1 minute read
Impact on The Structure of the River
The Pinheiros River is approximately 25 km long. Along this route, at specific points, the Novo Rio Pinheiros Program develops actions for the care of the river’s structure, under the responsibility of DAEE - Department of Water and Electricity, aiming to ensure the sustainability of the results proposed by the program:
• Desilting
Removal of materials from the bottom of the river, usually sand, silt, and other sediments. Desilted, the channel gets deeper, thus increasing drainage capacity and clearing the water. The final disposal of the removed sediments has an environmentally suitable destination.
• Protection of banks
The work is done to stabilize and contain the erosive and collapsing phenomena on the banks of the Pinheiros Canal. In addition to protecting the banks, there is a concern with the visual impact of these interventions. For this reason, after the works, vegetation is replaced on the banks, through landscaping actions with the implementation of more suitable species for that environment.