Great Western Star Issue No 2

Page 96

the conventional way but, in this case, the polystyrene melts, then burns as it is replaced with the molten metal. Clearly, care must be taken in the casting process to allow the gases from the burning plastic to escape, or the finished casting could be defective, with pockets of trapped gas leading to any number of flaws. To prevent such occurrences, a consumable volume is added to the pattern to allow these gases to be released. The polystyrene pattern will be lost because of the cast but being an almost virtual pattern, any number of identical patterns can be fabricated using this technology, all at a very low cost. In the case of 4709, the cylinder blocks for 4709 have taken a little longer to reach the casting stage because the original GWR cylinder block design has had to be modified in three areas: • Reduced saddle height to accommodate the current Network Rail loading gauge for mainline running • Reduced width over the cylinders to increase route availability • Slightly reduced cylinder bore to ensure sufficient strength despite the reduced width The castings were now due to be poured late in August. Meanwhile, thanks to Bob Meanley, who produced the redesign and Elliot Powick who provided the 3D CAD drawings.

The Boiler

The Barry Ten will continue to give until little is left but some rust flakes and the memories of their past, but there is still one thing none of our donors can give us and that’s a boiler. 4700 did carry a No 1 boiler for two years but, once the specially designed No 7 boiler became available in 1921, it was swapped. We could follow the same path with 4709 and use the boiler from 2861. Potentially, this would be a cheaper solution, by as much as £500,000 however, Laser Surfacing the Rockshafts

96

GREAT WESTERN STAR MAGAZINE

Laser Surfacing the Rockshaft Brackets

The rockshaft caps

during 2019 we decided to build a new no.7 boiler, as the risks and costs associated with using the older and marginally less powerful boiler from 2861 were felt to be unrealistic. So, we remain committed to 100% authenticity – a new No.7 boiler, fabricated in the UK.

The Rockshafts and Rockshaft Brackets

Parts removed from the donor engines for use on 4709 also include the rockshafts and rockshaft brackets. These transfer the movement of valve gear located between the engine frames to the piston valves on the outside of the frames. In service, the rockshaft sits in a bronze bearing within the rockshaft bracket. Unfortunately, the valuable bronze bearings were removed from the donor engines in the early days at Woodham Brothers scrapyard, leaving the exposed surfaces of the shaft and bracket to corrode for decades in the marine air of Barry docks. Grit blasting the damaged surfaces of the rockshafts and rockshaft brackets revealed the metal loss was severe. Remaking these parts

January/February 2021


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

From My Bookshelf

3min
pages 117-118

Western Star

2min
page 116

News from the World of GWR Modelling

9min
pages 112-115

Sanspareil Integrated Casting Services

2min
page 111

Railway Societies in Profile – No.1 The Branch Line Society

5min
pages 106-107

The Churchward 4-4-0 Counties – The First Modern British 4-4-0 - David Bradshaw

13min
pages 100-104

Comes Home to SVR

11min
pages 96-99

Worcestershire Parkway Station

2min
page 105

A Night Owl Emerges from the Dark – Part 2 - Paul Perton

6min
pages 92-95

Spotlight on Vintage Trains

13min
pages 87-91

Preservation Scene Heritage Railways Association News

7min
pages 85-86

The Abermule Disaster – January 26th 1921

14min
pages 81-84

Tales from Wales – Andrew Dyke

10min
pages 77-79

Getting a Bigger “Byte” into Devon

3min
page 80

The King and I – Leo Brown

10min
pages 74-76

A Locoman’s Tale – Bob Barnett

3min
page 73

Percy Hanniford

12min
pages 70-72

Farnworth

20min
pages 63-68

Preserving Another of Brunel’s Success Stories

16min
pages 57-62

A New Bow Street Runner

2min
page 55

Sleuths of the GWR Works

3min
page 56

Great Western Railway Power and Weight Classification

4min
pages 53-54

Taking the GWR Act to Parliament

24min
pages 46-52

A History of The Great Western Railway Being the Story of The Broad Gauge - George Augustus Sekon

15min
pages 42-45

Editor’s Thoughts

50min
pages 3-19

Undergoes a Major Restoration

12min
pages 20-25

Inside What Was the World’s Longest Railway Tunnel - Alex Watkins & Max Jones

21min
pages 32-41

Transport for Wales and Alun Griffiths host virtual ‘Bridge to Schools’ events across South Wales

3min
page 30

Rail 919: Welsh report shows that building roads is not the only or best option – Christian Woolmar

7min
pages 28-29

The Barmouth Bridge - a scale model in O Gauge Barmouth and Barmouth Junction

3min
page 26
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.