October 7, 2020 Dear Friends: New Orleans is no stranger to rain. In fact, our region is one of the rainiest in the country. Not surprisingly, fighting stormwater and managing flooding have dominated the design and development of our city's infrastructure since its founding over 300 years ago. Since Katrina, we have seen that storms have intensified due to climate change. And the 2020 hurricane season has reminded us all too frequently of our vulnerability. Starting in 2010, the Greater New Orleans Foundation (GNOF) began working aggressively to build the movement to live better with water, recognizing that new solutions to our water challenges are urgently required. We can no longer pipe and pump our way out of our problems and desperately need to incorporate green infrastructure principles to manage stormwater and reduce the subsidence that destroys our streets and makes flooding worse. That is why we are proud to have commissioned Waggonner & Ball Architecture/Environment to produce this Stormwater Opportunities: Spirit of Charity, Lafitte Greenway, Armstrong Park Study. It is our latest step towards implementing a holistic and resilient model for improving water management and alleviating flooding in the urban core of New Orleans as envisioned in the Greater New Orleans Urban Water Plan. Ten years ago, GNOF and the Idea Village launched the Water Challenge, an entrepreneurial competition that supports social enterprises that develop market-based solutions to the region's water challenges. Today, the Water Challenge is managed by Propeller with support from GNOF. In 2013, GNOF launched the Urban Water Series and began hosting citywide conversations about our city's water challenges and possible solutions. In 2014, we brought 26 leaders from the city government, including then Councilmember LaToya Cantrell, environmental non-profits, and neighborhoods vulnerable to flooding to visit three cities that successfully scaled green infrastructure and stormwater management strategies. Since 2016, in partnership with the City of New Orleans, we have held master classes and public lectures with experts to train planners, engineers, landscape designers, architects, and policymakers from across the Greater New Orleans region on best practices for implementing green infrastructure. During the past decade, GNOF has also invested $3.2 million to support non-profit and communitybased organizations working to advance our region's efforts to live better with water. In 2016, GNOF made its first grant to support the Greater Treme Consortium (GTC). This community-based organization has been an advocate for improved social, economic, and cultural conditions in the Historic Treme neighborhood, which has been the victim of injustices in planning and development and plagued by localized flooding and subsidence. GTC's Waterwise Treme initiative has engaged more than 200 residents who have designed and implemented their own green infrastructure projects, including constructing the biggest planter box in the city at the Treme Center that can capture 9,000 gallons of stormwater from its roof! GNOF helped support the New Orleans Redevelopment Authority's Community Adaptation Program, which funds residential green infrastructure projects for low-to mid-income families in Gentilly. GNOF has also supported the City of New Orleans' efforts to ensure that disadvantaged business enterprises (DBEs) have access to the more than $260 million in green infrastructure projects that the Cantrell Administration has put out for bid, such as the Gentilly Resilience District,
City Park, Pontilly Neighborhood Stormwater Network, and Hagan-Lafitte Basin flood mitigation initiatives. GNOF has commissioned the Water Environment Federation and Center for Watershed Protection to develop an entry-level green infrastructure certification program so that more of our region's disconnected workers can be successfully trained to access the new jobs generated by these vital projects. In 2018, GNOF led the Spirit of Charity Innovation District's strategic planning process, including the neighborhood surrounding the former VA Hospital site and Duncan Plaza. The plan envisions a robust, dynamic, job-creating District, where innovation and equity are at the forefront. It also calls for incorporating green infrastructure, particularly in Duncan Plaza, that can serve as a model for environmental sustainability and stormwater management. Earlier this summer, in partnership with the Sewerage and Water Board and the City of New Orleans, GNOF launched the "Every Drop Makes a Difference" campaign to inform residents about why our City floods and what various organizations are doing to reduce flooding, to promote green infrastructure, and to identify the actions each resident and business can take to reduce runoff. It is for organizations like the Greater Treme Consortium and residents of neighborhoods like Treme, Gentilly, and Pontilly and many others across our region that GNOF undertakes this work. This Stormwater Opportunities: Spirit of Charity, Lafitte Greenway, Armstrong Park Study provides recommended strategies to dramatically improve our stormwater management and decrease flooding that will benefit neighborhoods from the Spirit of Charity Innovation District to Mid-City to Treme. The findings demonstrate that we can create flood mitigation projects that will slow stormwater runoff, store it, and let it slowly enter the drainage system over time, potentially reducing the flooding caused by a ten-year storm by 39 percent. This study was made possible with generous financial support from the Berger Companies, Tommy Coleman, Flower Holdings, Gallo Mechanical, Valentino Hospitality, HRI Lodging, J Hospitality and Development, Laitram, the Roosevelt Hotel, and Tulane University. Flooding in our region will not be solved by one entity alone, but through a concerted, cross-sector effort of residents and businesses taking action on their own property, advocacy and support from community-based organizations, as well as large-scale, publicly-funded green infrastructure projects like those outlined in this report. If these recommendations are fully implemented, they will produce what our study's authors, David Waggonner and Ramiro Diaz, have called "heroic flood mitigation." That is exactly what New Orleans needs right now. Andy Kopplin
President and CEO Greater New Orleans Foundation Doris Z. Stone Chair in Philanthropic Leadership
I Defining the Problem II Design Scenarios III Proposed Approach IV Appendix
Vision Existing water challenges: Runoff and drainage
Goal: Reduce flooding in the district
Build upon the Greater New Orleans Urban Water Plan + City of New Orleans Resilience & Sustainability Goals Holistic stormwater management strategies + urban design create value and safety
Overview Commissioned by the Greater New Orleans Foundation and produced by Waggonner & Ball Architecture/Environment, the Stormwater Opportunities: Spirit of Charity, Lafitte Greenway, Armstrong Park Study is the next step towards implementing a holistic and resilient model for improving water management and alleviating flooding in the urban core of New Orleans. Recent storm events have impacted residents, interrupted businesses, and negatively affected the local economy. This study builds upon the Living With Water® strategies of the Greater New Orleans Urban Water Plan and the City of New Orleans Department of Public Works and Office of Resilience & Sustainability ongoing green infrastructure investments. Under Mayor Cantrell’s leadership, $260 Million of resilience projects and initiatives are underway around the city. This study provides a conceptual design basis for future investments that will offer significant flood mitigation if implemented. In the Downtown Central Business District, runoff from the highly impervious land cover, exacerbated by the hydraulic pressure coming from tall buildings, regularly overwhelms the undersized drainage infrastructure. Runoff from downtown impacts downstream neighborhoods in the Drainage Pump Station 2 basin, including Mid-City, Tulane-Gravier, and Treme. Slowing and storing runoff on the high ground reduces flooding in lower-lying neighborhoods. This study identifies several opportunities to capture large volumes of rainfall on publicly held land using Living With Water® urban water design strategies, such as water squares and parks, water features, bioswales, tree plantings, subsurface storage, and permeable paving. The team explored over 25 design scenarios, using Hydrologic and Hydraulic modeling feedback to analyze, refined, and illustrate impacts. Two refined design scenarios offer a range of phased implementation options for each of the two focus areas:
2
Extended study area
1
1. Spirit of Charity, Duncan Plaza, and the VA Hospital Site 2. Armstrong Park and Lafitte Greenway
Extended study area
Overview For the first study area, the Spirit of Charity, Duncan Plaza, and VA Hospital site, the design team used previously completed studies, including the Downtown Development District’s VA Complex Study and Duncan Plaza Master Plan as a starting point. The Minimum scenario assumes urban stormwater interventions are located only on land controlled by the city with minimal demolition of auxiliary structures on the VA site. The Proposed scenario imagines a completely redesigned Duncan Plaza, select demolition of non-historic VA buildings, and significant water storage targets.
BAYOU ST JOHN
At the Lafitte and Armstrong Park study area, the team refined and expanded design proposals from the Greater New Orleans Urban Water Plan. The Minimum scenario utilizes city-owned land to create subsurface and surface water detention within the former Carondelet Canal right-of-way. The more ambitious Proposed scenario extends the scope of the intervention to Bayou St. John, creating a waterway that both provides dramatic stormwater storage capacity and a new urban amenity.
As with any major construction project, robust community engagement, especially among those residents most vulnerable to flooding, will be critical to successful project design and implementation. Finally, we recognize that this study has a limited scope and is part of a larger movement of work that has been done and continues to be done by homeowners, business owners, non-profit and community-based organizations, neighborhood associations and revitalization groups to better “live with water”. We are committed to ensuring that any effort to move forward on one or more of these recommendations will build on the work of this larger movement.
N
lv
ez
Cl
ai
St
bo
rn
e
Av
e
L AFIT TE IMPACT AREA
rt pa
lS t
m
na
IBERVILLE
N
TUL ANE - GRAVIER
Ra
Ca
St
Ga N
The design team analyzed each of the scenarios in a 10 Year Stom Event, using the Storm Water Management Model (EPA SWMM) generously provided by the City of New Orleans. This digital Hydrologic and Hydraulic model processes stormwater flows across the land surface and in pipes and canals, simulating flooding. The combined impact of the Minimum scenario is a 12% reduction of flood volume across the study area, as compared to existing flooding. The combined impact from the more ambitious Proposed scenario is a heroic 39% reduction of flood volume. This translates to significantly lower water levels in pipes, canals, and streets, thereby alleviating the overburdened drainage system and potentially decreasing damage to property.
lan
eA ve
D OWNTOWN IMPACT AREA
ydr
as
St
la A ve
Po
FRENCH QUARTER MIS SIS SIPPI RIVER
Tu
CENTRAL BUSINES S DISTRICT
Loyo
While the optimal results will be achieved only if all of the modeled projects are implemented, many much-discussed proposals for Duncan Plaza, Armstrong Park, and the extension of the Lafitte Greenway from Claiborne Avenue to Basin Street, if implemented, could incorporate recommendations contained in this study and produce meaningful flood mitigation benefits in a matter of years. Where impediments like the need to demolish auxiliary structures on the VA site may preclude immediate action on other proposed projects, with proper long-term planning, and a commitment to realizing the vision contained in these recommendations, this dramatic reduction in flooding in some of our city’s most historic and vulnerable neighborhoods can be achieved.
/I -1 0
TREME - L AFIT TE
Flood Reduction Volume from 10-year, 24-hour Design Storm Baseline Base Flood Volume
Minimum Scenario Flood Volume
Existing Flood Volume Total Minimum Scenario Flood Reduction Proposed Scenario Flood Reduction
Proposed Scenario Flood Volume
137.6 Ac Ft - 16.9 Ac Ft (-12%) - 53.2 Ac Ft (-39%)
I
Defining the Problem
Urban Water Challenges Living With WaterÂŽ
Flooding is caused by runoff & overwhelmed drainage systems.
Subsidence results from excessive groundwater pumping.
Water assets are hidden behind walls, buried underground, or pumped out of sight.
Precipitation Events New Orleans
In New Orleans, the 10 year, 24 hour precipitation event is around 8.5 inches of rain. This means that every year there is around a 10% chance that 8.5 inches of rain will fall over a 24 hour period. Within that day most of that 8.5 inches will fall over a more intense 1 to 2 hour period. In the 10 year 24 hour storm:
Design Precipitation Events
Historic Precipitation Events, 2009 -2019
Major rain days over the last TEN years as measured at the NOAA Audubon Park rain gauge
10 inches in 24 Hours 25 Year (5% Annual Chance) Figure 2: Hyetograph of Rainfall for 10-year 24-hour design storm for New Orleans area.
9.26 inches: Hurricane Isaac, 8/29/12
8.5 inches in 24 Hours 10 Year (10% Annual Chance) This is the design event used in the stormwater model
1,128 Ac Ft of rain will fall on
the combined impact area of the project.
8.1 inches: Tropical Storm Lee, 9/3/11 +/-8.0-10.0 inches: Rain, 8/5/17 *
7.2 inches: Rain, 12/12/2009 7.1 inches: Rain, 07/11/2019
138 Ac Ft of that rainfall volume
will become floodwater.
5.4 inches in 24 Hours 2 Year (50% Annual Chance)
To compare the results with real and known storm events, Procella downloaded rainfall short interval data at the New Orleans airport in Kenner, Louisiana from wunderground.com. The storms on the following dates were analyzed: June 10, 2020, July 10, 2019, and May 12, 2019. Procella tried to pull August 5th, 2017 storm but the data didn’t show significant rainfall at the New Orleans airport where the short interval data is collected. Procella tried to collect short term data closer to the project site, however, historic data hourly data wasn’t publicly available. Upon comparison of the three real storms, the July 10th, 2019 storm was used because it’s peak intensity of 7 inches/hr for a 5-minute period was closest toFigure the design storm’s peak intensity 7.42 inches/hr for a 5-minute The hyetographs and 2: Hyetograph of Rainfall forof 10-year 24-hour design storm forperiod. New Orleans area. Hyetograph, 24 Hour Design rainfall data for the July10 10thYear, , 2019 storm is shown in FiguresStorm 3 and 4. in New Orleans To compare the results with real and known storm events, Procella downloaded rainfall short interval data at the New Orleans airport in Kenner, Louisiana from wunderground.com. The storms on the following dates were analyzed: June 10, 2020, July 10, 2019, and May 12, 2019. Procella tried to pull August 5th, 2017 storm but the data didn’t show significant rainfall at the New Orleans airport where the short interval data is collected. Procella tried to collect short term data closer to the project site, however, historic data hourly data wasn’t publicly available. Upon comparison of the three real storms, the July 10th, 2019 storm was used because it’s peak intensity of 7 inches/hr for a 5-minute period was closest to the design storm’s peak intensity of 7.42 inches/hr for a 5-minute period. The hyetographs and rainfall data for the July 10th, 2019 storm is shown in Figures 3 and 4.
5.7 inches: Rain, 8/27/19
Figure 3: Hyetograph for July 10th, 2019 storm based on data from the New Orleans airport in Kenner, LA
Hyetograph for Storm Event on 10 July 2019, MSY Airport Data
Procella Design, LLC
1106 General Taylor St New Orleans, LA 70115
Credit: Procella 2256144280
Figure 3: Hyetograph for July 10th, 2019 storm based on data from the New Orleans airport in Kenner, LA
Procella Design, LLC
0 inches
* estimated amount, not measured at NOAA Audubon Park rain gauge
1106 General Taylor St New Orleans, LA 70115
2256144280
Historic Approach
Greater New Orleans Urban Water Plan
Stormwater Volume
STORE
FLOOD
PUMP
pipes / canals
Duration
Pump
TYPICAL STORM can raintake CURVE
The region the �irst step STOREsystems FLOOD from pump��irst drainage towards an integrated living water PUMP system by replacing paved areas wherever possible with vegetated and pervious surfaces that absorb
pumps
levee
Drain
Stormwater Volume
Stormwater Volume
rain is, hundreds and aves of a tree. That ousands of these “leaves” can be created ross the region’s 155 square miles. Each ows and absorbs water where it falls, d the water that does run off is cleaner d reduced in volume. Just as a tree’s aves provide bene�its for the surrounding vironment by cleaning the air, by groundwater sorbing water, by providing shade, and providing homes for variegated �lora and Pave + Pipe una, so too will the addition of “leaves” today’s drainage systems provide uanti�iable and long�term bene�its to the ople and environment of the region.
Duration
INCREASE PUMPING pumps
Duration
Duration
Paradigm Shift
Living With Water® Approach
Stormwater Volume
rain pumps INCREASE PUMPING
levee groundwater
Slow
Duration Store & Use
Stormwater Volume
SLOW, STORE & USE
Duration
Drain
(when necessary)
Living Water System
Greater New Orleans Urban Water Plan
Credit: H+N+S
Impacted Neighborhoods and Stakeholders Neighborhoods Esplanade Ridge / Treme Civic Association Mid City Neighborhood Organization St. Bernard-N. Rampart Business and Residential Alliance, Inc Historic Faubourg Treme Association. Faubourg Lafitte Tenants Association Greater Treme Consortium Incorporated Historic Faubourg Treme Association Faubourg Tulane Gravier Neighborhood Alliance Lower Mid-City Neighborhood Association Vieux Carre Property Owners, Residents & Associates INC Warehouse District Neighborhood Association Revitalization BioDistrict New Orleans Broad Community Connections Broad Street Main Street Claiborne Avenue Alliance North Rampart Main Street Phoenix of New Orleans Ujamaa Economic Development Corporation Businesses French Quarter Business Association Decatur Street Merchant Association Downtown Development District Magazine St. Merchants Association Parks Friends of Laffite Greenway Lafayette Square Association
Impacted Neighborhoods and Stakeholders Project Impact Area Pumping Station Watershed Planning District Boundary Project Area
LAKE
Areas and Stakeholders
PONTCHARTRAIN
DPS6
Duncan Plaza & VA Hospital Site A
Duncan Plaza
B
Lafayette Square
1
City Hall
2
Civil District Court
3
Superdome
4
University Medical Center & Veterans Affairs
5
LSU Health Sciences Center
6
Tulane University Medical Center
7
Charity Hospital
8
Charity School of Nursing (Delgado)
9
VA Hospital Site
10
New Orleans Public Library
11
Downtown Development District
Armstrong Park & Lafitte Greenway 12
Friends of Lafitte Greenway
13
Congo Square Preservation Society
14
Louis Armstrong Park
15
Historic Faubourg Treme Assoc.
16
Iberville Housing Development
17
Faubourg Lafitte
18
Mahalia Jackson Theater
19
Municipal Auditorium
20
Treme Center
21
Vieux Carre Commission
DPS4
DPS7
DPS3 B A Y O U S T. J O H N DPS2
MID-CITY
AC CT IMP PROJE
T AREA 17
TULANE/GRAVIER
12
TREME/LAFITTE 15
4 18
5 19
Duncan Plaza/VA Project Area
Armstrong/Lafitte Project Area
20 14
16
8
13
7
6
9
FRENCH QUARTER
10
3 A
1
21
2
CENTRAL BUSINESS DISTRICT B
11
PR
O
C JE
T
IM
PA
CT
E AR
A
SS MI
ISS
IP
PI
RIV
ER
Hydrology (Surface Flow) Project Impact Area Pumping Station Watershed Planning District Boundary Project Area
LAKE
Surface Flows
PONTCHARTRAIN
Back Slope Armstrong/Lafitte Project Area
Duncan Plaza/VA Project Area
Mid Slope
SS MI
Up Slope
ISS
IP
PI
RIV
ER
Stormwater System Project Impact Area Pumping Station Watershed Planning District Boundary Project Area
LAKE
Surface Flows
PONTCHARTRAIN
Pipes, Culverts & Canals Pump Station
DPS6 DPS4
DPS7
DPS3 B A Y O U S T. J O H N DPS2
MID-CITY
to
DPS1
TREME/LAFITTE
TULANE/GRAVIER
Armstrong/Lafitte Project Area
Duncan Plaza/VA Project Area
FRENCH QUARTER
CENTRAL BUSINESS DISTRICT
O PR
JE
CT
IM
P
T AC
AR
EA
SS MI
ISS
IP
PI
RIV
ER
Proposed Water Storage Retrofits Project Impact Area Pumping Station Watershed Planning District Boundary Project Area
LAKE
Pipes, Culverts & Canals
PONTCHARTRAIN
Pump Station Proposed Stormwater Retrofits
DPS6 DPS4
DPS7
DPS3 B A Y O U S T. J O H N DPS2
MID-CITY
to
DPS1
TREME/LAFITTE
TULANE/GRAVIER
Armstrong/Lafitte Project Area
Duncan Plaza/VA Project Area
FRENCH QUARTER
CENTRAL BUSINESS DISTRICT
O PR
JE
CT
IM
P
T AC
AR
EA
SS MI
ISS
IP
PI
RIV
ER
Existing Flooding
Street flooding in the CBD on 04 April 2019 Credit: Chris Granger. NOLA.COM
Street flooding on Canal Street on 10 July 2019 Credit: Chris Granger. NOLA.COM
Street flooding at Hagan and Lafitte Streets, July 2012 Credit: Waggonner & Ball
ABCADEÿGACAHIÿBCÿJEKÿL@HEACIÿMN?ÿOPQCRÿSPÿTEÿUPISHV A?@W@ÿAXBPCOverburdened ÿAKY RBCKÿ DSystem [Lÿ@\HNEA?CWIÿMN?ÿOPQCRÿSPÿTEÿUPISHV DEÿVGÿ ASCYAEHÿ IZÿBPCP ÿJE
##$%&''((()*+,-).+/'*0(%'$+,1#1.%'-2#1.,0345677890:;9-8:<<0=:6075:97<6==5>57=6)"#/,
GHEA@WÿXPÿKYVÿSYEÿZPPRBCD[ÿ\N?W
aefghÿiÿfjcbbÿklmjalÿfaoÿppqÿrsptÿuÿppvpwÿcx
DPW Pipes Less than 15” in Diameter
pÿ̈©ÿr
^ÿ̀abbÿcdaefghÿiÿfjcbbÿklmjalÿfaoÿppqÿrsptÿuÿppvpwÿcx
pÿ̈©ÿr
01ÿ344ÿ536738
9 38ÿ
83 ÿ 8 ÿ
83ÿ 5 ÿ ÿ 677 44 ÿ 8 ÿ38ÿ3 ÿ 43 ÿ 3 ÿ ÿ !
?@ABCADEÿGACAHIÿBCÿJEKÿL@HEACIÿMN?ÿOPQCRÿSPÿTEÿUPISHV 0;0%#21-*%ÿ/-®G 0H ÿ#E "0A 12ÿ@ ("ÿ"1V ±"ÿ Wÿ¯Xÿ#"2P+°±ÿKY ÿ(-SY#0E2ÿÿ1*ÿZ#"0PÿP²³´ÿRB-C8#0D2ÿ[-ÿÿ;+(*$+°2 \N?Wÿ-*;ÿµ++;ÿ1*ÿ¶0(ÿ·2,0-*%) "##$%&''((()*+,-).+/'*0(%'$+,1#1.%'-2#1.,0345677890:;9-8:<<0=:6075:97<6==5>57=6)"#/,
*%ÿ/-®0ÿ#"012ÿ(-¯ÿ#"2+°±"ÿ"1±"ÿ(-#02ÿ1*ÿ#"0ÿ²³´ÿ-8#02ÿ-ÿ;+(*$+°2ÿ-*;ÿµ++;ÿ1*ÿ¶0(ÿ·2,0-*%)
2
"21%ÿ±2-*±02
]^ÿ̀abbÿcdaefghÿiÿfjcbbÿklmjalÿfaoÿppqÿrsptÿuÿppvpwÿcx
pÿ̈©ÿr
|}~} | } ~} }ÿ ÿ } ÿ ÿ ÿ ÿ } ÿ } } } ÿ ÿ ÿ ÿ ÿ } } }ÿ ÿ } ÿ ÿ }ÿ~ÿ }~ÿ ÿ ÿ } ÿ ÿ ÿ ÿ ÿ~ ~ ÿ } } ~ÿ~ÿ } } }ÿ ÿ ÿ ÿ ÿ ÿ ~ ~ ÿ }ÿ ÿ } ÿ } ÿ ~ ÿ }ÿ ÿ } ÿ } ÿ ÿ }ÿ }} } ÿ ~ ÿ ÿ} ÿ ÿ ÿ } ÿÿ }} ÿ }ÿ }ÿ }}ÿ } ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ¡ }ÿ } } ÿ ÿ } ÿÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ¡ ÿ ÿ ÿ ÿ }} }~} ÿ ÿ }ÿ} ÿ ÿ ÿ ÿ| ÿ ¢} } } ÿ } ÿ }~} ÿ } }} ÿ| ÿ ¢} } ÿ | ÿ| } } } } } ÿ ££ ÿ ÿÿ¤ ¤ ÿ ÿ }ÿ } ÿ } } ¡ }¡ ÿ } ÿÿ ÿ ¤ ¤ ÿ }} ÿ } ÿ } 0;0%#21-*%ÿ/-®0ÿ#"012ÿ(-¯ÿ#"2+°±"ÿ"1±"ÿ(-#02ÿ1*ÿ#"0ÿ²³´ÿ-8#02ÿ-ÿ;+(*$+°2ÿ-*;ÿµ++;ÿ1*ÿ¶0(ÿ·2,0-*%) } ~ ÿ ~ÿ }ÿ ~ÿ } ÿ ÿ }} }ÿ } ÿ ÿ ÿ ~} ~} ÿÿ£ ÿ ¥ ¥ ÿ ÿ } ÿ} ÿ } ¤ }~ ¤ ÿ } ÿ } } } ÿ £ ÿ ÿ } } } ÿ ÿ }} ÿ ÿ ¡ } ÿ¡ } } ÿ } ÿ ÿ ÿ ÿ } } } } } ÿ ÿ } ÿÿ ~ÿ } ÿ ÿ ÿ ÿ ÿ } y0}zÿ {;0ÿ ~ ,% +* }} ÿ ÿ }| } ~} ÿ ÿ } } ÿ ÿ ÿ ÿ } £ } ÿÿ¥ ÿ ÿ ÿ ÿ ÿ £ ÿ ÿ£ ÿÿ ÿ ~ ÿ ÿ ~ ÿ ÿ } ÿ ÿ ÿ ÿ ÿ } ÿ} ÿ } } } ÿ ÿ } } ÿ ¥ } ~ÿ } ~ } } ÿ } £ ÿ ÿ }ÿ } }ÿ ÿ ÿ ÿ } } ÿ ÿ ÿ ÿ ÿ } ÿÿ~ ÿ ~ ÿ } } } ÿ }ÿ ¤} ÿ} } ÿ¦ ÿ¦ ÿ ÿ ÿ } ÿ } ÿ ÿ } ÿ } } }ÿ ÿÿ ~ } ÿ ÿ } ÿ ÿ ÿ } ÿ ¤} ÿ } ÿ } } ÿ ÿ ÿ
;0,%y+* 0zÿ{;0,%+*
]ª«ÿh¨¬
."21%ÿ±2-*±02
Credit: nola.com
}ÿ } ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ÿ ¡ ÿ ÿ } } ÿ~} }ÿ }} ÿ ÿ ÿ| ÿ¢} } ÿ| } } } ÿ £ ¡ } ÿ ÿ ÿ¤ ÿ¤ ÿ }}ÿ ÿ } } ¤ }~ ÿ }ÿ ~ÿ } ÿ }} } ÿ ÿ ~} ÿ£ ÿ ¥ ÿ ÿ }ÿ }
]ª«ÿh¨¬
]ª«ÿh¨¬
Existing Elevation Sections
height in ft.
LSU HSC Campus
UMC Site Beyond VA Site Beyond
Section 1: Near Poydras St, with 80 times vertical exaggeration height in ft.
UMC
VA
Section 2: Near Canal St, with 80 times vertical exaggeration 2 1
Parks Flooding Culverts
Section Locations
The drawings above are vertically exaggerated 80 times, and show the general slope of land down and away from the levees that bound the Mississippi River. Small changes in elevation are imperceptible to the eye, but visibly impact the flow of stormwater. For example, areas that are slightly lower than surrounding areas function as bowls, collecting water that depends entirely on the existing system to drain. Flooding occurs in these low-lying areas if the
subsurface drainage system is unable to handle the volume of stormwater. A nuanced study of drainage is necessary in order to understand existing conditions and to propose design solutions that are tailored to fit specific locations.
Elevation Impact Areas
Historic Map Colorized by Waggonner & Ball
rt m
pa
eA ve
N 0 /I -1 e
as
St la A ve
ydr
Loyo
CENTRAL BUSINES S DISTRICT
Po
MIS SIS SIPPI RIVER
N
St
Loyo
New Orleans, 1828
Av
rn
lan
FRENCH QUARTER
bo
Tu
e
UMC
lS t
ai
TUL ANE - GRAVIER
MIS SIS SIPPI RIVER
as
la A ve
ydr
na
Cl
rn bo
eA ve
Po
Ra
St ez lv
Av
FRENCH QUARTER
ai
lan
Ca
e
lS t
N
/I -1 0
VA
Cl
Tu
na
N
TUL ANE - GRAVIER
Ca
e
N
Ga
Ga
lv
N
ez
Ra
St
m
pa
rt
St
TREME - L AFIT TE
St
TREME - L AFIT TE
CENTRAL BUSINES S DISTRICT
Elevation < -4 ft
-4 to -2 ft
-2 to 0 ft
0 - 2 ft
2 - 4 ft
4 - 6 ft
Area with significant elevation change since city SWMM model was created
>6 ft
Drainage Impact Areas
rt pa m Ra
St
N
ez lv
Loyo
Watershed Boundary
0 /I -1 e Av
rn bo
lan
FRENCH QUARTER
eA ve
ai
Tu
e
UMC
lS t
ydr
as
St la A ve
CENTRAL BUSINES S DISTRICT
Po
MIS SIS SIPPI RIVER
N
St
Existing Drainage System Base Flood Area
na
Loyo
as
MIS SIS SIPPI RIVER
ydr
la A ve
Po
Ca
Cl
rn bo
eA ve
ai
lan
TUL ANE - GRAVIER
N
Tu
FRENCH QUARTER
Cl
TUL ANE - GRAVIER
lS t
e
UMC
VA
/I -1 0
na
e
Ca
Av
N
VA
N
Ga
Ga
lv
N
ez
Ra
St
m
pa
rt
St
TREME - L AFIT TE
St
TREME - L AFIT TE
CENTRAL BUSINES S DISTRICT
Elevation Drainage Line
< -4 ft
-4 to -2 ft
-2 to 0 ft
0 - 2 ft
2 - 4 ft
4 - 6 ft
Area with significant elevation change since city SWMM model was created
>6 ft
Tree Canopy and Urban Heat Impact Areas
rt pa m N 0 /I -1 e Av e rn bo
eA ve
ai
lan
FRENCH QUARTER
Cl
Tu
lS t
ydr
as
St la A ve
CENTRAL BUSINES S DISTRICT
Po
Existing Land Surface Temperatures Extreme Heat
High Heat
Severe Heat
Above Average Heat
CENTRAL BUSINES S DISTRICT
MIS SIS SIPPI RIVER
N
St
Loyo
Existing Tree Canopy and Vegetation
na
Loyo
as
Ca
UMC
MIS SIS SIPPI RIVER
ydr
la A ve
Po
Ra
St ez lv
/I -1 0
rn bo
eA ve
TUL ANE - GRAVIER
ai
lan
FRENCH QUARTER
Cl
Tu
lS t
e
UMC
VA
e
na
Av
Ca
N
TUL ANE - GRAVIER
N
VA
N
Ga
Ga
lv
N
ez
Ra
St
m
pa
rt
St
TREME - L AFIT TE
St
TREME - L AFIT TE
II
Design Scenarios
Work Across Scales R E C O N N E C T I N G THE GRID AND EXTENDING THE GREENWAY TO BASIN ST. R E N O VAT E D C H A R I T Y O N T U L A N E AV E N U E
Heroes Tulane Ave.
Charity Redevelopment
Lafitte Blueway
Lafitte Greenway 8 E
Duncan Plaza
X T E N D E D
G
R E E N W A Y
Armstrong Park
20
DOWNTOWN CAMPUS LONG TERM VISION PLAN MASTER PLAN PROJECTS 1. Elks Place ground floor renovation 2. Elks Place campus green 3. Cleveland St Streetscape 4. Tulane Ave Streetscape 5. Canal St Streetscape 6. Poydras + Perdido space moves (to Murphy) 7. Tidewater renovation + plaza 8. New partnership research/ academic building 9. TUMC transition to clinical + research space 10. Deming renovation 11. New academic building 12. 1430 Tulane renovation
Networks
6
8
11
BUILDING LANDSCAPE
7 12
INFRASTRUCTURE + PARKING
7
9 4
3 10
5 2
1
11
DDD Streets
Tulane Downtown Campus
Parcels GNOF
Legacy Park
Jung Hotel
Water-Neutral Development
Claiborne Avenue
Existing Conditions
Project Area: VA Hospital Site - Duncan Plaza
Charity Hospital VA Hospital Site NOPL Main Branch Heal Garage
Duncan Plaza
City Hall
architecture + planning + interiors
1119 Tchoupitoulas Street New Orleans LA 70130 Street 1119 Tchoupitoulas New Orleans 504.593.9074 tel LA 70130 504.593.9074 tel
studiowta.com
studiowta.com
architecture + planning + interiors
architecture + planning + interiors 1119 Tchoupitoulas Street New Orleans LA 70130 1119 Tchoupitoulas Street New Orleans LA 70130 504.593.9074 tel 504.593.9074 tel
T
SA
ST RE E
S.
OGT AREM ST E REST ETRE
E ST R
EN
significance highUhistoric E
A
OG
no historic significance or high historic significance architectural merit
no historic significanc architectural merit
S.
AV
SA RA T
SA RA T
high potential for reuse due to scale high potential for reus highest historic significance and/or architectural character and/or architectural c
highest historic significance
H LIB ERTY S
H LIB ERT
PL A
PL AC E
ET
EET
1937
2
K
SOUT
DID
TRE
ET
DID
POERS DTIR DE OEST TRE
ET
OS
VENU
OUAMP
TSH R
TH R SOU
SOU
AMP
LOYO
ART
LA A
STRE
E
VENU
LA A
1950s-1980s
PER
ET
VENU
E
T TREE
LLE S
OS
LASA
TREE T LLE S
LASA
DID
PER
LOYO
1950s-1980s
1950s-1980s
LOYO
1948
LA A
E 1950s-1980s
1938
PER
VENU
1948
T
1948
1938
E
1938
1937
1961
EL
K
EL
STRE
SOUT
1937 1929 1937
LA A
1938
EL K
Y STR
ET
1937
significant additionpreviously to significant, not enough previously significant, not enough historic structure historic material remaining of merit historic material remaining of merit
historic material remaining, historic material remaining, showing demarcation of original showing demarcation of original architectural merit questionable architectural merit building questionable footprint vs. additions building for footprint vs. additions for historically significant structures historically significant structures
RE
1961 1938 1938 1948
T
significant addition to 1937 historic structure 1929
LOYO
1961 1938 1961
architectural merit questionable architectural merit building questionable footprint vs. additions building for footprint vs. a detrimental encroachement ondetrimental encroachement on historically significant historically significant historically significant structure historically significantstructures structure historically significant
ET
historically significant
H LIB ERTY
ST
1929
1938
RE
1929
1949-51?1937
1949-51?1937
ST
historic structure historic material remaining of merit historic material rema
no historic significance or no historic significance or high historic significance architectural merit architectural merit historic material remaining, historic material remaining, showing demarcation of original showing demarcation
SOUT
ET
historic structure
high historic significance
H LIB ERT
RE
IER
Y STR
AV
ET
GR1937 AV IER
high potential for reuse due to scale high potential for reuse due to scale highest historic significance historic significanthighest addition to significance previously toand/or architectural significant,character not enough previously significant, and/orsignificant architecturaladdition character
SOUT
1980s
ST
LASA architecture + planning + interiors
NE
UE
UE
KEY: IDENTIFICATION KEY: IDENTIFICATION OF SIGNIFICANCE OF SIGNIFICAN
LA
EN
GR
RE
LLE S FRETRREE ET ST TREE
ET
IER
1980s
ST
LASA
TRE
AV
LLE S FRETRREE ET ST TREE T
ET
GR
RERE STRE ET S. TRO ST BR EE RETTSO N ST REE
ET
SS
IER
1937 1937
FRER SE. TRO ST BR EE RETTSO N F
TRE
RA
1949-52
1980s
1949-51?
N
ET
TRE
3
MOLIA S S. RO SON S AGNOTLRIEAET BERT TREET STRE SON ET STRE ET
SS
YD
1949-52
AV
1937
BERT
RA
PO
1980s
GR
1949-51?
MAG
TRE
SS
1949-52
S. RO
YD
RA
AV
EN
detrimental encroachement ondetrimental encroach KEY: IDENTIFICATION KEY: IDENTIFICATION OF SIGNIFICANCE OF SIGNIFICANCE historically significant historically significant historically significant structurehistorically significant
1949-52
MAGMAG CLA CLA NOLI NOL RA S RA S A ST IA S TREE TRE REETTRE T ET ET
PO
SS
YD
UE
AV
S.
EA VE N
BO RN
REET
A ST
CLAR
RA
PO
1
EN
TU
1938
1938
CL AI
REET
A ST
CLAR YD
VE NU E
RN
CL
AI BO
VE NU E
BO RN
1938
CL AI
PO
EA
EA VE N
1938
EA
CL
AI BO
RN
The Old VA Site Re-Use Study, executed by Studio WTA and Spackman Mossop Michaels, identified the historic significance of each building or addition within the hospital site. The most significant buildings were recommended for preservation or rehabilitation. Most significant is the Charity Hospital School of Nursing (1) at Claiborne Avenue, portions of the power plant and utility buildings (2) at Freret and Lasalle Streets, and the heart of the VA Hospital (3).
NE
NE
T
LA
OLD VA SITE RE-USE OLDSTUDY VA SITE New RE-USE Orleans, STUDY LA 70112 New Orleans, LA 70112
LA
TREE
TU
UE
UE
DDD VA Complex Study, 2017
S. S.DE RBIG NY S TRE
S.DE RBIG NY S TRE
S.
Historic Significance
AV
TR EM E
NE
EET
LA
OLD VA SITE RE-USE OLDSTUDY VA SITE New RE-USE Orleans, STUDY LA 70112 New Orleans, LA 70112
TRE
ET
N
N
N
N
Historic Significance DiagramHistoric May 2017 Significance Dia
Historic Significance DiagramHistoric May 2017 Significance Diagram May 2017
studiowta.com
studiowta.com
Source: Downtown Development District, Studio WTA, Spackman Mossop Michaels (SMM)
Buildings Proposed for Demolition Several buildings around the VA campus have no historic significance or are detrimental encroachments on their historic neighbors. The City of New Orleans will potentially use a portion of these buildings for office space and Civil District Courts. For the MIN Scenario, we envision demolishing the most detrimental structures to create open space. The MID Scenario follows the recommendations of the DDD VA study, while the MAX Scenario aligns with the HRI Charity District vision.
Gr av
St
La
do
i rd Pe
sa
lle
St
ier
St
MIN Scenario Demolition
MID Scenario Demolition
MAX Scenario Demolition
Duncan Plaza
Source: Google Earth
HRI Charity District Vision The HRI Charity District vision proposed the most additional greenspace and extensive building demolition. The Charity School of Nursing building, and the Power building are left intact and the rest of the VA Site is turned into an extension of Duncan Plaza. This proposal is the starting point for MAX Scenario.
Source: HRI Properties
2017 Master Plan
To Lafitte Greenway & Armstrong Park
AV E E
W
A
L
K
STRE
EE
T
NOPL
SHOPPING VILLAGE EVENT STAGE
PARKING OUTDOOR DINNING
SHARED STREETS
DUNCAN PLAZA
ET STRE
DID
OS
TRE
ET
LASA LLE
ET S
TREE
T
BERT
FRER
PER
UE
SPORTS COURTS
SON
STRE
ET
OLIA MAGN
TR
AVEN
E
RS
ROOF DECKS
ET
E
E
LOYO LA
EET A STR
L
NU
T
LAWN DOG PARK L
AV E
STRE E
DROP-OFF
A
NE
ERTY
AVI E
PATIO
H LIB
GR
RESIDENTIAL APARTMENTS
SOUT
AI BO RN
CHARITY FORUM
SERVICE DRIVE
S. RO
The Proposed design scenario incorporates elements from this conceptual design.
LA
QUAD
CLAR
A great lawn is the green heart of the new development, with pedestrian connections to Poydras, Claiborne and Loyola, The Heal Garage would be opened up at the ground floor, creating covered outdoor space and increased connectivity between Duncan Plaza and the new developments on the VA Site. An allee of trees along Perdido Street provides a shaded pedestrian corridor from Loyola to Claiborne.
TU
CL
The 2017 Master Plan recommends preserving or rehabilitating the historic School of Nursing and VA Hospital, converting them into residential apartments. The historic utility buildings would become a commercial shopping and restaurant center.
NU E
DDD VA Complex Study
ORLEANS, LA VA ComplexCityNEW Hall
To Champions Square
Source: DDD, Studio WTA, SMM
Duncan Plaza Master Plan 2018
DO W
NT
O ET W PLAN TREE ANALYSIS | MASTER N
E STRE LASALL
ET
E STRE
LASALL
12” OAK
KE SI D
E
LEGEND PARKING GARAGE
LA
This ambitious redesign of Duncan Plaza by OJB Landscape Architecture was commissioned by the Downtown Development District. LEGEND It preserves the largest, oldest oak trees and creates FLEXIBLE LAWN various program areas. Decorative CHILDREN’S PLAY and interactive water features CULTURAL PLAZA were proposed, but stormwater F&B PLAZA management of a scale that would DOG PARK reduce flood risk was not included in theGATHERING-READING-GAMES design.
12” OAK
12” OAK
EXISTING TREE
27” OAK
PARKING GARAGE
POTENTIAL RELOCATED TREE TREE TO BE REMOVED 36” OAK
FUTURE DEVELOPMENT
F&B PLAZA
27” OAK
REMOVE (3) PALM TREES
PERFORMANCE PLAZA
RAIN GARDENS
GATHERING-READINGGAMES TERRACE
27” OAK
CITY HALL
RAIN GARDEN
TREE TO BE REMOVED
24” OAK 24” OAK
6” OAK
36” OAK
LIBRARY
30” OAK 24” OAK
(4) 10” OAK 24” OAK
36” OAK 24” OAK
24” OAK REMOVE PALM TREE
36” OAK
UP
PARKING GARAGE
10” OAK
24” OAK 24” OAK 15” OAK 30” OAK 54” OAK
REMOVE (4) PALM TREES
36” OAK
D
E
12” OAK REMOVE (2) PALM TREE
SI VE R
RI
27” OAK
10” OAK
24” OAK
42” OAK
12” OAK
LIBRA
8” OAK
24” OAK
36” OAK
12” OAK
REMOVE (6) BALD CYPRESS TREES 30” OAK
REMOVE PALM TREE
12” OAK
REMOVE PALM TREE
30” OAK
24” OAK
DOG PARK
ET E STRE LASALL E AVENU LOYOLA
LEGEND EXISTING TREE
30” OAK
24” OAK
TREE ANALYSIS | MASTER PLAN
POTENTIAL RELOCATED TREE
PERFORMANCE PLAZA
GATHERING-READINGGAMES TERRACE CAFE/ RESTROOMS
CITY HALL
FLEXIBLE LAWN
CULTURAL PLAZA
Right: Tree survey performed by OJB identified the significant trees in Duncan Plaza to be protected, relocated, or removed.
REMOVE (3) PALM TREES
CHILDREN’S PLAY
PERDIDO STREET
PERDIDO STREET
STRUCTURES
REMOVE (3) PALM TREES
REMOVE (5) CREPE MYRTLE TREES
CAFE/ RESTROOMS
WATER
21” OAK
34” OAK
FLEXIBLE TERRACES DINING TERRACE
REMOVE (5) HACKBERRY TREES
27” OAK
GRAVIER STREET
FLEXIBLE TERRACE
WATER
ENUE
AV LOYOLA
TO W
N OAK 36” 27” OAK
REMOVE (3) PALM TREES
Source: Downtown Development District, OJB Landscape Architecture
Infrastructure Improvements
Large Scale Storage in Streets and Open Spaces The concept of Interceptor Streets - large scale water storage underneath existing roadways - is based on a previous study completed for the DDD and City of New Orleans Department of Public Works (DPW). Interceptor Streets include pervious pavement parking lanes and upgrades to drainage pipes. This study guided the current work, but was not included in the scope and thus was not modeled. Duncan Plaza and other open spaces (shown in green) also have potential to create significant additional water storage. Upgrades to pipe storage: 1.15M gallons or 1.97 acre feet Pervious pavement parking lanes on 45 blocks: 1.85M gallons or 5.68 acre feet Duncan Plaza underground storage: 3.91M gallons or 11.99 acre feet Total potential storage: 6.91M gallons or 21.22 acre-feet Duncan Plaza is a major opportunity, providing more storage than pipe upgrades and pervious pavement combined.
Design Scenario Storage Volume Duncan Plaza:
12 Ac Ft
Pervious Pavement: Increased Storage: Current Storage:
5.7 Ac Ft 2 Ac Ft 1.6 Ac Ft
Duncan Plaza
Potential Interceptor Streets
DDD Proposed Interceptor Street
Improved Drainage, Permeable Parking Lane, Subsurface Storage
Permeable Concrete Parking Lane at S. Galvez
Permeable Asphalt or Concrete
Gravel Storage Larger Infiltrating Drainage Pipes Alternate: Pave Drain Modular Permeable Pavers
DDD Living With WaterÂŽ Alternative Improved Storage, Ecological, and Spatial Quality
Improved Crosswalks
Bioretention Bump Out
Bioretention Plantings, Seattle
Pave Drain
Gravel Storage Infiltrating Pipe Structural Sidewalks Provide Space for Tree Roots and Water Storage
Existing Conditions
Project Area: Lafitte Greenway - Armstrong Park
Bayou St. John
DPS #2
Sojourner Truth Neighborhood Center Treme Commnity Center Lafitte Greenway Mahalia Jackson Theater
Armstrong Park
Municipal Auditorium
Congo Square
Basin Street Station
Carondelet Canal Turning Basin Past + Present
Circulating System
Greater New Orleans Urban Water Plan
Water source for future circulating water system
Credit: H + N + S, Waggonner & Ball
Lafitte Greenway + Armstrong Park RECONNECTING THE GRID
MUNICIPAL AUDITORIUM
Source: Lafitte Blueway, Waggonner & Ball
Source: Center City Transformation, HRI Properties
Eliminate Interstate Geometry of Basin St. Curve Achieve Prominent Exposure for Municipal Auditorium. Allow Greenway Trail Head to Basin St.
19
Right of Way Green Infrastructure Green Infrastructure Precedents
Green Street Program Portland Green Streets Program Rego Park New York Calabasas California RRM Design Group
Credit: Dana Brown & Associates
Paso Robles California SvR Best Practices Urban Bioswale
Sustainable Urban Drainage System Llanelli Wales Best Practices Porous Parking
Credit: Dana Brown & Associates
Subsurface Water Detention Typical -> Intensive
Modular Storage Units Precast Storage Vaults
Plastic Storage Vaults
Park Above Cisterns Kasukabe, Japan
Large, Underground Concrete Cisterns Kasukabe, Japan
Water Plazas Safety + Amenity
Credit: Waggonner & Ball
Tanner Springs Park Portland CMS
Tanner Springs Park Portland CMS
Redfern Park Sydney, Australia
Engehave Park, Copenhagen Tredje Natur
Stormwater Modeling Impact Areas
• Stormwater modeling included DPS Watersheds 2 & 3 • Design storm is the 10 year, 24 hour event (8.5 Inches of Rain) • Modeling ran over 25 scenarios and alternates • Initially, the model ran the Min, Mid and Max Scenarios for each project area, and then refined and combined them to achieve optimal results
Scenario 1 2 3 4 5 6 7 8 8.1 8.5 9 9.3 10 11 12.1 13
Storage to Combined Impact Area Storage Reduction Reduction Flood Acres Ratio Ac Ft Ac Ft Scenario Description Ac Ft Base 10 Year 24 Hour Flood 137.6 2.2 : 1 MIN Downtown 23.9 9.3 126.8 10.8 -8% MID Downtown 51.9 23.2 3.6 : 1 123.0 14.6 -11% MAX Downtown 65.9 26.5 4.3 : 1 122.2 15.4 -11% 2.8 : 1 MIN Lafitte 20.6 6.9 130.3 7.3 -5% MID Lafitte 40.4 28.7 2.4 : 1 120.6 17.0 -12% 30.1 118.0 19.6 -14% 3.7 : 1 MID Downtown + MIN Lafitte 72.5 MAX Downtown + MID Lafitte 110.4 47.7 3.8 : 1 108.2 29.4 -21% Infinite Storage Test 82.2 55.4 -40% MAX Downtown (upsized pipes 4 without Lafayette Square ) + MID Lafitte 110.4 47.7 2.7 : 1 97.0 40.6 -30% MAX Downtown + MAX Lafitte (routing from St Louis Culvert) 174.5 78.8 4.1 : 1 94.6 43.0 -31% 78.8 2.9 : 1 77.8 59.8 -43% MAX Downtown + MAX Lafitte (routing from Orleans Ave Culvert 1 + Upsized Pipes) 174.5 MAX Downtown (without Lafayette Square) + MAX Lafitte (routing from St Louis Culvert) 167.1 97.4 40.2 -29% 76.7 4.2 : 1 MAX Lafitte (routing from Orleans Ave Culvert) 108.6 52.2 2.9 : 1 99.9 37.7 -27% Proposed Scenario: MID Downtown (upsized pipes 2) + MAX Lafitte (routing from Orleans Ave Culvert 160.4 75.5 3.0 : 1 84.4 53.2 -39% "Minimum" MIN Downtown + MIN Lafitte 44.6 16.2 2.6 : 1 120.7 16.9 -12%
Downtown Impact Area Flood Reduction Ac Ft Ac Ft 56.3 45.9 42.1 41.3 50.7 48.8 38.6 36.9 13.6 26.1 25.2 20.2 28.0 39.4 26.1 42.9
10.4 14.2 15.0 5.6 7.5 17.7 19.4 42.7 30.2 31.1 36.1 28.3 16.9 30.2 13.4
-19% -25% -27% -10% -13% -31% -34% -76% -54% -55% -64% -50% -30% -54% -24%
Lafitte Impact Area Flood Reduction Ac Ft Ac Ft 123.6 114.2 111.4 110.6 116.8 107.2 106.9 97.3 79.4 89.6 86.4 72.0 87.2 87.0 75.7 108.4
9.3 12.1 13.0 6.8 16.4 16.7 26.3 44.2 34.0 37.2 51.6 36.4 36.5 47.9 15.2
-8% -10% -10% -6% -13% -14% -21% -36% -28% -30% -42% -29% -30% -39% -12%
Stormwater Modeling VA Hospital Site - Duncan Plaza
Credit: Procella
Urban Water Design Components Basis of Stormwater Calculations and Estimates Type
Average Depth/SF
Type
Average Depth/SF
New Development
0.1 to 2 ft
Residual Space
3 ft
New buildings and sites store code minimum 1.25 inches More intensive storage at City Hall redevelopment sites
Pavement Storage
Structural water storage under parking, sidewalks and plazas.
Open Space Planted bioswales, open canals, and/or structural water storage under lawns and fields
Interventions in courtyards, setbacks and open space between VA buildings Flow through planters, cisterns, subsurface storage, bioretention
1.5 ft
AllĂŠe of Trees
Trees planted in structural soil with pervous paving or in bioswales
3 ft
Green/Blue Roof
Landscaping or detention on rooftops
1.5 ft
MIN Scenario
Duncan Plaza + VA Site + City Hall The Minimum (MIN) Scenario accounts for the Cityâ&#x20AC;&#x2122;s use of some of the VA buildings, while creating new urban park spaces through selective demolition. The City owns a portion of the Duncan Plaza site; interventions are limited to parcels controlled by the City. The pavilion, mounds and trees are preserved; the remainder of the park would be designed with stormwater management features. Jung Hotel
LSUHSC
Tulane Medical Center Hospital
Former Charity Hospital VA Site
NOPL
Design Scenario Impact Area Storage Volume Flood Volume
56 Ac Ft Base 46 Ac Ft MIN Scenario (19%) Total 23.9 Ac Ft Pavement Duncan Plaza
4.1 Ac Ft 4.7 Ac Ft
Open Space 15.2 Ac Ft
Duncan Plaza
Storage Type Open Space Residual Space Allee Blue/Green Roof Open Water Pavement New Development
City Hall
Node Flood Depth 2 ft 1 ft 0 ft
Existing Flood Depth Scenario Flood Depth
Superdome
MID Scenario
Duncan Plaza + VA Site + City Hall The Middle (MID) Scenario uses the DDD VA Site and Duncan Plaza studies as a starting point. Additional detention around City Hall and the New Orleans Public Library is added. This Scenario also includes more extensive building demolition and site redevelopment.
Jung Hotel
LSUHSC
Tulane Medical Center Hospital
Former Charity Hospital VA Site
NOPL
Design Scenario Impact Area Storage Volume Flood Volume
Total 51.9 Ac Ft Green Roof
0.4 Ac Ft
New Development
4 Ac Ft
Pavement 11.6 Ac Ft Duncan Plaza
12 Ac Ft
Open Space 23.8 Ac Ft
56 Ac Ft Base 42 Ac Ft MID Scenario (25%)
Duncan Plaza
Storage Type Open Space Residual Space Allee Blue/Green Roof Open Water Pavement New Development
City Hall
Node Flood Depth 2 ft 1 ft 0 ft
Existing Flood Depth Scenario Flood Depth
Superdome
MAX Scenario
Duncan Plaza + VA Site + City Hall The Maximum (MAX) Scenario uses the HRI Properties Charity District, DDD VA Site and Duncan Plaza studies as a starting point. Stormwater detention added in the MID Scenario is added to the MAX as well. Stormwater detention at Lafayette Square has been added as well, shown in the inset map. This scenario creates marginally more storage and flood reduction with significantly more building demolition. Jung Hotel
LSUHSC
Tulane Medical Center Hospital
Former Charity Hospital VA Site
NOPL
Design Scenario Impact Area Storage Volume Flood Volume Total 58.6 Ac Ft Green Roof
0.4 Ac Ft
New Development Pavement
4 Ac Ft 8.7 Ac Ft
Duncan Plaza
12 Ac Ft
Open Space 39.5 Ac Ft
56 Ac Ft Base 41 Ac Ft MAX Scenario (27%)
Duncan Plaza
Storage Type Open Space Residual Space Allee Blue/Green Roof Open Water Pavement New Development
City Hall
Node Flood Depth 2 ft 1 ft 0 ft
Existing Flood Depth Scenario Flood Depth
Superdome
Lafayette Square
MIN Scenario
Lafitte Greenway + Armstrong Park The Minimum (MIN) Scenario shows storage opportunities within the former Carondelet Canal right of way in the Lafitte Greenway and through manipulating existing water levels in Armstrong Park.
Ex
Design Scenario Impact Area Storage Volume Flood Volume
ist
124 Ac Ft Base 117 Ac Ft MIN Scenario (6%)
ing
La
fitt eG
re e
nw ay
Storage Type Open Space Residual Space Allee Blue/Green Roof Open Water Pavement New Development
Total 20.6 Ac Ft
Mahalia Jackson Theater
Node Flood Depth 2 ft
Open Water
7.5 Ac Ft
1 ft
Open Space
13.1 Ac Ft
0 ft
Existing Flood Depth Scenario Flood Depth
Tr ail
SWB Sewer Station Municipal Auditorium Congo Square
MID Scenario
Lafitte Greenway + Armstrong Park The Middle (MID) Scenario uses the WBAE Lafitte Blueway and HRI Properties City Center Transformation studies as a starting point. This scenario includes the redevelopment of nearby sites, and works around the redesign of Basin Street.
Mahalia Jackson Theater
Design Scenario Impact Area Storage Volume Flood Volume 124 Ac Ft Base
SWB Sewer Station
107 Ac Ft MID Scenario (13%)
Municipal Auditorium
Total 40.4 Ac Ft New Development Pavement Open Water
4 Ac Ft 8.7 Ac Ft 7.5 Ac Ft
Open Space 26.9 Ac Ft
Storage Type Open Space Residual Space Allee Blue/Green Roof Open Water Pavement New Development Node Flood Depth 2 ft 1 ft 0 ft
Existing Flood Depth Scenario Flood Depth
Congo Square
MAX Scenario
Lafitte Greenway + Armstrong Park The Maximum (MAX) Scenario uses the WBAE Lafitte Blueway and HRI Properties City Center Transformation studies as a starting point. This scenario includes the full extent of the Lafitte Greenway, as shown in the inset. The MAX scenario proposes significantly more storage volume and creates the most flood reduction in the Lafitte impact area.
Full Extent
Window
Mahalia Jackson Theater
Design Scenario Impact Area Storage Volume Flood Volume Total 108.6 Ac Ft New Development Pavement Open Water
124 Ac Ft Base
SWB Sewer Station
4 Ac Ft 8.7 Ac Ft 7.5 Ac Ft
Municipal Auditorium
87 Ac Ft MAX Scenario (30%)
Open Space 95.1 Ac Ft
Storage Type Open Space Residual Space Allee Blue/Green Roof Open Water Pavement New Development Node Flood Depth 2 ft 1 ft 0 ft
Existing Flood Depth Scenario Flood Depth
Congo Square
Matrix of Design Scenarios MIN
MID
MAX 1
MAX 2 Run 9.3 Lafitte Reduces Flooding in Treme - Lafitte
Lafitte
*Drawn at 1/3 the scale of downtown interventions
Base Flood Flood Reduction: 124 AcFt 6 AcFt (7%)
Run 9 Lafitte Reduces Floooding in Tulane - Gravier
Flood Reduction:
Flood Reduction:
16 AcFt (13%)
37 AcFt (30%) HRI Masterplan
HRI Masterplan
Downtown
+
Tree Relocation based on OJB masterplan
Base Flood Flood Reduction: 56 AcFt 10 AcFt (19%) Combined Base Flood 124 AcFt
Lafayette Square
+
Flood Reduction:
Flood Reduction:
Flood Reduction:
14 AcFt (25%)
15 AcFt (27%)
15 AcFt (27%)
Flood Reduction
Flood Reduction:
Flood Reduction:
41 AcFt (30%)
43 AcFt (31%)
60 AcFt (43%)
Lafayette Square
Matrix of Design Scenarios Proposed
MINIMUM
MAX 2
PROPOSED Run 9.2 Lafitte Reduces Flooding in Treme - Lafitte
Lafitte
*Drawn at 1/3 the scale of downtown interventions
Base Flood Flood Reduction: 124 AcFt 6 AcFt (7%)
Flood Reduction:
37 AcFt (30%)
MID
Downtown
Tree Relocation based on OJB masterplan
Base Flood Flood Reduction: 56 AcFt
10 AcFt (19%)
Combined Base Flood Flood Reduction: 124 AcFt 17 AcFt (12%)
Flood Reduction:
14 AcFt (25%) Flood Reduction:
53 AcFt (39%)
DRAFT
Impact Areas and Base Flood Base Flood Volume: 138 Ac Ft
an
e
EA
St
rt pa ui
s
St
lv
ras S t
3 - 6by in combining 6 - 9 all in of the subcatchments > 12 in < 1 inImpact areas 1 - 3 in 9 - 12 in Project were created where the MAX Scenario reduced flooding or stress on the drainage network. Open Space Residual Space Pavement New Development Green Roof
e Av e rn
ai
bo
FRENCH QUARTER
Cl
Loyo
la A ve
eA ve
D IM OW PA N C TO T W A N RE A
CENTRAL BUSINES S DISTRICT
Flood ImpactDepth AreasReduction from 10-year, 24-hour Design Storm Baseline
lan
IBERVILLE
MIS SIS SIPPI RIVER
Poyd
MIS SIS SIPPI RIVER
la A ve Loyo
MA Down X s tow cen n ario
D IM OW PA N C TO T W A N RE A
Tu
lS t
N
FRENCH QUARTER
na
/I -1 0
Ga N
/I -1 0 e e
ai
bo
IBERVILLE
Cl
eA ve
Ca
TUL ANE - GRAVIER
Av
lS t
rn
na
N
lan
Lo
m
St
Ra
ce na rio
lv Ga N
Ca
TUL ANE - GRAVIER Tu
EA
N
s
ez
ui
Drainage Pump Station 2
ez
Lo
St
St
L IM AFI PA T T CT E AR
TREME - L AFIT TE
St
La fitt eM AX S
e
rt
Drainage Pump Station 2
Av
St
L IM AFI PA T T CT E AR
TREME - L AFIT TE
s
St
Av
pa
s
le
m
an
Or
Ra
le
N
Or
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth 0 - 3 in
3 - 6 in
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
18 - 24 in
Area with significant elevation change since city SWMM model was created Major Drainage Line Credit: Waggonner & Ball
Infinite Storage Test Base Flood Volume: 138 Ac Ft
Infinite Storage Test Flood Reduction: 55 Ac Ft (-40%) reduces flooding in Downtown and has a significant impact in the Treme - Lafitte Neighborhood as well. However local topographic depressions such as the area around the Jung Hotel and along Gravier St remain partially flooded. This test demonstrates that even an infinite amount of stormwater detention around Duncan Plaza cannot solve all of Downtown’s flooding issues.
This scenario tested what would happen if all of the stormwater flowing through the culvert underneath Loyola Ave was removed from the drainage system near Duncan Plaza. This scenario would eliminate all of Duncan Plaza and City Hall’s stormwater as well as all of the CBD’s stormwater upstream of Duncan Plaza. This entirely unrealistic scenario dramatically
Drainage Pump Station 2 EA
EA
3 - 6 in
9 - 12 in
rt pa m Ra /I -1 0 e e
Av
FRENCH QUARTER
bo
rn
IBERVILLE
Loyo
la A ve
eA ve
ai
lan
D IM OW PA N C TO T W A N RE A
CENTRAL BUSINES S DISTRICT
6 - 9 in
lS t
MIS SIS SIPPI RIVER
ras S t
na
Cl
Tu
MIS SIS SIPPI RIVER
la A ve Poyd
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline 1 - 3 in
St
N
FRENCH QUARTER
Loyo
D IM OW PA N C TO T W A N RE A
< 1 in
s
lv N
/I -1 0 e e
Cl
eA ve
ai
bo
IBERVILLE
N
lan
Ca
TUL ANE - GRAVIER
Av
lS t
rn
na
Ga
lv Ga N
Ca
TUL ANE - GRAVIER Tu
ui
N
St
St
Lo
ez
s
ez
ui
Ra
m
St
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
L IM AFI PA T T CT E AR
TREME - L AFIT TE
St
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth > 12 in
0 - 3 in
3 - 6 in
Major Drainage Line
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
18 - 24 in
Minimum Scenario
Base Flood Volume: 138 Ac Ft
le
an
Or s
Av
le
an
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Drainage Pump Station 2 EA
EA
Open Space
3 - 6 in
Residual Space
Pavement
9 - 12 in New Development
rt pa m Ra /I -1 0 e e
Av
FRENCH QUARTER
bo
rn
IBERVILLE
Loyo
la A ve
eA ve
ai
lan
D IM OW PA N C TO T W A N RE A
CENTRAL BUSINES S DISTRICT
6 - 9 in
lS t
MIS SIS SIPPI RIVER
ras S t
na
Cl
Tu
MIS SIS SIPPI RIVER
la A ve Poyd
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline 1 - 3 in
St
N
FRENCH QUARTER
Loyo
D IM OW PA N C TO T W A N RE A
< 1 in
s
lv N
/I -1 0 e e
Cl
eA ve
ai
bo
IBERVILLE
N
lan
Ca
TUL ANE - GRAVIER
Av
lS t
rn
na
Ga
lv Ga N
Ca
TUL ANE - GRAVIER Tu
ui
N
St
St
Lo
ez
s
ez
ui
Ra
m
St
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
s
St
Or
Minimum Scenario Flood Reduction: 17 Ac Ft (-12%)
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth > 12 in Green Roof
0 - 3 in
3 - 6 in
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
Area with significant elevation change since city SWMM model was created Major Drainage Line
18 - 24 in
Proposed Scenario: MID Downtown + MAX Lafitte Base Flood Volume: 138 Ac Ft
le
an
Or s
Av
le
an
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Drainage Pump Station 2 EA
EA
Open Space
3 - 6 in
Residual Space
Pavement
9 - 12 in New Development
rt pa m Ra /I -1 0 e e
Av
FRENCH QUARTER
bo
rn
IBERVILLE
Loyo
la A ve
eA ve
ai
lan
D IM OW PA N C TO T W A N RE A
CENTRAL BUSINES S DISTRICT
6 - 9 in
lS t
MIS SIS SIPPI RIVER
ras S t
na
Cl
Tu
MIS SIS SIPPI RIVER
la A ve Poyd
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline 1 - 3 in
St
N
FRENCH QUARTER
Loyo
D IM OW PA N C TO T W A N RE A
< 1 in
s
lv N
/I -1 0 e e
Cl
eA ve
ai
bo
IBERVILLE
N
lan
Ca
TUL ANE - GRAVIER
Av
lS t
rn
na
Ga
lv Ga N
Ca
TUL ANE - GRAVIER Tu
ui
N
St
St
Lo
ez
s
ez
ui
Ra
m
St
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
s
St
Or
Proposed Scenario Flood Reduction: 53 Ac Ft (-39%)
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth > 12 in Green Roof
0 - 3 in
3 - 6 in
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
Area with significant elevation change since city SWMM model was created Major Drainage Line
18 - 24 in
Maximum Scenario: Lafitte Routes to Orleans Culvert Base Flood Volume: 138 Ac Ft
le
an
Or s
Av
le
an
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Drainage Pump Station 2 EA
EA
Open Space
3 - 6 in
Residual Space
Pavement
9 - 12 in New Development
rt pa m Ra /I -1 0 e e
Av
FRENCH QUARTER
bo
rn
IBERVILLE
Loyo
la A ve
eA ve
ai
lan
D IM OW PA N C TO T W A N RE A
CENTRAL BUSINES S DISTRICT
6 - 9 in
lS t
MIS SIS SIPPI RIVER
ras S t
na
Cl
Tu
MIS SIS SIPPI RIVER
la A ve Poyd
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline 1 - 3 in
St
N
FRENCH QUARTER
Loyo
D IM OW PA N C TO T W A N RE A
< 1 in
s
lv N
/I -1 0 e e
Cl
eA ve
ai
bo
IBERVILLE
N
lan
Ca
TUL ANE - GRAVIER
Av
lS t
rn
na
Ga
lv Ga N
Ca
TUL ANE - GRAVIER Tu
ui
N
St
St
Lo
ez
s
ez
ui
Ra
m
St
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
s
St
Or
Maximum Scenario Flood Reduction: 60 Ac Ft (-43%)
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth > 12 in Green Roof
0 - 3 in
3 - 6 in
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
Area with significant elevation change since city SWMM model was created Major Drainage Line
18 - 24 in
Maximum Scenario: Lafitte Routes to St. Louis Culvert Base Flood Volume: 138 Ac Ft Or
le
an
Maximum Scenario Flood Reduction: 43 Ac Ft (-31%) Or
s
Av
le
an
e
s
Av
e
TREME - L AFIT TE
TREME - L AFIT TE
L IM AFI PA T T CT E AR
EA
3 - 6 in
9 - 12 in
Area with significant elevation change since city SWMM model was created
rt pa m Ra /I -1 0 e Av e
Loyo
la A ve
eA ve
ai
bo
FRENCH QUARTER
Cl
lan
D IM OW PA N C TO T W A N RE A
CENTRAL BUSINES S DISTRICT
6 - 9 in
lS t
MIS SIS SIPPI RIVER
ras S t
Tu
na
N
TUL ANE - GRAVIER
MIS SIS SIPPI RIVER
la A ve Loyo
Poyd
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline 1 - 3 in
St
rn
e
D IM OW PA N C TO T W A N RE A
< 1 in
s
lv e
N
/I -1
0
eA ve
ai
bo
FRENCH QUARTER
Cl
lan
Ca
Av
lS t
rn
na
N
Tu
Ga
lv Ga
Ca
N
TUL ANE - GRAVIER
ui
N
St
St
Lo
ez
s
ez
ui
Ra
m
St
N
Lo
St
St
pa
rt
St
EA St
L IM AFI PA T T CT E AR
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth > 12 in
0 - 3 in Open Space
3 - 6 in
6 - 9 in Residual Space
9 - 12 in Pavement
12 - 15 in
15 - 18 in New Development
18 - 24 in
Impacts at Specific Sites
Proposed Scenario Flood Depth Reduction: 30% 1. La Salle at Cleveland Or
le
an
s
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
EA
m Ra
ez
s
St
e Av
IBERVILLE
bo
lle
an
d
Av
e
MIS SIS SIPPI RIVER
el
St
1 ev
sa
Cl
FRENCH QUARTER
La
eA ve
ai
lan
Loyo
la A ve
The modeled existing conditions showed 16.9 inches of flooding at this location in a 10-year 24-hour design storm event. The minimum scenario is expected to reduce flooding by 7% and the proposed scenario is expected to reduce flooding by 30%. While flooding is not eliminated at this location, reduction in flood depth may prevent building flooding and allow emergency vehicle access.
lS t
Cl
Tu
na
rn
TUL ANE - GRAVIER
N
This intersection, at the rear of the Jung Hotel on Canal Street, frequently floods. The hotel has constructed floodwalls with barriers in order to protect the building.
e
N
Ca
/I -1 0
Ga
lv
Credit: Google
Conclusion: The Lafitte Greenway-Armstrong Park project area routed to the Orleans Avenue culvert showed the most dramatic decrease in flooding at this location.
ui
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
D IM OW PA N C TO T W A N RE A
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline < 1 in Open Space
1 - 3 in
3 - 6 in
Residual Space
6 - 9 in Pavement
9 - 12 in New Development
> 12 in Green Roof
Impacts at Specific Sites
Proposed Scenario Flood Depth Reduction: 51% 2. S. Claiborne at Poydras Or
le
an
s
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
EA
m Ra
ez
s
St
e Av
lS t
bo
FRENCH QUARTER
MIS SIS SIPPI RIVER
eA ve
ai
lan
IBERVILLE
Cl
Tu
na
rn
TUL ANE - GRAVIER
N
This intersection leads to the on-ramps for Interstate 10, serving as a major traffic connector from the Central Business District to the metro area. Existing flooding here is significant, which impacts safety and transportation.
e
N
Ca
/I -1 0
Ga
lv
Credit: Google
Poy
dra
sS
Loyo
S.
Cl
ai
bo
rn
eA
ve
la A ve
2
The modeled existing conditions showed 13.9 inches of flooding at this location in a 10-year 24-hour design storm event. The minimum scenario is expected to reduce flooding by 31% and the proposed scenario is expected to reduce flooding by 51%. These are considered major improvements to the flooding in the area. Conclusion: The VA Hospital Site-Duncan Plaza project area with upsized pipes in Perdido St. and S. Galvez St. have the biggest impact on this intersection.
ui
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
t
D IM OW PA N C TO T W A N RE A
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline < 1 in Open Space
1 - 3 in
3 - 6 in
Residual Space
6 - 9 in Pavement
9 - 12 in New Development
> 12 in Green Roof
Impacts at Specific Sites
Proposed Scenario Flood Depth Reduction: 50% 3. S. Galvez at Perdido Or
le
an
s
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
EA
m Ra
ez
s
St
e Av
bo
FRENCH QUARTER
MIS SIS SIPPI RIVER
eA ve
ai
lan
IBERVILLE
Loyo
la A ve
The modeled existing conditions showed 16.2 inches of flooding at this location in a 10-year 24-hour design storm event. The minimum scenario is expected to reduce flooding by 21% and the proposed scenario reduces flooding by 50%. These are considered major improvements to the flooding in the area.
lS t
Cl
3
Tu
na
rn
TUL ANE - GRAVIER
N
This intersection is at the edge of the LSU Health Science Center (HSC) Campus, a major regional health care and educational complex. Existing flooding here is significant, impacting traffic for emergency vehicles.
e
N
Ca
/I -1 0
Ga
lv
Credit: Google
Conclusion: The VA Hospital Site-Duncan Plaza area interventions with upsized pipes in Perdido St. and S. Galvez St. produced the largest reduction of flooding in this area.
ui
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
D IM OW PA N C TO T W A N RE A
Poyd
3
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline < 1 in Open Space
1 - 3 in
3 - 6 in
Residual Space
6 - 9 in Pavement
9 - 12 in New Development
> 12 in Green Roof
Impacts at Specific Sites
Proposed Scenario Flood Depth Reduction: 12% 4. S. Liberty at Girod Or
le
an
s
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
EA
m Ra
ez
s
St
e Av
bo
FRENCH QUARTER
MIS SIS SIPPI RIVER
eA ve
ai
lan
IBERVILLE
Loyo
la A ve
The modeled existing conditions showed 17.8 inches of flooding at this location in a 10-year 24-hour design storm event. The minimum scenario is expected to reduce flooding by 3% and the proposed scenario is expected to reduce flooding by 12%.
lS t
Cl
Tu
na
rn
TUL ANE - GRAVIER
N
This intersection is the primary entrance to the Superdome and Smoothie King Center, along with access to adjacent hotels and office buildings. Existing flooding is significant, disrupting traffic, economic activity, and public safety.
e
N
Ca
/I -1 0
Ga
lv
Credit: Google
Conclusion: The VA Hospital Site-Duncan Plaza area interventions with upsized pipes in Perdido St. and S. Galvez St. , along with the interventions in Lafayette Square, produced the largest reduction of flooding in this area.
ui
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
D IM OW PA N C TO T W A N RE A
4
Poyd
3
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline < 1 in Open Space
1 - 3 in
3 - 6 in
Residual Space
6 - 9 in Pavement
9 - 12 in New Development
> 12 in Green Roof
Impacts at Specific Sites
Proposed Scenario Flood Depth Reduction: 20% 5. N. Johnson at Bienville Or
le
an
s
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
EA
ez
m Ra St
e Av
bo
FRENCH QUARTER
Loyo
5
Conclusion: The Lafitte Greenway-Armstrong Park project area routed to the Orleans Avenue culvert showed the most significant decrease in flooding at this location.
D IM OW PA N C TO T W A N RE A
Poyd
6
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline < 1 in Open Space
1 - 3 in
3 - 6 in
Residual Space
6 - 9 in Pavement
9 - 12 in New Development
> 12 in Green Roof
MIS SIS SIPPI RIVER
eA ve
ai
lan
IBERVILLE
la A ve
The modeled existing conditions showed 10.4 inches of flooding at this location in a 10-year 24-hour design storm event. The minimum scenario is expected to reduce flooding by 5%, and the proposed scenario is expected to reduce flooding by 20%.
lS t
Cl
Tu
na
rn
TUL ANE - GRAVIER
N
This intersection is located in between the UMC and Lafitte Greenway, and experiences significant flooding.
e
N
Ca
/I -1 0
Ga
lv
Credit: Google
N
St
5 St Lo ui s
pa
rt
St
Drainage Pump Station 2
Impacts at Specific Sites
Proposed Scenario Flood Depth Reduction: 38% 6. Basin at N. Claiborne le
an
s
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Drainage Pump Station 2
EA St
Or
pa m Ra
ez
s
St
e Av
bo
FRENCH QUARTER
Loyo
5
D IM OW PA N C TO T W A N RE A
Poyd
6
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline < 1 in Open Space
1 - 3 in
3 - 6 in
Residual Space
6 - 9 in Pavement
9 - 12 in New Development
> 12 in Green Roof
MIS SIS SIPPI RIVER
eA ve
ai
lan
IBERVILLE
la A ve
The modeled existing conditions showed 8.3 inches of flooding at this location in a 10-year 24-hour design storm event. The minimum scenario is expected to reduce flooding by 7% and the proposed scenario is expected to reduce flooding by 38%.
lS t
Cl
Tu
na
rn
TUL ANE - GRAVIER
N
This intersection leads to an on-ramp for Interstate 10, serving as a major traffic connector from the edge of the Central Business District and French Quarter to the metro area. Existing flooding impacts safety and transportation.
e
N
Ca
/I -1 0
Ga
lv
Credit: Google
Conclusion: The Lafitte Greenway-Armstrong Park project interventions, specifically in the area closest to this intersection, caused the greatest impact for flood reduction.
ui
N
Lo
St
St
rt
6
ding AcFt
Flooding AcFt
140 Summary
140
Impact120 Areas
120
100
100
1. Model shows that water storage benefits correlate more with 80 topography rather than with pipe connections in the drainage system
80 60
60
2. Additional water storage should be located in higher elevation areas 40 to reduce downstream flooding
40 20
20
3. Small change in benefit from MID to MAX scenarios in the CBD area 0
TREME - L AFIT TE
e Av e rn bo
rt pa
IBERVILLE
m
lS t
N
TUL ANE - GRAVIER
na
Ra
N
Ca
St
Ga
m
lv
ez
Cl
ai
St
fitt e Co
Tu
FRENCH QUARTER
eA ve
ydr
as
St
la A ve
Po
CENTRAL BUSINES S DISTRICT
Loyo
Area Base Area Flood Base Flood Scenario Minimum Scenario Proposed Scenario Minimum Proposed Scenario (Acres) Volume (Acres) (Ac Ft)Volume (Ac Ft) (Ac Ft) Reduction Reduction (Ac Ft) Reduction (Ac Ft) Reduction (Ac Ft) 137.616.9 (-12%) 16.9 (-12%) 137.6 53.2 (-39%) 53.2 (-39%) d Impact Combined Area Impact Area 293.7 293.7 123.615.2 (-12%) 15.2 (-12%) 123.6 47.9 (-39%) 47.9 (-39%) 254.1 254.1 mpact Area Lafitte Impact Area 56.313.4 (-24%) 13.4 (-24%) 56.3 30.2 (-54%) 30.2 (-54%) 154.1 154.1 wn Impact Downtown Area Impact Area afitte Treme Lafitte 113.6 3.3 (-5%)19.8 (-28%) 19.8 (-28%) 71.83.3 (-5%) 71.8 113.6 32.85.9 (-18%) 5.9 (-18%) 32.8 15.4 (-47%) 15.4 (-47%) Business Central District Business88.6 District 88.6 22.0 7.3 (-33%) 7.3 (-33%) 22.0 ravier Tulane Gravier 60.6 60.6 14.3 (-65%) 14.3 (-65%) D OWNTOWN 8.9 0.1 (-1%) 8.9 24.1 t John Bayou St John 24.1 0.1 (-1%) 3.3 (-37%) 3.3 (-37%)IMPACT AREA 1.20.0 (-1%) 1.2 0.0 (-1%)0.0 (-3%) 0.0 (-3%) 3.3 uarterFrench Quarter 3.3 2.7 2.7 0.70.2 (-24%) 0.2 (-24%) Iberville 0.7 0.4 (-61%) 0.4 (-61%)
lan
MIS SIS SIPPI RIVER
La
L AFIT TE IMPACT AREA
N
pa
ct
Ar
ea
Im pa Do bin c w ed nt Im t A re ow p n act a La Im fitt pa Are c a e Im t A Do Tr pa rea em ct Ce wn nt tow e - Are ra n L a l B Im afi tte us p a in c es t A s re Di a Tr s e Ce Tu me tric nt ra lan - La t lB e fi us - G tte r in es avi Ba s D er is y Tu ou tric la St t ne Jo Fr - G hn en ch rav i Ba Qu er yo art u e St r J Lo F Ib ohn w re e er nc rvi lle Ga h Q rd u en ar Di ter st ri Lo Ib ct w er er vi lle Ga rd en Di st ric t
4. Heroic scale water storage projects are needed to reduce flooding
/I -1 0
0
Im
d
BAYOU ST JOHN
Flood Reduction from 10-year, 24-hour Design Storm Baseline Base Flooding
Minimum Scenario Flooding
Proposed Scenario Flooding
* Relatively insignificant volume of existing flooding compared to other neighborhoods in the Combined Impact Area
III Proposed Approach
Vision Priority areas: 1. Duncan Plaza and the VA Hospital Site 2. Armstrong Park and Lafitte Greenway
2
Extended study area
1
Extended study area
Duncan Plaza: Civic Space Sacred Place
Duncan Plaza has been the focal point and primary gathering place for the recent protest rallies, including Black Lives Matter. Given the recent and past history of this important civic space, careful study and sincere community engagement will be necessary for the redesign of the park.
Minimum and Proposed Scenarios VA Hospital Site - Duncan Plaza
Minimum
Proposed
This scenario utilizes city owned land for stormwater management interventions. Subsurface storage under lawns and paving at Duncan Plaza respects oak tree canopies. Parking lot behind City Hall and parking lanes on Perdido, Gravier, LaSalle, and Freret streets reconstructed with subsurface storage and permeable paving. Select non-historic buildings at VA Site demolished to make space for urban water features.
Duncan Plaza rebuilt with a combination of subsurface storage, open basins, and water features. Perdido, Gravier, and LaSalle completely reconstructed with subsurface storage and permeable pavers. Non-historic structures around the VA demolished to make space for urban water features. An allee of trees along Perdido street, with subsurface detention, connect Duncan Plaza to the redeveloped VA Site. The Heal Garage and the New Orleans Public Library are ideal sites for demonstation green or blue roofs.
* Note: Scenarios are adaptable to alternative building preservation and demolition proposals
Section Diagram
VA Hospital Site - Duncan Plaza
VA Hospital Site
Charity Hospital
Heal Garage
New Development
Roof Garden Blue/Green Roof Stormwater Park
Permeable Paving
NOPL Main Branch
Rain Garden
Water Square
Detention Basin
Duncan Plaza
I-10
Subsurface Storage
Loyola Ave
Vision
VA Hospital Site - Duncan Plaza
New Development with Ambitious Storage
Roof Garden
Stormwater Park
Blue/Green Roof
Rain Garden Detention Basin
LEGEND Open Space Bioswale/Rain Garden Tree Water Path Plaza Permeable Paving Blue/Green Roof New Development New Building
Water Garden Permeable Paving
Subsurface Storage
Minimum and Proposed Scenarios Lafitte Greenway - Armstrong Park
Minimum
This scenario utilizes city owned land for stormwater management interventions in the Lafitte Greenway and Armstrong Park. A new civic space, located in the right-of-way of the former Carondolet Canal, is excavated to create an urban waterway.
Proposed
The right-of-way of the historic Carondelet excavated to create an urban waterway connected to Bayou St. John. Surface and subsurface detention under the the Lafitte Greenway and at the site of the historic turning basin relieves the St. Louis drainage canal. Development sites along the Lafitte Greenway and Armstrong Park should be incentivized to provide more stormwater detention than required by code.
Lafitte Greenway + Armstrong Park
Source: Lafitte Blueway,Waggonner & Ball
Lafitte Blueway
Greater New Orleans Urban Water Plan
source: Bosch Slabbers
Lafitte Blueway New Turning Basin
New Development
New Development Blue/Green Roof
St. Louis Street
New Street Rain Garden
Permeable Paving
Reconfigured Basin Street Bike Path
Water Square
Existing Culvert
Hydraulic Pressure
Subsurface Storage
Subsurface Storage
Detention Basin
Vision
Lafitte Greenway - Armstrong Park
Soft & Hard Edges
Accessible Water
Water Square
Improved Canal
Stormwater Wetlands LEGEND Open Space Bioswale/Rain Garden Tree Water Path Plaza Permeable Paving Blue/Green Roof New Development New Building
Subsurface Storage
Bioswales New Development with Ambitious Storage
Phasing
Proposed Scenario
Downtown
Lafitte Lon g Te rm Nea Term r
Ne ar Te rm
Lo ng Te rm
Point of Contact Ella Delio Greater New Orleans Foundation ella@gnof.org 617.230.6877 Ramiro Diaz Waggonner & Ball ramiro@wbae.com 504.524.5408
IV
Appendix
A
Preliminary Cost Estimate
Preliminary Cost Estimate Summary ID
Type
Site
Sq Ft
Acres
Water Depth (ft)
1
StorageAcFt ACRE/FT to CF CF/CY COST COST COST COST COST COST COST COST COST Bed Planting Irrigation Tree Allee Sod Totals 43559.90 27.00 Excavavtion/CY Contaminated SoRaintanks/CF Weir Control Structure Permeable Pavers -Vehicular Green Roof Assembly BioSwale Soils/CY $50.00 $40.00 $20.00 $5,000.00 $20.00 $35.00 $75.00 $6.00 $1.25 $825.00 $1.00 0.1 0.09 3967.52 146.95 $9,184.07 $1,469.45 $2,938.90 $5,000.00 $793,505.61 0.1 0.25 10819.65 400.73 $25,045.49 $4,007.28 $8,014.56 $5,000.00 $2,163,935.69 0.1 0.06 2661.85 98.59 $6,161.70 $985.87 $1,971.74 $5,000.00 $532,372.14 3 0.36 15475.44 716.46 $44,778.49 $7,164.56 $42,987.35 $30,950.96 $6,448.12 0.1 0.05 2275.46 84.28 $5,267.27 $842.76 $1,685.53 $5,000.00 $455,092.92 3 0.22 9496.43 439.65 $27,478.09 $4,396.49 $26,378.97 $18,992.90 $3,956.85 0.1 0.13 5847.26 216.57 $13,535.33 $2,165.65 $4,331.31 $5,000.00 $1,169,455.16 3 1.37 59508.40 2755.02 $172,188.67 $27,550.19 $165,301.12 $119,017.08 $24,795.22 Sub-Total General Conditions Contingency Inflation Design Fees Rough Order of Magnitude
• Pro-bono cost estimate performed by RCI
A 3.02 A 3.03 A 3.04 A 3.05 A 3.06 A 3.07 A 3.08 A 3.09
New Development New Development New Development Open Space New Development Open Space New Development Open Space
Armstrong Park Armstrong Park Armstrong Park Armstrong Park Armstrong Park Armstrong Park Armstrong Park Armstrong Park SF
39675.28 108196.78 26618.61 5158.49 22754.65 3165.48 58472.76 19836.18 283878.23
0.91 2.48 0.61 0.12 0.52 0.07 1.34 0.46
Description $812,098.04 Subsurface void/vault space for infiltration & detention (under parking, exterior spaces) to achieve 1.25" city stormwater runoff requirement $2,206,003.02Subsurface void/vault space for infiltration & detention (under parking, exterior spaces) to achieve 1.25" city stormwater runoff requirement $546,491.46 Subsurface void/vault space for infiltration & detention (under parking, exterior spaces) to achieve 1.25" city stormwater runoff requirement $132,329.47 Excavated bioswale with overflow to drainage system $467,888.48 Subsurface void/vault space for infiltration & detention (under parking, exterior spaces) to achieve 1.25" city stormwater runoff requirement $81,203.31 Excavated bioswale with overflow to drainage system $1,194,487.45Subsurface void/vault space for infiltration & detention (under parking, exterior spaces) to achieve 1.25" city stormwater runoff requirement $508,852.28 Excavated bioswale with overflow to drainage system $5,949,353.49 $297,467.67 $178,480.60 $297,467.67 $892,403.02 $7,615,172.47
• Quantity Takeoffs derived from GIS shapefile of the Proposed Design Scenario for the Duncan Plaza, VA, Lafitte, and Armstrong Park study areas Per SF
C 3.01 C 3.02 C 3.03 C 3.04 C 3.05 C 3.06 C 3.07 C 3.08
Pavement Open Space Open Space Open Space Open Space Pavement New Development New Development
City Hall City Hall City Hall City Hall City Hall City Hall City Hall City Hall SF
Per SF
26.83
32267.19 13078.96 25198.31 9112.18 8119.23 18411.74 41336.96 18593.14 166117.71
0.74 0.30 0.58 0.21 0.19 0.42 0.95 0.43
1.5 3 3 3 3 1.5 0.1 0.1
1.11 0.90 1.74 0.63 0.56 0.63 0.09 0.04
48400.67 39236.79 75594.75 27336.47 24357.63 27617.55 4133.69 1859.31
1792.62 1453.21 2799.81 1012.46 902.13 1022.87 153.10 68.86
$112,038.59 $90,825.90 $174,987.85 $63,278.87 $56,383.41 $63,929.50 $9,568.72 $4,303.96
$17,926.17 $14,532.14 $27,998.06 $10,124.62 $9,021.35 $10,228.72 $1,531.00 $688.63
$35,852.35
$5,000.00
$55,996.11
$5,000.00
$20,457.44 $3,061.99 $1,377.27
$5,000.00 $5,000.00 $5,000.00
$645,343.74
$108,991.08 $209,985.42 $75,934.64 $67,660.10
$184,117.39 $826,739.23 $371,862.84
$78,473.76 $151,189.85 $54,673.07 $48,715.38
$16,348.70 $31,497.89 $11,390.22 $10,149.04
Sub-Total General Conditions Contingency Inflation Design Fees Rough Order of Magnitude
28.53
$816,160.85 Subsurface void/vault space for infiltration & detention (under parking lot) $309,171.58 Excavated bioswale with overflow to drainage system $656,655.18 Subsurface void/vault space for infiltration & detention (under paved plaza) $215,401.41 Excavated bioswale with overflow to drainage system $191,929.27 Excavated bioswale with overflow to drainage system $283,733.05 Subsurface void/vault space for infiltration & detention (full width under street; 1/2 parking, 1/2 travel lanes) $845,900.94 Demolish existing concrete parking structure; subsurface void/vault space for infiltration & detention (under parking, exterior spaces) to achieve 1.25" city stormwater runoff requirement $383,232.70 Demolish existing City hall wing; subsurface void/vault space for infiltration & detention (under parking, exterior spaces) to achieve 1.25" city stormwater runoff requirement $3,702,184.98 $185,109.25 $111,065.55 $185,109.25 $555,327.75 $4,738,796.78
• Estimates focused on stormwater management cost drivers, including excavation, subsurface storage, permeable paving, bioswales, open canals, basic plantings, irrigation, and outlet to drainage system
D 3.01 D 3.02 D 3.03 D 3.04 D 3.05 D 3.06
Open Space Open Space Pavement Pavement New Development Green Roof
Duncan Plaza Duncan Plaza Duncan Plaza Duncan Plaza Duncan Plaza Duncan Plaza SF
Per SF
L 3.01 L 3.02 L 3.03 L 3.04 L 3.05 L 3.06 L 3.07 L 3.08 L 3.09 L 3.10 L 3.11 L 3.12 L 3.13 L 3.14 L 3.15 L 3.16 L 3.17 L 3.18 L 3.19 L 3.20 L 3.21 L 3.22 L 3.23 L 3.24 L 3.25 LS 3.01 LS 3.02 LS 3.03 ADD
Open Space Open Space Open Space Open Space Open Space Pavement New Development Pavement New Development Pavement New Development Pavement New Development Pavement New Development Open Space Open Space Open Space Open Space Open Space Open Space Open Space Open Space Open Space Open Space Open Space Pavement Pavement Base 3' Cut
Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafitte Greenway Lafayette Square Lafayette Square Lafayette Square
109082.87 65158.50 35341.63 36983.23 27360.43 31226.35 305153.01
2.50 1.50 0.81 0.85 0.63 0.72
3 3 1.5 1.5 2 0.25
7.51 4.49 1.22 1.27 1.26 0.18
327247.85 195475.05 53012.32 55474.72 54720.74 7806.57
12120.29 7239.82 1963.42 2054.62 2026.69 0.00
$757,518.17 $452,488.55 $122,713.70 $128,413.70 $126,668.38
7.39 0.19 0.26 0.26 0.22 1.67 1.57 0.28 1.77 0.25 1.77 0.64 1.84 0.22 1.33 3.62 4.50 3.48 0.30 0.16 3.02 0.80 0.70 0.85 6.12 1.21 0.56 0.28
3 3 3 3 3 1.5 0.1 1.5 0.1 1.5 0.1 1.5 0.1 1.5 0.1 3 3 3 3 1.5 3 1.5 1.5 3 3 5 1.5 1.5
22.17 0.58 0.79 0.77 0.66 2.50 0.16 0.43 0.18 0.37 0.18 0.95 0.18 0.33 0.13 10.87 13.49 10.44 0.91 0.24 9.06 1.19 1.05 2.54 18.36 6.07 0.84 0.42
965627.26 25357.55 34472.45 33619.00 28817.47 108935.31 6854.31 18602.63 7719.67 16011.21 7713.61 41568.51 8011.57 14468.68 5796.82 473366.01 587458.87 454601.05 39654.26 10561.08 394783.95 52035.54 45633.11 110493.62 799958.25 264289.57 36783.20 18128.90
35763.97 939.17 1276.76 1245.15 1067.31 4034.64 253.86 688.99 285.91 593.01 285.69 1539.57 296.72 535.88 214.70 17532.07 21757.74 16837.08 1468.68 391.15 14621.63 1927.24 1690.12 4092.36 29628.08 9788.50 1362.34 671.44 219078.99
$2,235,248.29 $58,698.04 $79,797.35 $77,821.76 $66,707.11 $252,165.08 $15,866.45 $43,061.65 $17,869.60 $37,062.98 $17,855.59 $96,223.41 $18,545.29 $33,492.31 $13,418.57 $1,095,754.65 $1,359,858.49 $1,052,317.24 $91,792.27 $24,446.94 $913,851.73 $120,452.64 $105,632.21 $255,772.28 $1,851,755.20 $611,781.42 $85,146.29 $41,965.05 $6,846,218.46
$121,202.91 $72,398.17 $19,634.19 $20,546.19 $20,266.94
$242,405.82
$5,000.00
$39,268.38 $41,092.39 $40,533.88
$5,000.00 $5,000.00 $5,000.00
$353,416.26 $369,832.32 $547,208.66
$909,021.81 $542,986.26
$98,174.58 $390,951.00
$136,353.58 $81,448.13
$92,720.44
$1,092,922.17
Sub-Total General Conditions Contingency Inflation Design Fees Rough Order of Magnitude
28.69
321876.49 8452.54 11490.84 11206.36 9605.85 72623.71 68543.22 12401.78 77196.87 10674.16 77136.32 27712.41 80115.85 9645.81 57968.36 157789.03 195820.07 151534.03 13218.12 7040.74 131594.95 34690.44 30422.15 36831.29 266653.36 52858.04 24522.19 12085.96 1971710.92 1971710.92
$357,639.73 $9,391.69 $12,767.58 $12,451.48 $10,673.14 $40,346.41 $2,538.63 $6,889.86 $2,859.14 $5,930.08 $2,856.89 $15,395.75 $2,967.25 $5,358.77 $2,146.97 $175,320.74 $217,577.36 $168,370.76 $14,686.76 $3,911.51 $146,216.28 $19,272.42 $16,901.15 $40,923.56 $296,280.83 $97,885.03 $13,623.41 $6,714.41 $2,190,789.91
$715,279.45
$5,000.00
$80,692.82 $5,077.26 $13,779.73 $5,718.27 $11,860.15 $5,713.79 $30,791.49 $5,934.49 $10,717.54 $4,293.94 $350,641.49 $435,154.72 $336,741.52
$5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00
$292,432.55 $38,544.84 $33,802.31 $81,847.13 $592,561.66 $195,770.05 $27,246.81 $13,428.82
$5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00
$70,437.64 $95,756.82 $93,386.11 $80,048.54
$726,237.09 $1,370,864.33 $124,017.82 $1,543,937.36 $106,741.62 $1,542,726.37 $277,124.06 $1,602,316.94 $96,458.06 $1,159,367.15
$50,715.22 $68,945.07 $67,238.15 $57,635.08
$10,565.67 $14,363.56 $14,007.95 $12,007.31
$2,362,397.31Subsurface void/vault space for infiltration & detention (under lawn & sidewalk) $1,540,272.10Excavated bioswale with overflow to drainage system $540,032.53 Subsurface void/vault space for infiltration & detention (full width under street; 1/2 parking, 1/2 travel lanes) $564,884.60 Subsurface void/vault space for infiltration & detention (full width under street; 1/2 parking, 1/2 travel lanes) $739,677.86 Subsurface void/vault space for infiltration & detention (under parking, exterior spaces) to achieve 1.25" city stormwater runoff requirement $1,092,922.17Soil & substrate added to roof of existing parking structure $6,840,186.57 $342,009.33 $205,205.60 $342,009.33 $1,026,027.99 $8,755,438.82
$3,313,167.46Intention is to provide in-line subsurface storage vaults for existing deep culvert. Anticipated excavation approx. 10' deep beyond baseline excavation. Paved shallow & potable surface water feature above ("turning basin") with outflow to L3.16. $199,808.25 Excavated bioswale with overflow to drainage system $271,630.37 Excavated bioswale with overflow to drainage system $264,905.45 Excavated bioswale with overflow to drainage system $227,071.18 Excavated bioswale with overflow to drainage system $1,104,441.40Subsurface void/vault space for infiltration & detention (full width under street; 1/2 parking, 1/2 travel lanes) $1,399,346.67Subsurface void/vault space for infiltration & detention (under parking, exterior spaces) to achieve 1.25" city stormwater runoff requirement $192,749.06 Subsurface void/vault space for infiltration & detention (full width under street; 1/2 parking, 1/2 travel lanes) $1,575,384.38Subsurface void/vault space for infiltration & detention (under parking, exterior spaces) to achieve 1.25" city stormwater runoff requirement $166,594.82 Subsurface void/vault space for infiltration & detention (full width under street; 1/2 parking, 1/2 travel lanes) $1,574,152.64Subsurface void/vault space for infiltration & detention (under parking, exterior spaces) to achieve 1.25" city stormwater runoff requirement $424,534.71 Subsurface void/vault space for infiltration & detention (full width under street; 1/2 parking, 1/2 travel lanes) $1,634,763.97Subsurface void/vault space for infiltration & detention (under parking, exterior spaces) to achieve 1.25" city stormwater runoff requirement $151,026.67 Subsurface void/vault space for infiltration & detention (full width under street; 1/2 parking, 1/2 travel lanes) $1,184,226.64Subsurface void/vault space for infiltration & detention (under parking, exterior spaces) to achieve 1.25" city stormwater runoff requirement $1,626,716.88Open "canal" feature approx. 5' deep beyond baseline excavation. Linked to surface water feature in L3.01. One natural landscaped bank, one gabion structure bank. 2 subsurface tie-ins to Lafitte St and 1 tie-in to Orleans Ave culvert. One pedestrian bridge. $5,069,116.26Subsurface void/vault space for infiltration & detention (under playing field). Excavation approx. 4' deep beyond baseline. $1,562,429.52Open "canal" feature approx. 5' deep beyond baseline excavation. Linked to surface water feature in L3.16. One natural landscaped bank, one gabion structure bank. 2 subsurface connections to receive inflow from Lafitte St. $312,461.12 Excavated bioswale with overflow to drainage system $108,740.12 Excavated bioswale with overflow to drainage system $1,357,500.56Open "canal" feature approx. 5' deep beyond baseline excavation. Linked to surface water feature in L3.18. One natural landscaped bank, one gabion structure bank. 3 subsurface connections to receive inflow from Lafitte St. One pedestrian Bridge $431,884.38 Subsurface void/vault space for infiltration & detention (under lawn/playing field) $379,360.75 Subsurface void/vault space for infiltration & detention (under lawn/playing field) $383,542.97 Open "canal" feature approx. 5' deep beyond baseline excavation. Linked to surface water feature in L3.21. One natural landscaped bank, one gabion structure bank. $2,745,597.69Open "canal" feature approx. 5' deep beyond baseline excavation. Linked to surface water feature in L3.24 with outflow into open drainage canal. One natural landscaped bank, one gabion structure bank. Two pedestrian bridges. $1,803,148.32Subsurface void/vault space for infiltration & detention (under lawn & sidewalk). Protect existing trees. $392,586.29 Subsurface void/vault space for infiltration & detention (under paved plaza). Replace urban landscaping & street furniture. $196,025.11 Subsurface void/vault space for infiltration & detention (under paved plaza). Replace urban landscaping & street furniture. $9,037,008.36presumed to be at discounted rated due to large volume $39,089,922.02 $1,954,496.10 $1,172,697.66 $1,954,496.10 $5,863,488.30 $50,035,100.18
• Building demolition and environmental remediation excluded $1,631,830.18 $1,174,920.43
$244,775.09
• Inlets from existing drainage system not included in cost estimate; DPW guidance required to estimate connection and street reconstruction costs. SF
Per SF
$110,150.73 $29,336.33
$79,308.71 $42,244.42
$16,522.65 $8,800.92
$144,543.16 $126,758.65
$31,221.40 $27,379.93
$43,363.05 $38,027.68
$29,486.87 $25,858.82
$734,137.71 $102,175.55 $50,358.07
$47,572.23 $125,063.16 $61,638.41
$66,072.55 $30,652.74 $15,107.45
$44,929.33 $3,678.33 $1,812.89
Sub-Total General Conditions Contingency Inflation Design Fees Rough Order of Magnitude
25.38
• Urban park amenities not included in estimate
N 3.01 N 3.02 N 3.03
V 2.1 V 2.10 V 2.11 V 2.12 V 2.13 V 2.14 V 2.2 V 2.3 V 2.4 V 2.5 V 2.6 V 2.7 V 2.8 V 2.9
Open Space Green Roof Pavement
Pavement Pavement Open Space Pavement Open Space Open Space Pavement Open Space Pavement Pavement Pavement Pavement Open Space Pavement
NOPL NOPL NOPL SF
17416.87 34656.00 35162.89 87235.76
Per SF
36.88
VA Site VA Site VA Site VA Site VA Site VA Site VA Site VA Site VA Site VA Site VA Site VA Site VA Site VA Site SF
20329.49 13281.70 128361.81 43898.09 35836.69 23169.95 23482.10 21640.16 14027.43 14426.28 19935.53 16503.13 64042.16 14264.98 453199.51
Per SF
36.32
0.40 0.80 0.81
3 0.25 1.5
1.20 0.20 1.21
52250.50 8663.98 52744.21
1935.20 320.89 1953.49
$120,950.24
$19,352.04
$122,093.09
$19,534.89
$39,069.79
$5,000.00
$703,257.80
0.47 0.30 2.95 1.01 0.82 0.53 0.54 0.50 0.32 0.33 0.46 0.38 1.47 0.33
1.5 1.5 3 1.5 3 3 1.5 3 1.5 1.5 1.5 1.5 3 1.5 28.5
0.70 0.46 8.84 1.51 2.47 1.60 0.81 1.49 0.48 0.50 0.69 0.57 4.41 0.49
30494.17 19922.50 385084.56 65846.99 107509.81 69509.68 35223.06 64920.32 21041.10 21639.37 29903.23 24754.64 192126.05 21397.43
1129.41 737.87 14262.39 2438.78 3981.84 2574.43 1304.56 2404.46 779.30 801.46 1107.53 916.84 7115.78 792.50
$70,588.35 $46,116.91 $891,399.44 $152,423.59 $248,865.30 $160,902.05 $81,534.87 $150,278.51 $48,706.24 $50,091.15 $69,220.44 $57,302.41 $444,736.23 $49,531.08
$11,294.14 $7,378.70 $142,623.91 $24,387.77 $39,818.45 $25,744.33 $13,045.58 $24,044.56 $7,793.00 $8,014.58 $11,075.27 $9,168.39 $71,157.80 $7,924.97
$22,588.27 $14,757.41 $285,247.82 $48,775.55 $79,636.90 $51,488.65 $26,091.16 $48,089.12 $15,586.00 $16,029.17 $22,150.54 $18,336.77 $142,315.59 $15,849.95
$5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00
$203,294.91 $132,816.99 $7,023,695.19
$1,212,959.96
$145,140.28
$104,501.24
$21,771.09 Sub-Total General Conditions Contingency Inflation Design Fees Rough Order of Magnitude
$39,508.29
$54,872.62
$226,349.55
$37,313.38
$224,438.87 $144,262.83 $199,355.33 $165,031.32
$12,624.69
$17,534.29
$72,328.93
$11,923.31
$142,649.84
$12,838.49
$17,831.23
$73,553.82
$12,125.24 Sub-Total General Conditions Contingency Inflation Design Fees Rough Order of Magnitude
$234,820.95
$411,714.90 Excavated bioswale with overflow to drainage system $1,212,959.96Soil & substrate added to roof of existing concrete library structure $888,955.57 Subsurface void/vault space for infiltration & detention (under parking lot) $2,513,630.43 $125,681.52 $75,408.91 $125,681.52 $377,044.56 $3,217,446.95 $312,765.67 Subsurface void/vault space for infiltration & detention (full width under street; 1/2 parking, 1/2 travel lanes) $206,070.01 Subsurface void/vault space for infiltration & detention (full width under street; 1/2 parking, 1/2 travel lanes) $1,324,271.16Subsurface void/vault space for infiltration & detention (full width under street; 1/2 parking, 1/2 travel lanes) $7,612,325.94Tree allee at 20' O.C. Subsurface vaulted water storage under paving. $373,320.64 Excavated, paved "Water Square" to receive inflow from surrounding surface runoff and catch basins. $243,135.03 Subsurface void/vault space for infiltration & detention (under parking and drop off lanes.) $360,492.55 Subsurface void/vault space for infiltration & detention (full width under street; 1/2 parking, 1/2 travel lanes) $227,412.20 Demolish existing building. Subsurface void/vault space for infiltration & detention (under paving) $415,935.32 Tree allee at 20' O.C. Subsurface vaulted water storage under paving. $223,397.72 Subsurface void/vault space for infiltration & detention (parking lanes only) $306,801.59 Subsurface void/vault space for infiltration & detention (parking lanes only) $254,838.88 Subsurface void/vault space for infiltration & detention (full width under street; 1/2 parking, 1/2 travel lanes) $663,209.62 Demolish existing buildings on site. Excavated, paved "Water Square" to receive inflow from surrounding surface runoff and catch basins. $337,304.62 Tree allee at 20' O.C. Subsurface vaulted water storage under paving. $12,861,280.95 $643,064.05 $385,838.43 $643,064.05 $1,929,192.14 $16,462,439.62 NOTES For New Development sites, cost of new construction NOT included; cost estimate to assume minimal additional cost to achieve City storage requirements for new construction Demo cost as separate line item. If demo cost is not attainable please note as such. For Lafitte Greenway sites, assume baseline removal of 3' soil from all project areas. Add line item for disposal of potentially contaminated soil Add budget line item for additional finer-scale stormwater modeling per project. Water Depth column does not indicate depth of excavation; used for overall water storage calculation purposes only. Unit Cost Line Item Notes Excavavtion/CY Contaminated Soils Raintanks/CF Weir Control Structure Permeable Pavers -Vehicular Green Roof Assembly BioSwale Soils/CY Bed Planting Irrigation Tree Allee Sod
Notes Removal and Haul Off Site - based off of storage capacity with a 25% over excavation factor Additional Fees to Haul to a Certified Contaminated Dump Site - based on 25% of excavated Soils based on historical Eco Construction Servivces product R-Tank Assemblies - including open aggregate base, backfill, topping and associated connective piping and fabrics This is a plug number based on historicals to control the outflow of the detained 1.25" of rain fall to slowly enter the storm sewer over a 24 hour period - these will be costume to each site budget based on 80mm Eco Prioria Histiorical Numbers - aggregate base with sand swept jonts 18" of Lightweight Soils - Pine Straw Mulch - 3 Gallon / 1 Gallon Shrubs/Groundcover - Drainage Mat - NOTE: All water proofing by others 18" of Highly Permeable Soils with a Pine Straw Topping - based on historical numbers from previous projcets 4" Pine Straw Mulch with a mix of 3 Gallon - 1 Gallon - & 4" Pot (Shrubs and Groundcover) Design Build 100% Coverage 3.5" Street Trees that fall with in Parks and Parkways Standards - staking, gator bag, mulch included Bermuda Sod
Exclusions *** DEMO Not Included in this Budget New Parking Structures New Streets and or Parking Lots - except where Permeable Pavers are noted
Urban Water Design Components Basis of Stormwater Calculations and Estimates Type
Average Depth/SF
Type
Average Depth/SF
New Development
0.1 to 2 ft
Residual Space
3 ft
New buildings and sites store code minimum 1.25 inches More intensive storage at City Hall redevelopment sites
Interventions in courtyards, setbacks and open space between VA buildings Flow through planters, cisterns, subsurface storage, bioretention
• Demolition and environmental remediation (if required) are not included in cost estimate
• Included in Open Space category for costing purposes
• Cost of building design & construction not included
Pavement Storage
Structural water storage under parking, sidewalks and plazas.
1.5 ft
Allée of Trees
Trees planted in structural soil with pervous paving or in bioswales
• Estimate includes excavation, RainTanks, outlet to drainage system, and permeable paving.
• Included in Open Space category for costing purposes
• Inlets from existing drainage system not included in cost estimate; DPW guidance required to estimate connection and street reconstruction costs. • 25% over excavation for structural support and 25% contaminated soil disposal assumed in estimate.
Open Space Planted bioswales, open canals, and/or structural water storage under lawns and fields • Estimate includes excavation, RainTanks (as applicable), outlet to drainage system, basic plantings, and irrigation. • 25% over excavation for structural support and 25% contaminated soil disposal assumed in estimate. • Demolition and environmental remediation (if required) are not included in cost estimate. • Design features (such as lighting, seating, shade structure, etc) are not included in estimate.
3 ft
Green/Blue Roof
Landscaping or detention on rooftops
• Not included in cost estimate • Modeled as Low Impact Development runoff reduction, not storage volume
1.5 ft
Proposed Design Scenario VA Hospital Site - Duncan Plaza
New Development with Ambitious Storage
Roof Garden
Stormwater Park
Blue/Green Roof
Rain Garden Detention Basin
LEGEND Open Space Bioswale/Rain Garden Tree Water Path Plaza Permeable Paving Blue/Green Roof New Development New Building
Water Garden Permeable Paving
Subsurface Storage
Duncan Plaza
Duncan POrder laza of Magnitude Cost Estimate Preliminary Hard Costs Pavement & Green Space Water Storage Public Space Amenities System Inlets & Street Reconstruction Demolition Subtotal Soft Costs Design & Engineering Community Engagement & Outreach General Conditions Contingency Inflation Subtotal Total
ESTIMATED COST
NOTES
$5,000,000 $0 $0 $0 $5,000,000
Assume 25% over excavation & 25% contaminated soils to certified dump site Design features not included (fountains, lighting, plaza paving, seating, shade pavilions, etc.) City of New Orleans DPW to provide guidance Not in estimate/unknown (could include subsurface features)
$500,000 $0 $250,000 $500,000 $250,000 $1,500,000
Assume 10% of hard costs GNOF to provide guidance Assume 5% of hard costs Assume 10% of hard costs Assume 5% of hard costs
$6,500,000
New Development
Pavement Storage
Allee of Trees
Open Space
Residual Space
Green/Blue Roof
VA / City Hall
VA/City HOrder all Rof etMagnitude rofits Preliminary Cost Estimate Hard Costs Passive Green Infrastructure Public Space Amenities System Inlets & Street Reconstruction Demolition Environmental Remediation Subtotal Soft Costs Design & Engineering Community Engagement & Outreach General Conditions Contingency Inflation Subtotal Total
ESTIMATED COST
$14,500,000 $0 $0 $0 $0 $14,500,000
$1,450,000 $0 $725,000 $1,450,000 $725,000 $4,350,000
NOTES
Assume 25% over excavation & 25% contaminated soils to certified dump site Design features not included (fountains, lighting, plaza paving, seating, shade pavilions, etc.) City of New Orleans DPW to provide guidance Not in estimate/unknown (could include subsurface features) Not in estimate/unknown
Assume 10% of hard costs GNOF to provide guidance Assume 5% of hard costs Assume 10% of hard costs Assume 5% of hard costs
$18,850,000
New Development
Pavement Storage
Allee of Trees
Open Space
Residual Space
Green/Blue Roof
Proposed Design Scenario Lafitte Greenway - Armstrong Park
Soft & Hard Edges
Accessible Water
Water Square
Improved Canal
Stormwater Wetlands LEGEND Open Space Bioswale/Rain Garden Tree Water Path Plaza Permeable Paving Blue/Green Roof New Development New Building
Subsurface Storage
Bioswales New Development with Ambitious Storage
Lafitte Blueway
Lafitte Blu ewaof y Magnitude Cost Estimate Preliminary Order Hard Costs Passive Green Infrastructure Public Space Amenities System Inlets & Street Reconstruction Demolition Environmental Remediation Subtotal Soft Costs Design & Engineering Community Engagement & Outreach General Conditions Contingency Inflation Subtotal Total
ESTIMATED COST
$32,200,000 $0 $0 $0 $0 $32,200,000
$3,220,000 $0 $1,610,000 $3,220,000 $1,610,000 $9,660,000
NOTES
Assume 25% over excavation & 25% contaminated soils to certified dump site Design features not included (fountains, lighting, plaza paving, seating, shade pavilions, etc.) City of New Orleans DPW to provide guidance Not in estimate/unknown (could include subsurface features) Not in estimate/unknown
Assume 10% of hard costs GNOF to provide guidance Assume 5% of hard costs Assume 10% of hard costs Assume 5% of hard costs
$41,860,000
New Development
Pavement Storage
Open Space
Armstrong Park
ArmstronOrder g Paof rkMagnitude Limited ACost dapEstimate tation Preliminary Hard Costs ESTIMATED COST Passive Green Infrastructure $800,000 Public Space Amenities $0 $0 Street Reconstruction & Subsurface Connectio Demolition $0 Environmental Remediation $0 Subtotal $800,000 Soft Costs Design & Engineering Community Engagement & Outreach General Conditions Contingency Inflation Subtotal Total
$80,000 $0 $40,000 $80,000 $40,000 $240,000
NOTES
Assume 25% over excavation & 25% contaminated soils to certified dump site Design features not included (fountains, lighting, plaza paving, seating, shade pavilions, etc.) City of New Orleans DPW to provide guidance Not in estimate/unknown (could include subsurface features) Not in estimate/unknown
Assume 10% of hard costs GNOF to provide guidance Assume 5% of hard costs Assume 10% of hard costs Assume 5% of hard costs
$1,040,000
New Development
Pavement Storage
Open Space
B
H&H Modeling
DRAFT
MIN Scenario Storage Targets Downtown
Downtown Impact Area Base Flood Volume 56.3 Ac Ft MID Scenario Flood Reduction
10.4 Ac Ft (-19%)
Total Storage Target
23.9 Ac Ft
Open Space Water Level
Residual Space Pavement
Green Roof New Development
Green Roof
DRAFT
MID Scenario Storage Targets (Proposed Scenario) Downtown
Downtown Impact Area Base Flood Volume 56.3 Ac Ft MID Scenario Flood Reduction
14.2 Ac Ft (-25%)
Total Storage Target
51.9 Ac Ft
Open Space Water Level
Residual Space Pavement
Green Roof New Development
Green Roof
DRAFT
MAX Scenario Storage Targets Downtown
Lafayette Square
Downtown Impact Area Base Flood Volume 56.3 Ac Ft MAX Scenario Flood Reduction
15 Ac Ft (-27%)
Total Storage Target
58.6 Ac Ft
Open Space Water Level
Residual Space Pavement
Green Roof New Development
Green Roof
DRAFT
MIN Scenario Storage Targets Lafitte
Lafitte Impact Area Base Flood Volume
123.6 Ac Ft
MIN Scenario Flood Reduction
6.8 Ac Ft (-6%)
Total Storage Target
20.6 Ac Ft
Open Space Water Level
Residual Space Pavement
Green Roof New Development
Green Roof
DRAFT
MID Scenario Storage Targets Lafitte
Lafitte Impact Area Base Flood Volume
123.6 Ac Ft
MID Scenario Flood Reduction
16.4 Ac Ft (-13%)
Total Storage Target
40.4 Ac Ft
Open Space Water Level
Residual Space Pavement
Green Roof New Development
Green Roof
DRAFT
MAX Scenario Storage Targets (Proposed Scenario) Lafitte
Lafitte Impact Area Base Flood Volume
123.6 Ac Ft
MAX Scenario Flood Reduction
36.5 Ac Ft (-30%)
Total Storage Target
108.6 Ac Ft
Full Extent
Window
Open Space Water Level
Residual Space Pavement
Green Roof New Development
Green Roof
DRAFT
MAX Scenario Storage Targets (Proposed Scenario)
N
Br oa dS t
Bayo u St J ohn
Lafitte
MAX Scenario Flood Reduction
36.5 Ac Ft (-30%)
Total Storage Target
108.6 Ac Ft
Or lea ns Av e
Ca na lS t
Ga lve zS t
123.6 Ac Ft
N
Lafitte Impact Area Base Flood Volume
Open Space Water Level
Residual Space Pavement
Green Roof New Development
Green Roof
Modeling Scenarios and Results Impact Areas
Report Legend
MAX Downtown + MID Lafitte
St
St
MAX Downtown + MAX Lafitte (routing from St Louis Culvert)
9.1
MAX Downtown + MAX Lafitte (routing from Orleans Ave Culvert 2)
9.2
MAX Downtown + MAX Lafitte (routing from Orleans Ave Culvert 1)
9.3
MAX Downtown + MAX Lafitte (routing from Orleans Ave Culvert 1 + Upsized Pipes)
10
D y d rLouis MAX Downtown (without Square) + MAX Lafitte (routing fromo St a s S Culvert) O I Lafayette
Tu
P
12.1
Proposed Scenario: MID Downtown (upsized pipes 2) + MAX Lafitte (routing from Orleans Ave Culvert + upsized pipes)
13
Minimum Scenario: MIN Downtown + MIN Lafitte
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline 3 - 6 in
Residual Space
6 - 9 in
Pavement
Flood Volume Reduction 43 Ac Ft
9 - 12 in New Development
> 12 in Green Roof
na
lS t
pa m
IBERVILLE
FRENCH QUARTER
eA ve
la A ve
lan
D IM OW PA N C TO T W A N RE A
t M W PA N CENTRAL MAX Lafitte (routing from Orleans C T O Ave Culvert) BUSINES S T W A N DISTRICT R E (upsized pipes 2) + MAX Lafitte (routing Proposed Scenario: MID Downtown from Orleans Ave Culvert + upsized pipes) A
Open Space
St
Loyo
Loyo
la A ve
MIS SIS SIPPI RIVER
N
Cl
ai
bo
9
1 - 3 in
s
MIS SIS SIPPI RIVER
e
FRENCH QUARTER
MAX Downtown (upsized pipes 1 without Lafayette Square) + MID Lafitte
< 1 in
ui
lv
TUL ANE - GRAVIER
8.5
12
Ca
N
/I -1 0
lS ANE - GRAVIER TUL(upsized t Square) + MID Lafitte MAX Downtown pipes 1 without Lafayette IBERVILLE
8.4
11
Lo
Ga
lv Ga
na
MAX Downtown (upsized pipesT2u lwithout Lafayette Square) + MID Lafitte an eA v MAX Downtown (upsized pipes 1 withouteLafayette Square) + MID Lafitte
8.3
rt
St pa m Ra s
ez
ui
rn
8.2
Ca
N
8.1 DuncanPlazaOutfall
St
ez
8
Lo
N
MID Downtown (upsized pipes 2) + MIN Lafitte
St
St
7.2
EA
rt
MID Downtown + MIN Lafitte
e
7.1
St Cu lve rt MID Downtown (upsized pipes 1) + MIN Lafitte
EA
Av
7
t. L ou is
Drainage Pump Station 2
Ra
MID Lafitte
L IM AFI PA T T CT E AR
TREME - L AFIT TE
N
6
Drainage Pump Station 2S
e
/I -1 0
MIN Lafitte
Av
e
5
L IM AFI PA T T CT E AR
TREME - L AFIT TE
s
Av
MAX Downtown
e
e
4
an
rn
MID Downtown
Av
bo
3
s
le
ai
MIN Downtown
an
Or
Cl
2
le
N
Or
1 Existing
St
Scenario
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth 0 - 3 in
3 - 6 in
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
Area with significant elevation change since city SWMM model was created Major Drainage Line
18 - 24 in
MIN Downtown le
an
Or s
Av
le
an
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Drainage Pump Station 2 EA
EA
Open Space
3 - 6 in
Residual Space
Pavement
9 - 12 in New Development
rt pa m Ra /I -1 0 e e
Av
FRENCH QUARTER
bo
rn
IBERVILLE
Loyo
la A ve
eA ve
ai
lan
D IM OW PA N C TO T W A N RE A
CENTRAL BUSINES S DISTRICT
6 - 9 in
lS t
MIS SIS SIPPI RIVER
ras S t
na
Cl
Tu
MIS SIS SIPPI RIVER
la A ve Poyd
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline 1 - 3 in
St
N
FRENCH QUARTER
Loyo
D IM OW PA N C TO T W A N RE A
< 1 in
s
lv N
/I -1 0 e e
Cl
eA ve
ai
bo
IBERVILLE
N
lan
Ca
TUL ANE - GRAVIER
Av
lS t
rn
na
Ga
lv Ga N
Ca
TUL ANE - GRAVIER Tu
ui
N
St
St
Lo
ez
s
ez
ui
Ra
m
St
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
s
St
Or
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth > 12 in Green Roof
0 - 3 in
3 - 6 in
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
Area with significant elevation change since city SWMM model was created Major Drainage Line
18 - 24 in
MID Downtown le
an
Or s
Av
le
an
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Drainage Pump Station 2 EA
EA
Open Space
3 - 6 in
Residual Space
Pavement
9 - 12 in New Development
rt pa m Ra /I -1 0 e e
Av
FRENCH QUARTER
bo
rn
IBERVILLE
Loyo
la A ve
eA ve
ai
lan
D IM OW PA N C TO T W A N RE A
CENTRAL BUSINES S DISTRICT
6 - 9 in
lS t
MIS SIS SIPPI RIVER
ras S t
na
Cl
Tu
MIS SIS SIPPI RIVER
la A ve Poyd
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline 1 - 3 in
St
N
FRENCH QUARTER
Loyo
D IM OW PA N C TO T W A N RE A
< 1 in
s
lv N
/I -1 0 e e
Cl
eA ve
ai
bo
IBERVILLE
N
lan
Ca
TUL ANE - GRAVIER
Av
lS t
rn
na
Ga
lv Ga N
Ca
TUL ANE - GRAVIER Tu
ui
N
St
St
Lo
ez
s
ez
ui
Ra
m
St
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
s
St
Or
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth > 12 in Green Roof
0 - 3 in
3 - 6 in
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
Area with significant elevation change since city SWMM model was created Major Drainage Line
18 - 24 in
MAX Downtown le
an
Or s
Av
le
an
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Drainage Pump Station 2 EA
EA
Open Space
3 - 6 in
Residual Space
Pavement
9 - 12 in New Development
rt pa m Ra /I -1 0 e e
Av
FRENCH QUARTER
bo
rn
IBERVILLE
Loyo
la A ve
eA ve
ai
lan
D IM OW PA N C TO T W A N RE A
CENTRAL BUSINES S DISTRICT
6 - 9 in
lS t
MIS SIS SIPPI RIVER
ras S t
na
Cl
Tu
MIS SIS SIPPI RIVER
la A ve Poyd
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline 1 - 3 in
St
N
FRENCH QUARTER
Loyo
D IM OW PA N C TO T W A N RE A
< 1 in
s
lv N
/I -1 0 e e
Cl
eA ve
ai
bo
IBERVILLE
N
lan
Ca
TUL ANE - GRAVIER
Av
lS t
rn
na
Ga
lv Ga N
Ca
TUL ANE - GRAVIER Tu
ui
N
St
St
Lo
ez
s
ez
ui
Ra
m
St
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
s
St
Or
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth > 12 in Green Roof
0 - 3 in
3 - 6 in
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
Area with significant elevation change since city SWMM model was created Major Drainage Line
18 - 24 in
MIN Lafitte le
an
Or s
Av
le
an
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Drainage Pump Station 2 EA
EA
Open Space
3 - 6 in
Residual Space
Pavement
9 - 12 in New Development
rt pa m Ra /I -1 0 e e
Av
FRENCH QUARTER
bo
rn
IBERVILLE
Loyo
la A ve
eA ve
ai
lan
D IM OW PA N C TO T W A N RE A
CENTRAL BUSINES S DISTRICT
6 - 9 in
lS t
MIS SIS SIPPI RIVER
ras S t
na
Cl
Tu
MIS SIS SIPPI RIVER
la A ve Poyd
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline 1 - 3 in
St
N
FRENCH QUARTER
Loyo
D IM OW PA N C TO T W A N RE A
< 1 in
s
lv N
/I -1 0 e e
Cl
eA ve
ai
bo
IBERVILLE
N
lan
Ca
TUL ANE - GRAVIER
Av
lS t
rn
na
Ga
lv Ga N
Ca
TUL ANE - GRAVIER Tu
ui
N
St
St
Lo
ez
s
ez
ui
Ra
m
St
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
s
St
Or
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth > 12 in Green Roof
0 - 3 in
3 - 6 in
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
Area with significant elevation change since city SWMM model was created Major Drainage Line
18 - 24 in
MID Lafitte le
an
Or s
Av
le
an
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Drainage Pump Station 2 EA
EA
Open Space
3 - 6 in
Residual Space
Pavement
9 - 12 in New Development
rt pa m Ra /I -1 0 e e
Av
FRENCH QUARTER
bo
rn
IBERVILLE
Loyo
la A ve
eA ve
ai
lan
D IM OW PA N C TO T W A N RE A
CENTRAL BUSINES S DISTRICT
6 - 9 in
lS t
MIS SIS SIPPI RIVER
ras S t
na
Cl
Tu
MIS SIS SIPPI RIVER
la A ve Poyd
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline 1 - 3 in
St
N
FRENCH QUARTER
Loyo
D IM OW PA N C TO T W A N RE A
< 1 in
s
lv N
/I -1 0 e e
Cl
eA ve
ai
bo
IBERVILLE
N
lan
Ca
TUL ANE - GRAVIER
Av
lS t
rn
na
Ga
lv Ga N
Ca
TUL ANE - GRAVIER Tu
ui
N
St
St
Lo
ez
s
ez
ui
Ra
m
St
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
s
St
Or
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth > 12 in Green Roof
0 - 3 in
3 - 6 in
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
Area with significant elevation change since city SWMM model was created Major Drainage Line
18 - 24 in
MAX Lafitte
Routing from Orleans Ave culvert
le
an
Or s
Av
le
an
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Drainage Pump Station 2 EA
EA
Open Space
3 - 6 in
Residual Space
Pavement
9 - 12 in New Development
rt pa m Ra /I -1 0 e e
Av
FRENCH QUARTER
bo
rn
IBERVILLE
Loyo
la A ve
eA ve
ai
lan
D IM OW PA N C TO T W A N RE A
CENTRAL BUSINES S DISTRICT
6 - 9 in
lS t
MIS SIS SIPPI RIVER
ras S t
na
Cl
Tu
MIS SIS SIPPI RIVER
la A ve Poyd
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline 1 - 3 in
St
N
FRENCH QUARTER
Loyo
D IM OW PA N C TO T W A N RE A
< 1 in
s
lv N
/I -1 0 e e
Cl
eA ve
ai
bo
IBERVILLE
N
lan
Ca
TUL ANE - GRAVIER
Av
lS t
rn
na
Ga
lv Ga N
Ca
TUL ANE - GRAVIER Tu
ui
N
St
St
Lo
ez
s
ez
ui
Ra
m
St
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
s
St
Or
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth > 12 in Green Roof
0 - 3 in
3 - 6 in
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
Area with significant elevation change since city SWMM model was created Major Drainage Line
18 - 24 in
Minimum Scenario: MIN Downtown + MIN Lafitte le
an
Or s
Av
le
an
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Drainage Pump Station 2 EA
EA
Open Space
3 - 6 in
Residual Space
Pavement
9 - 12 in New Development
rt pa m Ra /I -1 0 e e
Av
FRENCH QUARTER
bo
rn
IBERVILLE
Loyo
la A ve
eA ve
ai
lan
D IM OW PA N C TO T W A N RE A
CENTRAL BUSINES S DISTRICT
6 - 9 in
lS t
MIS SIS SIPPI RIVER
ras S t
na
Cl
Tu
MIS SIS SIPPI RIVER
la A ve Poyd
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline 1 - 3 in
St
N
FRENCH QUARTER
Loyo
D IM OW PA N C TO T W A N RE A
< 1 in
s
lv N
/I -1 0 e e
Cl
eA ve
ai
bo
IBERVILLE
N
lan
Ca
TUL ANE - GRAVIER
Av
lS t
rn
na
Ga
lv Ga N
Ca
TUL ANE - GRAVIER Tu
ui
N
St
St
Lo
ez
s
ez
ui
Ra
m
St
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
s
St
Or
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth > 12 in Green Roof
0 - 3 in
3 - 6 in
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
Area with significant elevation change since city SWMM model was created Major Drainage Line
18 - 24 in
MID Downtown + MIN Lafitte le
an
Or s
Av
le
an
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Drainage Pump Station 2 EA
EA
Open Space
3 - 6 in
Residual Space
Pavement
9 - 12 in New Development
rt pa m Ra /I -1 0 e e
Av
FRENCH QUARTER
bo
rn
IBERVILLE
Loyo
la A ve
eA ve
ai
lan
D IM OW PA N C TO T W A N RE A
CENTRAL BUSINES S DISTRICT
6 - 9 in
lS t
MIS SIS SIPPI RIVER
ras S t
na
Cl
Tu
MIS SIS SIPPI RIVER
la A ve Poyd
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline 1 - 3 in
St
N
FRENCH QUARTER
Loyo
D IM OW PA N C TO T W A N RE A
< 1 in
s
lv N
/I -1 0 e e
Cl
eA ve
ai
bo
IBERVILLE
N
lan
Ca
TUL ANE - GRAVIER
Av
lS t
rn
na
Ga
lv Ga N
Ca
TUL ANE - GRAVIER Tu
ui
N
St
St
Lo
ez
s
ez
ui
Ra
m
St
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
s
St
Or
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth > 12 in Green Roof
0 - 3 in
3 - 6 in
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
Area with significant elevation change since city SWMM model was created Major Drainage Line
18 - 24 in
MAX Downtown + MID Lafitte le
an
Or s
Av
le
an
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Drainage Pump Station 2 EA
EA
Open Space
3 - 6 in
Residual Space
Pavement
9 - 12 in New Development
rt pa m Ra /I -1 0 e e
Av
FRENCH QUARTER
bo
rn
IBERVILLE
Loyo
la A ve
eA ve
ai
lan
D IM OW PA N C TO T W A N RE A
CENTRAL BUSINES S DISTRICT
6 - 9 in
lS t
MIS SIS SIPPI RIVER
ras S t
na
Cl
Tu
MIS SIS SIPPI RIVER
la A ve Poyd
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline 1 - 3 in
St
N
FRENCH QUARTER
Loyo
D IM OW PA N C TO T W A N RE A
< 1 in
s
lv N
/I -1 0 e e
Cl
eA ve
ai
bo
IBERVILLE
N
lan
Ca
TUL ANE - GRAVIER
Av
lS t
rn
na
Ga
lv Ga N
Ca
TUL ANE - GRAVIER Tu
ui
N
St
St
Lo
ez
s
ez
ui
Ra
m
St
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
s
St
Or
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth > 12 in Green Roof
0 - 3 in
3 - 6 in
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
Area with significant elevation change since city SWMM model was created Major Drainage Line
18 - 24 in
MAX Downtown + MID Lafitte
Without Lafayette Square and Downtown pipes upsized
le
an
Or s
Av
le
an
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Drainage Pump Station 2 EA
EA
Open Space
3 - 6 in
Residual Space
Pavement
9 - 12 in New Development
rt pa m Ra /I -1 0 e e
Av
FRENCH QUARTER
bo
rn
IBERVILLE
Loyo
la A ve
eA ve
ai
lan
D IM OW PA N C TO T W A N RE A
CENTRAL BUSINES S DISTRICT
6 - 9 in
lS t
MIS SIS SIPPI RIVER
ras S t
na
Cl
Tu
MIS SIS SIPPI RIVER
la A ve Poyd
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline 1 - 3 in
St
N
FRENCH QUARTER
Loyo
D IM OW PA N C TO T W A N RE A
< 1 in
s
lv N
/I -1 0 e e
Cl
eA ve
ai
bo
IBERVILLE
N
lan
Ca
TUL ANE - GRAVIER
Av
lS t
rn
na
Ga
lv Ga N
Ca
TUL ANE - GRAVIER Tu
ui
N
St
St
Lo
ez
s
ez
ui
Ra
m
St
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
s
St
Or
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth > 12 in Green Roof
0 - 3 in
3 - 6 in
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
Area with significant elevation change since city SWMM model was created Major Drainage Line
18 - 24 in
MAX Downtown + MAX Lafitte
Without Lafayette Square and Lafitte routes from St Louis culvert
le
an
Or s
Av
le
an
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Drainage Pump Station 2 EA
EA
Open Space
3 - 6 in
Residual Space
Pavement
9 - 12 in New Development
rt pa m Ra /I -1 0 e e
Av
FRENCH QUARTER
bo
rn
IBERVILLE
Loyo
la A ve
eA ve
ai
lan
D IM OW PA N C TO T W A N RE A
CENTRAL BUSINES S DISTRICT
6 - 9 in
lS t
MIS SIS SIPPI RIVER
ras S t
na
Cl
Tu
MIS SIS SIPPI RIVER
la A ve Poyd
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline 1 - 3 in
St
N
FRENCH QUARTER
Loyo
D IM OW PA N C TO T W A N RE A
< 1 in
s
lv N
/I -1 0 e e
Cl
eA ve
ai
bo
IBERVILLE
N
lan
Ca
TUL ANE - GRAVIER
Av
lS t
rn
na
Ga
lv Ga N
Ca
TUL ANE - GRAVIER Tu
ui
N
St
St
Lo
ez
s
ez
ui
Ra
m
St
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
s
St
Or
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth > 12 in Green Roof
0 - 3 in
3 - 6 in
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
Area with significant elevation change since city SWMM model was created Major Drainage Line
18 - 24 in
MAX Downtown + MAX Lafitte Lafitte routes from St Louis culvert
le
an
Or s
Av
le
an
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Drainage Pump Station 2 EA
EA
Open Space
3 - 6 in
Residual Space
Pavement
9 - 12 in New Development
rt pa m Ra /I -1 0 e e
Av
FRENCH QUARTER
bo
rn
IBERVILLE
Loyo
la A ve
eA ve
ai
lan
D IM OW PA N C TO T W A N RE A
CENTRAL BUSINES S DISTRICT
6 - 9 in
lS t
MIS SIS SIPPI RIVER
ras S t
na
Cl
Tu
MIS SIS SIPPI RIVER
la A ve Poyd
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline 1 - 3 in
St
N
FRENCH QUARTER
Loyo
D IM OW PA N C TO T W A N RE A
< 1 in
s
lv N
/I -1 0 e e
Cl
eA ve
ai
bo
IBERVILLE
N
lan
Ca
TUL ANE - GRAVIER
Av
lS t
rn
na
Ga
lv Ga N
Ca
TUL ANE - GRAVIER Tu
ui
N
St
St
Lo
ez
s
ez
ui
Ra
m
St
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
s
St
Or
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth > 12 in Green Roof
0 - 3 in
3 - 6 in
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
Area with significant elevation change since city SWMM model was created Major Drainage Line
18 - 24 in
MAX Downtown + MAX Lafitte
Lafitte routes from Orleans Ave culvert with upsized pipes
le
an
Or s
Av
le
an
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Drainage Pump Station 2 EA
EA
Open Space
3 - 6 in
Residual Space
Pavement
9 - 12 in New Development
rt pa m Ra /I -1 0 e e
Av
FRENCH QUARTER
bo
rn
IBERVILLE
Loyo
la A ve
eA ve
ai
lan
D IM OW PA N C TO T W A N RE A
CENTRAL BUSINES S DISTRICT
6 - 9 in
lS t
MIS SIS SIPPI RIVER
ras S t
na
Cl
Tu
MIS SIS SIPPI RIVER
la A ve Poyd
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline 1 - 3 in
St
N
FRENCH QUARTER
Loyo
D IM OW PA N C TO T W A N RE A
< 1 in
s
lv N
/I -1 0 e e
Cl
eA ve
ai
bo
IBERVILLE
N
lan
Ca
TUL ANE - GRAVIER
Av
lS t
rn
na
Ga
lv Ga N
Ca
TUL ANE - GRAVIER Tu
ui
N
St
St
Lo
ez
s
ez
ui
Ra
m
St
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
s
St
Or
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth > 12 in Green Roof
0 - 3 in
3 - 6 in
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
Area with significant elevation change since city SWMM model was created Major Drainage Line
18 - 24 in
Proposed Scenario: MID Downtown + MAX Lafitte Lafitte routes to Orleans Ave culvert and both sites have upsized pipes
le
an
Or s
Av
le
an
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Av
e
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Drainage Pump Station 2 EA
EA
Open Space
3 - 6 in
Residual Space
Pavement
9 - 12 in New Development
rt pa m Ra /I -1 0 e e
Av
FRENCH QUARTER
bo
rn
IBERVILLE
Loyo
la A ve
eA ve
ai
lan
D IM OW PA N C TO T W A N RE A
CENTRAL BUSINES S DISTRICT
6 - 9 in
lS t
MIS SIS SIPPI RIVER
ras S t
na
Cl
Tu
MIS SIS SIPPI RIVER
la A ve Poyd
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline 1 - 3 in
St
N
FRENCH QUARTER
Loyo
D IM OW PA N C TO T W A N RE A
< 1 in
s
lv N
/I -1 0 e e
Cl
eA ve
ai
bo
IBERVILLE
N
lan
Ca
TUL ANE - GRAVIER
Av
lS t
rn
na
Ga
lv Ga N
Ca
TUL ANE - GRAVIER Tu
ui
N
St
St
Lo
ez
s
ez
ui
Ra
m
St
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
s
St
Or
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth > 12 in Green Roof
0 - 3 in
3 - 6 in
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
Area with significant elevation change since city SWMM model was created Major Drainage Line
18 - 24 in
Infinite Storage Test Base Flood Volume: 138 Ac Ft
Infinite Storage Test Flood Reduction: 55 Ac Ft (-40%) reduces flooding in Downtown and has a significant impact in the Treme - Lafitte Neighborhood as well. However local topographic depressions such as the area around the Jung Hotel and along Gravier St remain partially flooded. This test demonstrates that even an infinite amount of stormwater detention around Duncan Plaza cannot solve all of Downtown’s flooding issues.
This scenario tested what would happen if all of the stormwater flowing through the culvert underneath Loyola Ave was removed from the drainage system near Duncan Plaza. This scenario would eliminate all of Duncan Plaza and City Hall’s stormwater as well as all of the CBD’s stormwater upstream of Duncan Plaza. This entirely unrealistic scenario dramatically
Drainage Pump Station 2 EA
EA
3 - 6 in
9 - 12 in
rt pa m Ra /I -1 0 e e
Av
FRENCH QUARTER
bo
rn
IBERVILLE
Loyo
la A ve
eA ve
ai
lan
D IM OW PA N C TO T W A N RE A
CENTRAL BUSINES S DISTRICT
6 - 9 in
lS t
MIS SIS SIPPI RIVER
ras S t
na
Cl
Tu
MIS SIS SIPPI RIVER
la A ve Poyd
Flood Depth Reduction from 10-year, 24-hour Design Storm Baseline 1 - 3 in
St
N
FRENCH QUARTER
Loyo
D IM OW PA N C TO T W A N RE A
< 1 in
s
lv N
/I -1 0 e e
Cl
eA ve
ai
bo
IBERVILLE
N
lan
Ca
TUL ANE - GRAVIER
Av
lS t
rn
na
Ga
lv Ga N
Ca
TUL ANE - GRAVIER Tu
ui
N
St
St
Lo
ez
s
ez
ui
Ra
m
St
N
Lo
St
St
pa
rt
St
Drainage Pump Station 2
L IM AFI PA T T CT E AR
TREME - L AFIT TE
St
L IM AFI PA T T CT E AR
TREME - L AFIT TE
Poyd
ras S t
CENTRAL BUSINES S DISTRICT
Flood Depth > 12 in
0 - 3 in
3 - 6 in
Major Drainage Line
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
18 - 24 in
Civic Center Existing Conditions 2 Year, 24 Hour Event & 5 Year, 24 Hour Event
JUNG HOTEL
FORMER CHARITY H O S P I TA L
JUNG HOTEL
TULANE MEDICAL CENTER H O S P I TA L
VA S I T E
FORMER CHARITY H O S P I TA L
VA S I T E
NOPL
CITY HALL
SUPERDOME
Flood Depth 2 Reduction Year, 24 Hour Event 3 1- -62inin
NOPL
CITY HALL
SUPERDOME
0 < -1 3inin
TULANE MEDICAL CENTER H O S P I TA L
6 - 92 in - 3 in
Open MajorSpace Drainage LinePavement
Flood Depth 5 Year, 24 Hour Event 9 - 12>in3 in
12 - 15 in
15 - 18 in
18 - 24 in
0 - 3 in
3 - 6 in
Major Drainage Line
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
18 - 24 in
Civic Center Existing Conditions 10 Year, 24 Hour Event & 100 Year, 24 Hour Event
JUNG HOTEL
FORMER CHARITY H O S P I TA L
JUNG HOTEL
TULANE MEDICAL CENTER H O S P I TA L
VA S I T E
FORMER CHARITY H O S P I TA L
VA S I T E
NOPL
CITY HALL
SUPERDOME
Flood Depth 10 Reduction Year, 24 Hour Event 3 1- -62inin
NOPL
CITY HALL
SUPERDOME
0 < -1 3inin
TULANE MEDICAL CENTER H O S P I TA L
6 - 92 in - 3 in
Open MajorSpace Drainage LinePavement
Flood Depth 100 Year, 24 Hour Event 9 - 12>in3 in
12 - 15 in
15 - 18 in
18 - 24 in
0 - 3 in
3 - 6 in
Major Drainage Line
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
18 - 24 in
Duncan Plaza Intervention Flood Reduction 2 Year, 24 Hour Event
JUNG HOTEL
FORMER CHARITY H O S P I TA L
JUNG HOTEL
TULANE MEDICAL CENTER H O S P I TA L
VA S I T E
FORMER CHARITY H O S P I TA L
VA S I T E
NOPL
CITY HALL
SUPERDOME
Open Space
NOPL
CITY HALL
SUPERDOME
Flood Depth Reduction < 1 in
TULANE MEDICAL CENTER H O S P I TA L
1 - 2 in Pavement
Flood Depth 2 - 3 in
> 3 in
0 - 3 in
3 - 6 in
Major Drainage Line
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
18 - 24 in
Duncan Plaza Intervention Flood Reduction 5 Year, 24 Hour Event
JUNG HOTEL
FORMER CHARITY H O S P I TA L
JUNG HOTEL
TULANE MEDICAL CENTER H O S P I TA L
VA S I T E
FORMER CHARITY H O S P I TA L
VA S I T E
NOPL
CITY HALL
SUPERDOME
Open Space
NOPL
CITY HALL
SUPERDOME
Flood Depth Reduction < 1 in
TULANE MEDICAL CENTER H O S P I TA L
1 - 2 in Pavement
Flood Depth 2 - 3 in
> 3 in
0 - 3 in
3 - 6 in
Major Drainage Line
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
18 - 24 in
Duncan Plaza Intervention Flood Reduction 10 Year, 24 Hour Event
JUNG HOTEL
FORMER CHARITY H O S P I TA L
JUNG HOTEL
TULANE MEDICAL CENTER H O S P I TA L
VA S I T E
FORMER CHARITY H O S P I TA L
VA S I T E
NOPL
CITY HALL
SUPERDOME
Open Space
NOPL
CITY HALL
SUPERDOME
Flood Depth Reduction < 1 in
TULANE MEDICAL CENTER H O S P I TA L
1 - 2 in Pavement
Flood Depth 2 - 3 in
> 3 in
0 - 3 in
3 - 6 in
Major Drainage Line
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
18 - 24 in
Duncan Plaza Intervention Flood Reduction 100 Year, 24 Hour Event
JUNG HOTEL
FORMER CHARITY H O S P I TA L
JUNG HOTEL
TULANE MEDICAL CENTER H O S P I TA L
VA S I T E
FORMER CHARITY H O S P I TA L
VA S I T E
NOPL
CITY HALL
SUPERDOME
Open Space
NOPL
CITY HALL
SUPERDOME
Flood Depth Reduction < 1 in
TULANE MEDICAL CENTER H O S P I TA L
1 - 2 in Pavement
Flood Depth 2 - 3 in
> 3 in
0 - 3 in
3 - 6 in
Major Drainage Line
6 - 9 in
9 - 12 in
12 - 15 in
15 - 18 in
18 - 24 in
Combined Scenario Results All Scenarios*
Scenario 1 2 3 4 5 6 7 8 8.1 8.5 9 9.3 10 11 12.1 13
Storage to Combined Impact Area Storage Reduction Reduction Flood Acres Ratio Ac Ft Ac Ft Scenario Description Ac Ft Base 10 Year 24 Hour Flood 137.6 2.2 : 1 MIN Downtown 23.9 9.3 126.8 10.8 -8% MID Downtown 51.9 23.2 3.6 : 1 123.0 14.6 -11% MAX Downtown 65.9 26.5 4.3 : 1 122.2 15.4 -11% 2.8 : 1 MIN Lafitte 20.6 6.9 130.3 7.3 -5% MID Lafitte 40.4 28.7 2.4 : 1 120.6 17.0 -12% 30.1 118.0 19.6 -14% 3.7 : 1 MID Downtown + MIN Lafitte 72.5 MAX Downtown + MID Lafitte 110.4 47.7 3.8 : 1 108.2 29.4 -21% Infinite Storage Test 82.2 55.4 -40% MAX Downtown (upsized pipes 4 without Lafayette Square ) + MID Lafitte 110.4 47.7 2.7 : 1 97.0 40.6 -30% MAX Downtown + MAX Lafitte (routing from St Louis Culvert) 174.5 78.8 4.1 : 1 94.6 43.0 -31% 78.8 2.9 : 1 77.8 59.8 -43% MAX Downtown + MAX Lafitte (routing from Orleans Ave Culvert 1 + Upsized Pipes) 174.5 MAX Downtown (without Lafayette Square) + MAX Lafitte (routing from St Louis Culvert) 167.1 97.4 40.2 -29% 76.7 4.2 : 1 MAX Lafitte (routing from Orleans Ave Culvert) 108.6 52.2 2.9 : 1 99.9 37.7 -27% Proposed Scenario: MID Downtown (upsized pipes 2) + MAX Lafitte (routing from Orleans Ave Culvert 160.4 75.5 3.0 : 1 84.4 53.2 -39% "Minimum" MIN Downtown + MIN Lafitte 44.6 16.2 120.7 16.9 -12% 2.6 : 1
*Duncan Plaza Intervention scenario model run was added after publication of report and is not included in this table
Downtown Impact Area Flood Reduction Ac Ft Ac Ft 56.3 45.9 42.1 41.3 50.7 48.8 38.6 36.9 13.6 26.1 25.2 20.2 28.0 39.4 26.1 42.9
10.4 14.2 15.0 5.6 7.5 17.7 19.4 42.7 30.2 31.1 36.1 28.3 16.9 30.2 13.4
-19% -25% -27% -10% -13% -31% -34% -76% -54% -55% -64% -50% -30% -54% -24%
Lafitte Impact Area Flood Reduction Ac Ft Ac Ft 123.6 114.2 111.4 110.6 116.8 107.2 106.9 97.3 79.4 89.6 86.4 72.0 87.2 87.0 75.7 108.4
9.3 12.1 13.0 6.8 16.4 16.7 26.3 44.2 34.0 37.2 51.6 36.4 36.5 47.9 15.2
-8% -10% -10% -6% -13% -14% -21% -36% -28% -30% -42% -29% -30% -39% -12%
Procella Design, LLC
Downtown Stormwater Opportunities Modeling Report August 7, 2020
Introduction:
The Greater New Orleans Foundation (GNOF) hired Waggnonner and Ball Architects and Environments (WBAE) to produce a planning study that reflected downtown stormwater opportunities. WBAE in turn hired Procella Design LLC to conduct the stormwater modeling portion of the planning study. Procella used the City of New Orleans’ Stormwater Management Model to compare existing conditions with the results of proposed interventions. The proposed interventions include pervious parking, underground storage, blue roofs, and depressed parks in and around City Hall, Duncan Plaza, the Veterans Hospital site, Louis Armstrong Park, the Lafitte Greenway, and Lafayette Square.
Abbreviations:
Figure 1: Screenshot of the model extents in EPA-SWMM Procella used EPA-SWMM to model the proposed condition. The base model appears to have been built in PC- SWMM, the proprietary version of the SWMM software. This conclusion is based on the availability of the associated shapefiles available to the planning team, provided by DPW. Procella discussed with WBAE how to export and visualize data. As results become available, WBAE would join the node max HGL results with the node shapefile in Arc GIS. WBAE would then create raster flood maps or color code the nodes.
CBD – Central Business District DPS – Drainage Pump Station DPW – Department of Public Works EPA – Environmental Protection Agency GNOF – Greater New Orleans Foundation HGL – Hydraulic Grade Line SWMM – Stormwater Management Model WBAE – Waggonner and Ball Architecture and Environments
Base Model:
Rainfall:
On June 12, 2020, DPW provided the planning team with DPS 2, 3, 4 and 19 model and the associated shapefiles. The model was called “DPS02_03_04_19ExRevSACal_10Yr”, indicating some level of calibration undisclosed by Ardurra, the firm responsible for maintaining the City of New Orleans’s SWMM th model. This model covers roughly the east bank of New Orleans proper from the 17 Street Canal to the th Industrial Canal and parts of Jefferson Parish that feed into the 17 Street Canal. The model shows in detail Gentilly, the French Quarter, the CBD, Treme, some of Mid-City, the Bywater, the Marigny, and St Roch neighborhoods. The detailed part of the model stretches from the lake to the river, from Bayou St John to the industrial Canal, and bounded to the south by roughly by the elevated highway BUS 90. The rough coverage is hatched and the detailed coverage is almost solid black in Figure I.
Procella ran existing conditions model with Time Series “SCSTypeIII_24hr_10yr_8p5in” Based on New Orleans’s location, rainfalls are intense so a SCS Type III distributions is used. Also based on location, a 24hour storm with a 10% chance of occurring every year (referred to as a 10-year storm), has a total precipitation of 8.5 inches. 10-year 24-hour design storms are typically used to design stormwater infrastructure.
Procella Design, LLC
Procella Design, LLC
1106 General Taylor St New Orleans, LA 70115
2256144280
1106 General Taylor St New Orleans, LA 70115
2256144280
Figure 2: Hyetograph of Rainfall for 10-year 24-hour design storm for New Orleans area.
To compare the results with real and known storm events, Procella downloaded rainfall short interval data at the New Orleans airport in Kenner, Louisiana from wunderground.com. The storms on the following dates were analyzed: June 10, 2020, July 10, 2019, and May 12, 2019. Procella tried to pull th August 5 , 2017 storm but the data didn’t show significant rainfall at the New Orleans airport where the th short interval data is collected. Upon comparison of the three real storms, the July 10 , 2019 storm was used because it’s peak intensity of 7 inches/hr for a 5-minute period was closest to the design storm’s th peak intensity of 7.42 inches/hr for a 5-minute period. The hyetographs and rainfall data for the July 10 , 2019 storm is shown in Figures 3 and 4.
Time
Rainfall (inches)
Cumulative Rainfall (inches)
0:53
0
0
1:53
0
0
2:53
0
0
3:05
0
0
3:17
0
0
3:53
0.3
0.3
4:15
0.2
0.5
4:21
0.3
0.8
4:31
0.5
1.3
4:53
0.6
1.9
5:43
0.1
2
5:53
0.1
2.1
6:35
0
2.1
6:53
0
2.1
7:53
0
2.1
8:27
0.1
2.2
8:34
0.1
2.3
8:46
0.2
2.5
8:53
0.2
2.7
9:14
0.1
2.8
9:20
0.3
3.1
9:26
0.7
3.8
9:36
1.1
4.9
9:53
1.3
6.2
10:26
0
6.2
10:38 0 6.2 th Figure 4: Rainfall data for July 10 , 2019 storm based on data from the New Orleans airport in Kenner, LA The July 10, 2019 data was imported as a timeseries called 2019July10. When inputted made the date “08/05/2017” to match the rest of the model. Instead of changing all subcatchment’s rain gages, just changed the timeseries for Rain Gage “10 Year” from “SCSTypeIII_24hr_10yr_8p5in” to “2019July10”. The model took less than 15 min to run. This model was saved as: “200615_DPS02_03_04_19ExRevSACal_10Yr_2019July10eistingconditions”. When the results were checked, the downtown street links showed flooding similar to that of the 10-year storm existing conditions.
Modeling Proposed Interventions:
th Figure 3: Hyetograph for July 10 , 2019 storm based on data from the New Orleans airport in Kenner, LA
Procella Design, LLC
1106 General Taylor St New Orleans, LA 70115
2256144280
WBAE provided Procella with spreadsheet and maps describing the area and depths of each proposed intervention. Copies of the WBAE maps, which indicate where the interventions were to be modeled, are available in Appendix A. Procella Design, LLC
1106 General Taylor St New Orleans, LA 70115
2256144280
When modeling, Procella started with the CombinedMax scenario. To create different scenarios, models were saved as and proposed interventions deleted. Figure 5 shows the different scenario combinations for the first 8 runs.
Figure 5: Scenario combinations for first 8 runs
All of the interventions were modeled as storage nodes, except the two blue roofs, which were modeled as LID controls: green roofs. Based on the depth of adjacent nodes and the street link elevations, Procella selected an estimated invert elevation for each storage node. These values along with the area and depth information for the Combined Max scenario are shown in Figure 6. Proposed Invert Subcatchment Depth Node Storage Unit is Intervention Elevation Routed to Storage Area (ft2) (ft) Connected to Name NAVD88 (ft) Unit C 3.1 1.5 32,267 -1.73 DPS02_39766 HUCBD_45_02 C 3.2 3 13,079 -4.00 DPS02_39817 C 3.3 3 25,198 -1.70 DPS02_39985 C 3.4 3 9,112 -1.70 DPS02_39985 C 3.5 3 8,119 -3.14 DPS02_39967 C 3.6 1.5 18,412 -2.00 DPS02_39817 C 3.7 2 41,337 -2.86 DPS02_39807 HUCBD_63_06 C 3.8 2 18,593 -3.00 DPS02_39769 HUCBD_45_01 D 3.1 3 109,083 -3.72 DPS02_39971 D 3.2 3 65,159 -3.72 DPS02_39971 D 3.3 1.5 35,342 -2.16 DPS02_40221 HUCBD_43_02 D 3.4 1.5 36,983 -1.70 DPS02_39985 HUCBD_44_02 D 3.5 2 27,360 -3.10 DPS02_40008 D 3.6 0.25 31,226 N/A N/A HUCBD_64_05 N 3.1 3 17,417 -4.00 DPS02_39983 N 3.2 0.25 34,656 N/A N/A HUCBD_42_01 N 3.3 1.5 35,163 -4.00 DPS02_39207 V 3.1 3 374,982 -9.00 DPS02_39849 HUCBD_64_01-03 V 3.2 1.5 14,426 -4.00 DPS02_40032 HUCBD_65_02 V 3.3 1.5 19,936 -3.50 DPS02_39839 V 3.4 1.5 16,481 -3.50 DPS02_39997 V 3.5 1.5 23,482 -3.50 DPS02_39817 V 3.6 1.5 20,329 -3.10 DPS02_40008 V 3.7 3 38,231 -6.00 DPS02_39817 A 3.1 3 108,854 -3.00 TRL_29_01 A 3.2 0.1 39,675 -1.00 DPS03_43899 A 3.3 0.1 108,197 -1.00 DPS03_43988 A 3.4 0.1 26,619 -1.00 DPS03_43904 A 3.5 3 5,158 -3.00 DPS03_43948 Procella Design, LLC
1106 General Taylor St New Orleans, LA 70115
2256144280
A 3.6 A 3.7 A 3.8 A 3.9
0.1 3 0.1 3
22,755 3,165 58,473 19,836
-1.00 -3.00 -1.00 -3.00
DPS03_44161 DPS03_44161 DPS03_44161 DPS03_43994
L 3.1
3
321,876
-8.00
DPS02_37169
L 3.2 L 3.3 L 3.4 L 3.5 L 3.6 L 3.7 L 3.8 L 3.9 L 3.10 L 3.11 L 3.12 L 3.13 L 3.14 L 3.15
3 8,453 -4.00 DPS02_43766 3 11,491 -4.00 DPS02_43767 3 11,206 -4.00 DPS02_43763 3 9,606 -4.00 DPS02_43763 1.5 72,624 -0.42 DPS02_39193 0.1 68,543 -1.00 DPS02_37176 1.5 12,402 -1.77 DPS02_39162 0.1 77,197 -1.00 DPS02_39164 1.5 10,674 -1.50 DPS02_39164 0.1 77,136 -1.00 DPS02_37171 1.5 27,712 -1.50 DPS02_37171 0.1 80,116 -1.00 DPS02_39194 1.5 9,646 -0.95 DPS02_39188 0.1 57,968 -1.00 DPS02_39186 Figure 6: Proposed Interventions MAX Combined Scenario
HUCBD_56_02 HUCBD_57_01
Each storage node is 20’ deep with invert elevation set to value in table. Each storage node was named XMAX_ProposedInterventionName if it was a downtown node or ZMAX_ ProposedInterventionName if it was an Armstrong Park or Lafitte Greenway node. Each storage node had a storage curve by the same name as the storage node with the following formula for areas: Depth (ft) Area (ft2) 0 0 0.01 Area of Intervention Depth + 0.01 Area of Intervention Depth + 0.02 1 Figure 7: Storage Curves Tabular Input Each storage node had an outlet and overflow link. Outlet conduits were typically 10’ long and 1’ diameter circular pipe. Overflow conduits were always 2’ long and 2’ deep 50 wide with 10% sloped trapezoids with inlet and outlet offsets equal to the depth of the intervention. The invert elevations for the overflow conduits were always set at the depth + 0.01 above the invert elevation. Typically, this is approximately the same elevation of the adjacent street links. “GreenRoofs” were applied as LIDs rather than storage nodes. They were applied to subcatchments noted in table with surface width of 50ft. When modeling the VA Site, Procella ran the model with 10-year storm to check impacts. Immediately, Procella noticed that XMAX_V3.1 wasn’t filling up. In order to make this node more effective, Procella routed more subcatchments to that storage node and reran. Next, Procella added an additional inflow pipe at a higher elevation that flows into the node and reran. Finally, Procella lowered the invert elevation of the storage node to -9.00’. That allowed for it to fill up to roughly 2.5’ which is close to its 3’ depth.
Procella Design, LLC
1106 General Taylor St New Orleans, LA 70115
2256144280
,
The map of the interventions provided by WBAE on June 15 2020 for the Downtown Max scenario is shown in Figure 8. This can be compared with how the interventions were modeled in Figure 9.
Figure 8: Downtown Max Interventions mapped by WBAE
Figure 9: Sceenshot of how the Downtown Max Interventions were modeled in SWMM Procella Design, LLC
1106 General Taylor St New Orleans, LA 70115
2256144280
Before modeling the Laffite and Armstrong Park Max nodes, a copy of the model was saved as “200615_DowntownMax”. This was run and results were exported as Run4. Only then did Procella start modeling Lafitte Max conditions in the Combined Max model. When modeling Lafitte Max conditions in the Combined Max model, Procella started with the largest node to make sure enough flow made its way into the node for it to fill up. Procella anticipated similar issues as XMAX_V3.1 to occur with ZMAX_L3.1 due to its size. The first modeling attempt wasn’t even close to filling up. To address this, Procella routed subcatchments to the intervention and lowered the intervention. Additionally, Procella added an inlet pipe with 3’ diameter with invert at -5.00 and the outlet invert at -6.00’. After finishing modeling Lafitte Max, Procella ran the model, saved results as 10-year storm Run8, saved the file as “200617_CombinedMax”. To create the Run6 model: saved as the previous model as “200619_LaffiteMax”and delete out DowntownMax storage nodes and associated links. Procella also deleted the Green Roofs and rerouted the subcatchments to former nodes. The model was run, saved, and exported results for the 10-year storm as Run6. To create the downtown MIN condition scenario, “200615_DowntownMax” was opened and saved as “200619_DowntownMIN”. Deleted, modified nodes, and added nodes as needed to model all of Downtown MIN according to values in Figure 10. Procella ran the model and exported to 10-year Run 2- Downtown MIN. Invert Node Attached Other Node Depth Area Notes Elevation ID to Name (ft) (ft2) NAVD88 (ft) C 1.1 1.5 32,267 -1.73 DPS02_39766 XMAX_C3.1 C 1.2 3 13,020 -4.00 DPS02_39817 XMAX_C3.2 D 1.1 3 27,505 -3.72 DPS02_39971 XMAX_D3.1 Curve modified D 1.2 3 40,432 -3.72 DPS02_39971 XMAX_D3.2 Curve modified D 1.3 1.5 8,682 -2.16 DPS02_40221 XMAX_D3.3 Curve modified D 1.4 1.5 9,409 -1.70 DPS02_39985 XMAX_D3.4 Curve modified D 1.5 1.5 Combined with V1.2 D 1.6 1.5 17,185 -2.00 DPS02_39967 V 1.1 3 33,073 -9.00 DPS02_39817 XMAX_V3.7 Curve modified V 1.2 1.5 11,144 -3.50 DPS02_39817 XMAX_V3.5 Curve modified V 1.3 1.5 Combined with V1.10 V 1.4 1.5 Combined with V1.11 V 1.5 1.5 9,015 -3.50 DPS02_39997 XMAX_V3.4 Curve modified V 1.6 3 50,604 -6.00 DPS02_40032 V 1.7 3 121,600 -9.00 DPS02_39849 XMAX_V3.1 Curve modified V 1.8 3 1,773 -6.00 DPS02_39849 V 1.9 1.5 Combined with V1.5 V 1.10 1.5 15,127 -4.00 DPS02_40032 XMAX_V3.2 Curve modified V 1.11 1.5 16,203 -3.50 DPS02_39839 XMAX_V3.3 Curve modified Figure 10: Downtown Max Interventions modified as Downtown MIN interventions To create the downtown MID condition scenario, “200617_CombinedMax” was opened and saved as “200621_CombinedMID.” Deleted, modified nodes, and added nodes as needed to model all of Procella Design, LLC
1106 General Taylor St New Orleans, LA 70115
2256144280
Downtown MID according to values in Figure 11. Procella saved then dublicated the file and saved a backup files as “200621_ Combined Downtown MID_Lafitte Max”. Then, returning to “200621_CombinedMID”, Procella deleted, modified nodes and added nodes as needed to model all of Laffite MID according to the values in Figure 11. Procella ran the model and exported to 10-year Run 7 – Combined MID. Invert Node Attached Other Node Depth Area Elevation Notes ID to Name (ft) (ft2) NAVD88 (ft) C 2.1 1.5 32,267 -1.73 DPS02_39766 XMAX_C3.1 C 2.2 3 13,079 -4.00 DPS02_39817 XMAX_C3.2 C 2.3 3 25,198 -1.70 DPS02_39985 XMAX_C3.3 C 2.4 3 9,112 -1.70 DPS02_39985 XMAX_C3.4 C 2.5 3 8,119 -3.14 DPS02_39967 XMAX_C3.5 C 2.6 1.5 18,412 -2.00 DPS02_39817 XMAX_C3.6 C 2.7 2 41,337 -2.86 DPS02_39807 XMAX_C3.7 C 2.8 2 18,593 -3.00 DPS02_39769 XMAX_C3.8 D 2.1 3 109,083 -3.72 DPS02_39971 XMAX_D3.1 D 2.2 3 65,159 -3.72 DPS02_39971 XMAX_D3.2 D 2.3 1.5 35,342 -2.16 DPS02_40221 XMAX_D3.3 D 2.4 1.5 36,983 -1.70 DPS02_39985 XMAX_D3.4 D 2.5 2 27,360 -3.10 DPS02_40008 XMAX_D3.5 D 2.6 0.25 31,226 N/A N/A XMAX_D3.6 N 2.1 3 17,417 -4.00 DPS02_39983 XMAX_N3.1 N 2.2 0.25 34,656 N/A N/A XMAX_N3.2 N 2.3 1.5 35,163 -4.00 DPS02_39207 XMAX_N3.3 V 2.1 1.5 20,329 -3.10 DPS02_40008 XMAX_V3.6 V 2.2 1.5 23,482 -3.50 DPS02_39817 XMAX_V3.5 V 2.3 3 21,640 -6.00 DPS02_39817 XMAX_V3.7 Curve modified V 2.4 1.5 14,027 -3.00 DPS02_39817 V 2.5 1.5 14,426 -4.00 DPS02_40032 XMAX_V3.2 V 2.6 1.5 19,936 -3.50 DPS02_39839 XMAX_V3.3 V 2.7 1.5 16,503 -3.50 DPS02_39997 XMAX_V3.4 Curve modified V 2.8 3 64,042 -5.00 DPS02_39997 V 2.9 1.5 14,265 -3.00 DPS02_39997 V 2.10 1.5 13,282 -3.00 DPS02_39839 V 2.11 3 187,369 -9.00 DPS02_39849 XMAX_V3.1 Curve modified V 2.12 1.5 43,898 -4.00 DPS02_39844 V 2.13 3 Combined with V2.11 V 2.14 3 Combined with V2.11 A 1.1 3 108,854 -3.00 TRL_29_01 ZMAX_A3.1 A 1.2 3 19,836 -3.00 DPS03_43994 ZMAX_A3.9 L 1.1 3 170,786 -8.00 DPS02_37169 ZMAX_L3.1 Curve modified L 1.2
3 60,008 Combined with L1.1 Figure 11: Combined Max Interventions modified as Combined MID interventions
Procella Design, LLC
1106 General Taylor St New Orleans, LA 70115
2256144280
Procella saved “200621_CombinedMID” and then saved a copy as “200621_DowntownMID”. In that file, Procella deleted Lafitte MID nodes, rerouted two subcatchments to their former junctions, ran the model, saved, and exported to 10-year Run 3 – Downtown MID. Procella opened “200619_LaffiteMax” and saved a copy as “200621_LafitteMID” and deleted, modified, and added nodes as needed to model just Lafitte MID. Procella saved, ran the model and exported to 10year Run 5 – Lafitte MID.
Explorations, Analysis & Proposed Interventions Refinement:
When WBAE mapped the results of the first eight model runs. A couple observations were made: 1. Even the Max Combined scenario did not remove all the flooding, most notably around the Jung Hotel on Canal Street. WBAE wondered whether the storage of Duncan Plaza could ever be big enough to address this flooding or whether it was due to a low spot. 2. The team wondered if the downtown interventions were pulling the stormwater out of Loyola Ave culvert fast enough to fill the downtown interventions and reduce flooding. 3. The team wondered how the interventions would have performed in recent past storm events. 4. WBAE proposed that we test additional storage interventions along the Lafitte “Blueway” and Lafayette Square. Duncan Plaza Outfall To test whether unlimited storage at Duncan Plaza would eliminate flooding on Canal Street, Procella modeled an unrealistic scenario. Instead of flowing to Node DPS02_37147, the canal under Loyola will simply outfall to DuncanPlazaOutfall. This the equivalent of the water falling off a cliff. This involved changing the outlet for Conduit DPS02_37144 to DuncanPlazaOutfall with invert elevation of - 9.07’. The results were exported and analyzed. The closest node to the Jung Hotel was at Cleveland and LaSalle: Junction DPS02_38545. The street elevation at this point was determined from the adjacent street links as -1.20’. The results of the eight initial runs and the Duncan Plaza Outfall were analyzed in Figure 12. Run
Run Description
Max HGL (ft)
Depth In Street (inches)
Reduction (inches)
% Reduction
1
Existing
0.21
16.9
2
MIN Downtown
0.14
16.1
0.8
5%
3
MID Downtown
4
MAX Downtown
0.08
15.4
1.6
9%
0.10
15.6
1.3
8%
5
MID Lafitte
0.15
16.2
0.7
4%
6
MAX Lafitte
0.13
16.0
1.0
6%
7
MID Combined
0.03
14.8
2.2
13%
8
MAX Combined
0.01
14.5
2.4
14%
8.1
DuncanPlazaOutfall -0.50 8.4 8.5 50% Figure 12: Analysis of results at Jung Hotel: Intersection of Cleveland and Lasalle
The results determined that even with unlimited storage at Duncan Plaza, 8.4 inches of stormwater would be expected to still remain at the intersection with only a 50% reduction in flooding. Procella Design, LLC
1106 General Taylor St New Orleans, LA 70115
2256144280
Upsized Pipes in Gravier and Perdido It was determined that even at the maximum depth several of the downtown nodes were not filling. This is shown in Figure 13. Design Fill Max Depth Consequence Storage Unit Depth Difference XMAX_C3.1 1.5 2.42 -0.92 XMAX_C3.2 3 0.38 2.62 Not Filled
Existing Inlet Offset
Existing Outlet Offset
Proposed Size
Proposed Inlet Offset
Proposed Outlet Offset
1.75
-4.8
-8.97
5
-8
same
1.75
-4.75
-4.8
5
-8
-8
169.2
1.5
-3.14
-4.75
5
-8
-8
150.8
1.25
-1.7
-3.14
5
-8
-8
5
-8
-8
Conduit
Length
Existing Size
DPS02_39987
38.5
DPS02_39984
88.7
DPS02_39967 DPS02_39985 ProposedPerdido
381.56
DPS02_39817
270.3
1.5
5
same
same
XMAX_C3.3
3
0.8
2.2
Not Filled
DPS02_39997
230.1
1.5
-7.02
-7.72
5
same
same
XMAX_C3.4
3
1.03
1.97
Not Filled
DPS02_39839
322.8
1.75
-7.72
-8.69
5
same
same
DPS02_39844
297.4
1.75
-8.69
-9.59
5
same
same
DPS02_38949
234.1
2
-9.59
-10.3
5
same
same
DPS02_37147
48.1
2
-6.55
-9.07
5
-8
same
DPS02_39983
80
1.75
-5.65
-6.55
5
-8
-8
XMAX_C3.5
3
3.86
-0.86
XMAX_C3.6
1.5
0
1.5
Empty
XMAX_C3.7
2
1.45
0.55
Not Filled
XMAX_C3.8
2
3.52
-1.52
XMAX_D3.1
3
2.99
0.01
Almost Perfect
XMAX_D3.2
3
1.75
1.25
Not Filled
XMAX_D3.3
1.5
1.29
0.21
Not Filled
XMAX_D3.4
1.5
1.03
0.47
Not Filled
XMAX_D3.5
2
1.61
0.39
Not Filled
XMAX_N3.1
3
4.59
-1.59
XMAX_N3.3
1.5
4.52
-3.02
XMAX_V3.1
3
2.68
0.32
XMAX_V3.2
1.5
3.21
-1.71
XMAX_V3.3
1.5
0
1.5
Empty
XMAX_V3.4
1.5
0.15
1.35
Almost Empty Almost Empty
XMAX_V3.5
1.5
0.02
1.48
XMAX_V3.6
1.5
2.07
-0.57
Not Filled
To combat this, Procella upsized the pipes leading to these interventions in Perdido and Gravier. Figure 14 shows which pipes were changed and how. The nodes at each conduits’ junction was also increased to the proposed depth of at least -8’. This proposed condition increased the Combined Max scenario from 14% reduction to 38% reduction. It seemed as though that not only were the storage nodes significantly fuller, but they were fuller a longer period of time. However, by analyzing other junctions. It was determined that the upsized pipes increased flooding, when compared to the Combined Max scenario without upsized pipes, in some locations. Procella determined that the upsized pipes created a stormwater highway from theconnection between Loyola Ave and Claiborne Ave box culverts. This reduced flooding for the Jung Hotel because less water was flowing past Canal Street, however, it caused an increase in flooding in areas like Poydras Ave which had previous had a more empty Claiborne Ave box culvert to flow into. To combat this, the pipes were upsized to only 3’ and the riverside of the Perdido and Gravier upsized pipes did not connect to LaSalle.
1106 General Taylor St New Orleans, LA 70115
-7.02
DPS02_39971
172.6
1.5
-3.72
-5.65
5
-8
-8
DPS02_40221_1
138.8
1.25
-2.16
-3.72
5
-8
-8
ProposedGravier
382.78
-3.1
-6.37
-8
-8
479.4
1.5
5
DPS02_40008
5
-8
-8
DPS02_40032
326.3
1.75
-6.37
-8.59
5
same
same
DPS02_40190
250
2
-8.59
-11.05
5
same
same
DPS02_40190
101.2
2
-11.05
-12.04
5
same
same
Figure 14: Upsized pipes modified in Perdido and Gravier.
XMAX_V3.7 3 1.16 1.84 Not Filled Figure 13: Fill Difference for Downtown Max Storage nodes under Combined Max scenario.
Procella Design, LLC
-6.21
2256144280
Real Storm Events Procella ran the eight initial models with the 10-year 24-hour storm event, the July 10, 2019 storm event, and the May 12, 2019 storm event. The intensity of the July 10, 2019 storm event was similar to the 10year 24-hour storm and the flooding results for the three nodes analyzed were similar. The May 12, 2019 storm even was almost twice as intense although the total rainfall was significantly less. The results for that storm event were significantly higher than the 10-year 24-hour storm. Although these runs produced a lot of data, they were not analyzed in great depth or presented to the clients. Lafitte Blueway and Lafayette Square Additions WBAE provided Procella with spreadsheet and maps describing the area and depths of each proposed intervention of the Lafitte Blueway. Procella built these interventions as additions to the CombinedMax scenario and saved as “200708_Combined Max w additional.” The storage nodes were modeled with the inputs shown in Figure 15. The locations of the storage nodes were determined by the maps provided by WBAE shown in Appendix A. The Lafitte Blueway increased the reduction in flooding at the Jung Hotel from 14% in the Max Combined Scenario to 24%. The node at Galvez and Perdido saw a 21% increase in reduction. The node at Claiborne and Poydras saw a 7% increase in reduction. Additional nodes were entered to the analysis at this point. intersection of Johnson and Bienville saw a 13% increase in reduction between the Combined Max scenario and the Combined Max Scenario with Blueway additions. The intersection of Liberty and Girod saw only a 2% increase in reduction. The intersection of Basin and Claiborne remained the same, as did the intersection of Orleans and Galvez. WBAE also provided Procella with a spreadsheet and maps describing the area and depths of three proposed intervention in and around Lafayette Square. The inputs for those storage nodes are described in Figure 16. The only analysis node that showed significant flood reduction in response to Lafayette
Procella Design, LLC
1106 General Taylor St New Orleans, LA 70115
2256144280
Square was the intersection of Liberty and Girod with a 6% change. The results for the six analysis nodes for all the runs are shown in Appendix B. Depth Area Invert Elevation Node Connected Comments ID (ft) (ft2) NAVD88 (ft) to L 3.16 3 353,609 -6.00 DPS02_37183 L 3.17 3 195,820 Combined with L3.16 L 3.18 3 151,534 -6.00 DSP02_37187 L 3.19 3 13,218 -4.00 DPS02_37184 L 3.20 1.5 7,041 -5.00 DPS02_37188 L 3.21 3 131,595 -6.00 DPS02_37127 L 3.22 1.5 34,690 -4.00 DPS03_44325 L 3.23 1.5 30,422 -4.00 ZMAX_L3.21 L 3.24 3 36,831 -3.00 DPS02_37193 L 3.25 3 266,653 -6.00 J24867.1 Figure 15: Lafitte Blueway additional storage node inputs Invert Elevation Node ID Depth (ft) Area (ft2) NAVD88 (ft) Connected to LS 3.01 5 52,858 -2.00 DSP02_46423 LS 3.02 1.5 24,522 0.00 DPS02_46317 LS 3.03 1.5 12,086 0.00 DPS02_37335 Figure 16: Lafayette Square additional storage node inputs Initially, the Lafitte Blueway storage nodes were modeled off of the underground and open concrete channel known as the St Louis Canal. Though this had significant effect on downtown and the hospitals, it did little to relieve the flooding in the neighborhood. As a result two efforts were taken to redirect the benefit of the Lafitte Blueway to the neighborhood on the Orleans Ave side of the Blueway. Subcatchment New Outlet HUBSJ_17_02 ZMAX_L3.25 HUBSJ_19_02 ZMAX_L3.25 HUBSJ_21_02 ZMAX_L3.25 HUBSJ_23_02 ZMAX_L3.25 HUBSJ_05_02 ZMAX_L3.25 HUBSJ_08_02 ZMAX_L3.25 HUBSJ_09_01 ZMAX_L3.25 HUTRL_46_01 ZMAX_L3.24 HUSWB_EB_32 ZMAX_L3.21 HUTRL_46_02 ZMAX_L3.22 HUTRL_44_02 ZMAX_L3.22 HUTRL_41_02 ZMAX_L3.23 HUTUG_09_01 ZMAX_L3.20 HUTRFL_39_01 ZMAX_L3.19 HUTRL_34_01 ZMAX_L3.16 HUSWB_EB_72 ZMAX_L3.16 HUCBD_01_02 ZMAX_L3.8 HUCBD_56_02 ZMAX_L3.1 Figure 17: Subcatchment routing on the Lafitte Blueway Procella Design, LLC
1106 General Taylor St New Orleans, LA 70115
2256144280
1.
Subcatchments were routed to storage junctions shown in Figure 17. this change raised flooding slightly in the hospital area but lowered flooding in the neighborhood and business areas. Further away from the Blueway there was little to no change noted.
2.
Secondly, the Blueway storage nodes were attached to neighborhood nodes to he northeast of the Blueway. The storage nodes with new outlets are shown in Figure 18. To insure enough water was reaching some of the storage nodes, Procella upsized Conduit DPS03_44274 to 3’ diameter from 1.5’ diameter and upsized Conduit DPS03_44278 from 2’ diameter to 3’ diameter. Storage Unit New Outlet ZMAX_L3.19 DPS03_44258 ZMAX_L3.18 DPS03_44274 ZMAX_L3.20 DPS03_44274 ZMAX_L3.21 DPS03_44274 ZMAX_L3.24 DPS03_40916 ZMAX_L3.25 DPS03_16408 ZMAX_L3.25 DPS03_16396 ZMAX_L3.25 DPS03_16852 ZMAX_L3.25 DPS03_15326 ZMAX_L3.25 DPS03_15336 Figure 18: Storage node rerouting on the Lafitte Blueway Procella analyzed the six representative nodes and saw that each of these two efforts shifted the improvements to the neighborhood with minor flooding increases in hospital and downtown area. Additional runs were made to mix and match the Downtown MIN with Lafitte MID as well as Downtown MID conditions with the Laffite Max, Blueway additions, and upsized pipes in Perdido and Galvex. These were labeled by WBAE as “minimum” and “proposed” conditions respectively.
Conclusion:
The following conclusions were made based on the maps made by WBAE and the analysis of the six selected nodes. The results of the six selected nodes are shown in Appendix B. WBAE’s maps are shown in their report. Jung Hotel: Intersection of Cleveland and Lasalle The modeled existing conditions showed 16.9 inches of flooding at this location in a 10-year 24-hour design storm event. The minimum scenario is expected to reduce flooding by 7% and the proposed scenario is expected to reduce flooding by 30%. Although none of the proposed interventions removed the majority of the flooding in this street, the interventions may be enough to prevent stormwater from entering the hotel and causing property damage. What made the biggest impact: The addition of the Lafitte Blueway routed to the neighborhood showed the most dramatic decrease in flooding at this location. LSU Hospital: Intersection of Galvez and Perdido The modeled existing conditions showed 16.2 inches of flooding at this location in a 10-year 24-hour design storm event. The minimum scenario is expected to reduce flooding by 21% and the proposed scenario reduces flooding by 50%. These are considered major improvements to the flooding in the area.
Procella Design, LLC
1106 General Taylor St New Orleans, LA 70115
2256144280
What made the biggest impact: The downtown stormwater detention interventions with upsized pipes in Perdido and Galvez produced the largest reduction of flooding on this area. Superdome NW Corner: Intersection of Claiborne and Poydras The modeled existing conditions showed 13.9 inches of flooding at this location in a 10-year 24-hour design storm event. The minimum scenario is expected to reduce flooding by 31% and the proposed scenario is expected to reduce flooding by 51%. These are considered major improvements to the flooding in the area. At the on-ramp to the interstate, improvement to this area is important in cases of emergency. What made the biggest impact: The model showed that downtown stormwater interventions with upsized pipes in Perdido and Galvez had the biggest impact on flood reduction on the Superdome NW corner. Neighborhood: Intersection of Johnson and Bienville The modeled existing conditions showed 10.4 inches of flooding at this location in a 10-year 24 – hour design storm event. The minimum scenario is expected to reduce flooding by 5% and the proposed scenario is expected to reduce flooding by 20%. What made the biggest impact: The model showed that the Lafitte Blueway with connections to the neighborhood have the biggest impact on the neighborhood. Superdome SE Corner: Intersection of Liberty and Girod The modeled existing conditions showed 17.8 inches of flooding at this location in a 10-year 24 – hour design storm event. The minimum scenario is expected to reduce flooding by 3% and the proposed scenario is expected to reduce flooding by 12%. What made the biggest impact: The model showed that downtown elements with upsized pipes in Perdido and Galvez and the addition of Lafayette Square interventions (not included in the proposed scenario) had the biggest impact on flood reduction on the Superdome SE corner. Neighborhood near Armstrong Park: Intersection of Basin and Claiborne The modeled existing conditions showed 8.3 inches of flooding at this location in a 10-year 24-hour design storm event. The minimum scenario is expected to reduce flooding by 7% and the proposed scenario is expected to reduce flooding by 38%. What made the biggest impact: The model showed that the Lafitte Greenway interventions in the turning basin had the greatest impact on flooding in this area. Neighborhood: Intersection of Orleans and Galvez The modeled existing conditions showed 18.2 inches of flooding at this location in a 10-year 24 – hour design storm event. The minimum scenario is expected to reduce flooding by 1% and the proposed scenario is expected to reduce flooding by 19%. Of the impacted area, this neighborhood had some of the highest flood depths. Although the impact was smaller than other points, this intersection is representative of one of the largest areas of improvement. What made the biggest impact: The model showed that the Lafitte Blueway with connections to the neighborhood have the biggest impact on the neighborhood.
Procella Design, LLC
1106 General Taylor St New Orleans, LA 70115
2256144280
Procella Design, LLC
Appendix A WBAE provided maps of intervention locations
1106 General Taylor St New Orleans, LA 70115
2256144280
Appendix B Results of Six Selected Nodes for the 10-year, 24- hour design storm
Jung Hotel: Intersection of Cleveland and Lasalle Street Elevation -1.20’
LSU Hospital: Intersection of Galvez and Perdido Street Elevation -3.46’ Run
Run Description
Max HGL (ft)
Depth In Street (inches)
Reduction (inches)
% Reduction
1
Existing
-2.11
16.2
2
MIN Downtown
-2.31
13.8
2.4
15%
3
MID Downtown
4
MAX Downtown
-2.38
13.0
3.2
20%
-2.41
12.6
3.6
22%
Run
Run Description
1
Existing
0.21
16.9
2
MIN Downtown
0.14
16.1
0.8
5%
5
MID Lafitte
-2.21
15.0
1.2
7%
3
MID Downtown
0.08
15.4
1.6
9%
6
MAX Lafitte
-2.25
14.5
1.7
10%
4
MAX Downtown
0.10
15.6
1.3
8%
7
MID Combined
-2.49
11.6
4.6
28%
5
MID Lafitte
0.15
16.2
0.7
4%
8
MAX Combined
-2.53
11.2
5.0
31%
6
MAX Lafitte
0.13
16.0
1.0
6%
8.1
DuncanPlazaOutfall
-2.82
7.7
8.5
53%
7
MID Combined
0.03
14.8
2.2
13%
8.2
Upsized Pipes
-2.82
7.7
8.5
53%
8
MAX Combined
0.01
14.5
2.4
14%
8.3
-2.54
11.0
5.2
32%
8.1
DuncanPlazaOutfall
-0.50
8.4
8.5
50%
8.2
Upsized Pipes
-0.20
12.0
4.9
29%
7.1
-2.47
11.9
5.0
31%
8.3
Upsized Pipes Modified MID Combined Upsized Pipes Modified MAX Combined Upsized Pipes Modified 2 MID Combined Upsized Pipes Modified 3 MAX Combined Upsized Pipes Modified 3
-0.12
13.0
4.0
23%
8.4
-2.53
11.2
5.8
36%
-0.21
11.9
5.0
30%
7.2
-2.66
9.6
7.3
45%
-0.32
10.6
6.4
38%
8.5
Upsized Pipes Modified MID Combined Upsized Pipes Modified MAX Combined Upsized Pipes Modified 2 MID Combined Upsized Pipes Modified 3 MAX Combined Upsized Pipes Modified 3
-2.77
8.3
8.6
53%
-0.01
14.3
2.6
16%
9
-2.81
7.8
8.4
52%
-0.26
11.3
5.6
33%
10
-2.81
7.8
8.4
52%
MAX Combined Additions MAX Combined Additions wo LS MAX Combind Additons w subcatchment routing MAX Combined Additions w subcatchment and node routing to neighborhood MAX Combined Additions w subcatchment and node routing to neighborhood with upsized pipes modified 3
-0.17
12.4
4.6
27%
9.1
-2.79
8.0
8.2
50%
-0.13
12.8
4.1
24%
-0.16
12.5
4.4
26%
-2.76
8.4
7.8
48%
-0.15
12.6
4.3
26%
MAX Combined Additions MAX Combined Additions wo LS MAX Combind Additons w subcatchment routing MAX Combined Additions w subcatchment and node routing to neighborhood MAX Combined Additions w subcatchment and node routing to neighborhood with upsized pipes modified 3
-2.9
6.7
9.5
59%
-2.53
11.2
5.0
31%
-2.82
7.7
8.5
53%
-2.39
12.8
3.4
21%
-2.79
8.0
8.2
50%
8.4 7.2 8.5 9 10 9.1 9.2
9.3 11
12 13
12.1
Lafitte Max with Blueway connections to neighborhood "Proposed" Downtown MID with upsized pipes and Lafitte MAX with Blueway routed to neighborhood. No LS "Minimum" Downtown MIN Lafitte MID "Proposed" Downtown MID with upsized pipes and Lafitte MAX with Blueway routed to neighborhood. No LS. Upsized pipes reduced to 3'
Procella Design, LLC
Reduction (inches)
Max HGL (ft)
7.1
Depth In Street (inches)
% Reduction
9.2
9.3 11
-0.31
10.7
6.2
37%
0.04
14.9
2.0
12%
12 13
-0.29
10.9
6.0
35%
0.11
15.7
1.2
7% 12.1
-0.21
11.9
1106 General Taylor St New Orleans, LA 70115
5.0
Lafitte Max with Blueway connections to neighborhood "Proposed" Downtown MID with upsized pipes and Lafitte MAX with Blueway routed to neighborhood. No LS "Minimum" Downtown MIN Lafitte MID "Proposed" Downtown MID with upsized pipes and Lafitte MAX with Blueway routed to neighborhood. No LS. Upsized pipes reduced to 3'
30%
2256144280
Procella Design, LLC
1106 General Taylor St New Orleans, LA 70115
2256144280
Superdome NW Corner: Intersection of Claiborne and Poydras Street Elevation -2.46’ Run
Run Description
Max HGL (ft)
Depth In Street (inches)
Reduction (inches)
% Reduction
1
Existing
-1.3
13.9 9.8
4.1
29%
2
MIN Downtown
-1.64
3
MID Downtown
4
MAX Downtown
-1.79
8.0
5.9
42%
-1.79
8.0
5.9
42%
5
MID Lafitte
-1.31
13.8
0.1
6
MAX Lafitte
-1.32
13.7
7
MID Combined
-1.82
8
MAX Combined
-1.82
8.1
DuncanPlazaOutfall
8.2 8.3
MAX Combined Additions MAX Combined Additions wo LS MAX Combind Additons w subcatchment routing MAX Combined Additions w subcatchment and node routing to neighborhood MAX Combined Additions w subcatchment and node routing to neighborhood with upsized pipes modified 3
7.1 8.4 7.2 8.5 9 10 9.1 9.2
9.3 11
12 13
12.1
Intersection of Johnson and Bienville Street Elevation -2.13’ Run
Run Description
Max HGL (ft)
Depth In Street (inches)
1
Existing
-1.26
10.4
2
MIN Downtown
-1.29
3
MID Downtown
4
MAX Downtown
1%
5
0.2
2%
6
7.7
6.2
45%
7.7
6.2
45%
-1.97
5.9
8.0
Upsized Pipes
-2.17
3.5
Upsized Pipes Modified MID Combined Upsized Pipes Modified MAX Combined Upsized Pipes Modified 2 MID Combined Upsized Pipes Modified 3 MAX Combined Upsized Pipes Modified 3
-1.82
7.7
-1.48
Lafitte Max with Blueway connections to neighborhood "Proposed" Downtown MID with upsized pipes and Lafitte MAX with Blueway routed to neighborhood. No LS "Minimum" Downtown MIN Lafitte MID "Proposed" Downtown MID with upsized pipes and Lafitte MAX with Blueway routed to neighborhood. No LS. Upsized pipes reduced to 3'
Reduction (inches)
% Reduction
10.1
0.4
3%
-1.29
10.1
0.4
3%
-1.29
10.1
0.4
3%
MID Lafitte
-1.29
10.1
0.4
3%
MAX Lafitte
-1.3
10.0
0.5
5%
7
MID Combined
-1.31
9.8
0.6
6%
8
MAX Combined
-1.32
9.7
0.7
7%
58%
8.1
DuncanPlazaOutfall
-1.44
8.3
2.2
21%
10.4
75%
8.2
Upsized Pipes
-1.39
8.9
1.6
15%
6.2
45%
8.3
-1.32
9.7
0.7
7%
11.8
5.2
37%
7.1
-1.32
9.7
0.7
7%
-1.42
12.5
4.4
32%
8.4
-1.33
9.6
0.8
8%
-1.89
6.8
7.1
51%
7.2
-1.36
9.2
1.2
11%
-2.03
5.2
8.8
63%
8.5
Upsized Pipes Modified MID Combined Upsized Pipes Modified MAX Combined Upsized Pipes Modified 2 MID Combined Upsized Pipes Modified 3 MAX Combined Upsized Pipes Modified 3
-1.38
9.0
1.4
14%
-1.9
6.7
7.2
52%
9
-1.43
8.4
2.0
20%
-1.9
6.7
7.2
52%
10
-1.43
8.4
2.0
20%
-1.9
6.7
7.2
52%
9.1
-1.42
8.5
1.9
18%
-1.89
6.8
7.1
51%
9.2
-1.4
8.8
1.7
16%
-2.19
3.2
10.7
77%
9.3
MAX Combined Additions MAX Combined Additions wo LS MAX Combind Additons w subcatchment routing MAX Combined Additions w subcatchment and node routing to neighborhood MAX Combined Additions w subcatchment and node routing to neighborhood with upsized pipes modified 3
-1.48
7.8
2.6
25%
-1.35
13.3
0.6
4%
11
-1.38
9.0
1.4
14%
-1.93
6.4
7.6
54%
12
-1.45
8.2
2.3
22%
-1.66
9.6
4.3
31%
13
-1.3
10.0
0.5
5%
-1.89
6.8
7.1
51%
12.1
-1.43
8.4
2.0
20%
Lafitte Max with Blueway connections to neighborhood "Proposed" Downtown MID with upsized pipes and Lafitte MAX with Blueway routed to neighborhood. No LS "Minimum" Downtown MIN Lafitte MID "Proposed" Downtown MID with upsized pipes and Lafitte MAX with Blueway routed to neighborhood. No LS. Upsized pipes reduced to 3'
Procella Design, LLC
1106 General Taylor St New Orleans, LA 70115
2256144280
Procella Design, LLC
1106 General Taylor St New Orleans, LA 70115
2256144280
Superdome SE Corner: Intersection of Liberty and Girod Street Elevation 0.24’ Run
Run Description
Max HGL (ft)
Depth In Street (inches)
Reduction (inches)
% Reduction
1
Existing
1.72
17.8 17.4
0.4
2%
2
MIN Downtown
1.69
3
MID Downtown
4
MAX Downtown
1.67
17.2
0.6
3%
1.68
17.3
0.5
3%
5
MID Lafitte
1.7
17.5
0.2
6
MAX Lafitte
1.69
17.4
7
MID Combined
1.66
8
MAX Combined
1.65
8.1
DuncanPlazaOutfall
8.2 8.3
MAX Combined Additions MAX Combined Additions wo LS MAX Combind Additons w subcatchment routing MAX Combined Additions w subcatchment and node routing to neighborhood MAX Combined Additions w subcatchment and node routing to neighborhood with upsized pipes modified 3
7.1 8.4 7.2 8.5 9 10 9.1 9.2
9.3 11
12 13
12.1
Intersection of Basin and Claiborne Street Elevation -1.27’ Run
Run Description
Max HGL (ft)
1
Existing
8.3
2
MIN Downtown
3 4
1%
5
0.4
2%
6
17.0
0.7
4%
16.9
0.8
5%
1.17
11.2
6.6
Upsized Pipes
1.53
15.5
Upsized Pipes Modified MID Combined Upsized Pipes Modified MAX Combined Upsized Pipes Modified 2 MID Combined Upsized Pipes Modified 3 MAX Combined Upsized Pipes Modified 3
1.56
15.8
1.45
Lafitte Max with Blueway connections to neighborhood "Proposed" Downtown MID with upsized pipes and Lafitte MAX with Blueway routed to neighborhood. No LS "Minimum" Downtown MIN Lafitte MID "Proposed" Downtown MID with upsized pipes and Lafitte MAX with Blueway routed to neighborhood. No LS. Upsized pipes reduced to 3'
Depth In Street (inches)
Reduction (inches)
8.3
0.0
0%
MID Downtown
8.3
0.0
0%
8.3
MAX Downtown
8.3
0.0
0%
8.3
MID Lafitte
7.7
0.6
7%
7.7
MAX Lafitte
5.8
2.5
30%
5.8
7
MID Combined
7.7
0.6
7%
7.7
8
MAX Combined
5.6
2.6
32%
5.6
37%
8.1
DuncanPlazaOutfall
5.6
2.6
32%
5.6
2.3
13%
8.2
Upsized Pipes
5.8
2.5
30%
5.8
1.9
11%
8.3
5.8
2.5
30%
5.8
14.5
3.2
18%
7.1
7.7
0.6
7%
7.7
1.3
12.7
5.0
28%
8.4
5.9
2.4
29%
5.9
1.54
15.6
2.2
12%
7.2
7.7
0.6
7%
7.7
1.44
14.4
3.4
19%
8.5
Upsized Pipes Modified MID Combined Upsized Pipes Modified MAX Combined Upsized Pipes Modified 2 MID Combined Upsized Pipes Modified 3 MAX Combined Upsized Pipes Modified 3
5.6
2.6
32%
5.6
1.53
15.5
2.3
13%
9
5.6
2.6
32%
5.6
1.62
16.6
1.2
7%
10
5.6
2.6
32%
5.6
1.53
15.5
2.3
13%
9.1
5.3
3.0
36%
5.3
1.54
15.6
2.2
12%
9.2
5.2
3.1
38%
5.2
1.38
13.7
4.1
23%
9.3
MAX Combined Additions MAX Combined Additions wo LS MAX Combind Additons w subcatchment routing MAX Combined Additions w subcatchment and node routing to neighborhood MAX Combined Additions w subcatchment and node routing to neighborhood with upsized pipes modified 3
5.2
3.1
38%
5.2
1.68
17.3
0.5
3%
11
5.2
3.1
38%
5.2
1.45
14.5
3.2
18%
12
5.2
3.1
38%
5.2
1.68
17.3
0.5
3%
13
7.7
0.6
7%
7.7
1.54
15.6
2.2
12%
12.1
5.2
3.1
38%
5.2
Procella Design, LLC
1106 General Taylor St New Orleans, LA 70115
Lafitte Max with Blueway connections to neighborhood "Proposed" Downtown MID with upsized pipes and Lafitte MAX with Blueway routed to neighborhood. No LS "Minimum" Downtown MIN Lafitte MID "Proposed" Downtown MID with upsized pipes and Lafitte MAX with Blueway routed to neighborhood. No LS. Upsized pipes reduced to 3'
2256144280
Procella Design, LLC
% Reduction 8.3 8.3
1106 General Taylor St New Orleans, LA 70115
2256144280
Neighborhood: Intersection of Orleans and Galvez Street Elevation -2.29â&#x20AC;&#x2122; Run
Run Description
Max HGL (ft)
Depth In Street (inches)
Reduction (inches)
% Reduction
1
Existing
-0.77
18.2
2
MIN Downtown
-0.77
18.2
0.0
0%
3
MID Downtown
4
MAX Downtown
-0.77
18.2
0.0
0%
-0.77
18.2
0.0
0%
5
MID Lafitte
-0.79
18.0
0.2
1%
6
MAX Lafitte
-0.89
16.8
1.4
8%
7
MID Combined
-0.79
18.0
0.2
1%
8
MAX Combined
-0.9
16.7
1.6
9%
8.1
DuncanPlazaOutfall
-0.91
16.6
1.7
9%
8.2
Upsized Pipes
-0.9
16.7
1.6
9%
8.3
Upsized Pipes Modified MID Combined Upsized Pipes Modified MAX Combined Upsized Pipes Modified 2 MID Combined Upsized Pipes Modified 3 MAX Combined Upsized Pipes Modified 3
-0.89
16.8
1.4
8%
-0.81
17.8
0.5
3%
-0.89
16.8
1.4
8%
-0.81
17.8
0.5
3%
-0.9
16.7
1.6
9%
MAX Combined Additions MAX Combined Additions wo LS MAX Combind Additons w subcatchment routing MAX Combined Additions w subcatchment and node routing to neighborhood MAX Combined Additions w subcatchment and node routing to neighborhood with upsized pipes modified 3
-0.91
16.6
1.7
9%
-0.91
16.6
1.7
9%
-0.98
15.7
2.5
14%
-1.05
14.9
3.4
18%
-1.06
14.8
3.5
19%
-1.03
15.1
3.1
17%
-1.06
14.8
3.5
19%
-0.79
18.0
0.2
1%
-1.06
14.8
3.5
19%
7.1 8.4 7.2 8.5 9 10 9.1 9.2
9.3 11
12 13
12.1
Lafitte Max with Blueway connections to neighborhood "Proposed" Downtown MID with upsized pipes and Lafitte MAX with Blueway routed to neighborhood. No LS "Minimum" Downtown MIN Lafitte MID "Proposed" Downtown MID with upsized pipes and Lafitte MAX with Blueway routed to neighborhood. No LS. Upsized pipes reduced to 3'