.7 10.3
Capital Grants and Contributions
28.2
51.5
Operating Result
30.1
61.8
207.9
182.9
Operating Income Operating Expenditure Net Operating Result (before Capital Grants and Contributions
Capital Expenditure
Budget 2017-18 $’m
Priority Areas To ensure Council is spending against community priorities, 75% of operating and capital expenditure will be invested in the following top five expenditure areas: Spend Focus
Roads, Transport and Drainage Water and Sewer Open Space and Recreation Waste Management Waterways and Coastal Management Total
Operational Spend 2017-18 $’m 117.4 159.5 27.4 94.6 10.3 409.2
Capital Spend 2017-18 $’m 72.0 53.6 27.1 2.1 2.9 157.7
Total Spend 2017-18 $’m 189.4 213.1 54.5 96.6 13.2 566.9
% of Total Spend
25.0% 28.1% 7.2% 12.7% 1.7% 74.7%
This financial year, spending is focussed on maintaining and improving service levels in areas important to the community, and on improving asset management.
99
The plan also invests in the transformation of the Council to improve measurement, automation, customer service and efficiency. Savings arising from the transformation and resulting efficiencies will be reinvested into improving service levels.
Income Council is budgeted to receive $552.9 million in operating income in 2017-18.
Rates, Annual Charges and User Fees and Charges Rates, Annual Charges and User Fees revenue (86% of total revenue) is significantly constrained by legislation.
Rates The total amount of ordinary and special rates Council can charge is defined by legislation. Through recent amendments to the Local Government Act 1993, the NSW Government has implemented a rate path freeze for merged Councils including Central Coast Council. This means that Council is required to maintain the rate path that was last applied by the former Gosford City and Wyong Shire councils. This policy has been formalised in legislation and will apply until 30 June 2020. Despite the freeze in the rate paths, Council is still able to increase rates in accordance with the Independent Pricing and Regulatory Tribunal (IPART) approved annual “rate peg” increase. Council’s permissible rates income for 2017-18 is the sum of the general income for each of the former areas within the new council’s area, as if the amalgamation had not occurred, plus the allowable rate peg. (IPART) approved a 1.5% rate peg as the allowable increase in this capped amount.
100
Revaluation of Unimproved Land Values Council is legally required to use the most current unimproved land values when calculating ordinary and special rates. These values are provided by the NSW Valuer General (VG), the independent statutory authority responsible for determining land values in NSW. The latest values provided by the Valuer General and being used for levying rates in 2017-18 have a base date of 1 July 2016. These new valuations replace those with a base date of 1 July 2015 in the former Gosford City local government area and 1 July 2014 in the former Wyong Shire local government area. As a direct result of the NSW Valuer General’s revaluation, properties with large increases in land value will experience rate increases well above the IPART approved rate pegging increase of 1.5%. As Council’s total rates income can only increase by the IPART approved 1.5%, other ratepayers will see increases of less than 1.5% and many will see rate decreases. The revaluation only affects the allocation of Council’s permissible rate income to individual properties and does not result in increased revenue to Council.
Annual Charges Water, Sewer and Drainage Service Charges Central Coast Council’s water, sewerage and drainage services and a number of its associated ancillary services are declared monopoly services under Section 4 of the Independent Pricing and Regulatory Act. Council’s prices must therefore be set in accordance with any Independent Pricing and Regulatory (IPART) determined methodologies and/or maximum prices, and are subject to approval by the relevant Minister. All prices for water, sewerage, drainage and ancillary services for 2017-18 have been calculated in accordance with IPART’s Water Determination May 2013. Following the formation of the Central Coast Council, IPART has extended the period of the May 2013 determination until 30 June 2019. This means that the council’s maximum 2016-17 prices, as specified in the 2013 determinations, will continue to apply until 30 June 2019. These prices are not indexed for inflation. Domestic Waste Management Charge Central Coast Council provides domestic waste management services including weekly bin collection and 6 free kerbside collections per annum. Any amounts charged to residents for the domestic waste management service is “restricted for purpose”, which means Council can only recover the costs from residents without any profit. Any unspent funds must be restricted and used only to pay for the costs of providing the service.
101
User Charges and Fees User charges are fees are made of the following:
Water Usage Charges Water Usage charges for 2017-18 have been calculated in accordance with IPART’s Water Determination May 2013. Following the formation of the Central Coast Council, IPART has extended the period of the May 2013 determination until 30 June 2019. This means that the council’s maximum 2016-17 prices, as specified in the 2013 determinations, will continue to apply until 30 June 2019. These prices are not indexed for inflation.
Other Fees and charges Other fees and charges are subject to either competitive forces or legislated maximum charges. Council sets other fees and charges based on partial (subsidised) cost recovery, full cost recovery or subject to market forces. Pricing categories are disclosed against each fee in the Fees and Charges schedule appearing at Part 4.
Financial Assistance Grants In June 2017, the Federal Government announced that it was changing the timing for payment of the Financial Assistance Grant (FAG) for 2017-18. Specifically, the Federal Government announced that half of the FAG amount ($12.4 million) for 2017-18 would be paid early in June 2017. The nature of FAG grants, and the accounting rules that apply to them mean that this decision will have a favourable Profit and Loss impact in 2016-17 and unfavourable in 2017-18. At face value and in the absence of any further changes to timing of future grants, the decision to bring forward the payment of the FAG for 2017-18 will be that Council will actually receive $12.4 million less than originally budgeted. However, based on historical trends on timing of FAG grants, at this point Council is not going to make any budget adjustments in the Draft Plan regarding the FAG timing change. This is because future decisions by the Federal Government on the timing of FAG payments are unknown at this point. Historically the “bring forward” of FAG payments has repeated for several years in a row. Council’s budget position will be reviewed quarterly throughout 2017-18 and, based on any subsequent announcements from the Federal Government, determine whether a budget adjustment is required.
102
Expenditure Service Delivery The 2017-18 budget aims to maintain and improve the services and service levels in the 2016-17 Operational Plan. Our projected operational spend on service delivery for 2017-18 is $551.0 million, which will be spent on:
Employee Costs The 2017-18 budget for employee costs reflects legislative provisions regarding protection of staff employment entitlements and restrictions on changes to staff numbers. The budget also includes amounts required to harmonise the salary systems of the two former Councils into an interim salary system. This harmonisation will be performed in full consultation with staff and unions. The budget also provides an amount for increased resources to focus on transformation, improved asset management and the insourcing of some functions (for example pools and leisure centres).
Merger Costs The 2017-18 estimated cost of the merger is included in the budget for 2017-18 and is significantly funded by the New Council Implementation Fund of $10 million received by Council in June 2016.
103
Profit and Loss Statement Summary Summary Profit and Loss Statement
Budget 2017-18 $’m
Annual Budget 2016-17 $’m
Operating Income Rates and Annual Charges User Charges and Fees Interest and Investment Revenue Other Revenues Grants and Contributions – Operating Net Gains from Disposal of Assets Total Income attributable to Operations
344.0 131.9 10.2 13.4 43.5 10.0 552.9
348.0 120.7 11.0 15.4 46.5 8.4 550.0
Operating Expenses Employment Benefits and On-costs Borrowing Costs Materials and Contracts Depreciation and Amortisation Other Expenses Total Expenses attributable to Operations
182.0 20.2 123.6 125.8 99.4 551.0
167.4 22.5 146.8 130.8 72.2 539.7
Operating Result before Capital Amounts
1.9
10.3
Grants and Contributions – Capital
28.2
51.5
Net Operating Result
30.1
61.8
Capital Plan Council has budgeted to invest $207.5 million on assets in 2017-18 to improve and add to the asset portfolio, which has a gross replacement cost of over $9.5 billion. This Capital plan represents a 13% increase on 2016-17 ($183 million). Capital spend is reasonably evenly distributed between wards when regionally significant assets are considered. Ward / Region
Region Wide Local Scale Projects Budgewoi Gosford East Gosford West The Entrance Wyong Sub-total Local Scale Projects Grand Total
Capital Allocation $’m 128.3
% of Capital Spend 61.7%
18.1 12.0 18.4 19.2 12.0 79.6 207.9
8.7% 5.8% 8.8% 9.2% 5.8% 38.3% 100.0%
Regionally wide assets are defined as: • A project that provides benefit to the whole Central Coast community and is not suburb specific. • Water and Sewer projects, as while they are undertaken in individual suburbs the works contribute to the overall running of the water and sewer network across the region. • Income generating, strategic and regional focussed projects including Central Coast Stadium, regional sporting facilities, airport development works, performing arts centre and a regional library that can be enjoyed by people all over the Central Coast, not just in the suburb in which they are located.
104
The Capital Plan is targeted at Renewal and Upgrade to existing assets. 73% ($153 million) of Capital Spend is focussed on Renewals and Upgrades of existing assets (as indicated in yellow below). This allocation allows Council to maintain and renew existing assets and to aggressively tackle the asset backlog. Type of Capital
Renew / Replace SRV Upgrades (former Wyong only) Upgrades (non SRV) New Strategic / Regional / Property Development Grand Total
Capital Budget 2017-18 $â&#x20AC;&#x2122;m 67.0 10.0 75.5 55.4 207.9
% of Total
32.2% 4.8% 36.3% 26.7% 100.0%
The scale of the new Council also provides the capacity to continue investment in new and regionally significant new assets ($55.4 million on new assets). Capital spend is targeted at areas considered high priority by the community - 74% in top three community priorities of Roads, Transport and Drainage (RTD), Water and Sewer, and Open Space and Recreation (as indicated in yellow below).
Asset Spend Type
Airport Bridges Buildings Bus Facilities Car Parks Footpaths Furniture and Fittings Information Technology Library Books Natural Assets Open Space Assets Other Assets Other Structures Plant and Equipment Roads Sewerage Network Shared Pathway Sporting Facility Stormwater Drainage Swimming Pools Traffic Facilities Waste Management Water Supply Network Grand Total
Capital Budget 2017-18 $â&#x20AC;&#x2122;m 6.0 2.5 10.8 0.4 1.6 1.9 1.1 17.1 0.8 1.5 6.7 0.1 5.8 8.5 55.0 33.1 2.1 20.5 8.5 0.1 1.1 2.1 20.5 207.9
105
% of Total
2.9% 1.2% 5.2% 0.2% 0.8% 0.9% 0.5% 8.2% 0.4% 0.7% 3.2% 0.0% 2.8% 4.1% 26.5% 15.9% 1.0% 9.8% 4.1% 0.1% 0.5% 1.0% 9.9% 100.0%
Long Term Financial Plan
Long Term Financial Plan The purpose of the Long Term Financial Plan (LTFP) is to give an indication of future performance of Council based on its current strategy. Logically, the Long Term Financial Plan (LTFP) is informed by the Community Strategic Plan (CSP) and Councilâ&#x20AC;&#x2122;s Resourcing Strategies for Asset Management and Workforce. The CSP and resourcing strategies (including the LTFP) are currently under development. The State Government has directed that the CSP and strategies for new Councils be completed by 30 June 2018 following the election of new Councillors in September 2017. For this reason, the Long Term Financial Plan presented in this section provides a 10 year projection of the income statement based on strategic financial objectives and assumptions on escalations or savings in each of the revenue and expenditure areas.
Strategic Financial Objectives The following strategic financial objectives have been formulated for Central Coast Council and are based on fundamental principles of financial sustainability and service delivery. To this end, these objectives support and contribute to Councilâ&#x20AC;&#x2122;s vision of a vibrant and sustainable Central Coast.
107
Assumptions Savings arising from amalgamation and transformation Modelling and analysis done by Council identifies significant financial and other efficiency benefits resulting from amalgamation and the resulting transformation program. Conservative estimates of these savings are included in the projected Income Statement and are visible in the table of â&#x20AC;&#x153;escalationsâ&#x20AC;? in this section. However, given the need to improve service levels and assets supporting those services, it is anticipated that in the short to medium term savings will be reinvested into improving service delivery. Revenue Forecast Rates and special levies were increased by the approved rate peg of 1.5% for 2017-18 with a 2.0% increase forecast for 2018-19 to 2026-27. Annual charges for the General fund were based on the forecasted Consumer Price Index (CPI) for 2017-18 to 2026-27. Water, Sewerage and Drainage annual charges were based on the 2013 determination approved by IPART for 2017-18 and 2018-19 and then by 1.5% between 2019-20 and 2026-27. User fees and charges were budgeted for statutory charges, cost recovery and market based charges with all other fees increased by 5% for 2017-18 to 2026-27 years. The budgets for grants are based on those approved for operating and capital purposes as well as contributions for specific purposes for 2017-18. This budget is likely to increase during the 2017-18 year when further grants are secured. A conservative increase to grants has been applied for the 2018-19 to 2026-27 years. Interest and investment revenue is based on the forecasted interest rates for 2017-18 to 2026-27 years (moderate increase in rates predicted by most economists). Expenditure Forecast Employee expenses are budgeted to increase by 2.85% (the award increase) for 2017-18 with an increase of 2.95% to 3.55% for 2018-19 to 2026-27 to allow for award and legislated superannuation increases. These CPI increases on employee expenses are offset by anticipated efficiency savings and attrition of 2.0% between 2019-20 and 2021-22. Materials and Contracts are increased by CPI estimate of 2.0% for 2018-19 to 2026-27. These CPI increases are offset by savings (arising from increased scale and efficiency) of between 0.5% and 1% between 2018-19 and 2021-22. Depreciation is based on the estimated useful life of assets as known at the time and will be reviewed each year.
108
109
1,939 28,150 30,089
Grants and Contributions Provided for Capital Purposes
Net Operating Result including Capital Amounts
182,009 20,222 123,615 125,753 99,377 550,976
Operating Expenses Employee Benefits and On-costs Borrowing Costs Materials and Contracts Depreciation and Amortisation Other Expenses Total Expenses attributable to Operations
Net Operating Result excluding Capital Amounts
344,011 131,882 10,156 13,409 43,456 10,000 552,915
2017-18 $'000
Operating Income Rates and Annual Charges User Charges and Fees Interest and Investment Revenue Other Revenues Grants and Contributions Provided for Operating Purposes Net Gains from the Disposal of Assets Total Income attributable to Operations
10 Year Projected Operating Statement
Central Coast Council
Projected Income Statement 2017-18 to 2026-27
25,817
25,335
482
187,322 20,323 124,794 127,010 101,516 560,965
348,533 134,705 10,207 13,677 44,326 10,000 561,447
2018-19 $'000
24,039
22,520
1,519
189,346 20,526 126,637 128,280 103,702 568,492
354,914 138,626 10,309 13,950 45,212 7,000 570,011
2019-20 $'000
24,850
21,113
3,737
191,394 20,731 128,507 129,563 105,936 576,131
361,414 142,698 10,412 14,229 46,116 5,000 579,869
2020-21 $'000
23,851
19,705
4,146
193,463 20,939 130,405 130,859 108,219 583,885
368,034 146,927 10,516 14,514 47,039 1,000 588,030
21,691
18,298
3,393
200,231 21,148 133,013 132,167 110,553 597,112
374,779 151,322 10,621 14,804 47,979 1,000 600,505
20,498
16,890
3,608
207,237 21,360 135,673 133,489 112,937 610,696
381,648 155,889 10,728 15,100 48,939 2,000 614,304
PROJECTED YEARS 2021-22 2023-24 2022-23 $'000 $'000 $'000
20,680
16,890
3,790
214,490 21,573 138,386 134,824 115,374 624,648
388,646 160,637 10,835 15,402 49,918 3,000 628,437
2024-25 $'000
21,829
16,890
4,938
221,998 21,789 141,154 136,172 117,865 638,978
395,774 165,573 10,943 15,710 50,916 5,000 643,916
2025-26 $'000
22,019
16,890
5,129
228,696 22,007 143,977 137,534 120,410 652,624
403,035 170,706 11,053 16,024 51,935 5,000 657,753
2026-27 $'000
110
2017-18 1.50% 1.50% 2.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2.00% 5.00% 0.50% 2.00% 2.00% 0.00% 0.00% 2.85% 0.00% 0.50% 2.00% 0.00% 0.00% 3.00% 2.50% 2.00% 2.00%
2018-19 2.00% 2.00% 2.00% 0.00% 0.00% 0.00% 0.00% 0.00% 2.00% 5.00% 0.50% 2.00% 2.00% 0.00% 0.00% 2.95% 0.00% 0.50% 2.00% -1.00% 1.00% 3.00% 2.50% 2.00% 2.00%
2019-20 2.00% 2.00% 2.00% 1.50% 1.50% 1.50% 1.50% 1.50% 2.00% 5.00% 1.00% 2.00% 2.00% 0.00% 0.00% 3.05% -2.00% 1.00% 2.00% -0.50% 1.00% 3.00% 2.50% 2.00% 2.00%
2.0% 9.5% 0.0%
2.0% 9.5% 0.0%
2.0% 9.5% 0.0%
2.0% 9.5% 0.0%
2020-21 2.00% 2.00% 2.00% 1.50% 1.50% 1.50% 1.50% 1.50% 2.00% 5.00% 1.00% 2.00% 2.00% 0.00% 0.00% 3.05% -2.00% 1.00% 2.00% -0.50% 1.00% 3.00% 2.50% 2.00% 2.00%
Water, Sewerage and Drainage Charges are determined by IPART Domestic Waste Management Charge includes waste levy remitted to the NSW Government Childcare and Holiday parks Includes award and performance increases and legislative changes to superannuation to increase to 12% by 2025-26
Additional Information Assumed CPI Superannuation Guarantee Rate Annual Increase in Superannuation Guarantee Rate
^ # * â&#x2C6;&#x17E;
â&#x2C6;&#x17E;
# ^ ^ ^ ^ ^ *
Category Rates - Ordinary Rates - Special Domestic Waste Management Water Service Sewer Service Drainage Service User Charges - Water User Charges - Sewer Fees and Charges - Specific Fees and Charges - Other Interest - Investments Other Revenues Operating Grants Net Gains from Disposal Capital Grants Salaries and Wages - Estimated annual increase including super Salaries and Wages - Savings from efficiencies and natural attrition Borrowing Costs Materials and Contracts - CPI Materials and Contracts - Cost savings from amalgamation Depreciation Insurance Utilities Other Expenses Other Expenses - Waste Levy
Projected Income Statement 2017-18 to 2026-27: Assumptions and Escalations Table
Income
Expenditure
2.0% 10.0% 0.5%
2021-22 2.00% 2.00% 2.00% 1.50% 1.50% 1.50% 1.50% 1.50% 2.00% 5.00% 1.00% 2.00% 2.00% 0.00% 0.00% 3.05% -2.00% 1.00% 2.00% -0.50% 1.00% 3.00% 2.50% 2.00% 2.00%
2.0% 10.5% 0.5%
2022-23 2.00% 2.00% 2.00% 1.50% 1.50% 1.50% 1.50% 1.50% 2.00% 5.00% 1.00% 2.00% 2.00% 0.00% 0.00% 3.55% 0.00% 1.00% 2.00% 0.00% 1.00% 3.00% 2.50% 2.00% 2.00%
2.0% 11.0% 0.5%
2023-24 2.00% 2.00% 2.00% 1.50% 1.50% 1.50% 1.50% 1.50% 2.00% 5.00% 1.00% 2.00% 2.00% 0.00% 0.00% 3.55% 0.00% 1.00% 2.00% 0.00% 1.00% 3.00% 2.50% 2.00% 2.00%
2.0% 11.5% 0.5%
2024-25 2.00% 2.00% 2.00% 1.50% 1.50% 1.50% 1.50% 1.50% 2.00% 5.00% 1.00% 2.00% 2.00% 0.00% 0.00% 3.55% 0.00% 1.00% 2.00% 0.00% 1.00% 3.00% 2.50% 2.00% 2.00%
2.0% 12.0% 0.5%
2025-26 2.00% 2.00% 2.00% 1.50% 1.50% 1.50% 1.50% 1.50% 2.00% 5.00% 1.00% 2.00% 2.00% 0.00% 0.00% 3.55% 0.00% 1.00% 2.00% 0.00% 1.00% 3.00% 2.50% 2.00% 2.00%
2.0% 12.0% 0.0%
2026-27 2.00% 2.00% 2.00% 1.50% 1.50% 1.50% 1.50% 1.50% 2.00% 5.00% 1.00% 2.00% 2.00% 0.00% 0.00% 3.05% 0.00% 1.00% 2.00% 0.00% 1.00% 3.00% 2.50% 2.00% 2.00%
Appendix 1 Methods of Monitoring Financial Performance A primary goal of the LTFP is to enable transparent measurement and accountability. We use the following indicators to achieve this goal: Operating Performance Ratio Total continuing operating revenue (excluding capital grants and contributions) less operating expenses Total continuing operating revenue (excluding capital grants and contributions) This ratio measures Council’s achievement of containing operating expenditure within operating revenue. This ratio focuses on operating performance and excludes capital income from grants and contributions. Own Source Operating Revenue Ratio Rates and Annual Charges and User Charges and Fees Total continuing operating revenue inclusive of capital grants and contributions This ratio measures fiscal flexibility and the degree of reliance on external funding sources. A Council’s fiscal flexibility improves the higher the level of its own source of revenue. Unrestricted Current Ratio Current assets less all external restrictions Current liabilities less specific purpose liabilities The purpose of this ratio is to demonstrate whether there are sufficient funds available to meet short term obligations. Cash Expense Cover Ratio Cash and cash equivalents (including term deposits) Total expenses less depreciation less interest costs / 12 This liquidity ratio indicates the number of months Council can continue paying for its immediate expenses without additional cash inflow. Rates and Annual Charges Outstanding Percentage Rates, annual and extra charges and interest outstanding Rates, annual and extra charges and interest collectible The purpose of this measure is to assess the impact of uncollected rates and annual charges on liquidity and the adequacy of recovery efforts. Capital Expenditure Ratio Annual capital expenditure Annual depreciation The purpose of the capital expenditure ratio is to assess the extent to which a Council is expanding its asset base through expenditure on both new assets and the replacement and renewal of existing assets. Infrastructure Backlog Ratio Estimated cost to bring assets to a satisfactory condition Total value of infrastructure, building and other structures This ratio shows what proportion the backlog is against the total value of Council’s infrastructure.
111
Asset Maintenance Ratio Actual asset maintenance Required asset maintenance This ratio compares actual maintenance against required maintenance to determine whether Council is investing enough funds to stop the infrastructure backlog from growing. Building and Infrastructure Renewal Ratio Assets renewals (infrastructure, buildings and other structures) Depreciation, amortisation and impairment (infrastructure, buildings and other structures) The purpose of this ratio is to assess the rate at which these assets are being renewed against the rate at which they are depreciating for building and infrastructure assets. Debt Service Cover Ratio Operating result before capital (excluding interest and depreciation, amortisation, impairment) Principal repayments and borrowing interest costs This ratio measures the availability of operating cash to service debt including interest, principal and lease payments. Interest Cover Ratio Operating result before interest and depreciation Borrowing interest costs This ratio measures the ability of an organisation to pay interest on its debt.
112
Part 3
Statement of Revenue 2017-2018
Statement of Revenue The Statement of Revenue details how rates and annual charges are set, as well as fees and charges for using Council facilities and services.
Ordinary Rates and Special Rates The total amount of ordinary and special rates Council can charge is capped by legislation. For 2017-18 the Independent Pricing and Regulatory Tribunal (IPART) approved a 1.5% rate peg as the allowable increase in this capped amount. This capped amount is effectively shared between ratepayers according to the individual value of each property within each of the former Gosford and Wyong Local Government Areas. Under the Valuation of Land Act 1916 Council is legally required to use the most current land values when calculating ordinary and special rates. These values are provided by the NSW Valuer General (VG), the independent statutory authority responsible for determining land values in NSW. The latest values provided by the Valuer General are being used for levying rates in 2017-18 and have a base date of 1 July 2016. These new valuations replace those with a base date of 1 July 2015 in the former Gosford Local Government Area and 1 July 2014 in the former Wyong Local Government Area.
Land Categories Farmland
(Section 515 Local Government Act 1993)
Residential
(Section 516 Local Government Act 1993)
Residential – Flood Prone
(Section 516 Local Government Act 1993)
Mining
(Section 517 Local Government Act 1993)
Business
(Section 518 Local Government Act 1993)
As a direct result of the NSW Valuer General’s revaluation, properties with large increases in land value will experience rate increases well above the IPART approved rate pegging increase of 1.5%. As Council’s total rates income can only increase by the IPART approved 1.5%, other ratepayers will see increases of less than 1.5% and many will see rate decreases. Council usually has a limited number of inflexible rating structures mandated under the Local Government Act 1993. Although all of the available structures are primarily based on the unimproved land value of property, Council is usually able to consider options to alleviate significant rate variations that arise as a consequence of the revaluation. However, in accordance with recent/proposed amendments to the Local Government Act 1993, these limited options are not available to Central Coast Council. The NSW Government’s rate path freeze policy, means that Council is required to maintain the rate path that was last applied by the former Gosford City and Wyong Shire councils. This policy has been formalised in legislation and will apply until 30 June 2020.
Rating categories and Structure Categories In accordance with Section 514 of the Local Government Act 1993, all parcels of rateable land in Council’s area have been classified into one of the following categories of Ordinary rates:
Land is categorised as farmland if it is a parcel of rateable land valued as one assessment and its dominant use is for farming or agricultural production. Rural residential land is not categorised farmland. Land is categorised as residential if it is a parcel of rateable land valued as one assessment and its dominant use is for residential accommodation or rural residential land or if it is vacant land it is zoned or otherwise designated for use under an environmental planning instrument for residential purposes. Land is categorised as residential – flood prone if it is a parcel of rateable land valued as one assessment and it is vacant flood liable land which is unsuitable for building upon. Land is to be categorised mining if it is a parcel of rateable land valued as one assessment and its dominant use is for a coal mine or metalliferous mine. Land is to be categorised as business if it cannot be categorised as farmland, residential or mining. Caravan parks and manufactured home communities are to be categorised business.
2 114
Land Categories Business – Major Retail
Business – Local Retail
(Section 529(2)(d) Local Government Act 1993 - a sub-category may be determined for the category “business” according to a centre of activity) (Section 529(2)(d) Local Government Act 1993 - a subcategory may be determined for the category “business” according to a centre of activity)
The Business Sub Category of Major Retail applies to properties within the major retail precincts in the former Wyong Shire local government area of: • Bay Village Bateau Bay (refer to Map 1) • Lake Haven Shopping Centre and Home Mega Centre (refer to Map 2) • Westfield Tuggerah (refer to Map 3) • Tuggerah SuperCentre (refer to Map 4) The Business Sub Category of Local Retail applies to properties within the local retails precincts in the former Wyong Shire local government area at: • Chittaway Bay (refer to Map 5) • Lake Munmorah (refer to Map 6) • San Remo (refer to Map 7) • Wadalba (refer to Map 8)
The categorisation of all rateable land was determined as at 1 January 1994 and took place with the issue of the rate notice in January 1994. New parcels of land created since that date have been categorised with the issue of subsequent rate notices. Where subsequent changes in categorisation have occurred, written notices to this effect have been issued in accordance with Section 520 of the Local Government Act 1993.
Structure
Ordinary Rates
In accordance with recent/proposed amendments to the Local Government Act 1993 applicable to merged councils, Central Coast Council is required to maintain the rate path that was last applied by the former Gosford City and Wyong Shire councils.
Ordinary rates are used to provide essential services such as our road network, street lighting, street cleaning, footpaths, parks, sport and recreation facilities, environmental planning and conservation, city rangers, pest control, libraries, town planning and building control, community services, and much more.
For 2017-18 the rating structures that apply within each of the former Gosford and Wyong Local Government Areas therefore reflects the structure and path of rate increases in place within each of those areas prior to the formation of Central Coast Council on 12 May 2016.
Ordinary Rates Former Gosford Local Government Area Category and Sub category
Farmland Residential Residential – Flood Prone Business Business – Major Retail Business – Local Retail Mining
Ad Valorem Cents per $ land value 0.165067 0.283290 0.295997 0.530126 -
Former Wyong Local Government Area
Minimum ($) 514.00 14.00 263.00 522.00 -
Ad Valorem Cents per $ land value 0.282088 0.443603 0.965643 1.448464 1.207053 15.876904
Minimum ($) 300.00 300.00 300.00 300.00 300.00 300.00
Forecast income per category ($) 734,000 139,289,000 12,000 17,690,000 1,345,000 129,000 911,000
3 115
Estimated Ordinary Residential Rate - former Gosford Local Government Area Unimproved Land Value at 1 July 2016 $30,000
Ordinary Residential Rates $514
Unimproved Land Value at 1 July 2016 $160,000
Ordinary Residential Rates $514
Unimproved Land Value at 1 July 2016 $300,000
Ordinary Residential Rates $850
$40,000
$514
$170,000
$514
$320,000
$907
$50,000
$514
$180,000
$514
$340,000
$963
$60,000
$514
$190,000
$538
$360,000
$1,020
$70,000
$514
$200,000
$567
$380,000
$1,077
$80,000
$514
$210,000
$595
$400,000
$1,133
$90,000
$514
$220,000
$623
$450,000
$1,275
$100,000
$514
$230,000
$652
$500,000
$1,416
$110,000
$514
$240,000
$680
$550,000
$1,558
$120,000
$514
$250,000
$708
$600,000
$1,700
$130,000
$514
$260,000
$737
$650,000
$1,841
$140,000
$514
$270,000
$765
$700,000
$1,983
$150,000
$514
$280,000
$793
$750,000
$2,125
Unimproved Land Value at 1 July 2016
Ordinary Residential Rates
Estimated Ordinary Residential Rate - former Wyong Government Area Unimproved Land Value at 1 July 2016
Ordinary Residential Rates
Unimproved Land Value at 1 July 2016
Ordinary Residential Rates
$30,000
$300
$160,000
$710
$300,000
$1,331
$40,000
$300
$170,000
$754
$320,000
$1,420
$50,000
$300
$180,000
$798
$340,000
$1,508
$60,000
$300
$190,000
$843
$360,000
$1,597
$70,000
$311
$200,000
$887
$380,000
$1,686
$80,000
$355
$210,000
$932
$400,000
$1,774
$90,000
$399
$220,000
$976
$450,000
$1,996
$100,000
$444
$230,000
$1,020
$500,000
$2,218
$110,000
$488
$240,000
$1,065
$550,000
$2,440
$120,000
$532
$250,000
$1,109
$600,000
$2,662
$130,000
$577
$260,000
$1,153
$650,000
$2,883
$140,000
$621
$270,000
$1,198
$700,000
$3,105
$150,000
$665
$280,000
$1,242
$750,000
$3,327
Typical Residential Ratepayer- former Gosford Local Government Area Based on 2016 Land Value of $333,500 Ordinary Residential Rates Domestic Waste Management Charge* Three bin waste and recycling collection services with 6 bulk kerbside collections. *$479 Eastern area waste service or $424 Western area waste service which excludes the garden vegetation bin service Water Authority Charges (water, sewerage and drainage services as detailed in the table below) Total Annual Rates and Charges
4 116
Annual Amount $945 $479
Quarterly Instalment
$995 $2,419
$605
Water Authority Charges - former Gosford Local Government Area Single residential dwelling Water Service Charge (for the availability of your water supply service - separate user pays charges apply for water usage) Sewer Service Charge (for the availability of sewer services) Drainage Service Charge (provides funds to maintain and improve Councilâ&#x20AC;&#x2122;s drainage network) Total Service Charges (excluding water usage @ $2.29 per kL)
Annual Amount $198
Half Yearly Account
$672 $125 $995
$498
Typical Residential Ratepayer- former Wyong Local Government Area Based on 2016 Land Value of $259,000 Ordinary Residential Rates Domestic Waste Management Charge* Three bin waste and recycling collection services with 6 bulk kerbside collections. *$479 Eastern area waste service or $424 Western area waste service which excludes the garden vegetation bin service Water Authority Charges (water, sewerage and drainage services as detailed in the table below) Total Annual Rates and Charges
Annual Amount $1,149 $479
Quarterly Instalment
$776 $2,404
$601
Water Authority Charges - former Wyong Local Government Area Single residential dwelling Water Service Charge (for the availability of your water supply service - separate user pays charges apply for water usage) Sewer Service Charge (for the availability of sewer services) Drainage Service Charge (provides funds to maintain and improve Councilâ&#x20AC;&#x2122;s drainage network) Total Service Charges (excluding water usage @ $2.29 per kL)
Annual Amount $165
Quarterly Instalment
$483 $128 $776
$194
5 117
Billing Methodology Council operates as both the local government authority under the Local Government Act 1993 (LGA) and as the local water authority under the Water Management Act 2000 (WMA).
Billing Methodology former Gosford Local Government Area Rate or Service Charge Ordinary Rates
Legislation
Notice/Account
Billing Frequency
LGA
Annual Rates
July annually
In full by 31 August or Four instalments due; • 31 August • 30 November • 28 (or 29) February, and • 31 May
Water Account
Half Yearly*
30 days after issue date
Special Rates Domestic Waste Other (non-Domestic) Waste Stormwater Drainage Service
WMA
Water Availability
WMA
Sewerage Service Availability Water Usage Sewer Usage Trade Waste
*Various issue dates depending on suburb/area according to water meter reading program
6 118
Payment Dates
Billing Methodology former Wyong Local Government Area Rate or Service Charge
Legislation
Notice/Account
Billing Frequency
LGA
Annual Rates
July annually
WMA
Water Account
Quarterly*
Sewer Usage
Invoice
Trade Waste
Trade Waste Account
Based on water usage: • Small user – August annually • Large users quarterly Based on water usage: • Small user – August annually • Large users – monthly or quarterly
Ordinary Rates Special Rates Domestic Waste Other (non-Domestic) Waste
Water Availability
Payment Dates In full by 31 August or Four instalments due; • 31 August • 30 November • 28 (or 29) February, and • 31 May 30 days after issue date
Sewerage Service Availability Stormwater Drainage Service Water Usage
*Various issue dates depending on suburb/area according to water meter reading program
7 119
Map 1 - Business Major Retail - Bateau Bay
8 120
Map 2 - Business Major Retail â&#x20AC;&#x201C; Lake Haven
9 121
Map 3 - Business Major Retail â&#x20AC;&#x201C; Westfield Tuggerah
10 122
Map 4 - Business Major Retail â&#x20AC;&#x201C; Tuggerah SuperCentre
11 123
Map 5 - Business Local Retail â&#x20AC;&#x201C; Chittaway Bay
12 124
Map 6 - Business Local Retail â&#x20AC;&#x201C; Lake Munmorah
13 125
Map 7 - Business Local Retail â&#x20AC;&#x201C; San Remo
14 126
Map 8 â&#x20AC;&#x201C; Business Local Retail - Wadalba
15 127
Special Rates Special Rates are also levied based on land values provided by the NSW Valuer General. The following Special Rates will be levied under Section 495 of the Local Government Act 1993. Special Rate
Gosford Parking Special Rate Purpose Provide funding for the operation of the Baker Street Parking Station.
Properties Assessed
Base Amount
Ad Valorem Cents per $ land value
Forecast income
All properties categorised as Business, in accordance with Section 518 of the Local Government Act 1993, located within the Gosford Central Business District.
-
0.135790
$178,000
-
0.354254
$465,000
-
0.056113
$874,000
-
0.224173
$572,000
Background Introduced in 1978 as an ongoing rate. Refer to Map 9 Gosford Central Business District Improvement Special Rate Purpose All properties categorised as Provide funding for works Business, in accordance with Section which will enhance the 518 of the Local Government Act Central Business District and 1993, located within the Gosford benefit business properties Central Business District. located in that area. Background Introduced in 1994-95 as an ongoing rate Refer to Map 9 Business/Tourism Development Special Rate Purpose All properties categorised as Provide funding for Business / Business, in accordance with Section tourism works across the 518 of the Local Government Act former Gosford Local 1993, within the former Gosford Government Area. Local Government Area. Background Introduced in 1994-95 as an ongoing rate Refer to Map 10 Terrigal Tourism/Business Special Development Rate Purpose All rateable properties within Funding of special Terrigal, North Avoca and Wamberal development works. and are categorised as Business, in accordance with Section 518 of the Background Local Government Act 1993 or used Introduced in 2004-05 for a for the purpose of tourism and period of fifteen years. short-term holiday letting. Refer to Map 11
16 128
Special Rate
The Entrance Area Purpose Provide funding to The Entrance area to: • Promote the economic development of The Entrance area • Market and promote The Entrance area • Organise and manage promotional events within and around The Entrance area for the purpose of improving the market penetration of The Entrance area and its traders. Background Introduced from 1 July 1997, in accordance with Section 495 of Local Government Act 1993, to fund activities in The Entrance area and to enhance the local business area. Refer to Maps 12 and 13
Properties Assessed
The Entrance Area Special Rate applies to the following properties: • All land used for business purposes and categorised, in accordance with Section 518 of the Local Government Act 1993, in the suburb known as The Entrance • Major Facilities servicing Tourists identified as all properties in the suburbs of Magenta, The Entrance North, The Entrance, Blue Bay, Long Jetty, Toowoon Bay, Shelly Beach and Bateau Bay being land predominantly used for purposes as defined in Council’s current Local Environmental Plan (LEP) of; amusement centres camping grounds caravan parks eco-tourist facilities pubs registered clubs service stations tourist and visitor accommodation • Identified as Town Centres in Council’s current Retail Centres Strategy.
Base Amount
Ad Valorem Cents per $ land value
$89.00
0.360264
Forecast income
$562,000
These are properties that have been identified by Council as receiving a benefit through this special rate. Toukley Area Purpose Provide funding to the Toukley area to market and promote the economic development of the Toukley area within which this special rate applies. Background Introduced from 1 July 1997, in accordance with Section 495 of Local Government Act 1993, following a request by the Toukley Chamber of Commerce to fund activities in the Toukley area to enhance the local business area.
The Special Rate applies to the following properties: • All properties categorised as Business in the Toukley, Canton Beach, Noraville and Norah Head areas.
$89.00
0.267680
$176,000
These are properties that have been identified by Council as receiving a benefit from the activities funded through this special rate.
Refer to Map 14
17 129
Special Rate
Wyong Area Purpose Provide funding to the Wyong area to promote the economic development of the Wyong area within which this special rate applies. Background Introduced from 1 July 2005, in accordance with Section 495 of Local Government Act 1993, following a request from the Wyong-Tuggerah Chamber of Commerce to fund activities in the Wyong area to enhance the local business area. Refer to Map 15
Properties Assessed
The Special Rate applies to the following properties: â&#x20AC;˘ All properties categorised as Business in the suburb known as Watanobbi. â&#x20AC;˘ All properties categorised as Business in the suburb known as Wyong bounded by the following; north of the Wyong River from Tacoma in the east to the M1 Pacific Motorway in the west east of the M1 Pacific Motorway from the Wyong River to the suburb boundary between Wyong and Warnervale but to exclude Lot 32 DP 814964 south of the northern Wyong boundary to its intersection with the Pacific Highway and then south of the Pacific Highway to the intersection of Pollock Avenue, but to include Lot 400 DP 1114793 (this lot being to the north of the Pacific Highway) the eastern boundary of the suburb of Wyong from Johns Road to Wyong River. These are properties that have been identified by Council as receiving a benefit from the activities funded through this special rate.
18 130
Base Amount
Ad Valorem Cents per $ land value
$89.00
0.103939
Forecast income
$78,000
Map 9 â&#x20AC;&#x201C; Gosford CBD Special Rate and Gosford Parking Special Rate
19 131
Map 10 â&#x20AC;&#x201C; Business Tourism Special Rate
20 132
Map 11 â&#x20AC;&#x201C; Terrigal Tourism Special Rate
21 133
Map 12 â&#x20AC;&#x201C; The Entrance Special Rate â&#x20AC;&#x201C; Businesses in The Entrance
22 134
Map 13 â&#x20AC;&#x201C; The Entrance Special Rate â&#x20AC;&#x201C; Major Facilities Servicing Tourists
23 135
Map 14 - Toukley Area Special Rate
24 136
Map 15 â&#x20AC;&#x201C; Wyong Area Special Rate
25 137
Annual Charges In addition to ordinary rates and special rates, Council will levy annual charges for the following services in 2017-18: • • • • •
Domestic waste management services Waste management services (non-domestic) Water supply services Sewerage services Drainage services
Domestic Waste Management Services Charges Council levies a domestic waste management service charge on all parcels of rateable land to which a service is available. This covers the cost of providing waste collection and recycling services and the whole of life cost for managing waste including the remediation of landfills.
Domestic Waste Management Charges Domestic Waste Management Availability Charge
Annual Charge $66.00
Rate Per Week $1.27
No of Assessments 3,116
Forecast Income $206,000
$479.00
$9.88
129,209
$61,891,000
Purpose: Fund waste management facilities to meet potential future demands from vacant land. Applies to: All vacant parcels of rateable land within Council’s waste collection area. Refer Map 16 Domestic Waste Management Service – Eastern Area Purpose: Cover cost of Council’s three bin waste and recycling collection services plus the whole of life cost for managing waste including the remediation of landfills. Applies to: all domestic properties within Council’s waste collection area located east of the M1 Motorway with an approval for a residential building. Provides: Access to Council’s three bin collection service consisting of; • • • •
Weekly collection of a 120/140 litre waste bin* Fortnightly collection of a 240 litre recycling bin Fortnightly collection of a 240 litre garden vegetation bin, and; Six kerbside clean up services per year.
Upgrades and additional services: Available upon request of the owner at the additional cost(s) indicated below under Domestic waste management service – upgrades and additional services. Options for large residential complexes: Where more than 6 strata titled or community title residential units exist on one allotment, bulk bin options for waste and or recyclables may be provided up to the equivalent volume of one 120/140 litre waste bin* per tenement. Refer Map 16
26 138
Domestic Waste Management Charges Domestic Waste Management Service – Western Area
Annual Charge $424.00
Rate Per Week $8.15
No of Assessments 3,718
Forecast Income $1,576,000
Purpose: Cover cost of Council’s two bin waste and recycling collection services plus the whole of life cost for managing waste including the remediation of landfills. Applies to: all domestic properties within Council’s waste collection area located west of the M1 Motorway with an approval for a residential building. Provides: Access to Council’s two bin collection service consisting of; • • •
Weekly collection of a 120/140 litre waste bin* Fortnightly collection of a 240 litre recycling bin, and; Six kerbside clean up services per year.
Upgrades and additional services: Available upon request of the owner at the additional cost(s) indicated below under Domestic waste management service – upgrades and additional services. Refer to Map 16. *120 litre waste bin service applies within the former Gosford Local Government area. *140 litre waste bin service applies within the former Wyong Local Government area.
27 139
Map 16 â&#x20AC;&#x201C; Domestic Waste Management Charges Eastern Area and Western Area
28 140
Domestic Waste Management Service
Multiple services per week of any bin can be arranged in accordance with the waste collection contract. The cost will be the multiple of the standard annual charge.
Upgrades and Additional Services Domestic properties may upgrade their 120/140 litre domestic waste bin to a 240 litre domestic waste bin and/or request additional 240 litre domestic waste bins, 120/140 litre domestic waste bins, 240 litre recycling bin and 240 litre garden vegetation bins. The costs to upgrade and for additional bins are shown in the table below: Service Upgrades and Additions 120/140 litre waste bin to 240 litre waste bin upgrade 240 litre domestic bin additional service 120/140 litre domestic bin additional service 240 litre recycling bin additional service 240 litre vegetation bin additional service
Annual Charge $127.00
Rate Per Week $2.44
$380.00
$7.31
$252.00
$4.85
$96.00
$1.85
$103.00
$1.98
Service 120/140 litre Waste Bin 240 litre Waste Bin 660 litre Waste Bin 3 1.1 m Waste Bin 3 1.5 m Waste Bin 240 litre Recycling Bin 240 litre Vegetation Bin
Annual Charge $357.00 $476.00 $2,031.00 $2,836.00 $3,819.00 $96.00 $103.00
Rate Per Week $6.87 $9.15 $39.06 $54.54 $73.44 $1.85 $1.98
The yield to Council from these charges in 2017-18 is estimated to be $2,962,000. Pension Rebates - Ordinary Rates and Domestic Waste Management Charges Council provides a rate reduction on the combined ordinary rate levy amount and the domestic waste management charge of 50%, with a maximum combined reduction of $250 to eligible pensioners. Of this reduction 55% is reimbursed to Council by the NSW Government.
The anticipated yield for 2017-18 from the upgraded domestic waste services is $3,113,000. Additional Short Term Extra Service
The estimated total amount of pension rebates for ordinary rates and domestic waste management charges in 2017-18 is $6,591,000.
Residents may receive an additional service to any bin type on any working day by providing 1 full business day notice.
Water, Sewerage and Drainage Charges
Rate per Additional Service
120/140 litre Waste Bin 240 litre Waste Bin 240 litre Recycling Bin 240 litre Vegetation Bin
Rate Per Additional Service $17.44 $18.56 $17.44 $17.44
Other Waste Management Service Charge – Non Domestic
Central Coast Council’s water, sewerage and drainage services and a number of its associated ancillary services are declared monopoly services under Section 4 of the Independent Pricing and Regulatory Tribunal Act 1992. Council’s prices must therefore be set in accordance with any IPART determined methodologies and/or maximum prices, and are subject to approval by the relevant Minister. All prices for water, sewerage, drainage and ancillary services for 2017-18 have been calculated in accordance with IPART’s Water Determination May 2013, with the exception of retirement villages. Changes for water, sewerage, drainage services for retirement villages have been aligned in accordance with Council resolution 364/16 from the ordinary meeting held on 28 September 2016.
Council levies the waste management charge on all parcels of applicable land for which a Council waste, recycling or vegetation bin service is provided. Commercial customers and non-rateable properties may be provided with waste bins of various capacities and/or with 240 litre recycling bins and/or a 240 litre garden vegetation bins. The standard service frequency for the 120/140 litre and 240 litre waste bin is once per week and the 240 litre recycling bin and 240 litre garden vegetation bin once per fortnight.
Following the formation of the Central Coast Council, IPART has extended the period of the May 2013 determination until 30 June 2019. This means that the council’s maximum 2016-17 prices, as specified in the 2013 determinations, will continue to apply until 30 June 2019.
29 141
Water Supply Service Charges Council levies the water supply service charge on the owners of all properties for which there is an available water supply service. This covers the costs of making water available. For those properties that become chargeable or nonchargeable during the year a proportional charge or fee calculated on a daily basis is applied. The water supply service charges for 2017-18 are as follows: Meter Type / Size Residential property service Multi Premises Water availability Unmetered properties Non Res single 20mm 20mm meter 25mm meter 32mm meter 40mm meter 50mm meter 80mm meter 100mm meter 150mm meter 200mm meter Non specified pipe/meter size
The expected total yield in 2017-18 from this charge is $60,533,000. Sewerage Supply Service Charges Council levies this charge to cover the cost of supplying sewerage services on all properties for which there is a sewerage service either connected or available.
Former Gosford LGA $197.72
Former Wyong LGA $164.63
For those properties that become chargeable or nonchargeable during the year a proportional charge or fee calculated on a daily basis is applied.
$197.72 $197.72 N/A $197.72 N/A $275.94 $452.10 $706.42 $1,103.80 $2,825.74 $4,415.22 $9,934.26 $17,660.92 2 (meter size) /625 x $275.94
$164.63 $164.63 $577.49 $164.63 $146.02 $228.15 N/A $584.09 $912.63 $2,336.34 $3,650.54 $8,213.70 $14,602.14 2 (meter size) /625 x $228.15
Non Residential properties will be levied a sewerage service charge based on meter size and a sewerage usage charge. Where the sum of these charges is less than the non-residential minimum sewerage charge, the non-residential minimum will be charged instead.
The water supply service charges for retirement villages with one or more common meters in 2017-18 are as follows: Meter Size / Type 25mm 40mm 50mm 80mm 100mm 150mm 200mm Non specified pipe/meter size
Where water usage relates to multiple financial year periods the usage will be apportioned to each period on a daily average basis and the applicable periodâ&#x20AC;&#x2122;s water usage charge will be applied.
Former Gosford LGA $228.15 $584.09 $912.63 $2,336.34 $3,650.54 $8,213.70 $14,602.14 2 (meter size) x (25mm water service charge) / 625
A discharge factor in accordance with Councilâ&#x20AC;&#x2122;s Trade Waste Policy is applied to the charge based on the volume of water discharged into Councilâ&#x20AC;&#x2122;s sewerage system. Meter Type / Size Residential property service Multi Premises Sewer availability Non-residential minimum 20mm meter 25mm meter 40mm meter 50mm meter 80mm meter 100mm meter 150mm meter 200mm meter Non specified pipe/meter size
The expected total yield in 2017-18 from water service charges is $25,167,000. Water Usage Charges In addition to the water supply service charge, all potable water consumed will be charged at $2.29 per kilolitre.
30 142
Former Gosford LGA $672.42
Former Wyong LGA $483.28
$672.42 $672.42 $672.42
$483.28 $483.28 $483.28
$672.42 $1,541.80 x DF $2,526.08 x DF $6,167.22 x DF $15,788.10 x DF $24,668.90 x DF $55,505.04 x DF $98,675.64 x DF 2 (meter size) /625 x $402.52 x DF
$284.16 x DF $443.99 x DF $1,136.61 x DF $1,775.95 x DF $4,546.43 x DF $7,103.80 x DF $15,983.55 x DF $28,415.20 x DF 2 (meter size) /625 x $443.99 x DF
The sewerage supply service charges for retirement villages with one or more common meters in 2017-18 are as follows: Meter Size / Type 25mm 40mm 50mm 80mm 100mm 150mm 200mm Non specified pipe/meter size
Meter Type / Size
Former Gosford LGA $443.99 x DF $1,136.61 x DF $1,775.95 x DF $4,546.43 x DF $7,103.80 x DF $15,983.55 x DF $24,415.20 x DF 2 (meter size) x (25mm sewer service charge) / 625
The expected total yield in 2017-18 from sewerage supply service charge is $79,362,000.
Residential property service charge Multi premises 20mm meter 25mm meter 40mm meter 50mm meter 80mm meter 100mm meter 150mm meter 200mm meter Non specified pipe/meter size
Former Wyong LGA $128.32 $96.24 $128.32 $200.50 $513.28 $802.01 $2,053.14 $3,208.03 $7,218.05 $12,832.09 2 (meter size) /625 x $200.50
The residential drainage service charge above applies to retirement villages
Sewerage Usage Charges
The expected total yield in 2017-18 from this charge is $17,608,000.
There is no sewer usage charge payable by residential properties.
Pension Rebates - Water and Sewerage Service Charges
For non-residential properties, a discharge factor based on the type of premises is applied to the assessed volume of water purchased from Council to determine the volume discharged to the sewerage system. Sewage discharged into the sewerage network will be charged at $0.83 per kilolitre.
Council provides a reduction of 50% of the water supply service and water usage charges levied up to a maximum of $87.50 and a further reduction of 50% of sewerage service charges levied up to a maximum of $87.50.
The expected total yield in 2017-18 from this charge is $2,874,000.
Of these reductions 55% is reimbursed by the NSW Government.
Recycled Water
The estimated total amount of the pension rebate in 2017-18 is $4,677,000.
Supply of reticulated tertiary treated sewerage effluent, except when covered by an individual agreement, will be charged at $1.15 per kilolitre kilolitre for the former Wyong LGA and $1.79 per kilolitre for the former Gosford LGA.
Goods and Services Tax Good and Service Tax (GST) does not apply to Councilâ&#x20AC;&#x2122;s annual rates and charges. GST does however apply to certain fees as indicated in the schedule of fees and charges pursuant to a new A New Tax System (Goods and Services Tax) Act 1999.
Drainage Service Charges This charge is levied by Council for the provision of drainage services, and covers the cost of maintaining the drainage network. Refer to Maps 17 and 18. Basis of Charges Stormwater drainage charges (per property per annum)
Former Gosford LGA 124.64
31 143
Map 17 â&#x20AC;&#x201C; Drainage Service Charge Area (former Wyong Local Government Area)
32 144
Map 18 â&#x20AC;&#x201C; Drainage Service Charge Area (former Gosford Local Government Area)
33 145
Pricing for water, sewerage and drainage service and usage charges for each property type is as follows: North – former Wyong Local Government Area South – former Gosford Local Government Area Property Type Metered residential properties with individual meters • Houses and terraces • Strata title properties • Company title dwellings • Community development lots • Retirement villages Metered residential properties with common meters • Strata Title Properties • Company Title dwellings • Community development lots
Retirement villages with common meters.
Water Service Charges Each property, lot or unit is levied the residential water service charge.
Water Usage Charges Each property will be levied for water passing through its meter.
Sewer Service Charges Each property, lot or unit is levied the residential sewerage service charge.
Each strata lot or company title dwelling will be levied the residential water service charge. North: Each community development lot will be levied the multi premises water service charge for each property within the Multi Premises.
Usage through a common meter will be apportioned by unit entitlement and charged to each property, lot or dwelling.
Non-residential service charges will apply, and are based on the size of the meter.
Usage through a common meter will be charged to the owner of each Retirement Village.
Each strata lot or company title dwelling is levied the residential sewerage service charge. North: Each community development lot will be levied the multi premises sewerage service charge for each property within the Multi Premises. Sewerage service charges levied will be the higher of: • Meter based charge multiplied by discharge factor, plus usage, or • The residential sewerage service charge.
34 146
Sewer Usage Charges No charge.
Drainage service charges North: Each property, lot or unit is levied the residential drainage service charge. South: The drainage service charge will apply.
North: Each property, lot or unit is levied the multi premises drainage service charge. South: The drainage service charge will apply.
Estimated sewage discharged to the sewerage system will be charged at $0.83 per kilolitre.
North: The multi premises drainage service charge will apply. South: The drainage service charge will apply.
Property Type
Water Service Charges Each property, lot or unit is levied the nonresidential single 20mm water service charge.
Water Usage Charges Each property will be levied for water passing through its meter.
Sewer Service Charges Each property, lot or unit is levied the nonresidential sewerage service charge.
Sewer Usage Charges Estimated sewage discharged to the sewerage system will be charged at $0.83 per kilolitre.
Non-residential properties with meters of 25mm or greater or multiple meters of any size.
Each property, lot or unit is levied the nonresidential service charge based on the size on the meter(s).
Each property will be levied for water passing through its meter. Usage through a common meter will be apportioned by unit entitlement and charged to the owner of each property, lot or dwelling.
Estimated sewage discharged to the sewerage system will be charged at $0.83 per kilolitre.
Metered nonresidential multi premises properties with common meters i.e. • Strata Title Properties • Company Title dwellings • Community development lots
Each property, lot or unit is levied the nonresidential service charge based on the size on the meter(s), divided by the number of properties within the premises that is served by the meter(s).
a) Each property will be levied for water passing through its meter. Water usage through a common meter will be apportioned by unit entitlement and charged to the owner of each property, lot or dwelling, or; b) At the request of the owner’s corporation, Council may levy the entire water usage charge on the owner’s corporation.
Sewerage service charges levied will be the higher of: • Meter based charge multiplied by discharge factor, or • The nonresidential sewerage service charge. Sewerage service charges levied will be the higher of: • Meter based charge multiplied by discharge factor, or • The nonresidential sewerage service charge. The charge is then divided by the number of properties within the premises that are served by the meter(s).
Non-residential properties with single individual 20mm meters.
a) Estimated sewage discharged to the sewerage system will be charged at $0.83 per kilolitre divided by the number of properties within the premises that is served by the meter(s), or; b) At the request of the owner’s corporation, Council may levy the entire sewer usage charge on the owner’s corporation.
Drainage service charges North: The nonresidential drainage service charge will apply based on the size of the water meter. South: The drainage service charge will apply. North: The nonresidential drainage service charge will apply based on the size of the water meter. South: The drainage service charge will apply.
North: Each property, lot or unit is levied the multi premises drainage service charge. South: The drainage service charge will apply.
35 147
Property Type
Water Service Charges There is no charge for a separate fire service. Where a property has a combined fire and commercial service the property will be charged in accordance with meter size. Land that is not connected to the water supply, but can reasonably be connected will be levied the availability charge.
Water Usage Charges South: Each property will be levied for water greater than 10 kilolitres passing through its meter.
Sewer Service Charges No charge.
Sewer Usage Charges No charge.
Drainage service charges No charge.
No charge.
No charge.
South: The drainage service charge will apply.
Miscellaneous Multi premises: â&#x20AC;˘ Non Strata Titled Flats, â&#x20AC;˘ Dual Occupancies, â&#x20AC;˘ Mixed Development
North: Each property, lot or dwelling will be levied the multi premises property water service charge for each property within the Multi Premises. South: Each property, lot or dwelling will be levied the water service charge for each property within the Multi Premises.
Each property will be levied for water passing through its meter(s).
No charge.
North: The multi premises drainage service charge will apply. South: The drainage service charge will apply.
Unmetered properties connected to the water supply.
Each property, lot or unit is levied the water service charge for unmetered properties.
North: No charge South: No charge
Land that is not connected to the sewer system, but can reasonably be connected will be levied the availability charge. North: Each property, lot or dwelling will be levied the multi premises sewerage service charge for each property within the Multi Premises. South: Each property, lot or dwelling will be levied the sewerage service charge for each property within the Multi Premises. Each property, lot or unit is levied the sewerage service charge.
No charge.
South: The drainage service charge will apply.
Water fire service.
Vacant land.
36 148
Liquid Trade Waste Charges Liquid trade waste means all liquid waste other than sewage of domestic nature. Liquid trade waste charges categories and charging components are as follows: Liquid Trade Waste Discharge Category
Application Fee
Annual Trade Waste Fee
Reinspection Fee
Liquid Trade Waste Usage charge / kl
Excess Mass charges / kg
Non-compliant Excess Mass charges / kg
Category 1 Dischargers conducting an activity deemed by Council as requiring nil or minimal pre-treatment equipment, whose effluent is well defined and low risk to the sewerage system. Volume of discharge is low. Also included are activities with prescribed pre-treatment but low risk. Former Gosford $126.63 $73.52 $118.31 No charge No charge No charge LGA Former Wyong $52.19 $91.29 $85.60 No charge No charge No charge LGA Category 2 Dischargers conducting an activity deemed by Council to require a prescribed type of pre-treatment equipment and whose effluent is well characterised. Volume of discharge is up to 20 KL per day. Former Gosford $211.27 $234.44 $118.31 Compliant No charge No charge LGA $1.71 / KL Noncompliant $14.59 / KL Former Wyong $66.43 $365.16 $85.60 Compliant No charge No charge LGA Includes $1.71 / KL primary Nontreatment compliant device $14.59 / KL Category 3 Dischargers conducting an activity which is of an industrial nature and/or which results in discharge of large volumes (over 20 KL/day) of liquid trade waste to the sewerage system. Former Gosford $495.09 $1,968.86 $118.31 No charge Refer Refer attached LGA attached Schedule of Fees Schedule of Fees Refer attached Former Wyong $1,018.90 $613.39 $85.60 No charge Refer Schedule of Fees LGA attached Includes two Schedule site visits of Fees during construction Category 5 (Septic Liquid Waste Transported to Treatment Sites by Vehicles) Special conditions of discharge shall apply for wastes of this type. The wastes shall comply with the quality standards determined by Council. Refer to Schedule A, and the volume and quality shall be such that together no impact on the treatment process will occur. Note: Effluent waste only. Solid waste prohibited. Former Gosford $126.63 $73.52 $118.31 No charge No charge No charge LGA
37 149
Liquid Trade Waste Discharge Category
Application Fee
Annual Trade Waste Fee
Reinspection Fee
Liquid Trade Waste Usage charge / kl
Excess Mass charges / kg
Non-compliant Excess Mass charges / kg
Category S Dischargers conducting an activity of transporting and/or discharging septic tank waste, pan waste and ship to shore pumpouts into the sewerage system. Private pumping stations are included in this category. $85.60 No charge No charge Charged to private Former Wyong Residential Residential pumping stations LGA $54.87 $48.79 only – in NonNonaccordance with residential residential attached Schedule $221.85 $99.09 of Fees Includes one inspection
In addition to the substances listed above, excess mass charges will apply per kilogram of waste discharged in excess of the Liquid Trade Waste Policy Guideline Acceptance Limits. Non-compliant excess mass charges will apply for trade waste discharged in excess of the Liquid Trade Waste Approval Limit. The nominated charges are applied in accordance with the formulas contained in Council’s Liquid Trade Waste Policy. The estimated total yield in 2017-18 from trade waste charges is $2,279,000. It should be noted that Trade Waste Charges apply in addition to sewer service charges. Where properties discharging Liquid Trade Waste become chargeable or non-chargeable for a part of the financial year a proportional charge calculated on a weekly basis is to apply.
Interest on Overdue Rates and Charges In accordance with Section 566 of the Local Government Act 1993 and Section 356 of the Water Management Act 2000 Council charges interest on all rates and charges which remain unpaid after they become due and payable. Interest will be calculated on a daily basis using the simple interest method. Council will apply the lower of the maximum interest rates applicable to either overdue rates and charges levied under the Local Government Act 1993 or overdue charges levied under the Water Management Act 2000.
•
The due date for payment of water, sewerage and drainage services charges and usage charges, is a minimum of 30 days after issue date.
In accordance with Section 566(3) of the Local Government Act 1993, the Minister for Local Government has determined that the maximum rate of interest payable on overdue rates and charges levied under the Local Government Act 1993 for the 2017-18 rating year will be 7.5%. The methodology used to calculate the interest rate is the Supreme Court methodology (the Reserve Bank cash rate plus 6%), rounded to the nearest half per cent. The current Reserve Bank cash rate of 1.5% has been effective since 3 August 2016. The maximum rate of interest that may be applied to overdue charges levied under the Water Management Act 2000 is that which applies to the NSW Supreme Court judgement debts as follows: • In respect of the period from 1 January to 30 June in any year – the rate that is 6% above the cash rate last published by the Reserve Bank of Australia before that period commenced • In respect of the period from 1 July to 31 December in any year – the rate that is 6% above the cash rate last published by the Reserve Bank of Australia before that period commenced.
The due dates for payment of rates and charges levied under the Local Government Act 1993 are as follows: • If payment is made in a single instalment, the instalment is payable by 31 August 2017 • If payment is made by quarterly instalments, the instalments are payable by 31 August 2017, 30 November 2017, 28 February 2018 and 31 May 2018
38 150
Developer Contributions
Statement of Proposed Borrowing
Developer contributions for water and sewerage services are levied in accordance with the methodology developed by the Independent Pricing and Regulatory Tribunal (IPART). The various contributions are contained in Council’s Development Servicing Plans which are available for inspection at Council’s offices or via Council’s website. Other Developer Contributions are levied in accordance with Section 94 of the Environmental Planning and Assessment Act 1979. The various contribution rates are listed in the Section 94 plans available for inspection at Council’s offices or via Council’s website.
It is Council policy to borrow to fund capital projects that have a life expectancy beyond the term for repayment of the loan in order to establish intergenerational equity. All loans are secured over the income of the Council. In 2017-18 Council does not expect to require borrowings from external financial institutions to fund capital projects. The exception is where the borrowing cost is subsidised by the State or Federal Governments.
Fees and Charges
Charges for Works Carried out on Private Land by Council
In accordance with Section 608 of the Local Government Act 1993 Council may charge and recover an approved fee for any service it provides other than a service provided, or proposed to be provided, on an annual basis for which it may make an annual charge under Section 501.
In accordance with Section 67(1) of the Local Government Act 1993 Council may lawfully, by agreement with the owner or occupier of any private land, carry out any kind of work on that land.
A list of the fees to be charged by Council for the 201718 financial year is set out in the attached Schedule of Fees. Each fee within the Schedule of Fees has been determined using one of five pricing policies (as per the table below). The pricing policy used as the basis for determining each fee within the Schedule is disclosed in the Schedule of Fees.
The rates to be adopted by Council are set to recover the estimated cost to Council in providing the works on private land. The amounts to be charged for private works are set out in the attached Schedule of Fees in accordance with the type of works conducted by Council as indicated below: • • • • • • • • •
Categories of Pricing Policies in Respect of the Advertised Schedule of Fees
Septic and sewer connections and applications Water service connections and applications Footpath reinstatement Construction – kerb, guttering and foot paving Vehicle crossings Concrete work – supervision, design, etc. Kerb and gutter – supervision, design, etc. Road reinstatement Road testing
Code 1 2
3
For all other works a minimum charge for the use of Council labour, plant or materials on private land is charged equal to the actual cost (including overheads) plus 10%.
4
The Chief Executive Officer has the authority to set the fee for works to be undertaken by Council on private land, using Council labour, plant or materials, having regard to market forces in each instance, on condition that no such charge shall be less than the actual cost to Council (including overheads) plus 10%.
5
151
Category Description Price charged for this good/service is a statutory charge set by regulation. Price charged for this good/service reflects benchmarked market price. Full cost of providing the goods/services including direct and corporate overheads and margin. Price charged for this good/service reflects full costs to provide the goods/services Full cost of providing the goods/services including direct and corporate overheads. Price charged for this good/service reflects direct costs to provide the goods/services Full cost of providing the goods/services including direct overheads. The price of this good/service is set at a level to make a contribution towards the cost of providing the service. With the remainder of the costs being subsidised by Council in the provision of this service.
39
The fees shown in the Schedule of Fees are determined after allowing for the normal inflationary growth in the cost of providing these services. However, where the fee is based on the costs of providing the service, and those costs increased extraordinarily during the year, Council reserves the right to amend the fees to recover the cost increase. Fees levied under Category 1 are not at the discretion of Council and are subject to amendment in accordance with changes to the applicable legislation. This includes any changes to the application of GST. Some of Councilâ&#x20AC;&#x2122;s Fees and Charges have been calculated to pass through any applicable levies or taxes from NSW State Government (for example the EPA levy on certain waste types). Fees and Charges for 2017-18 have been set based on the levy applicable in June 2017. Should these levies or taxes be amended after the adoption of the 2017-18 Fees and Charges Council may need to update those impacted fees and charges. The fees and charges for building certification services have been prepared on the basis that the total cost of providing the service have been identified, including on-costs and overheads, and that there is no subsidy from Councils general purpose revenue. Costing systems are in place to ensure the on-going accuracy of actual income and expenditure compared to budget. The Chief Executive Officer has the authority to waive or amend fees and charges for reasonable grounds provided in writing.
40
152
2017-2018
Fees and Charges
Part 4
Fees and Charges Contents Item
Page
1.
Abandoned and Seized Item Release
155
2.
Active Open Space (Sports Facilities, Parks, Reserves and Beaches
155
3.
Advertising and Street Banners
157
4.
Airport – Warnervale
157
5.
Animal Control and Lifetime Registration
158
6.
Bookings – Halls, Centres and Theatres
158
7.
Bookings – Parks, Events, Sportsfields and Beaches
164
8.
Books and Corporate Publication
165
9.
Care and Education
165
10.
Cemeteries
166
11.
Certificates
167
12.
Development Assessment and Applications
168
13.
Environment
176
14.
Hire of Council Equipment
176
15.
Holiday Parks
176
16.
Information Management
191
17.
Information Requests
191
18.
Mapping – Geographical Information Services (GIS) Data and Maps
192
19.
Legal Fees
192
20.
Leisure and Lifestyle (Aquatics)
193
21.
Library Services
199
22.
Licences Permits and Inspections
199
23.
Miscellaneous
202
24.
Printing, Copying, Scanning and Design
203
25.
Professional Staff Costs
204
26.
Roads, Drainage and Pathways
204
27.
The Entrance Town Centre Management Fees
205
28.
Waste and Recycling
206
29.
Water and Sewerage Fees and Charges (Former Wyong Local Government Area)
207
30.
Water and Sewerage Fees and Charges (Former Gosford Local Government Area)
210
154
155
Events on Open Spaces Passive Booking (does not include weddings) Small Event - based on Special Events Matrix (listing available on request)
Non Profit Organisation / Charity Group - Full Day Event
Non Profit Organisation / Charity Group - Half Day Event
Wedding Booking Category 1 Based on Special Event Matrix (listing available by request) Category 2 Based on Special Event Matrix (listing available by request) Category 3 Based on Special Event Matrix (listing available by request)
02.10003 02.10004 02.10005
02.10006
02.10007
02.10008 02.10009
Special Events on Open Space Areas An organised activity held on one or more of Council's Open Space Areas such as beach land, a reserve area or a sportsground. Medium Events Based on Special Event Matrix (listing available by request)
Large Events Based on Special Event Matrix (listing available by request) (events over 5 consecutive days 30% discount, over 20 consecutive days 60% discount) Large Event Security Deposit Major Events Based on Special Event Matrix (listing available by request) (events over 5 consecutive days 30% discount, over 20 consecutive days 60% discount) Major Event Security Deposit Fireworks Display
02.10014
Circuses and Carnivals Daily Fee
Security Deposit Licence to use open space - fitness Season 1 - April to September Season 2 - October to March Surf School Operators Category 1 is defined as a high priority location Category 2 is defined as a low priority location Category 1 - Temporary Licence
Category 2 - Temporary Licence
Elite Surf School Operators A maximum of five (5) clients per session and only two (2) sessions per day from each elite surf coaching school is permitted. Temporary Licence
Stand Up Paddleboard (SUP) Operators Category 1 is defined as a high priority location Category 2 is defined as a low priority location Category 1 - Temporary Licence
Category 2 - Temporary Licence Personal Trainers, Fitness Groups and Boot Camps
02.10024 02.10025
02.10026 02.10027 02.10028
02.10031
02.10032
02.10034
02.10036
02.10037
02.10035
02.10033
02.10030
02.10029
State or National Titles and Special Cup Events All state/national titles and special cup games where admission is charged, the hire fee is to be determined by CEO. Please note: seasonal Per event allocation and fees are for competition and training purposes only. Hire fee's for Final series matches are to be determined by Manager Culture.
02.10022 02.10023
Per location up to 12 months
Per location up to 12 months
Per location up to 12 months
Per location up to 12 months
Per location up to 12 months
Per event
Per day
Per concert
Concerts Commercial (entry fee charged)
02.10020 02.10021
Per display
Fireworks Display (PROHIBITED in Natural Reserves) Copy of licence required, fireworks display fee is to be added to relevant Special Event Fee (Reserves, Parks and Beaches)
Per event
Per event Per day
Per day
Per day
Per day
Per day
Per day
Per 1/2 day (less than 8 hours)
Per day
Per day
Per application
02.10019
02.10017 02.10018
02.10015 02.10016
02.10013
02.10012
02.10011
02.10010
Corporate Activities / Sports Clinics Activities conducted as a corporate/commercial venture will be charged a fee to be determined by CEO upon application. Clinics conducted through a seasonal sporting association will be charged the applicable daily hire rate.
02.10001 02.10002
Per vehicle
Storage - if released - per day
2. ACTIVE OPEN SPACE (SPORTS FACILITIES, PARKS, RESERVES AND BEACHES)
01.10004
02.10000
Per sign
Release of impounded advertising signs
01.10003
Per article
Release of impounded articles (excluding signs)
01.10002
Per vehicle
1. ABANDONED AND SEIZED ITEM RELEASE
Motor vehicle release fee
Unit of Measurement
01.10001
Description of Fees and Charges
01.10000
2017-18 Item Number
For Publication
2
2
2
2
2
2
2
2
2
2
2
2 2
2
2
2
2
2
2
2
2
2
4
4
4
4
Price Category
2017-18 SCHEDULE OF FEES AND CHARGES
$1,136.36
$1,618.18
$2,909.09
$1,136.36
$1,618.18
$6,000.00
$810.00
10/11 of fee charged
10/11 of fee charged
10/11 of fee charged
$2,000.00
$1,000.00 $1,050.00
$600.00
$180.00
$136.50
$290.00
$331.00
$50.50
$100.00
$136.50
10/11 of fee charged
$25.00
$70.00
$80.00
$335.00
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$113.64
$161.82
$290.91
$113.64
$161.82
$0.00
$0.00
1/11 of fee charged
1/11 of fee charged
1/11 of fee charged
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
1/11 of fee charged
$0.00
$0.00
$0.00
$0.00
GST @ 10% Remitted to ATO (if applicable)
$1,250.00
$1,780.00
$3,200.00
$1,250.00
$1,780.00
$6,000.00
$810.00
Price determined on application by CEO
Price determined on application by CEO
Price determined on application by CEO
$2,000.00
$1,000.00 $1,050.00
$600.00
$180.00
$136.50
$290.00
$331.00
$50.50
$100.00
$136.50
Price on application
$25.00
$70.00
$80.00
$335.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
156
Single Location - Seasonal Temporary Licence Single Location -Temporary Licence Multiple Location - Seasonal Temporary Licence Multiple Location -Temporary Licence Category 2 Single Location - Seasonal Temporary Licence Single Location -Temporary Licence Multiple Location - Seasonal Temporary Licence Multiple Location -Temporary Licence Personal Trainers - Large group (10-18) Category 1 is defined as a high priority location Category 2 is defined as a low priority location Category 1
Single Location - Seasonal Temporary Licence Single Location -Temporary Licence Multiple Location - Seasonal Temporary Licence Multiple Location -Temporary Licence Category 2
Single Location - Seasonal Temporary Licence Single Location -Temporary Licence Multiple Location - Seasonal Temporary Licence Multiple Location -Temporary Licence Corporate Group Training / Coaching and Clinics Temporary Licence Fee to be charged per activity and determined by CEO of upon application based on location, participants and length of activity. Licence to use open space - beach access Administration fee Non-refundable Commercial fisherman beach access fee
02.10051
02.10052 02.10053 02.10054 02.10055 02.10056
02.10057 02.10058 02.10059 02.10060 02.10061 02.10062
Licence to use open space - construction access Administration fee Non-refundable Council reserve access bond no heavy machinery - Council reserves the right to increase the bond subject to the proposed use. Small machinery e.g. rubber wheeled bobcat, delivery vans and the like acceptable Council reserve access bond using heavy machinery - Council reserves the right to increase the bond subject to the proposed use Large plant / machinery e.g. excavator, concrete trucks and the like
Advertising signage Apex Park - Wyong display banner exhibition fee
Other sites Community Sport hire - oval / field hire Level 1 - Highest quality of facilities available - assessed on amenities, drainage, irrigation and sports field quality Level 2 - Medium quality of facilities available
Sporting groups field hire Field hire - day - level 1 (As per field Categorisation sheet) Field hire - day - level 2 (As per field Categorisation sheet)
Field hire - day - Woy Woy Oval
Casual Field hire - day - level 1 (As per field Categorisation sheet) Casual Field hire - day - level 2 (As per field Categorisation sheet) Casual Field hire - day - Woy Woy Oval Seasonal field hire Seasonal charge. Gives user group use of the space for the whole season, subject to availability A field is designated as a soccer, rugby/ league field, AFL ground, cricket field baseball/softball field and 2 Oztag/Touch football/ 5 a side soccer fields.
02.10067 02.10068
02.10071 02.10072
02.10073 02.10074
02.10075 02.10076
02.10078
02.10079
Seasonal field hire - day - level 1 (As per field Categorisation sheet) - 20% discount applies if field shared between 2 codes on same day
Seasonal field hire - day - level 2 (As per field Categorisation sheet) - 20% discount applies if field shared between 2 codes on same day
02.10083
02.10084
02.10081 02.10082
02.10080
02.10077
02.10070
02.10069
Beach access key bond
02.10066
02.10065
02.10063 02.10064
Category 1
02.10040
A combination of Category 1 and Category 2 sites will be subject to the Category 1 multiple site fee. Multiple location licences allow for up to 3 locations only. Seasonal licences are allocated for Summer period only from October to March each year. Personal Trainers - Small group (1-9) Category 1 is defined as a high priority location Category 2 is defined as a low priority location
Description of Fees and Charges
02.10041 02.10042 02.10043 02.10044 02.10045 02.10046 02.10047 02.10048 02.10049 02.10050
02.10039
02.10038
2017-18 Item Number
Per beach per year
Per day per field
Per day per field
5
5
5
5 Per day per field
5 Per day per field
5
5
5
5
2
Per day per field
Per day per field
Per day per field
Per day per field
Per sign
Per sign
3
3
Per application
3
Per application
3
2
Per application
Per beach
3
3
Per licence
Per year per application
2 2 2 2
Per licence up to 6 months Per licence up to 12 months Per licence up to 6 months Per licence up to 12 months
2 2 2 2
2 2 2 2
Per licence up to 6 months Per licence up to 12 months Per licence up to 6 months Per licence up to 12 months
Per licence up to 6 months Per licence up to 12 months Per licence up to 6 months Per licence up to 12 months
2 2 2 2
Price Category
Per licence up to 6 months Per licence up to 12 months Per licence up to 6 months Per licence up to 12 months
Unit of Measurement
$1,090.91
$1,181.82
$245.45
$109.09
$118.18
$122.73
$54.55
$59.09
10/11 of fee charged
$590.91
$2,500.00
$1,250.00
$72.73
$300.00
$386.36
$72.73
10/11 of fee charged
$736.36 $978.18 $1,127.27 $1,536.36
$981.82 $1,310.91 $1,536.36 $2,050.00
$327.27 $490.91 $513.64 $759.09
$490.91 $654.55 $772.73 $1,027.27
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$109.09
$118.18
$24.55
$10.91
$11.82
$12.27
$5.45
$5.91
1/11 of fee charged
$59.09
$0.00
$0.00
$7.27
$0.00
$38.64
$7.27
1/11 of fee charged
$73.64 $97.82 $112.73 $153.64
$98.18 $131.09 $153.64 $205.00
$32.73 $49.09 $51.36 $75.91
$49.09 $65.45 $77.27 $102.73
GST @ 10% Remitted to ATO (if applicable)
$1,200.00
$1,300.00
$270.00
$120.00
$130.00
$135.00
$60.00
$65.00
By Quote
$650.00
$2,500.00
$1,250.00
$80.00
$300.00
$425.00
$80.00
Price on application
$810.00 $1,076.00 $1,240.00 $1,690.00
$1,080.00 $1,442.00 $1,690.00 $2,255.00
$360.00 $540.00 $565.00 $835.00
$540.00 $720.00 $850.00 $1,130.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
157 Per night Per day
Fines - 3rd offence
Community sport hire - courts
Casual day fee - Large netball complexes
Seasonal day fee - All complex per court per day (all courts must be booked at once) Night fee - Baker Park and Adcock Park complex per hour including lighting Fees cover the period from 4pm to 9.30pm Night fee - Lemongrove complex per hour including lighting Fees cover the period from 4pm to 9.30pm
Night fee - Other complexes per night including lighting Fees cover the period from 4pm to 9.30pm
Casual day fee - Small complexes
Seasonal day fee - other complex - per complex per season per day
Seasonal night fee - other complex - per complex per season per night including lighting Fees cover the period from 4pm to 9.30pm
02.10101
02.10102
02.10103
02.10104
02.10107
02.10108
02.10109
02.10110
Permanent aircraft Annual licence fees Private Aircraft used for an individual's recreational / personal use Commercial Aircraft being used as part of a business Up to 1,000 kgs (maximum take-off weight) MTOW
1,001 kgs to 2,000 kgs (maximum take-off weight) MTOW
2,001 kgs to 3,000 kgs (maximum take-off weight) MTOW
Over 3,001 kgs (maximum take-off weight) MTOW
Airport usage fees Airport usage is defined as "a take-off and landing at the airport" Based on certified maximum take-off weight (MTOW)
Aircraft Parking fees Parking on council land Learn to fly activities These fees are in addition to the permanent aircraft fees listed above
04.10002 04.10003 04.10004
04.10007
04.10008
04.10009
04.10010
04.10011
04.10012
04.10006
04.10005
4. AIRPORT - WARNERVALE
The following organisations are exempt from airport usage fees at Warnervale Airport - Angel Flight, Australian Army, Care Flight, Department of Defence, Police, Royal Flying Doctor Service, Westpac Rescue Helicopter
Installation and removal of banners
03.10005
04.10001
Hire of banner poles - not-for-profit organisations
03.10004
04.10000
Standard banner design (includes 2 design concepts and 2 design changes)
Hire of banner poles - profit organisations
03.10002
03.10001
03.10003
3. ADVERTISING AND STREET BANNERS
Banners on poles
03.10000
02.10106
02.10105
02.10099 02.10100
Line marking (set up and paint) Line marking (paint only) Fines Charged for all unauthorised use of parks, reserves or sports fields including but not limited to out of season use, usage of closed grounds, or use without booking, licence or permission Fines - 1st offence Fines - 2nd offence
5
5
Per year (or part thereof)
5
5
5
5
5
3
3
3
3
5
5
5
5
5
5
5
5
4
4 4
4 4
4
4
5
Per tonne or part thereof per usage
Per year (or part thereof)
Per year (or part thereof)
Per year (or part thereof)
Per year (or part thereof)
Per year (or part thereof)
Per banner pole
Per week per pole
Per week per pole
Per banner design
Per season per night
Per season per day
Per hour
Per hour
Per court per season per day
Per day
Per offence
Per offence Per offence
Per field Per field
Per hour
02.10096 02.10097 02.10098
Per requests
Per field per night
Special mowing requests
Sundries
02.10093
5
Per night per field
Sports field / amenities cleaning fee
School Carnival
02.10092
5 5
Per night per field Per night per field
02.10094
School usage - ground only Free school usage includes weekly sport, PDHPE lessons, knockout competitions and finals (local only), trials for regional teams and team training where there is no requirement for amenities. All sports fields must be booked in advance. All other school bookings will be subject to the community sport hire charges for the level of sports field selected. Guidelines are available for further clarification
02.10091
5
Price Category
Per day per field
Unit of Measurement
02.10095
Seasonal field hire - day - Woy Woy Oval - 20% discount applies if field shared between 2 codes on same day Sporting Group field hire including lighting Field hire - night - All fields - Training Field hire - night - When competition standard lighting is required. Seasonal field hire including lighting Seasonal field hire - night - All fields - Training
Description of Fees and Charges
02.10085 02.10086 02.10087 02.10088 02.10089 02.10090
2017-18 Item Number
$1,500.00
$13.64
$4,000.00
$3,000.00
$2,000.00
$1,000.00
$550.00
10/11 of fee charged
$20.00
$45.45
$63.64
$545.45
$636.36
$32.73
$27.27
$23.64
$27.27
$75.45
$136.36
$1,700.00
$500.00 $1,000.00
$374.55 $187.27
$64.55
$245.45
$118.18
$1,090.91
$54.55 $109.09
$2,454.55
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$150.00
$1.36
$400.00
$300.00
$200.00
$100.00
$55.00
1/11 of fee charged
$2.00
$4.55
$6.36
$54.55
$63.64
$3.27
$2.73
$2.36
$2.73
$7.55
$13.64
$0.00
$0.00 $0.00
$37.45 $18.73
$6.45
$24.55
$11.82
$109.09
$5.45 $10.91
$245.45
GST @ 10% Remitted to ATO (if applicable)
$1,650.00
$15.00
$4,400.00
$3,300.00
$2,200.00
$1,100.00
$605.00
At cost + 15% admin fee
$22.00
$50.00
$70.00
$600.00
$700.00
$36.00
$30.00
$26.00
$30.00
$83.00
$150.00
$1,700.00
$500.00 $1,000.00
$412.00 $206.00
$71.00
$270.00
$130.00
$1,200.00
$60.00 $120.00
$2,700.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
158
Airport fees with organisations may be determined through contract negotiations
Dedication of land from developers administration fee
5. ANIMAL CONTROL AND LIFETIME REGISTRATION
04.10024
04.10025
05.10000
Dangerous dog enclosure compliance certificate
6. BOOKINGS - HALLS, CENTRES AND THEATRES
HALLS AND CENTRES Erina Community Hall
Maximum hourly rates Hall per hour Meeting rooms 1,2 and 3 Erina Centre Maximum hourly rates Art Space 1 Meeting Space 2 Meeting Space 3 Erina Room - 1 and 2 YOUTH SERVICES The Hub Youth Venue (ERINA) Business
06.10000
06.10001 06.10002
06.10003 06.10004 06.10005 06.10006 06.10007 06.10008 06.10009 06.10010 06.10011 06.10012 06.10013 06.10014
Sundry services
05.10019
Processing of identification/microchipping forms and all relevant paperwork for the Companion Animals Register (C.A.R) for organisations that have access to and can complete data entry on the C.A.R
Animal collection and transportation fee (to impound holding facility)
05.10018
05.10021
Advertising/notification - for auction only
05.10017
05.10020
Veterinary care
05.10013
05.10016
Impounding - other animals
05.10012
Animal holding and release per day
Veterinary care
05.10011
Daily sustenance (second and subsequent days)
9 to 14 nights
05.10010
05.10015
4 to 8 nights
05.10009
05.10014
Same day
1 to 3 nights
05.10008
Trained seeing eye or hearing dogs
05.10005
Seizure release fee for registered dogs/cats
Dog or cat owned by registered breeder
05.10004
05.10007
Non-desexed dog or cat
05.10003
05.10006
Desexed dog or cat owned by a pensioner
Desexed dog or cat
05.10002
Lifetime registration fee
05.10001
The Chief Executive Officer has delegated authority to amend statutory fees for changes to applicable legislation
Refuelling on council land
Signage at airport advertising space per square metre (or part thereof ) with a minimum of one square metre The cost of the design, manufacture and erection of the sign is at the advertiser's cost and must be approved by Council.
04.10023
Airport or runway closure
04.10021
04.10022
Other fees Application fee to Council for any use/activity on council land
Airport usage fees Airport usage is defined as "a training session/lesson at the airport" Based on certified maximum take-off weight (MTOW) Adventure sports These fees are in addition to the permanent aircraft fees listed above Airport usage fees Airport usage is defined as "a take-off and landing at the airport" Based on certified maximum take-off weight (MTOW) Itinerant aircraft Airport usage fees Airport usage is defined as "a take-off and landing at the airport" Based on certified maximum take-off weight (MTOW) Parking and tie down fee On council land
Description of Fees and Charges
04.10019 04.10020
04.10018
04.10016 04.10017
04.10015
04.10014
04.10013
2017-18 Item Number
3 3
3 3 3 3
Per hour Per hour Per hour Per hour
5
1
3
4
2
3
5
4
5
5
5
5
1
1
1
1
1
4
3
5
5
5
5
5
5
5
5
Price Category
Per hour Per hour
Per form
Per inspection
Per kilometre
Per animal
Per animal
Per animal per day
Per animal per day
Per animal
Per animal
Per animal
Per animal
Per animal
Per animal
Per animal
Per animal
Per animal
Per animal
Per dedication
Per negotiation
Per square metre per year
Per refuel
Per day (or part thereof)
Per application
Per night
Per tonne or part thereof per usage
Per tonne or part thereof per usage
Per tonne or part thereof per usage
Unit of Measurement
$18.18 $25.45 $32.73 $54.55
$32.73 $21.82
$10.00
$136.36
$15.00
$125.00
10/11 of fee charged
$48.00
$50.00
10/11 of fee charged
$240.00
$195.00
$68.00
$40.00
No charge
$2.00
$6.00
$2.00
$1.00
$511.82
10/11 of fee charged
$500.00
$100.00
$5,000.00
$500.00
$4.55
$13.64
$13.64
$13.64
2017-18 Central Coast Council Fee
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$53.00
$195.00
$53.00
$22.00
Other Regulatory Fees and Charges
$1.82 $2.55 $3.27 $5.45
$3.27 $2.18
$0.00
$13.64
$0.00
$0.00
1/11 of fee charged
$0.00
$0.00
1/11 of fee charged
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$51.18
1/11 of fee charged
$50.00
$10.00
$500.00
$50.00
$0.45
$1.36
$1.36
$1.36
GST @ 10% Remitted to ATO (if applicable)
$20.00 $28.00 $36.00 $60.00
$36.00 $24.00
$10.00
$150.00
$15.00
$125.00
By Quote
$48.00
$50.00
By Quote
$240.00
$195.00
$68.00
$40.00
No charge
$55.00
$201.00
$55.00
$23.00
$563.00
By contract negotiation
$550.00
$110.00
$5,500.00
$550.00
$5.00
$15.00
$15.00
$15.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Director-General OLG Companion Animals Director-General OLG Companion Animals Director-General OLG Companion Animals Director-General OLG Companion Animals
Regulatory Fees and Charges Paid to
159
Day Evening/Weekend PA set up Community/Not for Profit Rates Day Evening/Weekend PA set up Youth Program Rates Day hire Evening/Weekend hire Term/Yearly Package The Hill Youth Centre (KARIONG) Main Hall / Hourly Rate Private / Government Day Evening/Weekend Community/Not for Profit Rates Day Evening/Weekend Meeting Space Private / Government Day Evening/Weekend Community/Not for Profit Rates Day Evening/Weekend Art Space Private / Government Day Evening/Weekend Community/Not for Profit Rates Day Evening/Weekend Computer Room Private / Government Day Evening/Weekend Community/Not for Profit Rates Day Evening/Weekend Kitchen Facility Business Community Youth Program Rates Day Hire Evening/weekend hire Term/Yearly Package Kincumber Youth Centre Main Hall Hourly Rate Business Community Business: Evening or weekend Community: Evening or weekend Meeting Room Business Community Business: Evening or weekend Community: Evening or weekend Art Space Business Community Business: Evening or weekend Community: Evening or weekend Counselling Room Business Community Business: Evening or weekend Community: Evening or weekend Youth Program Rates Day Hire Evening/Weekend Hire Term/Yearly Package Kitchen Facility Business Community SENIOR SERVICES
50+ Leisure and Learning Centres Gosford and Ettalong Beach
06.10015 06.10016 06.10017 06.10018 06.10019 06.10020 06.10021 06.10022 06.10023 06.10024 06.10025 06.10026 06.10037 06.10038 06.10039 06.10040 06.10041 06.10042 06.10043 06.10047 06.10048 06.10049 06.10050 06.10051 06.10052 06.10053 06.10057 06.10058 06.10059 06.10060 06.10061 06.10062 06.10063 06.10064 06.10065 06.10066 06.10067 06.10068 06.10069 06.10070 06.10071 06.10072 06.10073 06.10074 06.10075 06.10076 06.10077 06.10078 06.10079 06.10080 06.10081 06.10082 06.10083 06.10084 06.10085 06.10086 06.10087 06.10088 06.10089 06.10090 06.10091 06.10092 06.10093 06.10094 06.10095 06.10096 06.10097 06.10098 06.10099 06.10100 06.10101 06.10102 06.10103 06.10104 06.10105 06.10106
06.10107
2017-18 Item Number
Description of Fees and Charges
3 5 3 5 3 5 3 5 3 5 3 5 3 5 3 5 5 5 5 3 5
Per hour Per hour Per hour Per hour Per hour Per hour Per hour Per hour Per hour Per hour Per hour Per hour Per hour Per hour Per hour Per hour Per hour Per hour Per hour Per hour Per hour
5 5
Per hour Per hour
5 5 5
3 3
Per hour Per hour
Per hour Per hour Per hour
5 5
Per hour Per hour
3 5
3 3
Per hour Per hour
Per hour Per hour
5 5
Per hour Per hour
5 5
3 3
Per hour Per hour
Per hour Per hour
5 5 5
Per hour Per hour Per hour
3 3
5 5 5
Per hour Per hour One off fee
Per hour Per hour
5 5 5
Price Category
Per hour Per hour One off fee
Unit of Measurement
$27.27 $22.73
$20.00 $24.55 $20.00
$25.45 $13.64 $31.82 $18.18
$25.45 $13.64 $31.82 $18.18
$25.45 $13.64 $31.82 $18.18
$34.55 $22.73 $40.91 $24.55
$16.36 $20.91 $16.36
$27.27 $22.73
$10.00 $11.82
$15.27 $21.00
$9.09 $10.91
$12.41 $17.18
$7.05 $10.00
$10.00 $11.82
$16.36 $20.00
$20.91 $22.73
$20.00 $22.73 $18.18
$22.73 $27.27 $90.91
$31.82 $40.91 $113.64
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$2.73 $2.27
$2.00 $2.45 $2.00
$2.55 $1.36 $3.18 $1.82
$2.55 $1.36 $3.18 $1.82
$2.55 $1.36 $3.18 $1.82
$3.45 $2.27 $4.09 $2.45
$1.64 $2.09 $1.64
$2.73 $2.27
$1.00 $1.18
$1.53 $2.10
$0.91 $1.09
$1.24 $1.72
$0.70 $1.00
$1.00 $1.18
$1.64 $2.00
$2.09 $2.27
$2.00 $2.27 $1.82
$2.27 $2.73 $9.09
$3.18 $4.09 $11.36
GST @ 10% Remitted to ATO (if applicable)
$30.00 $25.00
$22.00 $27.00 $22.00
$28.00 $15.00 $35.00 $20.00
$28.00 $15.00 $35.00 $20.00
$28.00 $15.00 $35.00 $20.00
$38.00 $25.00 $45.00 $27.00
$18.00 $23.00 $18.00
$30.00 $25.00
$11.00 $13.00
$16.80 $23.10
$10.00 $12.00
$13.65 $18.90
$7.75 $11.00
$11.00 $13.00
$18.00 $22.00
$23.00 $25.00
$22.00 $25.00 $20.00
$25.00 $30.00 $100.00
$35.00 $45.00 $125.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
160
Community and Road Education Scheme (program/course fees)
Theatres Laycock Auditorium Hire Sunday - Thursday Community Commercial Rate Dance Schools Performance Dance Schools Rehearsal Friday - Saturday Community Commercial Rate Dance Schools Performance Dance Schools Rehearsal Don Craig Room Hire Sunday - Thursday Community Commercial Dance Schools hire (holding room) Friday - Saturday Community Commercial Dance Schools hire (holding room) Peninsula Theatre Hire Sunday - Thursday Community Commercial Friday - Saturday Community Commercial Technical Staffing Monday - Friday Saturday Sunday Public Holiday Front of House Staffing Monday - Friday Saturday Sunday Public Holiday
06.10132
06.10133 06.10134 06.10135 06.10136 06.10137 06.10138 06.10139 06.10140 06.10141 06.10142 06.10143 06.10144 06.10145 06.10146 06.10147 06.10148 06.10149 06.10150 06.10151 06.10152 06.10153 06.10154 06.10155 06.10156 06.10157 06.10158 06.10159 06.10160 06.10161 06.10162 06.10163 06.10164 06.10165 06.10166 06.10167 06.10168 06.10169 06.10170
06.10121 06.10122 06.10123 06.10124 06.10125 06.10126 06.10127
06.10116 06.10117 06.10118 06.10119 06.10120
06.10115
06.10114
06.10128 06.10129 06.10130 06.10131
Gosford Private Social Functions < 6 hours Gosford Private Social Functions > 6 hours Hiring and Cleaning/Caretaker Fees applicable Gosford Hiring Fee For Private Social Functions > 6 hours Gosford Cleaning Caretaker Fee For Private Social Functions > 6 hours Ettalong Private Social Functions
Description of Fees and Charges
Ettalong Private Social Functions > 6 hours Hiring and Cleaning/Caretaker Fees applicable Ettalong Hiring Fee For Private Social Functions > 6 hours Ettalong Cleaning Caretaker Fee For Private Social Functions > 6 hours Bond Community or Not for Profit Groups Day Evening Cleaning Deposit (refundable) for use of the kitchen Where bond is not already applicable Hire of Rooms 1 and 2 Day Evening Hire of Room 3 Day Evening Use of Kitchen Fee applies where $330 is not already applicable Full use Tea making only CARES Facility Central Coast Life Time Learning Centre (CCLLC) Large facility fees applicable for casual hire
06.10113
06.10112
06.10111
06.10110
06.10108 06.10109
2017-18 Item Number
2 2 2 2 2 2 2 2
2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2
Per hour Per hour Per hour Per session
Per hour Per hour Per session Per hour Per hour Per session
Per hour Per hour Per hour Per hour Per person per hour Per person per hour Per person per hour Per person per hour Per person per hour Per person per hour Per person per hour Per person per hour
5
Per hour Per hour Per hour Per session
Per student
5 5
5 5
Per hour Per hour
Per usage Per usage
5 5
Per hour Per hour
5 5 5
Per hour Per hour Per deposit
3 2
Per application
Per function
3
3
Per hour Per function
3
3
3
3 3
Price Category
Per 6 hours or less
Per function
Per function
Per 6 hours or less Per hour
Unit of Measurement
$54.55 $63.64 $72.73 $118.18
$54.55 $65.45 $81.82 $127.27
$74.55 $154.55
$50.00 $104.55
$54.55 $95.45 $82.65
$45.45 $86.36 $82.65
$200.00 $381.82 $346.56 $495.86
$159.09 $309.09 $281.81 $297.52
$4.55
$48.11 $22.05
$16.04 $25.05
$6.02 $10.53
$18.05 $25.05 $52.92
$551.25
$132.30
$258.59
$105.24
$501.14
$132.30
$258.59
$501.14 $105.24
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$5.45 $6.36 $7.27 $11.82
$5.45 $6.55 $8.18 $12.73
$7.45 $15.45
$5.00 $10.45
$5.45 $9.55 $8.26
$4.55 $8.64 $8.26
$20.00 $38.18 $34.66 $49.59
$15.91 $30.91 $28.18 $29.75
$0.45
$4.81 $2.21
$1.60 $2.51
$0.60 $1.05
$1.80 $2.51 $0.00
$0.00
$13.23
$25.86
$10.52
$50.11
$13.23
$25.86
$50.11 $10.52
GST @ 10% Remitted to ATO (if applicable)
$60.00 $70.00 $80.00 $130.00
$60.00 $72.00 $90.00 $140.00
$82.00 $170.00
$55.00 $115.00
$60.00 $105.00 $90.91
$50.00 $95.00 $90.91
$220.00 $420.00 $381.22 $545.45
$175.00 $340.00 $309.99 $327.27
$5.00
$52.92 $24.26
$17.64 $27.56
$6.62 $11.58
$19.85 $27.56 $52.92
$551.25
$145.53
$284.45
$115.76
$551.25
$145.53
$284.45
$551.25 $115.76
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
161
Marketing Inclusion on website (included in hire rate) A3 poster and DL flyers displayed in foyer Content to be supplied Community and Commercial Broadcast email to theatre database (included in hire rate) Commercial - External billboard Artwork to be supplied Community - External billboard Artwork to be supplied Newspaper advertisement placement (size dependant) Artwork to be supplied Merchandising For use of merchandising space to sell programs and merchandise Commercial - Additional staff available at standard Front of House rates Community - Additional staff available at standard Front of House rates Security At request of Hirer or at discretion of Venue management Technical Production power House lights and general / foyer lighting are included in basic rental Wireless handheld microphone Wireless handheld microphone Wireless body microphone Wireless body microphone Haze machine – Look Solutions Unique Haze machine – Look Solutions Unique Smoke machine – Jem ZR33 Hi Mass DMX Smoke machine – Jem ZR33 Hi Mass DMX Piano hire and tuning - Yamaha C7 grand Additional Piano tuning on request Batteries - 9 volt Batteries – AA Gaffer tape Leucoplast Gel - specific show orders Data projector - Panasonic 20,000 ansi lumens Data projector - Panasonic 20,000 ansi lumens Data projector - Don Craig Room Stage Risers - 1.2m x 2.4m (Heights - 300mm, 600mm, 900mm) Painting stage floor back to black – Laycock Street Theatre Painting stage floor back to black – Peninsula Theatre Ticketing (Note: all tickets must be sold through Venue box office) Credit Card/Merchant Fee Levied on All Hirers (Patrons Excluded) Booking Fee Includes complimentary tickets Refund / Exchange Fee Transaction charge Levied on patrons Event creation charge Levied on Hirers Gosford Regional Gallery and Arts Centre Exhibition Hire Exhibitions in Community Gallery or studios 3 Week Exhibition 2 Week Exhibition
06.10181 06.10182 06.10183
06.10224 06.10225 06.10226 06.10227
06.10223
06.10222
06.10220 06.10221
06.10219
06.10218
06.10196 06.10197 06.10198 06.10199 06.10200 06.10201 06.10202 06.10203 06.10204 06.10205 06.10206 06.10207 06.10208 06.10209 06.10210 06.10211 06.10212 06.10213 06.10214 06.10215 06.10216 06.10217
06.10190 06.10191 06.10192 06.10193 06.10194 06.10195
06.10189
06.10188
06.10187
06.10184 06.10185 06.10186
Per 3 week exhibition Per 2 week exhibition
Per booking
Per transaction Per transaction
2 2
1
1 1
1
1 Per ticket
Per transaction
1 4 4 4 4 4 4 4 4 4 2 2 2 2 2 2 2 2 2 2 2 2
Per kilowatt hour Per day Per week Per day Per week Per day Per week Per day Per week Per booking Per request Each Each Per roll Per roll Per sheet Per day Per week (3 or more days) Per day Per unit Per application Per application
4
$1,109.09 $936.36
$63.64
$5.45 $2.91
$3.59
10/11 of fee charged
$40.91 $122.73 $50.00 $150.00 $50.00 $150.00 $30.91 $92.73 $209.09 10/11 of fee charged $4.55 $2.27 $27.27 $10.00 $32.73 $590.91 $1,772.73 $59.09 $25.45 10/11 of fee charged 10/11 of fee charged
10/11 of fee charged
10/11 of fee charged
10/11 of fee charged 10/11 of fee charged
$381.82 10/11 of fee charged
2 2
4 4
No charge $430.91
No charge No charge
10/11 of fee charged
No charge $145.45
10/11 of fee charged
10/11 of fee charged $81.82 $4.55
2017-18 Central Coast Council Fee
2 2
2 2
3
2 2
Per application
Per application Per application
No Charge included in venue hire
Per hire rate 2 month period dependent upon availability 2 month period dependent upon availability Per advertisement
Per hire rate Each
Per venue hire Per hour, or part thereof
4
Per item
Stains or damage to Venue furnishings and fittings will be repaired, dry-cleaned and/or re-fireproofed at the Hirer’s expense. Per venue hire Repairs needed as a consequence of a hire of the Venue will be charged to the Hirer. The Venue reserves the right to withhold this amount from the Hirer’s account.
06.10177 06.10178 06.10179
4 2 2
Price Category
Per request Per day Per person
06.10180
Unit of Measurement
Catering Other specific catering requests Use of commercial kitchen facilities Tea / Coffee / Juice and Biscuits Bar and Kiosk Bar and kiosk refreshments Items available for purchase by patrons Cleaning Normal (included in venue hire) Additional cleaning Costs incurred will be charged to the Hirer at the discretion of the Venue Management. This includes, but is not limited to, stains on carpets and other soft furnishings from make-up, glitter, chewing gum and spilt substances.
Description of Fees and Charges
06.10171 06.10172 06.10173 06.10174 06.10175 06.10176
2017-18 Item Number
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$110.91 $93.64
$6.36
$0.55 $0.29
$0.36
1/11 of fee charged
$4.09 $12.27 $5.00 $15.00 $5.00 $15.00 $3.09 $9.27 $20.91 1/11 of fee charged $0.45 $0.23 $2.73 $1.00 $3.27 $59.09 $177.27 $5.91 $2.55 1/11 of fee charged 1/11 of fee charged
1/11 of fee charged
1/11 of fee charged
1/11 of fee charged 1/11 of fee charged
1/11 of fee charged
$38.18
$0.00 $43.09
$0.00 $0.00
1/11 of fee charged
$0.00 $14.55
1/11 of fee charged
1/11 of fee charged $8.18 $0.45
GST @ 10% Remitted to ATO (if applicable)
$1,220.00 $1,030.00
$70.00
$6.00 $3.20
2% of Ticket sales by credit card $3.95
As metered @ 25c per kilowatt hour $45.00 $135.00 $55.00 $165.00 $55.00 $165.00 $34.00 $102.00 $230.00 By Quote $5.00 $2.50 $30.00 $11.00 $36.00 $650.00 $1,950.00 $65.00 $28.00 Price on application Price on application
By Quote
By Quote By Quote
By Quote
$420.00
No charge $474.00
No charge No charge
By Quote
No charge $160.00
Retail price
By Quote $90.00 $5.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
162
Large office/room (60 to 150 sqm) - exclusive use
Extra Large office/room (over 150 sqm) - exclusive use
Business/Private groups/organisations - (Key and hire bond also applies)
06.10281
06.10282
06.10283
06.10284
Large hall - casual bookings - hourly fee - min 3 hours
Medium office/room (20 to 60 sqm) - exclusive use
06.10280
06.10287
Small office/room (up to 20 sqm) - exclusive use
06.10276 06.10277 06.10278 06.10279
Small hall - casual bookings - hourly fee - min 3 hours
Small hall - casual bookings - hourly fee - min 3 hours Large hall - casual bookings - hourly fee - min 3 hours Extra Large hall - casual bookings - hourly fee - min 3 hours Daily for COLA and outdoor space hire, when not hired with hall/room
06.10275
Hourly for regular bookings (10 or more bookings per year)
Hourly for regular bookings (10 or more bookings per year)
06.10274
06.10285
Community/Not-for-profit groups/organisations (key bond also applies)
06.10271 06.10272 06.10273
06.10286
Various Educational Services Workshops, tours, school excursions (based on content and scale)
Retail Shop Various Products/Merchandise Ticketed entry exhibitions and events Membership Arts and Culture Gallery Supporters - single membership Gallery Supporters - family membership Activation and new revenue promotional offers For example gallery open days, come and try activities (at the discretion of the Unit Manager) Rural Fire Services Hire of Training Room Fire Control Centre Hire fees and charges (does not include electricity)
06.10264 06.10265 06.10266 06.10267 06.10268 06.10269 06.10270
10 Day Exhibition 1 Week Exhibition 4 Day Exhibition (weekend only) 1 Day Exhibition Commission on Artwork Sales 30% - 50% range, based on artist Functions / Garden Hire Foyer Gallery After hours Atrium Staff required for function Wedding Ceremonies (includes Filming and Photography fee) Additional hire after wedding ceremony in the Garden Additional hire after wedding ceremony in the rear courtyard Other events / activities (based on content and scale) Filming and Photography - Wedding Photography Filming and Photography - Family portrait Filming and Photography - Commercial Photography / portfolio shoots Filming and Photography - Student photography Filming and Photography - Commercial filming Filming and Photography - Student Filming (based on content and scale) Filming and Photography - Other filming and photography including media, not for profit and educational uses. (based on content and scale) Main Gallery Functions (based on scale) Studio Hire Community Rate community activities where a participation fee is charged Commercial/Government Rate half day Commercial/Government Rate full day Evening Small meeting room (kitchenette) Equipment Set up Fee Cleaning Cleaning Fee As per Conditions of Hire Storage In Arts Centre Cupboard Educational Services
Description of Fees and Charges
06.10263
06.10260 06.10261 06.10262
06.10248 06.10249 06.10250 06.10251 06.10252 06.10253 06.10254 06.10255 06.10256 06.10257 06.10258 06.10259
06.10241 06.10242 06.10243 06.10244 06.10245 06.10246 06.10247
06.10235 06.10236 06.10237 06.10238 06.10239 06.10240
06.10233 06.10234
06.10228 06.10229 06.10230 06.10231 06.10232
2017-18 Item Number
4 2
Per set-up Per hour
Per hour
Per hour
Per hour
Per week
Per week
Per week
Per week
Per hour Per hour Per hour Per day
Per hour
Per day
Per item Per event Per single membership Per single membership Per family membership Per promotional offer
Per quote
5
5
5
5
5
5
5
5 5 5 5
5
2
2 2 4 4 4 4
1
2
2 2 2 2 2 2
Per hour Per hour Per half day Per full day Per hour, after 5.30pm Per hour
Per month
2
2 2 2 5 2 2 2
2 2 2 2 2 2
2
2 2 2 1 4
Price Category
Per quote
Per hour Per hour Per hour Per hour Per hour Per hour Per hour
Per evening Per person per hour Per 1.5 hours Per hour Per hour Per event/activity
Per evening
Per 10 day exhibition Per 1 week exhibition Per 4 day exhibition Per 1 day exhibition Per sale
Unit of Measurement
$31.82
$22.73
$25.45
$354.55
$318.18
$168.18
$83.64
$18.18 $27.27 $36.36 $68.18
$9.09
$204.55
10/11 of fee charged 10/11 of fee charged $34.55 $22.73 $36.36 10/11 of fee charged
10/11 of fee charged
$63.64
$145.45
10/11 of fee charged
$31.82 $36.36 $181.82 $363.64 $25.00 $23.64
10/11 of fee charged
$177.27 $68.18 $227.27 $31.82 $227.27 10/11 of fee charged 10/11 of fee charged
$227.27 $95.45 $450.00 $90.91 $90.91 10/11 of fee charged
$636.36
$881.82 $681.82 $568.18 $227.27 10/11 of fee charged
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$3.18
$2.27
$2.55
$35.45
$31.82
$16.82
$8.36
$1.82 $2.73 $3.64 $6.82
$0.91
$20.45
1/11 of fee charged 1/11 of fee charged $3.45 $2.27 $3.64 1/11 of fee charged
1/11 of fee charged
$6.36
$14.55
1/11 of fee charged
$3.18 $3.64 $18.18 $36.36 $0.00 $2.36
1/11 of fee charged
$17.73 $6.82 $22.73 $3.18 $22.73 1/11 of fee charged 1/11 of fee charged
$22.73 $9.55 $45.00 $9.09 $9.09 1/11 of fee charged
$63.64
$88.18 $68.18 $56.82 $22.73 1/11 of fee charged
GST @ 10% Remitted to ATO (if applicable)
$35.00
$25.00
$28.00
$390.00
$350.00
$185.00
$92.00
$20.00 $30.00 $40.00 $75.00
$10.00
$225.00
Retail price By Quote $38.00 $25.00 $40.00 By promotional offer
By Quote
$70.00
$160.00
By Quote
$35.00 $40.00 $200.00 $400.00 $25.00 $26.00
By Quote
$195.00 $75.00 $250.00 $35.00 $250.00 By Quote By Quote
$250.00 $105.00 $495.00 $100.00 $100.00 By Quote
$700.00
$970.00 $750.00 $625.00 $250.00 By Quote
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
163
Hellenic Society (bond applies) - Chittaway Bay Hall
Toukley Merrymakers
St Barnabas Church
06.10326
06.10327
06.10328
Banksia Community Centre Central Coast Outreach Services
Wyong Administration Building - Function Room Hire Fees
Hire fees based on room size. Council reserves the right to increase the bond subject to the proposed use. Hire fees and charges: Wyong Administration Building - Function Room Hire Fees
ACL (Les) Taylor Room - non-community groups - less than 4hrs ACL (Les) Taylor Room - non-community groups - less than 4hrs - long term hire ACL (Les) Taylor Room - community groups - less than 4 hrs ACL (Les) Taylor Room - community groups - less than 4 hrs - long term hire ACL (Les) Taylor Room - non-community groups - greater than 4 hours ACL (Les) Taylor Room - non-community groups - greater than 4 hours - long term hire ACL (Les) Taylor Room - community groups - greater than 4 hours ACL (Les) Taylor Room - community groups - greater than 4 hours - long term hire Bond - for community groups Bond - for non-community groups
06.10331
06.10332
06.10333 06.10334
06.10335 06.10336 06.10337 06.10338 06.10339 06.10340 06.10341 06.10342 06.10343 06.10344
Full day wedding
Combined digital and visual promotional package - website hall and venue finder listing and venue signage
06.10325
3 Hour wedding
Visual promotional/advertising package - exterior signage per venue
06.10324
06.10329
Digital promotional/advertising package - website hall and venue finder listing - per venue
06.10323
06.10330
Security/after hours call out fee
Community facility advertising packages - limited space available for exclusive use and permanent booking hall and centre users to promote the service they provide at the specific venue
06.10320
06.10321
Business/Private groups/organisations
06.10319
06.10322
Market Stall space hire
Community/Not-for-profit groups/organisations
06.10318
Other community facility equipment and service fee
06.10317
Gallery promotion pack Includes 300 x DL invitation cards, 40 x A4 posters, 10 x A3 posters - required by all hirers
06.10313
Business/Private groups/organisations - weekly fee
Commission from sales - required by all hirers
06.10312
06.10316
Gallery assistance fee - including set up and curator - minimum 2 hours required by all hirers
06.10311
The Enterprise CafĂŠ - The Entrance Community Centre
Business/Private groups/organisations - weekly fee
06.10310
Community/Not-for-profit groups/organisations - weekly fee
Community/Not-for-profit groups/organisations - weekly fee
06.10309
06.10314
Business/Private groups/organisations - daily fee
06.10315
Community/Not-for-profit groups/organisations - daily fee
06.10308
Hire bond - Casual users - low risk functions
06.10301
Hire fees
Hire bond - Exclusive use office/space (applies to all hires including Community/Not-for-profit groups)
06.10300
06.10307
Hire bond - Permanent users
06.10298
06.10299
06.10306
Bonds (Does not apply to Casual and Permanent Community/Not-for-profit groups) Council reserves the right to increase the bond subject to the proposed use.
06.10297
The Entrance Gallery (TEG) - The Entrance Community Centre
Storage cupboard hire (where available and on request) - per cupboard
06.10296
06.10305
Storeroom hire (where available and on request) - per storeroom
06.10295
Key bond (applies to all hires including not-for-profit groups)
Cancellation administration fee When cancelled < 7 days before confirmed date Online booking fee - Non-refundable if cancelled, subtracted from hire fee for confirmed bookings
06.10294
06.10304
Extra Large office/room (over 150 sqm) - exclusive use
06.10293
Hire bond - Casual users - medium risk functions
Large office/room (60 to 150 sqm) - exclusive use
06.10292
Hire bond - Casual users - high risk functions
Medium office/room (20 to 60 sqm) - exclusive use
06.10291
06.10303
Small office/room (up to 20 sqm) - exclusive use
06.10290
06.10302
Extra Large hall - casual bookings - hourly fee - min 3 hours
Daily for COLA and outdoor space hire, when not hired with hall/room
06.10289
Description of Fees and Charges
06.10288
2017-18 Item Number
Per function Per function Per function Per function Per function Per function Per function Per function Per function Per function
Per week
Per hire
Per hire
Per week
Per week
Per year
Per year
Per year
Per call out
Per space
Per space
Per week
Per week
Per pack
Per exhibition
Per hour
Per week
Per week
Per exhibition day
Per exhibition day
Per key
Per function
Per function
Per function
Per space
Per booking
Per week
Per week
Per booking
Per booking
Per week
Per week
Per week
Per week
Per day
Per hour
Unit of Measurement
4 4 4 4 4 4 4 4 4 4
5
5
5
5
5
3
3
3
4
5
5
5
5
5
5
4
5
5
5
5
4
4
4
4
4
4
5
5
3
3
5
5
5
5
5
5
Price Category
$571.82 $340.91 $231.82 $140.91 $797.27 $476.36 $456.36 $276.36 $150.00 $552.00
$251.82
$536.36
$213.64
$27.27
$45.45
$545.45
$454.55
$136.36
$136.36
$36.36
$22.73
$350.00
$159.09
$159.09
10/11 of fee charged
$45.45
$318.18
$159.09
$113.64
$45.45
$40.00
$870.00
$390.00
$290.00
$290.00
$115.00
$2.73
$7.27
$36.36
$36.36
$554.55
$500.00
$336.36
$168.18
$159.09
$45.00
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$57.18 $34.09 $23.18 $14.09 $79.73 $47.64 $45.64 $27.64 $0.00 $0.00
$25.18
$53.64
$21.36
$2.73
$4.55
$54.55
$45.45
$13.64
$13.64
$3.64
$2.27
$0.00
$15.91
$15.91
1/11 of fee charged
$4.55
$31.82
$15.91
$11.36
$4.55
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.27
$0.73
$3.64
$3.64
$55.45
$50.00
$33.64
$16.82
$15.91
$0.00
GST @ 10% Remitted to ATO (if applicable)
$629.00 $375.00 $255.00 $155.00 $877.00 $524.00 $502.00 $304.00 $150.00 $552.00
$277.00
$590.00
$235.00
$30.00
$50.00
$600.00
$500.00
$150.00
$150.00
$40.00
$25.00
$350.00
$175.00
$175.00
20% commission
$50.00
$350.00
$175.00
$125.00
$50.00
$40.00
$870.00
$390.00
$290.00
$290.00
$115.00
$3.00
$8.00
$40.00
$40.00
$610.00
$550.00
$370.00
$185.00
$175.00
$45.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
164
Other Users
Gosford Smart Work Hub Telework Day Pass Day Pass to Gosford Smart Work Hub 9am-5pm Monday to Friday Telework Casual Membership Monthly Membership 3 days a Week for Gosford Smart Work Hub 7am-7pm Monday to Friday Telework Everyday Membership Monthly Membership 5 days a Week for Gosford Smart Work Hub 7am-7pm Monday to Frida Meeting Room Hire 1 hour 1 hour Meeting Room hire 5 days a Week for Gosford Smart Work Hub available 9am-5pm Monday to Friday Meeting Room Hire Half Day Half Day Meeting Room hire 5 days a Week for Gosford Smart Work Hub available 9am-5pm Monday to Friday Large Meeting Room Hire 1 Hour 1 Hour Large Meeting Room hire 5 days a Week for Gosford Smart Work Hub available 9am-5pm Monday to Friday Large Meeting Room Hire Half Day Half Day Large Meeting Room hire 5 days a Week for Gosford Smart Work Hub available 9am-5pm Monday to Friday Large Meeting Room Hire Full Day Full Day Large Meeting Room hire 5 days a Week for Gosford Smart Work Hub available 9am-5pm Monday to Friday Teleconference Room 1 Hour 1 hour Teleconference Room hire 5 days a Week for Gosford Smart Work Hub available 9am-5pm Monday to Friday After Hours Events After Hours event 7-10pm Monday to Friday Replacement Members Card Replacement Members/Swipe access Card if original card is lost Kincumber Mountain Kiosk Kincumber Kiosk application form to be completed Hire Monday to Thursday (10am - 11pm) Not for Profit or Charitable Organisation Standard Rate Security Deposit Hire Friday to Sunday (10am - 5pm) Not for Profit or Charitable Organisation (maximum fee $140.00)
Standard Rate (maximum fee $220.00) Security Deposit Hire Friday 5.00pm - 12.00 (Midnight) Not for Profit or Charitable Organisation Security Deposit (Not For Profit) Standard Rate Security Deposit (Standard) Hire Saturday 5.00pm 12.00 (Midnight) Not for Profit or Charitable Organisation Security Deposit (Not For Profit) Standard Rate Security Deposit (Standard) Hire Sunday 5.00pm 12.00 (Midnight) Not for Profit or Charitable Organisation Security Deposit (Not For Profit) Standard Rate Security Deposit (Standard)
06.10354
06.10355 06.10356
06.10374 06.10375 06.10376 06.10377 06.10378 06.10379 06.10380 06.10381 06.10382 06.10383 06.10384 06.10385 06.10386 06.10387 06.10388 06.10389 06.10390
Event pre-function: non-scheduled foreshore cleaning request
Event pre-function: non-scheduled reserves and parks mowing request
Event/function clean-up fee
Event bond Council reserves the right to increase the bond subject to the proposed use.
Electrical inspections (associated with events/functions) Electrical inspection fee - commercial
07.10001 07.10002
07.10004
07.10005
07.10006
07.10007
07.10008 07.10009
07.10003
7. BOOKINGS - PARKS, EVENTS, SPORTSFIELDS AND BEACHES
Events/functions Event/function administration fee (non-refundable if booking cancelled) For all applicants, including not-for-profit groups. Commercial event fee on sports field
07.10000
06.10368 06.10369 06.10370 06.10371 06.10372 06.10373
06.10367
06.10366
06.10365
06.10364
06.10363
06.10362
06.10361
06.10360
06.10359
06.10358
06.10357
Security (staff member per hour per officer out of hours functions) Out of hours means after 5pm Setting up if required (non complex) Setting up if required (complex e.g. weddings) PA system hire Data projector hire Laptop hire Tablecloth hire/laundry East Gosford Training Facility Community Groups
Description of Fees and Charges
06.10346 06.10347 06.10348 06.10349 06.10350 06.10351 06.10352 06.10353
06.10345
2017-18 Item Number
2 2 2
Per hour Per event Per card
3 2 3 2 3 2 3 2
Per hour Per booking Per hour Per booking Per hour Per booking Per hour Per booking
Per inspection
Per event or function
Per event or function
Per request
Per request
Per day per field
2
3
3
4
4
3
3
3 2 3 2
Per hour Per booking Per hour Per booking
Per event
3 2
Per hour Per booking
3
2
Per full day
Per hour
2
Per half day
3 3 2
2
Per hour
Per hour Per hour Per booking
2
Per half day
Per month, 5 day week 2
2
Per month, 3 day week
Per hour
2 2
Per day
2
2
Per hour Per hour
4 4 4 4 4 4
4
Price Category
Per hour Per hour Per item Per item Per item Per tablecloth
Per hour per officer
Unit of Measurement
$327.27
$1,200.00
$409.09
$247.27
$247.27
$1,418.18
$72.73
$122.73 $400.00 $463.64 $600.00
$236.36 $400.00 $590.91 $600.00
$181.82 $400.00 $527.27 $600.00
$50.00 $360.00
$31.82
$18.18 $31.82 $360.00
$21.00
$450.00
$50.00
$209.09
$100.00
$42.00
$70.00
$25.00
$409.09
$252.00
$25.00
$30.91
$27.27
$90.91 10/11 of fee charged $55.45 $55.45 $55.45 $5.09
$86.36
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$32.73
$0.00
$40.91
$24.73
$24.73
$141.82
$7.27
$12.27 $0.00 $46.36 $0.00
$23.64 $0.00 $59.09 $0.00
$18.18 $0.00 $52.73 $0.00
$5.00 $0.00
$3.18
$1.82 $3.18 $0.00
$0.00
$45.00
$5.00
$20.91
$10.00
$4.20
$7.00
$2.50
$40.91
$25.20
$2.50
$3.09
$2.73
$9.09 1/11 of fee charged $5.55 $5.55 $5.55 $0.51
$8.64
GST @ 10% Remitted to ATO (if applicable)
$360.00
$1,200.00
$450.00
$272.00
$272.00
$1,560.00
$80.00
$135.00 $400.00 $510.00 $600.00
$260.00 $400.00 $650.00 $600.00
$200.00 $400.00 $580.00 $600.00
$55.00 $360.00
$35.00
$20.00 $35.00 $360.00
$21.00
$495.00
$55.00
$230.00
$110.00
$46.20
$77.00
$27.50
$450.00
$277.20
$27.50
$34.00
$30.00
$100.00 By Quote $61.00 $61.00 $61.00 $5.60
$95.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
165
07.10019 07.10020
9. CARE AND EDUCATION
Child Care fee The fees for Care and Education centres are set to recover the annual operating and maintenance costs of the centres after Government subsidies. Little Coast Kids Kanwal and Little Coast Kids Wyong
Under 3 years (Fee to be in effect until 31 December 2017)
Under 3 years (Fee to be in effect from 1 January 2018) 3 to 6 years (Fee to be in effect until 31 December 2017) 3 to 6 years (Fee to be in effect from 1 January 2018) Little Coast Kids Toukley, Niagara Park Children's Centre, Terrigal Children's Centre and Umina Children's Centre
Under 3 years (Fee to be in effect until 31 December 2017) Under 3 years (Fee to be in effect from 1 January 2018) 3 to 6 years (Fee to be in effect until 31 December 2017)
3 to 6 years (Fee to be in effect from 1 January 2018) Little Coast Kids Northlakes and Kariong Children's Centre
Under 3 years (Fee to be in effect until 31 December 2017) Under 3 years (Fee to be in effect from 1 January 2018)
09.10000
09.10001
09.10003
09.10004 09.10005 09.10006 09.10007
09.10008 09.10009 09.10010
09.10011 09.10012
09.10013 09.10014
09.10002
8. BOOKS AND CORPORATE PUBLICATIONS
Other publications Coastal Paradise books Plans of management for Council buildings and reserves
08.10001 08.10002 08.10003
Monthly permanent parking space Levels 2 and 3 Monthly permanent parking space Levels 4 and 5 Deposit for issue of a permanent Parking access card (refundable) After Hours Vehicle Release Fee Plus amount owed for unpaid daily parking fee Saturday Parking Hours of operation are to be 7.30 am to 3.00pm Special Event Parking (Events at Central Coast Stadium) Permanent cards not accepted Overnight Parking Overnight Parking, applicable after the daily advertised closing time. Maximum 28 days.
08.10000
07.10046 07.10047
07.10045
07.10044
07.10040 07.10041 07.10042 07.10043
07.10039
07.10037 07.10038
2-3 Hours 3-4 Hours 4-5 Hours 5-6 Hours 6-7 Hours >7 hours Maximum All Day Fee (Until Close) Early Bird Discount Parking (Monday to Friday) Subject to arrival before 9.00am and departure after 4.30pm, Levels 4 and 5 only, otherwise normal casual rates apply. Pay and Display Parking Area Permanents Monday to Friday Only Monthly reserved parking space Level 1
Beach Access - Additional beach cleaning services are requested Truck and beach rake Beach cleaning up to 2 hours Beach cleaning greater than 2 hours
07.10018
07.10030 07.10031 07.10032 07.10033 07.10034 07.10035 07.10036
School key bond - one set - toilets only
07.10017
CENTRAL COAST STADIUM
Key bond - three sets
07.10016
Venue Hire Corporate Hospitality packages Events set up costs Ticketing fees and charges Training fees Gosford City Car Park (formerly Baker Street Parking Station) Casual 0-2 Hours
Key bond - two sets
07.10015
07.10022 07.10023 07.10024 07.10025 07.10026 07.10027 07.10028 07.10029
Key bonds Key bond - one set
07.10013 07.10014
07.10021
Electrical inspection fee - not-for-profit
Filming / Photography by professional crews Administration fee Administration fee charged to process application for approval for filming
07.10011 07.10012
Description of Fees and Charges
07.10010
2017-18 Item Number
2
Per child per day Per child per day
Per child per day
Per child per day Per child per day Per child per day
Per child per day Per child per day Per child per day
Per child per day
Each Per plan
Per night
Per vehicle
Per hour
Per month Per month Per parking access card Per vehicle
Per month
Per hour
3 3
3
3 3 3
3 3 3
3
5 4
2
2
5
2 2 1 4
2
3
3 3 3 3 3 3 3
Per hour Per hour Per hour Per hour Per hour Per hour Per hour Per hour
2 2 2 2 2
3 3
2
5
4
4
4
3
4
Price Category
Per application Per application Per event Per event Per application
Minimum 2 hours Per hour>2 hours
Minimum per day
Per facility
Per facility
Per facility
Per facility
Per application
Per inspection
Unit of Measurement
$74.55 $65.45 $10.50 $54.55
$84.55
$0.95
$3.64 $4.55 $5.91 $7.27 $8.18 $10.00 $7.27
$0.00
fee charged fee charged fee charged fee charged fee charged
$94.00 $95.00
$95.00
$97.00 $99.00 $93.00
$92.00 $86.00 $88.00
$90.00
$38.18 $31.80
$36.36
$4.55
10/11 of fee charged
10/11 of 10/11 of 10/11 of 10/11 of 10/11 of
$300.00 $145.00
$300.00
$30.00
$700.00
$500.00
$300.00
$72.73
$163.64
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$7.45 $6.55 $0.00 $5.45
$8.45
$0.10
$0.36 $0.45 $0.59 $0.73 $0.82 $1.00 $0.73
$0.00
fee charged fee charged fee charged fee charged fee charged
$0.00 $0.00
$0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00
$3.82 $0.00
$3.64
$0.45
1/11 of fee charged
1/11 of 1/11 of 1/11 of 1/11 of 1/11 of
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$7.27
$16.36
GST @ 10% Remitted to ATO (if applicable)
$94.00 $95.00
$95.00
$97.00 $99.00 $93.00
$92.00 $86.00 $88.00
$90.00
$42.00 $31.80
$40.00
$5.00
No charge
$82.00 $72.00 $10.50 $60.00
$93.00
$1.05
$4.00 $5.00 $6.50 $8.00 $9.00 $11.00 $8.00
$0.00
Price on application Price on application Price on application Price on application Price on application
$300.00 $145.00
$300.00
$30.00
$700.00
$500.00
$300.00
$80.00
$180.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
166
3 to 6 years (Fee to be in effect from 1 January 2018)
Enrolment bond
Casual hourly fee - under 3 years old (occasional care fee)
Casual hourly fee - 3-5 year olds (occasional care fee) Other fees (which will not attract Childcare Benefit)
Enrolment fee (non-refundable) One-off payable upon enrolment Enrolment fee for 2 or more children (non-refundable) One-off payable upon enrolment Nappy fee (to be charged at full cost recovery where parent/guardian have not provided) Late pickup fee for the first 15 minutes after centre closure Late pickup fee for every subsequent 15 minutes thereafter Birthday cakes made at the centre
09.10017
09.10018
09.10019 09.10020
09.10021
09.10023 09.10024 09.10025 09.10026
10. CEMETERIES Cemeteries under management of Council
Order for burial / Order for Interment
Perpetual maintenance costs - Cemetery Perpetual maintenance costs - Memorial Garden/Wall Bronze plaque - standard - including installation No larger than 135mm(w) X 135mm(h) with up to ten lines Administration fee - standard transfer burial and memorial rights Non-refundable Administration fee - complex transfer burial and memorial rights Applicable when archival retrieval of information is required - for licences purchased prior to 2005 where the licence holder does not hold original documentation Non-refundable Application to erect stone or concrete kerbing and or slab over grave General section only Permit for monumental works headstone Burial Licence / Right of Interment (single plot purchase) Double depth burial up to 1.2m x 2.4m - immediate use or reservation Burial Licence / Right of Interment (double plot purchase) Side by side double depth burial plots up to 1.2m x 2.4m - immediate use or reservation Burial Licence / Right of Interment - child Double depth burial up to 1m x 1.2m Removal of human remains from grave to another part of the cemetery
Exhumation of human remains from grave to transport to another cemetery
Memorial gardens Currently only available at Noraville and Jilliby Cemeteries. Placement and immurement of ashes Tuesday to Thursday 9:00am to 3:00pm Burial licence - niche purchase - Noraville Memorial Garden inclusive of granite pillar and standard cast bronze reserve plaque Niche caters for 1 ash container
10.10000
10.10001
10.10002 10.10003 10.10004
10.10013
10.10014
Plaque and ash placement in Noraville Memorial Garden - cast bronze plaque no larger than 135mm (w) X 135mm (h) with up to ten lines For a quote for additional lines or non standard plaque contact WSC cemetery officer
Plaque and ash placement in Jilliby Memorial Garden - cast bronze plaque no larger than 150mm (w) X 100mm (h) with up to six lines For a quote for non standard plaque contact WSC cemetery officer
Burial licence - niche purchase Memorial Wall inclusive of standard cast bronze reserve plaque
Plaque and ash immurement in Memorial Wall - cast bronze plaque no larger than 135mm (w) X 135mm (h) with up to ten lines (for a quote for additional lines or non standard plaque contact WSC cemetery officer)
Burial licence - Garden ash memorial position (Jilliby) inclusive of hardwood pillar (niche caters for 2 ash containers)
Star Memorial Plaque and placement on Memorial Wall Incorporates the cost of plaque (100mm x 100mm) and staff time and materials to install
10.10016
10.10017
10.10018
10.10019
10.10020
10.10021
10.10015
10.10012
10.10011
10.10010
10.10009
10.10008
10.10007
10.10006
10.10005
Workshop/Seminar attendance (minimum 2 hours) - professional development
Crèche - childcare fee during workshop attendance
Little Coast Kids T-shirt Workshop/Seminar attendance (minimum 2 hours) - community members
09.10030 09.10031
09.10033
Little Coast Kids Event/Activity/Excursion
09.10029
09.10032
4GB USB for children's documentation
Replacement of Little Coast Kids hat
09.10027
09.10028
09.10022
3 to 6 years (Fee to be in effect until 31 December 2017)
09.10016
Description of Fees and Charges
09.10015
2017-18 Item Number
2
Per request
Per licence
Per request
Per request
Per request
Per request
Per request
Per request
Per request
Per plot
Per plot
Per plot
2
2
2
2
2
2
2
2
2
2
2
2
3
Per application Per permit
2
3
5 5 2
2
5
5
4 5
4
4
4
4 3 3 4
3
3
3
3
3
3
3
Price Category
Per application
Per application
Per plot Per permit Per plaque
Per permit
Per child per hour
Per person
Per shirt Per person
Per child per activity
Per hat
Per USB
Per nappy Per child per 15 minutes Per child per 15 minutes Each
Per child
Per child
Per child per hour
Per child per hour
Per child
Per child per day
Per child per day
Unit of Measurement
$255.45
$497.27
$374.55
$559.09
$581.82
$581.82
$851.82
$586.36
$586.36
$907.27
$3,130.91
$1,814.55
$127.00
$190.00
$109.09
$80.91
$771.82 $152.73 $255.45
$320.00
$5.50
10/11 of fee charged
$9.09 10/11 of fee charged
10/11 of fee charged
$9.09
$10.00
$2.00 $25.00 $45.00 $9.09
$55.00
$65.00
$15.50
$17.50
By Quote
$88.00
$86.00
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$25.55
$49.73
$37.45
$55.91
$58.18
$58.18
$85.18
$58.64
$58.64
$90.73
$313.09
$181.45
$0.00
$0.00
$10.91
$8.09
$77.18 $15.27 $25.55
$0.00
$0.00
1/11 of fee charged
$0.91 1/11 of fee charged
1/11 of fee charged
$0.91
$1.00
$0.00 $0.00 $0.00 $0.91
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
GST @ 10% Remitted to ATO (if applicable)
$281.00
$547.00
$412.00
$615.00
$640.00
$640.00
$937.00
$645.00
$645.00
$998.00
$3,444.00
$1,996.00
$127.00
$190.00
$120.00
$89.00
$849.00 $168.00 $281.00
$320.00
Maximum $27.00 dependent on event $5.50
$10.00 Maximum $11.00 dependent on event
By Quote - Maximum of $10.00 dependent on activity
$10.00
$11.00
$2.00 $25.00 $45.00 $10.00
$55.00
$65.00
$15.50
$17.50
By Quote
$88.00
$86.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
167
Additional memorial items
Administration fee - information retrieval and re-issue of burial licences Memorial seat (includes installation of pre-selected design and memorial bronze plaque and 10 years asset maintenance) Ash Interment Fee - ash placement into niche with family in attendance Permit to Undertake Works in Cemeteries - Applies to Funeral Directors, Gravediggers and Monumental Masons for a period of 12 months Reservation Site accommodates one placement of ashes per niche New site - 1st Placement of Ashes Includes Bronze Plaque (14 lines) and placement of ashes - optional bud vase at additional cost Plus burial permit fee Plus Ashes Placement Fee Placement of Plaque in Section 3 or 4 of Granite Niche wall No Ashes
11. CERTIFICATES
Certificates Section 603 Local Government Act Urgency charge - Section 603 Local Government Act Certificate Per request Provided electronically within 36 hours of receipt or a manually requested section 603 Certificate provided within 72 hours of application receipt) Road widening certificates Per certificate
Planning certificates
Fee for certificate under Section 149 (2) of the Environmental Planning and Assessment Act (EPA)
Fee for certificate under Section 149 (2) and (5) of the EPA Act
10.10029
10.10030 10.10031 10.10032 10.10033 10.10034
11.10000
11.10001 11.10002 11.10003
11.10005
11.10006
11.10007
Section 88G Conveyancing Act Certificate - positive conveyance where land inspected
Section 54 LGA Classification of Land Certificate as to outstanding notices on premises Section 735A and 121ZP Section 603 LGA and Section 360 WMA combined Land Rates and Charges applicable and Water Charges under the Water Management Act, 2000 Prescribed fee $80.00 if water is not available Miscellaneous Charge 1 Conveyancing Certificate Combined with S603 certificate - total cost $113.81
11.10009
11.10010
11.10012
Inspection and Certificate of Completion for associated structure not included in certificate of completion for manufactured home
Install a manufactured home, moveable dwelling or associated structure on land associated with a Manufactured Home Estate, Camping Ground or Caravan Park Lodgement of objection to application of regulations (Section 82 of LGA) Lodgement of amended application (pursuant to Section 106 of LGA) Lodgement of review of determination (under Section 100 of LGA) Application to extend or renew approval (under Section 107 of LGA) Manufactured Home, Moveable Dwelling and Associated Structures (on land not in a manufactured home estate, camp ground or caravan park) Under Section 68 of the Local Government Act 1993 Lodgement of amended application (pursuant to Section 106 of LGA) Lodgement of review of determination (under Section 100 of LGA) Application to extend or renew approval (under Section 107 of LGA) Inspection of manufactured home, moveable dwelling and/or associated structure during installation Certificates and Other Approvals
11.10017 11.10018
11.10019
11.10020
Swimming pools
Swimming pool certification Swimming pool application for exemption
11.10030 11.10031
11.10032 11.10033
11.10026 11.10027 11.10028 11.10029
11.10021 11.10022 11.10023 11.10024 11.10025
Certificates and Other Approvals
Caravan Parks, Manufactured Home Estates and Camping Grounds Under Section 68 of the Local Government Act 1993 Inspection and Issue of Certificate of completion for manufactured home and associated structure
11.10016
11.10015
11.10013 11.10014
11.10011
Statement of outstanding charges - conveyance certificate (over the counter)
Certificates by CEO or Public Officer
11.10008
11.10004
10.10036
10.10035
Other charges Re-open grave (second and/or subsequent interment) Family Tree enquiry (Non-refundable) Extra inscription lines - memorial plaques
10.10025 10.10026 10.10027 10.10028
Per request
Per application
Per application Per application Per application Per inspection
Per certificate Per certificate Per certificate Per certificate
Per certificate
Per certificate
Per certificate
Per certificate
Per certificate Per certificate
Per certificate
Per certificate
Per certificate
Per certificate
Per certificate
Per certificate
3
Per plaque
1
2 2 2 2
2 2 2 2
2
1
1
1
2 1
2
1
1
1
1
1
5
4
2
4 2 3 3 2
2
2 3 3
2
2
2
Price Category
Per site
Per query Per request Per request Per permit Per reservation
Per item
Per request Per request Per line
Per request
Burial licence - Niche purchase full granite memorial wall
Plaque and ash immurement in full granite memorial wall - granite plaque as per wall specification with up to 10 lines. Additional lines or non-standard plaque available by quote
10.10023
Per request
Unit of Measurement
10.10024
Removal of ashes remains from one site in Memorial Garden or wall to another site within the Memorial Garden or wall within cemetery Remove and reinstate plaque/s where new niche has already been purchased and burial permit exists
Description of Fees and Charges
10.10022
2017-18 Item Number
$70.00
$295.00 $400.00 $235.00 $235.00
$200.00 $290.00 $400.00 $250.00
$100.00
$32.50
$65.00
$33.81
$215.00 $113.81
$33.41
By application
By application
$19.87
$133.00
$53.00
$80.00
$36.75
$470.00
$1,327.27
$25.00 $1,454.55 $110.00 $110.00 $909.09
10/11 of fee charged
$86.36 $71.82 $26.36
$377.27
$956.36
$540.91
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$0.00
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00 $0.00
$3.34
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$132.73
$2.50 $145.45 $0.00 $0.00 $90.91
1/11 of fee charged
$8.64 $7.18 $2.64
$37.73
$95.64
$54.09
GST @ 10% Remitted to ATO (if applicable)
$70.00
$295.00 $400.00 $235.00 $235.00
$200.00 $290.00 $400.00 $250.00
$100.00
$32.50
$65.00
$33.81
$215.00 $113.81
$36.75
By application
By application
$19.87
$133.00
$53.00
$80.00
$36.75
$470.00
$1,460.00
By Quote + 15% for admin costs $27.50 $1,600.00 $110.00 $110.00 $1,000.00
$95.00 $79.00 $29.00
$415.00
$1,052.00
$595.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
168
Up to $5,000 $5,001 - $50,000 base plus index
$50,001 - $250,000 base plus index
$250,001 - $500,000 base plus index
$500,001 - $1,000,000 base plus index -
12.10002 12.10003
12.10004
12.10005
12.10006
Application for tree identification, tree pruning, tree removal - 6 or more trees
Staged development application The maximum fee applicable for a staged development application in relation to a site and for any subsequent development application for any part of the site, is the maximum fee that would be payable if a single development application was required for all the development on the site.
Specific fees for local and state significant development These fees include the Plan First fee of $0.64 per $1,000 over $50,000 of estimated costs. Subdivision applications New public or private (community title) road
No new public road
12.10014
12.10015
12.10016
12.10017
12.10020
12.10018 12.10019
Application for tree identification, tree pruning, tree removal from private land
Application for tree identification, tree pruning, tree removal - up to 5 trees
12.10013
Fee for designated development (In addition to the fee required under 12.10001) Cancellation of development and certificate applications - Refund of portion of fees available where application is withdrawn or cancelled prior to completion of the assessment at the discretion of the Manager of Development Assessment. Refund is to be proportionate to the extent of assessment. After completion of assessment report there is nil refund available.
12.10011 12.10012
12.10010
Integrated development In addition to the fee specified elsewhere in 12.10001 Development Assessment fees, there is an additional fee for the referral and processing in respect to the general terms of approval to be granted by Council specified in Sections 91 and 91A of the EPA Act Fee for development that requires concurrence from another authority
Development Application Fees Council development application fees may be waived by the Manager of Development Assessment for not-for-profit charity / community organisations on sighting of appropriate documentation. If two or more fees are applicable to a single Development Application, the maximum fee payable is the sum of those fees. The maximum fee for development involving the erection of a building, the carrying out of work or the demolition of a work or a building, is calculated in accordance with the following: * fees include the Plan First levy of $0.64 per $1,000 over $50,000 of estimated costs. * fees determined under Section 12.10000 do not apply to development in other sections unless specified. * fees exclude the cost of notification and advertising.
12.10001
12.10009
12. DEVELOPMENT ASSESSMENT AND APPLICATIONS
12.10000
More than $10,000,000 base plus index
Resuscitation signs for swimming pools
11.10039
12.10008
Swimming pool registration administration fee (cost for completion of online application)
11.10038
$1,000,001 - $10,000,000 base plus index
Subsequent inspection
11.10037
12.10007
Swimming pools inspection (public pools)
Swimming Pool Compliance Certificate inspection (private pools) Initial inspection
11.10035 11.10036
Description of Fees and Charges
11.10034
2017-18 Item Number
Per subdivision
Per subdivision
Per application
Per application
Per development
Per request
Per application
Per application
Per application
Per application
Per application
Per application Per application
Per item
Per application
Per property
Per property
Per property
Unit of Measurement
1
1
4
4
1
1
1
1
1
1
1
1 1
4
5
1
1
3
Price Category
$665.00 base rate plus $65.00 per each additional lot created by the subdivision $330.00 base rate plus $53.00 per each additional lot created by the subdivision
$103.00 base rate plus $29.87 per tree more than 5 trees
$93.64
$920.00
$140.00 base rate plus $320.00 referral fee
$2,615.00 base rate plus $1.44 per $1,000 over $1,000,000 of estimated costs $15,875.00 base rate plus $1.19 per $1,000 over $10,000,000 of estimated cost
$352.00 base rate plus $3.64 per $1,000 over $50,000 of estimated costs $1,160.00 base rate plus $2.34 per $1,000 over $250,000 of estimated costs $1,745.00 base rate plus $1.64 per $1,000 over $500,000 of estimated costs
$110.00 $170.00 base rate plus $3.00 for each $1,000 (or part of) of estimated costs
$28.09
$11.00
$100.00
$150.00
$170.00
2017-18 Central Coast Council Fee
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$320.00
Other Regulatory Fees and Charges
$110.00 $170.00 base rate plus $3.00 for each $1,000 (or part of) of estimated costs
$30.90
$11.00
$100.00
$150.00
$170.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
$0.00
$0.00
1/11 of fee charged
$9.36
$0.00
$0.00
Plan First
Plan First
Plan First
Plan First
Plan First
Regulatory Fees and Charges Paid to
$665.00 base rate plus $65.00 per each additional lot created by the subdivision $330.00 base rate plus $53.00 per each additional lot created by the subdivision
$103.00 base rate plus $29.87 per tree more than 5 trees
$103.00
$920.00
$140.00 base rate plus Relevant regulatory $320.00 referral fee authority requiring approval
$0.00 $2,615.00 base rate plus $1.44 per $1,000 over $1,000,000 of estimated costs $0.00 $15,875.00 base rate plus $1.19 per $1,000 over $10,000,000 of estimated cost
$352.00 base rate plus $3.64 per $1,000 over $50,000 of estimated costs $0.00 $1,160.00 base rate plus $2.34 per $1,000 over $250,000 of estimated costs $0.00 $1,745.00 base rate plus $1.64 per $1,000 over $500,000 of estimated costs
$0.00
$0.00 $0.00
$2.81
$0.00
$0.00
$0.00
$0.00
GST @ 10% Remitted to ATO (if applicable)
169
4
Referral of application to design review panel for assessment (first referral) Referral of amended plans to design review panel for assessment (second or subsequent referral) Additional fees are payable for advertised development Designated development Advertised development Environmental planning instrument requirement not listed above
Notification fee as required under Council's relevant Development Control Plan
Fee for a request for a review of determination Maximum fee under Section 82A (3) Environmental Planning and Assessment (EPA) Act Development application does not involve erection, carrying out work or demolition of a building - 50% of the fee for the original development application
Does involve erection, carrying out work or demolition of a building < $100,000
Any other development as set out in table below Note: An additional amount of not more than $620.00 if notice of the application is required to be given under Section 82A (3) of the EPA Act. Please refer advertising fee under 08.10037 Additional fees are payable for advertised development
Up to $5,000
$5,001 - $250,000 base plus index
12.10025 12.10026
12.10027 12.10028 12.10029 12.10030 12.10031 12.10032
12.10033
12.10034
12.10036
12.10037
12.10038
12.10039
Per certificate
Per application
Per application
Modification of a development consent Modifications involving minor error, misdescription or miscalculation under Section 96(1)
Section 96(1A) minimal environmental impact
12.10050
12.10052 12.10053
12.10054
12.10051
Modification of a consent for local development
Plus an additional amount of not more than $665.00 if notice of the application is required to be given under Section 96(2) or 96AA(1) of the EPA Act (namely advertised development). An additional fee, not exceeding $760.00, is payable for residential flat development to which clause 115 (3) EPA Regulation 2000 applies cl248.
12.10049
Fee for review of a modification application - under Section 96AB
Fee for review of decision to reject a development application under Section 82B If estimated cost of the development is less than $100,000 If estimated cost of the development is $100,000 or more and less than or equal to $1,000,000 If estimated cost of the development is more than $1,000,000
More than $10,000,000 base plus index
12.10043
12.10044
Per application
$1,000,001 - $10,000,000 base plus index
12.10042
Per modification
Per modification
Per modification
Per modification
Per application Per application Per application
Per application
Per application
$500,001 - $1,000,000 base plus index
12.10041
Per application
Per application
Per application
Per application
1
1
1
1
1 1 1
1
1
1
1
1
1
1
1
1
1
1 1 1
Per development Per development Per development Per development
5 5
$250,001 - $500,000 base plus index
12.10045 12.10046 12.10047 12.10048
1 1
Per referral Per referral
Per development
12.10040
12.10035
Lodgement and recording of private subdivision certificates
Fee for development not involving the erection of a building, the carrying out of work or the subdivision of land or demolition of a building or Design Review Panel Referral for assessment of design quality
12.10024
4
Per subdivision Per inspection
Strata title - Inspection before issue of Strata certificate - Where not in conjunction with an Occupation Certificate issued for a Construction Certificate or Complying Development Certificate Strata Title - Inspection before issue of Strata Certificate - subsequent inspections
12.10023
12.10022
1
Price Category
Per subdivision
Unit of Measurement
Strata or community title
Description of Fees and Charges
12.10021
2017-18 Item Number
Lessor of $645.00 or 50% of original DA fee
$71.00
Up to $760.00
Up to $665.00
$55.00 $150.00 $250.00
50% of the fee for the original DA
$4,737.00 base rate plus $0.27 for each $1,000 (or part of) of the estimated cost which exceeds $10,000,000
$987.00 base rate plus $0.40 for each $1,000 (or part of) of the estimated cost which exceeds $1,000,000
$712.00 base rate plus $0.50 for each $1,000 (or part of) of the estimated cost which exceeds $500,000
$85.00 base rate plus $1.50 for each $1,000 (or part of) of the estimated cost which exceeds $50,000 $500.00 base rate plus $0.85 for each $1,000 (or part of) of the estimated cost which exceeds $250,000
$55.00
$190.00
By Quote
$259.09
$2,220.00 $1,105.00 $1,105.00
$2,400.00 $1,845.00
$285.00
$36.00
$126.00
$189.00
$330.00 base rate plus an additional $65.00 per each additional lot created by the subdivision
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
TOTAL 2017-18 FEE (GST inclusive where applicable)
$189.00
$55.00
$190.00
By Quote
$285.00
$2,220.00 $1,105.00 $1,105.00
$2,400.00 $1,845.00
$285.00
$36.00
$126.00
$987.00 base rate plus $0.40 for each $1,000 (or part of) of the estimated cost which exceeds $1,000,000
$712.00 base rate plus $0.50 for each $1,000 (or part of) of the estimated cost which exceeds $500,000
Up to $760.00
Up to $665.00
$55.00 $150.00 $250.00
50% of the fee for the original DA
$0.00 $71.00 $0.00 Lessor of $645.00 or 50% of original DA fee
$0.00
$0.00
$0.00 $0.00 $0.00
$0.00
$0.00 $4,737.00 base rate plus $0.27 for each $1,000 (or part of) of the estimated cost which exceeds $10,000,000
$0.00
$0.00
$85.00 base rate plus $1.50 for each $1,000 (or part of) of the estimated cost which exceeds $50,000 $0.00 $500.00 base rate plus $0.85 for each $1,000 (or part of) of the estimated cost which exceeds $250,000
$0.00
$0.00
$0.00
$0.00
$25.91
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00 $330.00 base rate plus an additional $65.00 per each additional lot created by the subdivision
GST @ 10% Remitted to ATO (if applicable)
Regulatory Fees and Charges Paid to
170
Description of Fees and Charges
Miscellaneous development engineering works - minimum charge (e.g. foot paving and VAC - 2 lot development) Additional fees - depending on extent, scope and number of assessments required. Additional fees range from 5% to 50% of initial fee Section 138 Roads Act 1993 application
Section 68 Application - Stormwater connection
Subdivision works within a property being developed (greenfield sites) (construction certificate/civil design approval and works compliance inspections) Water quality basin/constructed wetland/on-site stormwater detention basin and associated devices for up to 50 lots. Fee increased proportionally for greater than 50 lots Trunk stormwater drainage culvert structures (minimum twin cell 1200mm diameter) Constructed drainage channel (subject to controlled activity approval) up 25m wide Constructed drainage channel (subject to controlled activity approval) greater than 25m wide Retaining walls Half road construction or up to half road including kerb and gutter (excluding storm water drainage and concrete paths)* Full road construction including kerb and gutter (excluding storm water drainage and concrete paths)* Full road construction - rural road with table drains or similar
12.10089
12.10090
12.10092 12.10093 12.10094 12.10095 12.10096 12.10097 12.10098
12.10091
12.10070
12.10086 12.10087 12.10088
More than $10,000,000 base plus index
12.10066
12.10071 12.10072 12.10073 12.10074 12.10075 12.10076 12.10077 12.10078 12.10079 12.10080 12.10081 12.10082 12.10083 12.10084 12.10085
$1,000,001 - $10,000,000 base plus index
12.10065
The fee for the extension of a development consent under Section 95A of EP and A Act 1979
$500,001 - $1,000,000 base plus index
12.10064
Pre Development Application meeting Where estimated value is $1,000,000 or less - base rate $400.00 plus minimum $165.00 per hour (Planner, Engineer, Coastal Engineer and Ecologist) and/or minimum $250.00 per hour (Section Manager) and/or minimum $270.00 per hour (Unit Manager) and/or minimum $330.00 per hour (Group Leader) Where estimated value is greater than $1,000,000 - base rate $770.00 plus minimum $165.00 per hour (Planner, Engineer, Coastal Engineer and Ecologist) and/or minimum $250.00 per hour (Section Manager) and/or mnimum $270.00 per hour (Unit Manager) and/or minimum $330.00 per hour (Group Leader) Engineering Assessment Works within public roads Construction certificate administration fee Compliance certificate administration fee Urban development (construction certificate/civil design approval and works compliance inspections): Full carriageway construction (not including stormwater drainage) Kerb and gutter plus half carriageway construction greater than 2m wide (drainage not included) Kerb and gutter plus small shoulder construction less than 2m wide (drainage not included) Road stormwater drainage pipe Road stormwater drainage pits Concrete paths including inspections of area adjacent or road reserve Rural development (construction certificate/civil design approval and works compliance inspections): Full or half road construction - rural road with table drains or similar Other engineering works (construction certificate/civil design approval and works compliance inspections): Infill kerb and gutter works (max. 40m)
$250,001 - $500,000 base plus index
12.10063
12.10068 12.10069
$5,001 - $250,000 base plus index
12.10062
12.10067
Any other development Up to $5,000
Does involve erection, carrying out work or demolition of a building < $100,000
Original application greater than $110.00 Doesn't involve erection, carrying out work or demolition of a building
Section 96(2) application Original application less than $110.00
12.10060 12.10061
12.10059
12.10057 12.10058
12.10055 12.10056
2017-18 Item Number
4 4
Per lineal metre Per lineal metre
Per structure Per lineal metre Per lineal metre Per lineal metre Per lineal metre Per lineal metre Per lineal metre
Per basin
Per application
4 4 4 4 4 4 4
4
4
4 4 4
4 4 4 4 4 4
Per lineal metre Per lineal metre Per lineal metre Per lineal metre Each Per lineal metre
Per application Per application Per application
4 4
4
4
4
1
1
1
1
1
1
1
1
1
Price Category
Per application Per application
Per meeting
Per meeting
Per extension
Per application
Per application
Per application
Per application
Per application
Per application
Per modification
Per modification
Per modification
Unit of Measurement
$818.18 $45.45 $68.18 $13.64 $36.36 $50.00 $45.45
$2,272.73
$128.00
$993.00 10/11 of fee charged $273.00
$2,041.00
$47.00
$98.00 $60.00 $50.00 $15.00 $20.00 $15.00
$36.00 $36.00
10/11 of fee charged
10/11 of fee charged
$441.00
$4,737.00 base rate plus $0.27 for each $1,000 (or part of) of the estimated cost which exceeds $10,000,000
$85.00 base rate plus $1.50 for each $1,000 (or part of) of the estimated cost which exceeds $50,000 $500.00 base rate plus $0.85 for each $1,000 (or part of) of the estimated cost which exceeds $250,000 $712.00 base rate plus $0.50 for each $1,000 (or part of) of the estimated cost which exceeds $500,000 $987.00 base rate plus $0.40 for each $1,000 (or part of) of the estimated cost which exceeds $1,000,000
$55.00
$190.00
50% of the fee for the original DA
$55.00
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$55.00
$190.00
50% of the fee for the original DA
$55.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
$81.82 $4.55 $6.82 $1.36 $3.64 $5.00 $4.55
$227.27
$0.00
$0.00 1/11 of fee charged $0.00
$0.00
$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00
1/11 of fee charged
1/11 of fee charged
$0.00
$900.00 $50.00 $75.00 $15.00 $40.00 $55.00 $50.00
$2,500.00
$128.00
$993.00 By Quote $273.00
$2,041.00
$47.00
$98.00 $60.00 $50.00 $15.00 $20.00 $15.00
$36.00 $36.00
$770.00 base rate plus time based fees
$400.00 base rate plus time based fees
$441.00
$0.00 $4,737.00 base rate plus $0.27 for each $1,000 (or part of) of the estimated cost which exceeds $10,000,000
$85.00 base rate plus $1.50 for each $1,000 (or part of) of the estimated cost which exceeds $50,000 $0.00 $500.00 base rate plus $0.85 for each $1,000 (or part of) of the estimated cost which exceeds $250,000 $0.00 $712.00 base rate plus $0.50 for each $1,000 (or part of) of the estimated cost which exceeds $500,000 $0.00 $987.00 base rate plus $0.40 for each $1,000 (or part of) of the estimated cost which exceeds $1,000,000
$0.00
$0.00
$0.00
$0.00
$0.00
GST @ 10% Remitted to ATO (if applicable)
Regulatory Fees and Charges Paid to
171
Earthworks where separate Construction Certificate required - per lot greater than 750m2
Concrete footpaths (includes inspection of adjacent area). Where greater than 20 lots, a 15% reduction can apply where at least four of the above identified items are included in the proposed works Hoarding/Scaffolding Fees Charged under Section 139 of the Roads Act, 1993 for erection of hoarding/scaffolding during construction works
12.10103
12.10104
Per square metre
Per certificate
Re-inspections for maintenance or other bond releases Application and release of bonding of works
12.10128 12.10129 12.10130 12.10131
12.10132 12.10133
Technical/inspection services Natural Occurrence Information (including Flood Certificates) Council Development Control Plans
CD Version Full hard copy version Plus standard photocopying costs per page Civil design guidelines and construction specification Plus standard photocopying costs per page Individual chapters or pages Plus standard photocopying costs per page Fee for a certified copy of a document, map or plan held by Council
12.10139 12.10140 12.10141
12.10142 12.10143
12.10147
12.10146
12.10145
Planning Proposals (lodged from 1 July 2017 with Central Coast Council and planning proposals lodged prior to 30 June 2017 for land in the former Wyong Council local government area)
Class 1 and 10 development
12.10138
12.10144
Minor development
Major Development
12.10136
12.10137
Referrals from statutory authorities
Processing land dealings (such as easements, change of restrictions.) Letter for property infrastructure Bonds Civil works maintenance bond
12.10126 12.10127
Development investigation for Water and Sewerage Requirements under Section 306 Water Management Act 2000
Re-sign/endorse Linen / 88B - Non-Strata - per plan Re-sign/endorse Linen / 88B - Strata - per plan
12.10125
12.10135
Linen release - Strata - per unit
12.10124
12.10134
Fee for subdivision certificate - Strata
Linen release - Non-Strata - per unit
12.10123
Administration costs - certificates
Additional compliance inspections - where re-inspection is required Additional design assessment including for updated construction certificates / civil design considerations Section 307 Certificate, Water Management Act 2000
12.10115 12.10116 12.10117
Water and sewer works (refer to 30.10000 Water and Sewerage fees and charges) Fee for Subdivision Certificate The fee payable for the lodgement and recording of privately issued subdivision certificate Fee for subdivision certificate - Non-Strata
Vehicle access crossings Vehicle access crossing inspections (where designed and constructed in association with road works) Vehicle access crossing inspections (where not associated with road works) Fee for certificate indicating ability to utilise SEPP (exempt and complying developments codes) 2008
12.10111 12.10112 12.10113 12.10114
12.10118
Piling or ground anchors Piling or ground anchors application fee Piling or ground anchors in road reserve
12.10108 12.10109 12.10110
12..10119 12.10120 12.10121 12.10122
Per hour Per hour
B Class
12.10107
4
Per document
1
4
Per document Per document
4 4
4 4 Each Per document
1 Per hour Per request
1
1
4
Per investigation
Per investigation
Per investigation
Per referral
4 4
4
Per development
Per inspection Per application
4 4
4 4
4
4
4
1 4
1
4 4
4 4 4
4 4
2
Per certificate Per application
Per certificate Per certificate
Per certificate
Per certificate
Per certificate
Per certificate Per certificate
Per application Per application Per development stage
Per application Per month
Per linear metre
A Class
2
4 4
Per lot
Per linear metre
4 4 4 4
Price Category
Per lineal metre Each Per lineal metre Per lot
Unit of Measurement
12.10106
12.10105
Earthworks where separate Construction Certificate required - per lot up to 749m2
Stormwater drainage - pipes (excluding inter-allotment drainage) or bio-swales* Stormwater drainage - pits, headwall and closed Gross Pollutant Traps (excluding inter-allotment drainage)* Inter-allotment drainage (pipes and pits)*
Description of Fees and Charges
12.10099 12.10100 12.10101 12.10102
2017-18 Item Number
$53.00
$21.00
$263.00
$34.00 $683.00
$136.36 $166.00
$82.67
$650.59
$282.34
$233.00
Minimum 5% value of works with a minimum of $2,500 $210.00 $321.00
$309.00 $100.00
$133.00 $116.36
$75.45
$67.00
$291.82
$36.00 $287.00
$36.00
$200.00 $200.00 Minimum fee $250.00 maximum fee $1,000.00 $95.00 $150.00
$273.00 10/11 of fee charged
$525.00 base rate +$20.00 Per linear metre per month or part thereof $790.00 base rate + $80.00 Per linear metre per month or part thereof
$100.00 per lot minimum fee $850.00 $9.09
$13.64 $18.18 $18.18 $70.00 per lot minimum fee $500.00
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$15.00 $20.00 $20.00 $70.00 per lot minimum fee $500.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
$0.00
$0.00
$0.00
$0.00 $0.00
$13.64 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $11.64
$7.55
$0.00
$29.18
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 1/11 of fee charged
$53.00
$21.00
$263.00
$34.00 $683.00
$150.00 $166.00
$82.67
$650.59
$282.34
$233.00
Minimum 5% value of works with a minimum of $2,500 $210.00 $321.00
$309.00 $100.00
$133.00 $128.00
$83.00
$67.00
$321.00
$36.00 $287.00
$36.00
$200.00 $200.00 Minimum fee $250.00 maximum fee $1,000.00 $95.00 $150.00
$273.00 $12,950 per month development plus bond of $29,500 per road frontage
$525.00 base rate +$20.00 Per linear metre per month or part thereof $0.00 $790.00 base rate + $80.00 Per linear metre per month or part thereof
$0.00
1/11 of fee charged $100.00 per lot minimum fee $850.00 $0.91 $10.00
$1.36 $1.82 $1.82 1/11 of fee charged
GST @ 10% Remitted to ATO (if applicable)
Regulatory Fees and Charges Paid to
172
12.10152
Category A Amendment to permissible uses - site specific Category B Amendment to planning controls to enable intensification of land - no change to zoning If no studies required by Gateway, the further fee is
Category C Change to Zoning - Urban intensification If one or more Gateway studies required, applicant will carry these out and the further assessment fee is
Category D Minor Amendment (includes Word Change/Inconsistency) If no studies required by Gateway, the further fee is
Category E Major Application (Master Plan - developing zone and planning controls - sites greater than 5ha) If one or more Gateway studies required, applicant will carry these out and the further assessment fee is
Review of Additional Studies following Gateway Planning Proposal - Public Hearing Costs (All planning proposals lodged prior to 30 June 2017 and from 1 July 2017) Payment after exhibition arranged and before further processing commences
All Categories DEVELOPMENT ASSESSMENT FOR WATER AND SEWERAGE Miscellaneous and Ancillary Fees and Charges
Per assessment Misc charge 6 Building Over or Adjacent to Sewer Advice Investigation and preparation of letter regarding a buildingâ&#x20AC;&#x2122;s compliance with required standards for building adjacent to or over Council water or sewer pipes or structures Misc charge 18 Section 307 Certificate
12.10163
12.10164
12.10165
12.10166 12.10167
12.10168 12.10169 12.10170
12.10171
b) Commercial Buildings, Factories and Torrens Subdivision of Dual Occupancy etc.
c) Boundary Realign with Conditions
d) Subdivision, developments involving mains extensions
e) Developments without Requirement Fee
Misc charge 24 Water and Sewer Building Plan Assessment Review building plans with respect to the impact on assets and systems capacity. Includes building over sewer, building adjacent to sewer, system load demand Misc Charge 25 Inspections Council inspect and test water and sewer works carried out by private developers to ensure compliance with Council's standards. Should the works not comply with Council standards, a re-inspection is required. Council does not differentiate in price for major or minor works inspections. Private developers may be required to concrete encase sewer mains and provide additional sewer junctions a) Inspection of water and sewer works Inspection and testing of water and sewer works carried out by private developers prior to acceptance by Council
b) CCTV Costs Private developers may be required to pile drive or operate substantial equipment in the vicinity of sewer mains. Council use CCTV to inspect the works to determine that works are in accordance with Council standards and damage has not occurred to sewer assets. Security Bond
12.10174
12.10175
12.10176
12.10177
12.10178
12.10181
12.10180
12.10179
a) Dual Occupancies/Secondary Dwelling/Residential Flat Building
12.10173
12.10172
1
1
Per application
1
1
1
1
1
1
1
2
2
2
2
2
2 2
Per linear metre
Per assessment
Per certificate
Per certificate
Per certificate
Per certificate
Per certificate
Per application
Per application
Per lodgement
Per lodgement
Per lodgement
Per lodgement Per lodgement
2
2
Per lodgement Per lodgement
2
Per lodgement
12.10161 12.10162
12.10160
12.10159
12.10158
12.10157
2
2 2
Per lodgement
Category A Amendment to permissible uses - site specific Includes 1 x Advertising event Additional Advertising subject to full cost recovery Category B Amendment to planning controls to enable intensification of land - no change to zoning Includes 1 x Advertising event Additional Advertising subject to full cost recovery Category C Change to Zoning - Urban intensification Includes 1 x Advertising event Category D Minor Amendment (includes Word Change/Inconsistency) Includes 1 x Advertising event Additional Advertising subject to full cost recovery Planning Proposal - NSW Department of Planning and Environment - Gateway Support Fee Payment due after NSW Department's Gateway determination supporting PP is received and before further processing
Per occurrence Per hour or part thereof
12.10156
12.10153 12.10154 12.10155
Pre Lodgement Meeting and Advice Initial assessment and preparation of report to Council (a) Includes 1 hour meeting, site inspection (b) Additional Fee for Manager attendance at meeting Planning Proposal Lodgement Fee Initial assessment and preparation of report to Council. 30% Refund Applicable where the application is refused by Council
4
Per application Minor amendments to Wyong Local Environmental Plan (WLEP) 2013 and Gosford Local Environment Plan (LEP) 2014 to correct minor anomalies which are consistent with the Local Environment Plan (LEP), do not require additional studies and do not involve more than 2 lots of land. If staff time exceeds 40 hours then a rate of $165.00 per hour is payable by the proponent for additional hours Planning Proposals (lodged prior to 30 June 2017 for land in the former Gosford Council local government area)
12.10150
12.10151
4
Per application
Phase 2 fee (gateway determination to finalisation) base rate of $12,375.00 plus hourly rate of $165.00 per hour if staff time exceeds 75 hrs
4
Price Category
12.10149
Per application
Unit of Measurement
Phase 1 fee (application lodgement prior to gateway determination) base rate of $13,200.00 plus hourly rate of $165.00 per hour if staff time exceeds 80 hrs
Description of Fees and Charges
12.10148
2017-18 Item Number
$12.91 per linear metre + Lab charges as resolved by Council thereafter ($139.66 Minimum $201.36 + hourly rate of $327.08 for CCTV inspection
$134.96
$113.11
$427.72
$394.17
$216.13
$176.50
$60.84
Actual cost
20% of Category Fee
$16,537.50
$12,725.50
$9,371.30
$4,410.00 $7,166.30
$12,361.36
$30,903.45
$24,722.73
$24,722.73
$1,718.18 $325.00
$13,200.00 base rate plus time based fees if applicable $12,375.00 base rate plus time based fees if applicable $5,500.00 base rate plus time based fees if applicable
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
TOTAL 2017-18 FEE (GST inclusive where applicable)
$134.96
$113.11
$427.72
$394.17
$216.13
$176.50
$60.84
Actual cost
20% of Category Fee
$16,537.50
$12,725.50
$9,371.30
$4,410.00 $7,166.30
$13,597.50
$33,993.80
$27,195.00
$27,195.00
$1,890.00 $357.50
$0.00 $12.91 per linear metre + Lab charges as resolved by Council thereafter ($139.66 Minimum $0.00 $201.36 + hourly rate of $327.08 for CCTV inspection
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 $0.00
$1,236.14
$3,090.35
$2,472.27
$2,472.27
$171.82 $32.50
$0.00 $13,200.00 base rate plus time based fees if applicable $0.00 $12,375.00 base rate plus time based fees if applicable $0.00 $5,500.00 base rate plus time based fees if applicable
GST @ 10% Remitted to ATO (if applicable)
Regulatory Fees and Charges Paid to
173
• Additional hourly charge for reviewing previously reviewed plans An additional hourly charge may apply for reviewing previously assessed plans.
Misc charge 29 Development Assessment Special Projects (Roads and Rail or SPS adjustments, relocations, development in water catchment Per assessment areas) Council reviews and approves private developers' proposals for provision of new water or sewer mains or adjustment of existing mains or where a development may impact the integrity of Councils infrastructure. Works may involve installation of new water and sewer reticulation mains, sewer pump station / rising mains; adjustment of infrastructure or development located within the water supply catchments. The process is similar for all subdivisions and redevelopments, being the requirement to comply with conditions specified under Section 306 of the Water Management Act 2000. Connection to mains by private developer contractors incur an additional shut down and audit fee, which will be charged on the basis of actual costs incurred by Council. Fee assessment based on time and resources required to review and process documentation. An additional fee (quoted) applies for connection of newly constructed water mains to Councils system. Developers may be required to obtain and pay for a Section 307 Certificate for an additional fee, which states the development complies with the Water Management Act 2000.
• Additional hourly charge for reviewing previously reviewed plans An additional hourly charge may apply for reviewing previously assessed plans.
By quotation Misc Charge 30 Water Supply Shutdown and Audit for Developer Contracted Connections Council assesses, provided technical advice, and support to other service authorities and private developers for provision and/or adjustment of water and sewer assets. Council shuts down water mains prior to connection by developers' contractors of new mains to the water system. Council will audit the connection by third parties to ensure the integrity of each system is maintained. Fees for each audit will be charged on the basis of actual costs incurred by Council.
*Water Developer Charges per Equivalent Tenements (ET) Note: Sewer developer charges are also payable. ET is a unit of measurement, representative of water demand, whereby the water demand of 1 ET is equivalent to the water demand of a single detached dwelling.
Redevelopment Per equivalent tenements Gosford CBD Per equivalent tenements *Sewer Developer Charges per ET Note: Water developer charges are also payable. ET is a unit of measurement, representative of water demand, whereby the water demand of 1 ET is equivalent to the water demand of a single detached dwelling.
Redevelopment
12.10187
12.10188
12.10189
12.10190
12.10191
12.10192 12.10193 12.10194
12.10195
12.10186
Per equivalent tenements
Per hour
Per hour
Per hour • Additional hourly charge for reviewing previously reviewed plans An additional hourly charge may apply for reviewing previously assessed plans. Per assessment Misc charge 28 Development Assessment Large Projects - >15 and <50 lots and/or large or medium density developments involving sewer diversions <30 meters Council reviews and approves private developers' proposals for provision of new water or sewer mains or adjustment of existing mains. Works may involve installation of new water and sewer reticulation mains, internal sewer pump station / rising mains; or extension of new water or sewer mains to connect unserviced properties. The process is similar for all subdivisions and redevelopments, being the requirement to pay a developer charges and construct works under Section 306 of the Water Management Act 2000. Connection to mains by private developer contractors incur an additional shut down and audit fee, which will be charged on the basis of actual costs incurred by Council. Fee assessment based on time and resources required to review and process documentation. An additional fee (quoted) applies for connection of newly constructed water mains to Councils system. Developers may be required to obtain and pay for a Section 307 Certificate, for an additional fee, which states that the development complies with the Water Management Act 2000.
1
1 1
1
1
1
1
1
1
1
12.10185
12.10184
1
Per hour • Additional hourly charge for reviewing previously reviewed plans An additional hourly charge may apply for reviewing previously assessed plans. Per assessment Misc Charge 27 Development Assessment Medium Projects > 4 and ≤ 15 lots, and mains relocation Council reviews and approved private developers' proposals for provision or adjustment of water and sewer infrastructure services for new developments. Includes extensions servicing subdivisions and/or sewer diversions caused by development. Generally, new development is contained within a DSP, requiring the developer to service all lots or redevelopment involving adjustment of existing sewer/water mains. Connection to mains by private developer contractors incur an additional shut down and audit fee, which will be charged on the basis of actual costs incurred by Council. Fee assessment based on time and resources required to review and process documentation. An additional fee (quoted) applies for connection of newly constructed water mains to Councils system. Developers may be required to obtain and pay for a Section 307 Certificate, for an additional fee, which states that the development complies with the Water Management Act 2000.
12.10183
Price Category
1
Unit of Measurement
Misc Charge 26 Development Assessment of Small projects - Private SPS and /or Development ≤ 4 lots or extension of services to properties Per assessment outside service area Council reviews and approves private developers' proposals for provision of new water or sewer mains or adjustment of existing mains. Works may involve installation of new water and sewer reticulation mains, internal sewer pump station / rising mains; or extension of new water or sewer mains to connect unserviced properties. The process is similar for all subdivisions and redevelopments, being the requirement to pay a developer charges and construct works under Section 306 of the Water Management Act 2000. Connection to mains by private developer contractors incur an additional shut down and audit fee, which will be charged on the basis of actual costs incurred by Council. Fee assessment based on time and resources required to review and process documentation. An additional fee (quoted) applies for connection of newly constructed water mains to Councils system. Developers may be required to obtain and pay for a Section 307 Certificate, for an additional fee, which states that the development complies with the Water Management Act 2000.
Description of Fees and Charges
12.10182
2017-18 Item Number
$1,336.23
$2,708.22 $3,211.14
By Quote
$110.47
$3,657.43
$110.47
$901.77
$110.47
$709.21
$110.47
$294.31
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
GST @ 10% Remitted to ATO (if applicable)
$1,336.23
$2,708.22 $3,211.14
By Quote
$110.47
$3,657.43
$110.47
$901.77
$110.47
$709.21
$110.47
$294.31
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
174
Category C Masterplan Amendment
12.10201
Exceeding $500,000
Class 2 to 9
Up to $20,000 $20,001 to $50,000
$50,001 to $100,000 $100,001 to $300,000
$300,001 to $500,000
Exceeding $500,000
Fee for assessment of Complying Development Certificate applications for strata subdivision
12.10227 12.10228
12.10229 12.10230
12.10231
12.10232
12.10233
$300,001 to $500,000
12.10224
12.10226
$50,001 to $100,000 $100,001 to $300,000
12.10222 12.10223
12.10225
$20,001 to $50,000
12.10221
Exceeding $500,000 Fee for assessment of Complying Development Certificate applications
12.10217 12.10218
Class 1 and 10 (excluding single dwellings)
$300,001 to $500,000
12.10216
Up to $20,000
$50,001 to $100,000 $100,001 to $300,000
12.10214 12.10215
12.10220
Up to $20,000 $20,001 to $50,000
12.10212 12.10213
12.10219
Exceeding $500,000
Class 2 to 9
$300,001 to $500,000
12.10209
12.10211
$100,001 to $300,000
12.10208
12.10210
Class 1 and 10 (excluding single dwellings)
Up to $20,000 $20,001 to $50,000 $50,001 to $100,000
12.10204
12.10205 12.10206 12.10207
Category D Review Where DCP is prepared by Applicant
Category B Site Specific Amendment Preparation (New DCP site specific chapter)
12.10200
Fee for assessment of Construction Certificate applications
Category A Minor Amendment Preparation (Minor word changes - site specific)
12.10199
12.10203
Development Control Plans - Fee Assessment, preparation and/ processing of new OR amendment to current DCP, whether or not associated with a Planning Proposal, payment is due with the application. Any independent planning advice that needs to be sought will be fully funded by applicant.
12.10198
12.10202
Gosford CBD DEVELOPMENT CONTROL PLANS
Description of Fees and Charges
12.10196 12.10197
2017-18 Item Number
Per assessment
Per assessment
Per assessment
Per assessment Per assessment
Per assessment Per assessment
Per assessment
Per assessment
Per assessment Per assessment
Per assessment
Per assessment
Per assessment
Per assessment
Per assessment Per assessment
Per assessment Per assessment
Per assessment
Per assessment
Per assessment
Per assessment Per assessment Per assessment
Per application
Per plan
Per plan
Per plan
Per equivalent tenements
Unit of Measurement
3
3
3
3 3
3 3
3
3
3 3
3
3
3
3
3 3
3 3
3
3
3
3 3 3
2
2
2
2
1
Price Category
$0.00
10/11 of fee charged
10/11 of fee charged
$945.45 10/11 of fee charged
$527.27 $736.36
10/11 of fee charged
10/11 of fee charged
$736.36 10/11 of fee charged
$472.73
$368.18
10/11 of fee charged
10/11 of fee charged
$818.18 10/11 of fee charged
$418.18 $621.82
10/11 of fee charged
10/11 of fee charged
10/11 of fee charged
$263.64 $418.18 $577.27
$6,798.75 + advertising subject to full cost $13,597.50 + advertising subject to full cost $27,195.00 + advertising subject to full cost 50% of Category Fee
$3,576.90
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$3,576.90
TOTAL 2017-18 FEE (GST inclusive where applicable)
$635.00 base rate plus 0.4% of amount in excess of $100,000
$290.00 $460.00 $635.00
$900.00 $900.00 base rate plus 0.4% of the amount in excess of $100,001
$460.00 $684.00
By Quote
$810.00 $810.00 base rate plus 0.4% of the amount in excess of $100,000
$520.00
$405.00
By Quote
$580.00 $810.00
By Quote
$0.00
1/11 of fee charged
$0.00
By Quote
1/11 of fee charged $2,000.00 base rate plus 0.3% of the amount in excess of $300,000
$94.55 $1,040.00 1/11 of fee charged $1,040.00 base rate plus 0.4% of the amount in excess of $100,000
$52.73 $73.64
1/11 of fee charged
1/11 of fee charged $1,685.00 base rate plus 0.3% of the amount in excess of $300,000
$73.64 1/11 of fee charged
$47.27
$36.82
1/11 of fee charged
1/11 of fee charged $1,805.00 base rate plus 0.3% the amount in excess of $300,001
$81.82 1/11 of fee charged
$41.82 $62.18
1/11 of fee charged
1/11 of fee charged $1,520.00 base rate plus 0.3% of the amount in excess of $300,000
1/11 of fee charged
$26.36 $41.82 $57.73
$6,798.75 + advertising subject to full cost $0.00 $13,597.50 + advertising subject to full cost $0.00 $27,195.00 + advertising subject to full cost $0.00 50% of Category Fee
$0.00
$0.00
GST @ 10% Remitted to ATO (if applicable)
Regulatory Fees and Charges Paid to
175
Per application Per application Per application
$50,001 to $100,000 $100,001 to $300,000
$300,001 to $500,000 Over $500,000 Class 2 to 9 Buildings
Up to $20,000
$20,001 to $50,000
12.10239 12.10240
12.10241 12.10242 12.10243
12.10244
12.10245
Per application
$20,001 to $50,000
12.10238
$300,001 to $500,000
$500,001 to $1,000,000
Over $1,000,000
Inspection over and above the number of inspections in the service agreement
Appointment of CCCBC as the Principal Certifying Authority where CCCBC did not issue the Construction Certificate or Complying Development Certificate
Fees for amending a Construction Certificate when a development application is amended by a Section 96 application. The fees for the Construction Certificate are linked to the type of Section 96 application and the classification of the building Modification Section 96 (1) - Council error
Modification Section 96 (1) - applicants amendment
Modification Section 96 (1A) and (2) - class 1 and 10
Modification Section 96 (1A) and (2) - class 2 to 9 Fees for amending a Complying Development Certificate class 1 and 10
Class 2 to 9 Per amendment Separate to the standard fees for construction certificates, complying development certificates and critical stage inspections, Council may negotiate certification fee packages with commercial clients. Commercial clients are defined as construction companies/builders that undertake significant work either in value (generally over $500,000) or quantity (generally over 10 developments/year) within the Central Coast Council area. Council's Manager Environment and Certification may waive or reduce fees for certification packages in unique or exceptional circumstances where the fee payable is considered excessive or inappropriate. In all cases, the reduced fee will not be less than the amount required to Fee for Occupation Certificate (or interim Occupation Certificate) where a construction certificate is not required
12.10248
12.10249
12.10250
12.10251
12.10252
12.10253
12.10254
12.10255
12.10256
12.10257 12.10258
12.10259 12.10260
12.10261
Per application
Any other class of building - exceeding 2,000m2
Part building - no floor area
12.10274
12.10271
12.10273
Any other class of building - not exceeding 200m2
12.10270
Any other class of building - 201m to 2,000m
Residential (Class 1 and 10 and combinations)
12.10269
12.10272
Additional fees applicable for unauthorised works in certain circumstances - works completed in previous 24 months and applicant, or the Per certificate person on whose behalf the application is made, was responsible for the work. Maximum amount payable for application for Development Consent or Complying Development Consent PLUS maximum amount payable for application for a Construction Certificate . Amounts payable are as per the Environment Planning Acts and Regulations
12.10268
2
Fee for a Building Certificate
12.10265 12.10266 12.10267
2
Boarding house audit inspection fee Alternative solution assessment fee Bushfire attack level certificate (for Complying Development Certificate in bushfire prone areas)
12.10264
Per dwelling
1
1
1
Per dwelling
Per dwelling
1 1
Per dwelling
1
3 3 3
3
3
3
3 3
3
3
5
3
3
3
3
3
3
3
3
3
3 3
3 3
3
3
1
Price Category
Per dwelling
Per hour Per hour Per certificate
Per inspection
Occupation Certificate Re-Inspection
12.10263
Per inspection
Not obtained as part of Construction Certificate
Occupation Certificate Inspection
12.10262
Per amendment Per amendment
Per amendment
Per amendment
Per amendment
Per certificate
Per inspection
Per application
Per application
Per application
Per application
$50,001 to $100,000
$100,001 to $300,000
12.10246
12.10247
Per application
Per application Per application
Per application
Class 1 and 10 (including single dwellings)
Up to $20,000
12.10237
Fees for critical stage inspections. Where Council has issued the Construction Certificate and is the nominated Principal Certifying Authority (PCA)
12.10235
Per assessment
Unit of Measurement
12.10236
Long Service Levy - payable on all Construction Certificate and Complying Development Certificates. The Long Service Levy fee is charged at 0.35% of the value of the works
Description of Fees and Charges
12.10234
2017-18 Item Number
$250.00
$1,165.00 base rate plus $0.075 for each additional m2 over 2,000m2
$250.00 base rate plus $0.50 for each additional m2 over 200m2
$250.00
$250.00
By Quote
$165.00 $165.00 $331.82
$130.00
$175.00
$263.64
$263.64 $159.09
$145.45
$59.09
No charge
10/11 of fee charged
$136.36
10/11 of fee charged
10/11 of fee charged
$1,636.36
$1,090.91
$818.18
$686.36
$409.09
$954.55 10/11 of fee charged
$686.36 $818.18
$545.45
$409.09
$0.00
2017-18 Central Coast Council Fee
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
0.35% of the value of the works
Other Regulatory Fees and Charges
$150.00
by Quote
By Quote
$1,800.00
$1,200.00
$900.00
$755.00
$450.00
$1,050.00 by Quote
$755.00 $900.00
$600.00
$450.00
$0.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
$250.00 base rate plus $0.50 for each additional m2 over 200m2
$250.00
$250.00
By Quote
$165.00 $165.00 $365.00
$130.00
$175.00
$290.00
$290.00 $175.00
$160.00
$65.00
No charge
$0.00
$250.00
$0.00 $1,165.00 base rate plus $0.075 for each additional m2 over 2,000m2
$0.00
$0.00
$0.00
$0.00
$0.00 $0.00 $33.18
$0.00
$0.00
$26.36
$26.36 $15.91
$14.55
$5.91
$0.00
1/11 of fee charged 100% of the Construction Certificate or Complying Development Certificate fee PLUS the PCA (inspection) Services fee
$13.64
1/11 of fee charged
1/11 of fee charged
$163.64
$109.09
$81.82
$68.64
$40.91
$95.45 1/11 of fee charged
$68.64 $81.82
$54.55
$40.91
$0.00
GST @ 10% Remitted to ATO (if applicable)
Long Service Corporation
Regulatory Fees and Charges Paid to
176 Per inspection Per audit
Additional fee beyond first 75 hours - professional staff
Additional fee beyond first 75 hours - senior staff Lodgement and recording of private Construction Certificate
Lodgement and recording of private Occupation Certificate
Lodgement and recording of private Complying Development Certificates
Confirmation of commencement of consent where Council is nominated as principal certifying authority.
Fee for certificate indicating ability to utilise SEPP (exempt and complying developments codes) 2008
Preliminary review of development proposals to confirm compliance with SEPP (exempt and complying development) Codes 2008. Fee to be deducted from complying development certificate application where lodged with Central Coast Council Amount determined by the Director - the cost of the Minister, Corporation, Department or Director of doing anything referred to in that No relevant determination force - 120% of the cost of the Minister, Corporation, Department or Director of doing anything referred to in that Building specification booklet
Moved Dwelling Inspection - Within Central Coast Council Local Government Area Moved Dwelling Inspection - Adjoining Local Government Areas
Moved Dwelling Inspection - Elsewhere (e.g. Sydney) Fee for finalisation of incomplete building applications under the Local Government Act 1919 (prior to 1998) Temporary connection to sewer or building site (per IPART Final Determination May 2013)
Lodgement of Notice of Completion for the installation of a relocatable home or associated structure (Caravan Park)
Application for a Certificate of Completion and the inspection of a manufactured home and associated structure (manufactured home estate) Re-inspection required because of non compliance with the regulations at the initial inspection Application for a Certificate of Completion and the inspection of an associated structure not included on the Certificate of Completion previously issued for the manufactured home installed on the site (manufactured home estate) Re-inspection required because of non compliance with the regulations at the initial inspection
Inspection of manufactured home, moveable dwelling and/or associated structure during installation
Fire safety audit
Lodgement of Annual Fire safety statement
Sediment control signs
Development Control general administrative costs
12.10281
12.10282 12.10283
12.10284
12.10285
12.10286
12.10287
12.10288
12.10289 12.10290 12.10291
12.10292 12.10293
12.10294 12.10295 12.10296
12.10297
12.10298 12.10299 12.10300
12.10302
12.10303
12.10304
12.10305
12.10306
14. HIRE OF COUNCIL EQUIPMENT
External truck and plant hire Fee to include direct costs of plant item plus overheads Transport Infrastructure Heavy Machinery Weekly hire
Security Deposit - Base and weekly hire
13.10003 13.10004
14.10000
14.10001
14.10002
14.10005
Heavy Machinery - Base and weekly hire
15. HOLIDAY PARKS
GENERAL FEES APPLYING TO ALL HOLIDAY PARKS
Off - peak accommodation rate for ratepayers, residents and Council staff 10% discount on accommodation fees or package deals (does not include additional persons or ancillary fees)
BUDGEWOI HOLIDAY PARK Rates for ensuites, powered and unpowered sites are for two people.
14.10006
15.10000
15.10001
15.10002
15.10003
14.10003 14.10004
Biosecurity Inspection - pre-purchase inspection
Ecological Data Vegetation Mapping (ESRI) and technical reports (per northern or southern data set)
13.10002
13. ENVIRONMENT
Biosecurity
13.10001
Service fee for providing formal written advice on Exempt Development
12.10309
13.10000
Charge to recoup research and other costs
Research fee for research officer
12.10307
12.10308
12.10301
12.10279 12.10280
Per booking
Per hire
Per week Maximum 4 weeks Per hire
Per hire
Per issue
Per hour or part thereof
Per service
Per 15 minutes
Per hour
Per item
Per lodgement
Per inspection
Per application Per inspection Per application
Per lodgement
Per inspection Per inspection Per connection
Per inspection Per inspection
2
2
2
3
2
1
4
4
4
4
4
3
3
1
1 1 1
4
3 3 3
3 3
4 4 4
3
Per service Per application Per application Per document
1
4
1
1
3 1
3
3
4
4
1
Price Category
Per certificate
Per confirmation
Per application
Per application
Per hour Per application
Per hour
Per site
Per document
Per document
Wyong LEP Instruments Plus standard photocopying costs Section 94 Contribution Plans Plus standard photocopying costs Key iconic development Site fee Base fee Based on 60 hours at $193/hour (exc GST) for professional staff plus 15 hours at $397/hour (exc GST) for senior staff
12.10277
12.10278
Other fees and charges
Per document
Fee for a copy of a building certificate
Unit of Measurement
12.10276
Description of Fees and Charges
12.10275
2017-18 Item Number
10/11 of fee charged
$2,524.82
$1,261.92
$633.90
10/11 of fee charged
$150.00
$150.00
$227.27
$63.64
$120.91
$10.91
$55.00
$154.55
$200.00
$32.50
$65.00 $65.00 $32.50
$51.00
$709.09 $243.00 $60.00
$404.55 $554.55
By Quote By Quote $18.18
$227.27
$53.00
$665.00
$36.00
$36.00
$397.27 $36.00
$194.55
$17,546.36
$56.00
$111.00
$13.00
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1/11 of fee charged
$252.48
$126.19
$63.39
1/11 of fee charged
$0.00
$0.00
$22.73
$6.36
$12.09
$1.09
$0.00
$15.45
$20.00
$0.00
$0.00 $0.00 $0.00
$0.00
$70.91 $0.00 $0.00
$40.45 $55.45
$0.00 $0.00 $1.82
$22.73
$0.00
$0.00
$0.00
$0.00
$39.73 $0.00
$19.45
$1,754.64
$0.00
$0.00
$0.00
GST @ 10% Remitted to ATO (if applicable)
10% discount on accommodation fees or package deals (does not include additional persons or ancillary fees)
$2,777.30
$1,388.11
$697.29
by Quote
$150.00
$150.00
$250.00
$70.00
$133.00
$12.00
$55.00
$170.00
$220.00
$32.50
$65.00 $65.00 $32.50
$51.00
$780.00 $243.00 $60.00
$445.00 $610.00
By Quote By Quote $20.00
$250.00
$53.00
$665.00
$36.00
$36.00
$437.00 $36.00
$214.00
$19,301.00
$56.00
$111.00
$13.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
177
Powered sites - prime Nightly - 2 persons Weekly - 2 persons
Additional persons - sites Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years)
Weekly - additional adult (17 years and over) Weekly - additional child (6 to 16 years) Tourist fees - Shoulder Fees 28 Aug 2017 to 14 Dec 2017 and 28 Jan 2018 to 29 Apr 2018 Queen's Birthday (June) long weekend (Fri to Sun inclusive) Excludes Oct long weekend and Excludes Easter weekend Fees are to be paid in full prior to arrival
Powered sites Nightly - 2 persons Weekly - 2 persons Powered sites - prime Nightly - 2 persons Weekly - 2 persons Additional persons - sites Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years) Weekly - additional adult (17 years and over) Weekly - additional child (6 to 16 years)
Tourist fees - Peak Fees 15 Dec 2017 to 24 Dec 2017 and 9 Jan 2018 to 24 Jan 2018 *Daily rates apply Fees are to be paid in full prior to arrival Powered sites
15.10006 15.10007
15.10008 15.10009 15.10010
15.10011 15.10012 15.10013
15.10014 15.10015 15.10016
15.10017 15.10018 15.10019 15.10020 15.10021 15.10022 15.10023 15.10024 15.10025 15.10026 15.10027
15.10028
Nightly - additional adult (17 years and over)
Nightly - additional child (6 to 16 years)
Weekly - additional adult (17 years and over)
Weekly - additional child (6 to 16 years)
Permanents - Off-Peak Fees 1 Jul 2017 to 27 Aug 2017 and 30 Apr 2018 to 30 Jun 2018 Excludes Queen's Birthday long weekend Fees are to be paid in full prior to arrival Fees include continuous water Fees exclude electricity supply and unit/usage charges Fees are to be paid in advance on the first day of every fortnight
Cabins fees (The rate is up to 4 persons - including linen for 4)
Sheerwater
15.10044
15.10046
15.10047
15.10048
15.10049
15.10050
Powered sites - prime Nightly - 2 persons Additional persons - sites
15.10041 15.10042 15.10043
15.10045
Powered sites
Nightly - 2 persons
Weekly - additional child (6 to 16 years) Tourist fees - Premium Peak Fees 25 Dec 2017 to 8 Jan 2018 Australia Day weekend (Thu to Sat inclusive), Easter weekend (Thu to Sun inclusive) and Oct long weekend (Fri to Sun inclusive) *Daily rates apply Fees are to be paid in full prior to arrival
15.10037 15.10038
15.10040
Weekly - additional adult (17 years and over)
15.10036
15.10039
Nightly - additional adult (17 years and over)
Nightly - additional child (6 to 16 years)
15.10034
Additional persons - sites
15.10035
Nightly - 2 persons
15.10032
Powered sites - prime
15.10033
Nightly - 2 persons
15.10030
15.10031
15.10029
Powered sites
Nightly - 2 persons Weekly - 2 persons
15.10005
Tourist fees - Off-Peak Fees 1 Jul 2017 to 27 Aug 2017 and 30 Apr 2018 to 30 Jun 2018 Excludes Queen's Birthday long weekend Fees are to be paid in full prior to arrival
Description of Fees and Charges
15.10004
2017-18 Item Number
2 2 2 2
Per night Per night Per week Per week
Per week
Per week
Per night
Per night
Per night
Per night
Per week
Per week
Per night
Per night
Per night
2
2
2
2
2
2
2
2
2
2
2
2
2 2
Per night Per week
Per night
2 2
2 2
2 2
2 2
2 2
Price Category
Per night Per week
Per week Per week
Per night Per night
Per night Per week
Per night Per week
Unit of Measurement
$63.64
$95.45
$9.09
$13.64
$56.36
$52.73
$63.64
$95.45
$9.09
$13.64
$46.36
$42.73
$13.64 $9.09 $81.82 $54.55
$34.55 $207.27
$32.73 $196.36
$81.82 $54.55
$13.64 $9.09
$28.18 $169.09
$26.36 $158.18
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$6.36
$9.55
$0.91
$1.36
$5.64
$5.27
$6.36
$9.55
$0.91
$1.36
$4.64
$4.27
$1.36 $0.91 $8.18 $5.45
$3.45 $20.73
$3.27 $19.64
$8.18 $5.45
$1.36 $0.91
$2.82 $16.91
$2.64 $15.82
GST @ 10% Remitted to ATO (if applicable)
$70.00
$105.00
$10.00
$15.00
$62.00
$58.00
$70.00
$105.00
$10.00
$15.00
$51.00
$47.00
$15.00 $10.00 $90.00 $60.00
$38.00 $228.00
$36.00 $216.00
$90.00 $60.00
$15.00 $10.00
$31.00 $186.00
$29.00 $174.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
178
Weekly
Lorikeet Nightly - mid week Nightly - Fri/Sat Weekly Lorikeet Deluxe Nightly - mid week Nightly - Fri/Sat Weekly
Kingfisher Nightly - mid week
Nightly - Fri/Sat
Weekly
Additional linen hire Additional persons - cabins Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years) Weekly - additional adult (17 years and over) Weekly - additional child (6 to 16 years) Permanents - Peak Fees 15 Dec 2017 to 24 Dec 2017 and 9 Jan 2018 to 24 Jan 2018 *Daily rates apply Fees are to be paid in full prior to arrival Fees include continuous water Fees exclude electricity supply and unit/usage charges Fees are to be paid in advance on the first day of every fortnight Cabins fees (The rate is up to 4 persons - including linen for 4) Sheerwater Nightly - mid week - Garden cabin
15.10085 15.10086 15.10087 15.10088 15.10089 15.10090 15.10091 15.10092
15.10093 15.10094
15.10095
15.10096
15.10097 15.10098 15.10099 15.10100 15.10101 15.10102 15.10103
15.10104 15.10105 15.10106
15.10076 15.10077 15.10078
15.10084
Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years) Weekly - additional adult (17 years and over)
15.10071 15.10072 15.10073
Nightly - Fri/Sat Weekly Ibis Nightly - mid week Nightly - Fri/Sat
Weekly Additional linen hire
15.10069 15.10070
15.10079 15.10080 15.10081 15.10082 15.10083
Weekly Kingfisher Nightly - mid week Nightly - Fri/Sat
Weekly - additional child (6 to 16 years)
Nightly - Fri/Sat
15.10064
15.10065 15.10066 15.10067 15.10068
Permanents - Shoulder Fees 28 Aug 2017 to 14 Dec 2017 and 28 Jan 2018 to 29 Apr 2018 Queen's Birthday (June) long weekend (Fri to Sun inclusive) Excludes Oct long weekend and Excludes Easter weekend Fees are to be paid in full prior to arrival Fees include continuous water Fees exclude electricity supply and unit/usage charges Fees are to be paid in advance on the first day of every fortnight Cabins fees (The rate is up to 4 persons - including linen for 4) Sheerwater Nightly - mid week - Garden cabin
Per night
Weekly Lorikeet Deluxe Nightly - mid week
15.10061 15.10062 15.10063
15.10075
Per night
Nightly - Fri/Sat
15.10060
15.10074
2 2
Per week
Weekly Lorikeet Nightly - mid week
15.10057 15.10058 15.10059 2
Per night
Per night Per night Per week Per week
Per week
Per night
2
2 2 2 2
2
2
2
2 2 2
Per night Per night Per week Per night
2 2 2
Per night Per night Per week
2
2 2
Per night Per night Per week
2 2
2
2
2 2 2
Per night Per week
Per night
Per week
Per night Per night Per week
2
2 2
Per night Per night Per week
2
Per week
2
2
Per night Per night
2
Per week
2 2
Per night
Per night
Nightly - Fri/Sat
15.10056
2 2 2
Per night Per week
Per night
Nightly - mid week - Garden cabin
Price Category
Nightly - Fri/Sat Weekly Ibis Nightly - mid week
Unit of Measurement
15.10052 15.10053 15.10054 15.10055
Description of Fees and Charges
15.10051
2017-18 Item Number
$196.36
$18.18 $13.64 $109.09 $81.82
$943.64
$224.55
$157.27
$150.91 $209.09 $905.45
$141.82 $204.55 $850.91
$829.09
$138.18 $201.82
$180.00 $725.45
$120.91
$81.82
$18.18 $13.64 $109.09
$785.45
$130.91 $167.27
$758.18
$157.27
$126.36
$709.09
$151.82
$118.18
$687.27
$148.18
$114.55
$132.73 $616.36
$102.73
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$19.64
$1.82 $1.36 $10.91 $8.18
$94.36
$22.45
$15.73
$15.09 $20.91 $90.55
$14.18 $20.45 $85.09
$82.91
$13.82 $20.18
$18.00 $72.55
$12.09
$8.18
$1.82 $1.36 $10.91
$78.55
$13.09 $16.73
$75.82
$15.73
$12.64
$70.91
$15.18
$11.82
$68.73
$14.82
$11.45
$13.27 $61.64
$10.27
GST @ 10% Remitted to ATO (if applicable)
$216.00
$20.00 $15.00 $120.00 $90.00
$1,038.00
$247.00
$173.00
$166.00 $230.00 $996.00
$156.00 $225.00 $936.00
$912.00
$152.00 $222.00
$198.00 $798.00
$133.00
$90.00
$20.00 $15.00 $120.00
$864.00
$144.00 $184.00
$834.00
$173.00
$139.00
$780.00
$167.00
$130.00
$756.00
$163.00
$126.00
$146.00 $678.00
$113.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
179
Nightly - Fri/Sat
Kingfisher Nightly - mid week
Nightly - Fri/Sat
Additional linen hire Additional persons - cabins Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years) Weekly - additional adult (17 years and over) Weekly - additional child (6 to 16 years) Tourist fees - Premium Peak Fees 25 Dec 2017 to 8 Jan 2018 Australia Day weekend (Thu to Sat inclusive), Easter weekend (Thu to Sun inclusive) and Oct long weekend (Fri to Sun inclusive) *Daily rates apply Fees are to be paid in full prior to arrival
15.10116
15.10117 15.10118
15.10119
15.10120 15.10121 15.10122 15.10123 15.10124 15.10125 15.10126
Nightly - additional adult (17 years and over)
Nightly - additional child (6 to 16 years) Weekly - additional adult (17 years and over)
Weekly - additional child (6 to 16 years) Storage - Long Term Casual Occupants Fees are to be paid quarterly in advance on the first day of September, December, March and January
Standard Option 1 Fee includes 110 days usage within a twelve month period for up to four people per day. This fee also includes continuous water and excludes electricity (usage and service availability charge). Exceeding more than four (4) people will attract fees of $15 per adult and $9 per child per day. After using 110 days, the rate is $25.00 per day for up to eight (8) people.
Option 2 Fee includes 180 days usage within a twelve month period for up to eight (8) people per day. This fee also includes continuous water and excludes electricity (usage and service availability charge). Maximum people on site per day is not to exceed eight (8) people.
Prime Option 1 Fee includes 110 days usage within a twelve month period for up to four people per day. This fee also includes continuous water and excludes electricity (usage and service availability charge). Exceeding more than four (4) people will attract fees of $15 per adult and $9 per child per day. After using 110 days, the rate is $25.00 per day for up to eight (8) people.
Option 2 Fee includes 180 days usage within a twelve month period for up to eight (8) people per day. This fee also includes continuous water and excludes electricity (usage and service availability charge). Maximum people on site per day is not to exceed eight (8) people.
15.10148 15.10149
15.10150 15.10151
15.10152
15.10153 15.10154
15.10155
Additional persons - cabins
15.10144
15.10146 15.10147
Nightly - mid week Nightly - Fri/Sat Additional linen hire
15.10141 15.10142 15.10143
15.10145
Nightly - mid week
Nightly - Fri/Sat Kingfisher
15.10138
15.10135 15.10136 15.10137
15.10139 15.10140
Lorikeet
Nightly - mid week Nightly - Fri/Sat Lorikeet Deluxe
15.10134
Nightly - Fri/Sat
Lorikeet Deluxe Nightly - mid week
15.10114 15.10115
15.10133
Nightly - Fri/Sat
15.10113
Cabins fees (The rate is up to 4 persons - including linen for 4)
Lorikeet Nightly - mid week
15.10111 15.10112
Sheerwater Nightly - mid week - Garden cabin Nightly - Fri/Sat Ibis Nightly - mid week
Nightly - Fri/Sat
15.10110
15.10128 15.10129 15.10130 15.10131 15.10132
Ibis Nightly - mid week
15.10127
Nightly - Fri/Sat
15.10108 15.10109
Description of Fees and Charges
15.10107
2017-18 Item Number
2
Per year
Per year
Per year
Per year
Per week
Per night Per week
Per night
Per night Per night
Per night
Per night
Per night Per night
2
2
2
2
2
2 2
2
2 2
2
2
2 2
2
Per night Per night
2 2
2 2 2 2
2
2
2
2
2
2
2
2
2
Price Category
Per night Per night
Per night Per night Per week Per week
Per night
Per night
Per night
Per night
Per night
Per night
Per night
Per night
Per night
Unit of Measurement
$6,442.00
$5,751.00
$5,810.00
$5,061.00
$95.45
$13.64 $127.27
$18.18
$290.91 $290.91
$278.18
$278.18
$265.45 $265.45
$260.91
$260.91
$250.00 $250.00
$18.18 $13.64 $127.27 $95.45
$290.91
$233.64
$278.18
$229.09
$265.45
$217.27
$260.91
$207.27
$250.00
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$0.00
$0.00
$0.00
$0.00
$9.55
$1.36 $12.73
$1.82
$29.09 $29.09
$27.82
$27.82
$26.55 $26.55
$26.09
$26.09
$25.00 $25.00
$1.82 $1.36 $12.73 $9.55
$29.09
$23.36
$27.82
$22.91
$26.55
$21.73
$26.09
$20.73
$25.00
GST @ 10% Remitted to ATO (if applicable)
$6,442.00
$5,751.00
$5,810.00
$5,061.00
$105.00
$15.00 $140.00
$20.00
$320.00 $320.00
$306.00
$306.00
$292.00 $292.00
$287.00
$287.00
$275.00 $275.00
$20.00 $15.00 $140.00 $105.00
$320.00
$257.00
$306.00
$252.00
$292.00
$239.00
$287.00
$228.00
$275.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
180
4 4
Per cabin
Per cabin Per entry
Late checkout up to 2pm
Late checkout up to 5pm Late checkout after 5pm
Occupation agreement fee General fee for preparing each new Occupation agreement for storage van owners 16 amp power supply electricity charges
20 amp power supply electricity charges
Family parks membership
Additional housekeeping (linen, curtains, lounges) For when patrons ignore non smoking policy in cabin accommodation. In some circumstances cabins cannot be resold after heavy smokers check out, due to the limited time to air out the cabin, in this instance the nightly tariff would override the additional housekeeping fee
Additional cleaning (washing / cleaning lounges, linen, carpet) For additional cleaning that is required when patrons have pets in pet free accommodation. Locksmith charges For locksmith to gain entry to bad debtors vans, as required by Consumer, Trader, Tenancy, Tribunal. Local partnership/business - annual fee or $10.00 per month For local partnerships/businesses to be listed on CCHP websites. This also includes a link to their website Vehicle day use fee (minimum 2 hours) Includes use of amenities and pump out points to dispose of waste from portable toilets in all types of mobile vehicles.
15.10162 15.10163
15.10164
15.10166
15.10167
15.10168
Weekly - 2 persons Additional persons - sites
Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years)
Weekly - additional adult (17 years and over)
Weekly - additional child (6 to 16 years)
Tourist fees - Peak Fees 15 Dec 2017 to 24 Dec 2017 and 9 Jan 2018 to 24 Jan 2018 *Daily rates apply Fees are to be paid in full prior to arrival
Powered sites
15.10199 15.10200
15.10201
15.10202
15.10203
15.10204
Weekly - additional child (6 to 16 years) Tourist fees - Shoulder Fees 28 Aug 2017 to 14 Dec 2017 and 28 Jan 2018 to 29 Apr 2018 Queen's Birthday (June) long weekend (Fri to Sun inclusive) Excludes Oct long weekend and Excludes Easter weekend Fees are to be paid in full prior to arrival
15.10190 15.10191
15.10197 15.10198
Weekly - 2 persons Additional persons -sites Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years) Weekly - additional adult (17 years and over)
Weekly - 2 persons Unpowered sites Nightly - 2 persons
Nightly - 2 persons
15.10184
15.10185 15.10186 15.10187 15.10188 15.10189
15.10194 15.10195 15.10196
Weekly - 2 persons Unpowered sites
15.10182 15.10183
Powered sites
Powered sites Nightly - 2 persons
15.10180 15.10181
Nightly - 2 persons
Tourist fees - Off-Peak Fees 1 Jul 2017 to 27 Aug 2017 and 30 Apr 2018 to 30 Jun 2018 Excludes Queen's Birthday long weekend Fees are to be paid in full prior to arrival
15.10179
15.10193
Per night
Off-peak day pass for ratepayers or residents (parking not included) CANTON BEACH HOLIDAY PARK Rates for ensuites, powered and unpowered sites are for two people.
15.10176 15.10178
15.10192
Per week
Additional vehicle/boat parking yearly rate where space is available
15.10175
Per week
Per week
Per night Per night
2
2
2 2
2
2 Per week
Per night
2 2
Per week
Per night
2
2 2 2
Per night Per night Per week Per week
2
2
2
2
4
4
4
4
4
4
4
4
4
4
4
4 4
4
Per week
Per night
Per person per day
Per vehicle/boat per year
Per vehicle/boat per week
Additional vehicle/boat parking weekly rate where space is available
Per vehicle/boat per day
Additional vehicle/boat parking day rate where space is available
15.10174
Per vehicle per hour
Per year
Per year
Per quarter
Per quarter
Per agreement
15.10173
15.10172
15.10171
15.10170
15.10169
15.10165
Per site Per site
Per site
4
15.10161
Per cabin
4
Powered tourist sites
Per account
15.10160
15.10158 15.10159
Other fees and charges
Price Category
Late payment fee Levied on any account that is outstanding 7 days after payment falls due. Late checkout fee Cabin guests
Unit of Measurement
15.10156
Description of Fees and Charges
15.10157
2017-18 Item Number
$54.55
$81.82
$13.64 $9.09
$147.27
$24.55
$180.00
$30.00
$54.55
$13.64 $9.09 $81.82
$120.00
$20.00
$147.27
$24.55
$7.27
$331.82
$27.27
$4.55
$9.09
$109.09
10/11 of fee charged
$37.27
$65.45
$37.23
10/11 of fee charged
10/11 of fee charged
$47.27
$20.00 10/11 of fee charged
$15.45
$40.00
$42.73
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$5.45
$8.18
$1.36 $0.91
$14.73
$2.45
$18.00
$3.00
$5.45
$1.36 $0.91 $8.18
$12.00
$2.00
$14.73
$2.45
$0.73
$33.18
$2.73
$0.45
$0.91
$10.91
1/11 of fee charged
$3.73
$6.55
$3.72
1/11 of fee charged
1/11 of fee charged
$4.73
$2.00 1/11 of fee charged
$1.55
$4.00
$4.27
GST @ 10% Remitted to ATO (if applicable)
$60.00
$90.00
$15.00 $10.00
$162.00
$27.00
$198.00
$33.00
$60.00
$15.00 $10.00 $90.00
$132.00
$22.00
$162.00
$27.00
$8.00
$365.00
$30.00
$5.00
$10.00
$120.00
At cost +15% admin fee
$41.00
$72.00
$40.95
At cost
At cost
$52.00
$22.00 Nightly Tariff
$17.00
$44.00
$47.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
181
Unpowered sites
Nightly - 2 persons Additional persons - sites
Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years)
Weekly - additional adult (17 years and over) Weekly - additional child (6 to 16 years)
Permanents - Off-Peak Fees 1 Jul 2017 to 27 Aug 2017 and 30 Apr 2018 to 30 Jun 2018 Excludes Queen's Birthday long weekend Fees are to be paid in full prior to arrival Fees include continuous water Fees exclude electricity supply and unit/usage charges Fees are to be paid in advance on the first day of every fortnight
Cabins fees (The rate is up to 4 persons - including linen for 4) Jabiru Nightly - mid week
Nightly - Fri/Sat
Weekly
Osprey Nightly - mid week
Nightly - Fri/Sat
Weekly
Sandpiper Nightly - mid week
Nightly - Fri/Sat
Weekly
Sheerwater Nightly - mid week - 2 bedroom cabin with disabled access
Nightly - Fri/Sat
Weekly
Kingfisher Nightly - mid week - luxury 2 bedroom cabin Nightly - Fri/Sat Weekly Additional persons - cabins Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years) Weekly - additional adult (17 years and over) Weekly - additional child (6 to 16 years) Permanents - Shoulder Fees 28 Aug 2017 to 14 Dec 2017 and 28 Jan 2018 to 29 Apr 2018 Queen's Birthday (June) long weekend (Fri to Sun inclusive) Excludes Oct long weekend and Excludes Easter weekend Fees are to be paid in full prior to arrival Fees include continuous water Fees exclude electricity supply and unit/usage charges Fees are to be paid in advance on the first day of every fortnight
Cabins fees (The rate is up to 4 persons - including linen for 4) Jabiru Nightly - mid week
Nightly - Fri/Sat
Weekly
15.10217 15.10218
15.10219 15.10220
15.10221 15.10222
15.10223
15.10224 15.10225 15.10226
15.10227
15.10228
15.10229 15.10230
15.10231
15.10232
15.10233 15.10234
15.10235
15.10236
15.10237 15.10238
15.10239
15.10240
15.10241 15.10242 15.10243 15.10244 15.10245 15.10246 15.10247 15.10248 15.10249 15.10250
15.10251 15.10252 15.10253
15.10254
15.10255
Tourist fees - Premium Peak Fees 25 Dec 2017 to 8 Jan 2018 Australia Day weekend (Thu to Sat inclusive), Easter weekend (Thu to Sun inclusive) and Oct long weekend (Fri to Sun inclusive) *Daily rates apply Fees are to be paid in full prior to arrival
15.10213
15.10216
Weekly - additional child (6 to 16 years)
15.10212
Powered sites
Weekly - additional adult (17 years and over)
15.10211
Nightly - 2 persons
Nightly - additional child (6 to 16 years)
15.10210
15.10215
Unpowered sites Nightly - 2 persons Additional persons - sites Nightly - additional adult (17 years and over)
15.10214
Nightly - 2 persons
15.10206 15.10207 15.10208 15.10209
Description of Fees and Charges
15.10205
2017-18 Item Number
Per week
Per night
2
2
2
2 2 2 2
Per night Per night Per week Per week
Per night
2 2 2
2
2
2
2
2
2
2
2
2
2
2
2
2 2
2 2
2
2
2
2
Per night Per night Per week
Per week
Per night
Per night
Per week
Per night
Per night
Per week
Per night
Per night
Per week
Per night
Per night
Per week Per week
Per night Per night
Per night
Per night
Per week
Per week
2
2
Per night Per night
2
2
Price Category
Per night
Per night
Unit of Measurement
$627.27
$150.91
$104.55
$18.18 $13.64 $109.09 $81.82
$130.91 $167.27 $785.45
$643.64
$140.00
$107.27
$561.82
$117.27
$93.64
$627.27
$137.27
$104.55
$529.09
$114.55
$88.18
$95.45 $63.64
$13.64 $9.09
$42.73
$50.00
$63.64
$95.45
$9.09
$13.64
$34.55
$40.91
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$62.73
$15.09
$10.45
$1.82 $1.36 $10.91 $8.18
$13.09 $16.73 $78.55
$64.36
$14.00
$10.73
$56.18
$11.73
$9.36
$62.73
$13.73
$10.45
$52.91
$11.45
$8.82
$9.55 $6.36
$1.36 $0.91
$4.27
$5.00
$6.36
$9.55
$0.91
$1.36
$3.45
$4.09
GST @ 10% Remitted to ATO (if applicable)
$690.00
$166.00
$115.00
$20.00 $15.00 $120.00 $90.00
$144.00 $184.00 $864.00
$708.00
$154.00
$118.00
$618.00
$129.00
$103.00
$690.00
$151.00
$115.00
$582.00
$126.00
$97.00
$105.00 $70.00
$15.00 $10.00
$47.00
$55.00
$70.00
$105.00
$10.00
$15.00
$38.00
$45.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
182
2 2
Per week Per night Per night
Per night Per night
Weekly Sheerwater Nightly - mid week - 2 bedroom cabin with disabled access
Nightly - Fri/Sat
Weekly
Kingfisher Nightly - mid week - luxury 2 bedroom cabin
Nightly - Fri/Sat Weekly Additional persons - cabins Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years) Weekly - additional adult (17 years and over) Weekly - additional child (6 to 16 years) Permanents - Peak Fees 15 Dec 2017 to 24 Dec 2017 and 9 Jan 2018 to 24 Jan 2018 *Daily rates apply Fees are to be paid in full prior to arrival Fees include continuous water Fees exclude electricity supply and unit/usage charges Fees are to be paid in advance on the first day of every fortnight
Cabins fees (The rate is up to 4 persons - including linen for 4) Jabiru Nightly - mid week
Nightly - Fri/Sat Osprey Nightly - mid week
Nightly - Fri/Sat Sandpiper
15.10263 15.10264 15.10265
15.10266
15.10267
15.10268 15.10269
15.10270 15.10271 15.10272 15.10273 15.10274 15.10275 15.10276 15.10277
15.10278 15.10279 15.10280
15.10281 15.10282 15.10283
15.10284 15.10285
2
Per night Per night
Kingfisher Nightly - mid week - luxury 2 bedroom cabin
Nightly - Fri/Sat
Additional persons - cabins Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years) Weekly - additional adult (17 years and over) Weekly - additional child (6 to 16 years) Tourist fees - Premium Peak Fees 25 Dec 2017 to 8 Jan 2018 Australia Day weekend (Thu to Sat inclusive), Easter weekend (Thu to Sun inclusive) and Oct long weekend (Fri to Sun inclusive) *Daily rates apply Fees are to be paid in full prior to arrival
Cabins fees (The rate is up to 4 persons - including linen for 4) Jabiru
Nightly - mid week Nightly - Fri/Sat Osprey
15.10291 15.10292
15.10293
15.10294 15.10295 15.10296 15.10297 15.10298 15.10299
15.10300 15.10301
15.10302 15.10303 15.10304
Nightly - mid week - luxury 2 bedroom cabin
15.10314
Per night
Per night
2
2
2
Nightly - Fri/Sat Kingfisher
15.10312 15.10313
Per night
Nightly - mid week Nightly - Fri/Sat Sheerwater Nightly - mid week - 2 bedroom cabin with disabled access
15.10308 15.10309 15.10310 15.10311
2
2
2 2
2 2 2 2
2 2
Per night
2 2
Per night Per night
Per night
Nightly - mid week
Nightly - Fri/Sat Sandpiper
15.10305
15.10306 15.10307
Per night Per night Per week Per week
Per night
Per night
2 2
Per night Per night
2 2
Per night
Nightly - mid week
Nightly - Fri/Sat Sheerwater Nightly - mid week - 2 bedroom cabin with disabled access Nightly - Fri/Sat
15.10286
15.10287 15.10288 15.10289 15.10290
2
Per night 2
2
Per night
2
2 2 2 2
Per night Per night Per week Per week
Per night
2 2
2
2
Per night Per week
Per night
Per week
2
2
Per night
Per night
Nightly - Fri/Sat
15.10262
2
Per week
Weekly Sandpiper Nightly - mid week
2 2
Price Category
15.10259 15.10260 15.10261
Per night Per night
Unit of Measurement
Osprey Nightly - mid week Nightly - Fri/Sat
Description of Fees and Charges
15.10256 15.10257 15.10258
2017-18 Item Number
$290.91
$259.09
$259.09
$193.64 $193.64
$246.36
$246.36
$170.91 $170.91
$18.18 $13.64 $127.27 $95.45
$290.91
$230.00
$205.45 $259.09
$193.64
$155.45
$246.36
$197.27
$170.91
$138.18
$18.18 $13.64 $109.09 $81.82
$224.55 $943.64
$157.27
$741.82
$196.36
$123.64
$698.18
$167.27
$116.36
$725.45
$120.91 $180.00
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$29.09
$25.91
$25.91
$19.36 $19.36
$24.64
$24.64
$17.09 $17.09
$1.82 $1.36 $12.73 $9.55
$29.09
$23.00
$20.55 $25.91
$19.36
$15.55
$24.64
$19.73
$17.09
$13.82
$1.82 $1.36 $10.91 $8.18
$22.45 $94.36
$15.73
$74.18
$19.64
$12.36
$69.82
$16.73
$11.64
$72.55
$12.09 $18.00
GST @ 10% Remitted to ATO (if applicable)
$320.00
$285.00
$285.00
$213.00 $213.00
$271.00
$271.00
$188.00 $188.00
$20.00 $15.00 $140.00 $105.00
$320.00
$253.00
$226.00 $285.00
$213.00
$171.00
$271.00
$217.00
$188.00
$152.00
$20.00 $15.00 $120.00 $90.00
$247.00 $1,038.00
$173.00
$816.00
$216.00
$136.00
$768.00
$184.00
$128.00
$798.00
$133.00 $198.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
183
Late checkout up to 2pm Late checkout up to 5pm Late checkout after 5pm
16 amp power supply electricity charges
20 amp power supply electricity charges
Family parks membership Occupation agreement fee General fee for preparing each new Occupation agreement for storage van owners. Private ensuite fee Annual fee for standard sites with private ensuite.
Additional housekeeping (linen, curtains, lounges) For when patrons ignore non smoking policy in cabin accommodation. In some circumstances cabins cannot be resold after heavy smokers check out, due to the limited time to air out the cabin, in this instance the nightly tariff would override the additional housekeeping fee.
Additional cleaning (washing / cleaning lounges, linen, carpet) For additional cleaning that is required when patrons have pets in pet free accommodation. Locksmith charges For locksmith to gain entry to bad debtors vans, as required by Consumer, Trader, Tenancy, Tribunal. Local partnership/business - Annual fee or $10.00 per month For local partnerships/businesses to be listed on CCHP websites. This also includes a link to their website Vehicle day use fee (minimum 2 hours) Includes use of amenities and pump out points to dispose of waste from portable toilets in all types of mobile vehicles. Additional vehicle/boat parking day rate where space is available
15.10327 15.10328 15.10329
15.10330 15.10331 15.10332
15.10333
15.10334
15.10335 15.10336
15.10338
15.10339
Additional vehicle/boat parking yearly rate where space is available
Off-peak day pass for ratepayers or residents (parking not included)
NORAH HEAD HOLIDAY PARK Rates for ensuites, powered and unpowered sites are for two people.
Tourist fees - Off-Peak 1 Jul 2017 to 27 Aug 2017 and 30 Apr 2018 to 30 Jun 2018 Excludes Queen's Birthday long weekend Fees are to be paid in full prior to arrival Ensuite sites Nightly - 2 persons
Weekly - 2 persons
Powered sites - Standard
Nightly - 2 persons Weekly - 2 persons Powered sites - prime Nightly - 2 persons Weekly - 2 persons Unpowered sites Nightly - 2 persons Weekly - 2 persons Additional person - sites Nightly - additional adult (17 years and over)
15.10345
15.10346
15.10348
15.10349
15.10352
15.10353
15.10354 15.10355 15.10356 15.10357 15.10358 15.10359 15.10360 15.10361 15.10362 15.10363
15.10350 15.10351
Additional vehicle/boat parking weekly rate where space is available
15.10344
15.10343
15.10342
15.10341
15.10340
15.10337
Other fees and charges
Late payment fee Late payment fee of $47 will be levied on any account that is outstanding 7 days after payment falls due. Late checkout fee Cabin guests Powered tourist sites
15.10325
Option 2 Fee includes 180 days usage within a twelve month period for up to eight (8) people per day. This fee also includes continuous water and excludes electricity (usage and service availability charge). Maximum people on site per day is not to exceed eight (8) people.
15.10324
15.10326
Standard
Option 1 Fee includes 110 days usage within a twelve month period for up to four people per day. This fee also includes continuous water and excludes electricity (usage and service availability charge). Exceeding more than four (4) people will attract fees of $15 per adult and $9 per child per day. After using 110 days, the rate is $25.00 per day for up to eight (8) people.
15.10323
Additional persons - cabins Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years) Weekly - additional adult (17 years and over) Weekly - additional child (6 to 16 years) Storage - Long Term Casual Occupants Fees are to be paid quarterly in advance on the first day of September, December, March and January
15.10322
Nightly - Fri/Sat
15.10316 15.10317 15.10318 15.10319 15.10320 15.10321
Description of Fees and Charges
15.10315
2017-18 Item Number
4
Per vehicle per hour
2 2 2 2 2 2 2
Per night Per week Per night Per week Per night
2
2
4
4
4
Per night Per week
Per week
Per night
Per person per day
Per vehicle/boat per year
Per vehicle/boat per week
4
4
Per year
Per vehicle/boat per day
4 4
Per cabin
4
4
4 4
4
4
4 4 4
4
4
2
2
2 2 2 2
2
Price Category
Per entry
Per cabin
Per year
Per year Per agreement
Per quarter
Per quarter
Per site Per site Per site
Per cabin
Per account
Per year
Per year
Per night Per night Per week Per week
Per night
Unit of Measurement
$13.64
$20.91 $125.45
$28.18 $169.09
$27.27 $163.64
$234.55
$39.09
$7.27
$331.82
$27.27
$4.55
$9.09
$109.09
10/11 of fee charged
$37.27
$65.45
$449.09
$37.23 $47.27
10/11 of fee charged
10/11 of fee charged
$15.45 $20.00 10/11 of fee charged
$40.00
$42.73
$5,802.00
$5,056.00
$18.18 $13.64 $127.27 $95.45
$290.91
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$1.36
$2.09 $12.55
$2.82 $16.91
$2.73 $16.36
$23.45
$3.91
$0.73
$33.18
$2.73
$0.45
$0.91
$10.91
1/11 of fee charged
$3.73
$6.55
$44.91
$3.72 $4.73
1/11 of fee charged
1/11 of fee charged
$1.55 $2.00 1/11 of fee charged
$4.00
$4.27
$0.00
$0.00
$1.82 $1.36 $12.73 $9.55
$29.09
GST @ 10% Remitted to ATO (if applicable)
$15.00
$23.00 $138.00
$31.00 $186.00
$30.00 $180.00
$258.00
$43.00
$8.00
$365.00
$30.00
$5.00
$10.00
$120.00
At cost +15% admin fee
$41.00
$72.00
$494.00
$40.95 $52.00
At cost
At cost
$17.00 $22.00 Nightly Tariff
$44.00
$47.00
$5,802.00
$5,056.00
$20.00 $15.00 $140.00 $105.00
$320.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
184
Weekly - additional adult (17 years and over) Weekly - additional child (6 to 16 years) Tourist fees - Shoulder Fees 28 Aug 2017 to 14 Dec 2017 and 28 Jan 2018 to 29 Apr 2018 Queen's Birthday (June) long weekend (Fri to Sun inclusive) Excludes Oct long weekend and excludes Easter weekend Fees are to be paid in full prior to arrival Ensuite sites Nightly - 2 persons Weekly - 2 persons Powered sites - Standard Nightly - 2 persons Weekly - 2 persons Powered sites - prime Nightly - 2 persons Weekly - 2 persons Unpowered sites Nightly - 2 persons Weekly - 2 persons Additional person - sites Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years) Weekly - additional adult (17 years and over) Weekly - additional child (6 to 16 years) Tourist fees - Peak Fees 15 Dec 2017 to 24 Dec 2017 and 9 Jan 2018 to 27 Jan 2018 Easter weekend (Thu to Sun inclusive) October long weekend (Fri to Sun inclusive) *Daily rates apply Fees are to be paid in full prior to arrival Ensuite sites Nightly - 2 persons Powered sites - Standard Nightly - 2 persons Powered sites - prime Nightly - 2 persons Unpowered sites 2 2 2 2 2 2 2 2
Per night Per week Per night Per week Per night Per night Per week Per week
Per night Per night
Nightly - 2 persons Powered sites - Standard
Nightly - 2 persons
Powered sites - prime
15.10401 15.10402
15.10403
15.10404
Nightly - 2 persons
Unpowered sites Nightly - 2 persons
Additional person - sites
Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years) Weekly - additional adult (17 years and over)
Weekly - additional child (6 to 16 years) Permanents - Off-Peak Fees 1 Jul 2017 to 27 Aug 2017 and 30 Apr 2018 to 30 Jun 2018 Excludes Queen's Birthday long weekend Fees are to be paid in full prior to arrival Fees include continuous water Fees exclude electricity supply and unit/usage charges Fees are to be paid in advance on the first day of every fortnight
Cabins fees ( The rate is up to 4 persons - including linen for 4)
Bunkhouse - 2 to 4 persons Nightly - mid week Nightly - Fri/Sat
15.10405
15.10406 15.10407
15.10408
15.10409 15.10410 15.10411
15.10412 15.10413
15.10414
15.10415 15.10416 15.10417
15.10400
Tourist fees - Premium Peak Fees 25 Dec 2017 to 8 Jan 2018 Australia Day weekend (Thu to Sat inclusive), Easter weekend (Thu to Sun inclusive) and Oct long weekend (Fri to Sun inclusive) *Daily rates apply Fees are to be paid in full prior to arrival Ensuite sites
15.10399
Per night
Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years) Weekly - additional adult (17 years and over) Weekly - additional child (6 to 16 years)
Per night Per night
Per week
Per night Per night Per week
Per night
Per night
Per night Per night Per week Per week
Nightly - 2 persons Additional person - sites
15.10395 15.10396 15.10397 15.10398
2 2
2
2 2 2
2
2
2
2
2 2 2 2
2
2 2
Per night Per night
2
2 2
Per night Per week
Per night
2 2
2 2
2
Price Category
Per night Per week
Per week Per week
Per night
Unit of Measurement
15.10393 15.10394
15.10386 15.10387 15.10388 15.10389 15.10390 15.10391 15.10392
15.10368 15.10369 15.10370 15.10371 15.10372 15.10373 15.10374 15.10375 15.10376 15.10377 15.10378 15.10379 15.10380 15.10381 15.10382 15.10383 15.10384 15.10385
Nightly - additional child (6 to 16 years)
15.10365 15.10366 15.10367
Description of Fees and Charges
15.10364
2017-18 Item Number
$59.09 $80.00
$63.64
$13.64 $9.09 $95.45
$52.73
$70.00
$64.55
$83.64
$13.64 $9.09 $95.45 $63.64
$47.27
$65.45
$59.09
$79.09
$13.64 $9.09 $81.82 $54.55
$26.36 $158.18
$37.27 $223.64
$35.45 $212.73
$49.09 $294.55
$81.82 $54.55
$9.09
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$5.91 $8.00
$6.36
$1.36 $0.91 $9.55
$5.27
$7.00
$6.45
$8.36
$1.36 $0.91 $9.55 $6.36
$4.73
$6.55
$5.91
$7.91
$1.36 $0.91 $8.18 $5.45
$2.64 $15.82
$3.73 $22.36
$3.55 $21.27
$4.91 $29.45
$8.18 $5.45
$0.91
GST @ 10% Remitted to ATO (if applicable)
$65.00 $88.00
$70.00
$15.00 $10.00 $105.00
$58.00
$77.00
$71.00
$92.00
$15.00 $10.00 $105.00 $70.00
$52.00
$72.00
$65.00
$87.00
$15.00 $10.00 $90.00 $60.00
$29.00 $174.00
$41.00 $246.00
$39.00 $234.00
$54.00 $324.00
$90.00 $60.00
$10.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
185
Nightly - Fri/Sat
Weekly
Pelican/Osprey Nightly - mid week
Nightly - Fri/Sat Weekly Sandpiper * Includes linen for 2 persons Nightly - mid week Nightly - Fri/Sat Weekly
Sheerwater/Seagull Nightly - mid week
Nightly - Fri/Sat Weekly Kingfisher Nightly - mid week Nightly - Fri/Sat Weekly
Additional person - cabins Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years) Weekly - additional adult (17 years and over) Weekly - additional child (6 to 16 years)
15.10452
15.10453
15.10454 15.10455
15.10456 15.10457 15.10458 15.10459 15.10460 15.10461
15.10462 15.10463
15.10464 15.10465 15.10466 15.10467 15.10468 15.10469
15.10470 15.10471 15.10472 15.10473 15.10474
15.10445 15.10446 15.10447 15.10448 15.10449 15.10450 15.10451
Weekly - additional adult (17 years and over)
Weekly Additional person - cabins Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years)
15.10438 15.10439 15.10440 15.10441
Weekly - additional child (6 to 16 years) Permanents - Shoulder Fees 28 Aug 2017 to 14 Dec 2017 and 28 Jan 2018 to 29 Apr 2018 Queen's Birthday (June) long weekend (Fri to Sun inclusive) Excludes Oct long weekend and excludes Easter weekend Fees are to be paid in full prior to arrival Fees include continuous water Fees exclude electricity supply and unit/usage charges Fees are to be paid in advance on the first day of every fortnight Cabins fees ( The rate is up to 4 persons - including linen for 4) Bunkhouse - 2 to 4 persons Nightly - mid week Nightly - Fri/Sat Weekly Jabiru Nightly - mid week
Kingfisher Nightly - mid week Nightly - Fri/Sat
15.10435 15.10436 15.10437
15.10443 15.10444
Weekly
Description of Fees and Charges
15.10442
Nightly - Fri/Sat
15.10434
Nightly - Fri/Sat
15.10429
15.10433
Sandpiper * Includes linen for 2 persons Nightly - mid week
15.10427 15.10428
Weekly
Weekly
15.10426
Sheerwater/Seagull Nightly - mid week
Nightly - Fri/Sat
15.10425
15.10431 15.10432
Weekly Pelican/Osprey Nightly - mid week
15.10422 15.10423 15.10424
15.10430
Weekly Jabiru Nightly - mid week Nightly - Fri/Sat
15.10418 15.10419 15.10420 15.10421
2017-18 Item Number
2 2 2 2
2 2 2
Per night Per night Per week Per night Per night Per week Per week
2 2
Per night Per week
2
2 2 2
Per night Per night Per week Per night
2 2
2
2
Per night Per week
Per night
Per week
2
2
Per night Per night
2 2 2
2
2
Per night Per night Per week
Per week
Per week
2 2 2
Per night Per night
2 2
2
2
2
2
2
2
2
2
Per week
Per night Per night
Per week
Per night
Per night
Per week
Per night
Per night
Per week
Per night
2 2
Per night
2 2
Per night Per night Per week
2
Price Category
Per week
Unit of Measurement
$18.18 $13.64 $109.09 $81.82
$161.82 $247.27 $970.91
$207.27 $823.64
$137.27
$125.45 $188.18 $752.73
$190.00 $769.09
$128.18
$649.09
$158.18
$108.18
$71.82 $109.09 $430.91
$81.82
$109.09
$18.18 $13.64
$812.73
$135.45 $180.00
$660.00
$149.09
$110.00
$594.55
$139.09
$99.09
$649.09
$149.09
$108.18
$540.00
$90.00 $120.91
$354.55
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$1.82 $1.36 $10.91 $8.18
$16.18 $24.73 $97.09
$20.73 $82.36
$13.73
$12.55 $18.82 $75.27
$19.00 $76.91
$12.82
$64.91
$15.82
$10.82
$7.18 $10.91 $43.09
$8.18
$10.91
$1.82 $1.36
$81.27
$13.55 $18.00
$66.00
$14.91
$11.00
$59.45
$13.91
$9.91
$64.91
$14.91
$10.82
$54.00
$9.00 $12.09
$35.45
GST @ 10% Remitted to ATO (if applicable)
$20.00 $15.00 $120.00 $90.00
$178.00 $272.00 $1,068.00
$228.00 $906.00
$151.00
$138.00 $207.00 $828.00
$209.00 $846.00
$141.00
$714.00
$174.00
$119.00
$79.00 $120.00 $474.00
$90.00
$120.00
$20.00 $15.00
$894.00
$149.00 $198.00
$726.00
$164.00
$121.00
$654.00
$153.00
$109.00
$714.00
$164.00
$119.00
$594.00
$99.00 $133.00
$390.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
186
Bunkhouse - 2 to 4 persons Nightly - mid week Nightly - Fri/Sat Jabiru
Nightly - mid week Nightly - Fri/Sat Pelican/Osprey Nightly - mid week Nightly - Fri/Sat Sandpiper * Includes linen for 2 persons
Nightly - mid week Nightly - Fri/Sat Sheerwater/Seagull Nightly - mid week
Nightly - Fri/Sat Kingfisher
Nightly - mid week Nightly - Fri/Sat Additional person - cabins Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years) Weekly - additional adult (17 years and over) Weekly - additional child (6 to 16 years) Storage - Long Term Casual Occupants Fees are to be paid quarterly in advance on the first day of September, December, March and January
Standard Option 1 Fee includes 110 days usage within a twelve month period for up to four people per day. This fee also includes continuous water and excludes electricity (usage and service availability charge). Exceeding more than four (4) people will attract fees of $15 per adult and $9 per child per day. After using 110 days, the rate is $25.00 per day for up to eight (8) people.
Option 2 Fee includes 180 days usage within a twelve month period for up to eight (8) people per day. This fee also includes continuous water and excludes electricity (usage and service availability charge). Maximum people on site per day is not to exceed eight (8) people.
Other fees and charges Late payment fee Late checkout fee Cabin guests Powered tourist sites Late checkout up to 2pm Late checkout up to 5pm Late checkout after 5pm 16 amp power supply electricity charges
20 amp power supply electricity charges Top tourist parks membership Occupation agreement fee General fee for preparing each new Occupation agreement for storage van owners.
Additional housekeeping (linen, curtains, lounges) Additional cleaning (washing / cleaning lounges, linen, carpet) For additional cleaning that is required when patrons have pets in pet free accommodation. Locksmith charges For locksmith to gain entry to bad debtors vans, as required by Consumer, Trader, Tenancy, Tribunal. Local partnership/business - Annual fee or $10.00 per month Vehicle day use fee (minimum 2 hours) Off-peak day pass for ratepayers or residents (parking not included) TOOWOON BAY HOLIDAY PARK Rates for ensuites, powered and unpowered sites are for two people.
15.10477 15.10478 15.10479 15.10480
15.10481 15.10482 15.10483 15.10484 15.10485 15.10486
15.10487 15.10488 15.10489 15.10490
15.10491 15.10492
15.10493 15.10494 15.10495 15.10496 15.10497 15.10498 15.10499 15.10500
15.10501 15.10502
15.10503
15.10504 15.10505 15.10506 15.10507 15.10508 15.10509 15.10510 15.10511 15.10512
15.10513 15.10514 15.10515
15.10516 15.10517
Tourist fees - Off-Peak Fees 1 Jul 2017 to 27 Aug 2017 and 30 Apr 2018 to 30 Jun 2018 Excludes Queen's Birthday long weekend Fees are to be paid in full prior to arrival
Powered sites -Standard
15.10524
15.10525
15.10519 15.10520 15.10521 15.10523
15.10518
15.10476
Permanents - Peak 15 Dec 2017 to 27 Jan 2018 Easter weekend (Thu to Sun inclusive) October long weekend (Fri to Sun inclusive) *Daily rates apply Fees are to be paid in full prior to arrival Fees include continuous water Fees exclude electricity supply and unit/usage charges Fees are to be paid in advance on the first day of every fortnight Cabins fees ( The rate is up to 4 persons. Including linen for 4)
Description of Fees and Charges
15.10475
2017-18 Item Number
Per year Per vehicle per hour Per person per day
Per entry
Per cabin Per cabin
4 4 4
4
4 4
4 4 4
4 4 4 4
Per site Per site Per site Per quarter Per quarter Per year Per agreement
4 4
Per account
2
Per cabin
Per year
2
2 2 2 2
Per night Per night Per week Per week
Per year
2 2
Per night Per night
2
2
Per night Per night
2 2
2 2
Per night Per night Per night Per night
2 2
2 2
Price Category
Per night Per night
Per night Per night
Unit of Measurement
$109.09 $9.09 $7.27
10/11 of fee charged
$65.45 $37.27
10/11 of fee charged $33.05 $47.27
$15.45 $20.00 10/11 of fee charged 10/11 of fee charged
$38.18
$42.73
$5,745.00
$5,061.00
$18.18 $13.64 $127.27 $95.45
$309.09 $309.09
$267.27
$267.27
$204.55 $204.55
$253.64 $253.64
$179.09 $179.09
$130.00 $130.00
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$10.91 $0.91 $0.73
1/11 of fee charged
$6.55 $3.73
1/11 of fee charged $3.30 $4.73
$1.55 $2.00 1/11 of fee charged 1/11 of fee charged
$3.82
$4.27
$0.00
$0.00
$1.82 $1.36 $12.73 $9.55
$30.91 $30.91
$26.73
$26.73
$20.45 $20.45
$25.36 $25.36
$17.91 $17.91
$13.00 $13.00
GST @ 10% Remitted to ATO (if applicable)
$120.00 $10.00 $8.00
At cost +15% admin fee
$72.00 $41.00
At cost $36.35 $52.00
$17.00 $22.00 Nightly Tariff At cost
$42.00
$47.00
$5,745.00
$5,061.00
$20.00 $15.00 $140.00 $105.00
$340.00 $340.00
$294.00
$294.00
$225.00 $225.00
$279.00 $279.00
$197.00 $197.00
$143.00 $143.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
187
Weekly Ensuite sites Nightly
Weekly Additional person - sites Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years) Weekly - additional adult (17 years and over) Weekly - additional child (6 to 16 years) Tourist fees - Shoulder Fees 28 Aug 2017 to 14 Dec 2017 and 28 Jan 2018 to 29 Apr 2018 Queen's Birthday (June) long weekend (Fri to Sun inclusive) Excludes Oct long weekend and excludes Easter weekend Fees are to be paid in full prior to arrival Powered sites -Standard Nightly Weekly Powered sites - prime Nightly Weekly Ensuite sites Nightly Weekly Additional person - sites Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years) Weekly - additional adult (17 years and over) Weekly - additional child (6 to 16 years) Tourist fees - Peak Fees 15 Dec 2017 to 24 Dec 2017 and 9 Jan 2018 to 27 Jan 2018 Easter weekend (Thu to Sun inclusive) October long weekend (Fri to Sun inclusive) *Daily rates apply Fees are to be paid in full prior to arrival Powered sites -Standard Nightly - mid week Powered sites - prime
15.10530 15.10531 15.10532
15.10533 15.10534 15.10535 15.10536 15.10537 15.10538 15.10539
Powered sites -Standard Nightly - 2 persons
Powered sites - prime Nightly - 2 persons
Additional person - sites
Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years)
Weekly - additional adult (17 years and over)
Weekly - additional child (6 to 16 years)
15.10571 15.10572
15.10573
15.10574 15.10575
15.10576
15.10577
Weekly - additional child (6 to 16 years) Tourist fees - Premium Peak Fees 25 Dec 2017 to 8 Jan 2018 Australia Day weekend (Thu to Sat inclusive), Easter weekend (Thu to Sun inclusive) and Oct long weekend (Fri to Sun inclusive) *Daily rates apply Fees are to be paid in full prior to arrival
15.10565 15.10566
15.10569 15.10570
Weekly - additional adult (17 years and over)
15.10564
Ensuite sites
Nightly - additional child (6 to 16 years)
15.10563
Nightly - 2 persons
Additional person - sites Nightly - additional adult (17 years and over)
15.10561 15.10562
15.10568
Ensuite sites Nightly
15.10567
Nightly
15.10558
15.10559 15.10560
15.10555 15.10556 15.10557
15.10540 15.10541 15.10542 15.10543 15.10544 15.10545 15.10546 15.10547 15.10548 15.10549 15.10550 15.10551 15.10552 15.10553 15.10554
Nightly Weekly Powered sites - prime Nightly
Description of Fees and Charges
15.10526 15.10527 15.10528 15.10529
2017-18 Item Number
2 2 2 2 2 2
Per night Per week Per night Per night Per week Per week
Per week
Per week
Per night Per night
Per night
Per night
Per night
Per week
Per week
Per night
Per night
Per night
Per night
2
2
2 2
2
2
2
2
2
2
2
2
2
2
2 2
Per night Per week
Per night
2 2
2 2 2 2
Per night Per night Per week Per week
Per night Per week
2
2
Per night Per week
2
2
Per night Per week
2 2
Price Category
Per night Per week
Unit of Measurement
$63.64
$95.45
$13.64 $9.09
$72.73
$71.82
$83.64
$63.64
$95.45
$9.09
$13.64
$79.09
$71.82
$63.64
$13.64 $9.09 $81.82 $54.55
$51.82 $310.91
$42.73 $256.36
$38.18 $229.09
$13.64 $9.09 $81.82 $54.55
$256.36
$42.73
$207.27
$34.55
$31.82 $190.91
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$6.36
$9.55
$1.36 $0.91
$7.27
$7.18
$8.36
$6.36
$9.55
$0.91
$1.36
$7.91
$7.18
$6.36
$1.36 $0.91 $8.18 $5.45
$5.18 $31.09
$4.27 $25.64
$3.82 $22.91
$1.36 $0.91 $8.18 $5.45
$25.64
$4.27
$20.73
$3.45
$3.18 $19.09
GST @ 10% Remitted to ATO (if applicable)
$70.00
$105.00
$15.00 $10.00
$80.00
$79.00
$92.00
$70.00
$105.00
$10.00
$15.00
$87.00
$79.00
$70.00
$15.00 $10.00 $90.00 $60.00
$57.00 $342.00
$47.00 $282.00
$42.00 $252.00
$15.00 $10.00 $90.00 $60.00
$282.00
$47.00
$228.00
$38.00
$35.00 $210.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
188
Nightly - Fri/Sat Weekly Kingfisher Nightly - mid week - luxury cabin
Nightly - Fri/Sat
Weekly Beachcomber Nightly - mid week - luxury ocean view 2 bedroom cabin
Nightly - Fri/Sat Weekly
15.10591 15.10592 15.10593
15.10594 15.10595 15.10596 15.10597
15.10598
15.10599 15.10600 15.10601
15.10602 15.10603
2
Nightly - Fri/Sat
Weekly Kingfisher Nightly - mid week - luxury cabin
Nightly - Fri/Sat
Weekly Beachcomber Nightly - mid week - luxury ocean view 2 bedroom cabin
15.10625
15.10626 15.10627 15.10628
15.10629
15.10630 15.10631 15.10632
Nightly - Fri/Sat
15.10621
Weekly
Weekly Sandpiper Nightly - mid week
Ibis Nightly - mid week
Per night
Nightly - Fri/Sat
15.10617
15.10618 15.10619 15.10620
15.10623 15.10624
Per night
15.10622
2 2
Per week
Weekly Pelican/Sheerwater Nightly - mid week - Garden Villa
2
2 2 2
Per week Per night
2
Per night Per night
2
2
2
2
Per week
Per night
Per night
Per week
2
Per night Per night
2
Per week
2
2
15.10614 15.10615 15.10616
Per night
Jabiru Nightly - mid week
Nightly - Fri/Sat
2
2 2 2 2
15.10611 15.10612 Per night
Per night Per night Per week Per week
2 2
Per night Per night Per week
2
Per week
2 2
Per night Per night
2 2
Per night Per night Per week
2 2
Per week
2
2
Per night
Per night
2 2 2
Per night Per night Per week
2 2 2
Price Category
Per night Per night Per week
Unit of Measurement
15.10613
15.10610
Additional person - cabins
Weekly Ibis Nightly - mid week
15.10590
Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years) Weekly - additional adult (17 years and over) Weekly - additional child (6 to 16 years) Permanents - Shoulder Fees 28 Aug 2017 to 14 Dec 2017 and 28 Jan 2018 to 29 Apr 2018 Queen's Birthday (June) long weekend (Fri to Sun inclusive) Excludes Oct long weekend and excludes Easter weekend Fees are to be paid in full prior to arrival Fees include continuous water Fees exclude electricity supply and unit/usage charges Fees are to be paid in advance on the first day of every fortnight Cabins fees ( The rate is up to 4 persons - including linen for 4)
Nightly - Fri/Sat
15.10586 15.10587 15.10588 15.10589
15.10604
Nightly - Fri/Sat Weekly Sandpiper Nightly - mid week
15.10580 15.10581 15.10582 15.10583 15.10584 15.10585
15.10605 15.10606 15.10607 15.10608 15.10609
Cabins fees ( The rate is up to 4 persons - including linen for 4)
Jabiru Nightly - mid week Nightly - Fri/Sat Weekly Pelican/Sheerwater Nightly - mid week - Garden Villa
15.10579
Permanents - Off-Peak fees 1 Jul 2017 to 27 Aug 2017 and 30 Apr 2018 to 30 Jun 2018 Excludes Queen's Birthday long weekend Fees are to be paid in full prior to arrival Fees include continuous water Fees exclude electricity supply and unit/usage charges Fees are to be paid in advance on the first day of every fortnight
Description of Fees and Charges
15.10578
2017-18 Item Number
$195.45
$1,080.00
$269.09
$180.00
$987.27
$260.91
$164.55
$845.45
$215.45
$140.91
$867.27
$216.36
$144.55
$769.09
$190.91
$128.18
$18.18 $13.64 $109.09 $81.82
$248.18 $976.36
$162.73
$867.27
$199.09
$144.55
$195.45 $818.18
$136.36
$627.27
$148.18
$104.55
$154.55 $709.09
$118.18
$100.00 $133.64 $600.00
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$19.55
$108.00
$26.91
$18.00
$98.73
$26.09
$16.45
$84.55
$21.55
$14.09
$86.73
$21.64
$14.45
$76.91
$19.09
$12.82
$1.82 $1.36 $10.91 $8.18
$24.82 $97.64
$16.27
$86.73
$19.91
$14.45
$19.55 $81.82
$13.64
$62.73
$14.82
$10.45
$15.45 $70.91
$11.82
$10.00 $13.36 $60.00
GST @ 10% Remitted to ATO (if applicable)
$215.00
$1,188.00
$296.00
$198.00
$1,086.00
$287.00
$181.00
$930.00
$237.00
$155.00
$954.00
$238.00
$159.00
$846.00
$210.00
$141.00
$20.00 $15.00 $120.00 $90.00
$273.00 $1,074.00
$179.00
$954.00
$219.00
$159.00
$215.00 $900.00
$150.00
$690.00
$163.00
$115.00
$170.00 $780.00
$130.00
$110.00 $147.00 $660.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
189
Standard
Option 2 Fee includes 180 days usage within a twelve month period for up to eight (8) people per day. This fee also includes continuous water and excludes electricity (usage and service availability charge). Maximum people on site per day is not to exceed eight (8) people.
Prime Option 1 Fee includes 110 days usage within a twelve month period for up to four people per day. This fee also includes continuous water and excludes electricity (usage and service availability charge). Exceeding more than four (4) people will attract fees of $15 per adult and $9 per child per day. After using 110 days, the rate is $25.00 per day for up to eight (8) people.
Option 2 Fee includes 180 days usage within a twelve month period for up to eight (8) people per day. This fee also includes continuous water and excludes electricity (usage and service availability charge). Maximum people on site per day is not to exceed eight (8) people.
Other fees and charges Late payment fee Late checkout fee Cabin guests Powered tourist sites Late checkout up to 2pm Late checkout up to 5pm Late checkout after 5pm
15.10668
15.10669 15.10670
15.10671
15.10672 15.10673 15.10674 15.10675 15.10676 15.10677 15.10678 15.10679
Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years) Weekly - additional adult (17 years and over) Weekly - additional child (6 to 16 years) Storage - Long Term Casual Occupants Fees are to be paid quarterly in advance on the first day of September, December, March and January
15.10661 15.10662 15.10663 15.10664 15.10665
Option 1 Fee includes 110 days usage within a twelve month period for up to four people per day. This fee also includes continuous water and excludes electricity (usage and service availability charge). Exceeding more than four (4) people will attract fees of $15 per adult and $9 per child per day. After using 110 days, the rate is $25.00 per day for up to eight (8) people.
Additional person - cabins
15.10660
15.10667
Nightly - Fri/Sat
15.10659
15.10666
Beachcomber Nightly - mid week - luxury ocean view 2 bedroom cabin
Nightly - mid week Nightly - Fri/Sat Kingfisher
15.10652 15.10653 15.10654
15.10657 15.10658
Ibis
15.10651
Nightly - mid week - luxury cabin
Nightly - Fri/Sat Sandpiper Nightly - mid week Nightly - Fri/Sat
15.10647 15.10648 15.10649 15.10650
Nightly - Fri/Sat
Pelican/Sheerwater Nightly - mid week - Garden Villa
15.10645 15.10646
15.10655
Cabins fees ( The rate is up to 4 persons - including linen for 4) Jabiru Nightly - mid week Nightly - Fri/Sat
15.10641 15.10642 15.10643 15.10644
15.10656
Nightly - Fri/Sat Weekly Additional person - cabins Nightly - additional adult (17 years and over) Nightly - additional child (6 to 16 years) Weekly - additional adult (17 years and over) Weekly - additional child (6 to 16 years) Permanents - Peak Fees 15 Dec 2017 to 27 Jan 2018 Easter weekend (Thu to Sun inclusive) October long weekend (Fri to Sun inclusive) *Daily rates apply Fees are to be paid in full prior to arrival Fees include continuous water Fees exclude electricity supply and unit/usage charges Fees are to be paid in advance on the first day of every fortnight
Description of Fees and Charges
15.10633 15.10634 15.10635 15.10636 15.10637 15.10638 15.10639 15.10640
2017-18 Item Number
Per night
2
4 4 4 4 4
Per cabin Per site Per site Per site
2
2
2
2
2 2 2 2
2
2
2
Per account
Per year
Per year
Per year
Per year
Per night Per night Per week Per week
Per night
Per night
Per night
2 2
2 2
Per night Per night Per night Per night
2
2
2 2
2 2 2 2 2 2 2
Price Category
Per night
Per night
Per night Per night
Per night Per night Per week Per week
Per night Per week
Unit of Measurement
$15.45 $20.00 10/11 of fee charged
$40.00
$42.73
$8,024.00
$7,379.00
$6,379.00
$5,675.00
$18.18 $13.64 $127.27 $95.45
$420.91
$420.91
$326.36
$326.36
$305.45 $305.45
$226.36 $226.36
$271.82
$271.82
$213.64 $213.64
$18.18 $13.64 $109.09 $81.82
$316.36 $1,172.73
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$1.55 $2.00 1/11 of fee charged
$4.00
$4.27
$0.00
$0.00
$0.00
$0.00
$1.82 $1.36 $12.73 $9.55
$42.09
$42.09
$32.64
$32.64
$30.55 $30.55
$22.64 $22.64
$27.18
$27.18
$21.36 $21.36
$1.82 $1.36 $10.91 $8.18
$31.64 $117.27
GST @ 10% Remitted to ATO (if applicable)
$17.00 $22.00 Nightly Tariff
$44.00
$47.00
$8,024.00
$7,379.00
$6,379.00
$5,675.00
$20.00 $15.00 $140.00 $105.00
$463.00
$463.00
$359.00
$359.00
$336.00 $336.00
$249.00 $249.00
$299.00
$299.00
$235.00 $235.00
$20.00 $15.00 $120.00 $90.00
$348.00 $1,290.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
190
Peak Period December - January; Easter Long weekend and April school holidays; October Long weekend and September/October school holidays; Friday and Saturday nights from September until April (inclusive)
Non Powered Daily Peak 2017/18 Weekly Peak 2017/18 Powered Daily Peak 2017/18 Weekly Peak 2017/18
Extras 16 years or over 2017/18 Less than 16 years 2017/18 Shoulder Period Non Powered Daily Shoulder 2017/18 (2 persons) Weekly Shoulder 2017/18 (2 persons) Shoulder Period 10% of site fees only, not including extras Powered Daily Shoulder 2017/18 (2 persons)
15.10694
15.10695 15.10696 15.10697 15.10698 15.10699 15.10700
15.10701 15.10702 15.10703 15.10704 15.10705 15.10706 15.10707
Extras 16 years or over 2017/18 Less than 16 years 2017/18 Off Peak May - August Non Powered Daily Off Peak 2017/18 (2 persons) Weekly Off Peak 2017/18 (2 persons) Powered Daily Off Peak 2017/18 (2 persons) Weekly Off Peak 2017/18 (per 2 persons) Pay for 5 stay for 7 nights Extras 16 years or over 2017/18 Less than 16 years 2017/18 Key Deposit Payable on arrival where a key is issued. Total amount refundable upon key return on departure. Deposits Peak period requires a $50 deposit at time of booking, 50% payment of balance 6 months prior to arrival date and balance due 2 months prior to arrival date; Shoulder and Off-Peak periods require a deposit equal to 50% of the tariff (up to $200) at the time of making the reservation or within 7 days of making the original booking. Balance due prior to arrival.
Discount Rates 10% for group booking of non-profit organisations and schools (applies to site fee only, not extras). Maximum discount of $30 per booking. Group bookings - when there is only one administration process (confirmation letter and other communication) and only one group payment of fees. Groups must also request the group discount at time of booking and show proof of organisations registration on arrival at the camping Cancellation Fee A transfer of funds to another booking date, is applicable where Council's Booking Officer has been notified at least 30 (thirty) days prior to the proposed arrival date. Transfers made within 30 (thirty) days of the proposed arrival date will incur an administration fee. If a cancellation is made within 7 (seven) days of the proposed arrival date refunds will not be given. Cancellation are accepted by telephone (02) 4304 7621 or (02) 4379 1287 or post written notification to Patonga Bookings Officer PO Box 21, Gosford NSW 2250 Special consideration for refund requests must be made in writing and addressed to Patonga Booking Officers by email PatongaCampingGround@centralcoast.nsw.gov.au
15.10711 15.10712 15.10713 15.10714
15.10726
15.10727
15.10725
15.10721 15.10722 15.10723 15.10724
15.10715 15.10716 15.10717 15.10718 15.10719 15.10720
Weekly Shoulder 2017/18 (2 persons) Shoulder Period 10% of site fees only, not including extras
15.10710
15.10708 15.10709
15.10691 15.10693
15.10690
15.10687 15.10688 15.10689
16 amp power supply electricity charges 20 amp power supply electricity charges Top tourist parks membership Family parks membership Occupation agreement fee Private ensuite fee Local partnership/business - annual fee or $10.00 per month For local partnerships/businesses to be listed on CCHP websites. This also includes a link to their website Additional housekeeping (linen, curtains, lounges) Additional cleaning (washing / cleaning lounges, linen, carpet) Locksmith charges For locksmith to gain entry to bad debtors vans, as required by Consumer, Trader, Tenancy, Tribunal. Vehicle day use fee (minimum 2 hours) Includes use of amenities and pump out points to dispose of waste from portable toilets in all types of mobile vehicles. Off-peak day pass for ratepayers or residents (parking not included) Patonga Camping Area All site fees include 2 persons on site, extras charged as indicated.
Description of Fees and Charges
15.10680 15.10681 15.10682 15.10683 15.10684 15.10685 15.10686
2017-18 Item Number
3
3
Per booking
Per booking
3 3
3 3
Per site Per site
Per person Per person Per booking
3 3
4 4
3
Per site Per site
Per person Per person
Per site
3
3 3
Per site Per site
Per site
4 4
2 2
Per site Per site Per person Per person
2 2
4
4
4 4 4
4 4 4 4 4 4 4
Price Category
Per site Per site
Per person per day
Per vehicle per hour
Per cabin Per cabin Per entry
Per quarter Per quarter Per year Per year Per agreement Per year Per year
Unit of Measurement
10/11 of fee charged
10/11 of fee charged
$9.55 $6.82 $50.00
$24.55 $122.73
$19.55 $98.18
$9.55 $6.82
$260.00
$37.27
$29.09 $202.27
$9.55 $6.82
$51.82 $359.09
$40.91 $288.18
$7.27
$9.09
$65.45 $37.27 10/11 of fee charged
10/11 of fee charged 10/11 of fee charged $33.05 $37.23 $47.27 $436.36 $109.09
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1/11 of fee charged
1/11 of fee charged
$0.95 $0.68 $0.00
$2.45 $12.27
$1.95 $9.82
$0.95 $0.68
$26.00
$3.73
$2.91 $20.23
$0.95 $0.68
$5.18 $35.91
$4.09 $28.82
$0.73
$0.91
$6.55 $3.73 1/11 of fee charged
1/11 of fee charged 1/11 of fee charged $3.30 $3.72 $4.73 $43.64 $10.91
GST @ 10% Remitted to ATO (if applicable)
10% group booking discount up to maximum of $30 per booking
50% deposit at time of booking
$10.50 $7.50 $50.00
$27.00 $135.00
$21.50 $108.00
$10.50 $7.50
$286.00
$41.00
$32.00 $222.50
$10.50 $7.50
$57.00 $395.00
$45.00 $317.00
$8.00
$10.00
$72.00 $41.00 At cost +15% admin fee
At cost At cost $36.35 $40.95 $52.00 $480.00 $120.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
191
Cancellation Fee 2017/18 Aligned with single night off peak rate Refunds For cancellations after that period will incur an administration fee (refer to cancellation fees). No refund will be given for cancellations 7 days prior to proposed arrival date. Applications for refunds will only be accepted in writing.
Key Refund Key deposit payable on arrival where a key is issued. Total amount refundable upon key return on departure.
Key Refund 2017/18 Late Check Out Late check outs (4.00pm) are available for a fee and subject to the availability of the site. A late check out allows the customer to stay on the Late Check Out 2017/18 Patonga Tennis Courts 2017/18 Hourly rate per court - no lights
15.10729
15.10731
15.10732 15.10733
16.10001 16.10002 16.10003 16.10004 16.10005 16.10006 16.10007 16.10008 16.10009
Service Location Diagram Location of Sewer and / or Water mains in relation to a property's boundaries Sewer service Location Diagram
Sewer service Location Diagram and long section
Rates Record Statement (does not include water usage) Up to and including 5 years
More than 5 years Base fee of $30.00 for the first 30 minutes or part thereof, then $30.00 per 30 minutes thereafter
Debtors Copy of accounts or invoices
Further back than 5 years
Special Meter Reading Statement (Former Wyong)
Special Meter Reading Statement (Former Gosford) Water Billing Record Search Up to and including 5 years (Former Wyong)
Up to and including 5 years (Former Gosford) Further back than 5 years (Former Wyong)
Further back than 5 years (Former Gosford)
Government Information (Public Access) Act 2009 Access applications Application fee Per application Processing charge Up to 20 hours of processing time is covered by the initial $30 application fee for applications concerning the personal information of the Per hour applicant. Application of other types of information are charged at $30 per hour. A 50% discount on processing charges is available in certain circumstances: holders of a current pensioner concession card, full time students Per hour and non-profit organisations
17.10006
17.10008
17.10009 17.10010
17.10011
17.10012 17.10013
17.10014
17.10015
17.10016 17.10017 17.10018
17.10019 17.10020
17.10021
17.10022
17.10026
17.10023 17.10024 17.10025
17.10007
Per document
$30.00 $30.00 50% discount
1 1
$30.46 Base fee of $19.88 + $13.28 per 15 mins or part thereof $30.46 per half hour up to including 5 years
$19.87
$71.39
$60.94
$40.00
$20.00
$30.00 base rate + $30.00 per 30 mins or part thereof
$20.00
$39.74
$19.87
$56.34 $56.34
No charge $17.27
$45.00 $12.00
$16.00 $32.00 $16.00
$20.00 $55.00 $95.00 $180.00 $265.00 $580.00
$17.27 $12.27
$50.00
10/11 of fee charged
$24.55
10/11 of fee charged
2017-18 Central Coast Council Fee
1
1
1 1
1
Per document Per document Per document
1
1
4
4
4
4
1
1
1 1
3 4
Per document
Per document
Per document
Per document
Per document
Per document
Per diagram
Per diagram
Per diagram Per diagram
Property Sewerage Diagram - Up to and including A4 size Diagram showing the location of the internal house-service line, building and sewer for the property. Certified Uncertified
17.10003
17.10004 17.10005
Per agenda Per document
17. INFORMATION REQUESTS
Business Papers - Council Agenda Rates balance and ownership letter - for property owner
2 2
Per page Per page
17.10001 17.10002
2 2 2
2 2 2 2 2 2
3 5
3 3
3
3
3
3
Price Category
Per page Per page Per page
Per application Per application Per application Per application Per application Per application
Per site Per court per hour
Per refund
Per refund
Per cancellation
Per cancellation
Unit of Measurement
17.10000
16.10010 16.10011 16.10012 16.10013 16.10014 16.10015
16. INFORMATION MANAGEMENT
Paper Preparation and Conversion of Documents into Electronic Format Development Applications Up to $50,000 $50,000 to $250,000 $250,000 to $500,000 $500,000 to $1,000,000 Over $1,000,000 Over $10,000,000 Miscellaneous Documents Documents not part of lodgement process Monochrome up to A4 (Minimum PLUS $1 per page) Mixed format up to A4 (Minimum PLUS $1 per page) Monochrome up to A3 (Minimum PLUS $1 per page) PCA Document Conversion Mixed format - includes up to 10 pages maximum size A3 (Minimum PLUS $1 per page) Size A0 pages
16.10000
15.10734 15.10735
15.10730
Administration Fee for cancellation or transfer of booking Any cancellation of a booking will be charged an administration fee
Description of Fees and Charges
15.10728
2017-18 Item Number
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$19.87
$71.39
$60.94
$40.00
$20.00
$30.00 base rate + $30.00 per 30 mins or part thereof
$20.00
$39.74
$19.87
$56.34 $56.34
No charge $19.00
$45.00 $12.00
$16.00 $32.00 $16.00
$20.00 $55.00 $95.00 $180.00 $265.00 $580.00
$19.00 $13.50
$50.00
by Quote
$27.00
% of booking
TOTAL 2017-18 FEE (GST inclusive where applicable)
$0.00
$0.00
$0.00
50% discount
$30.00
$30.00
$30.46 Base fee of $19.88 + $13.28 per 15 mins or part thereof $0.00 $30.46 per half hour up to including 5 years
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 $0.00
$0.00 $1.73
$0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$1.73 $1.23
$0.00
1/11 of fee charged
$2.45
1/11 of fee charged
GST @ 10% Remitted to ATO (if applicable)
Regulatory Fees and Charges Paid to
192
Per tile (LAS) format
A4 Digital Map PDF/JPG A4 Printed Map A3 Digital Map PDF/JPG A3 Printed Map A2 Digital Map PDF/JPG A2 Printed Map A1 Digital Map PDF/JPG A1 Printed Map A0 Digital Map PDF/JPG A0 Printed Map Data Extraction on CD GIS Consultancy - Data Conversion etc Data Supply on USB
LiDAR Data (Classified) Extraction
19. LEGAL FEES
Legal costs - debt recovery Fees and charges in accordance with the Local Courts (Civil Procedure) Rules 2005 Filing fees - issue of statement - up to $10,000
Filing fees - issue of statement - $10,001 to $60,000
Filing fees - issue of Writ of Execution
Filing fees - service by agent
Fees and charges in accordance with the Bankruptcy Act 1966 Filing fees
Professional costs - preparation of process - filing Statement of Claim Debts up to $1,000
Debts between $1,001 to $5,000
18.10001 18.10002 18.10003 18.10004 18.10005 18.10006 18.10007 18.10008 18.10009 18.10010 18.10011 18.10012 18.10013
18.10014
19.10000
19.10001 19.10002 19.10003
19.10004
19.10005
19.10006
19.10007 19.10008
19.10009 19.10010
19.10011
Answering subpoena to give evidence Conduct money - $80 for the first two hours, plus employee cost per hour for each hour or part thereof after the first two hours *Cost will be dependent upon time Council office is required - up to $187 per hour Plus standard photocopying costs per page
Legal Services Professional costs on contested matters (hourly or part thereof)
Copying and reviewing documents in answer to subpoena Hourly charge $60.00 per hour
19.10035 19.10036
19.10037
Bankruptcy Bankruptcy Notice filing fee
19.10034
Garnishee
19.10024
19.10025 19.10026
Creditors Petition filing fee
As awarded
Attendance at examination order
19.10023
Professional costs - Petition dismissed Professional costs - order made Tracing fees (reasonable costs incurred) Search fees (reasonable costs incurred) Legal fees Answering subpoena for production of documents Conduct money - $80 for the first two hours, plus $105 per hour for each hour or part thereof after the first two hours Plus standard photocopying costs per page
As awarded
Professional costs - other Examination order
19.10028 19.10029 19.10030 19.10031 19.10032 19.10033
1
As awarded As awarded
Professional costs - issue of Writ of Execution Debts up to $60,000
19.10019 19.10020
19.10021 19.10022
19.10027
1
As awarded
Debts between $5,001 to $20,000
Debts over $20,000
19.10017
19.10018
1 3
Per hour Per hour
4
4
Per subpoena
Per subpoena
1 1 1 1
1
1
1
1
1
1
1
Per document As awarded Per trace Per search
Per document
Per document
As awarded As awarded
As awarded
As awarded
1
Debts between $1,001 to $5,000
As awarded As awarded
Professional costs - default judgement Debts up to $1,000
19.10014 19.10015
19.10016
1 1
As awarded As awarded
Debts between $5,001 to $20,000
Debts over $20,000
19.10012
1
1
1
1
1
1
1
2
2 2 2 2 2 2 2 2 2 2 2 2 2
1
Price Category
19.10013
As awarded
As awarded
Per document
Per document
Per document
Per document
Per document
Per digital map Per printed map Per digital map Per printed map Per digital map Per printed map Per digital map Per printed map Per digital map Per printed map Per layer Per hour Per USB
18. MAPPING - GIS DATA AND MAPS
Per review
Internal review
Unit of Measurement
17.10027
Description of Fees and Charges
18.10000
2017-18 Item Number
$60.00
$409.09
10/11 of fee charged
10/11 of fee charged
$2,033.00 $2,033.00 10/11 of Fee Charged 10/11 of Fee Charged
$0.00
$0.00
$256.36
$340.00
$340.00
$230.00
$829.55
$663.27
$497.45
$331.64
$572.73
$458.18
$343.64
$229.09
$0.00
$59.09
$0.00
$0.00
$0.00
$103.65
$7.75 $14.35 $11.00 $21.00 $45.20 $103.65 $71.65 $143.35 $90.40 $167.60 $103.65 $159.85 $6.60
$40.00
2017-18 Central Coast Council Fee
-
-
-
-
-
-
-
-
$1,215.00
$470.00
-
-
-
-
-
-
-
-
-
-
-
-
$515.00
-
$80.00
$478.00
$194.00
Other Regulatory Fees and Charges
$2,236.30 $2,236.30 By Quote By Quote
$1,215.00
$470.00
$282.00
$374.00
$374.00
$253.00
$912.50
$729.60
$547.20
$364.80
$630.00
$504.00
$378.00
$252.00
$515.00
$65.00
$80.00
$478.00
$194.00
$103.65
$7.75 $14.35 $11.00 $21.00 $45.20 $103.65 $71.65 $143.35 $90.40 $167.60 $103.65 $159.85 $6.60
$40.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
$0.00
$40.91
1/11 of fee charged
$60.00
$450.00
$80 + employee cost per hr or part thereof after first two hrs + photocopying costs
1/11 of fee charged $80 + $105 per hr or part thereof after first two hrs + photocopying costs
$203.30 $203.30 1/11 of Fee Charged 1/11 of Fee Charged
$0.00
$0.00
$25.64
$34.00
$34.00
$23.00
$82.95
$66.33
$49.75
$33.16
$57.27
$45.82
$34.36
$22.91
$0.00
$5.91
$0.00
$0.00
$0.00
$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00
GST @ 10% Remitted to ATO (if applicable)
Australian Financial Security Authority Australian Financial Security Authority
Australian Financial Security Authority
NSW Attorney Generals Department NSW Attorney Generals Department NSW Attorney Generals Department
Regulatory Fees and Charges Paid to
193
Application fee for personal information
Research fee for personal information in excess of 20hrs In accordance with GIPA regulations Research fee for non-personal information In accordance with GIPA regulations Application to review decision In accordance with GIPA regulations Application For Neighbour Details Dividing Fences Act (Nil fee for Commonwealth Pensioners)
19.10043
19.10044
General Admission Entry Fees Children 0 - 4 free, Children 5 - 9 must be supervised by a responsible adult 18yrs and over Adult Entry Children 0 - 4 years Spectator Children 5 - 18 Children under 10 yrs old must be supervised by a responsible adult 18yrs or older Sale of merchandise - Swimwear, goggles Sale of merchandise - CafĂŠ Sales Coffee, Ice and Other items Concession Pension card holders, Seniors Card Holders Group Bookings Non-school Groups (Does not include entry fees) Does not include entry fees Aqua/Adult Aqua/Adult(10) 10 visits Corporate Fitness (10) 10 visits Corporate Fitness Pool Hire Hydro Pool Adult/Sport/Social Pool hire separate charge 50m and 25m Lane Hire Wading Pool Club Carnival Bookings Centre Hire (After Hours) Pool Hire Teaching Pool User Group agreement Seasonal Charge Service Cleaning Fee Birthday Parties Slide Hire (inflatable) With 1 Staff Member School Groups School Entry School Carnival Booking Fee (includes starter) Spectators Multipasses / Swim Memberships Multipasses Adult 30 visits Concession/Child 14/U 30 visit pass 12 Month Membership Pass 12 Month Membership Pass Concession Learn to Swim Program Aqua Play 1 and 2 Mainstream and Aqua Play 3 4 per class Special Needs Lower class ratio Private Lesson 15mins
20.10001
20.10003
20.10042
20.10041
20.10028 20.10029 20.10030 20.10031 20.10032 20.10033 20.10034 20.10035 20.10036 20.10037 20.10038 20.10039 20.10040
20.10025 20.10026 20.10027
20.10019 20.10020 20.10021 20.10022 20.10023 20.10024
20.10016 20.10017 20.10018
20.10015
20.10013 20.10014
20.10011 20.10012
20.10008 20.10009 20.10010
20.10004 20.10005 20.10006 20.10007
20.10002
20. LEISURE AND LIFESTYLE (AQUATICS)
Leisure, Pool and Recreation Centre promotional offers and events for any of the above facilities, will be at the discretion of the Unit Manager and will be time limited only throughout the year GOSFORD OLYMPIC POOL
20.10000
19.10047
19.10046
19.10045
Personal Information and Privacy - Government Information (Public Access) Act 2009 - Formal GIPA 50% Discount for Commonwealth Pensioners
19.10042
19.10041
19.10040
Legal Document - Preparation (in-house)
Legal Document - Preparation (external solicitors) Price on application Legal fees relating to the alteration of a dealing affecting land Price on application Certification of a document by Public Officer or CEO
19.10039
Description of Fees and Charges
19.10038
2017-18 Item Number
1 1
Per hour Per application
2 2
Per child per lesson Per child per lesson
Per child per lesson
2
2
2 2 2 2
Per 30 visit pass Per 30 visit pass Per year Per year
Per child per lesson
2 2 2
2 2 2
2 2 2 2 2 2
2 2 2
2
2 2
2 2 2
2 2 2 2
2
Per student Per booking Per person
Per quote Per person Per hour
Per lane per hour Per hour Per day or part thereof Per hour Per hour Per year per location
Per person Per person Per person / per booking
Per person per 10 visit pass
Per person Per person per 10 visit pass
Per unit Per unit Per person
Per person Per child Per person Per child
Per offer/event
5
1
Per hour
Per application
1
Per application
3
3
Price on application Per certification
3 3
Price on application
Price Category
Per hour
Unit of Measurement
$32.30
$18.80
$13.70 $18.80
$145.73 $96.36 $551.82 $404.55
$3.64 $138.18 $2.18
10/11 of fee charged $25.00 $118.18
$28.55 $25.09 $400.00 $163.64 $45.45 $118.18
$9.45 $45.45 $4.36
$81.82
$11.45 $97.27
10/11 of fee charged 10/11 of fee charged $3.91
$5.91 No charge $2.18 $3.91
10/11 of fee charged
$16.00
$40.00
$30.00
$30.00
$30.00
$57.27
10/11 of fee charged
10/11 of fee charged
$409.09
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$0.00
$0.00
$0.00 $0.00
$14.57 $9.64 $55.18 $40.45
$0.36 $13.82 $0.22
1/11 of fee charged $2.50 $11.82
$2.85 $2.51 $40.00 $16.36 $4.55 $11.82
$0.95 $4.55 $0.44
$8.18
$1.15 $9.73
1/11 of fee charged 1/11 of fee charged $0.39
$0.59 $0.00 $0.22 $0.39
1/11 of fee charged
$0.00
$0.00
$0.00
$0.00
$0.00
$5.73
1/11 of fee charged
1/11 of fee charged
$40.91
GST @ 10% Remitted to ATO (if applicable)
$32.30
$18.80
$13.70 $18.80
$160.30 $106.00 $607.00 $445.00
$4.00 $152.00 $2.40
By quote $27.50 $130.00
$31.40 $27.60 $440.00 $180.00 $50.00 $130.00
$10.40 $50.00 $4.80
$90.00
$12.60 $107.00
Retail Price Retail Price $4.30
$6.50 No charge $2.40 $4.30
Price On Application
$16.00
$40.00
$30.00
$30.00
$30.00
$63.00
Price On Application
Price On Application
$450.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
194
20.10099
20.10098
20.10097
20.10096
20.10093 20.10094 20.10095
20.10092
20.10089 20.10090 20.10091
20.10084 20.10085 20.10086 20.10087 20.10088
20.10083
20.10079 20.10080 20.10081 20.10082
20.10078
20.10074 20.10075 20.10076 20.10077
20.10049 20.10050 20.10051 20.10052 20.10053 20.10054 20.10055 20.10056 20.10057 20.10058 20.10059 20.10060 20.10061 20.10062 20.10063 20.10064 20.10065 20.10066 20.10067 20.10068 20.10069 20.10070 20.10071 20.10072 20.10073
20.10048
20.10047
20.10046
20.10045
20.10043 20.10044
2017-18 Item Number
Monthly Debit Private based on 12 monthly deductions for 1 lesson per week
Casual Entry Adult Swim Concession/Senior Swim Child Swim 0 to 4yrs Child must be accompanied by a swimming adult Child Swim 5 to 17yrs Children under 10 yrs old must be supervised by a responsible adult 17yrs or older Refund processing fee for any approved refund Sale of merchandise - Swimwear, goggles Spa, Sauna, Steam Room Spa, Sauna, Steam Casual Includes pool entry Spa Sauna Steam Concession Includes pool entry School Groups School Group Entry School Carnival Booking Fee Sport / Fitness Groups Entry Birthday Pool Party's Non Catered (minimum 10 children) Swimming Programs Aqua Play 1 and 2 Mainstream and Aqua Play 3 4 per class Special Needs Lower class ratio Private Lesson 15 minutes 2nd Lesson per week Aqua Play and Mainstream Intensive LTS (5 consecutive lessons) Available only in School Holidays. Monthly Debit Aquaplay based on 12 monthly deductions for 1 lesson per week Monthly Debit Mainstream and Aqua Play 3 based on 12 monthly deductions for 1 lesson per week Monthly Debit Aqua Play and Mainstream based on 12 monthly deductions for additional lesson per week
2nd Lesson per week Aqua Play and Mainstream Intensive LTS (5 consecutive lessons) Available only in School Holidays. Monthly Debit Aquaplay based on 12 monthly deductions for 1 lesson per week Monthly Debit Mainstream and Aqua Play 3 based on 12 monthly deductions for 1 lesson per week Monthly Debit Aqua Play and Mainstream based on 12 monthly deductions for additional lesson per week Monthly Debit Private based on 12 monthly deductions for 1 lesson per week School Learn to Swim programs Squad Coaching Jnr Swimfit Casual Session Jnr Swimfit 4 Sessions valid 1 month Jnr Swimfit Unlimited Sessions Jnr Swimfit 10 Sessions pass Squad Bronze Casual Session Squad Bronze 4 Sessions valid 1 month Squad Bronze Unlimited Sessions 1st Child Squad Bronze Unlimited Sessions 2nd Child Squad Bronze Unlimited Sessions 3rd Child Squad Silver Casual Session Squad Silver 4 Sessions valid 1 month Squad Silver Unlimited Sessions 1st Child Squad Silver Unlimited Sessions 2nd Child Squad Silver Unlimited Sessions 3rd Child Squad Gold Casual Session Squad Gold 4 Sessions valid 1 month Squad Gold Unlimited Sessions 1st Child Squad Gold Unlimited Sessions 2nd Child Squad Gold Unlimited Sessions 3rd Child Special Olympics Special Olympics 10 session pass Adult Squad - Swim Fit PENINSULA LEISURE CENTRE
Description of Fees and Charges
2
Per person
2
Per month
2
Per month
2
2
Per month
Per month
2 2 2
2
2 2
Per child per lesson Per child per lesson Per child per lesson
Per child per lesson
Per child per lesson Per child per lesson
2 2 2 2
2
Per person
Per person Per carnival Per person Per child
2 2
2
Per child Per refund Per unit
2 2 2
Per person Per person Per child
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Per session Per month Per month Per 10 visit pass Per session Per month Per month Per month Per month Per session Per month Per month Per month Per month Per session Per month Per month Per month Per month Per session Per 10 visit pass Per session
2 2
Per child per lesson
Per month
2
Per month 2
2
Per month
Per month
2 2
Price Category
Per child per lesson Per child per lesson
Unit of Measurement
$121.13
$41.66
$70.50
$51.37
$32.30 $10.00 $16.00
$18.80
$13.70 $18.80
$3.91 $138.18 $4.55 $10.00
$5.36
$9.45
$10.00 10/11 of fee charged
$3.91
$6.73 $4.55 No charge
$17.09 $61.45 $94.55 $153.82 $20.82 $67.91 $103.36 $98.36 $93.36 $20.82 $67.91 $117.18 $110.45 $105.55 $20.82 $67.91 $138.18 $131.55 $124.82 $11.36 $96.36 $11.55
10/11 of fee charged
$121.13
$41.66
$70.50
$51.37
$10.00 $16.00
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$0.00
$0.00
$0.00
$0.00
$0.00 $0.00 $0.00
$0.00
$0.00 $0.00
$0.39 $13.82 $0.45 $1.00
$0.54
$0.95
$1.00 1/11 of fee charged
$0.39
$0.67 $0.45 $0.00
$1.71 $6.15 $9.45 $15.38 $2.08 $6.79 $10.34 $9.84 $9.34 $2.08 $6.79 $11.72 $11.05 $10.55 $2.08 $6.79 $13.82 $13.15 $12.48 $1.14 $9.64 $1.15
1/11 of fee charged
$0.00
$0.00
$0.00
$0.00
$0.00 $0.00
GST @ 10% Remitted to ATO (if applicable)
$121.13
$41.66
$70.50
$51.37
$32.30 $10.00 $16.00
$18.80
$13.70 $18.80
$4.30 $152.00 $5.00 $11.00
$5.90
$10.40
$11.00 Retail Price
$4.30
$7.40 $5.00 No charge
$18.80 $67.60 $104.00 $169.20 $22.90 $74.70 $113.70 $108.20 $102.70 $22.90 $74.70 $128.90 $121.50 $116.10 $22.90 $74.70 $152.00 $144.70 $137.30 $12.50 $106.00 $12.70
By Quote
$121.13
$41.66
$70.50
$51.37
$10.00 $16.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
195
Pool Hire 50m Pool Hire 25m Pool Hire 25m Program Pool Pool Hire Learn To Swim Pool Pool Hire Leisure Pool Club Carnival Bookings (Daily fee) Carnival Entry Fee No Pool Hire School Carnival Booking Fee (includes starter) School carnival change of pool set up (one pool change included with booking) School carnival Leisure Pool School slide hire no staff Water polo casual booking Meeting Room Hire (Pool Hall) Lane Hire 50m pool Lane Hire 25m pool Slide/Inflatable Hire (PLC) 2 Staff Supervising Slide/Inflatable Hire (PLC) 1 Staff Supervising Slide/Inflatable Hire (PLC) No Staff Memberships Gold (All areas) 12 months Gold Concession (All areas) 12 months Health Club 12 months Health Club Concession 12 months Pool Membership 12 months Pool Membership Concession 12 months Joining Fee (Direct Debit only) Membership Tag Member Transfer Crèche Gold 12 months Only available with Paid Membership Crèche 12mth Holiday Membership (weekly) Only available to customers outside local area. Corporate Memberships Rehabilitation Membership (3 months) Rehabilitation Membership pool only (3 months) Health and Fitness Gym / Group Fitness Casual Gym Casual Gym Casual concession
20.10129 20.10130 20.10131 20.10132 20.10133 20.10134 20.10135
20.10160 20.10161 20.10162 20.10163 20.10164 20.10165 20.10166
20.10158 20.10159
20.10136 20.10137 20.10138 20.10139 20.10140 20.10141 20.10142 20.10143 20.10144 20.10145 20.10146 20.10147 20.10148 20.10149 20.10150 20.10151 20.10152 20.10153 20.10154 20.10155 20.10156 20.10157
20.10125 20.10126 20.10127 20.10128
School Learn to Swim programs Squad Coaching Jnr Swimfit Casual Session Jnr Swimfit 4 Sessions valid 1 month Jnr Swimfit Unlimited Sessions Jnr Swimfit 10 Sessions pass Squad Bronze Casual Session Squad Bronze 4 Sessions valid 1 month Squad Bronze Unlimited Sessions 1st Child Squad Bronze Unlimited Sessions 2nd Child Squad Bronze Unlimited Sessions 3rd Child Squad Silver Casual Session Squad Silver 4 Sessions valid 1 month Squad Silver Unlimited Sessions 1st Child Squad Silver Unlimited Sessions 2nd Child Squad Silver Unlimited Sessions 3rd Child Squad Gold Casual Session Squad Gold 4 Sessions valid 1 month Squad Gold Unlimited Sessions 1st Child Squad Gold Unlimited Sessions 2nd Child Squad Gold Unlimited Sessions 3rd Child Special Olympics Special Olympics 10 session pass Adult Squad - Swim Fit Pool Hire Hourly rate unless specified otherwise Aquatic Centre Hire (After Hours) User groups seasonal usage fee Non Attended or Additional Booking Fee (User Group) Service Cleaning Fee
Description of Fees and Charges
20.10100 20.10101 20.10102 20.10103 20.10104 20.10105 20.10106 20.10107 20.10108 20.10109 20.10110 20.10111 20.10112 20.10113 20.10114 20.10115 20.10116 20.10117 20.10118 20.10119 20.10120 20.10121 20.10122 20.10123 20.10124
2017-18 Item Number
2 2 2
2 2
Per membership Per 3 months Per 3 months
Per session Per session
2 2
2 2 2 2 2 2 2 2 3 2
Per year Per year Per year Per year Per year Per year Per fee Per tag Per transfer Per year Per year Per week
2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2
Per day Per pool change Per booking Per session Per setup Per hour Per lane per hour Per lane per hour Per hour Per hour Per hour
Per hour Per hour Per hour Per hour Per hour Per day Per entry
2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Per session Per month Per month Per 10 visit pass Per session Per month Per month Per month Per month Per session Per month Per month Per month Per month Per session Per month Per month Per month Per month Per session Per 10 visit pass Per session
Per hour Per season Per booking Per application
2
Price Category
Per child per lesson
Unit of Measurement
$20.64 $18.64
$160.91 $474.55 $298.18
$468.18 $47.73
$963.64 $863.64 $831.82 $759.09 $613.64 $450.00 $53.64 $27.27 $22.73 $340.91
$142.04 $88.39 $88.39 $62.05 $115.50 $31.50 $31.98 $24.35 $177.27 $119.09 $61.82
$118.85 $97.85 $80.66 $80.66 $80.66 10/11 of fee charged $5.64
$328.36 $118.18 $113.64 10/11 of fee charged
$17.09 $61.45 $94.55 $153.82 $20.82 $67.91 $103.36 $98.36 $93.36 $20.82 $67.91 $117.18 $110.45 $105.55 $20.82 $67.91 $138.18 $131.55 $124.82 $11.36 $96.36 $11.55
By Quote
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
$2.06 $1.86
$16.09 $47.45 $29.82
$46.82 $4.77
$96.36 $86.36 $83.18 $75.91 $61.36 $45.00 $5.36 $2.73 $2.27 $34.09
$14.20 $8.84 $8.84 $6.20 $11.55 $3.15 $3.20 $2.43 $17.73 $11.91 $6.18
$11.88 $9.78 $8.07 $8.07 $8.07 1/11 of fee charged $0.56
$32.84 $11.82 $11.36 1/11 of fee charged
$1.71 $6.15 $9.45 $15.38 $2.08 $6.79 $10.34 $9.84 $9.34 $2.08 $6.79 $11.72 $11.05 $10.55 $2.08 $6.79 $13.82 $13.15 $12.48 $1.14 $9.64 $1.15
$0.00
GST @ 10% Remitted to ATO (if applicable)
$22.70 $20.50
$177.00 $522.00 $328.00
$515.00 $52.50
$1,060.00 $950.00 $915.00 $835.00 $675.00 $495.00 $59.00 $30.00 $25.00 $375.00
$156.24 $97.23 $97.23 $68.25 $127.05 $34.65 $35.18 $26.78 $195.00 $131.00 $68.00
$130.73 $107.63 $88.73 $88.73 $88.73 Price On Application $6.20
$361.20 $130.00 $125.00 Price On Application
$18.80 $67.60 $104.00 $169.20 $22.90 $74.70 $113.70 $108.20 $102.70 $22.90 $74.70 $128.90 $121.50 $116.10 $22.90 $74.70 $152.00 $144.70 $137.30 $12.50 $106.00 $12.70
By Quote
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
196
Children's Programs Crèche casual Member casual Fee only available to Gold members Birthday Party (pool and room usage, minimum 10 people) Sports Hall Court Hire Adult Netball, basketball, volleyball, soccer Court Hire Junior Netball, basketball, volleyball, soccer Court hire Concession Netball, basketball, volleyball, soccer Afterhours Court Hire - Corporate Rate Casual Session Senior
20.10187 20.10188 20.10189
Casual Session Junior
School Entry per student School Holiday Sports Clinics Sports Competition 45 minute game
Sports Competition 40 minute game Sports Competition 35 minute game Sports Competition 30 minute fame Sports Competition registration fee - Netball Sports Competition registration fee - Soccer After School Clinics Commercial Events Junior Sports Competitions Under 10's age group Junior Sports Competitions Under 10's age group registration fee Junior Sports Competitions 16 - 18yr age group Junior Sports Competitions 16 - 18yr age group registration fee Lifesaving Courses Pool Lifeguard Full course (includes first aid) Pool Lifeguard course Update First Aid Full course - Provide First Aid HLTAID003 First Aid Full course - Provide First Aid HLTAID004 Basic Resuscitation Course Update Room Hire Multipurpose Room Hire Crèche Room - Community Rate Crèche Room - Standard Rate BEACH LIFEGUARDING Provision of lifeguarding service or First Aid NIAGARA PARK STADIUM Adults Casual (18 years and over) Child Casual (4 - 17 years) Disability Groups School Groups (1 - 1.5 hours) Birthday Parties for up to 15 children Birthday Parties additional children
20.10198
20.10199 20.10200 20.10201
20.10202 20.10203 20.10204 20.10205 20.10206 20.10207 20.10208 20.10209 20.10210 20.10211 20.10212 20.10213 20.10214 20.10215 20.10216 20.10217 20.10218 20.10219 20.10220 20.10221 20.10222 20.10223 20.10224 20.10225 20.10226 20.10227 20.10228 20.10229 20.10230 20.10231
20.10195 20.10196 20.10197
20.10194
20.10193
20.10190 20.10191 20.10192
Personal Training 60 minutes 10 pack
Personal training - contractors hire - Full-time Personal training - contractors hire - Part-time
20.10185 20.10186
Body Analysis (30 minutes) Personal Training 30 minutes 10 pack
20.10182 20.10183
Description of Fees and Charges
20.10184
Group Fitness casual Group Fitness concession casual Aqua aerobics Aqua aerobics concession casual Seniors Programs School Group Fitness Room Hire Personal Training / Fitness Assessments Personal Training 1 person (30 minutes) Personal Training 1 person (1 hour) Personal Training 2 persons (30 minutes) Personal Training 2 persons (1 hour) Personal Training 3 persons (30 minutes) Personal Training 3 persons (1 hour) Personal Training Promotional Fee Non Member Fitness Assessment
20.10167 20.10168 20.10169 20.10170 20.10171 20.10172 20.10173 20.10174 20.10175 20.10176 20.10177 20.10178 20.10179 20.10180 20.10181
2017-18 Item Number
2 2
Per hour Per hour
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 2 2 2 2 2 2
Per team per week Per team per week Per team per week Per team competition Per team competition Per student per session Per Event Per team per game Per team competition Per team per game Per team competition Per person per course (3 day Per person per course Per person per course Per person per course Per person per course Per hour Per hour Per hour Per hour Per visit Per visit Per visit Per visit Per visit Per visit
2 2 2
2
2 2 2
2
Per hour
Per hour Per application Per session Maximum 2 hours Per session Maximum 2 hours Per student per entry Per participant Per team per week
2
2 2
2 2
2
Per person
Per 2 hours Per 2 hours
Over 20 hours per week access Under 20 hours per week access
Per 10 - 60 minute sessions
2 2
2 2 2 2 2 2 2 2
Per 30 minutes per person Per hour per person Per 30 minutes per 2 people Per hour per 2 people Per 30 minutes per 3 people Per hour per 3 people Per application Per assessment per person Per 30 minutes per person Per 10 - 30 minute sessions
2 2 2 2 2 2
Price Category
Per session Per session Per session Per session Per session Per session
Unit of Measurement
$5.00 $4.09 $4.09 $4.36 $150.00 $15.91
$83.05
$57.27 $32.73 $43.64
$440.91 $177.27 $140.91 $168.18 $68.18
$54.55 $48.18 $45.45 $61.82 $54.55 $10.00 10/11 of fee charged $39.09 $39.09 $50.00 $50.00
$4.45 $48.18 $61.82
$4.09
$163.64 10/11 of fee charged $6.73
$50.00
$50.00
$61.36
$10.00
$6.55 $4.18
$181.82 $104.55
$608.18
$39.45 $365.45
$40.45 $67.36 $50.45 $84.18 $58.82 $100.91 10/11 of fee charged $67.36
$15.09 $13.64 $15.09 $13.64 $9.09 $3.91
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$0.50 $0.41 $0.41 $0.44 $15.00 $1.59
$8.30
$5.73 $3.27 $4.36
$44.09 $17.73 $14.09 $16.82 $6.82
$5.45 $4.82 $4.55 $6.18 $5.45 $1.00 1/11 of fee charged $3.91 $3.91 $5.00 $5.00
$0.45 $4.82 $6.18
$0.41
$16.36 1/11 of fee charged $0.67
$5.00
$5.00
$6.14
$1.00
$0.65 $0.42
$18.18 $10.45
$60.82
$3.95 $36.55
$4.05 $6.74 $5.05 $8.42 $5.88 $10.09 1/11 of fee charged $6.74
$1.51 $1.36 $1.51 $1.36 $0.91 $0.39
GST @ 10% Remitted to ATO (if applicable)
$5.50 $4.50 $4.50 $4.80 $165.00 $17.50
$91.35
$63.00 $36.00 $48.00
$485.00 $195.00 $155.00 $185.00 $75.00
$60.00 $53.00 $50.00 $68.00 $60.00 $11.00 By Quote $43.00 $43.00 $55.00 $55.00
$4.90 $53.00 $68.00
$4.50
$180.00 By Quote $7.40
$55.00
$55.00
$67.50
$11.00
$7.20 $4.60
$200.00 $115.00
$669.00
$43.40 $402.00
$44.50 $74.10 $55.50 $92.60 $64.70 $111.00 Price on application $74.10
$16.60 $15.00 $16.60 $15.00 $10.00 $4.30
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
197
Family Membership - Fitness and Learn to Swim + Plus 1 Family Membership - Fitness and Learn to Swim + Plus 2 Rehabilitation Membership Memberships Promotional Fee Joining Fee One-off payable upon membership Sale of merchandise - Fitness equipment Sale of merchandise - Café Sales Coffee, Ice and Other items Health and Fitness Casual Usage Casual Gym Usage Concession $15.50 Full rate $19.00 Casual Group Fitness Class Concession $15.50 Full rate $19.00 Casual Seniors Visit
Fitness Passport per visit cost Personal Training 30 Minute Session Dependent on the number of sessions purchased - less than 10 sessions will be $36 per session - greater than 10 sessions will be $33 per session Bootcamp Non- member Bootcamp Member
Bootcamp Renewal Other Activities Learn to Play Inclusion Programs School PE Birthday Party Kindy Fun Sports Competitions Junior Netball Senior Netball Junior Basketball Senior Basketball Squash Dodgeball Court Hire Crèche Hire TOUKLEY POOL Casual Entry
20.10257 20.10258 20.10259 20.10260 20.10261
20.10268 20.10269 20.10270
20.10271 20.10272
20.10273 20.10274 20.10275 20.10276 20.10277 20.10278 20.10279 20.10280 20.10281 20.10282 20.10283 20.10284 20.10285 20.10286 20.10287 20.10288 20.10289 20.10290
20.10267
20.10266
20.10262 20.10263 20.10264 20.10265
Family Membership - Fitness and Learn to Swim (dependent on the length of commitment to the membership)
Vacation Care with lunch Vacation Care with no lunch Special Event Hire - standard up to 10 hours Special Event Hire - additional hours above 10 Special Event Excess Rubbish Removal Court Hire - Standard Court Hire - Community Rate (Subject to Manager Approval) Meeting Room / Foyer Hire - Standard Meeting Room / Foyer Hire - Standard Meeting Room / Foyer Hire - Community Rate (subject to Manager Approval) School Reward Day with lunch School Reward Day with no lunch Dance Studio Hire Dance Studio Day Hire Office Rent - Youth For Christ Café Rent - SPAR (Canteen) LAKE HAVEN RECREATION CENTRE Health and Fitness Memberships Health Club Membership (dependent on the length of commitment to the membership) Health Club Concession Health Club Concession (Teen) Foundation Membership Corporate Membership Family Membership - Fitness Only (dependent on the length of commitment to the membership)
Description of Fees and Charges
20.10256
20.10251 20.10252 20.10253 20.10254 20.10255
20.10232 20.10233 20.10234 20.10235 20.10236 20.10237 20.10238 20.10239 20.10240 20.10241 20.10242 20.10243 20.10244 20.10245 20.10246 20.10247 20.10248 20.10249 20.10250
2017-18 Item Number
2 2 2 2 2 2 2 2 2 2 2 2 2 2
Per term Per term Per guest Per guest Per term Per game Per game Per game Per game Per game Per game Per hour Per hour
2 2
Per program (8-10 weeks)
Per program (8-10 weeks) Per program (8-10 weeks)
2
Per session
2 2
Per visit Per visit
2
2
Per visit
Per visit
2 2
2 2 2 2 2
2
Per item Per item
Per year Per year Per 3 months Per membership Per person
Per year
$34.55 $46.36 $38.64 $45.91 $16.82 $38.64 $45.45 $14.55
$98.37 $945.45 $4.55 $15.73 $53.64
$140.91
$190.91 $154.55
10/11 of fee charged
$3.91
$6.82
10/11 of fee charged
10/11 of fee charged
10/11 of fee charged 10/11 of fee charged
10/11 of fee charged 10/11 of fee charged $356.36 10/11 of fee charged $53.64
10/11 of fee charged
$627.27 $441.18 10/11 of fee charged 10/11 of fee charged 10/11 of fee charged
10/11 of fee charged
2 2 2 2 2
2 2
Per year Per year Per year Per year Per year Per year
$12.73 $10.45 $1,200.00 $120.00 $136.36 $43.64 $40.91 $27.27 $136.36 $20.91 $11.82 $9.55 $181.82 $50.00 $1,909.09 $2,045.45
2017-18 Central Coast Council Fee
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Price Category
Per visit Per visit Per day Per additional hour Per pick up Per hour Per hour Per hour Per day Per hour Per visit Per visit Per week Per day Per month Per month
Unit of Measurement
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$3.45 $4.64 $3.86 $4.59 $1.68 $3.86 $4.55 $1.45
$9.84 $94.55 $0.45 $1.57 $5.36
$14.09
$19.09 $15.45
1/11 of fee charged
$0.39
$0.68
1/11 of fee charged
1/11 of fee charged
1/11 of fee charged 1/11 of fee charged
1/11 of fee charged 1/11 of fee charged $35.64 1/11 of fee charged $5.36
1/11 of fee charged
$62.73 $44.12 1/11 of fee charged 1/11 of fee charged 1/11 of fee charged
1/11 of fee charged
$1.27 $1.05 $120.00 $12.00 $13.64 $4.36 $4.09 $2.73 $13.64 $2.09 $1.18 $0.95 $18.18 $5.00 $190.91 $204.55
GST @ 10% Remitted to ATO (if applicable)
$38.00 $51.00 $42.50 $50.50 $18.50 $42.50 $50.00 $16.00
$108.21 $1,040.00 $5.00 $17.30 $59.00
$155.00
$210.00 $170.00
Prices range between $33.00 and $36.00
$4.30
$7.50
Prices range between $15.50 and $19.00
Prices range between $15.50 and $19.00
Retail Price Retail Price
By Quote By Quote $392.00 By Quote $59.00
Prices range between $2,350 and $2,500
Prices range between $636.00 and $954.00 $690.00 $485.30 By Quote By Quote Prices range between $1,530 and $1,724
$14.00 $11.50 $1,320.00 $132.00 $150.00 $48.00 $45.00 $30.00 $150.00 $23.00 $13.00 $10.50 $200.00 $55.00 $2,100.00 $2,250.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
198
20.10348 20.10349 20.10350 20.10351 20.10352 20.10353 20.10354 20.10355 20.10356 20.10357 20.10358
20.10314 20.10315 20.10316 20.10317 20.10318 20.10319 20.10320 20.10321 20.10322 20.10323 20.10324 20.10325 20.10326 20.10327 20.10328 20.10329 20.10330 20.10331 20.10332 20.10333 20.10334 20.10335 20.10336 20.10337 20.10338 20.10339 20.10340 20.10341 20.10342 20.10343 20.10344 20.10345 20.10346 20.10347
20.10291 20.10292 20.10293 20.10294 20.10295 20.10296 20.10297 20.10298 20.10299 20.10300 20.10301 20.10302 20.10303 20.10304 20.10305 20.10306 20.10307 20.10308 20.10309 20.10310 20.10311 20.10312 20.10313
2017-18 Item Number
Multi Visit 10 Visit aqua pass 10 visit aqua pass concession 10 visit master 20 visit 20 Visit Concession 4 visit silver/gold 8 Visit bronze 8 visit pool pass THE ENTRANCE OCEAN BATHS Pool Hire
Adult Swim Child 0-4 Child/Concession Spectator Family Schools Visit Aqua aerobics Aqua aerobics concession Sale of merchandise - Swimwear, goggles Sale of merchandise - CafĂŠ Sales Coffee, Ice and Other items Memberships Adult Aqua Master Child Concession Family Aquatic Education / Learn to Swim Mainstream Lessons Mainstream Lessons Per fortnight Private Learn to Swim 15mins per fortnight Private Learn to Swim 30mins per fortnight Swim Ability per fortnight Squads Dependent on the number of swimming sessions per week Multi Visit 10 Visit aqua pass 10 visit aqua pass concession 10 visit master 20 visit 20 Visit Concession 4 visit silver/gold 8 Visit bronze 8 visit pool pass WYONG POOL Casual Entry Adult Swim Child 0-4 Child/Concession Spectator Family Schools Visit Aqua aerobics Aqua aerobics concession Sale of merchandise - Swimwear, goggles Sale of merchandise - CafĂŠ Sales Coffee, Ice and Other items Memberships Adult Aqua Master Child Concession Family Aquatic Education / Learn to Swim Mainstream Lessons Mainstream Lessons Per fortnight Private Learn to Swim 15mins per fortnight Private Learn to Swim 30mins per fortnight Swim Ability per fortnight Squads Dependent on the number of swimming sessions per week
Description of Fees and Charges
2
Per hire
2 2 2 2 2 2
Per lesson Per fortnight Per fortnight Per fortnight Per fortnight Per month
2 2 2 2 2 2 2 2
2 2 2 2 2
Per year Per year Per year Per year Per year
Per 10 visit pass Per 10 visit pass Per 10 visit pass Per 20 visit pass Per 20 visit pass Per 4 visit pass Per 8 visit pass Per 8 visit pass
2 2 2 2 2 2 2 2 2 2
Per visit Per visit Per visit Per visit Per visit Per visit Per visit Per visit Per item Per item
2 2 2 2 2 2
Per lesson Per fortnight Per fortnight Per fortnight Per fortnight Per month
2 2 2 2 2 2 2 2
2 2 2 2 2
Per year Per year Per year Per year Per year
Per 10 visit pass Per 10 visit pass Per 10 visit pass Per 20 visit pass Per 20 visit pass Per 4 visit pass Per 8 visit pass Per 8 visit pass
2 2 2 2 2 2 2 2 2 2
Price Category
Per visit Per visit Per visit Per visit Per visit Per visit Per visit Per visit Per item Per item
Unit of Measurement
10/11 of fee charged
$116.36 $87.27 $50.91 $96.36 $52.73 $68.18 $77.27 $40.00
$16.30 $30.50 $53.00 $106.00 $22.50 10/11 of fee charged
$363.64 $977.27 $180.91 $180.91 $618.18
$4.82 No charge $2.64 $2.09 $13.45 $2.64 $9.73 $12.55 10/11 of fee charged 10/11 of fee charged
$116.36 $87.27 $50.91 $96.36 $52.73 $68.18 $77.27 $40.00
$16.30 $30.50 $53.00 $106.00 $22.50 10/11 of fee charged
$363.64 $977.27 $180.91 $180.91 $618.18
$4.82 No charge $2.64 $2.09 $13.45 $2.64 $9.73 $12.55 10/11 of fee charged 10/11 of fee charged
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
$400.00 $1,075.00 $199.00 $199.00 $680.00
$5.30 No charge $2.90 $2.30 $14.80 $2.90 $10.70 $13.80 Retail Price Retail Price
TOTAL 2017-18 FEE (GST inclusive where applicable)
1/11 of fee charged
$11.64 $8.73 $5.09 $9.64 $5.27 $6.82 $7.73 $4.00
$0.00 $0.00 $0.00 $0.00 $0.00 1/11 of fee charged
$36.36 $97.73 $18.09 $18.09 $61.82
$0.48 $0.00 $0.26 $0.21 $1.35 $0.26 $0.97 $1.25 1/11 of fee charged 1/11 of fee charged
$11.64 $8.73 $5.09 $9.64 $5.27 $6.82 $7.73 $4.00
By Quote
$128.00 $96.00 $56.00 $106.00 $58.00 $75.00 $85.00 $44.00
$16.30 $30.50 $53.00 $106.00 $22.50 Prices range between $60.00 and $160.00
$400.00 $1,075.00 $199.00 $199.00 $680.00
$5.30 No charge $2.90 $2.30 $14.80 $2.90 $10.70 $13.80 Retail Price Retail Price
$128.00 $96.00 $56.00 $106.00 $58.00 $75.00 $85.00 $44.00
$0.00 $16.30 $0.00 $30.50 $0.00 $53.00 $0.00 $106.00 $0.00 $22.50 1/11 of fee charged Prices range between $60 and $160
$36.36 $97.73 $18.09 $18.09 $61.82
$0.48 $0.00 $0.26 $0.21 $1.35 $0.26 $0.97 $1.25 1/11 of fee charged 1/11 of fee charged
GST @ 10% Remitted to ATO (if applicable)
Regulatory Fees and Charges Paid to
199
Reapplication of item identification such as RFID tags, barcodes, spine labels and room labels
Reservation (for items on loan, nil if item available at any branch) Reservation - senior citizens/children (under 18) (for items on loan, nil if item available at any branch)
Replacement card Photocopying (coin operated)
A4 black and white
A4 colour
A3 black and white
A3 colour
Printing from PC (Self service) A4 black and white
A4 colour
A3 black and white
A3 colour
Sale of discarded books (or as approved by the Manager, Director or Chief Executive Officer)
Inter-library loans charged per item when sourced from a NSW public library (additional fee of $16.50 when the item can only be sourced from outside the public library system) Calico bags USB flash drives 4GB Ear buds (Earphones) Room hire - not-for-profit
Room hire - commercial
Room hire exemption - applies to students showing their student card and pensioners showing their pension card only - only during business Language learning kits - lost/damaged CDs
21.10002
21.10003 21.10004
21.10005 21.10006
21.10007
21.10008
21.10009
21.10010
21.10011 21.10012
21.10013
21.10014
21.10015
21.10016
21.10017
21.10022
21.10023 21.10024
Greater than 12 sites (per site)
17 sites or less
Greater than 17 sites (per site)
Food Shops Annual Administration charge
22.10008
22.10009
22.10010
22.10011
22.10014
22.10015
Temporary food business â&#x20AC;&#x201C; annual approval to operate Per temporary food business. Applies to commercial food businesses and does not apply to food operations carried out by community service or charitable organisations. Annual approval to operate Per approval
22.10013
Per premises
Improvement notice served under Food Act
Re-inspection - registered premises
22.10012
Per premises
Per inspection
Per inspection
Per site
Per inspection
12 sites or less
22.10007
Per application
12 sites or less
Per application
Greater than 12 sites (per site) Per site Re-inspection required because of non-compliance with the Local Government (Manufactured Home Estates, Caravan Parks, Camping Grounds and Moveable Dwellings) Regulation 2005 at the initial inspection
22.10002 22.10003
22.10004
The fee for an application for approval under the Local Government Act not part of a development application Application for the initial approval to operate under Section 68 F2 or F3 for a caravan park, camping ground or manufactured home estate. Not part of development application
22.10001
Per item
Per item
Per item
Each Each
Per person/family per workshop
Per CD
Per hour Per CD
Per hour
Each Per item Per item Per hour
Per loan
Per 3 items
Per page
Per page
Per page
Per page
Per page
Per page
Per page
Per page
Each
Per item Per item
Per item
Per item
Unit of Measurement
22.10005 22.10006
22. LICENCES PERMITS AND INSPECTIONS
Application under Section 68 of the Local Government Act 1993
22.10000
4-6 yrs old, 75% Cost PLUS fee (Fee PLUS 75% Replacement Cost)
< 3 yrs old, Full Cost PLUS fee (Fee PLUS Replacement Cost)
21.10030
> 6 yrs old, 50% Cost PLUS fee (Fee PLUS 50% Replacement Cost)
Short Story Anthology Local History Publications Damaged Items To be determined by Library Services Manager depending on condition of book Includes $12 Processing fee
21.10027 21.10028 21.10029
21.10032
Library programs - prices are based on activity (up to a maximum of $25.00)
21.10031
Audio books - lost/damaged CDs
21.10025
21.10026
21.10018 21.10019 21.10020 21.10021
21. LIBRARY SERVICES
Lost library resources
21.10001
Description of Fees and Charges
21.10000
2017-18 Item Number
3
3
1
1
1
1
1
1
1
3
3
3
3
4 4 3
5
4
5 4
5
4 4 4 5
5
5
5
5
5
5
5
5
5
5
5
5 5
4
4
Price Category
$185.00
$235.00
$330.00
$3.75
$65.00
$5.40
$65.00
$5.40
$65.00
$65.00
10/11 of fee charged
10/11 of fee charged
10/11 of fee charged
10/11 of fee charged 10/11 of fee charged
10/11 of fee charged
10/11 of fee charged
$0.00 10/11 of fee charged
$21.82
$4.09 $10.00 $1.91 $10.91
$4.55
$3.18
$2.27
$0.55
$1.36
$0.18
$2.27
$0.55
$1.36
$0.18
$0.91
$1.82 $0.91
$1.82
10/11 of fee charged
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$24.00
$4.50 $11.00 $2.10 $12.00
$5.00
$3.50
$2.50
$0.60
$1.50
$0.20
$2.50
$0.60
$1.50
$0.20
$1.00
$2.00 $1.00
$2.00
Replacement cost plus $12 administration fee
TOTAL 2017-18 FEE (GST inclusive where applicable)
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
1/11 of fee charged
1/11 of fee charged
1/11 of fee charged
$185.00
$235.00
$330.00
$3.75
$65.00
$5.40
$65.00
$5.40
$65.00
$65.00
At cost +$12.00 processing fee At 75% cost +$12.00 processing fee At 50% cost +$12.00 processing fee
$0.00 No charge 1/11 of fee charged $7.40 processing fee plus $7.40 for each CD 1/11 of fee charged $7.40 processing Fee plus $7.40 for each CD 1/11 of fee charged Maximum $25.00 based on activity 1/11 of fee charged At cost 1/11 of fee charged At cost +15% admin fee
$2.18
$0.41 $1.00 $0.19 $1.09
$0.45
$0.32
$0.23
$0.05
$0.14
$0.02
$0.23
$0.05
$0.14
$0.02
$0.09
$0.18 $0.09
$0.18
1/11 of fee charged
GST @ 10% Remitted to ATO (if applicable)
Regulatory Fees and Charges Paid to
200
Domestic
Commercial
Application to alter an existing sewage management facility Inspection fees
Pre-purchase Inspection of domestic or commercial On-site sewage management system On-site sewage management system audit re-inspection (Applicable when the schedule of works has not been complied with) Additional expenses
Laboratory testing and travelling time
Alterations to Existing On Site Sewage Management System Reinspection of Major Commercial OSSM System Treating more than 2000 litres of effluent per day. Multiple systems (one allotment) Inspections New Waste Systems or Alterations, Hawkesbury River - access by water only
22.10032
22.10033
22.10034 22.10035
22.10036 22.10037
22.10039
22.10040 22.10041
OSSM Plumbing and Drainage inspection fees Inspection of plumbing and drainage work to ensure compliance with prescribed standards New Connection - On-site Sewage Management Inspection of new connections to an On-site Sewage Management system, and other connections where inspection of the connection to the Onsite Sewage Management system is required (e.g demolition and rebuild of previously connected property) Includes allowance for 1 WC. Alterations/Additions - On-site Sewage Management Inspection of alternations and extensions to internal plumbing, where no inspection of junction is required Includes allowance for 1 WC Additional WC (toilet) Reinspection fee Each additional inspection following identification of non-compliant plumbing and drainage work Rainwater tank Inspection of rainwater tank(s) and associated plumbing where there is a connection from the tank to internal plumbing Plumbing and drainage inspections in unsewered areas
22.10050
Alterations
Additional inspections
Protection of the Environment Act - cost recovery charges Recovery costs for regulatory services under the Protection of the Environment Operations Act 1997. Management
Senior technical Technical
22.10052 22.10053
22.10054
22.10055
22.10056
22.10058 22.10059
Administrative
Recovery of cost of entry and inspection for enforcement action - base rate $194.00 first hour plus $42.00 per 15 min thereafter
Noise monitoring
Fee for clean up, prevention and noise control notices
The following amount is payable under Section 94(2), 100 (2) or 267A of the Act in respect of a notice issued
Street vending licences
Outdoor dining eating areas
Roads Act 1993 Application Fee
22.10060
22.10061
22.10062
22.10063
22.10064
22.10065
22.10066
22.10067
22.10057
Residential - single dwellings, villas and units
Caravans and mobile homes Commercial/Industrial
22.10051
22.10049
22.10047 22.10048
22.10046
22.10045
22.10044
22.10042 22.10043
22.10038
Application for renewal of approval to operate sewage management facility
Domestic Commercial Application to install or construct a sewage management facility
22.10029 22.10030 22.10031
Commercial
Description of Fees and Charges
22.10028
Domestic
22.10026
On-Site sewage management fees
22.10025
22.10027
Mortuaries/Crematoriums
22.10024
22.10020 22.10021
Hairdressers/Beauty Salons/Barbers
Food shops - high risk Food shops - pubs and Clubs (bar only)
22.10019
Skin Penetration
Food shops - medium risk
22.10018
22.10023
Food shops - low risk
22.10017
22.10022
Single event approval to operate
Business Inspections
22.10016
2017-18 Item Number
Per year
Per notice
Per site
Per hour (or part thereof)
Per hour
Per hour Per hour
Per hour
Per inspection
Per permit
Per permit Per unit
Per unit
Per property
Per property Per property
Per property
Per property
Per additional system Per inspection
Per application
Per sample
Per property Per inspection
Per application
Per application
Per application
Per application Per application
Per application
Per application
Per premises
Per premises
Per premises
Per inspection Per inspection
Per inspection
Per inspection
Per approval
Unit of Measurement
5
1
4
5
3
3 3
3
1
1
1 1
1
1
1 1
1
1
5 5
5
4
4 4
4
4
4
4 4
5
5
3
3
3
3 3
3
3
3
Price Category
$4.55
$492.00
$186.36
10/11 of fee charged
$126.36
$204.55 $154.55
$259.09
$60.93
$82.76 $164.25 plus $47.68 per water closet $195.00
$164.25
$50.00
$25.00 $50.00
$235.00
$260.00
$50.00 $180.00 + costs for water taxi
$375.00
$225.00
$195.00 $145.00
$225.00
$900.00
$644.00
$52.00 $114.00
$230.00
$62.00
$170.00
$170.00
$159.00
$230.00 $108.00
$195.00
$165.00
$90.00
2017-18 Central Coast Council Fee
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$76.36
Other Regulatory Fees and Charges
$375.00
$225.00
$195.00 $145.00
$225.00
$900.00
$644.00
$52.00 $114.00
$230.00
$62.00
$170.00
$170.00
$159.00
$230.00 $108.00
$195.00
$165.00
$90.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
$8.09
$0.00
$18.64
1/11 of fee charged
$12.64
$20.45 $15.45
$25.91
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$89.00
$492.00
$205.00
$195.00 Base Rate plus time costs
$139.00
$225.00 $170.00
$285.00
$60.93
$82.76 $164.25 plus $47.68 per water closet $195.00
$164.25
$50.00
$25.00 $50.00
$235.00
$260.00
$0.00 $50.00 $0.00 $180.00 + costs for water taxi
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00
GST @ 10% Remitted to ATO (if applicable)
Regulatory Fees and Charges Paid to
201
Footpath hire Fixed Structure Application (Outdoor dining area only)
Environmental Health Written advice regarding registered premises Public Health Act 2010 (issue of prohibition order given to an occupier of premises at which there is a regulated system) Including re-inspection Public Health Act 2010 (issue of an improvement notice in any other case) Including re-inspection Microbial control (Cooling Towers) Single regulated system on premises Analysis of water sample per premises (by request of owner or operator) Market Cost Places of Shared Accommodation - Review of Safety Provisions 1-10 Occupants 11 or more occupants Reinspection fee
22.10071 22.10072 22.10073
Initial Compliance Investigation for Registered Boarding Houses Required under the provisions of Part 2 Division 4 of the Boarding Houses Act 2012 1-10 Occupants 11 or more occupants Reinspection fee
General Recovery of Cost of Entry and Inspection for Enforcement Action Recovery of Cost of Entry and Inspection for enforcement action under and Section 197 of the Local Government Act.
General Services Transportation to the site via a water taxi
Community Partnerships Busking licence application fee
Temporary Licensing of A Trade or Business on Open Space Areas Application Fee An application fee will be charged per licence. Transfer Fee A transfer fee will be charged per licence to the Licensee in the event of a sale of the business. Licence Fee Penalty Fee Administered by Property and Asset Management Department, All fines and/or cost recovery is at the discretion of the Senior Manager First Offence Second Offence Hire and Drive Operators Temporary Licence Avoca Lagoon, Gosford Waterfront Temporary Licence Terrigal Lagoon Stages Hire - delivery and transport costs only Medium Stage (4.2x2.4m x 1m) Medium stage delivery and pick up - same day only Mobile (modular) Stage (4.2x2.4mx1m) Daily hire only - if delivery and/or pick-up required outside of business hours, overtime rate applies. Security Deposit Overtime Rate (If applicable) (this fee is applied on top of stage hire fee when delivery/pick-up is required to occur outside normal working hours) Filming Ultra Low Impact Application Fee Fees in accordance with Local Government Filming Protocol Low Impact Application Fee Fees in accordance with Local Government Filming Protocol Medium Impact Application Fee Fees in accordance with Local Government Filming Protocol High Impact Application Fee Fees in accordance with Local Government Filming Protocol Security Deposit filming Late Application and Cancellation Fees Cancellation Fee If event is cancelled prior to two weeks from event date
22.10086 22.10087
22.10088 22.10089
22.10090 22.10091
22.10092 22.10093
22.10112 22.10113 22.10114
22.10111
22.10110
22.10109
22.10107 22.10108
22.10105 22.10106
22.10104
22.10103
22.10102
22.10101
22.10097 22.10098 22.10099 22.10100
22.10095 22.10096
22.10094
22.10083 22.10084 22.10085
22.10082
22.10078 22.10079 22.10080 22.10081
22.10075 22.10076 22.10077
22.10074
All outdoor eating areas
22.10069 22.10070
Description of Fees and Charges
22.10068
2017-18 Item Number
2
2
1
Per application
Per event
1
Per application
5
1
Per application
Per item
1
Per application
5 3
3 Per deposit Per instance
3
Same Day Pick up and Return
2 2
Per location up to 12 months Per location up to 12 months
Daily Hire Only
2 2
maximum maximum
Per site
2
Per transfer
5
2
2
2 2 2
2 2 2
Per application
Per 6 monthly licence
Per trip
Per inspection
Per premise Per premise Per hour
Per premise Per premise Per hour
2 2
1
Per notice
Per premise Per premise
2 1
5 3
5
Price Category
Per premises Per notice
Per square metre per week Per application
Per application
Unit of Measurement
$70.45
$650.00
Price on application
Price on application
Price on application
Price on application
$678.00 $616.36
$272.73
$272.73
$3,136.36
$3,909.09
$275.00 $355.00
10/11 of fee charged
$204.55
$72.73
$9.09
10/11 of fee charged
$210.00 base rate (1st Hour Minimum) + $50.00 per 15 minutes thereafter
$410.00 $580.00 $215.00 base rate (Minimum 1st hour) PLUS $50.00 per 15 minutes thereafter
$410.00 $580.00 $215.00 base rate (Minimum 1st hour) PLUS $50.00 per 15 minutes thereafter
$300.00 By Quote
$270.00
$450.00 $560.00
$1.64 $462.00
$318.18
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$7.05
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 $61.64
$27.27
$27.27
$313.64
$390.91
$0.00 $0.00
1/11 of fee charged
$20.45
$7.27
$0.91
1/11 of fee charged
$0.00
$0.00 $0.00 $0.00
$0.00 $0.00 $0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.16 $0.00
$31.82
GST @ 10% Remitted to ATO (if applicable)
$77.50
$650.00
Price on application
Price on application
Price on application
Price on application
$678.00 $678.00
$300.00
$300.00
$3,450.00
$4,300.00
$275.00 $355.00
Price on application
$225.00
$80.00
$10.00
Current PCA fee PLUS cost of water taxi each inspection
$210.00 base rate (1st Hour Minimum) + $50.00 per 15 minutes thereafter
$410.00 $580.00 $215.00 base rate (Minimum 1st hour) PLUS $50.00 per 15 minutes thereafter
$410.00 $580.00 $215.00 base rate (Minimum 1st hour) PLUS $50.00 per 15 minutes thereafter
$300.00 By Quote
$270.00
$450.00 $560.00
$1.80 $462.00
$350.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
202
Advertising (Where VPA not advertised as part of a DA, Planning Proposal or DCP)
Review of Voluntary Planning Agreement
Planning Proposal Applications (to prepare a Local Environmental Plan) Applications Environmental Planning and Assessment Act 1979 Category E Major Application (Master Plan - developing zone and planning controls - sites greater than 5ha) Includes 1 x Advertising event
Gosford Visitor Wharf Full Day
Half Day
Ferry Operator Levy Levy to cover commercial operators using Council's wharves Property Facilities and Asset Management Application and Licence Fees (Use of Council Land)
22.10136
22.10138 22.10139
22.10140
22.10141
Refundable Key Deposit (applies to any access) Key must be returned within 1 week of completion Key/Lock Replacement Fee (applies to any access) If facility requires to be re-keyed, full cost recovery will be applied Base Hire Fee (1 week) Does not include Key allocation (refer to key deposit) 1 Day Access Fee (maximum 1 day) Access for the purposes of to get ride on lawn mower out, furniture delivery, etc Weekly Hire fee (after base rate) Does not include Key allocation (refer to key deposit) Maximum up to 26 weeks Security Deposit - (1 day access) Security Deposit - Base and weekly hire Heavy Machinery (greater or equal to 5 tonne) 1 Day Access Fee Base hire fee (1 week) Weekly Hire fee (after base rate) Does not include Key allocation (refer to key deposit) Maximum up to 26 weeks Security Deposit - (1 day access) Security Deposit - Base and Weekly Hire Voluntary Planning Agreement Voluntary Planning Agreement Environmental Planning and Assessment Act 1979 Subdivision 2. Where Voluntary Planning Agreement is offered by applicant, fee payment for assessment and processing is due with the application. Fee payable with application If VPA is supported by Council all associated solicitors and registration fees are payable by the applicant, plus Advertising subject to full cost recovery
22.10135
23. MISCELLANEOUS
23.10000
22.10152
22.10151
22.10149
22.10150
St Hubert's Island - Canal Pontoons and Moorings Pursuant to Council Resolution (Min 4-99 19.1.1999) commenced following gazettal of LEP 383 on 19.11.99. Boat ramps, pontoons and moorings subject to a DA consent.
22.10146
Boat Ramps Establish Initial Licence 1 or 2 vessels only Price on application (equal to fee charged by the solicitor on the panel engaged to prepare the licence) (Approx.. $1,200 - $1,600) Replacement of Current Licence (change of name/alteration etc) 1 or 2 vessels only Pontoon/Walkway Structure (max 2 vessels moored) 1 or 2 vessels only Pontoon/Walkway Structure (max 2 vessels moored) 1 or 2 vessels only Mooring Space/Pontoon > 2 Vessels Greater than 2 vessels moored, a charge, in addition to the Annual Fee, applies to the issue of a Licence. The charge equals the amount charged by Solicitors to prepare the Licence.
Land Only - Community Organisation Lease or Licence
22.10145
22.10147 22.10148
Buildings - Community Organisation Lease or Licence
22.10144
22.10142 22.10143
22.10137
Unit of Measurement
2
2 2 2 2
Per Licence Per non shared licence Per shared licence Per vessel per year
2
5
Per application
Per application
5
2
Per instance
Per application
2
2
2
2
2
2
2 2
Per full day, 12-24 hours 10am10am Per half day, 0-12 hours 10am-10pm
Per application
Per agreement
Per agreement
Per application
Per deposit Per deposit
2 2 2 2 2 2
Per week Per deposit Per deposit Per hire Per day Per week Per week
2 2
Per week Per day
2 3
Per deposit
2
Price Category
Per key/lock
Late Application Fee Per event When application is received within 8 weeks of event date (Non refundable) Temporary Access Access over reserves is approved by the Co-ordinator of Passive Open Space, Parks and Playgrounds Officer or Natural Resources officer. Deposit and fee set is dependant upon the size of the project, duration, impact on the community and the likelihood of damage. Heavy machinery fees and charges apply in those situations when vehicle/s accessing reserve is greater than or equal to 5 tonne. Please note: Access over reserves cannot always be granted due to environmental, infrastructure, social impacts on reserve users etc . Any requirements for access associated with a DA need to be reviewed at DA assessment stage. A minimum of 10 working days is required for processing of application. If access is not utilised, refund of fees will not be given. Security deposits will be refunded on return of keys and after inspection of reserve.
Description of Fees and Charges
22.10134
22.10133
22.10129 22.10130 22.10131 22.10132
22.10123 22.10124 22.10125 22.10126 22.10127 22.10128
22.10122
22.10121
22.10120
22.10119
22.10118
22.10116 22.10117
22.10115
2017-18 Item Number
$400.00
$400.00
$843.00
$129.00
Price on application
$434.55
$434.55
$4,772.73
$22.73
$31.82
$49,445.45
$1,131.14
$472.50
$1,244.25
$1,000.00 $2,700.00
$500.00 $1,333.00 $0.00 $120.00 $683.00 $70.00
$70.00
$120.00
$252.00
$1,131.14
$200.00
$145.45
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$0.00
$0.00
$0.00
$0.00
$0.00
$43.45
$43.45
$477.27
$2.27
$3.18
$4,944.55
$113.11
$47.25
$0.00
$0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00
$0.00
$0.00
$113.11
$0.00
$14.55
GST @ 10% Remitted to ATO (if applicable)
$400.00
$400.00
$843.00
$129.00
Price on application
$478.00
$478.00
$5,250.00
$25.00
$35.00
$54,390.00
$1,244.25
$519.75
$1,244.25
$1,000.00 $2,700.00
$120.00 $683.00 $70.00
$500.00 $1,333.00
$70.00
$120.00
$252.00
$1,244.25
$200.00
$160.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
203
A4 Single sided - automatic printing
A4 Single sided - manual printing from hard copy files A4 Double sided - automatic printing
A3 Single sided - automatic printing
A3 Single sided - manual printing from hard copy file A3 Double sided - automatic printing Photocopying/printing (colour)
24.10003
24.10004 24.10005
24.10006
24.10007 24.10008 24.10009
1-5 photographs scanned to CD
One video burnt to DVD Multiple photographs scanned to CD - Price on application
24.10021
24.10022 24.10023
Per hour
Per document
Per DVD Per CD
Per CD
Per email
Per page in excess of 3 pages
A3
Per set of 3 pages (or part thereof)
Per page in excess of 3 pages
Plan printing (hard copy to hard copy) A0
A0:A3
A1
A1:A3
B1
B1:A3 B2
B2:A3 Scanning (from hardcopy, microfiche or microfilm to electronic) (Charges amounting to $5.00 or less will be waived) A4 A3 A0 A1 B1
24.10029 24.10030 24.10031 24.10032 24.10033 24.10034 24.10035
24.10036
24.10037
24.10038
24.10039
24.10040 24.10041
24.10042
24.10043
24.10044
24.10045
24.10046 24.10047
24.10048 24.10049
24.10050 24.10051 24.10052 24.10053 24.10054
Paper Preparation and Conversion of Documents into Electronic Format Council encourages electronic receipt therefore Conversion Fees will NOT apply if documents are received electronically Mapping - GIS Photocopying Charges (including research) Printing Services Printing and copying charges Printing house plans from microfilm or microfilm to hard copy A4 Per set of 3 pages (or part thereof)
24.10028
24.10027
Per page Per page Per page Per page Per page
Per page
Per page Per page
Per page
Per page
Per page
Per page
Per page
Per page
Per 3 page set
Per page
Per 3 page set
Per item
Copy of Call Recording. No charge for statutory organisations Per call NOTE: Must be authorised by the Section Manager. Not all calls are recorded. The recording will be provided in .WAV format and supplied on a CD for collection. Banner Stand Booking Fee Per booking
Email of photograph (jpeg or bitmap file)
24.10020
24.10026
Other graphic design and print services Desktop publishing
24.10018 24.10019
Per document Per document
Receipt and Recording of Certificates issued by Private Certifiers Fee for Council to register certificates issued by Private Certifiers
Thermal bind
24.10017
24.10025
Binding Strip binders
24.10015 24.10016
Copy of Council documents Item available free of charge on Council's website Hardcopies provided per page as per Photocopying charges
Request for more than 200 copies - quotation provided on application
24.10014
Per page
Per page
Per page
Per page
Per page Per page
Per page
Per page Per page
Per page
Per entry
Per document
Unit of Measurement
24.10024
A3 Single sided - automatic printing
A3 Double sided - automatic printing
24.10012
24.10013
A4 Single sided - automatic printing
Photocopying/printing (black and white)
24.10002
A4 Double sided - automatic printing
CUSTOMER CONTACT
24.10001
24.10011
24. PRINTING, COPYING, SCANNING AND DESIGN
24.10010
Competition entry fee - includes printing, framing and mounting of selected digital entries
23.10003
24.10000
Postage for non-compliance with Council requirements
EXPOSURE Photographic Competition
23.10002
Description of Fees and Charges
23.10001
2017-18 Item Number
5 5 5 5 5
5
5 5
5
5
5
5
5
5
5
5
5
5
2
1
3
3 3
3
3
3
3
3
3
3
3
3
3 3
3
3 3
3
5
4
Price Category
$0.30 $0.30 $2.10 $1.60 $1.60
$14.00
$16.00 $16.00
$18.00
$16.00
$18.00
$18.00
$20.00
$16.40
$16.40
$14.35
$14.35
$23.64
$45.00
$36.00
No charge
$30.00 10/11 of fee charged
$10.45
$10.00
$111.82
$2.91
$4.55
$5.00
$2.45
$2.95
$1.41
$1.14 $0.77
$0.59
$0.77 $0.59
$0.41
$54.55
$13.64
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2.36
$0.00
$0.00
$0.00
$3.00 1/11 of fee charged
$1.05
$1.00
$11.18
$0.29
$0.45
$0.50
$0.25
$0.30
$0.14
$0.11 $0.08
$0.06
$0.08 $0.06
$0.04
$5.45
$1.36
GST @ 10% Remitted to ATO (if applicable)
$0.30 $0.30 $2.10 $1.60 $1.60
$14.00
$16.00 $16.00
$18.00
$16.00
$18.00
$18.00
$20.00
$16.40
$16.40
$14.35
$14.35
$26.00
$45.00
$36.00
No charge
$33.00 By Quote
$11.50
$11.00
$123.00
$3.20
$5.00
$5.50
$2.70
$3.25
$1.55
$1.25 $0.85
$0.65
$0.85 $0.65
$0.45
$60.00
$15.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
204
Executive Leadership Team
Unit Manager
25.10001
25.10003
25.10005
Inspection fee per visit
Roads Engineering
Roads and Transport Banner Installation Where traffic control, hire of EWP is required Community Directional Signs Signage Dimensions subject to Council Approval Delineation Line marking for private driveway Road Widening Certificates Spray sealing works Vehicular Access Crossing/s Application Includes Inspection Fee Concrete Footpath Approvals Footpath Paving Footpath paving - Ratepayers contribution under Section 217(2) of the Roads Act 1993 Per lineal metre based on 1.5m width - can be proportional adjusted as required
Kerb and Guttering - Ratepayers contribution under Section 217(2) of the Roads Act 1993
Road Opening and Reinstatement Concrete footpath minimum 100mm thick - minimum 5 square metres Coloured concrete footpath - minimum 5 square metres Vehicular Crossing - minimum 5 square metres Heavy Vehicular Crossing - minimum 5 square metres Bitumen surface footpaths - minimum 5 square metres Footpath Pavers - minimum 5 square metres Footpath Pavers on Concrete - minimum 5 square metres Concrete in roads - minimum 5 square metres A/C pave - minimum 5 square metres A/C pave over concrete - minimum 5 square metres Gravel/Metal pavement or shoulder of constructed roads Saw cutting where opening is not sawn Prior to Work OR Dug outside sawn area - minimum 5 square metres Concrete Dowelling to Paths Grassed Areas Prepared turf in Parks or footpaths in front of houses - minimum 5 square metres Discount Over 50 sq mtrs - Private Entities
26.10014
26.10015
26.10016 26.10017
26.10026
26.10027 26.10028 26.10029 26.10030 26.10031 26.10032 26.10033 26.10034 26.10035 26.10036 26.10037 26.10038 26.10039 26.10040 26.10041 26.10042 26.10043 26.10044
26.10023 26.10024 26.10025
26.10019 26.10020 26.10021 26.10022
26.10018
Road openings/occupancy/closures Road Opening Permit Application fee - under Section 138 Roads Act 1993
26.10012 26.10013
4
Per square metre
Bitumen sealed local roads restoration minimum of 2m2 up to 20m2
Other works By quote upon application Road reinstatement
Other works
Over 20 m2
26.10006
26.10011
3
Per application
10 m2 to 20 m2
26.10005
26.10007 26.10008 26.10009 26.10010
Less than 10 m2
26.10004
4
Per square metre
3 3 3 3 3 3 3 3 3 3 3 3 3 3
Per square metre Per square metre Per square metre Per square metre Per square metre Per square metre Per square metre Per square metre Per square metre Per square metre Per square metre Per square metre Per dowel Per square metre Per site
3
5
Per lineal metre
Per lineal metre
2 5
Per approval
3 5 2 2
3
Per set (2 lines) Per certificate Per application Per application
5
Per application
4
4
Per sign
Per visit
Per application
4
4
Per square metre
Per application
4 4
Per square metre Per square metre
4
Per sign
26. ROADS, DRAINAGE AND PATHWAYS
1
Supply and install or modify existing regulatory parking signage Re-instatement of footpaths Concrete footpath 75mm thick reinforced - minimum one square metre
Per lease
3 3 1
3
3
3
3
5 5
Price Category
26.10001 26.10002 26.10003
Lease preparation
25.10010
Per application Per application Per lease
Per application
Per application
Per application
Per application
Per page Per CD
Unit of Measurement
26.10000
All other staff
General counsel/other senior solicitor and supply of legal services Junior solicitor Lease Investigations
25.10006
25.10007 25.10008 25.10009
25.10002
25. PROFESSIONAL STAFF COSTS
Professional staff costs (To cover full cost recovery for consulting, expert witness and/or private works) Chief Executive Officer
25.10000
B2 Supply of information on CD (Does not include the scanning fee which is an additional charge)
Description of Fees and Charges
24.10055 24.10056
2017-18 Item Number
10/11 of fee charged
$63.00
$256.77 $363.64 $319.77 $378.00 $227.18 $378.00 $454.36 $543.14 $393.55 $547.91 $150.82 $84.95 $17.18
$60.00 per lineal metre or half the cost
$76.50
$200.00
$56.50 $80.00 10/11 of fee charged $200.00
$267.27
10/11 of fee charged
$215.25
$161.95
10/11 of fee charged
$500.39
10/11 of fee charged
$135.12
$193.82
$340.12
$340.12
$267.27
10/11 of fee charged
10/11 of fee charged 10/11 of fee charged 10/11 of fee charged
10/11 of fee charged
10/11 of fee charged
10/11 of fee charged
10/11 of fee charged
$1.10 $5.45
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$76.50
$200.00
$62.15 $80.00 By Quote $200.00
$294.00
Quote on Application
$215.25
$161.95
By Quote
$550.43
By Quote
$148.63
$213.20
$374.13
$374.13
$294.00
By Quote
By Quote By Quote By Quote
By Quote
By Quote
By Quote
By Quote
$1.10 $5.45
TOTAL 2017-18 FEE (GST inclusive where applicable)
1/11 of fee charged
$6.30
$25.68 $36.36 $31.98 $37.80 $22.72 $37.80 $45.44 $54.31 $39.35 $54.79 $15.08 $8.50 $1.72
15% per site
$69.30
$282.45 $400.00 $351.75 $415.80 $249.90 $415.80 $499.80 $597.45 $432.90 $602.70 $165.90 $93.45 $18.90
$0.00 $60.00 per lineal metre or half the cost
$0.00
$0.00
$5.65 $0.00 1/11 of fee charged $0.00
$26.73
1/11 of fee charged
$0.00
$0.00
1/11 of fee charged
$50.04
1/11 of fee charged
$13.51
$19.38
$34.01
$34.01
$26.73
1/11 of fee charged
1/11 of fee charged 1/11 of fee charged 1/11 of fee charged
1/11 of fee charged
1/11 of fee charged
1/11 of fee charged
1/11 of fee charged
$0.00 $0.00
GST @ 10% Remitted to ATO (if applicable)
Regulatory Fees and Charges Paid to
205
Event sponsorship
Hire of site for event support stalls - 1 day event Not for profit - 3m x 3m Site Area - 3m x 3m Site Area - 3m x 4m Site Area - 3m x 5m Site Area - 3m x 6m Site Area - 4m x 5m Site Area - 6m x 6m Hire of site for event support stalls - 2 day event Site Area - 3m x 3m Site Area - 3m x 4m Site Area - 3m x 5m Site Area - 3m x 6m Site Area - 4m x 5m Site Area - 6m x 6m Hire of site for event support stalls - 3 day event Site Area - 3m x 3m Site Area - 3m x 4m Site Area - 3m x 5m Site Area - 3m x 6m Site Area - 4m x 5m Site Area - 6m x 6m Non-attendance fee at an event Hire of Memorial Park Event booking fee (includes provision of relevant information to assist in the successful running of the event, mowing of Memorial Park, cleaning staff, Memorial Park access, power and assistance with promotion of the event) Casual stall holders licence (allows for 134 trading days per year) Site Area - up to 12 square metres Site Area - 12 to 18 square metres Site Area - over 18 square metres Various Town Centre Event Fees Event advertising - Full page Event advertising - Half page Event advertising - Third page Busking permit Event promotional item (T shirt) Access to The Entrance Town Centre App Annual Access to a facility to advertise offers and special promotions (via The Entrance Town Centre App) Monthly Access to a facility to advertise offers and special promotions (via The Entrance Town Centre App) The Entrance Visitor Information Centre NSW Fishing Licences - daily
NSW Fishing Licences - monthly
NSW Fishing Licences - Annual
27.10001
27.10002
27.10003 27.10004 27.10005 27.10006 27.10007 27.10008 27.10009 27.10010 27.10011 27.10012 27.10013 27.10014 27.10015 27.10016 27.10017 27.10018 27.10019 27.10020 27.10021 27.10022 27.10023 27.10024 27.10025 27.10026 27.10027
27.10041 27.10042
27.10043
27.10044
27.10040
27.10028 27.10029 27.10030 27.10031 27.10032 27.10033 27.10034 27.10035 27.10036 27.10037 27.10038 27.10039
27. THE ENTRANCE TOWN CENTRE MANAGEMENT FEES
Co-ordination of special pelican feeding sessions (this fee includes a $50 contribution per session to the Volunteer Marine Rescue Association for managing the sessions)
27.10000
26.10056
26.10055
26.10049 26.10050 26.10051 26.10052 26.10053 26.10054
26.10048
Over 100 sq mtrs - Private Entities Traffic Control Road Occupancy Licence Approval to use a Traffic Management Plan on Council Roads Temporary Road Closure Applications Mandatory Advertising required Application for Oversize Overmass Vehicles on Council Roads Construction/Work Zones Application Construction/Work Zones Operation Central Coast Stadium Special Event Roads/Drainage Specifications Civil Works Specification Volume 1 - Design in Hardcopy Available electronically on Council's Website Hardcopy costs per page based on Council's photocopy charge Civil Works Specification Volume 2 - Construction in Hardcopy Available electronically on Council's Website Hardcopy costs per page based on Council's photocopy charge Civil Works Specification Volume 3 - Standard Drawings in Hardcopy Available electronically on Council's Website Hardcopy costs per page based on Council's photocopy charge
Description of Fees and Charges
26.10045 26.10046 26.10047
2017-18 Item Number
5
Per day
Per year
Per month
1
1
1
5
Per year Per month
3 3 3 3 3
Per item Per item Per item Per item Per item
5
Per day
5 5 5
5 5 5 5 5 5 5
Per site per event Per site per event Per site per event Per site per event Per site per event Per site per event Per day
Per month Per month Per month
5 5 5 5 5 5
5 5 5 5 5 5 5
Per site per event Per site per event Per site per event Per site per event Per site per event Per site per event
Per site per event Per site per event Per site per event Per site per event Per site per event Per site per event Per site per event
5
3
Per request
5
3
Per request
Per feeding session
3
Per request
Per event
1 2 2 3
Per application Per application Per month of operation Per event
$126.00
$1.92
$0.77
$0.38
$45.00
$500.00
$681.82 $363.64 $181.82 $9.09 $18.18
$270.00 $370.00 $460.00
$727.27
$260.00 $300.00 $320.00 $380.00 $420.00 $560.00 $50.00
$210.00 $280.00 $300.00 $360.00 $400.00 $520.00
No charge $120.00 $160.00 $200.00 $240.00 $260.00 $480.00
10/11 of fee charged
$80.00
Price on Request
Price on Request
Price on Request
$80.00 $136.50 $273.00 Price on Application
$275.00
2 5
Per licence Per application
2017-18 Central Coast Council Fee
10/11 of fee charged
Price Category
3
Per site
Unit of Measurement
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$33.08
$13.23
$6.62
Other Regulatory Fees and Charges
$0.00
$0.00
$0.00
$4.50
$50.00
$68.18 $36.36 $18.18 $0.91 $1.82
$27.00 $37.00 $46.00
$72.73
$26.00 $30.00 $32.00 $38.00 $42.00 $56.00 $5.00
$21.00 $28.00 $30.00 $36.00 $40.00 $52.00
$0.00 $12.00 $16.00 $20.00 $24.00 $26.00 $48.00
1/11 of fee charged
$8.00
$0.00
$0.00
$0.00
$0.00 $0.00 $0.00 $0.00
$0.00
$0.00
1/11 of fee charged
GST @ 10% Remitted to ATO (if applicable)
$35.00
$14.00
$7.00
$49.50
$550.00
$750.00 $400.00 $200.00 $10.00 $20.00
$297.00 $407.00 $506.00
$800.00
$286.00 $330.00 $352.00 $418.00 $462.00 $616.00 $55.00
$231.00 $308.00 $330.00 $396.00 $440.00 $572.00
No charge $132.00 $176.00 $220.00 $264.00 $286.00 $528.00
By Quote
$88.00
Price on Request
Price on Request
Price on Request
$80.00 $136.50 $273.00 Price on application
$275.00
$126.00
25% per site
TOTAL 2017-18 FEE (GST inclusive where applicable)
NSW Department of Primary Industries NSW Department of Primary Industries NSW Department of Primary Industries
Regulatory Fees and Charges Paid to
206
Visitor Information Centre Merchandise Cancer Council Sun cream (includes Everyday 110ml, Repel 110ml, Keyring Everyday 50ml, Everyday 35ml) Souvenir merchandise
UBD Maps
UBD Directories Central Coast UBD Directories Newcastle/Hunter/Central Coast Central Coast Forest Maps Best Bush Maps
27.10046 27.10047
27.10049
27.10050 27.10051 27.10052 27.10053
Bricks/Tiles/Pavers/Concrete - must not contain other contaminants - required to meet operational requirements
Minimum charge for bricks/tiles/pavers/concrete
Per tonne Virgin Excavated Natural Material (VENM) and Excavated Natural Material (ENM) - Does not include rocks, gravel, wet silty or sandy loam, tree roots or vegetation, or any other contamination - required to meet operational requirements. VEHM AND ENM NOT ACCEPTED AT KINCUMBER Organic Waste Organic Materials: Including: trees, garden vegetation, untreated timber, shredded green waste. Excluding tree stumps and trunks greater than Per tonne 1 metre measured at the widest point, treated timber.
28.10004
28.10005
28.10006
E-waste (1 to 15 items per customer per day)
E-waste (more than 15 items per day)
Scrap metal Includes ferrous and non-ferrous metals and car tyres on-rim (limit 4 per customer) Other waste Special Waste which requires additional handling, including: asbestos, security and customs, tree stumps >1m3, animals (must be wrapped in plastic) and food, bulky or dusty waste. SPECIAL WASTE NOT ACCEPTED AT KINCUMBER. Large commercial quantities (>10m3) to Buttonderry Waste Management Facility. Minimum charge for special waste
28.10010 28.10011
28.10013
28.10014
28.10015
Charities with Environment Protection Authority (EPA) exemption CHARITY EXEMPTION NOT ACCEPTED AT KINCUMBER Minimum charge $16.00 Charities without Environment Protection Authority (EPA) exemption CHARITY EXEMPTION NOT ACCEPTED AT KINCUMBER Minimum charge $22.00 Vehicle weighbridge docket
28.10022
28.10026 28.10027
28.10025
28.10024
Security Bond Applicable to all account holders (refundable when accounts are closed and all outstanding debt paid in full) Other waste management services Provision of 240 litre special event waste bin
Waste disposal fees for large entities disposing large tonnages may be determined through contract negotiation
28.10021
28.10023
Mattress surcharge Charged in addition to the mixed waste fee
Gas bottle and fire extinguisher surcharge Charged in addition to the mixed waste fee
28.10019
28.10020
28.10018
28.10016 28.10017
28.10012
Minimum charge for organic materials
Recyclables Recyclable household Items Aluminium cans and foil, car and marine batteries, car bodies (not LPG), whitegoods, metals, cardboard under 200kg, computers and TVs (undamaged), glass bottles and jars (NO FLAT GLASS), HDPE plastic milk bottles, milk and fruit juice cardboard cartons, PET plastic bottles, tin and steel aerosol cans, household batteries, motor oil (max 20ltrs), fluorescent lights ( max 12) Cardboard loads over 200kg
28.10009
28.10007 28.10008
Minimum charge for mixed waste
28.10003
2
2
Per bin per day
3
2 4
5
Per tonne
Per item
5
Per tonne
Per account holder
2
Per tonne
2
Per item Per item
2
2
2
2
Per load
Per tonne
Per item
Per tonne
2
Per tonne Per item
5
2
2
2
2
2
2
2
5 5 5 5
5
5
5
1
Price Category
Per tonne
Per load
Per load
Per tonne
Per load
Mixed waste: Including: general waste, building and demolition waste, commercial recyclables, tiles, bricks. Car tyres off-rim limit 4 per customer. FOOD WASTE NOT ACCEPTED AT KINCUMBER
28.10002
Per tonne
28. WASTE AND RECYCLING
Landfill Waste Disposal Tip Fees Landfill charges include components to cover Councilâ&#x20AC;&#x2122;s liability for the NSW State Government (EPA) Waste Levy of $138.20 plus GST where applicable.
28.10001
Per item Per item Per item Per item
Per item
Per item
Per item
Per 3 years
Unit of Measurement
28.10000
27.10048
3 Year NSW Fishing Licences
Description of Fees and Charges
27.10045
2017-18 Item Number
$20.09
10/11 of fee charged
$27.27
$175.00
$35.00
10/11 of fee charged
$5.45
$22.73
$18.87
$269.09
No charge
$681.82
No charge
$130.00
No charge
$10.91
$132.73
$20.89
$11.60
$20.89
$11.60
$169.07
$18.14 $24.50 $8.95 $6.32
10/11 of fee charged
10/11 of fee charged
10/11 of fee charged
$4.67
2017-18 Central Coast Council Fee
$19.00
-
-
-
-
-
-
-
$8.40
$140.00
-
-
-
-
-
-
-
$138.20
$8.40
$138.20
$8.40
$138.20
-
-
-
-
$80.33
Other Regulatory Fees and Charges
$3.91
1/11 of fee charged
$2.73
$0.00
$0.00
1/11 of fee charged
$0.55
$2.27
$2.73
$40.91
$0.00
$68.18
$0.00
$0.00
$0.00
$1.09
$13.27
$15.91
$2.00
$15.91
$2.00
$30.73
$1.81 $2.45 $0.90 $0.63
1/11 of fee charged
1/11 of fee charged
1/11 of fee charged
$0.00
GST @ 10% Remitted to ATO (if applicable)
$43.00
By Contract Negotiation
$30.00
$175.00
$35.00
By Contract Negotiation
$6.00
$25.00
$30.00
$450.00
No charge
$750.00
No charge
$130.00
No charge
$12.00
$146.00
$175.00
$22.00
$175.00
$22.00
$338.00
$19.95 $26.95 $9.85 $6.95
Recommended Retail Price Recommended Retail Price Recommended Retail Price
$85.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
NSW Environment Protection Authority
NSW Environment Protection Authority
NSW Environment Protection Authority
NSW Environment Protection Authority
NSW Environment Protection Authority
NSW Environment Protection Authority
NSW Environment Protection Authority
NSW Environment Protection Authority
NSW Department of Primary Industries
Regulatory Fees and Charges Paid to
207
Provision of commercial litter bin fee - The Entrance Town Centre
Collection of waste Collection of waste (dumped waste, or kerbside waste where the number of allocated kerbside collections are exceeded or for properties that are not entitled to kerbside collections). Waste type must be in accordance with legal and contractual guidelines and collection is at request.
29. WATER AND SEWERAGE FEES AND CHARGES - Former Wyong Local Government Area Although Central Coast Council formally came into existence in May 2016 customers should be advised that the 2017-18 fees and charges for water supply and sewerage services as listed below will continue to be applied according to the location of the service provided which will be in either the former Wyong or Gosford Council areas. Customers should be advised that this arrangement will also apply in 2018-19. The reason for this situation is that the pricing regulator IPART has now extended by two years the term of the current price path to 30 June 2019. As the current price path has only set prices on the basis of the former Wyong and Gosford Council areas all fees and charges must continue to be applied on this basis until the end of the current price path. The IPART determination for the current price path was issued in May 2013.
Connections and disconnections Water reconnection During business hours
Outside business hours
Disconnection fee Application for disconnection - All Sizes
Physical disconnection
Application for provision of new water service connection (all sizes) This fee is for administration only and does not include the physical connection fee which is listed in 29.10013 to 29.10020 inclusive according to service size. Re-instatement of damaged water service (Red Tag) This fee will apply for water services damaged either by third parties, by theft or by meter tampering and subsequently "red tagged" by Council. The "red tag" will direct the property owner to contact Council and pay the prescribed fee to reinstate the service. The prescribed fee is a combination of four IPART mandated fees covering initial disconnection (29.10006 and 29.10007) and reconnection (29.10008 and either 29.10003 or 29.10004). During business hours Outside business hours Provision of new water service connection This fee is for the actual physical water service connection. In addition to this fee the "29.10008 Application for provision of water service connection (all sizes)" fee is also required to be paid for internal administration and processing.
28.10030
29.10000
29.10001
29.10004
29.10005 29.10006
29.10007
29.10008
Per service
Short service - 40mm Long service - 40mm
Short service - 50mm
Long service - 50mm
For all services > 50mm
Sewerage junction cut-ins Sewerage junction cut-in (150mm) No excavation, no concrete encasement removal, no sideline, junction within property. Excavation provided by customer.
Sewerage junction cut-in (150mm) with sideline less than 3m No excavation, no concrete encasement removal, sideline, junction outside the property. Excavation provided by customer.
Sewerage junction cut-in (225mm) No excavation, no concrete encasement removal, no sideline, junction within property. Excavation provided by customer.
Sewerage junction cut-in (225mm) with sideline less than 3m No excavation, no concrete encasement removal, sideline, junction outside property. Excavation provided by customer.
Sewerage junction cut-in greater than 225mm or where excavation or removal of concrete encasement is required by Council. The fee listed represents labour costs only. Any costs for plant hire charges, material costs and traffic control will be additional where these applicable. Metered standpipes Security bond (25mm)
29.10016 29.10017
29.10018
29.10019
29.10020
29.10021
29.10023
29.10024
29.10025
29.10026
Security bond (63mm) Metered standpipe hire Annual fee - as per water service charge based on meter size (proportional for part of the year on a monthly basis)
Quarterly fee - as per water service charge based on meter size (proportional for part of the year on a monthly basis)
29.10029 29.10030 29.10031
29.10032
29.10028
29.10027
29.10022
Per service
Short or long service - 25mm
29.10015
1
1
Per hire Per hire
1
1
1
1
1
1
1
1
1
1
1 1
1
1 1
1 1
1
1
1
1
1
3
3
3
Price Category
Per hire
Per hire
Per hour
Per service
Per service
Per service
Per service
Per service
Per service Per service
Per service
Meter only (20mm) Short or long service - 20mm
Per service Per service
Per connection Per connection
Per application
Per disconnection
Per application
Per connection
Per connection
Per cubic metre
Per bin per service
Per bin per day
Unit of Measurement
29.10013 29.10014
29.10012
29.10010 29.10011
29.10009
29.10002 29.10003
Provision of 240 litre special event recycling bin
28.10029
Description of Fees and Charges
28.10028
2017-18 Item Number
Dependent on meter size
Dependent on meter size
$808.02
$419.91
10/11 of fee charged
$752.62
$712.88
$319.11
$304.66
By quotation incorporating a $135.76 per hour labour allowance
$2,838.68
$2,302.20
$1,613.40 $2,144.59
$858.37
$116.57 $707.34
$244.32 $372.78
$34.42
$134.40
$34.42
$169.54
$41.08
$71.82
$7.27
$32.73
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$2,838.68
$2,302.20
$1,613.40 $2,144.59
$858.37
$116.57 $707.34
$244.32 $372.78
$34.42
$134.40
$34.42
$169.54
$41.08
$79.00
$8.00
$36.00
TOTAL 2017-18 FEE (GST inclusive where applicable)
$808.02
$419.91
$135.76 base rate plus $33.77 per 15 min thereafter
$752.62
$712.88
$319.11
$304.66
$0.00 Dependent on meter size
$0.00 Dependent on meter size
$0.00
$0.00
1/11 of fee charged
$0.00
$0.00
$0.00
$0.00
$0.00 By quotation incorporating a $135.76 per hour labour allowance
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$7.18
$0.73
$3.27
GST @ 10% Remitted to ATO (if applicable)
Regulatory Fees and Charges Paid to
208
Major Works Inspection Fee This fee schedule is for the inspection, for the purposes of approval and compliance, of water and sewerage mains, constructed by others that are longer than 25 metres and/or greater than 2 metres in depth.
Water mains
Gravity sewer mains Rising sewer mains Plumbing and drainage inspection Workshop test of water meter (accuracy test) Up to and including 80mm
29.10036
29.10037
29.10038 29.10039
Raise or lower and/or laterally move existing services (more than 2 metres from existing location). Includes materials. Short - 20mm
Long - 20mm
Short or long - 25mm
Short - 40mm
Long - 40mm
Short - 50mm
Long - 50mm
For all services > 50mm Alteration from dual service to single service 20mm service only
Sewer main encasement with concrete Encasement inspection fee when construction is not by Council
Encasement constructed by Council
Raise and lower sewer manholes greater than 300mm. The price listed is the manhole adjustment inspection fee only. The charge for the actual physical adjustment is by quote. No charge is made for adjustments less than or equal to 300mm. Underground services locations - Council assists in on-site physical locations. Customer provides all equipment
Underground services locations - Council undertakes on-site physical locations and provides all equipment
Raise or lower and/or laterally move existing services (more than 2 metres from existing location) 20mm service short or long (assuming no materials are required)
For all services > 20mm or for 20mm short or long service adjustments requiring materials Plan plotting On film B1 size
29.10048 29.10049
29.10050
29.10051
29.10052
29.10053
29.10054
29.10055
29.10056 29.10057 29.10058
29.10059 29.10060
29.10061
29.10062
29.10064
29.10065 29.10066
29.10067
29.10087
29.10071 29.10072 29.10073 29.10074 29.10075 29.10076 29.10077 29.10078 29.10079 29.10080 29.10081 29.10082 29.10083 29.10084 29.10085 29.10086
29.10069 29.10070
29.10068
29.10063
A1 size A2 size A3 size A4 size On vellum B1 size A1 size A2 size A3 size A4 size On 60GSM paper B1 size A1 size A2 size A3 size A4 size TRADE WASTE
Per stop valve or hydrant
Relocation or alteration of services Relocate existing stop valve or hydrant Stated fee covers labour only and is exclusive of plant hire charges, material costs and traffic control measures.
29.10046
29.10047
Per analysis
Water sample analysis for water quality testing private supplies
29.10045
Per quote
1
4 4 4 4 4 4 4 4 4 4 4 4 4 4
Per plot Per plot Per plot Per plot Per plot Per plot Per plot Per plot Per plot Per plot
4
1
1
1
1
1
Per plot Per plot Per plot Per plot
Per plot
Per service
Per service
Per hour
Per hour
Per request
1
1
Per service Per inspection
1
1
1
1
1
1
1
1
1
1
1
1
1
1 1
1
1 1
1
Price Category
Per service
Per service
Per service
Per service
Per service
Per service
Per service
Per service
Per document
Statement of available pressure flow
29.10044
Per meter tested
Over 80mm
Per meter tested
Per metre Per metre
Per metre
Per kilolitre Per application
Per hire
Unit of Measurement
29.10043
29.10042
29.10040 29.10041
Monthly fee - as per water service charge based on meter size (proportional for part of the year on a monthly basis)
Standpipe water usage fee (all usage) as per standard water usage charges Backflow prevention device application and registration fee
29.10034 29.10035
Description of Fees and Charges
29.10033
2017-18 Item Number
By Quote By Quote By Quote By Quote By Quote
By Quote By Quote By Quote By Quote By Quote
By Quote By Quote By Quote By Quote
By Quote
By Quote
$136.45
10/11 of fee charged
10/11 of fee charged
$113.25
By Quote
$102.89
$411.98
By Quote (max $992.77) By Quote (max $1,747.80) By Quote (max $2,278.99) By Quote (max $2,436.60) By Quote (max $2,973.08) By Quote
$536.48
$344.40
$135.76 base rate plus $33.77 per 15 minutes thereafter
$82.76
$134.86
By Quote
$203.99
$8.14 $6.10
$6.10
$2.29 $70.21
Dependent on meter size
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
$0.00
-
-
-
-
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00
$0.00
-
1/11 of fee charged
1/11 of fee charged
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
-
-
-
-
-
-
-
-
-
-
$0.00
$0.00
-
$0.00
$0.00
$0.00
$0.00
Not Applicable
$0.00
$0.00 $0.00
$0.00
$0.00
-
TOTAL 2017-18 FEE (GST inclusive where applicable)
By Quote By Quote By Quote By Quote By Quote
By Quote By Quote By Quote By Quote By Quote
By Quote By Quote By Quote By Quote
By Quote
By Quote
$136.45
$81.46 base rate plus $19.86 per 15 minutes thereafter $135.76 base rate plus $33.77 per 15 minutes thereafter
$113.25
By Quote
$102.89
$411.98
By Quote (max $992.77) By Quote (max $1,747.80) By Quote (max $2,278.99) By Quote (max $2,436.60) By Quote (max $2,973.08) By Quote
$536.48
$344.40
$135.76 base rate plus $33.77 per 15 minutes thereafter
$82.76
$134.86
By Quote
$203.99
$8.14 $6.10
$6.10
$2.29 $70.21
$0.00 Dependent on meter size $0.00 $0.00
-
-
-
-
-
-
-
-
GST @ 10% Remitted to ATO (if applicable)
Regulatory Fees and Charges Paid to
209
Category 1 Category 2 Category 3 Category S - Residential Category S - Non-Residential Re-inspection fee - Where non-compliance has been detected Council will undertake additional inspections (over and above scheduled inspections allowed for in the Annual Trade Waste Fee) to confirm that remedial action has been implemented. A charge will be made for each Trade Waste Usage Charge The Trade Waste Usage Charge recovers the cost incurred by Council to provide additional treatment for effluent from Category 2 dischargers. The per kilolitre unit charge will vary according to whether or not a level of compliant pre treatment is provided by the discharger.
29.10096 29.10097 29.10098 29.10099 29.10100 29.10101
Where compliant pre-treatment equipment is provided,
Where non-compliant pre-treatment equipment is provided
Trade Waste Excess Mass and Non-Compliant Excess Mass Charges Excess Mass charges are applied where the substances as specified below are discharged in concentrations in excess of that deemed for domestic sewage. Non Compliant Excess Mass Charges are applied where the substances as specified below are discharged in concentrations in excess of the limit specified in the Approval. Mass charges will be calculated using a "per kilogram" rate and determined in accordance with the methodology in Council's Liquid Trade Waste Policy.
Biochemical Oxygen Demand
Suspended Solids Grease and Oil (total) Ammonia (as Nitrogen) ph Total Kheldhal Nitrogen Total Phosphorus Total Dissolved Solids Sulphate (as SO4) Aluminium Arsenic Barium Boron Bromine Cadmium Chloride Chlorinated Hydrocarbons Chlorinated Phenolics Chlorine Chromium Cobalt Copper Cyanide Fluoride Formaldehyde Herbicides/defoliants Iron Lead Lithium Manganese Mercaptans Mercury Methylene Blue Active Substances (MBAS) Molybdenum Nickel Organoarsenic compounds Pesticides general (excludes organochlorines and organophosphates)
29.10103
29.10104
29.10105
29.10106
29.10107 29.10108 29.10109 29.10110 29.10111 29.10112 29.10113 29.10114 29.10115 29.10116 29.10117 29.10118 29.10119 29.10120 29.10121 29.10122 29.10123 29.10124 29.10125 29.10126 29.10127 29.10128 29.10129 29.10130 29.10131 29.10132 29.10133 29.10134 29.10135 29.10136 29.10137 29.10138 29.10139 29.10140 29.10141 29.10142
29.10102
29.10095
29.10089 29.10090 29.10091 29.10092 29.10093 29.10094
Trade Waste Application Fee The Trade Waste Application Fee covers the cost of administration and technical services incurred by Council in processing an application. The fee is related to the category into which the discharger is classified and reflects the complexity of processing the application. Category 1 Category 2 Category 3 Category S - Residential - Non - Residential Annual Trade Waste Fee This fee recovers the cost incurred by Council for administration and the scheduled inspections each year to ensure a liquid trade waste discharger's ongoing compliance with the conditions of their approval
Description of Fees and Charges
29.10088
2017-18 Item Number
Per kilolitre
Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram
Per kilogram
Per kilolitre
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1
1
1
1 1 1 1 1 1
1 1
Per application Per application
Per year Per year Per year Per year Per year Per re-inspection
1 1 1
Price Category
Per application Per application Per application
Unit of Measurement
$0.97 $1.36 $0.76 $0.42 $0.18 $1.46 $0.04 $0.14 $0.71 $71.53 $35.78 $0.71 $14.59 $331.15 No charge $35.78 $1,457.09 $1.46 $23.84 $14.59 $14.59 $71.53 $3.56 $1.46 $715.31 $1.46 $35.78 $7.17 $7.17 $77.03 $2,384.35 $0.71 $0.71 $23.84 $715.31 $715.31
$0.76
$14.59
$1.71
$91.29 $365.16 $613.39 $48.79 $99.09 $85.60
$54.87 $221.85
$52.19 $66.43 $1,018.90
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00
$0.00
$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00
$0.00 $0.00 $0.00
GST @ 10% Remitted to ATO (if applicable)
$0.97 $1.36 $0.76 $0.42 $0.18 $1.46 $0.04 $0.14 $0.71 $71.53 $35.78 $0.71 $14.59 $331.15 No charge $35.78 $1,457.09 $1.46 $23.84 $14.59 $14.59 $71.53 $3.56 $1.46 $715.31 $1.46 $35.78 $7.17 $7.17 $77.03 $2,384.35 $0.71 $0.71 $23.84 $715.31 $715.31
$0.76
$14.59
$1.71
$91.29 $365.16 $613.39 $48.79 $99.09 $85.60
$54.87 $221.85
$52.19 $66.43 $1,018.90
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
210
Minimum sewerage service charge Non Residential Sewerage Service Charge 25mm 32mm 40mm 50mm 80mm 100mm 150mm 200mm Other sizes
30.10002
30.10026 30.10027 30.10028 30.10029 30.10030 30.10031 30.10032 30.10033 30.10034 30.10035 30.10036 30.10037 30.10038 30.10039 30.10040 30.10041 30.10042 30.10043
30.10025
30.10018 30.10019 30.10020 30.10021 30.10022 30.10023 30.10024
30.10016 30.10017
30.10015
30.10014
30.10013
30.10004 30.10005 30.10006 30.10007 30.10008 30.10009 30.10010 30.10011 30.10012
Non Residential Sewerage Service Charge Applies where volume of sewerage discharged is greater than the Discharge Allowance of 150 kL per year Trade Waste Charges Trade Waste Usage Charge - compliant Trade Waste Usage Charge - non-compliant (Charge where pre-treatment is not provided, or is inadequate to meet requirements of Agreement) Annual Trade Waste Application Fee: Category 1 Annual Trade Waste Application Fee: Category 2 Annual Trade Waste Application Fee: Category 3 Annual Trade Waste Agreement Fee: Category 1 Annual Trade Waste Agreement Fee: Category 2 Annual Trade Waste Agreement Fee: Category 3 Liquid Trade Waste Re-inspection Fee Excess Mass Charges Prices are applied in accordance with the relevant units and acceptable limits set out in the Trade Waste Policy Aluminium (Al) Ammonia (as N) Arsenic (As) Barium (Ba) Biological Oxygen Demand (BOD5) Boron (B) Bromine (Br2) Cadmium (Cd) Chloride Chlorinated Hydrocarbons Chlorinated Phenolics Chlorine (Cl2) Chromium (Cr) (Total) Cobalt (Co) Copper (Cu) Cyanide Fluoride (F) Formaldehyde
Sewerage Service Charge
30.10001
Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram
Per application Per application Per application Per year Per year Per year Per inspection
Per kilolitre Per kilolitre
Per kilolitre
Per service Per service Per service Per service Per service Per service Per service Per service Per service
Per service
30. WATER AND SEWERAGE FEES AND CHARGES - Former Gosford Local Government Area Although Central Coast Council formally came into existence in May 2016 customers should be advised that the 2017-18 fees and charges for water supply and sewerage services as listed below will continue to be applied according to the location of the service provided which will be in either the former Wyong or Gosford Council areas. Customers should be advised that this arrangement will also apply in 2018-19. The reason for this situation is that the pricing regulator IPART has now extended by two years the term of the current price path to 30 June 2019. As the current price path has only set prices on the basis of the former Wyong and Gosford Council areas all fees and charges must continue to be applied on this basis until the end of the current price path. The IPART determination for the current price path was issued in May 2013.
30.10003
Per kilolitre
Accept and treat septage and septic effluent
29.10155
30.10000
Unit of Measurement
Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram
Description of Fees and Charges
Petroleum Hydrocarbons (non-flammable) Phenolic compounds (non-chlorinated) Polynuclear aromatic hydrocarbons (PAH's) Selenium Silver Sulphide Sulphite Thiosulphate Tin Uranium Zinc Septage and Septic Effluent This fee recovers the cost incurred by Council in accepting (at Council treatment plants) and treating septic and chemical toilet waste and other effluent wastewater from licenced contractors. The fee is applied on a "per kilolitre" basis.
29.10143 29.10144 29.10145 29.10146 29.10147 29.10148 29.10149 29.10150 29.10151 29.10152 29.10153 29.10154
2017-18 Item Number
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1
1 1
1
1 1 1 1 1 1 1 1 1
1
1
1 1 1 1 1 1 1 1 1 1 1
Price Category
$0.70 $0.76 $71.50 $35.76 $0.76 $0.70 $14.58 $331.03 No charge $35.76 $1,456.58 $1.45 $23.82 $14.58 $14.58 $71.50 $3.56 $1.45
$126.63 $211.27 $495.09 $73.52 $234.44 $1,968.86 $118.31
$1.71 $14.58
$0.83
service charge)/625
(Meter size)2 x (25mm water
$1,541.80 $2,526.08 $3,947.02 $6,167.22 $15,788.10 $24,668.90 $55,505.04 $98,675.64
$672.74
$17.12
$2.40 $7.17 $14.59 $50.32 $1.42 $1.46 $1.46 $0.27 $7.17 $7.71 $14.59
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
$672.74
$17.12
$2.40 $7.17 $14.59 $50.32 $1.42 $1.46 $1.46 $0.27 $7.17 $7.71 $14.59
TOTAL 2017-18 FEE (GST inclusive where applicable)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00
$0.00
$0.70 $0.76 $71.50 $35.76 $0.76 $0.70 $14.58 $331.03 No charge $35.76 $1,456.58 $1.45 $23.82 $14.58 $14.58 $71.50 $3.56 $1.45
$126.63 $211.27 $495.09 $73.52 $234.44 $1,968.86 $118.31
$1.71 $14.58
$0.83
service charge)/625
$0.00 $1,541.80 $0.00 $2,526.08 $0.00 $3,947.02 $0.00 $6,167.22 $0.00 $15,788.10 $0.00 $24,668.90 $0.00 $55,505.04 $0.00 $98,675.64 $0.00 (Meter size)2 x (25mm water
$0.00
$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GST @ 10% Remitted to ATO (if applicable)
Regulatory Fees and Charges Paid to
211
30.10092
30.10091
30.10090
30.10088 30.10089
30.10087
30.10086
30.10085
30.10084
30.10083
30.10082
30.10081
30.10080
30.10079
30.10044 30.10045 30.10046 30.10047 30.10048 30.10049 30.10050 30.10051 30.10052 30.10053 30.10054 30.10055 30.10056 30.10057 30.10058 30.10059 30.10060 30.10061 30.10062 30.10063 30.10064 30.10065 30.10066 30.10067 30.10068 30.10069 30.10070 30.10071 30.10072 30.10073 30.10074 30.10075 30.10076 30.10077 30.10078
2017-18 Item Number
Certified Suitable for a contract of sale Misc Charge 19: Plumbing and drainage inspection fees. Inspection of plumbing and drainage work to ensure compliance with prescribed standards: a) New Sewer Connection Inspection of new sewerage connections, and other connections where inspection of the junction connection is required (e.g. demolition and rebuild of previously connected property) Includes allowance for 1 WC b) Alterations Inspection of alterations and extensions to internal plumbing, where no inspection of junction is required Includes allowance for 1 WC c) Each additional Water Closet d) Re-inspection Fee Each additional inspection, following previous identification of non-compliant plumbing and drainage work e) Rainwater tank connection Inspection of rainwater tank(s) and associated plumbing, where there is a connection from the tank to internal plumbing Misc Charge 20: Location of Water and Sewer Mains Onsite investigation works to identify the location (alignment and/or depth) of underground water and sewerage assets Minimum charge $864.80 Quote on application based on actual cost Misc Charge 21: Septage and Septic Effluent Discharge Disposal of septage and effluent from domestic onsite sewerage systems and sewer pumping stations by licenced contractors at Council Sewage Treatment Plants. Does not include complex muddy water waste and other waste classifications determined by Council, which are subject to a case-by-case fully recoverable charge, and may require concurrent approval from DPI Water
Grease and Oil (total) Herbicides/Weedicides/Fungicides Iron (Fe) Lead (Pb) Lithium (Li) Methylene Blue Active Substances (MBAS) Manganese (Mn) Mercaptans Mercury (Hg) Molybdenum (Mo) Nickel (Ni) Nitrogen (N) (Total Kjeldahl Nitrogen) Organoarsenic Pentachlorophenol Pesticides General (excludes organochlorines and organophosphates) Pesticides Organochlorine Pesticides Organophosphate PCB Petroleum Hydrocarbons (non flammable) pH Phenolic Compounds (excluding chlorinated) Phosphorus (Total) Polynuclear Aromatic Hydrocarbons (PAH) Selenium (Se) Silver (Ag) Sulphate (SO4) Sulphide (S) Sulphite (SO3) Suspended Solids (SS or NFR) Temperature Thiosulphate Tin (Sn) Total Dissolved Solids Uranium Zinc (Zn) Miscellaneous and Ancillary Fees and Charges Misc Charge 2: Property Sewerage Diagram Diagram showing the location of the house-service line, building and sewer for a property: a) Certified Suitable for a contract of sale Per sheet up to and including A4 size (where available) b) Uncertified Not Suitable for a contract of sale Per sheet up to and including A4 size (where available) Misc Charge 3: Service Location Diagram Certified Location of Sewer and/or Water mains in relation to a property's boundary
Description of Fees and Charges
1
1
Per kilolitre
1
1 1
1
1
Per property
Per property
Per property Per property
Per property
Per property
Per diagram
1
1
Per diagram
Per diagram
1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Price Category
Per diagram
Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram Per kilogram
Unit of Measurement
$14.58
$786.18
$47.37
$22.08 $47.37
$233.46
$256.07
$18.77
$11.73
$18.77
$1.36 $715.07 $1.45 $35.76 $7.16 $0.70 $7.16 No charge $2,383.53 $0.70 $23.82 $0.17 No charge $1,456.58 $715.07 $715.07 $715.07 $715.07 $2.39 $0.42 $7.16 $1.45 $14.58 $50.30 $1.41 $0.13 $1.45 $1.45 $0.97 No charge No charge $7.16 $0.04 No charge $14.58
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
$0.00
$78.62
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GST @ 10% Remitted to ATO (if applicable)
$14.58
$864.80
$47.37
$22.08 $47.37
$233.46
$256.07
$18.77
$11.73
$18.77
$1.36 $715.07 $1.45 $35.76 $7.16 $0.70 $7.16 No charge $2,383.53 $0.70 $23.82 $0.17 No charge $1,456.58 $715.07 $715.07 $715.07 $715.07 $2.39 $0.42 $7.16 $1.45 $14.58 $50.30 $1.41 $0.13 $1.45 $1.45 $0.97 No charge No charge $7.16 $0.04 No charge $14.58
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
212
30.10142 30.10143 30.10144 30.10145
30.10141
30.10140
30.10136 30.10137 30.10138 30.10139
30.10135
30.10134
30.10133
30.10132
30.10131
30.10130
30.10129
30.10126 30.10127 30.10128
30.10125
30.10124
30.10123
20mm 25mm 32mm 40mm
Stormwater drainage charge for all properties Miscellaneous and Ancillary Fees and Charges Misc Charge 4: Special Meter Reading Statement Misc Charge 5: Billing Record Search Statement (up to and including 5 years) Misc Charge 7: Water Reconnection Reconnection fee where service has been disconnected for non-payment of account. Reconnection only available during business hours Misc Charge 8: Workshop Test of Water Meter Removal of the meter by an accredited organisation, at the customer's request, to determine the accuracy of the water meter N.B.: A separate charge is also payable for transportation, dismantling, inspection and full mechanical test of the meter. Misc Charge 9: Water Main Disconnection Price payable when customer requests the Council to disconnect existing service a) Application for Disconnection Administration and system analysis fee only b) Physical Disconnection (N.B.: Application Fee must also be paid) Misc Charge 10: Water Service Connection Price payable when customer requests the Council to connect existing service to the meter a) Application for connection (all sizes) Administration and system capacity analysis fee only b) Physical connection (N.B.: Application Fee must also be paid) 20mm > 20mm Misc Charge 11: Standpipe hire -Security Bond Misc Charge 12: Standpipe Hire Annual hire charge of standpipe issued. Misc Charge 13 Standpipe Water Usage Fee Water Meter Hire Charge
Water Usage Charge for Residential and Non-Residential Properties Per kilolitre Metered water usage Where a water meter is not accessible or is apparently faulty, water usage will be billed on the estimated volume consumed, based on previous Stormwater Drainage Charge
30.10122
1 1 1 1
1
Per kilolitre Per service Per service Per service Per service
1 3 1 1
1
1
Per connection Per connection Per hire Per hire
Per application
Per disconnection
1
1
Per test
Per application
1 1 1
1
1
1 1 1 1 1 1 1 1 1
1
1
Per reading Per half hour Per reconnection
Per instance
Per service Per service Per service Per service Per service Per service Per service Per service Per service
Per service
Per kilolitre
30.10121
30.10112 30.10113 30.10114 30.10115 30.10116 30.10117 30.10118 30.10119 30.10120
30.10111
30.10110
30.10109
30.10108
30.10107
1 1 1 1 1 1 1 1 1
1
Per instance
Per service Per service Per service Per service Per service Per service Per service Per service Per service
1
1
Price Category
Per instance
Per kilolitre
Unit of Measurement
Sewerage Treatment Sewerage Treatment Fee Water Distribution Subject to Independent Pricing and Regulatory Tribunal (IPART) Determination May 2013 Water Service Charge Minimum water service charge Water Service Charge for Residential and Non-Residential Properties 25mm 32mm 40mm 50mm 80mm 100mm 150mm 200mm Other sizes
Misc Charge 22: Approved Category 4 (non-septic) Wastewater Discharge Approved Category 4 (non-septic) wastewater, composed primarily of water which has no impact on the treatment process, discharged at sewage disposal sites by Licensed Contractors Does not include complex muddy water waste and other waste classifications determined by Council, which are subject to a case-by-case fully recoverable charge, and may require concurrent approval from DPI Water. Misc Charge 23: Recoverable Works Charged on the basis of actual costs incurred by the Council, plus internal overheads charged in accordance with the rates published annually by the Council Sewerage Discharge Fee Minimum Sewerage Discharge Fee Sewage Discharge Fee 25mm 32mm 40mm 50mm 80mm 100mm 150mm 200mm Other sizes
Description of Fees and Charges
30.10106
30.10097 30.10098 30.10099 30.10100 30.10101 30.10102 30.10103 30.10104 30.10105
30.10096
30.10095
30.10094
30.10093
2017-18 Item Number
$197.72 $275.94 $452.10 $706.42
$2.29
$417.64 Quote on application $775.11 $1,103.80
$54.98
$290.55
$54.98
$227.44
$71.05 $30.32 $221.65
$124.64
$2.29
$275.94 $452.10 $706.42 $1,103.80 $2,825.74 $4,415.22 $9,934.26 $17,660.92 (Meter size)2 x (25mm water service charge)/625
$197.72
$0.83
$1,541.80 $2,526.08 $3,947.02 $6,167.22 $15,788.10 $24,668.90 $55,505.04 $98,675.64 (Meter size)2 x (25mm water service charge)/625
$672.42
Quote on Application based on Actual costs
$1.59
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$0.00 $0.00 $0.00 $0.00
$0.00
$0.00 $0.00 $0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00 $0.00 $0.00
$0.00
$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00
$0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00
$0.00
$0.00
GST @ 10% Remitted to ATO (if applicable)
$197.72 $275.94 $452.10 $706.42
$2.29
$417.64 Quote on application $775.11 $1,103.80
$54.98
$290.55
$54.98
$227.44
$71.05 $30.32 $221.65
$124.64
$2.29
$275.94 $452.10 $706.42 $1,103.80 $2,825.74 $4,415.22 $9,934.26 $17,660.92 (Meter size)2 x (25mm water service charge)/625
$197.72
$0.83
$1,541.80 $2,526.08 $3,947.02 $6,167.22 $15,788.10 $24,668.90 $55,505.04 $98,675.64 (Meter size)2 x (25mm water service charge)/625
$672.42
Quote on Application based on Actual costs
$1.59
TOTAL 2017-18 FEE (GST inclusive where applicable)
Regulatory Fees and Charges Paid to
213
30.10166
30.10165
30.10164
30.10163
30.10162
30.10161
30.10160
30.10159
30.10158
30.10155 30.10156 30.10157
30.10154
Water Supply Charge to Hunter Water Miscellaneous and Ancillary Fees and Charges Misc Charge 1: Conveyancing Certificate a) Combined with S603 certificate Misc Charge 14: Backflow Prevention Device Application and Registration Fee Initial registration of backflow device. Misc Charge 15: Backflow Prevention Application Device Annual Administration Fee Audit by inspectors of plumbers' annual compliance tests and the maintenance of records of results. Misc Charge 16: Statement of Available Pressure and Flow Covers all levels whether modelling is required or not. Misc Charge 17: Cancellation Fee Water and Sewerage Applications Charged to cancel an application for services, and process a refund of water and sewer application fees Misc Charge 31: Water Carter Fill Charge Charge per fill incurred by bulk water carters accessing water supply with monitoring equipment installed. Fee + (water usage charge x nominal tank size of water carter being filled, expressed in kilolitres) Bulk water carters incurring this fee are not subject to the Standpipe charges in Misc Charge 11 and Misc Charge 12 Recycled Water Charges Deposit for non-potable water access key A refundable deposit for coded key required to access and meter non-potable water supply filling points. Recycled Water Usage Charge Laboratory Services Laboratory analysis associated with Council inspection of privately constructed and disinfected water mains (See IPART determination for full details)
Water Supply Subject to Independent Pricing and Regulatory Tribunal (IPART) Determination May 2013
30.10152
30.10153
50mm 80mm 100mm 150mm 200mm Other sizes
Description of Fees and Charges
30.10146 30.10147 30.10148 30.10149 30.10150 30.10151
2017-18 Item Number
Per inspection
Per kilolitre
Per key
4
5
3
1
1
Per application Per instance
1
1
1 1 1
1
1 1 1 1 1 1
Price Category
Per instance
Per application
Per certificate Per certificate Per application
Per kilolitre
Per service Per service Per service Per service Per service Per service
Unit of Measurement
$265.65
$1.79
$25.00
$11.91
$23.46
$151.92
No charge
$33.81 $108.81 $81.04
$0.63
$1,103.80 $2,825.74 $4,415.22 $9,934.26 $17,660.72 For meter diameter sizes not specified in table, the following formula applies: (Meter size)2 x (25mm water service charge)/625
2017-18 Central Coast Council Fee
Other Regulatory Fees and Charges
-
-
-
-
-
-
-
-
-
-
TOTAL 2017-18 FEE (GST inclusive where applicable)
$26.57
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 $0.00 $0.00
$0.00
$292.22
$1.79
$25.00
$11.91
$23.46
$151.92
No charge
$33.81 $108.81 $81.04
$0.63
$0.00 $1,103.80 $0.00 $2,825.74 $0.00 $4,415.22 $0.00 $9,934.26 $0.00 $17,660.72 $0.00 For meter diameter sizes not specified in table, the following formula applies: (Meter size)2 x (25mm water service charge)/625
GST @ 10% Remitted to ATO (if applicable)
Regulatory Fees and Charges Paid to
Feedback We'd love to hear your thoughts about the Operational Plan for 2017-18. Your feedback will help us with improving future publications. Please send your thoughts and opinions to: Email: ask@centralcoast.nsw.gov.au Post: PO BOX 21, Gosford NSW 2250 or PO BOX 20, Wyong NSW 2259
Contact Us E ask@centralcoast.nsw.gov.au W www.centralcoast.nsw.gov.au
Gosford Office: 49 Mann St / PO Box 21 Gosford NSW 2250 P 02 4325 8222 Wyong Office: 2 Hely St / PO Box 20 Wyong NSW 2259 P 02 4350 5555 ABN 73 149 644 003 214
centralcoast.nsw.gov.au CentralCoastCouncil
@CCoastCouncil
@centralcoastcouncil @thisisthecentralcoast
Council Offices 2 Hely St Wyong / 49 Mann St Gosford | 8.30am - 5.00pm, Monday to Friday | T 4350 5555 / 4325 8222 April 2017