delivery program and operational plan 1
delivery program
2017/18 - 2020/21 incorporating operational plan 2018/19
delivery program and operational plan 2
contents About this Plan
3
Message from the Mayor and General Manager
4
Integrated Planning & Reporting Framework
6
What makes Griffith unique
9
Our community’s vision for the future
12
Our councillors
14
Senior Management Team
15
Organisation structure
17
Our services
18
Council’s Mission Statement, Vision, Corporate Motto & Logo
20
Delivery Program and Operational Plan Actions, Responsibilities and Measures
23
Financial Statements
146
Capital Works Program
275
delivery program and operational plan 3
about this plan This document combines Council’s Delivery Program, Operational Plan and Budget. Together they show how Council will contribute to delivering on community aims and strategies outlined in the Community Strategic Plan – “guiding griffith 2040”. We have used the four focus areas of the Community Strategic Plan – Leadership, Love the Lifestyle, Growing our City and Valuing our Environment to structure the Delivery Program. The Delivery Program sets out the activities that Council will complete in a four year period which is aligned to a Council term, along with measures we will use to track our progress in achieving the activities. The Operational Plan shows services, key projects and capital works that Council will deliver in the coming year. The Budget shows our income, expenditure and capital programs for the year ahead as well as Council’s Revenue Policy.
delivery program and operational plan 4
message from the mayor and general manager On behalf of Council, we proudly present the projects that will be delivered over the coming year and the services and programs Council has planned for the next four years to help our community achieve its vision to be a thriving and innovative regional capital, proud of its past and eagerly anticipating its future. This vision comes from the Community Strategic Plan “guiding Griffith 2040� which is a roadmap for our future, developed from residents and businesses sharing their views and ideas and describing where they want Griffith to be. The plans we present here explain how and when we will get there, and how much it will cost to achieve these outcomes. Our plans include a four year Delivery Program that covers the term of this new Council elected in September 2016, and an annual Operational Plan for 2018-19 including a $22.3M Capital Works program. Our Council is committed to working with a sense of common purpose and shared responsibility. we will manage our resources wisely on behalf of our community to ensure we continue to be financially sound, building on the NSW Government’s assessment that our Council is financially fit for the future. We will proudly continue to provide and improve the high quality roads, pathways and community infrastructure that position Griffith as an enviable local government area to live, work, visit and invest. We have some fantastic things happening that will only continue to enhance what is already here. We are pleased to announce $878,000 in Stronger Country Communities Funds has been received for an upgrade to Griffith Memorial Park and for the Griffith and Villages Pathways Project.
delivery program and operational plan 5
On the back of that funding we’ve also got some exciting news to come regarding the Griffith Regional Theatre. Meanwhile, work on the sewerage infrastructure for the Lake Wyangan, Nericon and Tharbogang villages is well underway and we are looking at further funding opportunities for other significant projects. Griffith City Council joined Regional Capitals Australia at the start of the 2017/18 financial year. Council is honoured to be accepted and acknowledges the importance of Regional Capitals in working together to influence Federal Government policy and legislation decisions that supports the growth of Regional Australia. We are confident and optimistic about Griffith’s future and the major economic development initiatives we will oversee on your behalf in the next four years. To support our strong, creative and vibrant community we will continue to deliver programs and activities that increase participation, access, inclusion and the expression and
celebration of our community identity and culture. Council will continue to advocate for improved economic, social and environmental outcomes for Griffith, as well as championing our community’s interests at a regional, state and national level. Working together, we will make our Griffith friendly, responsible, thriving and proud.
John Dal Broi, Mayor
Brett Stonestreet, General Manager
delivery program and operational plan 6
integrated planning & reporting framework
delivery program and operational plan 7
Local councils in NSW are required to undertake their planning and reporting activities in accordance with the Local Government Act 1993 and the Local Government (General) Regulation 2005. The Integrated Planning & Reporting (IP&R) framework enables councils to integrate their various plans together, understand how they interact and get the maximum leverage from their efforts by planning holistically for the future. Under the IP&R framework Council is required to prepare the following documents:
Community Strategic Plan ‘guiding griffith 2040’ The purpose of the Community Strategic Plan is to identify the community’s main priorities and aspirations for the future and to plan strategies for achieving these goals. While Council has a custodial role in initiating, preparing and maintaining the Community Strategic Plan it is not wholly responsible for its implementation. Other partners such as State agencies and community groups may also be engaged in delivering the long term objectives of the plan.
Delivery Program (this document) The Delivery Program is a statement of commitment to the community from each newly elected council. The Delivery Program outlines the principal activities to be undertaken by Council to implement the strategies established by the Community Strategic Plan within the resources available under the Resourcing Strategy over the four year term of Council. Essential elements for the Delivery Program include: • The Delivery Program directly addresses the objectives and strategies of the Community Strategic Plan and identifies principal activities that Council will undertake: • The Delivery Program must inform and be informed by the Resourcing Strategy • The Delivery Program must address the full range of Council operations • The Delivery Program must allocate high level responsibilities for each action or set of actions • Financial estimates for the four year period must be included in the Delivery Program.
Operational Plan (this document) The Operational Plan has been prepared as a sub-plan of the Delivery Program. It directly addresses the actions outlined in the Delivery Program and identifies projects, programs or activities that Council will undertake within the financial year towards addressing these actions. Essential elements for the Operational Plan include: • It must directly address the actions outlined in the Delivery Program • It must identify projects, programs or activities that Council will undertake within the financial year towards addressing these actions • The Operational Plan must allocate responsibilities for each project, program or activity • It must identify suitable measures to determine the effectiveness of the projects, programs and activities undertaken • The Operational Plan must include a detailed budget for the activities to be undertaken in that year.
Resourcing Strategy
The Community Strategic Plan, the Delivery Program and Operational Plan must be supported by a Resourcing Strategy. The Long Term Financial Plan, Workforce Plan and Asset Management Plan combine to form Council’s Resourcing Strategy. The Long Term Financial Plan provides information about the financial sustainability of Council to address its current and future needs. The Long Term Financial Plan is used to inform decision making during the development of the Delivery Program and must be for a minimum of ten years. The Workforce Plan must address the human resourcing requirements of Council’s Delivery Program for a minimum timeframe of four years.
delivery program and operational plan 8
The Asset Management Plan informs on the current condition and ability of the community assets that exist for delivery of services to the community. Council must account for and plan for all the existing assets under its ownership and any new asset solutions proposed in its Delivery Program. The Asset Management Plan must be for a minimum timeframe of ten years. When integrated, all these plans will ensure Council delivers the expressed levels of service to its community through optimal utilisation of its resources.
in relation to the objectives outlined in the Community Strategic Plan guiding griffith 2040, Council’s Delivery Program and Operational Plan. The Annual Report focuses on Council’s implementation of the Delivery Program and Operational Plan as these are the plans that are wholly Council’s responsibility and also includes some information that is prescribed by the Local Government (General) Regulation 2005.
End of Term Report This document will be prepared at the end of Council’s four-year term to report Council’s achievements in implementing the Community Strategic Plan over the previous four years.
Annual Report The Annual Report is a report to the community of Council’s performance and achievements
Community Strategic Plan 10+ years Workforce Plan
Community Engagement
Delivery Program 4 years Operational Plan 1 Year
Quarterly Report Annual Report End of Term Report
Resourcing Strategy
Long-Term Financial Plan
Asset Management Plan
delivery program and operational plan 9
what makes griffith unique
delivery program and operational plan 10
Top 3
population now
30,507
industries are 1. Agriculture, Fishing and Forestry, 2. Manufacturing 3. Construction
ATSIC population
9
26,422 population 2036
4.8%
towns and villages
born overseas
employment rate
19.2%
labourers - most common occupation in Griffith
online subscribers
1,300
community satisfaction rate (2016 community survey)
facebook followers
3,847
49.9% 50.1% 10.5%
university educated
regional population
$814M
1
37
1,640km 2
popularly elected Mayor
covered (LGA)
11
above sea level
elected representatives
95.2%
70%
Council’s community infrastructure
$1,366M 52,000
median age
18.8%
GRP
(gross regional product)
134m
75
parks sporting grounds
1,095
farming enterprises, and
3,519
tonnes of waste recycled
Largest
poultry producer in Australia
7
10,305 households
26.2%
mortgage
30%
renting
31.3%
couples with children
76.1%
households contain 2 or more people
$228
median rent p/w
24.9%
above regional average
$1,330
median weekly income
children under 18 years
21.7%
377k
annual visitors
aged 60 and above
7.5%
speak Italian
67.2%
60.6%
workforce participation
connected to the internet
delivery program and operational plan 11
Griffith was proclaimed in 1916 and is located within the Murrumbidgee Irrigation Area (MIA). It was named after Arthur Griffith, the New South Wales Minister for Public Works during the period of 1910-1915 and was designed by Walter and Marion Griffin, who received worldwide acclaim for their design of Canberra. Griffith is a regional city situated in the Riverina Region of south-western New South Wales, about 450 kilometres north of Melbourne, and 570 kilometres west of Sydney. Griffith City Council local government area is bounded by Carrathool Shire in the north, west and south-west, Narrandera Shire and Leeton Shire in the east, and Murrumbidgee Council in the south. Griffith is located in the heart of the Wiradjuri Nation – the largest nation of Aboriginal and Torres Strait Islander people in Australia. Griffith City Council recognises the contribution of Aboriginal people in the history and growth of Griffith and its surrounding villages. As such, Council acknowledges the Wiradjuri people as the traditional owners of the land and pays respect to Wiradjuri Elders past, present and future. Griffith City Council also acknowledges the contribution made to this community by the many and diverse cultural groups that have greatly contributed to the social and economic wealth of this region. Griffith is noted for its cultural diversity, with a higher than average number of residents of European descent, primarily Italian. Over more recent years, there has also been a growth in the local Indian and Pacific Islander population. Griffith is recognised as regional capital for surrounding areas providing a range of commercial, retail, recreational, educational and health facilities. Griffith City Council is governed by an elected body of twelve Councillors and has an annual operating budget in the vicinity of $54M.
delivery program and operational plan 12
our community’s vision for the future
delivery program and operational plan 13
The vision we have for the future of Griffith is designed to encourage commitment to our future and a sense of common purpose and responsibility. It reflects the kind of community we will be in 2040. The concept of a regional capital is a Federal Government initiative and Griffith is currently recognised as the regional capital of Western Riverina. This vision will be achieved through the implementation of the strategies based on the four core themes of our Community Strategic Plan, guiding griffith 2040. Those themes are: • Leadership • Loving our Lifestyle • Growing our City • Valuing our Environment These themes are clearly interwoven and impact upon each other. They are the cornerstone for our community’s progress and success. Overall, it is the people of our community that makes us unique. It is important our vision contains quality of life, prosperity and connectivity. The community’s vision for Griffith is captured in this simple statement:
Griffith is a thriving and innovative regional capital with a vibrant lifestyle and diverse economy. We embrace our community, heritage, culture and environment.
delivery program and operational plan 14
our councillors Cr John Dal Broi Mayor
Cr Dino Zappacosta
Cr Simon Croce
0418 686 100 jdalbroi@griffith.com.au
Deputy Mayor 0418 401 817 dzappacosta@griffith.com.au
6964 1051 scroce@griffith.com.au
Cr Doug Curran
Cr Deb Longhurst
Cr Eddy Mardon
0407 950 711 dcurran@griffith.com.au
0427 487 811 dlonghurst@griffith.com.au
0478 726 689 emardon@griffith.com.au
Cr Rina Mercuri
Cr Anne Napoli
Cr Mike Neville
0429 125 139 rmercuri@griffith.com.au
0407 001 849 anapoli@griffith.com.au
0419 600 207 mneville@griffith.com.au
Cr Brian Simpson
Cr Paul Snaidero
Cr Christine Stead
0438 388 828 bsimpson@griffith.com.au
0427 646 670 psnaidero@griffith.com.au
0428 668 099 cstead@griffith.com.au
delivery program and operational plan 15
council’s senior management team General Manager - Brett Stonestreet Brett Stonestreet was appointed as Griffith City Council’s General Manager in August 2011. Brett has 32 years of experience in local government and has spent a significant period of that time as a CEO, Group Manager and General Manager in Moyne Shire (Victoria), Gunnedah Shire, Cobar Shire and Barraba Shire councils.
Director Business, Cultural & Financial Services - Max Turner Max Turner is the Director of Business, Cultural & Financial Services with Griffith City Council. He returned to Griffith City Council in May 2012 after previously serving the Council from 2005 to 2011. Prior to working at Council, Max worked in the wine industry, most notably with Cranswick Premium Wines Ltd and Warburn Estate for 10 years in various senior financial roles. As Director of Business, Cultural & Financial Services, Max is responsible for Business Services including Griffith Community Private Hospital, Assets Management and Geographical Information Systems; Cultural Facilities including Griffith Regional Theatre and Art Gallery, Griffith Regional Aquatic Leisure Centre, West End Stadium, Library and Financial Services including Information Technology, Corporate Information, Rates & Water Billing, Grants, Procurement and Investments.
Director Sustainable Development - Vacant
Director Utilities – Graham Gordon Graham Gordon began his career at Griffith City Council as an Engineering Assistant/ Design Draftsman in June 1995. Since then he has taken on the roles of Development Engineer, Development Services Coordinator, and Engineering Design and Approvals Manager. He graduated from Deakin University with a Bachelor of Technology Degree, majoring in Civil Engineering and Management. He worked with private engineering consultants PPK and Calare Civil in Bathurst before joining Griffith City Council in 1995. As Director of Utilities, Graham is responsible for Survey, Design and Drafting Services, Solid Waste Management, Recycle Collection, Trade Waste, Landfill Operations, Weighbridge and Quarry, Water and Wastewater, Saleyards, Flood Mitigation and Road Safety.
delivery program and operational plan 16
Director Infrastructure and Operations – Phil King Phil King is the Director Infrastructure and Operations and commenced with Griffith City Council in July 2016. Phil has previously worked as Director Infrastructure Services at Lachlan Shire Council and Manager Design and Traffic at Parkes Shire Council, providing him with more than 10 years experience in Local Government. Phil has also had stints in the private sector working for engineering and surveying consulting firms in Port Stephens and Orange. Phil graduated from University of Newcastle with Bachelor Engineering (Civil) and Bachelor Surveying, both with honours. As Director Infrastructure and Operations, Phil is responsible for Emergency Management, Airport, Sports grounds, Parks & Landscapes, Noxious Weeds, Cemetery, Fleet, Depot Operations, Workshop, Store, Roads Construction and Maintenance, Roads and Maritime Services (RMS) Works, Drainage Maintenance and Construction.
Manager Executive Services - Shireen Donaldson Shireen Donaldson is the Manager Executive Services and is Council’s Public Officer and Right To Information Officer. Shireen previously held a number of positions within Council including Information Services Manager and Information Technology Manager. She also worked as the Systems Librarian at Griffith City Library. Shireen holds a Bachelor of Arts Degree in Information Science and has additional qualifications in Management, Finance, Information Technology and Project Management. As Manager Executive Services, Shireen is responsible for Human Resources, Work Health and Safety, Payroll, Governance and Administration, Compliance, Media and Communications, Statutory Reporting and Integrated Planning and Reporting.
NOTE: The responsibility of positions will be adjusted to consider the new organisational structure.
delivery program and operational plan 17
organisation structure General Manager
Director Economic & Organisational Development The Economic and Organisational Devopment Directorate is responsible for the following functions: • Visitor’s Centre • Economic Development • Youth & Community Development • Festivals & Events • Marketing • Media / Communications • Human Resources Management • Occupational Health & Safety • Risk Management • Insurances • Payroll • Government Information Public Access Act (GIPAA) requests • Internal Audit • Statutory Reporting • Integrated Planning & Reporting • Administration • Information Technology • Corporate Information
Director Sustainable Development
The Sustainable Development Directorate is responsible for the following functions: • Development Application (DA) Assessment • Property Management • Strategic Planning • Infrastructure Plans • Land Use Planning • Heritage • Transport Plans • Recreation Plans • Environment • Public Health • Food Safety • Planning & Environmental Compliance • Social Planning • Customer Services • Compliance
Director Business, Cultural & Financial Services The Business Services Directorate is responsible for the following functions: • Financial Planning • Purchasing/ Procurement • Grants Coordination • Investments • Rates & Water Billing • Asset Management • Geographical Information Systems (GIS) • Griffith Regional Aquatic Leisure Centre (GRALC) • West End Stadium • Regional Theatre • Art Gallery • Library – including Western Riverina Community Library • Private Hospital • Pioneer Park
Director Infrastructure & Operations
The Infrastructure and Operations Directorate is responsible for the following functions: • Emergency Management • Airport • Sports Grounds • Parks & Landscapes • Noxious Weeds • Cemetery • Fleet • Depot Operations • Workshop • Store • Roads Construction and Maintenance • Roads & Maritime Services (RMS) Works • Drainage Maintenance & Construction
Director Utilities
The Utilities Directorate is responsible for the following functions: • Survey, Design & Drafting Services • Solid Waste Management • Recycle Collection • Trade Waste • Landfill Operations • Weighbridge & Quarry • Water & Wastewater • Saleyards • Flood Mitigation • Road Safety
delivery program and operational plan 18
our services Economic Development & Tourism • Event Coordination • Visitor Information Centre
• City and Event Promotion • Pioneer Park Museum • New Development Facilitation and Promotion
Facilities • Griffith Regional Aquatic Leisure Centre • Griffith City Library • Griffith Regional Theatre • Griffith Regional Art Gallery • Westend Stadium
Environment & Health • Food & Skin Penetration Premises Services • Environmental Services and Projects • Public Health Services
Urban Design • Project Design & Management • Strategy Development
Parks & Gardens • Sports Grounds • Parks & Landscapes • Noxious Weeds • Cemetery
Waste Services • Solid Waste Management • Recycle Collection • Solid Waste Collection • Landfill operations • Weighbridge • Quarry
Infrastructure & Operations • Road Construction & Maintenance • Cycleways & Footpaths • Carparks • RMS Works • Drainage Maintenance & Construction
delivery program and operational plan 19
Human Resources • Staff Training • Recruitment • Industrial Relations • Work Health & Safety • Risk • Workers Compensation & Insurance • Payroll
Governance • Integrated Planning & Reporting Framework • Statutory Reporting Airport • Aerodrome Operations
Depot
Finance • Debtors & Creditors • Rates & Revenue • Financial Planning • Grants • Investments • Purchasing & Procurement Compliance • Animal Control • Regulatory Control
Building Certification • Construction Certification • Development assessment • Drainage diagrams Communication • Website • Media Releases • Advertisements • Media Relations • Staff Communications • Social Media
Engineering Design & Approvals • Survey, Design & Drafting • Traffic Engineering
Assets • Asset Management • GIS
• Administration Support • Councillor Support
Information Services • IT • Corporate Information Water & Sewerage Services • Water • Water Filtration Plant • Wastewater • Wastewater Treatment Plant • Water Quality
• Fleet Management • Depot Operations • Mechanical Workshop • Store
Saleyards • Saleyards Operation
Planning and Compliance • Planning & Environmental Compliance • Development Assessment • Land Use Controls • Planning Certificates • Property Services
Customer Service
Community Development • Community Development • Australia Day Event Management • Citizenship
delivery program and operational plan 20
council’s mission statement 1. To respond to the needs of the community and deliver in an economical manner those services which are the responsibility of Local Government. 2. To provide Local Government administration that is dedicated, accountable and committed to the improvement of the quality of life and the economic well-being of the citizens of the City of Griffith.
council’s vision for griffith Council’s adopted vision for Griffith is: To be an acknowledged major regional centre with an emphasis on best agricultural practices, providing: • a viable local economy with sustainable development and growth; • a clean and ecologically sustainable built environment and natural environment; • a quality lifestyle for residents, and • a pride in our cultural diversity.
Left: Artist impression for Yambil Street Upgrade
delivery program and operational plan 21
council’s corporate motto “Love the Lifestyle” As a community, Griffith is proud of its heritage and is inspired by its potential. This city and its community provides an abundance of opportunities for work, leisure, retail, education, business and investment. Our motto, “Love the Lifestyle” is a reflection of this as it embodies all that defines Griffith.
council’s corporate logo
Griffith’s logo complements the corporate slogan and establishes recognition of the Griffith area, the fundamentals that have helped to create a strong community and the design principles of Griffith’s architect, Walter Burley Griffin. The logo includes abstract representations of a waterwheel, the town plan, the sun, irrigation channels and the fruit produced by these elements.
delivery program and operational plan 22
delivery program and operational plan 23
delivery program 2017/18-2020/21 incorporating the operational plan 2018/19 actions, responsibilities and performance measures The 2017/18 - 2020/21 Delivery Program is a plan where the community’s strategic goals, as set out in the Community Strategic Plan – guiding griffith 2040, are translated into actions. These are the principal activities to be undertaken by Council over its four year term to implement the strategies established by the Community Strategic Plan within the resources available under the Resourcing Strategy. Supporting the Delivery Program is an annual Operational Plan. It incorporates the individual projects and activities that will be undertaken for the 2018/19 year to achieve the commitments made in the four year Delivery Program.
delivery program and operational 24
leadership
capital works program
1. leadership 01 Develop an engaged and connected community 1.1 Provide clear and transparent communication to the community. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide a diverse range of
1.1.1
Ensure regular
1.1.1.1
Performance Measure
Responsibility
Number of COGs issued.
Corporate Communications Officer
mediums to communicate
communication provided
Number of Media Releases
with the community.
through adopted measures.
vs % coverage. Number Social Media engagements. Number of Social Media followers. Minimum of 10 Community Catchups per quarter.
01 Develop an engaged and connected community 1.1 Provide clear and transparent communication to the community. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide interactive websites
1.1.2
Review of current website
for all Council facilities.
1.1.2.1
design, functionality and
Performance Measure
Responsibility
Number of website hits
Corporate Communications
across the organisation.
Officer
Number of Committee
Manager Executive Services
content. Provide opportunities for the
1.1.3
Provide Committees,
1.1.3.1
community to interact with
Working Groups and Friends
recommendations to
Council and staff.
of Groups to enable
Council.
community input to Council services and facilities.
01 Develop an engaged and connected community 1.1 Provide clear and transparent communication to the community. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide opportunities for the
1.1.3
Maintain an active social
1.1.3.2
Performance Measure
Responsibility
Number of community
Corporate Communications Officer
community to interact with
media presence; provide
engagement sessions per
Council and staff.
Workshops, interactive
quarter.
meetings and community engagement sessions in accordance with the Community Engagement Strategy. Inform community of Council decisions.
1.1.4
Council and Committee
1.1.4.1
Council and Committee
Agendas and Minutes
Minutes uploaded to Council
prepared and distributed
website.
within agreed timeframes.
Manager Executive Services
01 Develop an engaged and connected community 1.1 Provide clear and transparent communication to the community. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Tourism and Economic
1.1.5
Key of Events good news
1.1.5.1
Performance Measure
Responsibility
E Newsletter sent out
Marketing & Promotions Officer
Development information
stories, workshops and
monthly. Facebook
collated and distributed to
regional articles collated and
continues to grow by 15%.
the community.
distributed to stakeholders
Brochures produced.
and operators. Tourism and Economic
1.1.5
Tourism and Economic
Development information
Development Quarterly
collated and distributed to
Report prepared and further
the community.
enhanced.
1.1.5.2
Produced quarterly.
Economic Development Officer
01 Develop an engaged and connected community 1.2 Be well informed, proactive and responsive to current issues that impact our community. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Assist our community and
1.2.1
Council to provide feedback
State Government to
to NSW Education
maximise positive outcomes
Department during planning
from secondary education
and construction phases.
infrastructure investment in
(Option 1 - new secondary
Griffith.
school. Option 2 - upgrading
1.2.1.1
Performance Measure
Responsibility
Regular engagement with
General Manager
Department of Education.
Griffith High School and Wade High School.) Explore opportunities to
1.2.2
Engage with organisers of
sustain important annual
Griffith and Yenda Christmas
community building events
Carols to determine how
in Griffith and surrounding
best to support these events.
villages.
1.2.2.1
Griffith and Yenda Carols continue on an annual basis.
General Manager
01 Develop an engaged and connected community 1.2 Be well informed, proactive and responsive to current issues that impact our community. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide a robust Council
1.2.3
Implementation of a new
1.2.3.1
Performance Measure
Responsibility
Number of meetings
Manager Executive Services
Committee and Working
Council Committee and
postponed due to lack of
Group/Friends of structure.
Working Group/Friends of
quorum.
structure. Maintain two way dialogue
1.2.4
COG is consulted on key
with Community Opinion
projects and issues
Group (COG).
impacting the community.
Keep abreast of emerging
1.2.5
Investigate mediums and
trends and issues through
technologies to enable
internal monitoring.
improved information flow and reporting.
1.2.4.1
1.2.5.1
Minimum 3 communications
Corporate Communications
to COG per quarter.
Officer
Reports to SMT as required.
Corporate Communications Officer
01 Develop an engaged and connected community 1.2 Be well informed, proactive and responsive to current issues that impact our community. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Investigate options to
1.2.6
Provide opportunities for
1.2.6.1
Performance Measure
Responsibility
Number of Community
Corporate Communications Officer
improve Councillor
Councillor interaction and
Workshops/Mornings in the
interaction with constituents.
investigate online
Mall held. Number of online
communication options.
sessions held.
02 Work together to achieve our goals 2.1 Actively engage with State, Federal and non-government agencies in a local advocacy role. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Griffith City Council seeks
2.1.1
The NSW State Government
2.1.1.1
Performance Measure
Responsibility
The Murray/Murrumbidgee
General Manager
leadership role with
will legislate the
JO established in accordance
implementation of Joint
establishment of JOs during
with State Government
Organisation of Councils
2017. Griffith City Council
framework.
(JOs) initiative.
will take a proactive role in the establishment and strategic direction of the Murray/Murrumbidgee JO.
Council actively lobbies
2.1.2
Pursue grant opportunities
Government agencies to
to continue construction of
provide infrastructure to
Griffith Industrial Link Road.
support our growing City of Griffith and Western Riverina.
2.1.2.1
Appropriate grant applications submitted.
General Manager
02 Work together to achieve our goals 2.1 Actively engage with State, Federal and non-government agencies in a local advocacy role. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Ongoing liaison with State
2.1.3
Meetings held as required.
2.1.3.1
Performance Measure
Responsibility
Number of meetings with
Manager Executive Services
and Federal and non-
State and Federal
government agencies on
representatives with Mayor
matters of relevance.
and or GM.
Lobby with an on behalf of
2.1.4
Meet with key stakeholders
agencies to State and
and lobby State and Federal
Federal governments on
governments on current
matters which affect the
issues which affect the
community.
community.
Work with both the new
2.1.5
Maintain membership of
2.1.4.1
2.1.5.1
Number of meetings and
Community Development
projects.
Coordinator
Thrive Riverina Report
Marketing & Promotions Officer
Destination Network -
Thrive Riverina for the
circulated to the Tourism
Destination Riverina Murray
2018/19 year and
and Events Committee.
- as well as Thrive Riverina.
collaborate on projects.
02 Work together to achieve our goals 2.1 Actively engage with State, Federal and non-government agencies in a local advocacy role. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Work with both State and
2.1.6
Build relationships to
Federal agencies in relation
facilitate and encourage
to (Tourism) Economic
investment in the Griffith
Development matters.
region.
2.1.6.1
Performance Measure
Responsibility
Quarterly meetings held.
Economic Development Officer
02 Work together to achieve our goals 2.2 Partner with and provide support to organisations who deliver services and programs locally. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Explore opportunities to
2.2.1
Following decision by
2.2.1.1
Performance Measure
Responsibility
Seek partnership co-
General Manager
partner with NSW
Department Education
contribution from the
Department of Education in
regarding Option 1 New
Department of Education re
regard to Secondary
School or Option 2 Renovate
-
Education investment in
Wade High and Griffith High
Griffith Regional Sporting
Griffith.
Schools, Council explore
Precinct Project.
opportunities to co fund infrastructure that can realise broader community as well as student educational outcomes.
02 Work together to achieve our goals 2.2 Partner with and provide support to organisations who deliver services and programs locally. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Work with Griffith
2.2.2
Initial focus on identifying
2.2.2.1
Performance Measure
Responsibility
In principal commitment by
General Manager
Neighbourhood House and
existing buildings that may
Council to locate a new
other stakeholders to
achieve objectives of Griffith
Community Center in
identify options for a facility
Neighbourhood House.
Olympic Street adjacent to
to meet current and future
Area News Building.
needs. Provide opportunities for
2.2.3
Deliver two rounds of
community groups to access
Community Grant funding
grant funding.
and two information
2.2.3.1
Number of grants awarded.
Community Development Coordinator
sessions each year. Provide opportunities for community groups to access grant funding.
2.2.3
Support Club Grants NSW to allocate funds.
2.2.3.2
Number of Club Grants
Community Development
allocated.
Coordinator
02 Work together to achieve our goals 2.2 Partner with and provide support to organisations who deliver services and programs locally. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Collaborate with our local
2.2.4
Hold a quarterly Tourism
tourism operators by
2.2.4.1
Social Networking evening.
building and growing
Performance Measure
Responsibility
4 sessions held per year.
Visitor Information Centre
maintain growing
Coordinator
attendance.
relationships. Collaborate with our local
2.2.4
Regular contact with
2.2.4.2
4 visits per year to major
Visitor Information Centre Coordinator
tourism operators by
operators on site, phone,
operators & 2 workshops
building and growing
email.
that extend skill and
relationships.
knowledge. Regular Operator famils.
02 Work together to achieve our goals 2.3 Maximise opportunities to secure external funding for partnerships, projects and programs to improve the quality of life for residents and visitors. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Identify funding
2.3.1
Apply for relevant grants
opportunities for the
2.3.1.1
and identify projects.
improvement of the regional
Performance Measure
Responsibility
Number of grant
Director - Infrastructure &
applications submitted and
Operations
successful grants obtained.
and local road networks. Seek appropriate funding to
2.3.2
Apply for relevant grant
2.3.2.1
Number of grant
Director - Infrastructure & Operations
implement the actions and
funding opportunities to
applications submitted and
priorities outlined in the
undertake construction of
successful grants obtained.
Pedestrian Access Mobility
footpaths and cycleways.
Plan (PAMP) and Bicycle Plan.
02 Work together to achieve our goals 2.3 Maximise opportunities to secure external funding for partnerships, projects and programs to improve the quality of life for residents and visitors. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Develop and maintain a
2.3.3
Provide monthly report to
network of grant sources to
Senior Management Team
identify grant opportunities.
on grants available and
2.3.3.1
Performance Measure
Responsibility
Number of grants applied
Finance Manager
for.
applied for. Investigate external funding
2.3.4
Apply for external funding
opportunities to support the
for approved Urban Design
Griffith Playground Strategy
Projects.
(2014) and Griffith CBD Strategy (2015) rollout.
2.3.4.1
Grants applied for and grants awarded.
Technical Support Officer
02 Work together to achieve our goals 2.3 Maximise opportunities to secure external funding for partnerships, projects and programs to improve the quality of life for residents and visitors. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Investigate external funding
2.3.4
Apply for grant funding.
opportunities to support the Griffith Playground Strategy (2014) and Griffith CBD Strategy (2015) rollout.
2.3.4.2
Performance Measure
Responsibility
Grants applied for and
Technical Support Officer
grants awarded.
02 Work together to achieve our goals 2.4 Develop partnerships with industry and agriculture leaders. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Encourage existing
2.4.1
Investigate opportunities to
2.4.1.1
Performance Measure
Responsibility
Progress project with a view
General Manager
partnerships with tertiary
establish a Country
to commencing the Country
education providers that
Universities Center in
University Center in 2019.
support quality education
Griffith.
pathways for Griffith students. Collaborate with food and
2.4.2
Establish networks and
wine industry to ensure
collaborate with food and
Griffith becomes top of mind
wine industry leaders to
in the area of authentic wine
increase profile of Griffith
and culinary experiences in
region as a foodie
Australia.
destination.
2.4.2.1
At least one media famil per
Marketing & Promotions
year and 2 articles published.
Officer
02 Work together to achieve our goals 2.5 Develop partnerships to provide leadership in irrigation, water efficiency and availability. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Maintain strategic and
2.5.1
Work with MI to: 1.
Performance Measure 2.5.1.1
Responsibility
1. Construct new EMR during General Manager
operational relationships
automate the East Mirrool
2018. 2. Discuss circulation
with Murrumbidgee
regulator 2. contribute to a
of water at Lake Wyangan
Irrigation.
Master Plan to assist with
with a view to improving
addressing Blue Green Algae
water quality.
at Lake Wyangan. Continued support to Deakin 2.5.2
Assistance provided as
University Centre of
required to promote the
Excellence.
business case of the Centre
2.5.2.1
Number of meetings held.
Director - Sustainable Development
of Excellence. Provide ongoing support for
2.5.3
Convene Build More Dams
the Build More Dams Action
Action Group meetings as
Group.
required.
Number of meetings held.
Director - Utilities
03 Plan and lead with good governance 3.1 Undertake Council activities within a clear framework of strategic planning, policies, procedures and service standards. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Council's Integrated
3.1.01
Operational Plan developed,
3.1.1.1
Performance Measure
Responsibility
IP&R documents prepared in
General Manager
Planning and Reporting suite
exhibited and adopted by
accordance with statutory
of documents developed,
Council by June 2018.
requirements. Six monthly
outcomes reported and
Progress reports provided to
progress reports provided to
documents reviewed in
Council.
Council.
accordance with statutory requirements.
03 Plan and lead with good governance 3.1 Undertake Council activities within a clear framework of strategic planning, policies, procedures and service standards. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Ongoing monitoring of
3.1.03
Monitor customer contact
3.1.3.1
Performance Measure
Responsibility
Analysis of telephone
Customer Service Coordinator
Customer Focus Review
and transactions on a
contact data.
outcomes.
regular basis.
Griffith City Council "Mystery Shopper" report conducted annually. Survey of customer experience. CRM resolution performance. Customer Complaint resolution performance.
03 Plan and lead with good governance 3.1 Undertake Council activities within a clear framework of strategic planning, policies, procedures and service standards. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide a risk management
3.1.04
Review Risk Register and
framework.
Performance Measure
Responsibility
Risk Register reviewed. Risk
Human Resources - Risk
develop Risk Management
Management Action Plans
Manager
Action Plans.
developed and
3.1.4.1
communicated annually. Ensure appropriate Internal Audit program is maintained at Griffith City Council.
3.1.05
Annual internal audit plan developed.
3.1.5.1
Number of internal audit projects undertaken. Number of internal audit recommendations undertaken.
Manager Executive Services
03 Plan and lead with good governance 3.1 Undertake Council activities within a clear framework of strategic planning, policies, procedures and service standards. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide a compliant Human
3.1.06
Undertake review of HR
Resource Management
3.1.6.1
policies.
Performance Measure
Responsibility
HR policies reviewed by June
Human Resources - Risk
2018.
Manager
Number of staff provided
Workforce Planning
with training.
Manager
service to meet legislative and organisational requirements. Provide a compliant Human
3.1.06
Provide a relevant training
Resource Management
calendar for staff
service to meet legislative
development and
and organisational
compliance.
requirements.
3.1.6.2
03 Plan and lead with good governance 3.1 Undertake Council activities within a clear framework of strategic planning, policies, procedures and service standards. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide a compliant Human
3.1.06
Implement Award changes
Resource Management
3.1.6.3
as required.
Performance Measure
Responsibility
Number of Consultative
Human Resources - Risk
Committee meetings held.
Manager
Number of PINS per month.
Compliance Coordinator
service to meet legislative and organisational requirements. Provide effective compliance
3.1.07
Undertake regular patrols of
3.1.7.1
services including animal
restricted parking areas and
School zone patrols
control, parking compliance,
school zones.
conducted daily during
litter compliance, overgrown vegetation on privately owned land.
school terms.
03 Plan and lead with good governance 3.1 Undertake Council activities within a clear framework of strategic planning, policies, procedures and service standards. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide effective compliance
3.1.07
Provide and maintain an
3.1.7.2
Performance Measure
Responsibility
Number of PINS per month.
Compliance Coordinator
services including animal
effective companion animal
Number of rehomed
control, parking compliance,
program and facility.
companion animals per
litter compliance, overgrown
month.
vegetation on privately owned land. Provide effective compliance services including animal control, parking compliance, litter compliance, overgrown vegetation on privately owned land.
3.1.07
Respond to litter complaints in a timely manner.
3.1.7.3
Number of inspections conducted per quarter.
Compliance Coordinator
03 Plan and lead with good governance 3.1 Undertake Council activities within a clear framework of strategic planning, policies, procedures and service standards. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Performance Measure
Responsibility
Provide effective compliance
3.1.07
Maintain a seasonal program 3.1.7.4
Number of intention notices
Compliance Coordinator
services including animal
for compliance with
sent per quarter.
control, parking compliance,
overgrown vegetation.
litter compliance, overgrown vegetation on privately owned land. Provide governance services
3.1.08
to Council.
Review local policies and
3.1.8.1
commence review of public
Local policies reviewed by
Governance Coordinator
September 2017.
policies. Ensure statutory reporting complies with legislative requirements.
3.1.09
Prepare statutory reports within required timeframes.
3.1.9.1
Annual Report delivered by 30 November. Statutory reports presented to Council within required timeframes.
Manager Executive Services
03 Plan and lead with good governance 3.1 Undertake Council activities within a clear framework of strategic planning, policies, procedures and service standards. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Facilitate the proactive
3.1.10
Respond and assess GIPA
3.1.10.1
Performance Measure
Responsibility
Number of applications
Governance Coordinator
public release of
applications in a timely
approved within statutory
government information in
manner. Review Information
timeframes.
accordance with legislative
Guide.
and organisational requirements. Continue to provide
3.1.11
Continuous monitoring of
efficient, accurate and
State Records Act and other
compliant record
related legislation to ensure
management services to
Council's compliance with
both internal and external
record management
customers of Council.
standards and requirements.
3.1.11.1
Implement electronic record disposal policy and strategy.
Corporate Info Coordinator
03 Plan and lead with good governance 3.1 Undertake Council activities within a clear framework of strategic planning, policies, procedures and service standards. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Continue to provide
3.1.11
Ongoing training and
3.1.11.2
Performance Measure
Responsibility
Records management
Corporate Info Coordinator
efficient, accurate and
promotion of record
training for new staff,
compliant record
management to Council staff
monthly refresher training
management services to
with the aim to continually
for all staff, on demand
both internal and external
reduce the use of paper-
group training for
customers of Council.
based records and improve
departments.
search and retrieval of electronic records. Continue to provide
3.1.11
Investigation of emerging
3.1.11.3
Full configuration and
efficient, accurate and
technologies that can
utilisation of Ezescan
compliant record
improve record
software.
management services to
management processes.
both internal and external customers of Council.
Corporate Info Coordinator
03 Plan and lead with good governance 3.1 Undertake Council activities within a clear framework of strategic planning, policies, procedures and service standards. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Continue to provide
3.1.11
Continue digitisation of
efficient, accurate and
3.1.11.4
paper based Council records.
Performance Measure
Responsibility
Completion of Council
Corporate Info Coordinator
Depot paper based records
compliant record
digitisation.
management services to
Ongoing digitisation of
both internal and external
paper based Council
customers of Council.
Business papers.
Continue to provide
3.1.11
Maintain accurate Council
3.1.11.5
Ongoing NAR maintenance.
efficient, accurate and
records, including Name and
Rural addressing project
compliant record
Address Register (NAR) and
status.
management services to
rural addressing.
both internal and external customers of Council.
Corporate Info Coordinator
03 Plan and lead with good governance 3.1 Undertake Council activities within a clear framework of strategic planning, policies, procedures and service standards. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide corporate property
3.1.12
Coordinate preparation of
services to Council.
3.1.12.4
Plans of Management for
Performance Measure
Responsibility
Priority Plans of
Corporate Property Officer
Management completed.
Council owned community land. Provide corporate property services to Council.
3.1.12
Commence the local Crown Land: Number of land parcels transferred to Council and identify local benefits from Crown Land lots.
3.1.12.5
Categories land into precincts
Corporate Property Officer
03 Plan and lead with good governance 3.1 Undertake Council activities within a clear framework of strategic planning, policies, procedures and service standards. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide reliable IT services
3.1.13
Review all software
within Council.
Provide reliable IT services
3.1.13
within Council. Land Use Strategy Development.
Performance Measure
Responsibility
PCs to maintain a turnover
Information Technology
applications and other
ratio of 5 years minimum.
Manager
programs on an annual
Annual upgrade of Authority
basis. Replacement of
completed. Report on other
hardware as required.
applications as renewed.
Maintain support services to
3.1.13.1
3.1.13.2
Council departments. 3.1.15
Review Council's Land Use Strategy.
3.1.15.1
80% CRMs closed as per
Information Technology
service standard.
Manager
Strategy meets legislative
Director - Sustainable
requirements.
Development
03 Plan and lead with good governance 3.2 Ensure Council's financial sustainability through effective financial management that is transparent and accountable. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Adopt Delivery Program and
3.2.1
Meet annual statutory
Operational Plans (Budget)
reporting requirements.
3.2.1.1
Performance Measure
Responsibility
Adoption of annual financial
Finance Manager
statements within OLG
inclusive of 10 Year Long
guidelines. Adoption of
Term Financial Plan.
annual operating budget by Council prior to 30 June. Adoption of quarterly operational review reports. Meet OLG financial sustainability ratios.
delivery program and operational plan 56
love the lifestyle
2. love the lifestyle 04 Ensure Griffith is a great place to live 4.1 Enable accessible diversity in housing choice. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Review Planning instruments
4.1.1
Investigate land and housing
to encourage development.
Performance Measure
Responsibility
Affordable housing
Economic Development
availability with the view to
incentives investigated.
Officer
influence supply to meet
Affordable housing strategy.
4.1.1.2
demand. Maintain a land availability monitor.
4.1.2
Compare land use with projections.
4.1.2.1
Land availability monitor is
Planning & Environment
current.
Manager
04 Ensure Griffith is a great place to live 4.1 Enable accessible diversity in housing choice. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Work with land and property
4.1.3
Work with developers to
developers to develop
facilitate construction of
residential properties.
residential properties.
4.1.3.1
Performance Measure
Responsibility
Number of new residents.
Economic Development Officer
04 Ensure Griffith is a great place to live 4.2 A shared responsibility for the safety of individuals and the community. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Identify and promote road
4.2.01
Investigate strategies to
safety projects relevant to
4.2.1.1
resolve road safety issues.
Performance Measure
Responsibility
Develop and implement a 3
Road Safety & Traffic Officer
year road safety action plan
Griffith Local Government
and report strategies to the
Area.
Transport Committee by June 2019.
Improve public safety by
4.2.02
Develop and implement
provision of appropriate
"Signs as Remote
information signage in
Supervision" in public areas.
4.2.2.1
Review of existing signage
Parks & Gardens Manager
completed by June 2018.
public areas. Investigate opportunities to fund and develop safer parks and streetscapes consistent with the Crime Prevention Strategy.
4.2.03
Install lighting and CCTV in designated areas.
4.2.3.1
Number of installations.
Technical Support Officer
04 Ensure Griffith is a great place to live 4.2 A shared responsibility for the safety of individuals and the community. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Review of Crime Prevention
4.2.04
Review local Bureau of Crime
Plan.
4.2.4.1
Statistics and Research
Performance Measure
Responsibility
Crime Prevention Plan
Community Development
reviewed annually.
Coordinator
Number of
Community Development
campaigns/meetings held.
Coordinator
(BOCSAR) data and amend current Crime Prevention Plan. Review of Crime Prevention Plan.
4.2.04
Work with Neighbourhood Watch Committee and other agencies to create awareness and improve community safety.
4.2.4.2
04 Ensure Griffith is a great place to live 4.2 A shared responsibility for the safety of individuals and the community. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Deliver Food Business
4.2.05
Undertake Food Business
Inspections on food
Inspections within the
premises within the Griffith
Griffith LGA.
4.2.05.1
Performance Measure
Responsibility
240 X Inspections Griffith
Environment, Health &
LGA/ann.
Sustainability Coordinator
80 X Inspections Narrandera
Environment, Health & Sustainability Coordinator
and surrounding LGA's as required under the NSW Food Act 2003. Deliver Food Business
4.2.05
Undertake Food Business
4.2.05.2
Inspections on food
Inspections within the
LGA/ann. 55 X Inspections
premises within the Griffith
Narrandera, Hay and
Hay LGA/ann.
and surrounding LGA's as
Murrumbidgee LGA's.
X Inspections Murrumbidgee
required under the NSW Food Act 2003.
LGA/ann.
55
04 Ensure Griffith is a great place to live 4.2 A shared responsibility for the safety of individuals and the community. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Deliver Arbovirus
4.2.06
Set and collect Mosquito
4.2.06.1
Performance Measure
Responsibility
2 X Mosquito Traps set,
Environment, Health & Sustainability Coordinator
Surveillance Program as
traps weekly from 2 x sites
collected and collections
required by NSW Health.
surrounding Griffith during
freighted for analysis weekly
November to April.
between November to April. (24 weeks/ann) (48 trappings/ann).
Deliver Arbovirus
4.2.06
Test Sentinel Flock of
4.2.06.2
Sentinel Flock (15 chickens)
Environment, Health & Sustainability Coordinator
Surveillance Program as
chickens weekly between
tested weekly and samples
required by NSW Health.
November to April.
sent for analysis weekly. (24 weeks/ann) (360 tests/ann).
04 Ensure Griffith is a great place to live 4.2 A shared responsibility for the safety of individuals and the community. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Deliver Microbial Control
4.2.07
Undertake Microbial Control
4.2.07.1
Performance Measure
Responsibility
100 X Cooling Tower and
Environment, Health & Sustainability Coordinator
Sampling (Cooling Tower
sampling (Cooling Tower
Warm Water System
and Warm Water System)
and Warm Water Systems)
inspections each July to June
inspections as required
for prevention of
FY. 10 - 20 X Cooling Tower
under the Public Health Act
Legionnaires Disease.
and Warm Water System re-
2010.
inspections each July to June FY. (All Cooling Towers sampled for Legionella and Total Plate Count).
04 Ensure Griffith is a great place to live 4.2 A shared responsibility for the safety of individuals and the community. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Deliver Public Swimming
4.2.08
Undertake pool sampling of
4.2.08.1
Performance Measure
Responsibility
35 X pool samples of Public
Environment, Health & Sustainability Coordinator
Pool inspections as required
Public Swimming Pools and
Pools and Spa's/ann. 10 X
under the Public Health Act
Spa Pools. Complete pool
pool samples of Hotels,
2010.
sampling of Hotel, Motel
Motels and Accommodation
and Accommodation
facilities/ann. 15 X School
facilities. Undertake pool
pool samples /ann. 5 X GCC
sampling of School Pools
Splash Park samples/ann.
(Kalinda & GPSO). Undertake sampling of GCC's Splash Park.
04 Ensure Griffith is a great place to live 4.2 A shared responsibility for the safety of individuals and the community. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Deliver On-site Sewage
4.2.09
Undertake On-site Sewage
4.2.09.1
Performance Measure
Responsibility
10 X On-site Sewage
Environment, Health & Sustainability Coordinator
Management inspections as
Management inspections on
Management
required under NSW Local
both existing Septic and
inspections/ann. 10 X
Government Act 1993 and
Aerated Water Treatment
'Approvals to Operate'
POEO Act 1997.
Systems (AWTS) as they
issued/ann.
arise. Issue 'Approvals to Operate'. Deliver Immunisation Clinics
4.2.10
Undertake monthly Early
as supported by Griffith City
Childhood Immunisation
Council and NSW Health.
Clinics for vaccination and
4.2.10.1
12 X Monthly Immunisation
Environment, Health &
Clinics delivered/ann.
Sustainability Coordinator
130 X Annual Flu
Environment, Health & Sustainability Coordinator
prevention of childhood preventable diseases. Deliver Immunisation Clinics
4.2.10
Deliver Annual Flu
4.2.10.2
as supported by Griffith City
Vaccinations to all Council
Vaccinations delivered to
Council and NSW Health.
staff requesting vaccination.
Council staff/ann.
04 Ensure Griffith is a great place to live 4.2 A shared responsibility for the safety of individuals and the community. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Deliver Hairdresser, Beauty
4.2.11
Undertake inspections of
4.2.11.1
Performance Measure
Responsibility
55 X Hairdresser, Beauty and
Environment, Health & Sustainability Coordinator
and Skin Penetration
Griffith LGA Hairdresser,
Skin Penetration premise
Inspections within Griffith
Beauty and Skin Penetration
inspections in Griffith
and Narrandera LGA's as
premises including
LGA/ann.
required by NSW Health.
equipment and facilities.
Deliver Hairdresser, Beauty
4.2.11
Undertake inspections of
4.2.11.2
10 X Hairdresser, Beauty and
Environment, Health & Sustainability Coordinator
and Skin Penetration
Narrandera LGA Hairdresser,
Skin Penetration premise
Inspections within Griffith
Beauty and Skin Penetration
inspections in Narrandera
and Narrandera LGA's as
premises including
LGA/ann.
required by NSW Health.
equipment and facilities.
Deliver Mortuary Inspections as required by NSW Health.
4.2.12
Undertake inspections of Mortuary premises including equipment and facilities.
4.2.12.1
3 X Mortuary
Environment, Health &
inspections/ann.
Sustainability Coordinator
04 Ensure Griffith is a great place to live 4.2 A shared responsibility for the safety of individuals and the community. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Deliver Lake Wyangan Water
4.2.13
Undertake regular water
4.2.13.1
Performance Measure
Responsibility
90 X water samples/ann.
Environment, Health & Sustainability Coordinator
Quality Sampling as required
samples of Lake Wyangan to
(Taken fortnightly between
by the Australian
determine lake water
October-April).
Recreational Water
suitability for Recreational
30 X water samples (Taken
Guidelines and
water use.
Monthly between May-Sept).
Murrumbidgee Regional
10 X water samples (Taken
Algal Coordinating
weekly during 'Red Alerts').
Committee.
04 Ensure Griffith is a great place to live 4.3 Promote and celebrate our social and cultural diversity. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Prepare and implement
4.3.1
Work with the multicultural
Multicultural Engagement
interagency network and
Strategy.
other organisations to
4.3.1.1
Performance Measure
Responsibility
Number of activities held
Community Development
and meetings attended.
Coordinator
Number of ceremonies held.
Community Development Coordinator
facilitate and promote multicultural festival activities and events. Hold Citizenship Ceremonies
4.3.2
Citizenship Ceremonies and
4.3.2.1
as required and organise
Australia Day Ceremony held
Number of people receiving
Australia Day Ceremony.
as required.
Citizenship.
04 Ensure Griffith is a great place to live 4.3 Promote and celebrate our social and cultural diversity. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Promote various events to
4.3.3
Promote and grow events
4.3.3.1
Performance Measure
Responsibility
Number of events and
Marketing & Promotions Officer
showcase Griffith's social
including Multicultural
increase in attendees for
and cultural diversity.
Festival, Sikh Games, Easter
these events.
Party, Spring Fest, Salami Festival and new events through the Visitors InformationCentre.
04 Ensure Griffith is a great place to live 4.4 Provide and promote accessibility to services and facilities. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide sufficient aquatic
4.4.1
Program pool space to
facilities to meet the
4.4.1.1
maximise utilisation.
Performance Measure
Responsibility
Provision of pool space for
Leisure Services Manager
Learn to Swim, public
demands of the community.
swimming and other programs.
Provide sufficient aquatic
4.4.1
Seek funding and continue
4.4.1.2
Include pool funding in 10
facilities to meet the
planning for construction of
Year Long Term Financial
demands of the community.
a 50 m pool.
Plan.
Maintain the Griffith
4.4.2
Provide a clean functional
Regional Aquatic Leisure
and well maintained aquatic
Centre (GRALC) in
facility available to the
accordance with Asset
public.
Management Plans.
4.4.2.1
Compliance with GRALC Maintenance Schedule.
Leisure Services Manager
Leisure Services Manager
04 Ensure Griffith is a great place to live 4.4 Provide and promote accessibility to services and facilities. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide a collection of
4.4.3
Maintain a collection of
4.4.3.1
Performance Measure
Responsibility
Circulation per capita at a
Library Manager
library material, meeting
library material in
minimum of 3.5. Number of
community and industry
accordance with State
visits to WRL website. 48%
standards.
Library guidelines.
stock less than five years old.
Griffith City Library to
4.4.4
facilitate digital inclusion in
Provide digital education
4.4.4.1
programs to the community.
Library Manager
old. Number of internet
the community. Griffith City Library to
Hardware less than 5 years access bookings.
4.4.4
Provide reliable high speed
facilitate digital inclusion in
internet and computer
the community.
equipment.
4.4.4.2
Maintain ratio of 1 PC per 3,000 residents.
Library Manager
04 Ensure Griffith is a great place to live 4.4 Provide and promote accessibility to services and facilities. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Position the Griffith City
4.4.5
Provide a number of Library
4.4.5.1
Performance Measure
Responsibility
Provide a quarterly report on
Library Manager
Library as a community hub
programs to all sectors of
visitation per annum
for learning, networking and
the community.
(minimum 5 visits per
leisure.
capita). Deliver a minimum of 20 programs annually reflecting the population demographic.
Position the Griffith City Library as a community hub for learning, networking and leisure.
4.4.5
Promote the Library facilities for optimum community use.
4.4.5.2
Number of participants in programs.
Library Manager
04 Ensure Griffith is a great place to live 4.4 Provide and promote accessibility to services and facilities. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide Library
4.4.6
Complete development of
accommodation and
4.4.6
Theathrette Facility.
Performance Measure
Responsibility
Achieve Occupation
Library Manager
Certificate for room by 30
ancillary services to
June 2019
community and industry standards. Provide Library
4.4.6
Provide a clean, functional
accommodation and
and well maintained library
ancillary services to
facility available to the
community and industry
public.
4.4.6.1
Compliance with Library
Library Manager
Maintenance Schedule.
standards. Provide access to community services.
4.4.7
Maintain an up to date Community Directory.
4.4.7.1
Community Directory
Community Development
reviewed biannually.
Coordinator
04 Ensure Griffith is a great place to live 4.4 Provide and promote accessibility to services and facilities. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide access to
4.4.7
Work with Multicultural Inter
community services.
agency Network and other organisations to facilitate and promote Multicultural Festival activities and events.
4.4.7.2
Performance Measure
Responsibility
Number of activities held
Community Development
and meetings attended.
Coordinator
04 Ensure Griffith is a great place to live 4.5 Plan for, develop and provide a suitable range of cultural and art facilities, engaging programs and diverse events. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Griffith Regional Theatre will
4.5.1
Develop and deliver high
4.5.1.1
Performance Measure
Responsibility
Deliver a minimum of 16
Theatre & Art Gallery Manager
deliver a diverse and
quality, diverse
entrepreneurial shows per
engaging program of events
entrepreneurial season that
calendar year including a
that caters to the needs of
is inclusive of different age,
minimum of 3 seniors shows,
the community.
cultural and interest groups
4 educational/family shows
in the community.
and a minimum of 1 show for the CALD community.
Griffith Regional Theatre will deliver a diverse and engaging program of events that caters to the needs of the community.
4.5.1
Deliver biannual community music production.
4.5.1.2
Produce and deliver
Theatre & Art Gallery
Community Production
Manager
every 2 years.
04 Ensure Griffith is a great place to live 4.5 Plan for, develop and provide a suitable range of cultural and art facilities, engaging programs and diverse events. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Griffith Regional Theatre will
4.5.1
Deliver annual Theatre
deliver a diverse and
Workshops for young
engaging program of events
people.
4.5.1.3
Performance Measure
Responsibility
Number of Workshops held
Theatre & Art Gallery
and number of attendees.
Manager
Increase audience by 5 - 10
Theatre & Art Gallery Manager
that caters to the needs of the community. Griffith Regional Theatre will
4.5.1
Marketing strategy
4.5.1.4
deliver a diverse and
developed, reviewed and
%, increase up take of
engaging program of events
implemented annually.
memberships and
that caters to the needs of
subscriptions by 3 - 5%
the community.
annually.
04 Ensure Griffith is a great place to live 4.5 Plan for, develop and provide a suitable range of cultural and art facilities, engaging programs and diverse events. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide a well maintained
4.5.2
Provide a clean functional
Theatre facility for the public
and well maintained Theatre
and performers, meeting
facility available to the
community and industry
public.
4.5.2.1
Performance Measure
Responsibility
Compliance with Theatre
Theatre & Art Gallery
Maintenance Schedule.
Manager
Technology updated as per
Theatre & Art Gallery Manager
standards. Provide a well maintained
4.5.2
Ensure technological
4.5.2.2
Theatre facility for the public
facilities are maintained and
budget allocation. Annual
and performers, meeting
upgraded to meet current
review against current
community and industry
industry standards.
industry standards.
standards.
04 Ensure Griffith is a great place to live 4.5 Plan for, develop and provide a suitable range of cultural and art facilities, engaging programs and diverse events. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide a well maintained
4.5.2
Upgrade Theatre
Theatre facility for the public
4.5.2.3
airconditioning system.
Performance Measure
Responsibility
Installation of new air
Theatre & Art Gallery
conditioning system BGR.
Manager
Number of sponsors
Theatre & Art Gallery
engaged with the Theatre.
Manager
and performers, meeting community and industry standards. Investigate opportunities for
4.5.3
Develop an annual
sponsorship for the Griffith
sponsorship strategy for
Regional Theatre.
Griffith Regional Theatre.
4.5.3.1
04 Ensure Griffith is a great place to live 4.5 Plan for, develop and provide a suitable range of cultural and art facilities, engaging programs and diverse events. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
The Griffith Regional Art
4.5.4
Develop and deliver annual
4.5.4.1
Performance Measure
Responsibility
Minimum of 8 exhibitions
Theatre & Art Gallery Manager
Gallery will develop and
exhibition program that
per year including a
deliver a diverse and
includes quality touring and
minimum of 2 touring
engaging program of
locally sourced solo and
exhibitions and a minimum
cultural activities.
group exhibitions.
of 2 exhibitions by local artists.
The Griffith Regional Art
4.5.4
Deliver a minimum of 6
4.5.4.2
Minimum of 6 exhibitions
Theatre & Art Gallery Manager
Gallery will develop and
Artspace exhibitions per year
per year including minimum
deliver a diverse and
including works by local
of 3 exhibitions by local
engaging program of
artists and displays of
artists.
cultural activities.
interest to the local community.
04 Ensure Griffith is a great place to live 4.5 Plan for, develop and provide a suitable range of cultural and art facilities, engaging programs and diverse events. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
The Griffith Regional Art
4.5.4
Develop and review the
Gallery will develop and
annual marketing strategy
deliver a diverse and
for the Art Gallery.
4.5.4.3
Performance Measure
Responsibility
Increase community
Theatre & Art Gallery
engagement by 5 - 10%.
Manager
Minimum of 8 public
Theatre & Art Gallery Manager
engaging program of cultural activities. The Griffith Regional Art
4.5.4
Develop and deliver high
4.5.4.4
Gallery will develop and
quality, diverse schedule of
programs delivered annually
deliver a diverse and
public programs that caters
including a minimum of 2
engaging program of
to the needs of different
school holiday programs,
cultural activities.
age, cultural and interest
minimum of 3 educational
groups.
programs and a minimum of 2 Master Classes.
04 Ensure Griffith is a great place to live 4.5 Plan for, develop and provide a suitable range of cultural and art facilities, engaging programs and diverse events. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide a well maintained
4.5.5
Provide a clean functional
Art Gallery facility for the
and well maintained Art
public and performers
Gallery facility available to
meeting community and
the public.
4.5.5.1
Performance Measure
Responsibility
Compliance with Art Gallery
Theatre & Art Gallery
Maintenance Schedule.
Manager
One new story per quarter.
Curator
industry standards. Griffith Pioneer Park
4.5.6
Reignite interest in Griffith
Museum to establish key
Pioneer Park Museum
collections and items of
through identifying items
significance and find
and collections within the
engaging ways to deliver
museum of significance.
these treasured stories.
Highlight these items through creative storytelling.
4.5.6.1
04 Ensure Griffith is a great place to live 4.5 Plan for, develop and provide a suitable range of cultural and art facilities, engaging programs and diverse events. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Continue to develop and
4.5.7
Improve and maintain
grow total visitation to
existing digital facilities -
Griffith Pioneer Park
website and Facebook - and
Museum.
develop new platforms such
4.5.7.1
Performance Measure
Responsibility
Visitor numbers to increase
Business & Administration
by 5%.
Coordinator Pioneer Park Museum
as a blog/monthly column to increase foot and social traffic to the Griffith Pioneer Park Museum. Develop themed trails and
4.5.8
Improve signage in the
ways to effectively move
Pioneer Park Museum
visitors around Griffith
grounds.
Pioneer Park Museum.
4.5.8.1
New signage installed.
Technical Coordinator Pioneer Park Museum
04 Ensure Griffith is a great place to live 4.5 Plan for, develop and provide a suitable range of cultural and art facilities, engaging programs and diverse events. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Continue to grow Griffith
4.5.9
Develop new maps and
Pioneer Park Museum as an event venue.
material.
4.5.9.1
Performance Measure
Responsibility
New material developed and
Business & Administration
distributed.
Coordinator Pioneer Park Museum
04 Ensure Griffith is a great place to live 4.6 Encourage a socially inclusive community that cares for all age groups and genders, people of different abilities, disadvantaged or minority groups. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Prepare the disability
4.6.1
Prepare draft, place on
Inclusion and Access Plan
4.6.1.1
exhibition and endorse DIAP.
Performance Measure
Responsibility
DIAP endorsed reviewed and
Community Development
updated annually.
Coordinator
Number of young people
Community Development Coordinator
(DIAP) and implement recommendations. Prepare Youth Engagement
4.6.2
Consult with young people
4.6.2.1
Strategy and implement
to inform the Youth
participating in the Griffith
recommendations.
Engagement Strategy and
Youth Committee and or the
commence preparation of
number of meetings held.
the Youth Engagement Strategy.
04 Ensure Griffith is a great place to live 4.6 Encourage a socially inclusive community that cares for all age groups and genders, people of different abilities, disadvantaged or minority groups. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Engage with young people
4.6.3
Promote and facilitate Youth
4.6.3.1
Performance Measure
Responsibility
Number of youth activities
Community Development Coordinator
and liaise with local agencies
Week and other events in
held in partnership with
and user groups.
partnership with Agencies to
Council. Number of young
deliver programs and
people involved in
activities.
organising events.
Develop Ageing Strategy.
4.6.4
Consult with stakeholders and form a working group to develop aging strategy.
4.6.4.1
Number of
Community Development
consultations/meetings held.
Coordinator
04 Ensure Griffith is a great place to live 4.6 Encourage a socially inclusive community that cares for all age groups and genders, people of different abilities, disadvantaged or minority groups. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Maintain the Citrus
4.6.5
Work with the community to
4.6.5.1
Performance Measure
Responsibility
Maintain 70 sculptures.
Events Coordinator
Sculptures (Spring Fest) as
ensure all groups feel
Measure increase of
one of our greatest
welcome to be involved with
Facebook hits and reach and
community events.
this significant annual
capture the diverse range of
festival.
Griffith and number of volunteers engaged.
Promote Local Government
4.6.6
Provide suitable activities to
and Griffith City Council
promote Local Government
through the organisation
Week and increase the
and coordination of Local
public's awareness of Local
Government Week activities.
Government objectives and services.
4.6.6.1
Number of events held over Local Government Week.
Governance Coordinator
04 Ensure Griffith is a great place to live 4.6 Encourage a socially inclusive community that cares for all age groups and genders, people of different abilities, disadvantaged or minority groups. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Promote the benefits and
4.6.7
Engage volunteers to
4.6.7.1
Performance Measure
Responsibility
Number of volunteers
Visitor Information Centre Coordinator
social inclusion of
participate in community
engaged and the number
volunteering.
activities and facilities.
that continue to volunteer.
04 Ensure Griffith is a great place to live 4.7 Promote reconciliation and embrace our Wiradjuri heritage and culture. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Aboriginal Community
4.7.1
Implement
Engagement Protocol to be
recommendations from
endorsed and implemented
Aboriginal Community
by Council.
Engagement Protocol.
Prepare Aboriginal
4.7.2
Form Elders group and
4.7.1.1
4.7.2.1
Performance Measure
Responsibility
Report on progress to
Community Development
Communities Committee.
Coordinator
Report on progress to
Community Development Coordinator
Reconciliation Plan and
undertake consultation
Communities Committee.
implement
process.
Number of consultations
recommendations. Prepare Aboriginal
held. 4.7.2
Consult with the local
Reconciliation Plan and
Aboriginal Community
implement
Working Party (CWP).
recommendations.
4.7.2.2
Number of meetings held.
Community Development Coordinator
04 Ensure Griffith is a great place to live 4.7 Promote reconciliation and embrace our Wiradjuri heritage and culture. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Investigate and utilise the
4.7.3
Develop the stories and
Aboriginal connection with Pioneer Park Museum.
artifacts.
4.7.3.1
Performance Measure
Responsibility
Number of stories and
Curator
displays.
05 Promote a healthy and active lifestyle 5.1 Develop partnerships to improve local access to health, mental health and allied health services. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Lobby State Government to
5.1.1
Take leadership role in
5.1.1.1
Performance Measure
Responsibility
State Government
General Manager
commit funding in forward
reviewing new Base Hospital
commitment to fund Griffith
estimates for renewal of
Clinical Services Plan and
Base Hospital renewal in
Griffith Base Hospital.
Infrastructure Master Plan.
2018 budget and forward estimates.
05 Promote a healthy and active lifestyle 5.2 Build a community which promotes, facilitates and supports an active and healthy lifestyle for all. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Maintain and renew
5.2.1
Manage and maintain
5.2.1.1
Performance Measure
Responsibility
Playground safety
Parks & Gardens Manager
playgrounds in accordance
playgrounds in accordance
inspections carried out as
with the Playground
with the Playground
per the schedule.
Strategy.
Strategy.
Maintain Council's parks and
5.2.2
Manage and maintain parks
5.2.2.1
Parks and reserves
reserves in accordance with
and reserves to the level of
maintained within allocated
Playground Strategy.
service.
budget.
Maintain Council's parks and
5.2.2
Develop and document
reserves in accordance with
proposed levels of service
Playground Strategy.
for parks and reserves.
5.2.2.2
Levels of service document finalised by June 2018.
Parks & Gardens Manager
Parks & Gardens Manager
05 Promote a healthy and active lifestyle 5.2 Build a community which promotes, facilitates and supports an active and healthy lifestyle for all. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Promote healthy lifestyle
5.2.3
Collaborate with
programs to the community.
Performance Measure
Responsibility
Make Healthy Normal
Community Development
Murrumbidgee Local Health
campaign promoted on
Coordinator
District (MLHD) to promote
Council's web page. Number
the Make Healthy Normal
of initiatives promoted.
5.2.3.1
campaign. Continue to build strong
5.2.4
Support local sporting
networks with sporting
organisations to host major
bodies.
meets in Griffith.
Collaboration with local
5.2.5
Support the opportunity to
growers, producers and
hold an open air farmers
interested parties to
market to showcase our
establish a Griffith farmers
local produce to meet the
market in the CBD.
makers and highlight the importance of freshly grown and picked produce.
5.2.4.1
2 major sporting events per
Events Coordinator
year.
5.2.5.1
Seasonal Farmers Market
Marketing & Promotions
operating in June 2018/19.
Officer
05 Promote a healthy and active lifestyle 5.3 Plan for and provide sporting and recreational facilities to encourage an active lifestyle and wellbeing. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Maintain all Council's
5.3.1
Manage and maintain
sporting ovals.
5.3.1.1
Council's sporting ovals to
Performance Measure
Responsibility
Sporting ovals maintained
Parks & Gardens Manager
within allocated budget.
the level of service. Maintain all Council's
5.3.1
sporting ovals.
Develop and document
5.3.1.2
levels of service for sporting
Levels of service document
Parks & Gardens Manager
finalised by June 2018.
ovals. Implement capital upgrades
5.3.2
Seek grant funding for
to sporting and recreational
capital upgrades on sporting
facilities as funding becomes
and recreational facilities.
available through grants or otherwise.
5.3.2.1
Number of successful grants.
Parks & Gardens Manager
05 Promote a healthy and active lifestyle 5.2 Build a community which promotes, facilitates and supports an active and healthy lifestyle for all. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Griffith Regional Aquatic
5.3.3
Provide a high standard of
5.3.3.1
Performance Measure
Responsibility
Aquatic Centre is open a
Leisure Services Manager
Leisure Centre (GRALC) to
services and programs in the
minimum of 4,200 hours per
provide a range of services
following areas: general
annum. Increase attendances
for the improved health,
swimming, swimming
by 5% year on year.
well-being and lifestyle of
carnivals, swim school,
the community.
gymnasium classes and programs, creche, swim squad, kiosk, gymnasium access.
Griffith Stadium to provide a
5.3.4
Provide a clean, functional
5.3.4.1
Increased utilisation of the
range of services for the
facility, available to the
Stadium. Compliance with
improved health, well-being
community.
Stadium Maintenance
and lifestyle of the community.
Schedule.
Leisure Services Manager
05 Promote a healthy and active lifestyle 5.2 Build a community which promotes, facilitates and supports an active and healthy lifestyle for all. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Griffith Stadium to provide a
5.3.4
Installation of new roof
range of services for the
5.3.4.2
Griffith Stadium.
Performance Measure
Responsibility
New Stadium roof
Leisure Services Manager
constructed by 30 June
improved health, well-being
2019.
and lifestyle of the community. Deliver phase one of
5.3.6
Facilitate the construction of
Olympic Street Youth
the new Griffith Skate Park
Precinct as identified in the
(Olympic Street).
5.3.6.1
Construction complete and
Project Planner
finalised.
Griffith CBD Strategy (2015). Implement the design and
5.3.7
Finalise the design
construction of a 50 m pool
specifications for the Griffith
consistent with the Griffith
Regional Aquatic Leisure
Regional Aquatic Leisure
Centre.
Centre Master Plan.
5.3.7.1
Specifications finalised.
Principal Planner Urban Design & Strategic Planning
05 Promote a healthy and active lifestyle 5.2 Build a community which promotes, facilitates and supports an active and healthy lifestyle for all. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Collaborate with Council
5.3.8
Meet regularly with planning
staff ro ensure
and engineering staff to
recreational,road cycling and
incorporate pedestrian and
walking trails are
cycling recreation in future
incorporated in planning in
planning.
Performance Measure
Responsibility
5.3.8.1
Regular meetings held.
Project Planner
5.3.9.1
Number of projects
Principal Planner Urban
delivered.
Design & Strategic Planning
and across the LGA, for locals and the visitor economy. Deliver Urban Design Projects.
5.3.9
Scope, design and plan projects of city significance.
delivery program and operational 97
capital works program growing our city
3. growing our city
06 Encourage our local economy to grow 6.1 Encourage and support the establishment of new and diversified industries and businesses. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Attract and host
6.1.1
Develop and promote the
6.1.1.1
Performance Measure
Responsibility
Number of trade delegations
Economic Development Officer
international trade
Business Prospectus to
to Griffith. Number of
delegations to further
attract new investment in
meetings held. Prepare new
promote business
the region.
business prospectus.
opportunities within the region.
06 Encourage our local economy to grow 6.1 Encourage and support the establishment of new and diversified industries and businesses. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Liaise with agencies to
6.1.2
Attend regular meetings
develop resources and
6.1.2.1
Performance Measure
Responsibility
Number of meetings held.
Economic Development
with agencies.
Officer
programs to assist small business to establish in the area. Work with new industries
6.1.3
and build relationships.
Supply welcome bags at
6.1.3.1
Four Conferences per year.
conferences. Build new
Visitor Information Centre Coordinator
industries into tour itineraries. Work with new industries and build relationships.
6.1.3
Meet with industry and gain an understanding of the scale of the industry.
6.1.3.2
Number of meetings held
Economic Development Officer
06 Encourage our local economy to grow 6.1 Encourage and support the establishment of new and diversified industries and businesses. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Undertake supply chain
6.1.4
Identify new
analysis.
6.1.4
industry/business
Performance Measure
Responsibility
Engage with potential new
Economic Development
businesses.
Officer
Number of business
Economic Development
meetings hosted.
Officer
Number of business
Economic Development
meetings hosted.
Officer
opportunity. Profile Griffith as a vibrant,
6.1.5
Continue to build strong
contemporary regional hub,
business relationships and
a great place to do business.
networks. Attend business
6.1.5.1
events/breakfasts and facilitate meetings. Promote Griffith in a national publication as a great place to invest. Profile Griffith as a vibrant,
6.1.5
Promote Griffith in all
contemporary regional hub,
business publications as a
a great place to do business.
great place to invest.
6.1.5.2
06 Encourage our local economy to grow 6.2 Promote opportunities to assist existing businesses to grow. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Seek funding applications to
6.2.1
Partner with stakeholders
run professional
such as the Griffith Business
development for local
Chamber, Business
businesses.
Enterprise Centre and
6.2.1.1
Performance Measure
Responsibility
Number of meetings per
Economic Development
year.
Officer
Letters of support provided
Economic Development Officer
Regional Development Australia (RDA) Riverina to apply for funding and run events for local businesses. Liaise with Federal and State
6.2.2
Promote and support grant
6.2.2.1
agencies to promote grant
funding applications for
for local services applying
funding opportunities for
local businesses to expand.
for funding to expand or set
businesses in the Western Riverina.
up new business.
06 Encourage our local economy to grow 6.2 Promote opportunities to assist existing businesses to grow. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Liaise with Federal and State
6.2.2
Work collaboratively with
agencies to promote grant
partner Council's and seek
funding opportunities for
opportunities to grow the
businesses in the Western
Kidman Way.
6.2.2.2
Performance Measure
Responsibility
Collaborate three events
Marketing & Promotions
annually.
Officer
Regular reporting completed
Economic Development Officer
Riverina. Participate in the Small
6.2.3
Continue to build the strong
6.2.3.1
Business Friendly Councils
partnership with Small
as per agreements and on
Program and implement
Business Council and Griffith
time.
initiatives to promote the
City Council.
region as a place to do business.
06 Encourage our local economy to grow 6.2 Promote opportunities to assist existing businesses to grow. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Participate in the Small
6.2.3
Griffith Now Hiring program
Business Friendly Councils Program and implement initiatives to promote the region as a place to do business.
to attract skilled workers.
6.2.3.2
Performance Measure
Responsibility
Number of skilled workers
Economic Development
attracted to the region.
Officer
06 Encourage our local economy to grow 6.3 Plan strategically and consider land use management to encourage investment in the region. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Implement best practice
6.3.1
Comprehensive DCP
development guidelines. Lake Wyangan Land Use Strategy.
6.3.1.1
Performance Measure
Responsibility
DCP adopted.
Planning & Environment
prepared. 6.3.2
Master Plan Infrastructure requirements revise Griffith Land Use Strategy to meet legislative requirements.
Manager 6.3.2.1
Master plan adopted. New
Planning & Environment
Land Use Strategy adopted.
Manager
06 Encourage our local economy to grow 6.4 Promote and support diverse agricultural industries and encourage 'best practice'. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Communicate Griffith as a
6.4.1
Promote Griffith as the
6.4.1.1
Performance Measure
Responsibility
Minimum two stories in
Marketing & Promotions Officer
progressive agricultural
agricultural powerhouse of
major publications and or
region.
the Riverina, share good
media visits.
news stories across social platforms and profile in regional editorial.
06 Encourage our local economy to grow 6.5 Promote Griffith as a desirable visitor and tourism destination. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Promote Griffith and grow
6.5.1
Utilise Tourism Routes such
6.5.1.1
Performance Measure
Responsibility
Promotional material to be
Marketing & Promotions Officer
visitor numbers. This
as Kidman Way & Burley
developed. Burley Griffin
includes independent
Griffin Way a means to
Touring route. Number of
travellers as well as coach
attract visitors to Griffith.
drive market promotions.
groups. Update the Griffith Marketing Plan 2018-2021.
6.5.2
Update the Griffith
Marketing plan updated and
Marketing & Promotions
Marketing Plan, adopt by
endorse by the Tourism and
Officer
Committee and implement.
Major Events Committee.
This plan highlights our key destination assets - food and wine, Italian heritage, friendly people.
6.5.2.1
06 Encourage our local economy to grow 6.5 Promote Griffith as a desirable visitor and tourism destination. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Performance Measure
Responsibility
Establish the Citrus
6.5.3
Develop a media kit to
Media Kit developed by July
Marketing & Promotions
2018.
Officer
Increase in TripAdvisor
Marketing & Promotions
platform, host a workshop,
comments and recorded in
Officer
invigorate listings, facilitate
the Tourism & ED quarterly
ownership to businesses.
report.
Sculptures as one of
generate media interest in
Australia's most unique
the Citrus Sculptures event.
6.5.3.1
events. Increase Griffith's presence
6.5.4
on TripAdvisor.
Increase lucrative conference
6.5.5
Manage the TripAdvisor
Create Conference Planner.
6.5.4.1
6.5.5.1
market. Increase lucrative events opportunities.
Conference Planner created
Events Coordinator
Dec 2018. 6.5.6
Develop an Events Planner Kit for event organisers to use.
6.5.6.1
Events Planner on website by September 2018.
Events Coordinator
06 Encourage our local economy to grow 6.5 Promote Griffith as a desirable visitor and tourism destination. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Calendar of events on
6.5.7
User friendly Calendar of
website.
6.5.7.1
Events.
Performance Measure
Responsibility
New user friendly calendar
Marketing & Promotions
of events in place by July
Officer
2018. Calendar of events on
6.5.7
website.
Develop new visit Griffith
6.5.7.2
In place by July 2018.
wbsite in line with new
Marketing & Promotions Officer
visitor guide. Calendar of events on website.
6.5.7
Roll out the Griffith Ambassador program.
6.5.7.3
In place by July 2018.
Marketing & Promotions Officer
07 Encourage a skilled workforce with employment opportunities 7.1 Increase the range of opportunities to work locally. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Identify opportunities for
7.1.1
Identify opportunities within
7.1.1.1
Performance Measure
Responsibility
Number of trainees and
Workforce Planning Manager
Council traineeships and
organisation structure for
apprentices employed.
work experience programs.
potential traineeships.
Number of work experience placements.
Grow and diversify the
7.1.2
Backpacker Market.
Work with employment
7.1.2.1
agencies and backpacker
Regular meetings with
Economic Development
industry groups.
Officer
3 meetings per year per
Economic Development
agency.
Officer
hostels to facilitate seasonal worker housing. Work with agencies such as
7.1.3
Regular meetings held with
the RDA Riverina and Griffith
agencies to increase
Business Chamber to
opportunities to work locally.
increase the range of opportunities to work locally.
7.1.3.1
07 Encourage a skilled workforce with employment opportunities 7.2 Develop partnerships to build on quality education and training opportunities. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Continue Council's
7.2.1
Ongoing commitment to
7.2.1.1
Performance Measure
Responsibility
Interaction with Charles Sturt
Director - Sustainable Development
commitment to further
Western Riverina Higher
University, Deakin University,
education options and
Education Project.
Riverina Institute NSW TAFE
pathways.
and other providers of higher education pathways.
Continue Council's
7.2.1
commitment to further
Participate in the Grow Our
7.2.1.2
Own project.
Number of meetings
Economic Development
attended..
Officer
Support the establishment
Economic Development Officer
education options and pathways. Support local providers of
7.2.2
Provide ongoing advocacy
7.2.2.1
educational and skills
support to existing
of the Country Universities
programs.
organisations delivering
Centre.
services locally.
07 Encourage a skilled workforce with employment opportunities 7.3 Advocate for safe work practices and employment standards. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide a compliant Work
7.3.1
Undertake review of WHS
Health Management system
7.3.1.1
policies.
Performance Measure
Responsibility
Number of WHS policies
Human Resources - Risk
reviewed.
Manager
Number of staff provided
Workforce Planning Manager
to meet legislative and organisational requirements. Provide a compliant Work
7.3.1
Provide a relevant training
7.3.1.2
Health Management system
calendar for staff
with WHS training. Number
to meet legislative and
development and
of WHS initiatives
organisational requirements.
compliance in WHS.
implemented.
Provide a compliant Work
7.3.1
Implement amendments to
7.3.1.3
Number of Workshops to
Human Resources - Risk Manager
Health Management system
WHS Act and Legislation
notify staff. Number of WHS
to meet legislative and
changes as required.
Committee meetings held.
organisational requirements.
07 Encourage a skilled workforce with employment opportunities 7.3 Advocate for safe work practices and employment standards. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Work with Government
7.3.2
Agency consultation held.
7.3.2.1
Performance Measure
Responsibility
Number of matters pursued.
Economic Development
agencies to communicate
Officer
with employers and employees. Work with Government
7.3.2
Investigate non-compliance
agencies to communicate
matters within Council's
with employers and
jurisdiction.
employees.
7.3.2.2
Number of matters
Planning & Environment
investigated or referred.
Manager
08 Provide and manage assets, services and facilities 8.1 Provide, renew and maintain a range of quality infrastructure, assets, services and facilities delivered in a cost effective and sustainable manner. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Maintain water infrastructure
8.1.01
Manage and maintain water
including reservoirs, mains
8.1.1.1
infrastructure as per budget.
Performance Measure
Responsibility
Works completed as per
Director - Utilities
budget allocation.
and treatment plants. Maintain sewer
8.1.02
infrastructure including
Manage and maintain sewer
8.1.2.1
infrastructure as per budget.
Works completed as per
Director - Utilities
budget allocation.
pump stations, rising mains and treatment plants. Plan and provide water and
8.1.03
Update Developer Service
sewerage services that meet
Plans (DSP) for water and
growth demands.
sewerage to ensure adequate infrastructure plans in place for future demand.
8.1.3.1
Completion of DSP for water and sewerage.
Director - Utilities
08 Provide and manage assets, services and facilities 8.1 Provide, renew and maintain a range of quality infrastructure, assets, services and facilities delivered in a cost effective and sustainable manner. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Design and construct
8.1.04
Design and construct Lake
8.1.4.1
Performance Measure
Responsibility
Construction and
Director - Utilities
reticulated sewerage
Wyangan and Nericon
commissioning of Lake
network for villages of Lake
reticulated sewerage.
Wyangan and Nericon sewer
Wyangan, Nericon and
to be completed by
Tharbogang.
December 2018.
Design and construct
8.1.05
Design and construct water
reticulated water network to
mains in accordance with
accommodate expansion of
allocated budget.
8.1.5.1
Complete designs and
Director - Utilities
construction as required.
residential land releases. Maintain water pressure
8.1.06
Monitor flows and pressure
8.1.6.1
Compliance with minimum
zones and metered districts
for variations, anomalies and
flow rate and pressure
infrastructure.
flow patterns.
standards as per Supply Levels of Service policy.
Director - Utilities
08 Provide and manage assets, services and facilities 8.1 Provide, renew and maintain a range of quality infrastructure, assets, services and facilities delivered in a cost effective and sustainable manner. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Maintain water meter
8.1.07
Manage and maintain
replacement program to
Griffith and villages water
ensure meter age less than
meter annual replacement
10 years.
program.
Maintain an annual water
8.1.08
mains replacement program.
Manage and maintain
8.1.7.1
Performance Measure
Responsibility
800 replacements per
Director - Utilities
annum.
8.1.8.1
100% capital works for water
Griffith and villages water
mains completed by June
mains replacement program
2019.
Director - Utilities
in accordance with allocated budget. Provide engineering design
8.1.09
Engineering design and
and referral services to
referrals provided to Council
internal departments within
departments.
Council.
8.1.9.1
Design progression and
Engineering Design &
referrals reported quarterly.
Approvals Manager
08 Provide and manage assets, services and facilities 8.1 Provide, renew and maintain a range of quality infrastructure, assets, services and facilities delivered in a cost effective and sustainable manner. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide gravel from the
8.1.10
Gravel extraction to be
8.1.10.1
Performance Measure
Responsibility
Gravel meets the demand
Waste Operations Manager
Tharbogang quarry to meet
carried out as per licence
required for Council
the demands of Council's
and development
roadworks whilst
road building projects.
application requirements.
maintaining extraction limits.
Maintain and develop
8.1.11
Manage and maintain
8.1.11.1
Griffith Livestock Marketing
infrastructure and services to
Griffith Livestock Marketing
Centre maintained to
bring together willing buyers
Centre within allocated
facilitate and maximise the
and sellers of livestock in the
budgets.
buying and selling of
Western Riverina region.
livestock with a target of 450,000 head of sheep and ability to sell cattle when required.
Director – Utilities
08 Provide and manage assets, services and facilities 8.1 Provide, renew and maintain a range of quality infrastructure, assets, services and facilities delivered in a cost effective and sustainable manner. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Maintain and develop
8.1.11
Upgrade existing facilities to
8.1.11.2
Performance Measure
Responsibility
Capital works to be
Director - Utilities
infrastructure and services to
improve selling conditions
maintained in the allocated
bring together willing buyers
for sheep yards.
budget each financial year.
and sellers of livestock in the Western Riverina region. Maintain and develop
8.1.11
Improvement upgrades to
8.1.11.3
Upgrade existing truck wash
infrastructure and services to
existing truck wash at Griffith
Griffith Saleyards - works to
bring together willing buyers
Saleyards.
be completed by June 2019.
and sellers of livestock in the Western Riverina region.
Director – Utilities
08 Provide and manage assets, services and facilities 8.1 Provide, renew and maintain a range of quality infrastructure, assets, services and facilities delivered in a cost effective and sustainable manner. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Efficiently manage and
8.1.12
Maintain a modern and
maintain Council's fleet
suitable fleet to meet the
services.
requirements of Council's
8.1.12.1
Performance Measure
Responsibility
Maintain 80% utilisation of
Fleet & Depot Manager
all fleet items.
services and facilities. Efficiently manage and
8.1.12
maintain Council's fleet
Provide efficient fleet
8.1.12.2
services to Council.
maintenance. 8.1.13
Review alternative locations
8.1.13.1
Location for the new
Principal Planner Urban Design & Strategic Planning
location and design for a
for the new Cemetery and
Cemetery and Crematorium
new Cemetery and
crematorium.
finalised.
Crematorium.
Fleet & Depot Manager
through proactive
services. Review and finalise the best
Minimise downtime of fleet
08 Provide and manage assets, services and facilities 8.1 Provide, renew and maintain a range of quality infrastructure, assets, services and facilities delivered in a cost effective and sustainable manner. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide cemetery facilities to
8.1.14
Manage and maintain
8.1.14.1
Performance Measure
Responsibility
Cemeteries managed
Parks & Gardens Manager
meet the needs of the
Griffith, Yenda and Bagtown
efficiently and to agreed
community.
cemeteries within allocated
service standards.
budgets. Maintain Griffith Airport
8.1.15
Maintain and manage
infrastructure including
Griffith Airport in accordance
terminal buildings, runways
with Civil Aviation Safety
and carparks.
Authority (CASA) standards.
Maintain Griffith Airport
8.1.15
Implement
infrastructure including
recommendations of annual
terminal buildings, runways
CASA audit.
and carparks.
8.1.15.1
Successful completion of
Airport Coordinator
annual CASA audit.
8.1.15.2
CASA recommendations implemented.
Airport Coordinator
08 Provide and manage assets, services and facilities 8.1 Provide, renew and maintain a range of quality infrastructure, assets, services and facilities delivered in a cost effective and sustainable manner. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Ongoing review &
8.1.17
Review & update Asset
8.1.17.1
Performance Measure
Responsibility
Provide annual report on
Asset Management Coordinator
assessment of Asset
Management Plans for
status of Asset Management
Management Plans for all
Council infrastructure.
Plans.
asset classes. Ongoing review &
8.1.17
Complete cyclical Valuation
assessment of Asset
Reviews on each Asset class
Management Plans for all
as required under statutory
asset classes.
guidelines.
Implement Strategic
8.1.18
Implement Strategic Asset
8.1.17.2
8.1.18.1
Annual review of each Asset
Asset Management
Class.
Coordinator
Inspections and capital
Asset Management Coordinator
Maintenance Module for
Management module to
works within the Strategic
capital road works and road
enable programming of
Maintenance Module of the
asset inspections.
inspection programs and
asset management system
capital works.
by 30 June 2019.
08 Provide and manage assets, services and facilities 8.1 Provide, renew and maintain a range of quality infrastructure, assets, services and facilities delivered in a cost effective and sustainable manner. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Predictive Model produced
8.1.19
A comprehensive predictive
for Road assets.
Performance Measure
Responsibility
Road asset model set up to
Asset Management
model developed to assist
assist operational staff by 30
Coordinator
road engineering staff with
June 2019.
8.1.19.1
development of the road sealing program. Develop a Business Process
8.1.20
Develop a Business Process
Manual for Asset
Manual that specifies how
Management.
Council will procure and maintain asset inventory and spatial data and processes to ensure our asset data is kept relevant and up to date.
8.1.20.1
Business Process Manual
Asset Management
developed by 30 June 2019.
Coordinator
08 Provide and manage assets, services and facilities 8.1 Provide, renew and maintain a range of quality infrastructure, assets, services and facilities delivered in a cost effective and sustainable manner. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide GIS services to the
8.1.21
Provide timely, responsive
organisation. Provide GIS services to the
GIS services for Council. 8.1.21
organisation. Maintain street sweeping
8.1.21.1
Complete rural addressing
8.1.21.2
project. 8.1.22
program to improve quality
Manage and maintain street
8.1.22.1
sweeping program.
Performance Measure
Responsibility
Respond to GIS work
Asset Management
requests within 48 hours.
Coordinator
Rural addressing project
Asset Management
completed by 30 June 2019.
Coordinator
Street sweeping undertaken
Works Manager -
as per program.
Maintenance
Reports to Griffith Pioneer
Business & Administration
of stormwater run off. Provide regular upkeep to
8.1.23
Griffith Pioneer Park
8.1.23.1
ensure our tourism facilities
Museum Masterplan
Park Museum Working
Coordinator Pioneer Park
are attractive, accessible and
updated and report
Group.
Museum
social media friendly.
provided to Working Group.
08 Provide and manage assets, services and facilities 8.1 Provide, renew and maintain a range of quality infrastructure, assets, services and facilities delivered in a cost effective and sustainable manner. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide regular upkeep to
8.1.23
Masterplan for Visitor
ensure our tourism facilities
8.1.23.2
Performance Measure
Responsibility
Successful budget bids.
Visitor Information Centre
Information Centre updated.
Coordinator
are attractive, accessible and social media friendly. Provide regular upkeep to ensure our tourism facilities are attractive, accessible and social media friendly.
8.1.23
Audit of Tourism Assets and interpretive signage.
8.1.23.3
Completed October 2018.
Visitor Information Centre Coordinator
08 Provide and manage assets, services and facilities 8.2 Maintain and develop an effective transport network (public roads, pathways, pedestrian access and transport corridors) for Griffith and villages. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Implement Heavy Vehicle
8.2.1
Investigation, design and
Strategy recommendations.
Performance Measure
Responsibility
Complete investigation and
Engineering Design &
land acquisition for future
design to identify land
Approvals Manager
stages of the Southern
acquisition requirements.
8.2.1.1
Industrial Link Road. Maintain regional and local
8.2.3
Maintain regional and local
road infrastructure network
roads and traffic facilities to
as per adopted service
adopted service standards.
8.2.3.1
Works carried out within
Works Manager -
Council's allocated budget.
Maintenance
Works carried out within
Works Manager –
Council's allocated budget.
Maintenance
standard. Maintain regional and local
8.2.3
Develop and implement
road infrastructure network
annual gravel re-sheeting
as per adopted service
program.
standard.
8.2.3.2
08 Provide and manage assets, services and facilities 8.2 Maintain and develop an effective transport network (public roads, pathways, pedestrian access and transport corridors) for Griffith and villages. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Maintain regional and local
8.2.3
Sealed roads rehabilitation
road infrastructure network
program implemented in
as per adopted service
accordance with Asset
standard.
Management Plan.
Develop and improve the
8.2.4
Construct roads in
transport network through
accordance with Capital
rehabilitation and capital
Works Program.
8.2.3.3
8.2.4.1
Performance Measure
Responsibility
Works carried out within
Works Manager -
Council's allocated budget.
Maintenance
Works carried out within
Works Manager -
Council's allocated budget.
Construction
Works carried out within
Works Manager –
Council's allocated budget.
Construction
works. Construction of the Southern 8.2.5 Industrial Link Road (Heavy Vehicle Strategy).
Construct Thorne Road.
8.2.5.1
08 Provide and manage assets, services and facilities 8.2 Maintain and develop an effective transport network (public roads, pathways, pedestrian access and transport corridors) for Griffith and villages. DELIVERY PLAN (4 YEARS) DP Action
Code
OPERATION PLAN (1 YEAR) Action
Construction of the Southern 8.2.5
Construct Thorne
Industrial Link Road (Heavy
Road/Kidman Way
Vehicle Strategy).
intersection.
Investigate strategies to
8.2.6
attract additional air services. Develop opportunities for
Discussions with regional
8.2.5.2
8.2.6.1
airlines. 8.2.7
Liaise with stakeholders and
heavy vehicles to access
industry regarding
Griffith City, in conjunction
opportunities to improve
with the Heavy Vehicle Link
heavy vehicle transport
Road system.
routes.
8.2.7.1
Performance Measure
Responsibility
Works carried out within
Works Manager -
Council's allocated budget.
Construction
Number of meetings held.
Economic Development
Air services survey.
Officer
Number of meetings held.
Economic Development Officer
08 Provide and manage assets, services and facilities 8.3 Improve the aesthetic of the City and villages, by developing quality places and improved public realm. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Initiate place activation
8.3.1
Implement a place activation
projects in Griffith and the
project in the city centre of
surrounding villages.
Griffith.
Initiate place activation
8.3.1
Investigate and prepare,
projects in Griffith and the
where appropriate, place
surrounding villages.
activation plans for the
8.3.1.1
8.3.1.2
Performance Measure
Responsibility
Report progress to CBD
Principal Planner Urban
Working Group.
Design & Strategic Planning
Report progress to CBD
Project Planner
Working Group.
surrounding villages. Deliver entrance statements at the main entrances into the City of Griffith in keeping with the Griffith Entrance Strategy.
8.3.2
Finalise and adopt the Griffith Entrance Strategy.
8.3.2.1
Griffith Entrance Strategy and relevant action is adopted.
Project Planner
08 Provide and manage assets, services and facilities 8.3 Improve the aesthetic of the City and villages, by developing quality places and improved public realm. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Deliver streetscape upgrades
8.3.3
Design phase one of the
to Yambil Street and Kooyoo
8.3.3.1
Yambil Street Upgrade.
Performance Measure
Responsibility
Design specifications for
Project Planner
tender documentation has
Street consistent with the
been prepared.
Griffith CBD Strategy. Liaise and support CBD
8.3.4
Support the CBD Strategy
8.3.4.1
Regular meetings with the
Economic Development Officer
Strategy Working Party in
Working Party in seeking
Urban design team and
implementing Place Creation
grant funding to facilitate
meeting with the CBD
Strategies.
workshops that engage the
Working Group.
community in decision making process.
08 Provide and manage assets, services and facilities 8.4 Mitigate the impact of natural disasters. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Retain formal relationships
8.4.1
Complete investigation,
8.4.1.1
Performance Measure
Responsibility
Report to Floodplain
Senior Engineering Coordinator
through the Floodplain
design and implementation
Management Committee
Management Committee
of flood mitigation measures
and OEH on progression of
and appropriate government
in accordance with OEH
funded works.
agencies for planning,
funding guidelines.
funding and response to flooding. Lead and guide the local
8.4.2
Facilitate Local Emergency
8.4.2.1
Meetings held and
Director - Infrastructure & Operations
emergency community
Management Committee
recommendations
through participation in the
meetings quarterly.
implemented.
Local Emergency Management Committee.
delivery program and operational plan 130
valuing our environment
4. valuing our environment 09 Enhance the natural and built environment 9.1 Encourage considered planning, balanced growth and sustainable design. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Manage and maintain an
9.1.1
Implement the Planning
efficient Development
9.1.1.1
Department service review.
Performance Measure
Responsibility
Service review milestones
Director - Sustainable
achieved.
Development
Number of applications that
Planning & Environment
are not rejected.
Manager
Application process as per legislative requirements. Manage and maintain an
9.1.1
Work with customers to
efficient Development
improve the standard of
Application process as per
documentation.
legislative requirements.
9.1.1.2
09 Enhance the natural and built environment 9.1 Encourage considered planning, balanced growth and sustainable design. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Transition to online
9.1.2
Liaise with Department of
development applications
9.1.2.1
Planning and Environment
Performance Measure
Responsibility
Online DA application
Planning & Environment
process operational.
Manager
Number of matters
Planning & Environment
investigated and finalised.
Manager
Compliance database
Planning & Environment
created.
Manager
over the implementation of the planning portal. Investigate and regulate
9.1.3
Review and implement
unauthorised building works
protocols to deal with
and land use.
unauthorised building works
9.1.3.1
and land use. Investigate and regulate unauthorised building works and land use.
9.1.3
Develop a compliance database.
9.1.3.2
09 Enhance the natural and built environment 9.1 Encourage considered planning, balanced growth and sustainable design. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Provide guidance on
9.1.4
Hold regular forums with
9.1.4.1
Performance Measure
Responsibility
Annual forums held. Number
Planning & Environment Manager
potential development,
developers, consultants and
of pre-lodgement meetings
construction and planning
stakeholders.
addressed.
issues. Maintain Council processes
9.1.6
Adjustments made to
9.1.6.1
Compliance with
Planning & Environment Manager
consistent with Department
Council processes as
Department of Planning and
of Planning and Environment
required.
Environment requirements.
requirements. Investigate options for encouraging quality design.
9.1.7
Investigate planning powers to encourage improved design.
9.1.7.1
Planning powers identified.
Planning & Environment Manager
09 Enhance the natural and built environment 9.1 Encourage considered planning, balanced growth and sustainable design. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Review the LEP, DCP and
9.1.8
Define key Urban
9.1.8.1
Performance Measure
Responsibility
Key Urban Microclimate
Environment, Health & Sustainability Coordinator
DC's to reflect Urban
Micoclimate Design
Design principles 25%
Microclimate Design
principles and source
complete.
principles linking urban
funding.
climate, water sensitive urban design (WSUD), green infrastructure and human health from street to city scale.
09 Enhance the natural and built environment 9.2 Develop partnerships with the community and government agencies to care for the environment. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Develop Griffith City Council
9.2.1
Develop structure for OSM
9.2.1.1
Performance Measure
Responsibility
On-Site Sewage
Environment, Health & Sustainability Coordinator
On-Site Sewage
Plan, determine process for
Management (OSM) Plan
Management (OSM) Plan.
capturing OSM information
complete.
within Authority, HP Records Manager & Intramaps and commence development of OSM Plan.
09 Enhance the natural and built environment 9.3 Deliver projects to protect and improve biodiversity and biosecurity. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Deliver a noxious weeds
9.3.1
Manage and maintain
9.3.1.1
Performance Measure
Responsibility
Number of inspections and
Parks & Gardens Manager
eradication and control
Council's noxious weeds
spraying programs
program.
program.
undertaken.
Development of Griffith City
9.3.2
Develop structure and
9.3.2.1
Roadside Vegetation
Environment, Health & Sustainability Coordinator
Council Roadside Vegetation
commence development of
Management Plan 50%
Management Plan.
the GCC Roadside
complete.
Vegetation Management Plan.
09 Enhance the natural and built environment 9.4 Value and protect our heritage buildings and precincts. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Review heritage database
9.4.1
Respond to requests for
and study.
heritage consideration.
9.4.1.1
Performance Measure
Responsibility
Number of heritage matters
Planning & Environment
considered.
Manager
09 Enhance the natural and built environment 9.5 Improve sustainable land use. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Develop a Contaminated
9.5.1
Determine process and
9.5.1.1
Performance Measure
Responsibility
CL sites identified 25%
Environment, Health & Sustainability Coordinator
Land (CL) Register for Griffith
identify CL sites for Register,
complete. CL register 25%
City Council LGA.
determine process for
complete.
capturing CL information within Authority, HP Records Manager & Intramaps (the Register) and source funding.
10 Use and manage our resources wisely 10.1 Manage Griffith's water resources and water quality responsibly. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Offer rebates for water
10.1.1
Rebate program for water
efficient devices. Maintain Risk Based Drinking Water
Performance Measure
Responsibility
10.1.1.1
Number of rebates provided.
Director - Utilities
10.1.2.1
Risk Based Drinking Water
Director – Utilities
efficient devices provided. 10.1.2
Review Risk Based Drinking Water Management System.
Management System
Management System in
prepared in accordance with
accordance with State
legislative requirements.
Government requirements.
Compliance with Australian Drinking Water Guidelines and results published monthly on Council's website.
10 Use and manage our resources wisely 10.1 Manage Griffith's water resources and water quality responsibly. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Commence Lake Wyangan
10.1.3
Commence implementation
10.1.3.1
Performance Measure
Responsibility
Implementation measures
Environment, Health & Sustainability Coordinator
and Catchment
of 3 priority LW&CM
determined once priority
Management Project.
Strategy recommendations
actions agreed. Funding
and source funding.
measures determined once priority actions agreed.
10 Use and manage our resources wisely 10.2 Reduce energy consumption and greenhouse gas emissions. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Investigate opportunities to
10.2.1
Establish baseline data of
implement energy efficient
10.2.1.1
fleet energy consumption.
Responsibility
Fleet energy consumption
Fleet & Depot Manager
data prepared by 30 June
fleet and depot buildings. Liaise with local energy
Performance Measure
2018. 10.2.2
Identify and implement
10.2.2.1
Street lighting issues
Director - Infrastructure & Operations
provider to maintain and
opportunities to improve
identified and reported to
upgrade street lighting.
street lighting.
Essential Energy. Implement new technologies as they become available.
Continue to undertake Energy Audits on Griffith City Council facilities.
10.2.3
Complete Energy Audit on GCC's buildings.
10.2.3.1
Number of audits
Environment, Health &
undertaken.
Sustainability Coordinator
10 Use and manage our resources wisely 10.3 Provide environmentally sustainable waste management services. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Continually upgrade the
10.3.1
Continue utilisation and
10.3.1.1
Performance Measure
Responsibility
Statutory reports submitted
Waste Operations Manager
existing waste management
upgrading of existing
in accordance with licencing
centres to provide waste
landfilling facilities.
requirements.
handling to accommodate the current and future needs of the community. Encourage resource recovery
10.3.2
and kerbside recycling.
Provide and promote
10.3.2.1
Provide relevant information
resource recovery and
to the community in relation
recycling initiatives.
to resource recovery
Waste Operations Manager
services. Maintain waste collection
10.3.3
Provide domestic,
10.3.3.1
Ensure daily collection
and disposal from domestic,
commercial, street and park
service is provided. Bin
commercial, street and park
bin collections.
network maintained.
areas.
Waste Operations Manager
10 Use and manage our resources wisely 10.3 Provide environmentally sustainable waste management services. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Deliver a Local Organics
10.3.4
Consult the Griffith
10.3.4.1
Performance Measure
Responsibility
Objective measure of
Environment, Health & Sustainability Coordinator
Collection Service for the
Community to measure
Community support for (GO)
Griffith Community.
support for Garden Organics
and (FOGO) organics
(GO) only or Food Organics
diversion service.
and Garden Organics (FOGO) waste collection (kerbside, public place and business) organics diversion service. Determine business case for GO or FOGO organics diversion.
10 Use and manage our resources wisely 10.4 Encourage and promote the use of alternative and renewable energy sources. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Determine Biomass business
10.4.2
Undertake fuel study of
opportunities for bio energy
region to consolidate
production and
existing data. Cost Biomass
consumption (GCC &
power plant to test
Regional). (Waste to Energy).
commercial viability.
Determine Mid Scale Solar
10.4.3
Undertake study of Mid
Behind the Meter business
Scale Solar applications. Cost
opportunities (GCC &
Mid Scale Solar to test
Community).
commercial viability.
10.4.2.1
Performance Measure
Responsibility
Study and report prepared.
Economic Development Officer
10.4.3.1
Mid Scale Solar applications
Environment, Health &
study complete.
Sustainability Coordinator
10 Use and manage our resources wisely 10.5 Plan and implement programs to improve sustainability. DELIVERY PLAN (4 YEARS)
OPERATION PLAN (1 YEAR)
DP Action
Code
Action
Implement the Street Tree
10.5.1
Administer Street Tree
Preservation policy.
10.5.1.1
Preservation policy.
Performance Measure
Responsibility
Compliance with Street Tree
Parks & Gardens Manager
policy. Number of street trees planted.
Engage Council in
10.5.2
Develop Renewable Energy
10.5.2.1
Renewable Energy Policy,
Environment, Health & Sustainability Coordinator
Renewable Energy
Policy for Council.
complete. Reneweable
opportunities/deliverables.
Commence development of
Energy Master Plan
Renewable Energy Master
commenced. Source funding
Plan. Source funding for
for Renewable Energy
Renewable Energy Master
Master Plan.
Plan. Rejoin OEH Sustainability Advantage program. Asset Management Plan for
10.5.3
Capture data and produce
Asset Management Plan
Technical Coordinator
Griffith Pioneer Park
replacement, refurbishment
prepared.
Pioneer Park Museum
Museum
and maintenance program.
delivery program and operational plan 146
financial statements
delivery program and operational plan 147
contents
148 149 150 263 267 271
2018/19 Consolidated Operating Revenues 3% Rates & Annual Charges 20%
User Charges & Fees 49%
2%
Interest & Investment Revenue Grants & Contributions
26%
Other Revenues
2018/19 Consolidated Operating Expenditures 8% Employee 21%
46%
Borrowing Materials & Contracts Depreciation Other Expenses
23% 2%
ϭϰϵ
GRIFFITH LGA PROPERTIES RATING CATEGORIES
Scale 1:50000 @ A0 1
0
1
2
3
4
kilometres
RATING PROPERTIES BUSINESS FARMING FARMING IRRIGABLE NON RATABLE RESIDENTIAL Map compiled by GCC GIS Section 09/04/2013
INSET
DISCLAIMER: DISCLAIMER: This map/plan map/plan has has been been compiled compiled from from various various sources, sources, both both This formal the publisher publisher formal and and informal. informal. While While all all care care has has been been taken, taken, the does does not not warrant warrant the the accuracy accuracy of of the the map/plan. map/plan. To the the extent extent permitted permitted by by law, law, Griffith Griffith City City Council Council explicitly explicitly To rejects rejects responsibility responsibility for for any any injury, injury, loss loss or or damage damage arising arising out out of of any any inaccuracy, inaccuracy, error error or or omission omission contained contained in in the the map/plan. map/plan. The The user user of of the the map/plan map/plan agrees agrees to to use use itit only only on on this this condition. condition. Users Users are are invited invited to to notify notify Griffith Griffith City City Council Council of of any any apparent apparent inaccuracies inaccuracies or or discrepancies discrepancies discovered discovered by by them. them.
SEE INSET
5
Statement of Revenue Policy - Program Operating Results 2017/2018 2017 15/16 Actual
2018 16/17 Budget
2018 17/18 Budget
(1,331,215)
(2,320,592)
(1,971,428)
1,513,942
1,715,988
1,376,110
206,769
274,318
264,707
389,496
(330,286)
(330,611)
(191,435)
(232,602)
(231,663)
253,697
256,269
259,399
62,262
23,667
27,736
451,758
(306,619)
(302,875)
(506,058)
(590,580)
(860,913)
675,376
673,180
1,009,704
169,318
82,600
148,791
(1,535,908)
(1,867,081)
(1,932,204)
2,104,305
2,236,114
2,264,501
0
2,000
2,000
568,397
371,033
334,297
(1,258,597)
(1,852,117)
(1,750,783)
1,354,594
1,810,845
1,822,697
95,997
(41,272)
71,914
(994,200)
(1,155,404)
(1,148,517)
1,012,682
1,194,106
1,170,964
18,482
38,702
22,447
Council Executive
Total Operating Income Total Operating Expenditure Total Discretionary Expenditure
Total Council Executive Council Chambers/Offices
Total Operating Income Total Operating Expenditure
Total Council Chambers/Offices TOTAL GOVERNANCE Administration/Secretarial
Total Operating Income Total Operating Expenditure
Total Administration/Secretarial Finance
Total Operating Income Total Operating Expenditure Total Discretionary Expenditure
Total Finance Human Resources
Total Operating Income Total Operating Expenditure
Total Human Resources Information Technology
Total Operating Income Total Operating Expenditure
Total Information Technology Central Supply Services
AUTHORITY
Page 1 of 11
Statement of Revenue Policy - Program Operating Results 2017/2018 2017 15/16 Actual
2018 16/17 Budget
2018 17/18 Budget
(236,059)
(272,189)
(300,097)
291,154
300,300
329,704
55,095
28,111
29,607
(522,899)
(586,713)
(593,385)
664,640
720,378
724,200
141,741
133,665
130,815
(882,833)
(916,668)
(932,772)
Total Operating Expenditure
963,800
1,028,519
1,033,931
Total Works Management
80,967
111,851
101,159
(419,886)
(514,955)
(618,448)
468,302
515,102
528,576
0
132,000
150,000
48,416
132,147
60,128
(4,190,571)
(3,891,238)
(4,042,201)
2,869,504
3,089,423
3,232,872
(477)
0
0
0
30,000
60,000
Central Supply Services
Total Operating Income Total Operating Expenditure
Total Central Supply Services Customer Service Management
Total Operating Income Total Operating Expenditure
Total Customer Service Management Works Management
Total Operating Income
Civil Infrastructure & Asset Services
Total Operating Income Total Operating Expenditure Total Discretionary Expenditure
Total Civil Infrastructure & Asset Services Fleet Management
Total Operating Income Total Operating Expenditure Total Discretionary Income Total Discretionary Expenditure
Total Fleet Management
(1,321,544)
(771,815)
(749,329)
TOTAL ADMINISTRATION
(143,131)
85,022
149,829
(195,016)
(148,955)
(172,140)
566,931
575,714
601,369
371,915
426,759
429,229
Fire Protection
Total Operating Income Total Operating Expenditure
Total Fire Protection
AUTHORITY
Page 2 of 11
Statement of Revenue Policy - Program Operating Results 2017/2018 2017 15/16 Actual
2018 16/17 Budget
2018 17/18 Budget
Total Operating Income
(85,843)
(112,045)
(93,700)
Total Operating Expenditure
149,334
167,419
184,096
63,492
55,374
90,396
(215,905)
(198,145)
(184,100)
403,751
395,526
431,154
187,845
197,381
247,054
Total Operating Income
(2,253)
0
0
Total Operating Expenditure
67,791
35,880
37,995
65,538
35,880
37,995
688,789
715,394
804,674
(135,302)
(105,525)
(109,400)
Total Operating Expenditure
501,243
491,597
552,187
Total Discretionary Income
(12,864)
(37,200)
(9,300)
Total Discretionary Expenditure
69,067
37,200
169,711
Total Health Services
422,144
386,072
603,198
(204)
(500)
(400)
5,108
4,500
4,800
4,904
4,000
4,400
(3,704)
(3,200)
(3,700)
7,313
20,500
18,000
3,609
17,300
14,300
Animal Control
Total Animal Control Ranger Services
Total Operating Income Total Operating Expenditure
Total Ranger Services State Emergency Services
Total State Emergency Services TOTAL PUBLIC ORDER & SAFETY Health Services
Total Operating Income
Immunisation
Total Operating Income Total Operating Expenditure
Total Immunisation Insect & Vermin Control
Total Operating Income Total Operating Expenditure
Total Insect & Vermin Control Noxious Weeds
AUTHORITY
Page 3 of 11
Statement of Revenue Policy - Program Operating Results 2017/2018 2017 15/16 Actual
2018 16/17 Budget
2018 17/18 Budget
(143,561)
(127,642)
(126,500)
300,021
288,948
296,429
Total Discretionary Income
(8,000)
4,000
0
Total Discretionary Expenditure
45,275
4,000
0
Total Noxious Weeds
193,735
169,306
169,929
TOTAL HEALTH
624,392
576,678
791,827
Total Operating Expenditure
423,044
442,948
482,847
Total Discretionary Income
(53,576)
(8,425)
(5,425)
Total Discretionary Expenditure
39,486
28,486
11,850
Total Community Services Mang'T
408,954
463,009
489,272
(14,274)
(13,500)
(14,000)
23,938
25,159
26,340
9,664
11,659
12,340
(34,746)
(37,000)
(35,750)
65,986
82,438
83,773
31,240
45,438
48,023
15,184
15,692
15,392
15,184
15,692
15,392
465,042
535,798
565,027
(82,643)
(82,740)
(84,300)
Total Operating Expenditure
53,673
72,779
61,454
Total Housing
(28,969)
(9,961)
(22,846)
Noxious Weeds
Total Operating Income Total Operating Expenditure
Community Services Mang'T
Senior Citizens Centre
Total Operating Income Total Operating Expenditure
Total Senior Citizens Centre Other Community Services
Total Operating Income Total Operating Expenditure
Total Other Community Services Education
Total Operating Expenditure
Total Education TOTAL COMMUNITY SERVICES & EDUCATI Housing
Total Operating Income
AUTHORITY
Page 4 of 11
Statement of Revenue Policy - Program Operating Results 2017/2018 2017 15/16 Actual
2018 16/17 Budget
2018 17/18 Budget
(226,171)
(246,500)
(242,000)
2,089,102
2,332,452
2,542,236
(35,085)
0
(60,000)
32,744
20,000
160,000
1,860,591
2,105,952
2,400,236
(601,850)
(558,000)
(492,000)
1,690,777
1,761,385
1,686,044
1,088,926
1,203,385
1,194,044
Total Operating Income
(35,985)
(38,000)
(38,460)
Total Operating Expenditure
383,497
419,908
431,767
347,512
381,908
393,307
(201,816)
(206,000)
(206,000)
774,443
720,504
769,093
572,627
514,504
563,093
(470,923)
(633,574)
(434,500)
529,230
580,268
588,696
58,307
(53,306)
154,196
204,615
214,880
217,680
204,615
214,880
217,680
(3,923,589)
(4,080,232)
(4,197,090)
2,651,475
2,803,023
2,855,132
Strategic Planning
Total Operating Income Total Operating Expenditure Total Discretionary Income Total Discretionary Expenditure
Total Strategic Planning Development Approvals
Total Operating Income Total Operating Expenditure
Total Development Approvals Street & Gutter Cleaning
Total Street & Gutter Cleaning Urban Stormwater Drainage
Total Operating Income Total Operating Expenditure
Total Urban Stormwater Drainage Public Cemeteries
Total Operating Income Total Operating Expenditure
Total Public Cemeteries Public Conveniences
Total Operating Expenditure
Total Public Conveniences Domestic Waste Management
Total Operating Income Total Operating Expenditure
AUTHORITY
Page 5 of 11
Statement of Revenue Policy - Program Operating Results 2017/2018 2017 15/16 Actual
2018 16/17 Budget
2018 17/18 Budget
(1,272,114)
(1,277,209)
(1,341,958)
(1,149,445)
(1,141,588)
(1,163,620)
Total Operating Expenditure
804,352
1,036,773
1,044,272
Total Other Waste Management
(345,093)
(104,815)
(119,348)
(2,460,042)
(2,271,690)
(2,500,000)
1,825,432
2,014,328
1,981,978
Total Discretionary Expenditure
183,466
0
0
Total Waste Processing
(451,143)
(257,362)
(518,022)
(1,021,988)
(1,005,855)
(1,047,790)
1,530,360
1,568,415
1,551,146
Total Discretionary Income
(14,625)
(75,642)
(50,079)
Total Waste Management Admin
493,748
486,918
453,277
23,347
23,671
42,000
23,347
23,671
42,000
2,552,354
3,228,565
3,415,659
(9,996,754)
(10,379,169)
(10,610,652)
8,044,687
9,112,301
8,952,674
Total Discretionary Expenditure
275,322
112,500
240,000
Total Potable Water Supplies
(1,676,745)
(1,154,368)
(1,417,978)
(211,911)
(234,500)
(240,650)
Total Operating Expenditure
89,077
113,698
123,726
Total Raw Water Supplies
(122,834)
(120,802)
(116,924)
Total Domestic Waste Management Other Waste Management
Total Operating Income
Waste Processing
Total Operating Income Total Operating Expenditure
Waste Management Admin
Total Operating Income Total Operating Expenditure
Other Sanitation & Garbage
Total Operating Expenditure
Total Other Sanitation & Garbage TOTAL HOUSING & COMMUNITY AMENITIE Potable Water Supplies
Total Operating Income Total Operating Expenditure
Raw Water Supplies
Total Operating Income
AUTHORITY
Page 6 of 11
Statement of Revenue Policy - Program Operating Results 2017/2018 2017 15/16 Actual
2018 16/17 Budget
2018 17/18 Budget
(11,057)
(1,500)
(2,000)
5,411
1,100
1,500
(72,691)
0
0
70,197
0
0
Water Private Works
Total Operating Income Total Operating Expenditure Total Discretionary Income Total Discretionary Expenditure
Total Water Private Works
(8,140)
(400)
(500)
TOTAL WATER SUPPLIES
(1,807,720)
(1,275,570)
(1,535,402)
(8,886,801)
(8,917,128)
(9,217,949)
7,863,462
8,049,725
8,259,816
Total Discretionary Expenditure
427,004
217,500
150,000
Total Sewer Supplies
(596,335)
(649,903)
(808,133)
TOTAL SEWER SERVICES
(596,335)
(649,903)
(808,133)
(172,904)
(165,978)
(165,600)
969,359
940,073
1,029,052
(7,429)
(18,168)
0
5,248
23,779
0
794,274
779,706
863,452
(193,254)
(144,974)
(159,878)
488,585
483,163
465,575
(3,758)
0
0
1,963
0
0
293,535
338,189
305,697
Total Operating Income
(23,138)
(18,250)
(17,250)
Total Operating Expenditure
271,309
270,299
285,545
Sewer Supplies
Total Operating Income Total Operating Expenditure
Library Services
Total Operating Income Total Operating Expenditure Total Discretionary Income Total Discretionary Expenditure
Total Library Services Pioneer Park Museum
Total Operating Income Total Operating Expenditure Total Discretionary Income Total Discretionary Expenditure
Total Pioneer Park Museum Griffith Regional Art Gallery
AUTHORITY
Page 7 of 11
Statement of Revenue Policy - Program Operating Results 2017/2018 2017 15/16 Actual
2018 16/17 Budget
2018 17/18 Budget
(44,970)
(28,000)
0
Total Discretionary Expenditure
38,228
54,452
0
Total Griffith Regional Art Gallery
241,429
278,501
268,295
(416,610)
(511,780)
(378,600)
1,316,404
1,455,990
1,339,688
(92,000)
(6,327)
0
Total Discretionary Expenditure
52,731
80,004
10,000
Total Griffith Regional Theatre
860,524
1,017,887
971,088
(1,432,818)
(1,434,000)
(1,480,500)
2,229,622
2,300,010
2,399,155
Total Discretionary Expenditure
19,678
0
0
Total Aquatic Facilities
816,482
866,010
918,655
Total Operating Income
(29,482)
(32,017)
(32,000)
Total Operating Expenditure
791,332
903,061
833,163
Total Discretionary Income
(4,345)
(1,455)
0
Total Sporting Grounds
757,505
869,589
801,163
(33,252)
(35,838)
(36,603)
3,254,176
3,486,069
3,479,470
(12,190)
0
0
10,065
2,125
0
3,218,799
3,452,356
3,442,867
(103,420)
(102,500)
(102,000)
Griffith Regional Art Gallery
Total Discretionary Income
Griffith Regional Theatre
Total Operating Income Total Operating Expenditure Total Discretionary Income
Aquatic Facilities
Total Operating Income Total Operating Expenditure
Sporting Grounds
Passive Recreation
Total Operating Income Total Operating Expenditure Total Discretionary Income Total Discretionary Expenditure
Total Passive Recreation Sports Stadium
Total Operating Income
AUTHORITY
Page 8 of 11
Statement of Revenue Policy - Program Operating Results 2017/2018 2017 15/16 Actual
2018 16/17 Budget
2018 17/18 Budget
276,457
309,264
305,356
173,038
206,764
203,356
46,275
53,525
55,542
46,275
53,525
55,542
7,201,860
7,862,527
7,830,115
(140,545)
(87,340)
(110,000)
144
11,824
10,836
Sports Stadium
Total Operating Expenditure
Total Sports Stadium Sporting Bodies Subsidies
Total Operating Expenditure
Total Sporting Bodies Subsidies TOTAL RECREATION & CULTURE Quarry
Total Operating Income Total Operating Expenditure
Total Quarry
(140,401)
(75,516)
(99,164)
TOTAL MINING / MANUFACTURING & CON
(140,401)
(75,516)
(99,164)
(2,123,609)
(2,790,706)
(654,096)
7,589,263
7,755,837
7,999,787
(500,000)
0
0
7,721
0
50,000
4,973,375
4,965,131
7,395,691
(109,000)
(110,000)
(111,000)
459,302
491,615
487,284
350,302
381,615
376,284
260,098
276,336
308,652
260,098
276,336
308,652
(808,291)
(816,420)
(829,550)
817,272
828,639
867,222
Roads & Bridges
Total Operating Income Total Operating Expenditure Total Discretionary Income Total Discretionary Expenditure
Total Roads & Bridges Street Lighting
Total Operating Income Total Operating Expenditure
Total Street Lighting Footpaths & Cycleways
Total Operating Expenditure
Total Footpaths & Cycleways Griffith Airport
Total Operating Income Total Operating Expenditure
AUTHORITY
Page 9 of 11
Statement of Revenue Policy - Program Operating Results 2017/2018 2017 15/16 Actual
2018 16/17 Budget
2018 17/18 Budget
8,981
12,219
37,672
108,081
86,065
86,191
108,081
86,065
86,191
14,462
20,454
17,496
14,462
20,454
17,496
(1,017,466)
(950,000)
(950,000)
776,013
823,253
856,606
0
0
0
(126,747)
(93,394)
5,473,847
5,615,073
8,128,592
Total Operating Income
(53,392)
(67,300)
(68,900)
Total Operating Expenditure
595,451
564,324
710,817
(1,964)
(88,818)
0
1,500
69,506
10,000
541,595
477,712
651,917
Total Operating Income
(89,137)
(93,950)
(98,950)
Total Operating Expenditure
207,406
255,230
290,420
Total Discretionary Income
(16,408)
(18,500)
0
Total Discretionary Expenditure
94,127
23,500
0
Total Events Co- Ordinator
195,988
166,280
191,470
0
(500)
(500)
337,577
458,736
445,283
Total Griffith Airport Parking Areas
Total Operating Expenditure
Total Parking Areas Bus Shelters & Sheds
Total Operating Expenditure
Total Bus Shelters & Sheds Rta Work
Total Operating Income Total Operating Expenditure Total Discretionary Expenditure
Total Rta Work TOTAL TRANSPORT & COMMUNICATION
(241,453)
Visitors Centre
Total Discretionary Income Total Discretionary Expenditure
Total Visitors Centre Events Co- Ordinator
Economic Development
Total Operating Income Total Operating Expenditure
AUTHORITY
Page 10 of 11
Statement of Revenue Policy - Program Operating Results 2017/2018 2017 15/16 Actual
2018 16/17 Budget
2018 17/18 Budget
(30,815)
(95,000)
0
Total Discretionary Expenditure
29,746
110,000
8,000
Total Economic Development
336,508
473,236
452,783
39,418
36,191
39,667
Total Discretionary Expenditure
8,209
0
0
Total Land Development
47,627
36,191
39,667
(507,229)
(492,600)
(457,600)
525,033
542,965
562,368
17,804
50,365
104,768
(44,823)
(56,915)
(40,000)
Total Operating Expenditure
19,316
20,000
20,000
Total Unclassified Services
(25,506)
(36,915)
(20,000)
1,114,015
1,166,869
1,420,605
(15,960,197)
(16,183,096)
(16,652,906)
(15,960,197)
(16,183,096)
(16,652,906)
(8,075,395)
(3,259,925)
(5,774,360)
(8,075,395)
(3,259,925)
(5,774,360)
(24,035,592)
(19,443,021)
(22,427,266)
(8,151,120)
(1,964,703)
(2,066,512)
Economic Development
Total Discretionary Income
Land Development
Total Operating Expenditure
Griffith Livestock Mk Centre
Total Operating Income Total Operating Expenditure
Total Griffith Livestock Mk Centre Unclassified Services
Total Operating Income
TOTAL ECONOMIC AFFAIRS Rates and Charges
Total Operating Income
Total Rates and Charges General Purpose Grants
Total Operating Income
Total General Purpose Grants TOTAL GENERAL PURPOSE REVENUES
GRAND TOTAL
AUTHORITY
Page 11 of 11
2018/19 REVENUE POLICY GUIDELINES
2018/19 REVENUE POLICY ALPHABETICAL
INDEX Page No
Access Culvert Levels ............................................................................................ 77 Administration Fees (Property Lease) ................................................................... 13 Administration Fees (Aerodrome Leases) ............................................................. 79 Advertising - Bus Shelters ...................................................................................... 88 Advertising - Development Applications ................................................................. 22 Advertising - Road Closures .................................................................................. 76 Advertising - Visitors' Centre .................................................................................. 80 Aerodrome (Fees & Charges/Parking).............................................................. 78-79 Amusement Devices (Charges) ............................................................................. 19 Animal Control (Fees & Charges) ..................................................................... 14-15 Annual Report ........................................................................................................ 12 Application for Occupation Certificate .................................................................... 29 Application (Petrol Pumps, Oil Storage Units) ....................................................... 16 Appointment of Principal Certifying Authority (PCA) .............................................. 27 Approval to Operate – Amusement Devices .......................................................... 19 Approval to Operate - Mortuary.............................................................................. 19 Approval to Operate – Undertaker’s Business ....................................................... 19 Aquatic Leisure Centre...................................................................................... 67-69 Archiving Documents/Plans ................................................................................... 32 Art Gallery Fees ................................................................................................ 60-61 Asphaltic Concrete ................................................................................................. 76 Backflow Prevention Rentals ................................................................................. 54 Banna Avenue Kiosk .............................................................................................. 86 Banner (Street)....................................................................................................... 80 Binding ................................................................................................................... 13 Bins (Household Garbage Collection) .................................................................... 44 Bond Applications .................................................................................................. 40 Books - Failure to Return ....................................................................................... 57 Books - Overdue Fines .......................................................................................... 57 Books - Reservation of ........................................................................................... 57 Bridges ................................................................................................................... 76 Building Certificate (Section 6.25) .......................................................................... 31 (i)
2018/19 REVENUE POLICY GUIDELINES
Burley Griffin Room Rates ..................................................................................... 64 Business Papers .................................................................................................... 12 Busker’s Licence .................................................................................................... 42 Camping Grounds .................................................................................................. 42 Camping Licence ................................................................................................... 42 Car Parking (Construction)..................................................................................... 40 Car Parking (Annual Leases) ................................................................................. 86 Car Rental Firms Operating from Aerodrome ........................................................ 78 Caravan Parks, Camping Grounds and Manufactured Home Estates .................. 42 Cat Registration (Lifetime) ..................................................................................... 15 Cat Trap Hire.......................................................................................................... 15 Cattle ........................................................................................................... 14-15, 81 CCTV Footage Recovery Fees .............................................................................. 11 Cement Concrete ................................................................................................... 76 Cemeteries ........................................................................................................ 47-52 Certificate - Building ............................................................................................... 31 Certificate - Planning .............................................................................................. 32 Certificate - Subdivision.......................................................................................... 29 Certificates under Section 603 ............................................................................... 11 Collection Charges (Waste) ................................................................................... 44 Community Facilities Contributions…………………………………………… .......... 37 Complying Development ................................................................. 25, 27, 30-32, 34 Contribution Plans – Section 64 ............................................................................. 36 Contribution Plans – Section 7.11 & 7.12.......................................................... 37-39 Copy of Register (S.309 PoEO) ............................................................................ 18 Construction Certificate ..................................................................................... 25-27 Consultancy Fee (Development) ............................................................................ 40 Consultancy Fee (Heritage) ................................................................................... 40 Conveyance Fee .................................................................................................... 16 Council Chambers (Use of) .................................................................................... 86 Council Land (Use of) ............................................................................................ 86 Council Rates Notice (Copy of) .............................................................................. 11 Council Water Usage Notice (Copy of) .................................................................. 53 Culvert Levels......................................................................................................... 77 Dalton Park (Lease Fee) ........................................................................................ 74 Damage Deposits (Footpath Paving, Kerb & Guttering) ........................................ 40 Designed Development .......................................................................................... 22 Destruction/Removal of Stock (Animal Control) ..................................................... 15 Destruction/Removal of Stock (Saleyards & Markets) ........................................... 81 (ii)
2018/19 REVENUE POLICY GUIDELINES
Developer Removal of Trees on Council Streets & Road Verges.......................... 40 Development Application Fees.......................................................................... 21-24 Development Fees Miscellaneous .................................................................... 30-42 Development Application Fees - Advertising Signage ........................................... 21 Development Application Fees - Subdivision ......................................................... 21 Development Servicing Plans - Section 64 ............................................................ 36 Dwelling Entitlement Application ............................................................................ 30 Dishonoured Cheque Fee ...................................................................................... 13 Disposal Charges ................................................................................................... 45 Dog Registration (Charges) ................................................................................... 15 Drainage Developer Servicing Plan ....................................................................... 36 Drainage/Sanitary Diagram .................................................................................... 32 Drainage Reserves - Leasing for Business Purposes............................................ 88 Driveway Levels ..................................................................................................... 77 Engineering Works ........................................................................................... 75-77 Facsimile ................................................................................................................ 12 Fire Safety .............................................................................................................. 40 Flood Levels (Building Control) .............................................................................. 77 Food Inspections ................................................................................................... 19 Footpath Levels...................................................................................................... 77 Freedom of Information Act ................................................................................... 13 Garbage - Household Collection ............................................................................ 44 Garbage - Public Disposal and Putrescible Waste Charges .................................. 45 Griffith Regional Theatre ................................................................................... 62-66 Hazardous Wastes................................................................................................. 46 Health Administration Charges ......................................................................... 17-18 Heater to Install - Oil or Solid Fuel ........................................................................ 41 Hire of Gallery ................................................................................................... 60-61 Hire of Library Meeting Room ................................................................................ 58 Hire of Meeting Room at Council Offices ............................................................... 86 Hire of Plant ...................................................................................................... 82-85 Hire of Staff (Plant Hire) ......................................................................................... 83 Hire of Senior Citizens Hall .................................................................................... 20 Hire of Stadium ................................................................................................. 71-73 Hire of Traffic Facilities ........................................................................................... 76 Hoardings (Advertising Structures) ........................................................................ 19 Impounding Charges (Animals) ........................................................................ 14-15 Impounding Charges (Shopping Trolley, Skateboards, Cars, Sandwich Boards).16 Inspection and Resitting of Buildings (Development) ............................................. 41 (iii)
2018/19 REVENUE POLICY GUIDELINES
Inspection Fee (Development) ......................................................................... 28, 30 Inspection of Registers (S.309 POED) .................................................................. 18 Inspection – Beauty Salon ..................................................................................... 18 Inspection – Boarding House ................................................................................. 18 Inspection – Food Premises................................................................................... 19 Inspection – Hairdresser ........................................................................................ 18 Inspection – Legionella .......................................................................................... 17 Inspection – Noxious Weeds ................................................................................. 17 Inspection – Public Water Supply .......................................................................... 17 Inspection – Skin Penetration ................................................................................ 18 Inspection – Water Carters .................................................................................... 17 Inspection of Premises (s608 LGA) ....................................................................... 18 Integrated Development ......................................................................................... 22 Interest on Overdue Rates and Charges ............................................................... 11 Inter-Library Loans ................................................................................................. 58 Internet Access (Library) ....................................................................................... 57 Kerb and Gutter Contribution ................................................................................. 76 Kiosk (Banna Avenue) ........................................................................................... 86 Land (Use of Council Land) ................................................................................... 86 Landing Fees (Aerodrome) - Fees and Charges ................................................... 78 Lease - Aerodrome ........................................................................................... 78-79 Lease - Canteens ................................................................................................... 88 Lease –Car Parking ............................................................................................... 86 Lease – Crown Reserve......................................................................................... 88 Lease - Dalton Park ............................................................................................... 74 Lease - Property Administration Fee ...................................................................... 13 Lease - Road Reserves or Drainage Reserves ..................................................... 88 Lease - Road Reserves for Grazing Purposes ...................................................... 88 Lease - Terminal .................................................................................................... 78 Legionella Inspections ............................................................................................ 17 Library Fees ...................................................................................................... 57-58 Licence - Amusement Devices (Application and Renewal) .................................... 19 Licence - Camping ................................................................................................. 42 Licence Preparation Fee ........................................................................................ 87 Light Tokens for Sporting Grounds ........................................................................ 70 Livestock ........................................................................................................... 14-15 Low Pressure Sewer Provision of On-Site Works .................................................. 39 Local Environmental Plan – Copy of Document or Map......................................... 33 Long Service Levy.................................................................................................. 27 (iv)
2018/19 REVENUE POLICY GUIDELINES
Maintenance on Storage Charges ......................................................................... 15 Map Printing ........................................................................................................... 10 Map Sales ........................................................................................................ 10, 33 Map Special (Labour Per Hour) ............................................................................. 10 Meter Reading (Water) .......................................................................................... 12 Merchant Fees ....................................................................................................... 11 Micro-chipping Fee ................................................................................................. 15 Miscellaneous Fees (Development) ................................................................. 30-35 Modification of Consent (Development) ............................................................ 23-24 Mortuary - Approval to Operate .............................................................................. 19 Museums................................................................................................................ 59 Neighbourhood Parks Contributions ...................................................................... 39 Notification Costs (Development) .......................................................................... 22 Notification Costs (Impounded items) ................................................................... 15 Noxious Weeds ..................................................................................................... 17 Occupation Certificate (Development) ................................................................... 29 Occupation of a Car Parking Space ....................................................................... 40 Open Space Contributions ..................................................................................... 38 Outstanding Notices ............................................................................................... 32 Paddock Sales ....................................................................................................... 81 Parking Infringements ............................................................................................ 16 Parks and Gardens Fees ....................................................................................... 70 Petrol Pumps, Oil Storage Units etc on Public Places (Section 611) ..................... 16 Photocopying ......................................................................................................... 12 Photocopying - Library ........................................................................................... 57 Pioneer Park Museum Fees................................................................................... 59 Planning Certificate (Section 10.7) ......................................................................... 32 Plans (Copying)................................................................................................ 10, 33 Plant Hire Rates and Conditions ....................................................................... 82-85 Pollution Control ..................................................................................................... 18 Pool (Aquatic Leisure Centre) ........................................................................... 67-69 Pound Fees ....................................................................................................... 14-15 Principal Certifying Authority (PCA) ...................................................................... 27 Private Accredited Certifier…………………………………………………… ............ 30 Property Lease Administration Fee ........................................................................ 13 Property Rentals, Leases and Charges (Fees & Charges) ............................... 86-88 Property Transfers Listings .................................................................................... 11 Public Disposal (of Garbage) Charges.............................................................. 45-46 Public Information (Section 12 LGA) - Printing of Document ................................. 13 (v)
2018/19 REVENUE POLICY GUIDELINES
Public Libraries .................................................................................................. 57-58 Public Order & Safety (Fees & Charges) .......................................................... 14-16 Public Pool/Spa Inspection..................................................................................... 17 Putrescible Waste Disposal Charges ..................................................................... 45 Quarries & Pits ....................................................................................................... 75 Rate - Enquiry ........................................................................................................ 11 Rate - Search Fees ................................................................................................ 11 Rate - Status Report .............................................................................................. 11 Rating Structure ....................................................................................................... 1 Raw Water Charges............................................................................................... 54 Regional Theatre Fees...................................................................................... 62-66 Registration Charges (Dogs and Cats) .................................................................. 15 Relocated Home & Associated Structure ............................................................... 41 Residential Vacant Annual Charge (Garbage) ....................................................... 44 Replacement Bins (Waste) .................................................................................... 44 Review of Development Determination .................................................................. 24 Rezoning Application Fee (Development) .............................................................. 35 Road Closures (Advertising Cost) .......................................................................... 76 Road Closures (Application Fee) ........................................................................... 13 Road Opening Fees ............................................................................................... 76 Road Reserves - Leasing of for Business Purposes.............................................. 88 Road Reserves - Leasing of for Grazing Purposes................................................ 88 Roads and Traffic Management Contributions....................................................... 39 Roads - Urban/Sealed Rural/Unsealed Rural ........................................................ 76 Royalties on Gravel ................................................................................................ 75 Saleyards & Markets .............................................................................................. 81 Sanitary/Drainage Diagram .................................................................................... 32 Search Fees (Engineering & Works) ..................................................................... 10 Search Fees (Rates) .............................................................................................. 11 Section 12 (Public Information - Printing of Document) ......................................... 12 Section 121ZP Certificates ..................................................................................... 32 Section 10.7 (Planning Certificates) ....................................................................... 32 Section 6.25 (Building Certificates) ........................................................................ 32 Section 64 Development Servicing Plans .............................................................. 36 Section 68 Approvals ............................................................................................. 41 Section 603 Certificates ......................................................................................... 11 Section 611 (Petrol Pumps, Oil Storage Units etc on Public Places) ..................... 16 Section 735A Certificates ....................................................................................... 32 Section 88G Certificate .......................................................................................... 11 (vi)
2018/19 REVENUE POLICY GUIDELINES
Section 7.11 Contribution Plans ........................................................................ 37-39 Section 4.55 Modifications of Consent (Development) ..................................... 23-24 Senior Citizens Hall (Hire Rates)............................................................................ 20 Septic Tank Waste Disposal (Yenda) .................................................................... 56 Septic Tanks .......................................................................................................... 18 Service Charge for Public Authorities..................................................................... 76 Sewer Indemnity .................................................................................................... 40 Sewer Management Facility ................................................................................... 18 Sewerage Charges for Residential & Non-Residential.................................... 3-8, 56 Sewerage Development Servicing Plan ................................................................. 35 Sheep .......................................................................................................... 14-15, 81 Sporting Fields - Line Marking, Garbage Removal, Clean-up ................................ 70 Sports Stadium.................................................................................................. 71-73 Stamping of Additional Plans ................................................................................. 32 Stock - Destruction/Removal of (Animal Control)................................................... 15 Stock - Destruction/Removal of (Saleyards & Markets) ......................................... 81 Storage Charges (Car, Impounded Items) ............................................................ 16 Stormwater Management Service Charge ......................................................... 2, 43 Street Banner (Weekly Fee) .................................................................................. 80 Subdivision Certificate ............................................................................................ 29 Subdivision Fees .................................................................................................... 21 Surrender Fee - Animals ........................................................................................ 15 Swimming Pool (Certificates) ................................................................................. 40 Swimming Pool (Inspection) ................................................................................... 40 Tables & Chairs on Footpath - Licence .................................................................. 87 Tar & Bituminous Surface ...................................................................................... 76 Tender Document Fee ........................................................................................... 12 Terminal Lease Fee (Aerodrome) .......................................................................... 78 Theatre (Regional) Fees ................................................................................... 62-66 Trade Waste Charges ............................................................................................ 55 Tree Removal by Developers ................................................................................. 40 Truck Wash Charges (Saleyards) .......................................................................... 81 Tyres (Disposal Charges) ...................................................................................... 46 Undertakers Business - Approval to Operate......................................................... 19 Unsealed Pavement ............................................................................................... 76 Urban Roads/Sealed Rural Roads/Unsealed Rural Roads .................................... 76 Visitors' Centre ....................................................................................................... 80 Vending Vehicles ................................................................................................... 19 Waste Disposal Charges .............................................................................. 2, 44-46 (vii)
2018/19 REVENUE POLICY GUIDELINES
Waste Collection Services for Special Events ....................................................... 46 Waste Storage Container....................................................................................... 41 Water Allocations (Development)........................................................................... 39 Water Connection Fees ......................................................................................... 53 Water Meter Reading ............................................................................................ 12 Water Sampling Analysis ....................................................................................... 17 Water Supply (Fees and Charges) ............................................................... 9, 53-54 Water Supply Development Servicing Plan .......................................................... 36 Water Supply Extension ......................................................................................... 53 Water Meter Rental Charges ............................................................................ 53-54 Water Meter Testing Fee ....................................................................................... 53
(viii)
2018/19 REVENUE POLICY GUIDELINES
2018/19 REVENUE POLICY FUNCTION
O1
INDEX
ADMINISTRATION Engineering & Works ............................................................................... 10 Corporate Support Services ................................................................ 11-13
02
PUBLIC ORDER & SAFETY Animal Control .................................................................................... 14-15 Other ........................................................................................................ 16
03
HEALTH Administration & Inspection ................................................................ 17-18 Food Control ............................................................................................ 19
04
COMMUNITY SERVICES & EDUCATION Other Community Services ...................................................................... 20
05
HOUSING & COMMUNITY AMENITIES Development Assessment-Development ............................................ 21-24 Development Assessment-Construction ............................................ 25-29 Development Assessment-Miscellaneous .......................................... 30-42 Urban Stormwater & Drainage ................................................................. 43 Household Garbage Collection ................................................................ 44 Other Sanitary & Garbage .................................................................. 45-46 Public Cemeteries ............................................................................... 47-51 Cemetery-General ................................................................................... 52
06
WATER SUPPLIES ............................................................................ 53-54
07
SEWERAGE SERVICES .................................................................... 55-56
(ix)
2018/19 REVENUE POLICY GUIDELINES
08
RECREATION & CULTURE Public Libraries.................................................................................... 57-58 Museums ................................................................................................. 59 Art Galleries ........................................................................................ 60-61 Other Cultural Services ....................................................................... 62-66 Swimming Facilities............................................................................. 67-69 Parks and Gardens ................................................................................. 70 Other Sport & Recreation.................................................................... 71-74
10
MINING, MANUFACTURING & CONSTRUCTION Quarries & Pits ......................................................................................... 75
11
TRANSPORT & COMMUNICATION Urban Roads/Sealed Rural Roads/Unsealed Rural Roads...................... 76 Bridges ..................................................................................................... 77 Aerodromes ........................................................................................ 78-79
12
ECONOMIC AFFAIRS Tourism & Area Promotion....................................................................... 80 Saleyards & Markets ................................................................................ 81 Other Business Undertakings ............................................................. 82-88
(x)
2018/19 REVENUE POLICY GUIDELINES
2018/19 REVENUE POLICY GUIDELINES SETTING COUNCIL’S FEES AND CHARGES Council’s fees and charges for the various goods and services it delivers are set out in detail within the schedule which follows this section. When determining these fees and charges Council must consider the presence and/or influence of certain economic factors in addition to principles related to the setting of prices for goods or services. The following economic factors should be considered: ECONOMIC FACTOR • Public Good and the Exclusion Principle • Externalities
•
Merit Goods
•
Natural Monopoly
•
Capital Shortage
•
Consumer Protection and Safety Entrepreneurial Opportunities
•
•
Equity and Social Justice
DESCRIPTION Council services may be provided free of charge in those circumstances where it is impossible or impractical to exclude users who do not choose to pay (free-riders). Fees may be discounted to a level below the cost of a service where the production or consumption of the service generates external benefits to the community (hence creating a community service obligation) provided the cost of the discount does not exceed the estimated benefit. Fees may be discounted to a level below the cost of a service if full cost recovery would prevent or discourage its consumption and the service is regarded as having particular merit to the welfare and well-being of the community (hence creating a community service obligation) provided the discount does not exceed the estimated benefit. Where Council has a monopoly over the production of a good or service, prices should be set at a level to fully recover costs unless there are explicit community service obligations or equity objectives. Where Council produces a good or service, purely because of the unavailability of necessary capital, prices should be set at a level to fully recover costs and risk. Prices in respect of regulatory functions should be set at a level to fully recover costs unless there are explicit community service obligations or equity objectives. Where Council produces a good or service as a commercial pursuit, prices should be set a level to fully recover costs and risk. Fees may be discounted to a level below the cost of a service if it is a stated intention to subsidise the users because of equity or social objectives.
GOODS & SERVICES TAX The following schedule of fees and charges has been prepared using the best available information in relation to the GST impact on the fees and charges at the time of publication. However, there may be fees and charges for which council is not able to confirm the GST status. (xi)
2018/19 REVENUE POLICY GUIDELINES
Accordingly if a fee that is shown as being subject to GST is subsequently proven not to be subject to GST, then that fee will be amended by reducing the GST to nil. Conversely if council is advised that a fee which is shown as being not subject to GST becomes subject to GST then the fee will be increased but only to the extent of the GST.
FEE JUSTIFICATIONS The setting of Council’s fees and charges has been justified utilising the following seven (7) pricing principles: • • • • • • •
Annual charges Fee for Service Cost Recovery Statute Limited Commercial Basis New Fee New Charge
Some fees and charges may be based on two (2) or more pricing principles. The principle used for each fee is included in the following schedule adjacent to each fee or charge. Council has defined these categories as follows: PRICING PRINCIPLE
DESCRIPTION
1. Annual Charges
This pricing principle relates to fees or charges which are charged on a once per annum basis. Their simple calculation and one-off nature allow the fee or charge to be raised annually. 2. Fee for Service (User This principle is used where a specific individual cost Pays) can be isolated and charged to the user of the service. Here, the cost of the provision of the service is recovered from individual users.
(xii)
2018/19 REVENUE POLICY GUIDELINES
PRICING PRINCIPLE
DESCRIPTION
3. Cost Recovery
Here, the fee or charge is set in order to recover Council’s costs in the provision of the service. The costs or the provision the service must be able to be isolated to allow calculation. Fees or charges may be based on full or partial cost recovery dependent upon the nature of the fee or charge.
4. Statute Limited
These fees or charges are set by government regulation and thus the setting of these fees or charges is outside Council control.
5. Commercial Basis
This principle is applied to fees or charges whose setting may be affected by commercial or market factors. Here, Council considers market forces such as supply and demand and where the same or similar service is provided by private enterprise, the price charged by these private operators. These are new fees for the current year. They have not been raised or levied in previous years.
6. New Fee
7. New Charge
These are new charges for the current year. They have not been raised or levied in previous years.
The following abbreviations are used throughout the schedule of fees and charges: • • • • • • •
Annual charges Fee for Service Cost Recovery Statute Limited Commercial Basis New Fee New Charge
AN FS CR SL CB NF NC
(xiii)
2018/19 REVENUE POLICY GUIDELINES
2018/19 RATING STRUCTURE ORDINARY (GENERAL) SERVICES Proposed Rates for Increase of 2.3% By virtue of section 494 of the Local Government Act, 1993, council is required to make and levy an ordinary rate for each year on all rateable land in its area. Residential Base amount charge - $365.50 per rateable assessment (35% of total yield)
(2.9% variation)
Ad Valorem Rate - $0.006630 cents in the dollar based on the 2016 unimproved capital value of the property. (65% total yield)
(2.5% variation)
Business Base amount charge - $402.80 per rateable assessment (15% of total yield)
(3.8% variation)
Ad Valorem Rate - $0.008834 cents in the dollar based on the 2016 unimproved capital value of the property. (85% total yield)
(3.2% variation)
Farmland Base amount charge - $394.20 per rateable assessment (14% of total yield)
(1.1% variation)
Ad Valorem Rate - $0.007682 cents in the dollar based on the 2016 unimproved capital value of the property. (86% total yield)
(4.0% variation)
Farmland – Irrigable Intensive Base amount charge - $1,053.35 per rateable assessment (27% of total yield)
(-0.3% variation)
Ad Valorem Rate - $0.009018 cents in the dollar based on the 2016 unimproved capital value of the property. (73% total yield)
(1.6% variation)
Example of Residential Ordinary rates for 2018/19 (UCV (Unimproved Capital Land Value) x Ad Valorem Rate) + Base Rate = (80,000 x $0.006630) + $365.50 = $530.40 + $365.50 = $895.90
(1)
2018/19 REVENUE POLICY GUIDELINES
WASTE MANAGEMENT SERVICES 2018/19 Fee ($) Domestic Waste Service Charge 240 Litre Bin Weekly Service Domestic Capital Loan Charge Total Charge
% Variation
284.00 per annum 27.00 per annum 311.00 per annum (5.98 per week)
2.9% 3.8%
Residential Vacant Charge
39.00 per annum (0.75 per week)
2.6%
Domestic Recycling Service (Subject to contractual rise/fall agreement)
141.00 per annum (2.71 per week)
2.9%
520.00 per annum 27.00 per annum 547.00 per annum (10.52 per week)
3.0% 3.8%
660 Litre Bin Weekly Service Commercial Capital Loan Charge Total Charge
1369.00 per annum 27.00 per annum 1396.00 per annum (26.85 per week)
1.5% 3.8%
1100 Litre Bin Weekly Service Commercial Capital Loan Charge Total Charge
2284.00 per annum 27.00 per annum 2311.00 per annum (44.44 per week)
1.5% 3.8%
Industrial/Commercial Recycling Service (Subject to contractual rise/fall agreement)
299.00 per annum (5.75 per week)
3.1%
Industrial/Commercial Waste Service Charge (as requested) 240 Litre Bin Weekly Service Commercial Capital Loan Charge Total Charge
STORMWATER MANAGEMENT SERVICE 2018/19 Fee ($)
% Variation
Stormwater Management Service Charge Residential Premises – On Urban Land 12.50 per annum 5.00 per annum Exempt 25.00 per annum 25.00 per annum
Strata Residential Strata Business Vacant Other Commercial Premises–On Urban Land
(2)
0.0% 0.0% 0.0% 0.0%
2018/19 REVENUE POLICY GUIDELINES
2018/19 SEWER CHARGES 2017/18 Fee ($)
2018/19 Fee ($)
% Variation
Residential Properties (Per Tenement) -Existing Infrastructure & Operating Fee -Sewer Reclamation Plant Upgrade Levy Total Fee
575 235 810
599 235 834
4.2% 0.0%
Non Connected Residential Properties Within 75m Of Service -Existing Infrastructure & Operating Fee -Sewer Reclamation Plant Upgrade Levy Total Fee (Non Connected Residential)
411 231 642
426 231 657
3.6% 0.0%
See below
See below
Non Residential Properties
Sewer charges for non-residentials for 2018/19 will be based on:• Water Consumption (C) • Sewer Discharge Factor (SDF) • Annual Access Charge-Includes Sewer Reclamation Plant Upgrade Levy (AC) • Sewerage Treatment Charge (STC) • Trade Waste Administration Charge - if applicable (TWAC) • Trade Waste Usage Charge - if applicable (TWUC) • Trade Waste Discharge Factor - if applicable (TWDF)
Sewerage Access Annual Charge (Based on meter size) 2017/18
2018/19
Access Charge ($)
Access Charge ($)
20mm Water Meter Service -Existing Infrastructure & Operating Fee -Sewer Reclamation Plant Upgrade Levy Total Charge (20mm)
224 235 459
233 235 468
4.0% 0.0%
25mm Water Meter Service -Existing Infrastructure & Operating Fee -Sewer Reclamation Plant Upgrade Levy Total Charge (25mm)
351 261 612
366 261 627
4.3% 0.0%
32mm Water Meter Service -Existing Infrastructure & Operating Fee -Sewer Reclamation Plant Upgrade Levy Total Charge (32mm)
578 415 993
602 415 1,017
4.2% 0.0%
40mm Water Meter Service -Existing Infrastructure & Operating Fee -Sewer Reclamation Plant Upgrade Levy Total Charge (40mm)
901 635 1,536
937 635 1,572
4.0% 0.0%
Meter Size
(3)
% Variation
2018/19 REVENUE POLICY GUIDELINES
50mm Water Meter Service -Existing Infrastructure & Operating Fee -Sewer Reclamation Plant Upgrade Levy Total Charge (50mm)
1407 966 2,373
1464 966 2,430
4.1% 0.0%
80mm Water Meter Service -Existing Infrastructure & Operating Fee -Sewer Reclamation Plant Upgrade Levy Total Charge (80mm)
3602 2446 6,048
3746 2446 6,192
4.0% 0.0%
100mm Water Meter Service -Existing Infrastructure & Operating Fee -Sewer Reclamation Plant Upgrade Levy Total Charge (100mm)
5630 3811 9,441
5855 3811 9,666
4.0% 0.0%
150mm Water Meter Service -Existing Infrastructure & Operating Fee -Sewer Reclamation Plant Upgrade Levy Total Charge (150mm)
12664 8516 21,180
13171 8516 21,687
4.0% 0.0%
200mm Water Meter Service -Existing Infrastructure & Operating Fee -Sewer Reclamation Plant Upgrade Levy Total Charge (200mm)
12664 8516 21,180
13171 8516 21,687
4.0% 0.0%
CBD Area-Unmetered Services (Low) -Existing Infrastructure & Operating Fee -Sewer Reclamation Plant Upgrade Levy Total Charge (CBD Area-Low)
571 239 810
595 239 834
4.2% 0.0%
CBD Area-Unmetered Services (Medium) -Existing Infrastructure & Operating Fee -Sewer Reclamation Plant Upgrade Levy Total Charge (CBD Area-Medium)
1449 414 1,863
1506 414 1,920
3.9% 0.0%
CBD Area-Unmetered Services (High) -Existing Infrastructure & Operating Fee -Sewer Reclamation Plant Upgrade Levy Total Charge (CBD Area-High)
2607 633 3,240
2712 633 3,345
4.0% 0.0%
Non Connected Non Residential Properties Within 75m Of Service -Existing Infrastructure & Operating Fee -Sewer Reclamation Plant Upgrade Levy Total Charge (Non Connected Non Res.)
224 235 459
233 235 468
4.0% 0.0%
Sewerage Treatment Charge/kL
1.56
1.62
3.8%
Charge ($) 90 189 501
Charge ($) 99 192 504
10.0% 1.6% 0.6%
1.28
1.33
3.9%
Annual Trade Waste Administration Category 1 Category 2 Category 3 Trade Waste Treatment Charge/kL
(4)
2018/19 REVENUE POLICY GUIDELINES
Example Non-Residential Sewerage Charge for 2018/19 1. With No Trade Waste Assumptions: *Water Consumption (C) = 500kl/annum *Sewerage Discharge Factor (SDF) = 0.7 *20mm Water meter (AC) = $468 *Sewerage Treatment Charge (STC) = $1.62/kL Annual Bill = = = =
AC + (C x STC) x SDF $468.00 + (500 x 1.62) x 0.7 $468.00 + $567.00 $1,035.00
2. With Trade Waste (Complying Category 1) If the above example also had a trade waste discharge (of Category 1) with a: *Trade Waste Discharge Factor (TWDF) = 0.5 *Trade Waste Administration Charge (TWAC) = $99 *Trade Waste Usage Charge (TWUC) = $1.33/kL then the annual bill would be:Annual Bill = = = =
$1,035.00 + TWAC + (C x TWUC) x TWDF $1,035.00 + $99.00 + (500 x 1.33) x 0.5 $1,035.00 + $99.00 + $332.50 $1,466.50
3. With Trade Waste (Complying Category 2) If example number 1 also had a trade waste discharge (of Category 2) with a: *Trade Waste Discharge Factor (TWDF) = 0.5 *Trade Waste Administration Charge (TWAC) = $192 *Trade Waste Usage Charge (TWUC) = $1.33/kL then the annual bill would be: Annual Bill = = = =
$1,035.00 + TWAC + (C x TWUC) x TWDF $1,035.00 + $192.00 + (500 x 1.33) x 0.5 $1,035.00 + $192.00 + $332.50 $1,559.50
(5)
2018/19 REVENUE POLICY GUIDELINES
4. Non-Compliance Category 2 Trade Waste Discharge If example number 1 is a non-complying Category 2 trade waste discharger with a: *Trade Waste Discharge Factor (TWDF) = 0.5 *Trade Waste Administration Charge (TWAC) = $192 *Non-Compliance Charge (NCC) = $9.50/kL then the annual bill would be: Annual Bill = = = =
$1,035.00 + TWAC + (C x NCC) x TWDF $1,035.00 + $192.00 + (500 x 9.50) x 0.5 $1,035.00 + $192.00 + $2,375.00 $3,602.00
Concurrence & Charging Categories for Liquid Trade Waste Dischargers Business Types Animal Wash, Kennels B&B / Hostel / Boarding B&B / Hostel / Boarding + Laundry B&B / Hostel / Boarding + Serving Evening Meal Bakery Beautician Bus / Coach Depot Butcher (retail) CafĂŠ Cakes/ Patisserie Car / Truck Dealership (with mechanical workshop) Car / Truck Detailing (automatic and self wash) Car Detailing (Hand) Caravan Park (no kitchen) Caravan Park (with kitchen) Caravan Park (with waste dump) Chicken/Poultry Shop (includes BBQ) Commercial Caterer Commercial Swimming Pool Community Hall (with hot food) Community Hall (no hot food) Crafts Activities (<200L/day) Crafts Activities (>200L/day) Day Care Centre Day Care Centre (no food) Delicatessen (with hot food) Dental Surgery (no X-ray) plus plaster casts Dental Surgery (with X-ray) Doctor's Surgery (no X-ray) plus plaster casts Doctor's Surgery (with X-ray) Drink Manufacturer / Factory Equipment Hire-depending on what is for hire Fast Food Outlet
(6)
Concurrence Category A A A A A Exemption B A A A B B A A A S A A A A Exemption A A A A A A A A A C A or B A
Charging Category 1 2 2 2 2 1 2 2 2 2 2 2 2 1 2 2 2 2 2 2 1 1 2 2 1 2 1 2 1 2 3 2 2
2018/19 REVENUE POLICY GUIDELINES
Business Types Florist Food Processing Plant or Factory Fresh Fish Outlet Fruit & Vegetable Shop (retail) Fruit Packing Shed Function Centre Funeral Parlour Glass Cutting Hairdresser Hospital Hotel / Club (with food) Hotel / Club (no food) Industrial Waste Treatment Jewellery Shop (retail only) Jewellery Shop (with manufacturing) Joinery / Furniture Juice Bar KFC / Red Rooster etc. Laboratory (autopsy, dental, photographic, tertiary institution) Laboratory (large) Laundry / Dry Cleaning Mechanical Workshop Metalworks / Sheet Metal Fabrication Mobile Cleaning (eg. Bins) Motel Motel + Laundry Motel + Restaurant Nursing Home Optical Service (medical, educational) Optical Service (retail) Panel Beating Pet Shop (retail) Photographic (tray / manual) Pizza Shop Poultry Abattoir Printing (screen) Production Facility (large) Restaurant Saleyards School Service Station (covered fore court) Shopping Complex Sports Club / Kiosk Stone Working Supermarket Take Away Food Shop Tertiary Institution (TAFE) Transport Depot / Terminal Veterinary (with x-ray)
(7)
Concurrence Category Exemption C A A A A A B Exemption B A A C Exemption A C A A
Charging Category 1 3 2 2 2 2 1 2 1 2 2 2 3 1 2 3 2 2
B
2
C A A C A A A A A B A B A A A C B C A C A B B A A A A B B A
3 2 2 3 1 2 2 2 2 2 1 2 1 1 2 3 2 3 2 3 2 2 2 2 2 2 2 2 2 2
2018/19 REVENUE POLICY GUIDELINES
Sewer Discharge Factors (SDF) and Trade Waste Discharge Factors (TWDF)
Code
Description
SDF (%)
TWDF (%)
2/1
2% Sewerage / 1% Trade Waste
2
1
25/0
25% Sewerage / 0% Trade Waste
25
0
5/0
5% Sewerage / 0% Trade Waste
5
0
15/0
15% Sewerage / 0% Trade Waste
15
0
30/10
30% Sewerage / 10% Trade Waste
30
10
35/0
35% Sewerage / 0% Trade Waste
35
0
50/0
50% Sewerage / 0% Trade Waste
50
0
55/10
55% Sewerage / 10% Trade Waste
55
10
60/40
60% Sewerage / 40% Trade Waste
60
40
60/60
60% Sewerage / 60% Trade Waste
60
60
70/0
70% Sewerage / 0% Trade Waste
70
0
75/15
75% Sewerage / 15% Trade Waste
75
15
80/50
80% Sewerage / 50% Trade Waste
80
50
80/70
80% Sewerage / 70% Trade Waste
80
70
85/25
85% Sewerage / 25% Trade Waste
85
25
85/35
85% Sewerage / 35% Trade Waste
85
35
95/*
Category 2 Awaiting Inspection
95
*
95/0
95% Sewerage / 0% Trade Waste
95
0
95/70
95% Sewerage / 70% Trade Waste
95
70
95/90
95% Sewerage / 90% Trade Waste
95
90
100/30
100% Sewerage / 30% Trade Waste
100
30
0
0
0/0
0% Sewerage / 0% Trade Waste
* Category 2 awaiting inspection
(8)
2018/19 REVENUE POLICY GUIDELINES
2018/19 WATER CHARGES Potable Water Two part tariff comprising Access Fee based on Meter Size (see below) plus Consumption charge of step 1 (0-200 kL) & step 2 (> 200 kL) Consumption Charge 0-200 kL > 200 kL Crisis Accommodation Charge-one rate for entire consumption
2017/18 Charge / kL ($) 0.72 1.38
2018/19 Charge / kL ($) 0.72 1.41
% Variation
-
0.72
-
Meter Size
2017/18 Access Fee ($) 138 216 348 546 852 2175 3399 7650 7650 276 138 216 486 909 2907
2018/19 Access Fee ($) 138 216 348 546 852 2175 3399 7650 7650 276 138 216 486 909 2907
% Variation
20 mm 25 mm 32 mm 40 mm 50 mm 80 mm 100 mm 150 mm 200 mm Strata Neighbourhood Unmetered Property Yenda Dual CBD (C1) CBD (C2) CBD (C3)
0.0% 2.2%
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Raw Water Two part tariff comprising Access Fee based on Meter Size (see above) plus Consumption Charge (from zero usage) Consumption Charge
2017/18 Charge / kL ($) 0.36
2018/19 Charge / kL ($) 0.37
% Variation 2.8%
Standpipe Charges for the taking of water from designated standpipes at Griffith (Oakes Rd) and Yenda (Mirrool Ave) are: Standpipe (metered) potable â&#x20AC;&#x201C; per kilolitre Standpipe (metered) non potable â&#x20AC;&#x201C; per kilolitre
$2.30 $0.85
Nature Strips The rebate for an additional 100kL of free water for publicly accessible nature strips or reserves will be available for the 2018/19 financial year. (9)
Fees for 2018/2019 01 ADMINISTRATION Engineering & Works
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
Map Sales - Black/White (each) (Shire, City & Village Maps)
34.00
35.00
CR
N
Special Maps (labour per hour) *
85.00
88.00
CR
N
Sale of Aerial Data
Negotiated Charge
Negotiated Charge
CR
N
Sale of Drone Data
-
Negotiated Charge
NC/CR
N
Sale of Spatial Data
Negotiated Charge
Negotiated Charge
CR
N
Special Maps Printing - Colour ** - A0 (1189mm x 841mm) - A1 (841mm x 594mm) - A2 (594mm x 420mm) - A3 (420mm x 297mm) - A4 (297mm x 210mm)
77.00 67.00 47.00 36.00 20.00
78.00 68.00 48.00 37.00 21.00
CR CR CR CR CR
N N N N N
Plans Printing - Colour - A0 (1189mm x 841mm) - A1 (841mm x 594mm) - A2 (594mm x 420mm) - A3 (420mm x 297mm)
51.00 34.00 28.00 19.00
52.00 35.00 29.00 20.00
CR CR CR CR
N N N N
Special Maps Printing - Black & White (with minimal colour component) - A0 (1189mm x 841mm) - A1 (841mm x 594mm) - A2 (594mm x 420mm) - A3 (420mm x 297mm) - A4 (297mm x 210mm)
34.00 23.00 15.00 10.00 7.00
35.00 24.00 16.00 11.00 7.50
CR CR CR CR CR
N N N N N
Search/Compilation Fees (per hour)
85.00
88.00
CB
N
Copying of Plans - Black & White - A1 (841mm x 594mm) - A2 (594mm x 420mm) - A3 (420mm x 297mm) - A0 (1189mm x 841mm)
16.00 13.00 9.00 25.00
17.00 14.00 10.00 26.00
CR CR CR CR
N N N N
Reduction of Plans - Black & White - From A2 to A3/A4 - From A1 to A3/A4 - From B1 to A3/A4 - From A0 To A3/A4
9.00 9.00 9.00 9.00
10.00 10.00 10.00 10.00
CR CR CR CR
N N N N
Scan & Save Plans to USB, CD or Email (per sheet scanned)
3.00
3.50
CR
N
DESCRIPTION
* Where more than 10-15 minutes are required to compile map. ** Majority of map must be colour
Page 10
Fees for 2018/2019 01 ADMINISTRATION Corporate Support Services
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
320.00
325.00
CB
N
350.00 70.00 350.00 70.00
355.00 70.00 355.00 70.00
CB CB CB CB
N N N N
7.5%
7.5%
SL
N
N/A
N/A
Search Fees (per hour) When Staff Research Information for Outside Firms
85.00
88.00
CB
N
Copy of Council Rate Notice (on Base Stock) - Official Coloured Copy - Black & White Copy
10.00 5.00
15.00 7.00
CR CR
N N
Certificates Under Section 603 Urgency Fee - Certificate to be Available Within 24 hrs (additional)
80.00 82.00
80.00 84.00
SL CB
N N
Certificates Under Section 88G Conveyancing Act Urgency Fee - Certificate to be Available Within 24 hrs (additional)
62.00 115.00
62.00 118.00
SL CB
N N
110.00 (minimum) 85.00/hour
115.00 (minimum) 90.00/hour
CR CR
N N
DESCRIPTION Rate Status Report (Hard Copy, CD-ROM, Diskette) Property Transfers Listings - Annual - Monthly - E-mail (annual) - E-mail (monthly) Interest on Overdue Rates and Charges (In accordance with Section 566 of the Local Government Act, 1993) Merchant Fees
CCTV Footage Recovery Fees (by subpoena) - 0 to 2 Hours of total footage extracted - For every hour thereafter
Page 11
Fees for 2018/2019 01 ADMINISTRATION Corporate Support Services cont.
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
110.00 120.00
110.00 130.00
CR CR
N N
Free of Charge
Free of Charge
1.00
1.00
FS
Y
1.45 1.65 3.65 2.65 2.65
1.50 1.70 3.70 2.70 2.70
FS FS FS FS FS
Y Y Y Y Y
Business Papers Paper Copy-Annual (available free-council's web page) Archived Business Paper (per copy) Business Paper - CD Rom (annual) Copy of Council Meeting (CD)
450.00 35.00 350.00 35.00
457.00 35.00 357.00 35.00
CR CR CR FS
N N N N
Annual Report Paper Copy (available free on council's web page) Annual Operational Plan/4 Year Delivery Plan (available free on council's web page) Long Term (10 years) Financial Plan (available free-council's web page)
71.00 71.00
72.00 72.00
71.00
72.00
CR CR CR CR
N N N N
Tender Document Fee (As required) - Quotation - Tender - Tender (large or including plans)
106.00 178.00 335.00
108.00 181.00 341.00
CR CR CR
N N N
Search/Compilation Fees (per hour)
85.00
88.00
CB
N
Scan & Save Plans to USB, CD or Email (per sheet scanned)
3.00
3.50
CR
N
DESCRIPTION Water Meter Reading Urgency Fee (available within 24 hours additional) Public Information Schedule 1 Government Information (Public Access) Regulation 2009 Printing of Document (If copies of documents are required, copying fee payable in accordance with Council's Revenue Policy) Photocopying/Printing (per A4 page) - Black & White (First A4 Black & White Page Free) Printing (per A4 page) - Colour Photocopying/Printing (per A3 page) - Black & White Printing (per A3 page) - Colour Facsimile - Local (per A4 page) Facsimile - STD (per A4 page) Note: Refer Development Assessment Section for photocopying fees relating to Planning documents.
Page 12
Fees for 2018/2019 01 ADMINISTRATION Corporate Support Services cont.
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
25.00
25.50
FS
Y
As advised by the Office of the Information Commissioner
As advised by the Office of the Information Commissioner
SL
N
- Personal Information (per hour-after first 20 hours)
As advised by the Office of the Information Commissioner
As advised by the Office of the Information Commissioner
SL
N
- Non-personal Information (per hour)
As advised by the Office of the Information Commissioner
As advised by the Office of the Information Commissioner
SL
N
Dishonoured Cheque Administration Fee (Includes Bank Fees)
30.00
30.00
CR
N
Property Lease Administration Fee (Renewals/alterations/legal assistance/advertising re execution of documents)
394.00
401.00
FS
Y
Actual Costs
Actual Costs
CR
Y
DESCRIPTION Binding (cost per bound document) Government Information (Public Access) Act 2009 - Application Fee per application for requests GIPA Act 2009
Processing Fees Under the GIPA Act 2009
Permanent Road Closure Application Fee
Page 13
Fees for 2018/2019 02 PUBLIC ORDER & SAFETY Animal Control
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
Livestock - Animals 1-20 (per head) - Animals thereafter (per head)
55.00/day 28.00/day
55.00/day 30.00/day
FS FS
N N
- Domestic Pets - Dogs or cats (excluding feral): 1st day impound
55.00/day
55.00/day
FS
N
double to initial impounding charge
double to initial impounding charge
FS
N
- Impoundment of an attacking dog in serious attack
-
500.00
NF/FS
N
- Additional impounding fee for attacking dog
-
100/day
NF/FS
N
Impounding Penalty In addition to the impounding infringement notice may be issued according to the seriousness of the situation or subsequent repetition of impounding involving the same animal or owner of appliance/article/animal These charges are: - Abandon animal in public place (impounding)
As Gazetted
As Gazetted
SL
N
- Animal not under effective control
As Gazetted
As Gazetted
SL
N
- Veterinary Charges (costs actually incurred in providing treatment)
Actual Costs
Actual Costs
CR
N
- Trespass Charge - the charge above for impounding may be levied as a trespass charge and additional expense may be applied for damages to property, crops or garden
Actual Costs
Actual Costs
CR
N
- Driving/Transportation Charges
Actual Costs
Actual Costs
CR
N
- Ranger - Per Ranger (eg: stock, pollution etc)
210.00/hour
210.00/hour
CR
N
DESCRIPTION Impounding Fees Animals
- Subsequent impounding of the same animals within a twelve month period
Page 14
Fees for 2018/2019 02 PUBLIC ORDER & SAFETY Animal Control
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
50.00/day 35.00/day
55.00/day 30.00/day
CR CR
N N
Notification Costs - Where owner known - Where owner unknown - Advertisement cost
Actual Costs Actual Costs Actual Costs
Actual Costs Actual Costs Actual Costs
CR CR CR
N N N
Destruction/Removal of Stock - Sheep - Cattle
Actual Costs Actual Costs
Actual Costs Actual Costs
CR CR
N N
Lifetime Dog and Cat Registration - Entire animal - Desexed animal - Desexed animal sold by eligible pound - Pensioner rate (desexed animal) - Registered breeder (entire or desexed pet)
As Gazetted As Gazetted As Gazetted As Gazetted As Gazetted
As Gazetted As Gazetted As Gazetted As Gazetted As Gazetted
SL SL SL SL SL
N N N N N
- Trained Assistance Animals
As Gazetted
As Gazetted
SL
N
- Farm Working Dogs
As Gazetted
As Gazetted
SL
N
15.00 35.00/pup 15.00
20.00 15.00/pup 15.00
CR CR CR
Y Y Y
Surrender Fee - Dogs (Tuesday) - Dogs (Wednesday-Monday) - Cats (Tuesday) - Cats (Wednesday-Monday)
70.00 70.00 70.00 70.00
70.00 70.00 70.00 70.00
FS FS FS FS
N N N N
Cat Trap Hire - Deposit (bond) - Hire (per week) - Destruction (per animal)
66.00 30.00 70.00
65.00 30.00 70.00
CR CR CR
N Y N
General Euthanasia & Disposal (per animal)
70.00
70.00
CR
N
Parvovirus Vaccine
10.00
15.00
CR
N
3.00 per day
3.00 per day
CR
N
DESCRIPTION Maintenance or Storage Charge - Livestock (impounding) - Pets - Dog or Cat (impounding)
Micro Chipping Fee - Micro chipping of animals by Council's Ranger - Litter of pups (3 or more) - Registered Rescue Groups (complying with clause 16d)
Boarding Fee After 3 Days Grace
Page 15
Fees for 2018/2019 02 PUBLIC ORDER & SAFETY Other
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
198.00
202.00
CR
N
119.00 167.00
121.00 170.00
AN AN
N N
Shopping Trolleys - Conveyance (per trolley) - Storage (per day)
75.00 10.00
76.00 10.00
SL SL
N N
Motor Vehicles - Conveyance (per motor vehicle) - Storage (per day)
320.00 12.00
325.00 12.00
SL SL
N N
Miscellaneous Small Articles - Conveyance (per article) - Storage (per day)
45.00 8.00
46.00 8.00
SL SL
N N
Miscellaneous Large Articles - Conveyance (per article) - Storage (per day)
88.00 10.00
90.00 10.00
SL SL
N N
Administration Fee
40.00
41.00
FS
N
280.00 365.00 + cost of removal
285.00 372.00 + cost of removal
SL SL
N N
35.00 103.00
36.00 105.00
SL SL
N N
Parking Infringements
As Gazetted
As Gazetted
SL
N
Parking Infringements - Private Parking area where agreement has been made with Council
As Gazetted
As Gazetted
SL
N
DESCRIPTION Petrol Pumps, Oil Storage Units, etc, on Public Places (Section 611-Local Government Act 1993) Application Annual Fee - Single pump or unit - Dual pump or unit
Advertising Structures (Removal) - per structure - Sandwich Board - Other Advertising Structures Notification Costs (Removal) - Where owner known - Advertisement Cost
Page 16
Fees for 2018/2019 03 HEALTH Administration & Inspection
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
238.00 163.00 250.00
245.00 168.00 258.00
FS FS FS
N N N
97.00 N/C 250.00
100.00 N/C 258.00
FS
N
FS
N
Inspection - Public Water Supply
163.00 per inspection plus actual sampling analysis cost
168.00 per inspection plus actual sampling analysis cost
FS
N
Inspection - Water Carters
163.00 per inspection plus actual sampling analysis cost
168.00 per inspection plus actual sampling analysis cost
FS
N
DESCRIPTION Public Health Public Pool/Spa (excludes motels, hotels, schools) - First Swimming Pool/Spa (inspection & sample) - Each additional Swimming Pool/Spa (inspection & sample) - Sample (non-compliance) Semi-Public Pool/Spa (includes motels, hotels, schools) - First Swimming Pool/Spa (inspection & sample) - Excludes schools - Second Swimming Pool/Spa (inspection) - Satisfactory - Second & there-after Swimming Pool/Spa (inspection & sample) (Non Compliant)
Inspections - Legionella - First Cooling tower, warm water systems & hot water systems (inspection & sample) # - Each additional tower (inspection & sample) # - Sample (non-compliance) # - Review of Risk Management Plans
238.00
245.00
FS
N
97.00 250.00 -
100.00 258.00 50.00 per hour
FS FS NF/CR
N N N
Inspections - Noxious Weeds - Urban Fees (per assessment) - Rural Fees (per assessment)
236.00 401.00
243.00 413.00
FS FS
N N
Pool Water Microbiology (total Plate Count, Faecal Coliforms, Pseudomonas Aeruginosa)
349.00 first sample & 157.00 each additional sample thereafter
359.00 first sample & 162.00 each additional sample thereafter
FS
N
Water Microbiology (total Coliforms, Faecal Coliforms, E.coli, Total Nitrogen, Suspended Solids, pH, Electrical Conductivity) Rainwater Tanks (total Coliforms, E.coli, pH, Electrical Conductivity, Calcium, Magnesium, Iron, Copper, Lead, Zinc) House & Garden Bore Water (total Coliforms, E.coli, Electrical Conductivity, Calcium, Magnesium, Iron, Manganese, Arsenic, pH, Sodium, Sulphate, Nitrate, Fluoride, Chloride)
320.00 first sample & 168.00 each additional sample thereafter 315.00 first sample & 168.00 each additional sample thereafter 374.00 first sample & 227.00 each additional sample thereafter
330.00 first sample & 173.00 each additional sample thereafter 325.00 first sample & 173.00 each additional sample thereafter 385.00 first sample & 234.00 each additional sample thereafter
FS
N
FS
N
FS
N
Actual Cost
Actual Cost
FS
N
Water Sampling Analysis
Other Water Sample Analysis
# If samples done simultaneously with the contractor differ in outcome, re-sampling will be charged as actual costs relating to laboratory tests. Normal inspection fees will not be charged as indicated above.
Page 17
Fees for 2018/2019 03 HEALTH Administration & Inspection
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
373.00
384.00
CR
N
179.00
184.00
CR
N
60.00
62.00
CR
N
126.00 per hour or part thereof (minimum half hour)
130.00 per hour or part thereof (minimum half hour)
FS
N
126.00 per hour or part thereof (minimum half hour)
130.00 per hour or part thereof (minimum half hour)
FS
N
271.00/inspection 123.00/inspection
279.00/inspection 127.00/inspection
FS FS
N N
As Gazetted As Gazetted
As Gazetted As Gazetted
SL SL
N N
Actual Cost, min 212.00 (min 1 hour)
Actual Cost, min $218.00 (min 1 hour)
CR
N
Inspection of Register (s.309 PoEO)
18.00
19.00
FS
N
Copy of Register (s.309 PoEO)
23.00
24.00
FS
N
Inspection of Premises (s.608 LGA) - per hour, pro rata - minimum
169.00 95.00
174.00 98.00
CR CR
Y Y
DESCRIPTION Sewerage Management Facility Application for Approval to Install or Construct an Onsite Sewerage Management Facility (Includes initial licence to operate the facility and an inspection) Application for Approval to Alter or Add to an Existing Onsite Sewerage Management Facility (Includes an inspection) Note: Alterations to an existing tank include:- The disposal system (eg. absorption trench or irrigation area) is being relocated or replaced; or - The septic tank is being relocated or upgraded; or - Additional plumbing fixtures are being added to the system; or - Bedrooms are being added to the dwelling that will increase the daily wastewater flow to the system; or - The existing septic system is malfunctioning and is being repaired Application for approval to operate an onsite Sewerage Management Facility (Includes an inspection) Note: The approval to operate is required according to the risk category of the septic system Re-inspection of Outstanding Matters for Approval to Operate an Onsite Sewage Management System
Additional Operational Inspection (per hour)
Note: Operating an onsite Sewerage Management Facility without an approval, or operating the facility otherwise than in accordance with an approval, is guilty of an offence Inspections: - Boarding House - Hairdresser/Beauty Salon/Skin Penetration Pollution Control: - Prevention Notice - (s.95, PoEO) - Clean Up Notice - (s.91, PoEO) Compliance Cost Notice (s.104, PoEO)
Note: All inspections require 24 hour notice. Late notice inspection may be permitted subject to availability of Staff and also upfront payment of 50% surcharge per inspection Page 18
Fees for 2018/2019 03 HEALTH Food Control
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
- Low Risk Premises - Pre Package (per hour or part there of) #
174.00
179.00
FS
N
- Medium Risk Premises (1 annual inspection) #
174.00
179.00
FS
N
- High Risk Premises (2 annual inspection) #
277.00
285.00
FS
N
28.00/per inspection 174.00/hour or part thereof
29.00/per inspection 179.00/hour or part thereof
FS
N
FS
N
174.00
179.00
FS
N
- Additional inspection
174.00/hour or part thereof
179.00/hour or part thereof
FS
N
- Temporary & special events that include food stalls - levied on event organiser (excludes not for profit organisations)
174.00/hour or part thereof
179.00/hour or part thereof
FS
N
- Temporary & special events that include food stalls - levied on event organiser (not for profit organisations)
81.00/per hour of part thereof
83.00/per hour of part thereof
FS
N
Cost plus 20%
Cost plus 20%
CR
N
DESCRIPTION Inspections - Food Premises
- Administration Charge (s12 Food Regulation 2000) - Category C Food Premises # - Not For Profit premises (2 annual inspections)
Food School # Low Risk, Medium & High Risk and Category C Food Premises, Classified by NSW Food Authority. Hoarding - not exceeding 12m2 - exceeding 12m2
Amusement Device (excludes Council endorsed events/festival & Griffith Show) - Approval to Operate - Renewal licence per machine (per annum) Vending Vehicle - Approval to Operate (note: fee will be a pro rata amount based on date of application in respect to end of financial year) Annual Approval (includes 1 inspection) (note: fee will be a pro rata amount based on date of approval in respect to end of financial year) Inspection Health Administration - Operate undertakers business/mortuary - Inspections - Undertaker's Business - Inspections - Mortuary
156.00/month
161.00/month
AN
N
156.00 + 5.00 per additional m2 > 12m2
161.00 + 6.00 per additional m2 > 12m2
AN
N
69.00 + 53.00/machine 48.00 + 5.00/machine
71.00 + 55.00/machine 49.00 + 6.00/machine
FS FS
N N
391.00/vehicle
403.00/vehicle
SL
N
174.00/vehicle
179.00/vehicle
AN
N
174.00/hour or part thereof
179.00/hour or part thereof
FS
N
174.00/inspection 174.00/inspection
285.00 179.00/inspection 179.00/inspection
NC/CR FS FS
N N N Page 19
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 04 COMMUNITY SERVICES & EDUCATION Other Community Services 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
48.00 15.00
49.00 16.00
CR CR
Y Y
Casual Hires Community Groups - Hire Fee (per session) - Bond (refund if left in clean & tidy condition) - Cleaning Fee (if required)
115.00 170.00 50.00/hour
115.00 170.00 60.00/hour
FS FS FS
Y Y Y
Public Meetings/Seminars - Hire Fee (per hour) - Bond (refunded if left in a clean and tidy condition) - Cleaning Fee (per hour)
60.00/hour Nil Nil
60.00/hour Nil Nil
FS CR CR
Y N Y
260.00 300.00 50.00/hour 520.00 Hirer to arrange at own discretion
260.00 300.00 60.00/hour 520.00 Hirer to arrange at own discretion
CB CR CR CR FS
Y N Y N Y
10.00 At Cost
10.00 At Cost
CR CR
Y Y
DESCRIPTION SENIOR CITIZENS HALL - HIRE RATES Regular User Groups (Hirers using the Centre more than 4 times per year) - Regular User Groups - Senior Community Regular User Groups
Private Bookings - Hire Fee - Bond (refunded if left in a clean and tidy condition) - Cleaning Fee (Hirer given choice, if cleaner is to be engaged) - Bond (18th & 21st birthday parties) - Security Officer to close 18th & 21st Birthday parties if necessary BBQ Hire - Hire Fee - Replacement of Key
Page 20
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Development Assessment - Development
DESCRIPTION
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
Development Application (Fees as determined under Part 15 Division 1 - Fees & Charges of the Environmental Planning and Assessment Regulation 2000) If two or more fees are applicable
The sum of those fees
The sum of those fees
SL
N
For each development application > $50,000 referred to in the below table a fee is remitted to the Dept. of Planning & Infrastructure
0.64% per $1,000
0.64% per $1,000
SL
N
Development involving the erection of a building, the carrying out of work or the demolition of a work or a building, and having an estimated cost within the range specified in the Table below-excluding dwellings value $100,000 or less
See Table Below
See Table Below
110.00 170.00 + 3.00
110.00 170.00 + 3.00
SL SL SL
N N N
$50,001 - $250,000 PLUS an additional fee for each $1,000 (or part of $1,000) by which the estimated cost exceeds $50,000
352.00 +
352.00 +
SL
N
3.64
3.64
SL
N
$250,001 - $500,000 PLUS an additional fee for each $1,000 (or part of $1,000) by which the estimated cost exceeds $250,000
1160.00 +
1160.00 +
SL
N
2.34
2.34
SL
N
$500,001 - $1,000,000 PLUS an additional fee for each $1,000 (or part of $1,000) by which the estimated cost exceeds $500,000
1745.00 +
1745.00 +
SL
N
1.64
1.64
SL
N
$1,000,001 - $10,000,000 PLUS an additional fee for each $1,000 (or part of $1,000) by which the estimated cost exceeds $1,000,000
2615.00 +
2615.00 +
SL
N
1.44
1.44
SL
N
More than $10,000,000 PLUS an additional fee for each $1,000 (or part of $1,000) by which the estimated cost exceeds $10,000,000
15875.00 +
15875.00 +
SL
N
1.19
1.19
SL
N
285.00 +
285.00 +
SL
N
93.00
93.00
SL
N
455.00
455.00
SL
N
760.00
1,000.00
SL
N
665.00 +
665.00 +
SL
N
65.00
65.00
SL
N
330.00 +
330.00 +
SL
N
53.00
53.00
SL
N
330.00 +
330.00 +
SL
N
65.00
65.00
SL
N
Table - Estimated Cost Up to $5,000 $5,001 - $50,000 PLUS an additional fee for each $1,000 (or part of $1,000) of the estimated cost
Advertising Structure/Signage PLUS for each advertisement in excess of one, or the fee calculated in accordance with the table below whichever is the greater (Note that this excludes sandwich boards) Development Involving the Erection of a Dwelling-House with an Estimated Construction Cost of $100,000 or Less Residential Flat Development which is Required to be Referred to a Design Review Panel Under SEPP No. 65 Design Quality of Residential Flat Development Additional to any other fees payable Subdivision of Land (other than Strata subdivision) Involving the Opening of a Public Road PLUS for each additional lot created Subdivision of Land (other than Strata subdivision) Not Involving the Opening of a Public Road PLUS for each additional lot created Strata Subdivision PLUS for each additional lot created
Page 21
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Development Assessment - Development 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
285.00
285.00
SL
N
920.00
920.00
SL
N
Post determination advertising in local newspaper Designated development Advertised development
22.50 2,220.00 1,105.00
24.00 2,220.00 1,105.00
CR SL SL
N N N
Prohibited development
1,105.00
1,105.00
SL
N
Development for which an environmental planning instrument or development control plan requires notice to be given otherwise than as referred to above
1,105.00
1,105.00
SL
N
- Written Notification 1 - 5 Neighbours
80.00
80.00
CR
N
- Written Notification 6 - 10 Neighbours
120.00
120.00
CR
N N
DESCRIPTION Development Not Involving the Erection of a Building, the Carrying out of a Work, the Subdivision of Land or the Demolition of a Building or Work Designated Development Additional to any other fees payable Advertising
Notification
- Written Notification 11 + Neighbours
180.00
180.00
CR
- Written Notification of a significant proposal
332.00
332.00
CR
N
140.00 320.00
140.00 320.00
SL SL
N N
140.00 320.00
140.00 320.00
SL SL
N N
Development that Requires Concurrence An additional processing fee, plus a concurrence fee for payment to each concurrence authority, are payable in respect of an application for development that requires concurrence under the Act or an environmental planning instrument Additional processing fee payable to Council PLUS: Concurrence fee payable to other concurrence authorities Integrated Development An additional processing fee, plus an approval fee for payment to each approval body, are payable in respect of an application for integrated development Additional processing fee payable to Council PLUS: Approval fee payable to other approval authorities Staged Development Application The maximum fee payable for a staged development application in relation to a site, and for any subsequent development application for any part of the site, is the maximum fee that would be payable if a single development application only was required for all the development on the site
Page 22
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Development Assessment - Development
DESCRIPTION Site Compatibility Certificate Affordable rental housing PLUS for each dwelling in the development Infrastructure PLUS for each hectare (or part of a hectare) of the area of land Seniors Housing Where the proposed development is for the purposes of a residential care facility (within the meaning of State Environmental Planning Policy {Housing for Seniors or People with a Disability} 2004) PLUS an additional fee per bed in the proposed facility in any other case PLUS per dwelling in the proposed development Modification of a Consent for Local Development Application under section 4.55 (1) of the Act Application under section 4.55 (1A) of the Act, or under section 4.56 (1) of the Act in respect of a modification which, in the opinion of the consent authority, is of minimal environmental impact Application under section 4.55 (2) of the Act, or under section 4.56 (1) of the Act in respect of a modification which, in the opinion of the consent authority, is not of minimal environmental impact, is If the fee for the original application was less than $100 If the fee for the original application was $100 or more:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
265.00 + 42.00
265.00 + 42.00
SL SL
N N
265.00 + 265.00
265.00 + 265.00
SL SL
N N
280.00 + 45.00 280.00 + 45.00
280.00 + 45.00 280.00 + 45.00
SL SL SL SL
N N N N
SL
N
SL
N
71.00 71.00 645.00 or 50% of the 645.00 or 50% of the original fee, whichever is original fee, whichever is the lesser the lesser
50% of the original fee
50% of the original fee
SL
N
In the case of an application with respect to a development application that does not involve the erection of a building, the carrying out of work or the demolition of a work or building
50% of the original fee
50% of the original fee
SL
N
In the case of an application with respect to a development application that involves the erection of a dwelling-house with an estimated cost of construction of $100,000 or less
190.00
190.00
SL
N
665.00
665.00
SL
N
760.00
760.00
55.00 85.00 + 1.50
55.00 85.00 + 1.50
SL SL SL
N N N
500.00 + 0.85
500.00 + 0.85
SL SL
N N
712.00 + 0.50
712.00 + 0.50
SL
N
987.00 + 0.40
987.00 + 0.40
SL SL SL
N N N
In the case of an application with respect to any other development application, as set out in the table to this clause Plus an additional amount if notice of the application is required to be given under section 4.55 (2) or 4.56 (1) of the Act Additional fee for development to which clause 115 (1A) applies Table - Estimated Cost Up to $5,000 $5,001 - $250,000 PLUS an additional fee for each $1,000 (or part of $1,000) of the estimated cost $250,001 - $500,000 PLUS an additional fee for each $1,000 (or part of $1,000) by which the estimated cost exceeds $250,000 $500,001 - $1,000,000 PLUS an additional fee for each $1,000 (or part of $1,000) by which the estimated cost exceeds $500,000 $1,000,001 - $10,000,000 PLUS an additional fee for each $1,000 (or part of $1,000) by which the estimated cost exceeds $1,000,000
Page 23
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
DESCRIPTION Modification of a Consent for Local Development More than $10,000,000 PLUS an additional fee for each $1,000 (or part of $1,000) by which the estimated cost exceeds $10.000,000 Modification of Development Application (prior to determination) Dwelling house and other ancillary development Dual occupancy/Multiple dwellings Commercial & Industrial Subdivision < 5 lots Subdivision 5 to 20 lots Subdivision > 20 lots Review of Determination A development application that does not involve the erection of a building, the carrying out of a work or the demolition of a work or building A development application that involves the erection of a dwelling-house with an estimated cost of construction of $100,000 or less Any other development application, as set out in the table below Table - Estimated Cost Up to $5,000
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Development Assessment - Development 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
4737.00 + 0.27
4737.00 + 0.27
SL SL
N N
120.00 315.00 315.00 131.00 251.00 360.00
120.00 315.00 315.00 131.00 251.00 360.00
FS FS FS FS FS FS
N N N N N N
50% of fee
50% of fee
SL
N
190.00
190.00
SL
N
SL
N
55.00
55.00
SL
N
85.00 + 1.50
85.00 + 1.50
SL SL
N N
$250,001 - $500,000 PLUS an additional fee for each $1,000 (or part of $1,000) by which the estimated cost exceeds $250,000 $500,001 - $1,000,000 PLUS an additional fee for each $1,000 (or part of $1,000) by which the estimated cost exceeds $500,000
500.00 + 0.85
500.00 + 0.85
SL SL
N N
712.00 + 0.50
712.00 + 0.50
SL SL
N N
$1,000,001 - $10,000,000 PLUS an additional fee for each $1,000 (or part of $1,000) by which the estimated cost exceeds $1,000,000
987.00 + 0.40
987.00 + 0.40
SL SL
N N
More than $10,000,000 PLUS an additional fee for each $1,000 (or part of $1,000) by which the estimated cost exceeds $10,000,000 Plus an additional amount if notice of the application is required to be given under section 8.3 of the Act Review of Modification Application An application under section 8.9 for a review of a decision (fee that was payable in respect of the application that is the subject of the review)
4737.00 + 0.27
4737.00 + 0.27
SL SL
N N
620.00
620.00
SL
N
50% of fee
50% of fee
SL
N
55.00
55.00
SL
N
150.00
150.00
SL
N
250.00
250.00
SL
N
2,540.00
2,540.00
FS
N
$5,001 - $250,000 PLUS an additional fee for each $1,000 (or part of $1,000) of the estimated cost
Review of Decision to Reject a Development Application If the estimated cost of the development is less than $100,000 If the estimated cost of the development is $100,000 or more and less than or equal to $1,000,000 If the estimated cost of the development is more than $1,000,000 Application Fee for Referral to Development Review Panel (Plus applicable Review of Determination Fee)
Page 24
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Development Assessment - Construction 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
157.00 $157.00 + 0.3% of value > $5,000
162.00 $162.00 + 0.3% of value > $5,000
CR
Y
CR
Y
value between $100,001 to $250,000
$183.00 + 0.25% of value > $100,000
$188.00 + 0.25% of value > $100,000
CR
Y
value > $250,000
$209.00 + 0.2% of value > $250,000
$215.00 + 0.2% of value > $250,000
CR
Y
DESCRIPTION Construction Certificates for Building Works & Complying Development Certificates Building Works Value value up to $5,000 value between $5,001 to $100,000
# Note: A 25% discount will be applicable if an applicant lodges & pays for the CC the same time of DA payment and also appoint Council as principal Certifying Authority. Note: this includes general inspections. # Value reflected on the construction certificate (CC) and complying development certificate (CDC) application should be a true reflection of actual construction cost.
Page 25
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
DESCRIPTION Civil Works Related to Subdivision
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Development Assessment - Construction 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
1 - 5 lots
325.00 per lot
335.00
CR
Y
6 - 20 lots
1,621.00 + 183.00 per lot > 5
1,675.00 + 188.00 per lot > 5
CR
Y
> 20 lots
6220.00 + 157.00 per lot > 20
6410.00 + 162.00 per lot > 20
CR
Y
Construction Certificate fee + extra 50%
Construction Certificate fee + extra 50%
CR
Y
Class 1 & Class 10 Domestic
146.00
150.00
CR
Y
Class 2-9, Class 10 Commercial/Industrial
262.00
270.00
CR
Y
1 - 20 lots
325.00
335.00
CR
Y
> 20 lots
596.00
614.00
CR
Y
# Express Construction Certificate - Authorised by Delegated Officer (Conditions Apply) # Additional Construction Certificate (Admin fee)
Civil Works - Subdivision (Additional Admin fee)
# Note: A 25% discount will be applicable if an applicant lodges & pays for the CC at the same time of DA payment and also appoint Council as principal Certifying Authority
Page 26
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Development Assessment - Construction
DESCRIPTION
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
Modification of Proposal After Issue of Construction Certificate or Complying Development Certificate for Building Works
- Minor Modification where no additional cost of amended works can be established
- Major Modification where additional cost of amended works can be established
The lesser of $262.00 or 50% of original Construction Certificate Application Fee
The lesser of $270.00 or 50% of original Construction Certificate Application Fee
The greater of $481.00 or The greater of $495.00 or 50% of original 50% of original Construction Certificate Construction Certificate Application Fee Application Fee
FEE JUSTIF.
REVISED GST APPLIC.
CR
Y
CR
Y
CR
Y
Civil Works - Subdivision - Any Number of Lots
50% of original Construction Certificate Application fee
50% of original Construction Certificate Application fee
CR
Y
Long Service Levy (Applies to all Construction Certificates $25,000 and above)
0.35% (or as amended by Act)
0.35% (or as amended by Act)
SL
N
No Charge
No Charge
Appointment of Principal Certifying Authority (PCA) - Notification of Appointment of PCA (Griffith City Council)
Page 27
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Development Assessment - Construction 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
Inspections Building # Class 1 - Each new dwellings
618.00
636.00
CR
Y
- An additional inspections in access of 4
155.00
160.00
CR
Y
314.00 209.00
323.00 215.00
CR CR
Y Y
200.00
206.00
CR
Y
167.00 per inspection
172.00 per inspection
CR
Y
167.00 per inspection
172.00 per inspection
CR
N
167.00 per inspection 167.00 per inspection 167.00 per inspection
172.00 per inspection 172.00 per inspection 172.00 per inspection
CR CR CR
N N N
- Between 1 - 5 lots
As mentioned in DA Consent
As mentioned in DA Consent
CR
N
- Between 6 - 20 lots
30 inspections
30 inspections
CR
N
- Between 21 - 50 lots
70 inspections
70 inspections
CR
N
- Greater than 50 lots up to 100 lots
120 inspections
120 inspections
CR
N
as per DA condition
as per DA condition
CR
N
No additional surcharge
No additional surcharge
CR
N
- Building works - Class 1 - Class 10 - payment required prior to inspection
$262.00 per hour or part thereof
$270.00 per hour or part thereof
CR
Y
- Building works - Class 2-9 & Class 10 Commercial/Industrial
$262.00 per hour or part thereof
$270.00 per hour or part thereof
CR
Y
$262.00 per hour or part thereof $262.00 per hour or part thereof
$270.00 per hour or part thereof $270.00 per hour or part thereof
CR
Y
CR
N
DESCRIPTION
# Class 10 - Class 10 building - Class 10 structure # * Class 2-9 - All building works / per inspection Health - Related to Class 1 - Class 10 buildings Civil Works Related to Building Works - Residential/Commercial/Industrial (which does not include subdivision) Related to Subdivision Works - Between 1 - 5 lots - Between 6 - 20 lots - Greater than 20 lots Number of Inspections
- Greater than 100 lots Same Day Inspection - Payment required prior to inspection Inspection Outside Normal Business Hours
- Civil works - building - Civil works - subdivision
# Note: A 25% discount will be applicable if an applicant lodges & pays for the CC at the same time of DA payment and also appoint Council as principal Certifying Authority * Poultry Shed Inspection Fee - price will be quoted upon request
Page 28
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Development Assessment - Construction 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
Class 1
$116.00 per certificate
$120.00 per certificate
CR
Y
Class 2 - Class 9 & Class 10 Commercial/Industrial
$167.00 per certificate
$172.00 per certificate
CR
Y
Class 10 Domestic
$95.00 per certificate
$98.00 per certificate
CR
Y
241.00
248.00
CR
N
180.00 per lot 820.00 + 139.00 per lot > 5 2708.00 + 122.00 per lot > 20
185.00 per lot 925.00 + 143.00 per lot > 5 3070.00 + 126.00 per lot > 20
CR
N
CR
N
CR
N
330.00 820.00 + 139.00 per lot > 5 2708.00 + 122.00 per lot > 20
340.00 925.00 + 143.00 per lot > 5 3070.00 + 126.00 per lot > 20
CR
N
CR
N
CR
N
100.00
103.00
CR
N
DESCRIPTION # Interim/Final Occupation Certificate
Subdivision Certificate Plan of Consolidation or Boundary Adjustment Torrens Title 1 - 5 lots 6 - 20 lots > 20 lots Strata & Community Title 1 - 5 lots (includes common property) 6 - 20 lots (includes common property) > 20 lots (includes common property) Amendment of Subdivision Certificate (due to inaccuracy by applicant)
Page 29
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Development Assessment - Miscellaneous 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
36.00 36.00 36.00 36.00
36.00 36.00 36.00 36.00
SL SL SL SL
N N N N
- Class 1 & 10 Buildings
$155.00 (per inspection) or $155.00 per hour (whichever is greater)
$160.00 (per inspection) or $160.00 per hour (whichever is greater)
CR
Y
- Class 2 - 9 Buildings
$200.00 (per inspection) or $200.00 per hour (whichever is greater)
$206.00 (per inspection) or $206.00 per hour (whichever is greater)
CR
Y
- Inspection outside normal business hours
Extra 50% surcharge per inspection
Extra 50% surcharge per inspection
CR
Y
2,112.00
2,175.00
CR
Y
403.00
415.00
CR
N
151.00 (per hour or part thereof)
155.00 (per hour or part thereof)
CR
N
DESCRIPTION Miscellaneous Payable by Private Accredited Certifier - Complying Development Certificate - Construction Certificate - Occupation Certificate - Subdivision Certificate Where Griffith City Council is not Appointed to Issue Construction Certificate (fees to be paid prior to inspection) Inspection Normal Business Hours
Mausoleum - Capella - Perpetual Maintenance per Crypt (payable as per DA condition) Dwelling Entitlement Application
Search Fee (enquiries that require > 1 hour research)
Page 30
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Development Assessment - Miscellaneous
DESCRIPTION
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
250.00 per dwelling
250.00 per dwelling
SL
N
Building Certificate - Class 1 building (together with any class 10 buildings on the site) or a class 10 building - Other class of building not exceeding 200m2
250.00
250.00
SL
N
250.00 + 0.50 per m2 > 200 m2
250.00 + 0.50 per m2 > 200 m2
SL
N
1,165.00 + 0.075 per m2 > 2000 m2
1,165.00 + 0.075 per m2 > 2000 m2
SL
N
- Where the application relates to a part of a building and that part consists of an external wall only or does not otherwise have a floor area
250.00
250.00
SL
N
- More than one inspection of the building before issuing a building certificate
90.00
90.00
SL
N
- Other class of building exceeding 200m2 but not exceeding 2,000 m2 - Other class of building exceeding 2,000m2
An additional fee may be charged for an application for a building certificate in relation to a building where the applicant for the certificate, or the person on whose behalf the application is made, is the person who erected the building or on whose behalf the building was erected and any of the following circumstances apply:
a) Where a development consent, complying development certificate or construction certificate was required for the erection of the building and no such consent or certificate was obtained
The maximum fee will be The maximum fee will be equivalent to the fee that equivalent to the fee that maybe imposed for a maybe imposed for a combined DA/CC, or a CC or combined DA/CC, or a CC or a CDC application a CDC application
SL
N
b) Where a penalty notice has been issued for an offence under section 4.2 (1) of the EP&A Act in relation to the erection of the building and the person to whom it was issued has paid the penalty required by the penalty notice in respect of the alleged offence (or if the person has not paid the penalty and has not elected to have the matter dealt with by a court, enforcement action has been taken against the person under Division 4 of Part 4 of the Fines Act 1996)
The maximum fee will be The maximum fee will be equivalent to the fee that equivalent to the fee that maybe imposed for a maybe imposed for a combined DA/CC, or a CC or combined DA/CC, or a CC or a CDC application a CDC application
SL
N
c) Where order No 2, 12, 13, 15, 18 or 19 in the Table to section 9.34 (1) of the EP&A Act has been given in relation to the building unless the order has been revoked on appeal
The maximum fee will be The maximum fee will be equivalent to the fee that equivalent to the fee that maybe imposed for a maybe imposed for a combined DA/CC, or a CC or combined DA/CC, or a CC or a CDC application a CDC application
SL
N
d) Where a person has been found guilty of an offence under the EP&A Act in relation to the erection of the building
The maximum fee will be The maximum fee will be equivalent to the fee that equivalent to the fee that maybe imposed for a maybe imposed for a combined DA/CC, or a CC or combined DA/CC, or a CC or a CDC application a CDC application
SL
N
e) Where the court has made a finding that the building was erected in contravention of a provision of the EP&A Act
The maximum fee will be The maximum fee will be equivalent to the fee that equivalent to the fee that maybe imposed for a maybe imposed for a combined DA/CC, or a CC or combined DA/CC, or a CC or a CDC application a CDC application
SL
N
13.00 53.00
13.00 53.00
SL SL
N N
Urgency Fee - issued within 5 days
Additional 112.00
Additional 112.00
FS
N
Application Withdrawn Prior to Inspection
50% fee retained
50% fee retained
FS
N
Application Withdrawn After Inspection
100% fee retained
100% fee retained
FS
N
Copy of a Building Certificate (uncertified) Copy of a Building Certificate (certified)
Page 31
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Development Assessment - Miscellaneous 2017/18 FEE ($) Includes GST (If Applic.) 167.00
2018/19 FEE ($) Includes GST (If Applic.) 167.00
FEE JUSTIF. FS
REVISED GST APPLIC. N
53.00 per lot
53.00 per lot
SL
N
133.00 66.50 33.25
133.00 66.50 33.25
SL SL SL
N N N
Additional 136.00 per lot 129.00 (per lot) 129.00 (per lot) 257.00 (per lot)
Additional 136.00 per lot 133.00 (per lot) 133.00 (per lot) 265.00 (per lot)
FS CR CR CR
N N N N
58.00
60.00
CR
N
Search and Provide Copy of Sanitary/Drainage Plan Direct to Plumbers etc.
22.00
23.00
CR
N
Sewer location diagram for the purpose of the Conveyancing Act
50.00
52.00
CR
N
Sewer location diagram with two internal drainage connection points
178.00
185.00
CR
N
For each additional point
26.00
27.00
CR
N
105.00
108.00
FS
N
46.00 + photocopying charge per page
48.00 + photocopying charge per page
FS
N
No Charge
No Charge
No Charge 118.00
No Charge 122.00
FS
N
DESCRIPTION Compliance Certificate - Administration Charge Planning Certificate - Section 10.7 (2) Combined Section 10.7 (2) and Section 10.7 (5) - 1st Lot - 2nd Lot - 3rd Lot & each subsequent Lot In special cases Council will allow a single certificate in rural areas for multiple lots within a single deposited plan where such lots share common attributes Prioritise Fee (issued by the end of the next working day) Section 735A Certificate (Outstanding Notices under LGA 1993) Section 121ZP (Outstanding Notices under EP&A Act 1979) Per Certificate Application Requesting Site Inspection Sanitary/Drainage Diagram Search and Provide a Copy of Sanitary/Drainage Plan for Conveyancing Purposes
Application withdrawn prior to being issued will receive a 50% refund Urgency fee (issued within 7 working days of lodgement) Preparation of Sanitary/Drainage Plan where there are no Existing Plans (see below) Copy of Building Plans Archiving Documents/Plans - All Complying Development & Development Applications (Class 1 & 10) - Development Applications (Class 2 - 9) & Subdivision - Electronically Submitted - Not Electronically Submitted
# Note: This fee will be refunded if the diagram is provided in AutoCAD format at completion of works
Page 32
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
05 HOUSING & COMMUNITY AMENITIES Development Assessment - Miscellaneous 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
Photocopying/Printing (per A4 page) - Black & White (First A4 Black & White Page Free) Printing (per A4 page) - Colour Photocopying/Printing (per A3 page) - Black & White Printing (per A3 page) - Colour Facsimile - Local (per A4 page) Facsimile - STD (per A4 page)
1.00
1.00
FS
N
1.45 1.65 3.65 2.65 2.65
1.50 1.70 3.70 2.70 2.70
FS FS FS FS FS
N N N N N
Search/Compilation Fees (per hour)
85.00
88.00
CB
N
Scan & Save Plans to USB, CD or Email (per sheet scanned)
3.00
3.50
CR
N
DESCRIPTION Planning Documents
Copy of LEP Document or Map - Written document without maps (uncertified) - Written document without maps (Certified) for use as evidence under section 10.8 (2) EP & A Act - Individual LEP Map sheets (A3 size certified copy) for use as evidence under section 10.8 (2) EP & A Act - Individual LEP Map sheets (AO size - Uncertified copy) - Individual LEP Map sheets (A1 size - Uncertified copy) - Individual LEP Map sheets (A2 size - Uncertified copy) - Individual LEP Map sheets (A3 size - Uncertified copy) - Individual LEP Map sheets (A4 size - Uncertified copy) - Complete Set (uncertified written document including uncertified A3 size colour copies of maps)
47.00
48.00
CR
N
53.00
53.00
SL
N
7.00
7.00
SL
N
53.00 26.00 13.00 7.00 3.00
53.00 26.00 13.00 7.00 3.00
SL SL SL SL SL
N N N N N
452.00
466.00
CR
N
No Charge
No Charge
-
150.00
155.00
CR
All Other Uncertified LEP Maps Charged as per General Mapping Products (refer to page 10) Engineering Guidelines (CD) Engineering Guidelines - Hard Copy (Colour)
N
Page 33
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Development Assessment - Miscellaneous 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
As per printing fees As per printing fees As per printing fees As per printing fees As per printing fees As per printing fees As per printing fees 66.00
As per printing fees As per printing fees As per printing fees As per printing fees As per printing fees As per printing fees As per printing fees 68.00
CR CR CR CR CR CR CR CR
N N N N N N N N
15.00 As per printing fees As per printing fees As per printing fees 33.00 As per printing fees 15.00
16.00 As per printing fees As per printing fees As per printing fees 34.00 As per printing fees 16.00
CR CR CR CR CR CR CR
N N N N N N N
3,650.00 non-refundable deposit + actual costs of preparation
3,760.00 non-refundable deposit + actual costs of preparation
CR
N
272.00
280.00
CR
N
- Area less than 2 ha
1,615.00 + investigation costs
1,664.00 + investigation costs
CR
N
- Area between 2 ha to 8 ha
3,238.00 + investigation costs
3,335.00 + investigation costs
CR
N
- Area exceeding 8 ha
6,485.00 + investigation costs
6,680.00 + investigation costs
CR
N
DESCRIPTION Development Control Plans (DCPs) & Contribution Plans - Documents (black & white copy) - Documents > 25 pages (black & white copy) - Documents (colour) - Documents > 25 pages (colour) - DCP No. 22 - Exempt and Complying Development - Comprehensive DCP (black & white copy) - Comprehensive DCP (colour copy) - Comprehensive DCP (CD) Other Planning Documents - Copy of Draft Review (CD) - Copy of Draft Review (colour hard copy) - Land use Strategy - Hard copy (black & white) - Land use Strategy - Hard copy (colour) - Land use Strategy - CD Rom - Other Planning Studies - Hard copy (black & white only) - Other Planning Studies - CD where available
Preparation of New Site-Specific DCPs
Land use Strategy Review - Registration of Interest (fees are non refundable) Application for inclusion in Land use Strategy Review (fees are non refundable)
Page 34
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Development Assessment - Miscellaneous FEE JUSTIF.
REVISED GST APPLIC.
- A site specific re-zoning application for an area less than 2ha (one zone)
3,045.00 non-refundable 3,136.00 non-refundable upfront fee + cost of upfront fee + cost of preparation of Local preparation of Local Environmental Study or Environmental Study or additional reports/studies additional reports/studies required required
CR
N
- Multiple zones or re-zoning of a site with area exceeding 2ha
6,090.00 non-refundable 6,273.00 non-refundable upfront fee + cost of upfront fee + cost of preparation of Local preparation of Local Environmental Study or Environmental Study or additional reports/studies additional reports/studies required required
CR
N
- A site specific re-zoning application for an area less than 2ha (one zone)
7,105.00 non-refundable 7,318.00 non-refundable upfront fee + cost of upfront fee + cost of preparation of Local preparation of Local Environmental Study or Environmental Study or additional reports/studies additional reports/studies required required
CR
N
- Multiple zones or re-zoning of a site with area > 2ha
12,180.00 non-refundable 12,545.00 non-refundable upfront fee + cost of upfront fee + cost of preparation of Local preparation of Local Environmental Study or Environmental Study or additional reports/studies additional reports/studies required required
CR
N
DESCRIPTION Re-Zoning Application/Amendment to Local Environmental Plan
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
NOTE: Fees will be determined based upon Council's staff and resources pricing policy. A deposit is required to be paid at time of lodgement Base Fee for Re-Zoning Applications Subject to Growth Strategy
Base fee for Re-Zoning Applications Not Part of Growth Strategy
Page 35
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Development Assessment - Miscellaneous 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
Water (per tenement) - Water Supply Development Servicing Plan No.1 - November 2012 Sewer (per tenement)
7,369.00
7,509.00
CR
N
- Sewerage Development Servicing Plan No. 1 - November 2012
5,165.00
5,263.00
CR
N
Drainage (per tenement) - Developer Servicing Plan - Collina Stormwater - Collina
4,066.00
4,143.00
CR
N
DESCRIPTION Section 64 Development Servicing Plans Calculation of Standard Local Water & Sewerage Equivalent Tenements (ET) Local Residential Water ET = 480kl/annum Local Sewer Discharge Factor (SDF) = 0.40
Page 36
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Development Assessment - Miscellaneous
DESCRIPTION
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
374.00 167.00 251.00 374.00
385.00 172.00 259.00 385.00
CR CR CR CR
N N N N
1,675.00 760.00 1,132.00 1,675.00
1,725.00 783.00 1,166.00 1,725.00
CR CR CR CR
N N N N
1,560.00 705.00 720.00 1,560.00
1,607.00 726.00 742.00 1,607.00
CR CR CR CR
N N N N
374.00 167.00 251.00 374.00
385.00 172.00 259.00 385.00
CR CR CR CR
N N N N
374.00 167.00 251.00 374.00
385.00 172.00 259.00 385.00
CR CR CR CR
N N N N
374.00 167.00 251.00 374.00
385.00 172.00 259.00 385.00
CR CR CR CR
N N N N
Section 7.11 Contribution Plans Community Facilities (per tenement) Existing Griffith (infill), Yenda, Bilbul, Rest of Griffith Residential - Precinct 1 Subdivision (per Lot) - Tenement (1 bedroom) - Tenement (2 bedroom) - Tenement (3+ bedroom) Residential - Precinct 2 Subdivision (per Lot) - Tenement (1 bedroom) - Tenement (2 bedroom) - Tenement (3+ bedroom) Residential - Precinct 3 Subdivision (per Lot) - Tenement (1 bedroom) - Tenement (2 bedroom) - Tenement (3+ bedroom) Residential - Precinct 4 Subdivision (per Lot) - Tenement (1 bedroom) - Tenement (2 bedroom) - Tenement (3+ bedroom) Residential - Hanwood, Yenda & Bilbul Subdivision (per Lot) - Tenement (1 bedroom) - Tenement (2 bedroom) - Tenement (3+ bedroom) All Other Development (Rural Residential, Small Holdings, Industry & Employment, Highway Service) General Mixes Use - All Precincts, Villages and the Residue of the Local Government Area - Subdivision (per Lot) - Tenement (1 bedroom) - Tenement (2 bedroom) - Tenement (3+ bedroom)
Page 37
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Development Assessment - Miscellaneous
DESCRIPTION Open Space (per tenement) Existing Griffith (infill), Yenda, Bilbul, Rest of Griffith Residential - Precinct 1 - Subdivision (per Lot) - Tenement (1 bedroom) - Tenement (2 bedroom) - Tenement (3+ bedroom) Residential - Precinct 2 - Subdivision (per Lot) - Tenement (1 bedroom) - Tenement (2 bedroom) - Tenement (3+ bedroom) Residential - Precinct 3 - Subdivision (per Lot) - Tenement (1 bedroom) - Tenement (2 bedroom) - Tenement (3+ bedroom) Residential - Precinct 4 - Subdivision (per Lot) - Tenement (1 bedroom) - Tenement (2 bedroom) - Tenement (3+ bedroom) Residential - Hanwood, Yenda & Bilbul - Subdivision (per Lot) - Tenement (1 bedroom) - Tenement (2 bedroom) - Tenement (3+ bedroom) All Other Development (Rural Residential, Small Holdings, Industry & Employment, Highway Service) General Mixes Use - All Precincts, Villages and the Residue of the Local Government Area - Subdivision (per Lot) - Tenement (1 bedroom) - Tenement (2 bedroom) - Tenement (3+ bedroom)
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
1,278.00 577.00 866.00 1,278.00
1,316.00 594.00 892.00 1,316.00
CR CR CR CR
N N N N
4,897.00 2,210.00 3,309.00 4,897.00
5,044.00 2,276.00 3,408.00 5,044.00
CR CR CR CR
N N N N
2,690.00 1,217.00 1,819.00 2,690.00
2,771.00 1,254.00 1,874.00 2,771.00
CR CR CR CR
N N N N
1,278.00 577.00 866.00 1,278.00
1,316.00 594.00 892.00 1,316.00
CR CR CR CR
N N N N
1,278.00 577.00 866.00 1,278.00
1,316.00 594.00 892.00 1,316.00
CR CR CR CR
N N N N
1,278.00 577.00 866.00 1,278.00
1,316.00 594.00 892.00 1,316.00
CR CR CR CR
N N N N
Page 38
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Development Assessment - Miscellaneous
DESCRIPTION Neighbourhood Parks (per tenement) - Collina Roads & Traffic Management (per tenement) - Residential - Existing Griffith (infill), Yenda, Bilbul, Collina, Rest of Griffith - Commercial/Industrial - Existing Griffith (infill), Yenda, Bilbul, Collina, Rest of Griffith Section 7.12 Development Contribution - Where the value of development < $100,000 - Where the value of development is between $100,000 and $200,000 - Where the value of development > $200,000 Note: Value of development is determined in accordance with Part 5B of the EPA Act 1979
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
628.00
647.00
CR
N
815.50
840.00
CR
N
1,096.00
1,129.00
CR
N
Nil 0.5% of value 1.0% of value
Nil 0.5% of value 1.0% of value
CR CR
N N
5,500.00
4,000.00
CR
Y
2,330.00 2,915.00 By Quotation By Quotation 420.00 260.00 2,385.00 -
2,100.00 2,500.00 900.00 10,000.00 By Quotation 300.00 300.00 2,900.00 4,900.00
CR CR NC/CR CR CR CR CR CR NC/CR
Y Y Y Y Y Y Y Y Y
By Quotation from PSS P/L
By Quotation from PSS P/L
CR
Y
8,305.00 By Quotation
7,200.00 By Quotation
CR CR
Y Y
CR
N
Low Pressure Sewer-Provision Of On Site Works Council has adopted the EOne Low Pressure Sewerage System. All equipment to be installed within Griffith Council are to be sourced from this supplier and may be purchased through Griffith City Council - Simplex Pumping Unit (Tank, Pump & Controller) GP2010ip including Low Voltage Protection - Simplex Poly Tank Only (2010 iP Tank) - Simplex Pump (Core) Unit Only (Extreme Pump Core) - Simplex Controller - Duplex Pumping Unit - Other Pumping Combinations - Boundary Kit With Box - Administration Charge/Pumping Unit Purchased including Sewer Diagram - Installation Of Simplex Pumping Units - Installation Of Duplex Pumping Units Note: All installations to be carried out only by accredited plumbers trained by Environment Group Ltd. Design Services For Low Pressure Sewer - Designers are required to have low pressure designs checked by a designer approved by Council. Council Uses the services of Steve Wallace from Pressure Sewer Solutions P/L Forward Funding Of Low Pressure Sewer On Site Works (includes installation & administration charge) - Cost for Simplex pumping unit (residential site) - Cost for non standard pumping unit Water Allocation Cash contribution from small developers without water allocations to purchase permanent high security water allocation.
- Fee (up to 2.0 ML) *
Market Rate (per ML) + Market Rate (per ML) + 20% of total value + 20% of total value + 150.00 administration fee 155.00 administration fee
* For contributions above 2.0 ML refer to Council's Water-Volumetric Contributions Policy (WS-CP-208)
Page 39
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Development Assessment - Miscellaneous
DESCRIPTION
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
127.00
131.00
CR
N
53.00
55.00
CB
N
134.00 278.00 659.00
138.00 286.00 679.00
FS FS FS
N N N
165.00 1,568.00
170.00 1,615.00
FS CR
N N
30% surcharge 5% surcharge
30% surcharge 5% surcharge
CR CR
N N
As Quoted 85.00/per hour 180.00/per hour No Charge
As Quoted 88.00/per hour 185.00/per hour No Charge
FS FS FS
N N N
103.00 52.00
106.00 54.00
FS FS
N N
FS
N
CR
N
Car Parking Contribution Construction Cost Per Square Metre NPR = Number of parking requires 30 = 30m2/ Parking space L = Cost of land per square metre C = Construction cost per square metre (annual CPI % increase applicable) Occupation of a Car Parking Space - Per space per day of occupation Bond (Administration Fee) - Outstanding works value up to $50,000 - Outstanding works value between $50,001 - $200,000 - Outstanding works value is greater than $200,000 Damage Deposits - Inspection - Refundable deposit for footpath paving and kerb & guttering Capital Works Surcharge (Bonds) - Incomplete Civil Works (amount equals total construction costs + 30%) - Maintenance for Civil Works (amount equals 5% of total construction costs) Consultancy - Urban Design Consulting Works - Administration Staff Fee (minimum $35.00) - Professional/Technical Staff - Simple Counter Enquiry Minuted Meeting with Professional Staff - First Hour - Every 15 Minutes After First Hour Heritage Consultancy - First & Second Consultation - Third Consultation and thereafter Fire Safety - Lodgement of an Annual Fire Safety Statement (within specified time) - Penalty Fee for Late Submission of an Annual Fire Safety Statement - Fire Safety Inspection Sewer Indemnity - Preparation of Deed of Agreement - new - Preparation of Deed of Agreement - amendment/change of ownership Application for Swimming Pool Certificate of Compliance Private Swimming Pool Inspection Program # - First Inspection - Reinspection (if required) - Fee for Council Officer to Process Registration of Pool Developer Removal Of Trees On Council Streets & Road Verges - Large Established Trees Over 6 Metres - Trees Between 4 - 6 Metres - Smaller Trees
No Charge
No Charge
157.00 per consultation
162.00 per consultation
No Charge
No Charge
As Gazetted
As Gazetted
CR
N
157.00 (per hour or part thereof)
162.00 (per hour or part thereof)
CR
Y
235.00 28.00 150.00
242.00 29.00 150.00
CR CR SL
N N N
103.00 100.00 10.00
106.00 100.00 11.00
CR CR CR
N N Y
7000.00 per tree 5000.00 per tree 3000.00 per tree
7000.00 per tree 5000.00 per tree 3000.00 per tree
CR CR CR
N N N
# Where a CPR sign is provided by Council, an additional $20 will be charged to recover costs. Page 40
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Development Assessment - Miscellaneous
DESCRIPTION
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
103.00 103.00
106.00 106.00
FS FS
N N
103.00 103.00 525.00 103.00 103.00
106.00 106.00 541.00 106.00 106.00
FS FS FS FS FS
N N N N N
124.00
128.00
FS
N
185.00
191.00
FS
N
Section 68 Approval Activities (Local Government Act, 1993) Section 68 LGA Inspections - Drainage Inspection (Int/Ext) - Sewered area Class 1 (up to 2 inspections) - Drainage Inspection (Int/Ext) - Sewered area Class 10 (up to 2 inspections) Drainage Inspection (Int/Ext) - Sewered area Class 2-9 1 - 15 fixtures 16 - 30 fixtures > 30 fixtures - Stormwater-where drainage system available Class 1 (up to 2 inspections) - Stormwater-where drainage system available Class 10 (up to 2 inspections) - Stormwater-where drainage system available Class 2-9 floor area up to 500m2 - Stormwater-where drainage system available Class 2-9 floor area > 500m2 Transport of Waste - Approval to operate (per vehicle) - Where disposal is not within the Griffith LGA licensed waste management facility - Fine (waste disposal log book not maintained) Approval to Place Waste Storage Container in a Public Place (bins in excess of 240 ltr) - Application Fee - Rental (per month) Inspection and Resitting of Buildings
209.00
209.00
CR
N
317.00
317.00
SL
N
1,030.00
1,030.00
CB
N
116.00 169.00
116.00 169.00
CR CB
N N
155.00/hour or part thereof
160.00/hour or part thereof
FS
N
227.00 + 134.00/hour or part thereof + $1.00 per km (return trip) outside City of Griffith LGA
235.00 + 138.00/hour or part thereof + $1.00 per km (return trip) outside City of Griffith LGA
FS
N
Moveable Dwellings & Associated Structure Application - value up to $5,000
-
NC/CR
N
- value between $5,001 to $100,000
-
162.00 $162.00 + 0.3% of value > $5,000
NC/CR
N
- value between $100,001 to $250,000
-
$188.00 + 0.25% of value > $100,000
NC/CR
N
- value > $250,000
-
$215.00 + 0.2% of value > $250,000
NC/CR
N
- Within Council area
- Outside Council area
0 -125m2 (gross floor area)
$62.00 + $3.12/m2
Replaced by above
2
126 -310m2 (gross floor area)
$463.00 + $1.76/m >125m2
Replaced by above
2
> 310m2 (gross floor area)
$798.00 + $0.88/m >310m2
Replaced by above
Page 41
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Development Assessment - Miscellaneous 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
-
285.00 285.00 285.00 285.00 285.00
NC/CR NC/CR NC/CR NC/CR NC/CR
N N N N N
309.00
318.00
FS
N
- Application to install
278.00
285.00
FS
N
Camping Licence - To occupy land upon which a dwelling is being erected
148.00
153.00
FS
N
Caravan Parks, Camping Grounds & Manufactured Home Estates - Initial Application to operate per site - 12 sites or less
25.00 300.00
26.00 309.00
SL SL
N N
- Reinspection for non-compliance per site - 12 sites or less
25.00 300.00
26.00 309.00
SL SL
N N
- Renewal, continuation or periodic inspection per site - 17 sites or less
12.00 204.00
13.00 210.00
SL SL
N N
- Reinspection for non-compliance per site - 17 sites or less
12.00 204.00
13.00 210.00
SL SL
N N
- Replacement Approval (new proprietor)
60.00
62.00
SL
N
- Inspection, Certification of Completion, Manufactured Home and Associated Structures on the Site: - Reinspection for non-compliance - Separate Associated Structure not on Certificate of Compliance - Reinspection for non-compliance Busker's Licence - Per person per month - Per group per month
110.00
113.00
SL
N
110.00 55.00 55.00
113.00 57.00 57.00
SL SL SL
N N N
N/C N/C
N/C N/C
DESCRIPTION Section 68 Approval Activities (Local Government Act, 1993) - (Continued) Temporary Structure Waste in a sewer Swinging goods over a road with a device (crane/lift) over the footpath Carry out water supply, sewerage or stormwater work Operate public carpark Relocatable Home & Associated Structure Inspections Oil or Solid Fuel Heater
Page 42
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Urban Stormwater and Drainage 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
Residential Premises - on urban land - Strata Residential (per annum) - Strata Business (per annum) - Vacant (per annum) - Other (per annum)
12.50 5.00 Exempt 25.00
12.50 5.00 Exempt 25.00
AN AN AN AN
N N N N
Commercial Premises - on urban land - (per annum)
25.00
25.00
AN
N
DESCRIPTION Stormwater Management Service Charge
Page 43
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Household Garbage Collection
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
- 240 litre-Domestic Waste Management * Charge per year (serviced weekly)
276.00/service
284.00/service
FS
N
- 240 litre-Industrial/Commercial User Charge * Charge per year (serviced weekly)
505.00/service
520.00/service
FS
N
- 660 litre-Industrial/Commercial User Charge * Charge per year (serviced weekly)
1349.00/service
1369.00/service
FS
N
- 1100 litre-Industrial/Commercial User Charge * Charge per year (serviced weekly)
2250.00/service
2284.00/service
FS
N
Capital Loan Charge Landfill Carbon Fee
26.00 N/A
27.00 N/A
AN
N
Residential Vacant - Annual Charge per assessment
38.00
39.00
AN
N
- 240 litre-Recycling Collection (Domestic Waste) Charge per year (serviced fortnightly)
137.00/service (Subject to contractual rise/fall agreement)
141.00/service (Subject to contractual rise/fall agreement)
FS
N
- 240 litre-Recycling Collection (Industrial/Commercial Waste) Charge per year (serviced fortnightly)
290.00/service (Subject to contractual rise/fall agreement)
299.00/service (Subject to contractual rise/fall agreement)
FS
N
40.00 56.00 154.00 257.00
41.00 58.00 156.00 261.00
CR CR CR CR
N N N N
39.00
39.00
CR
N
90.00 100.00 915.00 1,640.00
90.00 100.00 915.00 1,640.00
CR CR CR CR
N N N N
DESCRIPTION Collection Charges
Additional Collection Services (Special, per address with minimum per bin): - 240 litre Domestic - 240 litre Commercial - 660 litre Commercial - 1100 litre Commercial Additional Charges - Penalty Fee For Video Verification Of Missed Collection (refundable if verified) Replacement Bins - 240 litre Domestic - 240 litre Commercial - 660 litre Commercial - 1100 litre Commercial * Note that Capital Loan Charge needs to be added to fee.
Page 44
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Other Sanitary & Garbage
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
Mixed Waste (per tonne) - Minimum Charge - Commercial load containing recyclable material
133.00 37.00 266.00
137.00 38.00 274.00
FS FS FS
Y Y Y
Separated Waste (per tonne) - Un-reinforced concrete/bricks - Lightly reinforced concrete - Heavily reinforced concrete - Steel - Minimum Charge - Clean fill (virgin excavated natural material-no rock) - Grease Trap Waste (per litre) - Green Waste (per tonne) - Minimum Charge
18.50 29.00 32.00 20.00 22.00 Free 0.34 58.00 29.00
19.00 30.00 33.00 21.00 23.00 Free 0.37 60.00 30.00
FS FS FS FS FS FS FS FS FS
Y Y Y Y Y Y Y Y Y
As per waste type
As per waste type
FS
Y
34.00 min.
35.00 min.
FS
Y
As per waste type
As per waste type
FS
Y
34.00 min.
35.00 min.
FS
Y
Flat Charges for Car, Ute and Trailer - Mixed Waste - Car or Station Wagon - Van, Ute or Box Trailer (max. 1.8m x 1.2m x 0.5m)
10.00 26.00
10.00 27.00
FS FS
Y Y
Van, Ute or Box Trailer (max. 1.8m x 1.2m x 0.5m) - Single Waste - Concrete, bricks - Steel - Green Waste
13.50 9.00 23.00
14.00 9.30 24.00
FS FS FS
Y Y Y
62.00 per m3
64.00 per m3
FS
Y
165.00 37.00
170.00 38.00
FS FS
Y Y
DESCRIPTION Public Disposal Charges
Trailers Greater Than 1.8m x 1.2m x 0.5m will be charged by weight/tonne - Minimum Charge Trailers Greater Than 1.8m x 1.2m x 0.5m filled above water level will be charged by weight/tonne - Minimum Charge
Mixed Waste - Applies if weighbridge out due to power failure Putrescible Wastes (vegetable or animal)/tonne - Minimum Charge
Page 45
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Other Sanitary & Garbage cont.
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
Hazardous Wastes - Refrigerators (with CFC gases removed)
23.00
24.00
CR
Y
Animals - Dogs and cats - Sheep, goats and large dogs - Cows and horses
11.50 17.50 146.00
12.00 18.00 150.00
CR CR CR
Y Y Y
Tree Stumps - Tree diameter of 1.6m and over
166.00
170.00
CR
Y
Asbestos - Up to 25 tonne (per tonne) - Minimum charge - Rewrapped Asbestos-including materials (per tonne)
186.00 34.00 204.00
192.00 35.00 210.00
CR CR CR
Y Y Y
Bulk Loads of Asbestos ( > 50 tonnes) - 1st 25 tonne - (per tonne) - 2nd 25 tonne (per tonne) - Reminding weight (per tonne)
186.00 139.50 93.00
192.00 144.00 96.00
CR CR CR
Y Y Y
Rehabilitation Soil (per tonne) (from Service Stations etc)
168.00
173.00
CR
Y
Drilling/Suction Sludge (per tonne)
17.50
18.00
FS
Y
Tyres - Car - Light Truck - 4wd etc - Heavy Truck - up to 1.15m diameter with 220 tread width - Super Single - over 1.15m diameter or over 220 tread width - Small Earthmover - 1.0m to 1.3m diameter - Medium Earthmover - 1.3m to 1.8m diameter - Large Earthmover - 1.8m diameter and over
10.50 17.50 27.00 40.00 115.00 436.00 587.00
10.80 18.00 28.00 41.00 118.00 449.00 605.00
CR CR CR CR CR CR CR
Y Y Y Y Y Y Y
Mattresses - Large Double, Queen, King - Single
24.00 14.50
25.00 15.00
CR CR
Y Y
Gas Bottles - 4kg to 9kg - 18kg to 45kg - Fire Extinguishers - Forklift & Auto Tanks
4.00 10.00 6.00 10.00
4.00 10.00 6.00 10.00
CR CR CR CR
Y Y Y Y
Quoted
Quoted
FS
Y
DESCRIPTION
Waste Collection Services For Special Events - Delivery and collection of bins plus disposal of rubbish
Page 46
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Griffith Cemetery 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
General Section Includes Permit to Bury - New Grave (1st interment - casket or ashes) - Re-Open (2nd interment - casket) - Re-Open (2nd & subsequent interments - ashes) - New Grave - Infant (1st interment - casket or ashes) - Re-Open - Infant (2nd interment - ashes) - Ashes placed inside Casket (at time of casket interment)
1,848.00 1,077.00 424.00 905.00 424.00 296.00
1,906.00 1,109.00 437.00 932.00 437.00 305.00
CR CR CR CR CR CB
Y Y Y Y Y Y
Lawn Section Includes Permit to Bury, Plaque and Vases - New Grave (1st interment - casket or ashes) - Re-Open (2nd interment - casket or ashes) - Re-Open (2nd interment - ashes) - Re-Open (3rd or subsequent internment - ashes) - Ashes placed inside Casket (at time of casket interment)
2,918.00 1,360.00 665.00 775.00 647.00
3,007.00 1,401.00 686.00 799.00 667.00
CR CR CR CR CB
Y Y Y Y Y
Infant Lawn Section Includes Permit to Bury, Plaque and Vase - New Grave (1st interment - casket or ashes) - Re-Open (2nd interment - casket) - Re-Open (2nd interment - ashes) - Re-Open (3rd interment - ashes) - Includes permit to bury only - Pre Term Garden
1,552.00 1,295.00 1,172.00 424.00 801.00
1,578.00 1,334.00 1,208.00 437.00 825.00
CR CR CR CR CR
Y Y Y Y Y
732.00
754.00
CR
Y
702.00
723.00
CR
Y
1,105.00
1,122.00
CB
Y
1,272.00 779.00
1,310.00 802.00
CB CB
Y Y
10,267.00 6,126.00 2,537.00
10,575.00 6,310.00 2,613.00
CR CR CR
Y Y Y
205.00 225.00
211.00 232.00
SL CR
N N
1,703.00 2,112.00
1,754.00 2,175.00
CB CR
Y Y
DESCRIPTION
Ashes Includes Permit to Bury - Lawn One (1st interment) - Plus Plaque costs to be determined & paid for at the time of ordering, depending on size and style required. - Lawn One (2nd interment) - Plus Plaque costs to be determined & paid for at the time of ordering, depending on size and style required. Includes Permit to Bury and Plaque - Rose Garden Niche Wall - Level A - B - C (1st interment) - Level A - B - C (2nd interment) Below Ground Vaults Includes Permit to Bury - Double - Single - Infant Double (pre purchased prior to 30 June 1996) Re-Open - Permit to Bury - Suspended Slab Mausoleum - Capella Includes Permit to Bury - Per Interment in Crypt - Perpetual Maintenance per Crypt (payable as per DA condition)
Page 47
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Griffith Cemetery 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
144.00
148.00
CR
Y
1,124.00 494.00
1,161.00 509.00
CR CR
Y Y
Miscellaneous - Triple depth or extra wide grave - Hire of staff to assist with casket from hearse - Late fee for burial paperwork (within one working day) - Removal of plaque for private reconditioning - Sand fill for cultural burials as requested (per plot)
200.00 150.00 100.00 -
206.00 155.00 103.00 100.00 100.00
CR CR CR NC/CR NC/CR
Y Y Y Y Y
After Hours Booking Fee - Per Interment
102.00
105.00
FS
N
4.0%
4.0%
FS
Y
Current Fee 144.00
Current Fee 148.00
FS FS
Y N
225.00
232.00
FS
N
Monumental Mason Performance Bond - Once Only - per business entity
1,277.00
1,315.00
CR
N
Exhumation - Per Exhumation - Per Exhumation - within Cemetery (administration fee)
2,814.00 424.00
2,898.00 437.00
FS FS
Y Y
DESCRIPTION Late Funerals (Council staff require approximately one (1) hour after the departure of mourners/funeral director to complete their tasks) - Actual Cost (per hour) Saturday Funerals (additional charge) Burial - Casket - Ashes
Agent's Fee - On fees collected on behalf of Griffith City Council Reservation - Available ALL Sections - current fee payable in FULL - Transfer of Right of Burial (administration fee) Monumental Permit - All works
Page 48
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Yenda Cemetery 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
General Section Includes Permit to Bury - New Grave (1st interment - casket or ashes) - Re-Open (2nd interment - casket) - Re-Open (2nd & subsequent interments - ashes) - New Grave - Infant (1st interment - casket or ashes) - Re-Open - Infant (2nd interment - ashes) - Ashes placed inside Casket (at time of casket interment)
1,741.00 968.00 424.00 835.00 424.00 296.00
1,793.00 997.00 437.00 860.00 437.00 305.00
CR CR CR CR CR CB
Y Y Y Y Y Y
Lawn Section Includes Permit to Bury, Plaque and Vases - New Grave (1st interment - casket or ashes) - Re-Open (2nd interment - casket or ashes) - Re-Open (2nd interment - ashes) - Re-Open (3rd or subsequent internment - ashes) - Ashes placed inside Casket (at time of casket interment)
2,751.00 1,291.00 665.00 775.00 296.00
2,835.00 1,331.00 686.00 799.00 305.00
CR CR CR CR CB
Y Y Y Y Y
Infant Lawn Section Includes Permit to Bury, Plaque and Vase - New Grave (1st interment - casket or ashes) - Re-Open (2nd interment - casket) - Re-Open (2nd interment - ashes) - Re-Open (3rd interment - ashes) - Includes permit to bury only
1,418.00 1,155.00 1,031.00 775.00
1,462.00 1,190.00 1,063.00 799.00
CR CR CR CR
Y Y Y Y
Ashes Includes Permit to Bury and Plaque - Niche Wall - 1st Interment - 2nd Interment
1,289.00 779.00
1,329.00 802.00
CR CR
Y Y
10,267.00
10,575.00
CR
Y
205.00 225.00
211.00 232.00
SL CR
N N
CR
Y
DESCRIPTION
Below Ground Vaults Includes Permit to Bury - Double Double (pre purchased prior to 30 June 1996) Re-Open - Permit to Bury - Suspended Slab Late Funerals (Council staff require approximately one (1) hour after the departure of mourners/funeral director to complete their tasks) - Actual Cost (per hour)
144.00
148.00
CR
Y
Miscellaneous - Extra depth or extra wide grave - Hire of staff to assist with casket from hearse - Late fee for burial paperwork (within one working day) - Removal of plaque for private reconditioning - Sand fill for cultural burials as requested (per plot)
200.00 150.00 100.00 -
206.00 155.00 103.00 100.00 100.00
CR CR CR NC/CR NC/CR
Y Y Y Y Y
Page 49
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Yenda Cemetery 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
1,127.00 494.00
1,161.00 509.00
CR CR
Y Y
102.00
105.00
FS
Y
4.0%
4.0%
FS
Y
Current Fee 144.00
Current Fee 148.00
FS FS
Y N
225.00
232.00
FS
N
Monumental Mason Performance Bond - Once Only - per business entity
1,277.00
1,315.00
CR
N
Exhumation - Per Exhumation - Per Exhumation - within Cemetery (administration fee)
2,814.00 424.00
2,898.00 437.00
FS FS
Y Y
DESCRIPTION Saturday Funerals (Additional Charge) Burial - Casket - Ashes After Hours Booking Fee - Per Interment Agent's Fee - On fees collected on behalf of Griffith City Council Reservation - Available ALL Sections - current fee payable in FULL - Transfer of Right of Burial (administration fee) Monumental Permit - All works
Page 50
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Bagtown Cemetery
DESCRIPTION Monumental Permit - All works Exhumation - Per Exhumation - Per Exhumation - within Cemetery (administration fee)
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
225.00
232.00
FS
N
2,814.00 424.00
2,898.00 437.00
FS FS
Y Y
Page 51
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 05 HOUSING & COMMUNITY AMENITIES Cemetery - General 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
Plaque - 381mm x 279mm (15'' x 11'') - Raised Edge - Dual - 8 line - 3, 4, 5 or 6 line standard DP - Raised Edge - Single - 8 line
752.00 519.00
775.00 535.00
CB CB
Y Y
Plaque - 203mm x 152mm (8'' x 6'') - Raised Edge - Single - 5 line
263.00
271.00
CB
Y
Detachable Plate - For second interment - Dual Plaque - 3, 4, 5 or 6 line
153.00
158.00
CB
Y
Additional Line(s) - Charge for additional lines - 381mm x 279mm - per line - Charge for additional lines - 203mm x 152mm - per line
32.00 29.00
33.00 30.00
CB CB
Y Y
Photo - Ultra image - 5cm x 7cm (Colour) - Ultra image - 5cm x 7cm (Black & White) - Milling of plaque for photo
241.00 218.00 152.00
248.00 225.00 157.00
CB CB CB
Y Y Y
Badges & Emblems - Emblems/Badges on Order Forms - First one free if ordered with plaque - Additional Emblems/Badges if ordered with plaque Type A, B & C - Additional Emblems/Badges - Ordered separately
48.00 134.00
49.00 138.00
CB CB
Y Y
Vases - Two vases are supplied in Lawn Section with first plaque order - Lawn (Plastic) - Niche Wall (Plastic)
10.00 4.00
11.00 5.00
CB CB
Y Y
Plaque Maintenance - Reconditioning of Plaque - 381mm x 279mm - Dual with 1 detachable - Reconditioning of Plaque - 381mm x 279mm - Dual with 2 detachables - Reconditioning of Plaque - 381mm x 279mm - Single - Reconditioning of Plaque - 203mm x 152mm - Polishing Kit - Alteration - Per letter - Alteration - Per Name letter
235.00 288.00 185.00 142.00 N/A 87.00 104.00
242.00 297.00 191.00 146.00 N/A 90.00 107.00
CB CB CB CB
Y Y Y Y
CB CB
Y Y
Concrete Mounting Block - Mounting Block - Suit 381mm x 279mm (Including fixing) - Mounting Block - Suit 203mm x 152mm (Including fixing)
132.00 114.00
136.00 117.00
CB CB
Y Y
Commemorative Tree Lot Corridor - Raised Edge - Single - 8 line (Including Mounting Block)
268.00
276.00
CB
Y
DESCRIPTION Plaque Charges
Page 52
Fees for 2018/2019 06 WATER SUPPLIES
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
1,155.00 1,370.00 140.00 190.00
1,160.00 1,375.00 150.00 200.00
CR CR CR CR
Y Y Y Y
1,370.00 150.00 130.00 Free Free
1,375.00 160.00 140.00 Free Free
CR CR CR CR CR
Y Y Y Y Y
1,155.00
1,160.00
CR
Y
Water Meter Testing Fees - 20mm - 25mm - 32-40mm - 50-80mm
225.00 245.00 315.00 375.00
230.00 250.00 320.00 380.00
CR CR CR CR
Y Y Y Y
Backflow Prevention Testing Fee
141.00
144.00
CR
Y
-
250.00
NC/CR
Y
Investigation Fee for Water Supply Extension (per application)
500.00
500.00
CR
Y
Copy of Council Water Usage Notice (on Base Stock) - Official Coloured Copy - Black & White Copy
10.00 5.00
15.00 7.00
CR CR
N N
Fee for Flow Rate Test - NSW Fire Brigade
220.00
230.00
CR
Y
Water Meter Reconnection Fee (where a water restricting meter has been installed)
230.00
250.00
CR
Y
Water Meter Disconnection Fee
230.00
250.00
CR
Y
Water Fill Fee for Swimming Pool (from hydrants only)
95.00
100.00
CR
Y
1.67/metre (Minimum Fee of 350.00)
1.70/metre (Minimum Fee of 350.00)
CR
Y
Quoted
Quoted
CR
Y
DESCRIPTION Water Connection Fees - 20mm meter (including connection from main) - 25mm meter (including connection from main) - 20mm meter (supply & install meter only) - 25mm meter (supply & install meter only) - Larger sizes by quotation - Upgrade meter size from 20mm to 25mm - Downgrade meter to 40mm - Downgrade meter to 32mm - Downgrade meter to 25mm - Downgrade meter to 20mm Water Connection Fees (Yenda) - 20mm potable meter plus 20mm or 25mm raw meter (2 meters) (including connection from main)
Water Inspection Fee (Including WAE Drawings)
Ozonation (Disinfection) of Water Mains - Up to 150mm in diameter (per metre length of water main) (Note that cost of Water Disinfection Unit to be added-Refer plant hire rates) - Greater than 150mm in diameter (per metre length of water main) Water Rebate - Water Saving Devices AAA Rated Shower Rose - $20.00 rebate (each) AAAA Dual Flush Toilet Suite/Cistern - $50.00 (each) Home Dialysis Rebate - First 100 kL/annum free
Page 53
DESCRIPTION: PRINCIPAL ACTIVITY:
Fees for 2018/2019 06 WATER SUPPLIES
SUB-CATEGORY:
DESCRIPTION Raw Water Charges: Griffith City Council - Parks and Gardens (unmetered) Standpipe (short term user). Weekly Charge - Opening Fee Standpipe (Metered) Potable - per kilolitre Standpipe (Metered) Non Potable - per kilolitre Standpipe Key Deposit (refundable on return)
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
3,500.00
3,500.00
CR
N
60.00/week 2.20 0.80 150.00
70.00/week 2.30 0.85 250.00
CR CR CR CR
N N N N
0.72 (first 200kL) 1.38 there after
0.72 (first 200kL) 1.41 there after
CR CR
N N
-
0.72 (for entire consumption)
NC/CR
N
0.36
0.37
CR
N
138.00 216.00 348.00 546.00 852.00 2,175.00 3,399.00 7,650.00 7,650.00 276.00 138.00 216.00 486.00 909.00 2,907.00
138.00 216.00 348.00 546.00 852.00 2,175.00 3,399.00 7,650.00 7,650.00 276.00 138.00 216.00 486.00 909.00 2,907.00
CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR
N N N N N N N N N N N N N N N
N/A
N/A
33.00 36.00 48.00 51.00 57.00 189.00 234.00 363.00 600.00 42.00 54.00 66.00 72.00 78.00 225.00 297.00 477.00 927.00
36.00 39.00 51.00 54.00 60.00 192.00 237.00 366.00 603.00 45.00 57.00 69.00 75.00 81.00 228.00 300.00 480.00 930.00
CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR CR
N N N N N N N N N N N N N N N N N N
Water Metered Potable Water (per kilolitre) Crisis Accommodation Charge
Metered Raw Water (per kilolitre) Access Fee - Potable/Raw (based on meter size) - 20mm - 25mm - 32mm - 40mm - 50mm - 80mm - 100mm - 150mm - 200mm - Strata Neighbourhood (shared meter) - Unmetered Property (less than 225 metres from water main) - Yenda Dual - CBD Area - Unmetered Services (Low users) - CBD Area - Unmetered Services (Medium users) - CBD Area - Unmetered Services (High users) Dedicated Fire Service Backflow Prevention Rentals - Backflow Prevention Med 20mm - Backflow Prevention Med 25mm - Backflow Prevention Med 32mm - Backflow Prevention Med 40mm - Backflow Prevention Med 50mm - Backflow Prevention Med 80mm - Backflow Prevention Med 100mm - Backflow Prevention Med 150mm - Backflow Prevention Med 200mm - Backflow Prevention High 20mm - Backflow Prevention High 25mm - Backflow Prevention High 32mm - Backflow Prevention High 40mm - Backflow Prevention High 50mm - Backflow Prevention High 80mm - Backflow Prevention High 100mm - Backflow Prevention High 150mm - Backflow Prevention High 200mm
Page 54
Fees for 2018/2019 07 SEWERAGE SERVICES
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
TRADE WASTE CHARGES Category 3 Trade Waste Services Approvals and Contract - Application and set up charge (major pre-treatment OR > 20kl/d) - Annual Trade Waste Administration Charge (TWAC) - Trade Waste Usage Charge - per kL (TWUC)
820.00 501.00 1.28
830.00 504.00 1.33
CR AN CR
N N N
Excess Mass Charges (Unit Prices) - Suspended Solids (per kg) > 300mg/L - Total Nitrogen (per kg) TKN > 50 mg/L - Total Phosphorus (per kg) > 10 mg/L - Sulphate (per kg) > 100 mg/L - Sulphide (per kg) > 1mg/L - Total Dissolved Solids (per kg) > 1000 mg/L
1.42 0.37 16.25 0.23 1.60 0.15
1.45 0.38 16.50 0.24 1.65 0.16
CR CR CR CR CR CR
N N N N N N
$0.00/kg discharged $1.43/kg discharged $3.50/kg discharged $7.40/kg discharged
$0.00/kg discharged $1.45/kg discharged $3.55/kg discharged $7.50/kg discharged
FS FS FS FS
N N N N
185.00
190.00
CR
N
Category 2 - Application Fee (new application) - Annual Trade Waste Administration Charge (TWAC) - Non Compliance Charge - NCC ( per kL) - Trade Waste Usage Charge - per kL (TWUC) - Renewal or Minor Change to an Approval - Reinspection Charge (each)
100.00 189.00 9.00 1.28 90.00 90.00
100.00 192.00 9.50 1.33 95.00 100.00
CR AN FS FS CR CR
N N N N N N
Category 1 - Application Fee (new application) - Annual Trade Waste Administration Charge (TWAC) - Renewal or Minor Change to an Approval - Reinspection Charge (each)
90.00 90.00 90.00 90.00
100.00 99.00 95.00 100.00
CR AN CR CR
N N N N
Category S (Septic) - Application Fee (new application) - Renewal or Minor Change to an Approval
160.00 160.00
165.00 165.00
CR CR
N N
Investigation Fee for Sewerage Reticulation Extension (per application)
500.00
500.00
CR
Y
-
250.00
NC/CR
Y
Cost plus 20%
Cost plus 20%
FS
Y
DESCRIPTION
Biological Oxygen Demand (BOD) Cost Of Discharge/Kg BOD5 - For BOD5 â&#x2030;¤ to 300 mg/L - For BOD5 from 301 - 600 mg/L - For BOD5 from 601 - 1500 mg/L - For BOD5 > 1500mg/L pH Charges - For discharges of trade waste not complying with the approved licence limits for pH, for each daily occurrence.
Sewer Cut-In Fee Private Analytical Testing by Quotation (cost plus 20%)
Page 55
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 07 SEWERAGE SERVICES
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
22.00/kl 210.00
23.00/kl 220.00
CR CR
N N
810.00 642.00
834.00 657.00
AN AN
N N
459.00 612.00 993.00 1,536.00 2,373.00 6,048.00 9,441.00 21,180.00 21,180.00 810.00 1,863.00 3,240.00 459.00
468.00 627.00 1,017.00 1,572.00 2,430.00 6,192.00 9,666.00 21,687.00 21,687.00 834.00 1,920.00 3,345.00 468.00
AN AN AN AN AN AN AN AN AN AN AN AN AN
N N N N N N N N N N N N N
(3) Non Residential Sewerage Treatment Charge - per Kl (STC)
1.56
1.62
CR
N
Sale of Recycled Water to Saleyards (per kL)
0.36
0.37
CR
N
DESCRIPTION Septic Tank Waste Disposal - Discharge fee based on total capacity (kl)of tanker truck or approved discharge metered volume (1) (2)
Discharge made in the designated hours Additional charge (if a Council employee is required to leave his/her duties to attend the disposal, ie. outside designated hours)
Sewerage Charges for Residential & Non-Residential (1)
(a) Residential Sewerage Charge (per residence) (b) Non Connected Residential Properties within 75m of Service (80%)
(2) Non Residential Sewerage Access Annual Charge (AC) (a) 20mm Water Meter Service (b) 25mm Water Meter Service (c) 32mm Water Meter Service (d) 40mm Water Meter Service (e) 50mm Water Meter Service (f) 80mm Water Meter Service (g) 100mm Water Meter Service (h) 150mm Water Meter Service (i) 200mm Water Meter Service (j) CBD Area - Unmetered Services (Low users) (k) CBD Area - Unmetered Services (Medium users) (l) CBD Area - Unmetered Services (High users) (m) Non Connected Non Residential Properties within 75m of service
Page 56
Fees for 2018/2019 08 RECREATION & CULTURE Public Libraries
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
Fax - Send (per 10 pages) Fax - Send Overseas (per 10 page) Fax - Receive (per transmission)
2.50 5.50 2.50
2.50 5.50 2.50
CB CB CB
Y Y Y
Photocopying - Black & White or Colour - A4 (per page) - A3 (per page) - Microfilm/Microfiche prints
0.40 1.00 0.40
0.20 0.50 0.20
CB CB CB
Y Y Y
Computer - Printout/scan/copy - Headsets
0.40 2.00
0.20 2.00
CB CB
Y Y
Internet Access - Standard PCs (per hour) - Express PCs - Wireless (per hour) - Access Card
1.20 N/C N/C 1.00
1.20 N/C N/C 1.00
CB
Y
CB
Y
Laminating - Business Card - A4 - A3
1.00 2.00 5.00
1.00 2.00 5.00
CB CB CB
Y Y Y
Fines for Overdue Books (per week)
1.00 (per week)
N/C
CR
N
Failure to Return Books (outstanding fines plus cost of book)
Fine + Cost of Book
Fine + Cost of Book
CR
N
N/C
N/C
DESCRIPTION
Reservation of Books (per book)
Page 57
Fees for 2018/2019 08 RECREATION & CULTURE Public Libraries
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
Non Residential Membership Fee
20.00
20.00
FS
N
Inter-Library Loans (per book) - Public Library - Academic Library
5.00 20.00
5.00 20.00
FS FS
Y Y
Discarded Books
1.00
1.00
CR
Y
420.00
420.00
AN
Y
3.00/sheet 5.00/sheet
3.00/sheet 5.00/sheet
CR CR
N N
60.00 30.00
60.00 30.00
CB CB
Y Y
DESCRIPTION
Book Club Subscriptions Preservation Material - Clear Mylar Envelopes - A4 - Clear Mylar Envelopes - A3 Hire of Meeting Room/Study Rooms - Cost for full day hire/room - Cost for half day hire/room (less than four hours)
Page 58
Fees for 2018/2019 08 RECREATION & CULTURE Museums
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
Entry - Adults - Pensioners/Tertiary Students (over 15) - Child (under 15) - Family (2 adults & 3 children under 15, child under 5 years free of charge)
12.00 10.00 8.00 30.00
12.00 10.00 8.00 30.00
CB CB CB CB
Y Y Y Y
Annual Season Ticket - Single Season Ticket - Family Season Ticket - Photographers Season Ticket (client visit included for photos only) - Arts/Cultural Groups (by arrangement)
30.00 40.00 50.00 30.00
30.00 40.00 50.00 30.00
CR CR AF CR
Y Y Y Y
Events - Weddings - St James Church - Weddings - Marquee and Weekend Hire - Weddings (Ceremonies) & Other - Ground Hire Only - Events - Marquee or > 100 PAX - Myall Park Hall Hire - half day - Myall Park Hall Precinct (BBQ area, hall, kitchen, etc.) - BBQ Hire (gas)/BBQ - Heater Hire (gas) - charged per heater - Wine and Irrigation Building (seats up to 60 people only) - Italian Museum (no kitchen)
150.00 500.00 150.00 500.00 130.00 320.00 20.00 10.00 80.00 80.00
200.00 500.00 200.00 500.00 130.00 350.00 10.00 10.00 80.00 80.00
CB CB CB CB CB CB CB CB CB CB
Y Y Y Y Y Y Y Y Y Y
25.00 p/h 50.00 p/h
25.00 p/h 50.00 p/h
CB CB
N N
50.00
50.00
CB
Y
-
250.00 700.00
NC/CB NC/CB
Y Y
DESCRIPTION PIONEER PARK MUSEUM
Photographs - Use of Grounds up to 4.00 pm - Use of Grounds after 4.00 pm Park Train - Special event days, or by request - subject to staff availability Hire of Drinks Trailer/Pop Up Van - Per Day - Per Week (7 days)
* Hire rates for events are dependent on numbers, duration, level of risk and security hire costs. ** Exclusive Hire of the Museum at discretion of the Coordinator.
Page 59
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 08 RECREATION & CULTURE Art Galleries 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
Artist Entry Fee
At the discretion of the Gallery Coordinator
At the discretion of the Gallery Coordinator
CR
Y
Workshops
At the discretion of the Gallery Coordinator
At the discretion of the Gallery Coordinator
CR
Y
30% of selling price *
30% of selling price *
CR
Y
At the discretion of the Gallery Coordinator
At the discretion of the Gallery Coordinator
CB
Y
- Per day including evening
At the discretion of the Gallery Coordinator
At the discretion of the Gallery Coordinator
CB
Y
Hire of Courtyard
At the discretion of the Gallery Coordinator
At the discretion of the Gallery Coordinator
CB
Y
- Half Day
At the discretion of the Gallery Coordinator
At the discretion of the Gallery Coordinator
CB
Y
- Full Day
At the discretion of the Gallery Coordinator
At the discretion of the Gallery Coordinator
CB
Y
At the discretion of the Gallery Coordinator
At the discretion of the Gallery Coordinator
CB
Y
At the discretion of the Gallery Coordinator
At the discretion of the Gallery Coordinator
CB
Y
50.00
50.00
CB
Y
- Hire of Foyer for Openings
As per Griffith Regional Theatre Rates
As per Griffith Regional Theatre Rates
CR
Y
- Use of Kitchen & Bar
As per Griffith Regional
As per Griffith Regional
CR
Y
Theatre Rates
Theatre Rates
Per Agreement
Per Agreement
CB
Y
20% of selling price
20% of selling price
CB
Y
DESCRIPTION GRIFFITH REGIONAL ART GALLERY
Commission On Sale Of Artwork Hire of Gallery for Exhibition - Per day
Hire of Meeting Room - Non Commercial Groups (other than the Art Gallery committees)
Commercial Groups - Half Day
- Full Day Artspace - Set up of Artspace at Griffith Regional Theatre
- Catering (To be booked through Griffith Regional Theatre) - Commission on Sale Of Artwork (Artspace)
* Or as negotiated with Gallery Coordinator. Weekends & Public Holidays incur extra loading.
Page 60
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 08 RECREATION & CULTURE Art Galleries 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
Hire Charges for Functions Monday - Friday - 8am - 12 noon - 12 noon - 5pm - Morning & Afternoon (9am-5pm) - Evenings 5pm - midnight
90.00 90.00 120.00 120.00
90.00 90.00 120.00 120.00
CB CB CB CB
Y Y Y Y
Saturday - 8am - 12 noon - 12 noon - 5pm - Morning & Afternoon (9am-5pm) - Evenings 5pm - midnight
100.00 100.00 130.00 130.00
100.00 100.00 130.00 130.00
CB CB CB CB
Y Y Y Y
Sunday - 8am - 12 noon - 12 noon - 5pm - Morning & Afternoon (9am-5pm) - Evenings 5pm - midnight
110.00 110.00 140.00 140.00
110.00 110.00 140.00 140.00
CB CB CB CB
Y Y Y Y
Staff - At least one staff member must be on duty at all times that any part of the Art Gallery is occupied. Two staff members are required if patron numbers over 60 are expected Monday - Friday (2 hours minimum) - Staff (RSA Holder)
40.00/hour
40.00/hour
CB
Y
Saturday (2 hours minimum) - Staff (RSA Holder)
55.00/hour
55.00/hour
CB
Y
Sunday (2 hours minimum) - Staff (RSA Holder)
65.00/hour
65.00/hour
CB
Y
30.00 100.00 5.00 30.00
30.00 100.00 5.00 30.00
CB CB CB CB
Y Y Y Y
50.00
50.00
CB
N
DESCRIPTION GRIFFITH REGIONAL ART GALLERY (Continued)
* Public Holiday Fees and charges apply; contact Art Gallery for Public Holiday schedule. Bar Facilities - Please discuss your bar requirements with the Art Gallery Coordinator If you wish to sell alcohol or purchased alcohol is included in the ticket price one off licence will be required and can be obtained from OLGR (Office of Liquor Gaming and Racing) Hire Equipment - TV - Data Projector - Tablecloths (each) - Urn, cups and saucers (20 available) Confirmation of Hire - Hiring the Art Gallery must be confirmed by return of the confirmation of hire and a deposit of $50 being paid to the Art Gallery
Page 61
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 08 RECREATION & CULTURE Other Cultural Services 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
800.00 600.00
800.00 600.00
CB CB
Y Y
Booking Fee - Per ticket including complimentary - Credit card / EFTPOS Handling Fee - Online Booking Fee
3.00 1.99% 1.50
3.00 1.99% 1.50
CB CB CR
Y Y Y
Confirmation of Hire ($800.00 deposit to confirm hire)
800.00
800.00
CB
N
500.00 250.00
500.00 250.00
CR CB
Y Y
65.00/hour (ex Staff) 80.00/hour (ex Staff) 90.00/hour (ex Staff)
65.00/hour (ex Staff) 80.00/hour (ex Staff) 90.00/hour (ex Staff)
CR CR CR
Y Y Y
Community Booking Fee - Per ticket - Complimentary - Credit Card / EFTPOS - Online Booking Fee
2.00 2.00 1.99% 1.50
2.00 2.00 1.99% 1.50
CR CR
Y Y
CR
Y
Confirmation of Community Hire ($500.00 deposit to confirm hire)
400.00
500.00
CB
N
600.00 300.00
600.00 300.00
CB CB
Y Y
DESCRIPTION GRIFFITH REGIONAL THEATRE AUDITORIUM HIRE COMMERCIAL Performance Only - $800 or 11.5% of Gross Box Office (whichever is greater) - Second Show (on same day) $600 or 11.5% of Gross Box Office (whichever is greater)
COMMUNITY Community Performance (Auditorium) - Base rent of $500 or 10% of Gross Box Office (whichever is greater) - Second show (on same day) $250 or 10% of Gross Box Office (whichever is greater) Community Rehearsals - In conjunction with a community booking, one FREE four hour rehearsal on a day to be agreed with the Theatre Manager Rehearsal Beyond This - Monday - Friday - Saturday - Sunday
SCHOOL PRESENTATION DAYS - Venue Hire - Plus $300 for book of tickets (including set-up cost) or $2.00 per seat if tickets sold by theatre
NB: These COMMUNITY rates include use of dressing rooms. Additional cleaning and breakage at cost. Where date of booking being made is beyond current financial year, receipt of deposit will enable quote from current financial year to be applied to future financial year.
Page 62
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 08 RECREATION & CULTURE Other Cultural Services 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
750.00 360.00 360.00 160.00 150.00
750.00 360.00 360.00 160.00 150.00
CB CB CB CB CB
Y Y Y Y Y
Commercial Event Rental - Evening 5pm to 12am - Full Day 9am to 5pm - Half Day 9am to 1pm or 1pm to 5pm - Full Day 9am to 12am - Each additional hour (or part thereof) - Rehearsals or setups
150.00 150.00 100.00 280.00 50.00 45.00/per hour
150.00 150.00 100.00 280.00 50.00 45.00/per hour
CB CB CB CB CB CB
Y Y Y Y Y Y
Community Event Rental - Full Day 9am to 5pm - Half Day 9am to 1pm or 1pm to 5pm
120.00 80.00
120.00 80.00
CB CB
Y Y
100.00 100.00 150.00 100.00 3.50/person 5.00/person
100.00 100.00 150.00 100.00 3.50/person 5.00/person
CB CB CB CB CB CB
Y Y Y Y Y Y
Per Agreement
Per Agreement
CB
Y
Corkage Charges - Wine (per person)
5.00
5.00
CB
Y
Tablecloths - each
5.00
5.00
CB
Y
DESCRIPTION GRIFFITH REGIONAL THEATRE (Continued) CONFERENCES/PUBLIC MEETINGS/COMMERCIAL Guidelines - Set up days & times are chargeable Rental (Auditorium) - Full Day (3 sessions of 4 hours each) - Morning/Afternoon per session (4 hours) 8-12pm 1-5pm - Evening (4 hours) 6-10pm - Each additional hour (or part thereof) - Foyer (in conjunction with auditorium) per day when utilised for trade shows/displays FOYER ONLY
Use of Kitchen Used "Cold" Kitchen 9-5pm In Conjunction use of "Hot" Kitchen 9-5pm Use of Kitchen Plus Crockery & Cutlery in Conjunction with BGR Hire Use of Crockery & Cutlery in Conjunction with BGR Hire Morning/Afternoon Tea per person - Instant Coffee Morning/Afternoon Tea per person - Percolated Coffee Catering Arranged by Griffith Regional Theatre
NB: Where date of booking being made is beyond current financial year, receipt of deposit will enable quote from current financial year to be applied to future financial year.
Page 63
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 08 RECREATION & CULTURE Other Cultural Services 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
Functions and Performances - Hire of Room - Evening 6.30pm - 12am - Full Day up to 8 hours, 9am - 5pm - Half Day up to 4 hours, 9am-1pm or 1pm - 5pm - Full Day 9am - 11.30 pm, Mon - Fri
150.00 150.00 90.00 280.00
150.00 150.00 90.00 280.00
CB CB CB CB
Y Y Y Y
Each Additional Hour or Part Thereof
50.00
50.00
CB
Y
Rehearsals and/or Set ups
45.00/hour
45.00/hour
CB
Y
Use of Kitchen Used "Cold" Kitchen 9-5pm In Conjunction use of "Hot" Kitchen 9-5pm Use of Kitchen Plus Crockery & Cutlery in Conjunction with BGR Hire Use of Crockery & Cutlery in Conjunction with BGR Hire Morning/Afternoon Tea per person - Instant Coffee Morning/Afternoon Tea per person - Percolated Coffee
100.00 100.00 150.00 100.00 3.50/person 5.00/person
100.00 100.00 150.00 100.00 3.50/person 5.00/person
CB CB CB CB CB CB
Y Y Y Y Y Y
Per Agreement
Per Agreement
FS
Y
5.00
5.00
CB
Y
5.00
5.00
CB
Y
1.00 5.00 30.00 20.00 50.00 100.00 55.00 110.00 110.00 25.00 Each
1.00 5.00 30.00 20.00 50.00 100.00 55.00 110.00 110.00 25.00 Each
CB CB CB CB CB CB CB CB CB CB
Y Y Y Y Y Y Y Y Y Y
DESCRIPTION GRIFFITH REGIONAL THEATRE (Continued) BURLEY GRIFFIN ROOM RATES
Catering Arranged by Griffith Regional Theatre Corkage Charges - Wine (per person) Tablecloths - each Hire of Crockery/Glassware (offsite) - Per item - Breakage per item Use of TV/Video Use of OHP Use of Piano Data Projector Laptop Lighting Desk and Lights (per session) PA System (with sound desk) Stage Riser
NB: Where date of booking being made is beyond current financial year, receipt of deposit will enable quote from current financial year to be applied to future financial year.
Page 64
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 08 RECREATION & CULTURE Other Cultural Services 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
Staff (Technical) - Duty Technician (weekday) - Duty Technician (Saturday) - Duty Technician (Sunday) - Sound Engineer (weekday) - Sound Engineer (Saturday) - Sound Engineer (Sunday)
55.00 70.00 80.00 50.00 60.00 70.00
60.00 80.00 90.00 60.00 70.00 80.00
CB CB CB CB CB CB
Y Y Y Y Y Y
- Lighting/Stagehand (weekday) - Lighting/Stagehand (Saturday) - Lighting/Stagehand (Sunday) - Bump-in/out (weekday) - Bump-in/out (Saturday) - Bump-in/out (Sunday) - Public Holiday
40.00 55.00 65.00 40.00 55.00 65.00 POA
45.00 65.00 75.00 45.00 60.00 70.00 POA
CB CB CB CB CB CB CB
Y Y Y Y Y Y Y
Staff (FOH) - FOH Manager (weekday) - FOH Manager (Saturday) - FOH Manager (Sunday) - Usher (weekday) - Usher (Saturday) - Usher (Sunday) - Public Holiday
45.00 60.00 70.00 40.00 55.00 65.00 POA
50.00 70.00 80.00 45.00 60.00 70.00 POA
CB CB CB CB CB CB CB
Y Y Y Y Y Y Y
Contractors
POA
POA
CB
Y
DESCRIPTION GRIFFITH REGIONAL THEATRE (Continued) Staff - At least one staff member must be on duty at all times when any part of the Theatre is occupied
Note: Contract staff in addition to above subject to separate negotiation
Page 65
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
DESCRIPTION GRIFFITH REGIONAL THEATRE (Continued) Cleaning - Auditorium Hire Only - Hirers will be charged a one-off fee for cleaning after a performance. Extra Cleaning - All Facilities - Hirers are responsible for ensuring the facility is left in a clean & tidy condition. Fees will be charged if extra cleaning is required. Where the hirer has booked more than one performance additional fees may be charged for extra cleaning required between performances. Miscellaneous Fees Piano - Where tuning is requested prior to function. - Where used for a School function hire (Tuning Including charges may still be required) Cinema Screen/Movie Projector Hire (per 4hr session) Portable Stage Sculptured Curtain Viewing (per person) (includes postcard) Dance Floor Merchandising Levy (10% of gross sales) Set of Tickets Advertising Commission and Additional Promotions Promotional Service Charges Test & Tag (if required) Reprinting of Lost Tickets (per ticket) Inclusion in Season Book Theatre Membership (per annum) - Adult - Couple
Fees for 2018/2019 08 RECREATION & CULTURE Other Cultural Services 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
-
150.00
NF/CR
Y
70/hour
70/hour
CB
Y
200.00 Cost + 25% 100.00
250.00 Cost + 25% 100.00
CR FS FS
Y Y Y
250.00 200.00 3.50
250.00 200.00 3.50
CB CB CB
Y Y Y
100.00
100.00
CB
Y
10%
10%
CB
Y
300.00 Per Agreement 250.00 16.50/unit 2.50 300.00
300.00 Per Agreement 300.00 16.50/unit 2.50 300.00
CR FS CR CB CR CB
Y Y Y Y Y Y
30.00 50.00
30.00 50.00
AN AN
Y Y
COMMUNITY JOINT VENTURE GUIDELINES * Fees and charges are negotiable but must at least cover Theatre costs * To be negotiated by the Theatre Manager * Compliance criteria: - Must be a local group - Must be a community orientated group, ie service club or school - Must have potential to increase/broaden current or potential Theatre usage - Must not be a commercial venture * Sample programmes could include: - Drama classes in school holidays, theatre sports, debating contests, resident theatre company, technical classes * Must be compliant in terms of: - insurance - child protection screening - in all other matters which would otherwise put the Griffith City Council at undue risk
Page 66
Fees for 2018/2019 08 RECREATION & CULTURE Swimming Facilities
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
DESCRIPTION AQUATIC LEISURE CENTRE Casual Entries - Pool Only - Adult - Pool Only - Student/Pensioner - Pool Only - Baby Under 2 Years - Pool Only - Pre-School Child - Pool Only - Adult Accompanying Pre-School Child In Water - Pool Only - School Group Per Student - Pool Only - Family - Pool Only - Swimming Carnivals (per student) - Pool Only - Spectator - Adult - Pool Only - Department of Sport/Rec (student entry) - Pool Only - Swim School Accompanying Adult - All Areas (includes Aerobic, Aquarobics, Gym and Pool use) - Adult - All Areas - Students/Pensioner - A.G.E. Classes (includes Pilates, Aqua & Combo) - Fitkids (kids classes) - Gym, Aerobic & Aqua classes - School Group Entry - Aerobic Classes - 30 minutes - Crèche - per child per hour Memberships - All Areas (Includes Aerobic, Aquarobics, Gym & Pool use) - 12 Months-Adult - All Areas (Includes Aerobic, Aquarobics, Gym & Pool use) - 3 Months-Adult - All Areas (Includes Aerobic, Aquarobics, Gym & Pool use) - 1 Month-Adult - All Areas (Includes Aerobic, Aquarobics, Gym & Pool use) - 12 Months-Student/ Pensioner/Seniors Card/Veterans Affairs Card - All Areas (Includes Aerobic, Aquarobics, Gym & Pool use) - 3 Months-Student/ Pensioner/Seniors Card/Veterans Affairs Card - All Areas (Includes Aerobic, Aquarobics, Gym & Pool use) - 1 Month-Student/ Pensioner/Seniors Card/Veterans Affairs Card - Pool Only Membership - 3 Months - Pool Only Membership - 3 Months - Student/Pensioner - Pool Only Membership - 12 Months - Pool Only Membership - 12 Months - Student/Pensioner - Direct Debit Membership - Adult (per fortnight) - Direct Debit Membership - Corporate - Adult (per fortnight) - Direct Debit Membership - Students/Pensioner/Seniors Card/Veterans Affairs Card (per fortnight)
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
6.00 4.00 Free 3.00 1.50 3.80 19.50 4.80 1.50 4.20 Free 13.00 8.00 5.00 5.00 6.50 10.50 6.50
6.00 4.00 Free 3.00 1.50 3.80 19.50 4.80 1.50 4.00 Free 14.00 9.00 5.00 5.00 6.50 11.00 6.50
FS FS
Y Y
FS FS FS FS FS FS FS
Y Y Y Y Y Y Y
FS FS FS FS FS FS FS
Y Y Y Y Y Y Y
800.00 270.00 100.00 480.00
840.00 290.00 105.00 520.00
FS FS FS FS
Y Y Y Y
160.00
170.00
FS
Y
60.00
65.00
FS
Y
150.00 449.00 35.50 32.00 21.50
170.00 115.00 470.00 315.00 37.50 34.00 23.50
FS NF/FS FS NF/FS FS FS FS
Y Y Y Y Y Y Y
Page 67
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
DESCRIPTION Multivisit Passes (valid for 3 years) 30 Visits=25% Discount, 20 Visits=15% Discount, 10 Visits=5% Discount - All Areas - Adult - 30 Visits - All Areas - Students/Pensioner/Seniors Card/Veterans Affairs Card - 30 Visits - Pool Only - Adult - 30 Visits - Pool Only - Student/Pensioner/Seniors Card/Veterans Affairs Card - 30 Visits - Crèche - 30 visits - All Areas - Adult - 20 Visits - All Areas - Students/Pensioner/Seniors Card/Veterans Affairs Card - 20 Visits - All Areas - Adult - 10 Visits - All Areas - Students/Pensioner/Seniors Card/Veterans Affairs Card - 10 Visits Learn to Swim (10% Discount for 2nd child, 20% Discount for 3rd & Subsequent Children) - Learn to swim - Monday-Friday - per lesson (paid per term) - Learn To Swim - Saturday - per lesson (paid per term) - Learn To Swim - Special Needs (one on one) - Private Lessons - Weekends (per 30 minutes) - Private Lessons - Weekdays (per 30 minutes) - Starts, Turns & Finishes program - Bronze Squad - per month - Silver Squad - per month - Gold Squad - per month - Casual Squad Fee (offered at Head Coach's discretion) - School with our Instructor (40 min) - School with our Instructor (45 min) - Schools Requiring Additional Instructors-per Instructor per hour or part thereof Training Courses/Certifications - Bronze Medallion Certificate RLSSA - Resuscitation (Full) - Resuscitation (Update) - NSW Police Recruitment Assessment - NSWDPI Hydrometric Water Employees Assessment
Fees for 2018/2019 08 RECREATION & CULTURE Swimming Facilities 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
295.00 179.00 134.50 108.00 150.00 220.00 135.00 117.00 70.00
315.00 202.50 135.00 90.00 150.00 238.00 153.00 133.00 85.50
FS FS FS FS FS FS FS FS FS
Y Y Y Y Y Y Y Y Y
13.70 14.70 18.20 50.00 39.00 99.00 115.00 125.00 9.00 6.90 7.20 57.50
14.70 15.90 19.20 55.00 44.00 14.70 105.00 120.00 130.00 14.70 7.20 7.50 60.00
FS FS FS FS FS NF/FS FS FS FS FS FS FS FS
N N N N N N Y Y Y Y N N N
125.00 67.00 36.00 10.00 10.00
130.00 70.00 40.00 10.00 10.00
CB CB CB CB FS
N N N Y Y
Page 68
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 08 RECREATION & CULTURE Swimming Facilities 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
GST APPLIC.
50.00 70.00 220.00 392.00 310.00 550.00 45.00 205.00 370.00 Price by Quotation
55.00 75.00 247.50 440.00 337.50 600.00 50.00 225.00 400.00 By Quotation
FS FS FS FS FS FS FS FS FS FS
Y Y Y Y Y Y Y Y Y Y
20.00 110.00 Normal Charges 100.00 200.00 200.00 300.00 54.50 65.00 215.00 43.00 2.20 2.00 40.00 2.50 5.00 As Advertised 10.00 15.00
25.00 115.00 110.00 220.00 220.00 330.00 57.00 67.00 225.00 45.00 2.50 2.50 40.00 2.50 5.00 As Advertised 10.00 15.00
FS FS FS FS FS FS FS FS FS FS FS FS CR FS CR CR FS FS FS
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Pilates Classes - Casual - Multiple Purchase - GRALC Member Discount 40% off advertised price
14.50 12.50
15.00 13.00
FS FS
Y Y
GRALC Staff Membership for Fitness Training (per year)
Free
Free
Challenges - Per Person/Week of Challenge
12.50
13.00
FS
Y
DESCRIPTION Personal Training/ Multi Session Packages (5 Session 10% Discount, 10 Session 20% Discount) - 30 minute session - 60 minute session - 5 x 30 minute session - 10 x 30 minute session - 5 x 60 minute session - 10 x 60 minute session - Buddy Packages (2 people) - per session/person (min 60 minutes) - 5 x 60 minute Buddy sessions (per person) -10% discount - 10 x 60 minute Buddy sessions (per person) - 20% discount - Group training Booking/Hire/Administration Charges - Pool Booking Late Cancellation Fee (less than 24 hours notice) - Program Pool Hire - Carnival/School - whole pool per hour - Race Club Meets - School Swimming Carnival 25m Pool Hire - up to 3 hours - School Swimming Carnival 25m Pool Hire - up to 3 hours - incl. Room Hire - School Swimming Carnival 25m Pool Hire - 3 to 7 hours - School Swimming Carnival 25m Pool Hire - 3 to 7 hours - incl. Room Hire - Lane Hire - per lane per hour - Weekend Lane Hire per lane per hour - Private Hire of Centre (per hour) - Room Hire (per hour) - Lockers - Towel Hire - Non-Member Gymnasium Program - Reprint of Membership Cards - Administration Fee - Receipt on letterhead (per term) - Miscellaneous or Introductory Programs - Independent PT Charge < 30 Min (per session) - Independent PT Charge > 30 Min (per session)
Definitions: Student - Person attending primary or secondary school full time. Pensioner - Person in receipt of a Australian pensioner concession card or Austalian seniors card. GRALC Staff - GRALC employee rostered to work within 4 weeks of current date.
Page 69
Fees for 2018/2019 08 RECREATION & CULTURE Parks and Gardens
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
105.00/field 48.00/court
108.00/field 50.00/court
FS FS
Y Y
Clean Up Sporting Fields After Use - Per employee/hour
63.00
65.00
CR
Y
Tokens for Sports Ground Lighting
3.60
4.00
CR
Y
Bond & Key Deposit for Power Box at Memorial Park Griffith (Refundable on return of key)
45.00
45.00
CR
N
Goal Post Removal for Soccer & Rugby League at Wade Park Yenda
160.00
165.00
CR
Y
DESCRIPTION Line Marking of Sporting Fields - Touch Football, Hockey, Soccer & Rugby Union Fields-Including labour - Netball Courts-including labour
Page 70
Fees for 2018/2019 08 RECREATION & CULTURE Other Sport & Recreation
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
DESCRIPTION
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
4.00 4.00
4.20 4.20
FS FS
Y Y
33.00 33.00
34.00 34.00
FS FS
Y Y
64.00 64.00
66.00 66.00
FS FS
Y Y
395.00 395.00
405.00 405.00
FS FS
Y Y
SPORTS STADIUM ADMISSION CHARGES School Competitions: - All school bookings (student/booking) - Casual (player/hour) COURT HIRE Junior Sports (excluding badminton) Court/Hour - Casual (maximum) - Competition Stadium/Hour - Casual - Competition Stadium/Day (9am-5pm) - Casual - Competition Stadium/2 Hours - Casual - Competition Stadium/Day (9am-5pm) - Casual - Competition
120.00 120.00
123.00 123.00
FS FS
Y Y
395.00 395.00
405.00 405.00
FS FS
Y Y
Stadium Membership - Casual (unlimited court use)
90.00
93.00
FS
Y
Page 71
Fees for 2018/2019 08 RECREATION & CULTURE Other Sport & Recreation
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
DESCRIPTION
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
4.00 4.00
4.20 4.20
FS FS
Y Y
50.00 50.00
51.50 51.50
FS FS
Y Y
90.00 90.00
93.00 93.00
FS FS
Y Y
495.00 495.00
510.00 510.00
FS FS
Y Y
SPORTS STADIUM (Continued) Senior Sports (excluding badminton) Player/Hour - Casual - Competition Court/Hour - Casual (maximum) - Competition Stadium/Hour - Casual - Competition Stadium/Day (9am-5pm) - Casual - Competition
Page 72
Fees for 2018/2019 08 RECREATION & CULTURE Other Sport & Recreation
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
DESCRIPTION
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
SPORTS STADIUM (Continued) COURT HIRE Senior Sports (Continued) Stadium/2 Hours - Casual - Competition Stadium/3Hours - Casual - Competition
180.00 180.00
185.00 185.00
FS FS
Y Y
255.00 255.00
262.50 262.50
FS FS
Y Y
Badminton - March Entire Stadium at Junior/ Senior Sport Rate - 1-2 per court/ per hour - 3-4 per court/ per hour - 5 + per court/ per hour
35.00 50.00 90.00
36.00 51.50 93.00
FS FS FS
Y Y Y
Parties, Churches & Charities - Birthday Parties/ Church/ Charity Group - Stadium/hour
85.00
87.50
FS
Y
-
200.00 N/C
NC/CR
N
20.00
21.00
FS
Y
Bond (refunded if Stadium is left undamaged, clean & tidy) - Private Use - Sporting/ Community Groups Basketball Committee - Hire Of Meeting Room/week
Page 73
Fees for 2018/2019 08 RECREATION & CULTURE Other Sport & Recreation
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
As Below
As Below
AN
Y
547.00 590.00
557.00 601.00
FS FS
Y Y
892.00
918.00
FS
Y
1,200.00
1,200.00
CR
N
- Grounds / Amenities / Dining Room (day or night hire rate)
265.00
272.00
FS
Y
- Stable Hire (per stable cubicle/week)
120.00
120.00
FS
Y
DESCRIPTION DALTON PARK Lease/Licence Fee From July 1, 2000 lease is to apply on a per lot basis for all new lease/licence arrangements (Crown Reserves) - Community Organisations - Private Lease/Licence Special Event/Day (Included Race Meetings & Harness Racing) Rental Income - Bond & Key Deposits (Jockey Club and Harness Racing Clubs are NOT required to pay Bond Fee) (refundable upon the grounds or facilities being left in a clean & tidy condition) Note: - Arrangements must be made with the groundsman at Dalton Park regarding the signing of the application form. This must be signed by the groundsman prior to the application being processed by Customer Service - Party bookings will not be accepted 2 weeks prior or 2 weeks after a Jockey Club or Harness Racing Club meeting has been listed with Griffith City Council - No 18th or 21st Birthday Party Allowed (or other parties within this age group)
Page 74
Fees for 2018/2019 10 MINING, MANUFACTURING & CONSTRUCTION Quarries & Pits
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
3.00/tonne
3.00/tonne
FS
Y
Sale of 5/7 mm Aggregate (/m³)
132.00
136.00
CR
Y
Reseals and New Seals (7mm) (plus plant and labour)
7.00/m2
8.00/m2
CR
Y
Reseals and New Seals (10mm) (plus plant and labour)
7.20/m2
8.20/m2
CR
Y
DESCRIPTION Engineering Works: Royalties on Gravel
Page 75
Fees for 2018/2019 11 TRANSPORT & COMMUNICATION Urban Roads/Sealed Rural Roads/ Unsealed Rural Roads
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
457.00 482.00 120.00 Nil
470.00 496.00 124.00 Nil
CR CR CR
N N N
Application Approval Fee Urgent Approval Fee (Less than 10 working days) - Additional Fee (Fees can be waived at discretion of Director of Infrastructure & Operations)
105.00 209.00
108.00 215.00
CR CR
N N
Road Opening/Boring Final Inspection Fee (per inspection) Note: Additional fee charged for additional inspections (Fee can be waived at discretion of Director of Infrastructure & Operations)
167.00
172.00
CR
N
500.00 min 10,000.00 max
500.00 min 10,000.00 max
CR CR
N N
72.00
72.00
CR
N
234.00/Plan 132.00/hour (min 217.00)
241.00/Plan 136.00/hour (min 223.00)
FS FS
N N
162.00 per ad per week 85.00
165.00 per ad per week 88.00
CR CR
N N
108.00 153.00 29.00 39.00 Price On Application 85.00
108.00 153.00 30.00 40.00 Price On Application 88.00
CR CR CR CR CR CR
Y Y Y Y Y Y
Hire Rates Of Traffic Facilities To Private Works - Per Day/Sign - Per Week/Sign
13.60 50.20
14.00 51.00
CR CR
Y Y
Hire of Traffic Lights (per day)
167.50
170.00
CR
Y
Service Charges for Public Authorities - Per service call out plus - Per quarter hour
93.50 47.00
95.00 48.00
CR CR
N N
81.00
83.00
CR
N
81.00
83.00
CR
N
149.00 74.00 37.50
160.00 85.00 42.50
CR CR CR
N N N
DESCRIPTION Engineering Works: Road Opening Fees (per sq. m) - Asphaltic concrete (max 75mm thick) - Cement concrete (max 100mm thick) - Tar & bituminous surface - Unsealed pavement (This fee covers the reinstatement of the road seal upon completion of works)
Road Opening/Boring Refundable Bond - Bond to be calculated at 5% of the value of the works impacting on the Road reserve. Bond is to be released after six months if final inspection reveals works were completed to the specified standard. (Fee can be waived at discretion of Director of Infrastructure & Operations) Oversize Overmass Permit (increase subject to notification by NHVR) Traffic Control Plans - Basic Plan - Complex Plans (road closures, detours, etc.) Road Closures - Advertising Cost - Admin Staff Fee for Applications Works Within Road Reserves (per hour) Replacement Rates Of Traffic Facilities To Non-Profit Organisations - Barrier Board (1 complete set) - Signs & Legs - Witches Hats - Flashing Lights - Other Items - Administration Staff Fee (per hour) - Non refundable
Speed Zone Authorization (application to RMS) - extension of SZA or Road Closures on local & RMS Roads Contribution to Kerb and Gutter - Total Cost (per lin metre) - Frontage (per lin metre) - Sideage (per lin metre)
Page 76
Fees for 2018/2019 11 TRANSPORT & COMMUNICATION Bridges
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
Access Culvert/Driveway Levels - Inspections
300.00
310.00
CR
N
Footpath Levels
300.00
310.00
CR
N
Flood levels: - Primary Application - Amended/Reviewed
122.00 63.00
126.00 65.00
CR CR
N N
DESCRIPTION Engineering Works:
Page 77
Fees for 2018/2019 11 TRANSPORT & COMMUNICATION Aerodromes
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
DESCRIPTION RPT Fee (Sydney or Melbourne Passengers): - Per Passenger - Other Aircraft per take off and or landing
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
11.40 12.20
11.60 12.40
FS FS
Y Y
3.00/sq metre 1.50/sq metre 2.40/sq metre 1.20/sq metre 1.34/sq metre 0.67/sq metre 0.95/sq metre 0.48/sq metre 0.63/sq metre 0.32/sq metre
3.05/sq metre 1.53/sq metre 2.44/sq metre 1.22/sq metre 1.36/sq metre 0.68/sq metre 0.97/sq metre 0.49/sq metre 0.64/sq metre 0.33/sq metre
CB CB CB CB CB CB CB CB CB CB
Y Y Y Y Y Y Y Y Y Y
8.15/head 366.00 212.00/machine
8.30/head 373.00 216.00/machine
FS AN AN
Y Y Y
1,259.00
1,282.00
CB
Y
715.00
728.00
AN
Y
357.00
363.00
AN
Y
Lease Fees: Lease Area < 1000 sq metres - Landside < 1000 sq metres - Airside 1000-4000 sq metres - Landside 1000-4000 sq metres - Airside 4001-10000 sq metres - Landside 4001-10000 sq metres - Airside 10001-15000 sq metres - Landside 10001-15000 sq metres - Airside > 15000 sq metres - Landside > 15000 sq metres - Airside Terminal Lease Fee - Small operation Air Charter (use of toilets etc) - Car hire stall per year - Vending Machine (per machine) Annual Advertising Fee-Terminal - Electronic Advertising (per annum) Car Rental & Hire Car Firms Operating From Aerodrome - Cost per vehicle per space (per annum) (for spaces along fence or first row near terminal) - Cost per vehicle per space (per annum) (all other spaces)
Page 78
Fees for 2018/2019 11 TRANSPORT & COMMUNICATION Aerodromes
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
900.00 1,061.00 352.00
916.00 1,080.00 358.00
AN AN AN
Y Y Y
389.00 227.00
396.00 231.00
AN AN
Y Y
Free 11.40 9.30 2,485.00
Free 11.60 9.50 2,530.00
CB CB AN
Y Y Y
Aerodrome Lease Administration Fee - Renewals/alterations/legal assistance/advertising re execution of documents
394.00
401.00
FS
Y
Lawn Maintenance for Air services Australia - Navigational Area (per month)
419.00
425.00
FS
Y
DESCRIPTION Landing Charge (Annual) - Commercial Aircraft based at Aerodrome - Code A (each/annum) - Commercial Aircraft based at Aerodrome - Code B (each/annum) - Private Aircraft based at Aerodrome (each/annum) (Stat dec required for proof of private use and that no tax deduction is claimed) - Helicopter (commercial) - Helicopter (private use) (Stat dec required for proof of private use and that no tax deduction is claimed) Aircraft Parking - First week - 1 week to 1 month (per night) - 1 month to 1 year (per night) - 1 year
Page 79
Fees for 2018/2019 12 ECONOMIC AFFAIRS Tourism & Area Promotion
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
DESCRIPTION
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
40.00
42.00
FS
N
-
200.00
NC/CR
N
10% of Room Rate
10% of Room Rate
FS
Y
Visitors' Centre - Promotional Signage of Griffith Entrances (per week/banner) - Bond (refunded if banners are taken down within the allotted timeframe) - Commission on Bookings
Page 80
Fees for 2018/2019 12 ECONOMIC AFFAIRS Saleyards & Markets
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
0.59 0.26 0.85
0.60 0.27 0.87
CB CB
Y Y
4.80 2.10 6.90
4.80 2.10 6.90
CB CB
Y Y
Minimum Charge Per Agent When Yard Dues do not Exceed this Amount - (sheep & cattle)
102.00
104.00
CB
Y
Licence Fee Per Agent Per Year
27.00
27.00
AN
Y
Private Weighing Per Head Plus Handling Fee
5.15 60.00
5.15 60.00
CB CB
Y Y
Paddock Sales
60.00
60.00
CR
Y
Removal & Destruction of Stock - Sheep-Cancerous (per head) * - Sheep Disposal Fee-Non Cancerous (per head) * - Cattle (per head) *
46.00 14.00 165.00
48.00 15.00 165.00
CR CR CR
Y Y Y
Storage of Trailer (after 24hrs) Per Night
20.00
25.00
CR
Y
43.00 0.37 (Min $5.00)
43.00 0.40 (Min $5.00)
CR CR
Y Y
Holding Charges if Not Removed Within 24 hrs - Cattle (per head per day) - Sheep (per head per day)
1.75 0.31
1.75 0.32
CR CR
Y Y
Agistment Charge - Sheep (per head per day)
0.56
0.56
CR
Y
Scanning Fee - Store Cattle Sales (per head) - NVD Sheep Scanning System Fee (per head)
1.08 0.20
1.08 0.20
CB CB
Y Y
DESCRIPTION Sheep - Producer - Agent Cattle - Producer - Agent
Truck Wash - Sale of Keys (to access Truck Wash) - Fee for Truck Wash (per minute)
* Note that fee does not include a callout charge of minimum 4 hours if required
Page 81
Fees for 2018/2019 12 ECONOMIC AFFAIRS Other Business Undertakings
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
Graders - Cat 12M & Volvo G930 - Volvo & Volvo G940
160.00 180.00
160.00 180.00
CB CB
Y Y
Backhoe - 38-51kW
130.00
130.00
CB
Y
Tractors - 75kW and above - Tractor & Slasher (Parks)
100.00 100.00
100.00 110.00
CB CB
Y Y
Tractor Attachments - Drawn Combination Roller - Broom - Slasher
71.00 80.00 30.00
71.00 80.00 30.00
CB CB CB
Y Y Y
Forklift - 2 Tonne - 3 Tonne
70.00 75.00
70.00 75.00
CB CB
Y Y
DESCRIPTION Plant Hire Rates & Conditions (Per hour)
Page 82
Fees for 2018/2019 12 ECONOMIC AFFAIRS Other Business Undertakings
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
140.00 160.00
140.00 160.00
CB CB
Y Y
Trucks - 1 tonne - 2 tonne - 5 tonne & above - Water cart (12000 litres) - Utilities (various)/Sedans/hour - Truck with Crane - Patch mobile (Patching/sealing per hour, plus consumables and operators)
50.00 85.00 120.00 45.00 140.00 200.00
50.00 85.00 120.00 45.00 150.00 220.00
CB CB CB CB CB CB
Y Y Y Y Y Y
Street Sweeper
180.00
200.00
CB
Y
Garbage Trucks
200.00
220.00
CB
Y
Stabilizer (includes tractor) (minimum hire period: 4 hours)
460.00
460.00
CB
Y
Drone - Includes drone, operator & spotter with vehicle and data storage media (Note: Hourly rate will be charged from time of departure from Council's Administration building to return)
200.00
250.00
CB
Y
Air Compressor - With operator + hammer
250.00
300.00
CB
Y
Labourer/Plant Operator
80.00
80.00
CB
Y
Mechanics, Supervisors, Overseers
160.00
160.00
CB
Y
Engineers/Managers
250.00 90.00 90.00
CB
Y
Mini Dingo and Attachments
250.00 90.00 90.00
CB
Y
Mini Excavator - 3 tonne - 5 tonne
90.00 100.00
90.00 100.00
CB CB
Y Y
DESCRIPTION Plant Hire Rates & Conditions (Continued) - Per hour Rollers - Self-Propelled (Pneumatic) - Self-Propelled (Vibrating - 18 tonne)
Note: 1. Plant numbers not applicable for any of the above. 2. Work outside normal hours will be subject to penalty rates.
Page 83
Fees for 2018/2019 12 ECONOMIC AFFAIRS Other Business Undertakings
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
cost + 40%
cost + 40%
CB
Y
Large Sewer Jetter
120.00
120.00
CB
Y
Skid Steer Loader
100.00
100.00
CB
Y
Water Disinfection Unit - Minimum charge (half day) - Full day
250.00 350.00
250.00 350.00
CB CB
Y Y
1,000.00
1,000.00
CB
Y
Truck Mounted Hydro Excavator
-
300.00 + Disposal Costs
NC/CB
Y
Hook Lift Truck
-
300.00 + Disposal Costs
NC/CB
Y
Hydro Excavation Unit (per hour) Large
150.00
150.00
CB
Y
Hydro Excavation Unit (per hour) Small
125.00
125.00
CB
Y
Sale Of Used Cutting Edges (each) (When available)
5.00
5.00
CB
Y
Sale of Used Steel Posts
3.00
3.00
CB
Y
Disposal Costs of Wet Spoil / Materials
Cost + Minimum 20%
Cost + Minimum 20%
CB
Y
Miscellaneous Store Items
Cost + Minimum 50%
Cost + Minimum 50%
CB
Y
DESCRIPTION Plant Hire Rates & Conditions (Continued) Travelling Charges - For plant travelling by low loader
Large Skid Mounted Sykes 8" Pump (per day with hoses) (Freight and set up not included)
Page 84
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 12 ECONOMIC AFFAIRS Other Business Undertakings
Plant Hire Rates & Conditions (Continued) Conditions of Plant Hire The private hire of Council's plant will be subject to the following conditions: - Work will be carried out at a time to suit Council's Works Programme and is subject to change without notice. - Payment for the estimated hire period is to be made before work is commenced. - Minimum hire period is of one (1) hour. - Council will make a refund if hire period is less than estimated period. Subject to condition above. - If requested, additional hire will be carried out. Payment for this additional work is to be made within seven (7) days of this work being completed. - Hire rates are for total time on the site excluding lunch break. - Details of work to be carried out must be given to the operator by the hirer unless special arrangements have been made. - It is the hirer's responsibility to check and mark the location of any services or public utilities. Council will not accept liability for any damages to unmarked services etc. - Plant requiring an operator will only be hired with an operator supplied by Council. - All plant items, other than implements or those on daily or plant only rates, will be charged $20.00 per hour for time worked outside normal hours. - Plant hire rates do not include operator cost of $80/hour.
Page 85
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 12 ECONOMIC AFFAIRS Other Business Undertakings 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
520.00 350.00
530.00 360.00
CB CB
Y Y
3.50
3.50
CB
Y
250.00 140.00
255.00 145.00
CB CB
Y Y
60.00
61.00
CR
Y
Use of Council's Ceremonial Curtain & Easel - Bond (refunded if returned in a clean and undamaged condition)
55.00
56.00
CR
N
Banna Avenue Kiosk, Daily Hire Fee - Charities, Non Profit Organisations, Schools etc - Commercial Organisations - Daily Hire Fee - Half Day Hire Fee (9am to 1pm or 1pm to 5pm)
N/C 154.00 82.00
N/C 157.00 84.00
CR CR
Y Y
52.00 per car space + rates & charges
53.00 per car space + rates & charges
AN
Y
362.00
368.00
CB
Y
41.00
42.00
AN
Y
DESCRIPTION Property Rentals, Leases, Licences & Charges Use of Council Chambers for Public Hearings, Court Hearings etc - Daily fee - Half day Morning/Afternoon Tea at Council Chambers (per head) plus cost of snacks/food Meeting Room at Council Offices (incl. Mayor's Office & Training Room) - Daily fee - Half day Use of Council's Teleconferencing Equipment (per 30 minutes)
Use of Council Land - Annual fee where approved on-street car parking on the footpath verge is endorsed (per car space) + Council Rates & Water Charges ** - Commercial ventures not associated with Griffith City Council community sponsored events. For the use of Council land and facilities (per day) * Use of Council Land to Access Business Property - ie. Charge for using car park for entrance to business (per square metre)
* Plus a bond if considered appropriate by the General Manager or Administration Manager ** New rent is calculated from base date 30 June 2018. Rent for previous year plus increase thereof increased by the percentage increase in the Consumer Price Index (all groups) Sydney for the 12 month period ending on the 30 June for that particular year.
Page 86
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
DESCRIPTION Property Rentals, Leases, Licences & Charges Advertising Structure on the Public Footpath - Licence agreement - Annual fee Note: No DA fees will be applicable for sandwich boards That advertising sandwich board signs of a temporary nature set up by Real Estate Agents for the purpose s of advertising an open home or auction be exempt from the above fee Outdoor Eating Area on the Public Footpath - Licence agreement - Annual fee (per square metre) - Griffith CBD - Annual fee (per chair) - Village - Bond to be held by Council Goods on the Public Footpath - Licence agreement - Annual fee Disabled Access Facility on the Public Footpath (eg: ramp) - Licence agreement (no annual fee-renew licence agreement every 3 years)
Fees for 2018/2019 12 ECONOMIC AFFAIRS Other Business Undertakings 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
147.00 137.00
149.00 139.00
FS CB
N N
147.00 53.00 30.00 500.00
149.00 54.00 31.00 500.00
FS CB CB CR
N N N N
147.00 137.00
149.00 139.00
FS FS
N N
187.00
190.00
FS
Y
Page 87
DESCRIPTION: PRINCIPAL ACTIVITY: SUB-CATEGORY:
Fees for 2018/2019 12 ECONOMIC AFFAIRS Other Business Undertakings 2017/18 FEE ($) Includes GST (If Applic.)
2018/19 FEE ($) Includes GST (If Applic.)
FEE JUSTIF.
REVISED GST APPLIC.
Lease of Road Reserves for Grazing Purposes (fee per hectare or part thereof)
127.00
129.00
AN
Y
Occupation of Road Reserve for Underground Piping (fee per kilometre per year) Note: Minimum amount to be charged is for 1 kilometre
605.00
616.00
AN
N
- Where the lease forms an integral part of business, including provision of car parking Note: minimum amount to be charged is $500 per annum
5% of current land plus rates (min $500)
5% of current land plus rates (min $500)
AN
Y
- Where the lease is used for landscaping and similar works to enhance the appearance of the area *
130.00
132.00
AN
Y
Leasing of Advertising Space on Bus Shelters - per Shelter/Annum
1,360.00
1,384.00
AN
N
Lease of Council Car Park Area for Sales of Market Type Produce (fish vans, fruit & veg etc) - Annual Charge * - Daily Charge *
2,788.00 278.00
2,838.00 283.00
AN CB
N N
547.00
557.00
AN
Y
Leases of Canteens - Ted Scobie Oval/Lake Wyangan (per week) (non charity groups)
68.00
69.00
CB
Y
Licence Agreement
147.00
149.00
FS
Y
DESCRIPTION Property Rentals, Leases, Licences & Charges
Lease of Road Reserves, Drainage Reserves etc, for Business Purposes:
Leases/Licences of Crown Reserves & Council Owned Reserves to: - Non Profit Organisations eg. Scouts etc *
* New rent is calculated from base date 30 June 2018. Rent for previous year plus increase thereof increased by the percentage increase in the Consumer Price Index (all groups) Sydney for the 12 month period ending on the 30 June for that particular year.
Page 88
FEE JUSTIFICATION BASIS
Abbreviations Used:
AN:
Annual Charges
FS:
Fee for Service (User Pays)
CR:
Cost Recovery Basis
CB:
Commercial Basis
NF:
New Fee
NC:
New Charge
SL:
Statute Limited
Page 89
Griffith City Council Years ending 30 June 2021 INCOME STATEMENT - CONSOLIDATED
Actuals 2016/17 $
Revised Budget 2017/18 $
2018/19 $
Projected Years 2019/20 $
2020/21 $
Income from Continuing Operations Revenue: Rates & Annual Charges User Charges & Fees Interest & Investment Revenue Other Revenues Grants & Contributions provided for Operating Purposes Grants & Contributions provided for Capital Purposes Other Income: Net gains from the disposal of assets Total Income from Continuing Operations
29,896,000 14,548,000 1,422,000 1,314,000 11,693,000 4,614,000
29,816,620 15,786,776 1,261,629 1,761,967 6,628,146 6,539,861
30,612,562 15,789,610 1,249,918 1,672,188 7,045,034 5,641,257
31,479,538 16,328,298 1,252,663 1,660,379 8,100,018 21,095,639
32,346,148 16,751,197 1,252,284 1,681,634 7,685,949 3,016,832
339,000 63,826,000
61,794,999
62,010,569
79,916,536
62,734,045
Employee Benefits & On-Costs Borrowing Costs Materials & Contracts Depreciation & Amortisation Other Expenses Total Expenses from Continuing Operations
21,653,000 1,470,000 11,227,000 11,168,000 4,488,000 50,006,000
23,623,476 1,407,175 12,376,910 11,423,721 4,459,153 53,290,435
24,779,411 1,372,941 12,279,691 11,410,792 4,459,965 54,302,801
25,394,733 1,372,847 11,968,814 11,524,900 4,497,653 54,758,947
26,026,393 1,440,040 12,155,859 11,640,149 4,606,180 55,868,621
Operating Result from Continuing Operations
13,820,000
8,504,564
7,707,769
25,157,589
6,865,423
-
-
-
-
-
13,820,000
8,504,564
7,707,769
25,157,589
6,865,423
9,206,000
1,964,703
2,066,512
4,061,950
3,848,591
Expenses from Continuing Operations
Discontinued Operations - Profit/(Loss) Net Profit/(Loss) from Discontinued Operations
Net Operating Result for the Year Net Operating Result before Grants and Contributions provided for Capital Purposes
Griffith City Council Years ending 30 June 2021 INCOME STATEMENT - GENERAL FUND
Actuals 2016/17 $
Revised Budget 2017/18 $
2018/19 $
Projected Years 2019/20 $
2020/21 $
Income from Continuing Operations Revenue: Rates & Annual Charges User Charges & Fees Interest & Investment Revenue Other Revenues Grants & Contributions provided for Operating Purposes Grants & Contributions provided for Capital Purposes Other Income: Net gains from the disposal of assets Total Income from Continuing Operations
20,568,000 6,602,000 668,000 1,195,000 11,459,000 3,436,000
20,274,969 7,569,401 646,657 1,587,787 6,461,146 4,844,761
20,828,426 7,380,700 632,000 1,496,480 6,872,034 4,313,937
21,396,490 7,667,121 632,000 1,479,400 7,925,068 20,447,039
21,956,527 7,830,185 632,000 1,495,226 7,508,991 2,368,232
288,000 44,216,000
41,384,721
41,523,577
59,547,118
41,791,160
Employee Benefits & On-Costs Borrowing Costs Materials & Contracts Depreciation & Amortisation Other Expenses Total Expenses from Continuing Operations
17,701,000 97,000 6,166,000 7,144,000 2,921,000 34,029,000
19,763,956 83,745 5,962,349 7,442,686 3,247,994 36,500,730
20,909,411 109,241 5,838,882 7,370,849 3,258,280 37,486,663
21,427,983 167,313 5,544,118 7,444,557 3,327,758 37,911,729
21,961,535 297,942 5,721,195 7,519,003 3,407,377 38,907,052
Operating Result from Continuing Operations
10,187,000
4,883,991
4,036,914
21,635,389
2,884,108
-
-
-
-
-
10,187,000
4,883,991
4,036,914
21,635,389
2,884,108
6,751,000
39,230
1,188,350
515,876
Expenses from Continuing Operations
Discontinued Operations - Profit/(Loss) Net Profit/(Loss) from Discontinued Operations
Net Operating Result for the Year Net Operating Result before Grants and Contributions provided for Capital Purposes
(277,023)
Griffith City Council Years ending 30 June 2021 INCOME STATEMENT - WATER FUND
Actuals 2016/17 $
Revised Budget 2017/18 $
2018/19 $
Projected Years 2019/20 $
2020/21 $
Income from Continuing Operations Revenue: Rates & Annual Charges User Charges & Fees Interest & Investment Revenue Other Revenues Grants & Contributions provided for Operating Purposes Grants & Contributions provided for Capital Purposes Other Income: Net gains from the disposal of assets Total Income from Continuing Operations
1,878,000 7,091,000 550,000 106,000 175,000 611,000
1,965,395 7,528,175 421,972 157,390 108,000 368,450
1,969,833 7,701,810 434,918 157,888 116,000 375,450
2,030,305 7,932,864 437,663 162,625 117,980 375,450
2,091,916 8,170,850 437,284 167,503 120,019 375,450
15,000 10,426,000
10,549,382
10,755,899
11,056,887
11,363,023
Employee Benefits & On-Costs Borrowing Costs Materials & Contracts Depreciation & Amortisation Other Expenses Total Expenses from Continuing Operations
2,148,000 2,971,000 2,109,000 764,000 7,992,000
2,025,843 4,074,707 2,104,432 700,380 8,905,362
2,026,555 4,011,207 2,124,532 682,753 8,845,047
2,077,219 4,008,499 2,145,777 668,808 8,900,304
2,128,619 4,052,298 2,167,235 685,260 9,033,412
Operating Result from Continuing Operations
2,434,000
1,644,020
1,910,852
2,156,583
2,329,611
-
-
-
-
-
2,434,000
1,644,020
1,910,852
2,156,583
2,329,611
1,823,000
1,275,570
1,535,402
1,781,133
1,954,161
Expenses from Continuing Operations
Discontinued Operations - Profit/(Loss) Net Profit/(Loss) from Discontinued Operations
Net Operating Result for the Year Net Operating Result before Grants and Contributions provided for Capital Purposes
Griffith City Council Years ending 30 June 2021 INCOME STATEMENT - SEWER FUND
Actuals 2016/17 $
Revised Budget 2017/18 $
2018/19 $
Projected Years 2019/20 $
2020/21 $
Income from Continuing Operations Revenue: Rates & Annual Charges User Charges & Fees Interest & Investment Revenue Other Revenues Grants & Contributions provided for Operating Purposes Grants & Contributions provided for Capital Purposes Other Income: Net gains from the disposal of assets Total Income from Continuing Operations
7,450,000 855,000 204,000 13,000 59,000 567,000
7,576,256 689,200 193,000 16,790 59,000 1,326,650
7,814,303 707,100 183,000 17,820 57,000 951,870
8,052,743 728,313 183,000 18,355 56,970 273,150
8,297,705 750,162 183,000 18,905 56,939 273,150
36,000 9,184,000
9,860,896
9,731,093
9,312,531
9,579,862
Employee Benefits & On-Costs Borrowing Costs Materials & Contracts Depreciation & Amortisation Other Expenses Total Expenses from Continuing Operations
1,804,000 1,373,000 2,090,000 1,915,000 803,000 7,985,000
1,833,677 1,323,430 2,339,854 1,876,603 510,779 7,884,343
1,843,445 1,263,700 2,429,602 1,915,411 518,932 7,971,090
1,889,531 1,205,534 2,416,197 1,934,565 501,087 7,946,914
1,936,238 1,142,098 2,382,366 1,953,911 513,544 7,928,157
Operating Result from Continuing Operations
1,199,000
1,976,553
1,760,003
1,365,617
1,651,705
-
-
-
-
-
1,199,000
1,976,553
1,760,003
1,365,617
1,651,705
632,000
649,903
808,133
1,092,467
1,378,555
Expenses from Continuing Operations
Discontinued Operations - Profit/(Loss) Net Profit/(Loss) from Discontinued Operations
Net Operating Result for the Year Net Operating Result before Grants and Contributions provided for Capital Purposes
Griffith City Council Years Ending 30 June 2021 BALANCE SHEET - CONSOLIDATED
Actuals 2016/17 $
Current Year 2017/18 $
2018/19 $
Projected Years 2019/20 $
2020/21 $
ASSETS Current Assets Cash & Cash Equivalents Investments Receivables Inventories Other Total Current Assets Non-Current Assets Investments Receivables Inventories Infrastructure, Property, Plant & Equipment Investments Accounted for using the equity method Intangible Assets Other Total Non-Current Assets TOTAL ASSETS
19,639,000 17,404,000 7,694,000 3,702,000 90,000 48,529,000
23,922,539 12,132,886 8,266,090 3,761,809 175,105 48,258,429
24,847,747 10,032,892 7,928,789 3,980,034 190,173 46,979,635
23,606,720 8,544,830 9,162,387 3,896,489 185,464 45,395,889
22,289,146 7,071,583 7,594,288 3,951,490 190,830 41,097,337
4,000,000 386,000 698,142,000 339,000 5,825,000 708,692,000 757,221,000
559,888 2,279,141 712,954,597 339,000 5,825,000 721,957,626 770,216,055
557,788 2,459,329 723,809,590 339,000 5,825,000 732,990,707 779,970,342
555,688 2,393,003 751,855,382 339,000 5,825,000 760,968,073 806,363,962
553,588 2,432,848 771,153,682 339,000 5,825,000 780,304,118 821,401,454
5,299,000 1,018,000 1,240,000 6,155,000 13,712,000
5,849,518 973,873 1,488,659 6,131,532 14,443,581
6,224,640 1,046,767 1,676,550 6,131,532 15,079,487
6,115,828 1,078,526 1,555,642 6,131,532 14,881,528
6,253,562 1,099,620 1,916,794 6,131,532 15,401,508
4,000 18,888,000 166,000 19,058,000 32,770,000 724,451,000
8,760 19,262,691 189,468 19,460,919 33,904,501 736,311,555
9,152 20,886,141 189,468 21,084,762 36,164,249 743,806,093
9,239 21,580,500 189,468 21,779,208 36,660,735 769,703,227
9,481 30,713,706 189,468 30,912,656 46,314,163 775,087,291
410,815,000 313,636,000 724,451,000 724,451,000
422,675,555 313,636,000 736,311,555 736,311,555
430,170,093 313,636,000 743,806,093 743,806,093
456,067,227 313,636,000 769,703,227 769,703,227
461,451,291 313,636,000 775,087,291 775,087,291
LIABILITIES Current Liabilities Payables Income received in advance Borrowings Provisions Total Current Liabilities Non-Current Liabilities Payables Income received in advance Borrowings Provisions Total Non-Current Liabilities TOTAL LIABILITIES
Net Assets EQUITY Retained Earnings Revaluation Reserves Council Equity Interest
Total Equity
Griffith City Council Years Ending 30 June 2021 BALANCE SHEET - GENERAL FUND
Actuals 2016/17 $
Current Year 2017/18 $
2018/19 $
Projected Years 2019/20 $
2020/21 $
ASSETS Current Assets Cash & Cash Equivalents Investments Receivables Inventories Other Total Current Assets Non-Current Assets Investments Receivables Inventories Infrastructure, Property, Plant & Equipment Investments Accounted for using the equity method Intangible Assets Other Total Non-Current Assets TOTAL ASSETS
384,000 17,404,000 2,516,000 1,143,000 90,000 21,537,000
2,000,000 12,132,886 2,927,154 2,179,667 175,105 19,414,811
2,500,000 10,032,892 2,750,924 2,405,794 190,173 17,879,783
2,500,000 8,544,830 4,167,062 2,322,557 185,464 17,719,913
2,500,000 7,071,583 2,623,018 2,372,561 190,830 14,757,991
13,000 446,139,000 339,000 5,825,000 452,316,000 473,853,000
6,888 1,162,641 455,988,036 339,000 5,825,000 463,321,565 482,736,376
4,788 1,342,829 464,138,358 339,000 5,825,000 471,649,975 489,529,758
2,688 1,276,503 488,455,404 339,000 5,825,000 495,898,594 513,618,507
588 1,316,348 503,503,966 339,000 5,825,000 510,984,902 525,742,893
5,297,000 1,018,000 474,000 6,155,000 12,944,000
5,847,657 973,873 666,310 6,131,532 13,619,372
6,222,814 1,046,767 796,006 6,131,532 14,197,118
6,114,009 1,078,526 610,892 6,131,532 13,934,959
6,251,720 1,099,620 891,706 6,131,532 14,374,578
4,000 1,229,000 166,000 1,399,000 14,343,000 459,510,000
8,760 2,426,713 189,468 2,624,941 16,244,313 466,492,063
9,152 4,930,707 189,468 5,129,328 19,326,446 470,203,312
9,239 6,569,815 189,468 6,768,523 20,703,482 492,915,026
9,481 16,728,109 189,468 16,927,059 31,301,636 494,441,257
258,477,000 201,033,000 459,510,000 459,510,000
265,459,063 201,033,000 466,492,063 466,492,063
269,170,312 201,033,000 470,203,312 470,203,312
291,882,026 201,033,000 492,915,026 492,915,026
293,408,257 201,033,000 494,441,257 494,441,257
LIABILITIES Current Liabilities Payables Income received in advance Borrowings Provisions Total Current Liabilities Non-Current Liabilities Payables Borrowings Provisions Total Non-Current Liabilities TOTAL LIABILITIES
Net Assets EQUITY Retained Earnings Revaluation Reserves Council Equity Interest
Total Equity
Griffith City Council Years Ending 30 June 2021 BALANCE SHEET - WATER FUND
Actuals 2016/17 $
Current Year 2017/18 $
2018/19 $
Projected Years 2019/20 $
2020/21 $
ASSETS Current Assets Cash & Cash Equivalents Investments Receivables Inventories Other Total Current Assets Non-Current Assets Investments Receivables Inventories Infrastructure, Property, Plant & Equipment Other Total Non-Current Assets TOTAL ASSETS
12,626,000 3,020,000 2,559,000 18,205,000
16,751,425 2,981,340 1,582,143 21,314,908
17,457,407 2,758,671 1,574,240 21,790,318
16,329,853 2,504,151 1,573,931 20,407,935
14,453,051 2,402,676 1,578,930 18,434,657
4,000,000 373,000 131,783,000 136,156,000 154,361,000
553,000 1,116,500 134,403,090 136,072,590 157,387,498
553,000 1,116,500 135,889,333 137,558,833 159,349,151
553,000 1,116,500 139,019,535 140,689,035 161,096,970
553,000 1,116,500 143,121,545 144,791,045 163,225,701
2,000 2,000
1,861 1,861
1,826 1,826
1,819 1,819
1,842 1,842
2,000 154,359,000
1,861 157,385,637
1,826 159,347,326
1,819 161,095,151
1,842 163,223,859
87,031,000 67,328,000 154,359,000 154,359,000
90,057,637 67,328,000 157,385,637 157,385,637
92,019,326 67,328,000 159,347,326 159,347,326
93,767,151 67,328,000 161,095,151 161,095,151
95,895,859 67,328,000 163,223,859 163,223,859
LIABILITIES Current Liabilities Payables Borrowings Provisions Total Current Liabilities Non-Current Liabilities Payables Borrowings Provisions Total Non-Current Liabilities TOTAL LIABILITIES
Net Assets EQUITY Retained Earnings Revaluation Reserves Council Equity Interest
Total Equity
Griffith City Council Years Ending 30 June 2021 BALANCE SHEET - SEWER FUND
Actuals 2016/17 $
Current Year 2017/18 $
2018/19 $
Projected Years 2019/20 $
2020/21 $
ASSETS Current Assets Cash & Cash Equivalents Investments Receivables Inventories Other Total Current Assets Non-Current Assets Investments Receivables Inventories Infrastructure, Property, Plant & Equipment Other Total Non-Current Assets TOTAL ASSETS
6,629,000 2,158,000 8,787,000
5,171,114 2,357,596 7,528,710
4,890,340 2,419,194 7,309,534
4,776,867 2,491,174 7,268,041
5,336,095 2,568,594 7,904,689
120,220,000 120,220,000 129,007,000
122,563,471 122,563,471 130,092,181
123,781,899 123,781,899 131,091,433
124,380,444 124,380,444 131,648,485
124,528,171 124,528,171 132,432,860
766,000 766,000
822,349 822,349
880,544 880,544
944,750 944,750
1,025,088 1,025,088
17,659,000 17,659,000 18,425,000 110,582,000
16,835,978 16,835,978 17,658,327 112,433,854
15,955,434 15,955,434 16,835,978 114,255,455
15,010,685 15,010,685 15,955,434 115,693,051
13,985,597 13,985,597 15,010,685 117,422,175
65,307,000 45,275,000 110,582,000 110,582,000
67,158,854 45,275,000 112,433,854 112,433,854
68,980,455 45,275,000 114,255,455 114,255,455
70,418,051 45,275,000 115,693,051 115,693,051
72,147,175 45,275,000 117,422,175 117,422,175
LIABILITIES Current Liabilities Payables Income received in advance Borrowings Provisions Total Current Liabilities Non-Current Liabilities Payables Borrowings Provisions Total Non-Current Liabilities TOTAL LIABILITIES
Net Assets EQUITY Retained Earnings Revaluation Reserves Council Equity Interest
Total Equity
Griffith City Council Years ending 30 June 2021 CASH FLOW STATEMENT - CONSOLIDATED
Actual 2016/17 $
Revised Budget 2017/18 $
2018/19 $
Projected Years 2019/20 $
2020/21 $
Cash Flows from Operating Activities Receipts: Rates & Annual Charges User Charges & Fees Interest & Investment Revenue Received Grants & Contributions Other Payments: Employee Benefits & On-Costs Materials & Contracts Borrowing Costs Other Net Cash provided (or used in) Operating Activities
29,896,000 14,548,000 1,422,000 16,307,000 1,653,000
29,816,620 15,786,776 1,261,629 13,168,007 1,761,967
30,612,562 15,789,610 1,249,918 12,686,291 1,672,188
31,479,538 16,328,298 1,252,663 29,195,657 1,660,379
32,346,148 16,751,197 1,252,284 10,702,781 1,681,634
(21,653,000) (11,227,000) (1,470,000) (4,488,000)
(23,623,476) (12,376,910) (1,407,175) (4,459,153)
(24,779,411) (12,279,691) (1,372,941) (4,459,965)
(25,394,733) (11,968,814) (1,372,847) (4,497,653)
(26,026,393) (12,155,859) (1,440,040) (4,606,180)
24,988,000
19,928,285
19,118,561
36,682,489
18,505,572
-
653,000 401,621
286,097
348,165
197,697
Cash Flows from Investing Activities Receipts: Sale of Infrastructure, Property, Plant & Equipment Deferred Debtors Receipts Payments: Purchase of Infrastructure, Property, Plant & Equipment Deferred Debtors & Advances Made Net Cash provided (or used in) Investing Activities
-
(26,410,944) (500,000)
(22,390,785) -
(39,833,192) (500,000)
(30,688,449) (300,000)
-
(25,856,323)
(22,104,688)
(39,985,027)
(30,790,752)
-
2,300,000
3,300,000
2,250,000
11,050,000
-
(1,359,537)
(1,488,659)
(1,676,550)
(1,555,642)
Cash Flows from Financing Activities Receipts: Proceeds from Borrowings & Advances Payments: Repayment of Borrowings & Advances Net Cash Flow provided (used in) Financing Activities Net Increase/(Decrease) in Cash & Cash Equivalents
-
940,463
1,811,341
573,450
9,494,358
3,021,000
(4,987,575)
(1,174,786)
(2,729,089)
(2,790,822)
plus: Cash, Cash Equivalents & Investments-beginning of year
38,022,000
41,043,000
36,055,425
34,880,639
32,151,550
Cash & Cash Equivalents - end of the year
41,043,000
36,055,425
34,880,639
32,151,550
29,360,728
0.03
0.05
0.05
0.05
0.05
Less Depreciation & Amortisation Joint Ventures & Associated Entities Net Gains/Losses from the Disposal of Assets
11,168,000 -
11,423,721 -
11,410,792 -
11,524,900 -
11,640,149 -
Net Cash Operating Result for the Year
13,820,000
8,504,564
7,707,769
25,157,589
6,865,423
Debt Service Ratio
Griffith City Council Years ending 30 June 2021 CASH FLOW STATEMENT - GENERAL FUND
Actual 2016/17 $
Revised Budget 2017/18 $
2018/19 $
Projected Years 2019/20 $
2020/21 $
Cash Flows from Operating Activities Receipts: Rates & Annual Charges User Charges & Fees Interest & Investment Revenue Received Grants & Contributions Other Payments: Employee Benefits & On-Costs Materials & Contracts Borrowing Costs Other Net Cash provided (or used in) Operating Activities
20,568,000 6,602,000 668,000 14,895,000 1,483,000
20,274,969 7,569,401 646,657 11,305,907 1,587,787
20,828,426 7,380,700 632,000 11,185,971 1,496,480
21,396,490 7,667,121 632,000 28,372,107 1,479,400
21,956,527 7,830,185 632,000 9,877,223 1,495,226
(17,701,000) (6,166,000) (97,000) (2,921,000)
(19,763,956) (5,962,349) (83,745) (3,247,994)
(20,909,411) (5,838,882) (109,241) (3,258,280)
(21,427,983) (5,544,118) (167,313) (3,327,758)
(21,961,535) (5,721,195) (297,942) (3,407,377)
17,331,000
12,326,677
11,407,763
29,079,947
10,403,111
560,500 8,388
4,724
2,100
2,100
Cash Flows from Investing Activities Receipts: Sale of Infrastructure, Property, Plant & Equipment Deferred Debtors Receipts Payments: Purchase of Infrastructure, Property, Plant & Equipment Deferred Debtors & Advances Made
-
Net Cash provided (or used in) Investing Activities
-
(18,257,065)
(15,646,171)
(32,024,103)
(22,317,566)
(17,688,177)
(15,641,447)
(32,022,003)
(22,315,466)
2,300,000
3,300,000
2,250,000
11,050,000
Cash Flows from Financing Activities Receipts: Proceeds from Borrowings & Advances Payments: Repayment of Borrowings & Advances Net Cash Flow provided (used in) Financing Activities Net Increase/(Decrease) in Cash & Cash Equivalents
(593,614) (583,000)
(666,310)
(796,006)
(610,892)
1,706,386
2,633,690
1,453,994
10,439,108
(3,655,114)
(1,599,994)
(1,488,062)
(1,473,247)
plus: Cash, Cash Equivalents & Investments-beginning of year
18,371,000
17,788,000
14,132,886
12,532,892
11,044,830
Cash & Cash Equivalents - end of the year
17,788,000
14,132,886
12,532,892
11,044,830
9,571,583
0.00
0.02
0.02
0.02
0.02
7,144,000 -
7,442,686
7,370,849
7,444,557
7,519,003
10,187,000
4,883,991
4,036,914
21,635,389
2,884,108
Debt Service Ratio Less Depreciation & Amortisation Joint Ventures & Associated Entities Net Gains/Losses from the Disposal of Assets Net Operating Result for the Year
Griffith City Council Years ending 30 June 2021 CASH FLOW STATEMENT - WATER FUND
Actual Revised Budget 2016/17 2017/18 $ $
2018/19 $
Projected Years 2019/20 $
2020/21 $
Cash Flows from Operating Activities Receipts: Rates & Annual Charges User Charges & Fees Interest & Investment Revenue Received Grants & Contributions Other Payments: Employee Benefits & On-Costs Materials & Contracts Borrowing Costs Other Net Cash provided (or used in) Operating Activities
1,878,000 7,091,000 550,000 786,000 121,000
1,965,395 7,528,175 421,972 476,450 157,390
1,969,833 7,701,810 434,918 491,450 157,888
2,030,305 7,932,864 437,663 493,430 162,625
2,091,916 8,170,850 437,284 495,469 167,503
(2,148,000) (2,971,000) (764,000)
(2,025,843) (4,074,707) (700,380)
(2,026,555) (4,011,207) (682,753)
(2,077,219) (4,008,499) (668,808)
(2,128,619) (4,052,298) (685,260)
4,543,000
3,748,452
4,035,384
4,302,360
4,496,846
73,000 393,233
281,373
346,065
195,597
Cash Flows from Investing Activities Receipts: Sale of Infrastructure, Property, Plant & Equipment Deferred Debtors Receipts Payments: Purchase of Investment Securities Purchase of Infrastructure, Property, Plant & Equipment Deferred Debtors & Advances Made Net Cash provided (or used in) Investing Activities
(3,589,260) (500,000) -
(3,623,027)
(3,610,775)
(5,275,979) (500,000)
(6,269,245) (300,000)
(3,329,402)
(5,429,914)
(6,373,648)
Cash Flows from Financing Activities Receipts: Proceeds from Borrowings & Advances Proceeds from Finance Leases Other Financing Activity Receipts Payments: Repayment of Borrowings & Advances Net Cash Flow provided (used in) Financing Activities
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
2,790,000
125,425
705,982
plus: Cash, Cash Equivalents & Investments-beginning of year
13,836,000
16,626,000
Cash & Cash Equivalents - end of the year
16,626,000
Balance of Sec 64 Water Reserve Balance of Unrestricted Cash
Net Increase/(Decrease) in Cash & Cash Equivalents
(1,127,554)
(1,876,802)
16,751,425
17,457,407
16,329,853
16,751,425
17,457,407
16,329,853
14,453,051
2,735,761 13,890,239
3,104,211 13,647,214
3,479,661 13,977,746
3,855,111 12,474,742
4,230,561 10,222,490
Less Depreciation & Amortisation Net Gains from the Disposal of Assets
2,109,000
2,104,432
2,124,532
2,145,777
2,167,235
Net Operating Result for the Year
2,434,000
1,644,020
1,910,852
2,156,583
2,329,611
Griffith City Council Years ending 30 June 2021 CASH FLOW STATEMENT - SEWER FUND
Actual Revised Budget 2016/17 2017/18 $ $
2018/19 $
Projected Years 2019/20 $
2020/21 $
Cash Flows from Operating Activities Receipts: Rates & Annual Charges User Charges & Fees Interest & Investment Revenue Received Grants & Contributions Other Payments: Employee Benefits & On-Costs Materials & Contracts Borrowing Costs Other Net Cash provided (or used in) Operating Activities
7,450,000 855,000 204,000 626,000 49,000
7,576,256 689,200 193,000 1,385,650 16,790
7,814,303 707,100 183,000 1,008,870 17,820
8,052,743 728,313 183,000 330,120 18,355
8,297,705 750,162 183,000 330,089 18,905
(1,804,000) (2,090,000) (1,373,000) (803,000)
(1,833,677) (2,339,854) (1,323,430) (510,779)
(1,843,445) (2,429,602) (1,263,700) (518,932)
(1,889,531) (2,416,197) (1,205,534) (501,087)
(1,936,238) (2,382,366) (1,142,098) (513,544)
3,114,000
3,853,156
3,675,414
3,300,182
3,605,615
-
-
-
Cash Flows from Investing Activities Receipts: Sale of Infrastructure, Property, Plant & Equipment Deferred Debtors Receipts Payments: Purchase of Investment Securities Purchase of Infrastructure, Property, Plant & Equipment Deferred Debtors & Advances Made Net Cash provided (or used in) Investing Activities
19,500
-
(4,564,619)
(3,133,839)
(2,533,110)
(2,101,638)
(4,545,119)
(3,133,839)
(2,533,110)
(2,101,638)
Cash Flows from Financing Activities Receipts: Proceeds from Borrowings & Advances Proceeds from Finance Leases Other Financing Activity Receipts Payments: Repayment of Borrowings & Advances Net Cash Flow provided (used in) Financing Activities Net Increase/(Decrease) in Cash & Cash Equivalents
-
-
-
-
-
-
-
(765,923)
(822,349)
(880,544)
(944,750)
-
(765,923)
(822,349)
(880,544)
(944,750)
814,000
(1,457,886)
(280,774)
(113,472)
559,227
plus: Cash, Cash Equivalents & Investments-beginning of year
5,815,000
6,629,000
5,171,114
4,890,340
4,776,867
Cash & Cash Equivalents - end of the year
6,629,000
5,171,114
4,890,340
4,776,867
5,336,095
Balance of Sec 64 Sewer Reserve Balance of Unrestricted Cash
1,456,306 5,172,694
1,714,556 3,456,558
1,977,706 2,912,634
2,240,856 2,536,011
2,504,006 2,832,089
0.15
0.23
0.24
0.23
0.22
Less Depreciation & Amortisation Net Gains from the Disposal of Assets
1,915,000
1,876,603 -
1,915,411 -
1,934,565 -
1,953,911 -
Net Operating Result for the Year
1,199,000
1,976,553
1,760,003
1,365,617
1,651,705
Debt Service Ratio
delivery program and operational plan 275
capital works program
delivery program and operational plan 276
contents Capital Works Program - General Fund
277
Capital Works Program - Waste Fund
281
Capital Works Program - Water Fund
282
Capital Works Program - Sewer Fund
283
Griffith City Council - Long Term Infrastructure Plan Capital Works Program General Fund
1
2
3
2018/19
2019/20
2020/21
Year 1 Funding Item
Ranking/ Priority
Department
Linkage to Delivery Program/ Community Strategic Plan
Project
Comments
Project Total General Purpose Revenue
Grants/ Contributions
Reserves
Loans
1
1
Public Cemeteries
8.1.14
Lawn Beams - Blumer Ave site
Unavoidable, as expenditure required to enable continued service provision, fund from fees and charges generated
7,430
87,164
7,430
2
1
Public Cemeteries
8.1.14
Vault Construction - Blumer Ave site
Unavoidable, as expenditure required to enable continued service provision, fund from fees and charges generated
96,130
554,157
96,130
3
1
Public Cemeteries
8.1.13
New Cemetery - Stage 1 Rifle Range Road
Funded from general purpose revenue. Expenditure unavoidable to provide capacity for this essential service to the community
50,000
1,750,000
50000
200000
4
2
Fleet
8.1.12
Plant Replacement Program - General (Net)
Needed to maintain service level, fund from general purpose revenue
1,322,500
12,695,950
1,322,500
1,157,750
5
3
Fleet
8.1.16
Depot Buildings Asset Maintenance (Capital)
Needed to maintain service level, fund from general purpose revenue
95,000
1,560,079
95,000
10,000
10,000
6
2
Aquatic Facilities
4.4.1
GRALC Redevelopment
Needed to improve service level, fund from external loan 50% & Grant 50%
0
6,000,000
3,000,000
3,000,000
7
3
Aquatic Facilities
4.4.2
Aquatic Facility Asset Maintenance (Capital)
Needed to maintain service level, fund from Facilities Reserve
8
3
Aquatic Facilities
4.4.2
Aquatic Facility Equipment Maintenance (Capital)
9
2
Parks & Gardens
5.3.1
West End Sports Precinct
10
2
Parks & Gardens
5.2.1
Playground Equipment Replacement - General
Needed to maintain service level, fund from general purpose revenue Needed to maintain service level, fund from grant, loan, contributions & Section 94A Needed to maintain service level, fund from Section 94A
11
2
Parks & Gardens
5.2.1
Playground Equipment Replacement - City Park
Needed to maintain service level, fund from Section 94A
0
0
2
Parks & Gardens
5.2.1
Halse Park Irrigation System
Needed to maintain service level, fund from Section 94A
2
Parks & Gardens
5.2.1
Irrigation System Installation - Replacements/Upgrades
Needed to maintain service level, fund from general purpose revenue
14
2
Parks & Gardens
8.1.17
Upgrade Toilet Blocks - General
15
2
Parks & Gardens
5.3.1
Refurbish Sporting Ovals
16
5
Parks & Gardens
5.2.1
New Community Stage-Community Gardens
17
4
Parks & Gardens
5.2.1
Upgrade Memorial Park-Griffith
Funded from SCCF Grant & Section 94A
8.3.1
New Rose Garden-Adjacent to Visitors Information Centre (Addendum)
Lower priority but necessary in medium / longer term, fund general purpose revenue
60,000
Needed to maintain service level, fund from general purpose revenue
5
Parks & Gardens
73,000
42,000
70,500
84,500
105,500
52,000
10,000,000
8,800,000
175,000
75,000
131,681
0
25,000
0 131,681
25,000
25,000
24,585
76,367
24,585
0
225,346
0
1,212,500
607,000
925,867
0
12
18
175,000
7,959 102,974
350,500
18,800,000
0
13
Needed to maintain service level, fund from general purpose revenue (50%) & PRMF (50%) Needed to maintain service level, fund from Parks & Gardens Infrastructure Reserve Lower priority but necessary in medium / longer term, fund from Stuart McWilliam Beautification Reserve & SCCF Grant
73,000
84,500
7,690
25,445
26,336
105,346
36,880
212,595
36,880
0
200,000
100,000
978,000
300,000
0
486,000
120,000
606,000
606,000
122,500
60,000 15,000
39,504 678,000
62,500
19
3
Parks & Gardens
5.2.1
Upgrade Irrigation System & Garden-Noorebar Ave (Addendum)
15,000
15,000
20
2
Roads & Bridges
8.2.3
Blackspot Works- 1:1 RMS
50% funded from RMS, priority safety projects with 50% contribution from R2R
0
1,260,000
21
2
Roads & Bridges
8.2.3
Rural Unsealed - Specified Maintenance
Partially funded from FAGS grant road component & general purpose revenue
1,161,240
13,622,963
1,161,240
1,201,883
1,243,949
22
2
Roads & Bridges
8.2.3
Reseals Urban
Partially funded from FAGS grant road component & general purpose revenue
409,492
4,803,910
409,492
423,824
438,658
23
2
Roads & Bridges
8.2.3
Reseals Rural
Partially funded from FAGS grant road component & general purpose revenue
827,540
9,708,209
827,540
856,505
886,483
24
2
Roads & Bridges
4.2.1
Traffic Safety Projects - RMS
RMS funded (50%) + GCC (50%)
842,717
67,000
70,350
73,868
25
3
Roads & Bridges
8.2.3
Kerb & Gutter Renewal (New Expenditure)
Lower priority but necessary in medium / longer term, fund from general purpose revenue
0
586,754
26
3
Roads & Bridges
8.2.3
Road Rehabilitations
Funded from R2R, seen as a priority road maintenance issue
0
4,337,120
27
3
Roads & Bridges
8.2.3
Road Resealing Program
Funded from R2R, seen as a priority road maintenance issue
0
0
28
3
Roads & Bridges
8.2.3
Road Rehabilitations - Flood Affected Roads
Needed to maintain service level, fund from NADRRA Grant
0
800,000
800,000
800,000
29
3
Roads & Bridges
8.2.1
Walla Ave/Bromley Rd/Kidman Way Southern Bypass (Industrial Link)
Funded from Fixing Country Roads Grant & R2R
0
574,000
7,400,000
574,000
6,826,000
30
3
Roads & Bridges
8.2.3
Upgrade CBD Roads - Roads/Kerb & Gutter/Drainage
Needed to improve service level, fund from loan
0
1,000,000
4,000,000
1,000,000
1,000,000
31
3
City Strategy
2.3.4
Griffith CBD Strategy
Needed to improve service level, fund from Loan & Major Projects reserve
0
1,500,000
6,500,000
1,500,000
750,000
32
3
City Strategy
2.3.4
Lake Wyangan Development
Needed to improve service level, fund from Loan
33,500
33,500
101,780 525,417
2,000,000
33
3
City Strategy
2.3.4
Monitoring System-Lake Wyangan
Needed to maintain service level, fund from general purpose revenue
54,000
214,000
214,000
34
3
City Strategy
8.2.3
New Traffic Counters
Lower priority but necessary in medium / longer term, fund from general purpose revenue
13,770
47,704
13,770
30,000
70,000
30,000
35
3
36 37
Lower priority but necessary in medium / longer term, fund from general purpose revenue Priority to be determined but necessary in medium / longer term, fund from general purpose revenue
160,000
750,000 2,000,000
City Strategy
8.2.3
Replace Survey Equipment
3
Street Lighting
10.2.2
Additional Lights - General
24,585
288,416
24,585
25,445
26,336
2
Works Management
8.2.3
Miscellaneous Capital Works Replacement Items
Needed to maintain service level, fund from general purpose revenue
12,196
143,075
12,196
12,623
13,065
38
3
Governance
8.1.17
Governance Building Asset Maintenance (Capital)
Needed to maintain service level, fund from general purpose revenue
78,980
461,417
78,980
66,183
13,064
39
3
Governance
8.1.17
99.84kW Solar System - Council's Administration Building
Needed to maintain service level, fund from general purpose revenue
150,000
150,000
150,000
265,351
162,426
40
5
Governance
3.1.11
Council Identification Sign & Time Capsule Project
Needed to maintain service level, fund from general purpose revenue
25,000
25,000
25,000
41
3
Library
4.4.6
Library Building Asset Maintenance (Capital)
Needed to maintain service level, fund from general purpose revenue
30,000
522,404
30,000
42
3
Library
10.4.1
70kW Solar System - Library Building
Needed to maintain service level, fund from general purpose revenue
0
70,000
43
3
IT Services
3.1.13
Annual PC Replacement/Renewal Program
Needed to maintain service level, fund from general purpose revenue
114,232
1,195,118
114,232
115,374
116,528
44
3
IT Services
3.1.13
Servers & Network Upgrades
Needed to maintain service level, fund from general purpose revenue
47,135
229,046
47,135
17,300
27,475
45
3
IT Services
3.1.13
Replace CCTV Cameras - CBD
Needed to maintain service level, fund from general purpose revenue
0
63,614
46
5
IT Services
3.1.13
Corporate Phone System Upgrade
Needed to maintain service level, fund from general purpose revenue
250,000
47
3
Saleyards
8.1.11
Upgrade Truck Wash
Needed to improve service level, fund from general purpose revenue & grant
232,750
48
3
Saleyards
8.1.11
Concrete Construction - Sheep Yard & Pavement Areas
49
3
Saleyards
8.1.11
Shade Structures / Yard Improvements / Signs / Misc
50
3
Saleyards
8.1.11
Refurbish Sheep Loading Ramps
Needed to maintain service level, fund from general purpose revenue
51
3
Saleyards
8.1.11
Upgrade Canteen
52
3
Saleyards
8.1.11
Saleyard Expansion-Sheep Yards
70,000
250,000
250,000
388,940
388,940
35,480
416,230
35,480
36,722
38,007
12,420
145,704
12,420
12,855
13,305
45,000
225,000
45,000
45,000
45,000
Needed to maintain service level, fund from general purpose revenue
8,000
8,000
8,000
Needed to maintain service level, fund from general purpose revenue
0
540,000
40,000
100,000
Expenditure required to enable continued service provision, fund from fees and charges generated Expenditure required to enable continued service provision & mitigate WHS concerns raised, fund from fees and charges generated
156,190
53
3
Theatre
4.5.2
Theatre Asset Maintenance (Capital)
Needed to maintain service level, fund from Building Reserve
2,034,839
1,025,500
40,000
85,000
54
3
Stadium
5.3.4
Stadium Building Asset Maintenance (Capital)
Needed to maintain service level, fund from general purpose revenue
58,205
0
663,500
362,000
174,498
58,205
15,713
11,088
55
3
Pioneer Park Museum
8.1.23
Pioneer Park Museum Buildings Asset Maintenance (Capital)
Needed to maintain service level, fund from general purpose revenue
106,200
361,100
106,200
68,900
12,000
56
3
Aerodrome
8.1.15
Terminal Building Asset Maintenance (Capital)
Needed to maintain service level, fund from general purpose revenue
0
121,958
0
20,713
57
3
Aerodrome
8.1.15
Renew Kangaroo Fencing
Needed to maintain service level, fund from general purpose revenue
54,000
354,000
54,000
58
3
Aerodrome
8.1.15
Renew Gravel Car Park
Needed to maintain service level, fund from general purpose revenue
25,000
25,000
25,000
59
3
Visitors Centre
8.1.23
Visitors Centre Building Asset Maintenance (Capital)
Needed to maintain service level, fund from general purpose revenue
50,507
80,407
50,507
60
3
Events Coordination
8.1.23
Banner Changeover-Bannerconda
Needed to maintain service level, fund from general purpose revenue
76,180
76,180
76,180
61
3
Senior Citizens Centre
8.1.23
Senior Citizens Centre Building Asset Maintenance (Capital)
Needed to maintain service level, fund from general purpose revenue
0
69,000
62
3
Housing
8.1.23
State Bank House Asset Maintenance (Capital)
Needed to maintain service level, fund from general purpose revenue
22,000
30,000
22,000
63
3
Housing
8.1.23
239 Banna Ave-Asbestos Removal
Needed to maintain service level, fund from general purpose revenue
2,000
2,000
2,000
Expenditure required to enable continued service provision & mitigate WHS concerns raised, fund from fees and charges generated
10,400
20,800
10,400
Needed to maintain service level, fund from general purpose revenue
0
7,886
49,170
348,205
49,170
11,088 300,000
3,000
16,900
26,000
13,000
64
3
Housing
8.1.17
Installation of Anchor Points on Council Buildings - WHS Issues
65
3
Ranger Services
4.2.2
Replace "Alcohol Free Zone" Signs
66
3
Parking Areas
8.2.3
Reseal Car Parks (New Expenditure)
67
3
Footpaths & Cycleways
2.3.2
PAMP Implementation
68
3
Footpaths & Cycleways
2.3.2
Cycleways (Reseals & New Paths)
69
3
Footpaths & Cycleways
8.2.3
CBD Paving Replacement
70
4
Footpaths & Cycleways
2.3.2
Hanwood Cycleway
71
4
Footpaths & Cycleways
2.3.2
Villages Footpaths
Funded from SCCF Grant & general purpose revenue Needed to maintain service level, fund from OEH Grant (66.6%) & internal loan from Water Fund (33.4%)
0 0
500,000
1,000,000
500,000
500,000
0
61,460
721,028
61,460
63,611
65,837
682,176
60,537
62,051
63,602
Lower priority but necessary in medium / longer term, fund from general purpose revenue Needed to maintain or improve accessibility service level, fund 50% from general purpose revenue / 50% RMS Lower priority but necessary in medium / longer term, fund from general purpose revenue (50%) & RMS (50%) Lower priority but necessary in medium / longer term, fund from general purpose revenue Funded from RMS in 2018/19 & general purpose revenue, RMS & contribution from Baiada in 2019/20
72
4
Urban Stormwater
8.1.17
Yoogali Levee
73
4
Urban Stormwater
8.1.17
Drainage Improvements-Collina
Needed to maintain service level, fund from Section 64 Drainage Reserve
12,293
281,926
24,586
25,446
26,336
65,000
65,000
1,351,786
130,000
117,836
121,960
628,348
53,561
55,436
57,376
53,561 0
625,000
1,200,000
625,000
575,000
22,570
196,000
437,140
218,570
218,570
74
4
Urban Stormwater
8.1.17
Drainage Improvements/Replacements
75
4
General
8.1.17
Allocation of Wages/Salaries to Capital Works
Allocation of current staff to capital projects
60,537
Total
6,018,088
2,400,000
3,971,483
1,453,340
1,500,000
900,000
2,500,000
Total Capital
119,446,822
13,942,911
30,709,103
21,667,566
Infrastructure Backlog
10,467,382
1,669,412
2,976,327
2,429,577
Improved LOS
22,011,750
3,284,604
7,485,667
7,183,299
Growth Works
19,803,784
1,829,845
11,091,893
4,071,913
Asset Renewals
67,163,906
7,159,050
9,155,216
7,982,778
Total
119,446,822
13,942,911
30,709,103
21,667,566
2018/19
2019/20
2020/21
119,446,822
13,942,911
30,709,103
21,667,566
New Capital Grant/Contribution Income
34,921,197
3,971,483
21,084,489
2,436,499
Summary Total Capital Expenditure
Priority
3,672 52,672
12,293
Priority to be determined but necessary in medium / longer term, fund from Stormwater Reserve
Legend
10,400
1. Council is committed to the expenditure
1
New Loans
20,800,000
2,500,000
2,250,000
11,050,000
2. Projects are essential to keep existing resources engaged or service levels maintained in a key function or infrastructure area
2
Funded by Rates, Fees & Charges or FAGS
55,349,289
6,018,088
6,654,003
5,920,220
3. Will be necessary to continue to provide the required level of service in the future
3
Funded by existing Grants/Loans already accounted for
4. Funding has already been secured to complete the project
4
Funded from existing Reserves
1,453,340
720,611
2,260,848
5. Is necessary expenditure but maybe able to be deferred
5
Funded by Asset/Land Sales
6. Project is not essential to providing a service or function
6
Total Capital Spend Funded
13,942,911
30,709,103
21,667,566
0 8,376,335 0 119,446,822
Current Year Capital Item Requests Not Considered Further Due To Lack Of Funding 76
3
Parks & Gardens
Parks & Gardens Lunch Room Extension
77
3
Parks & Gardens
Upgrade Irrigation System & Garden-Noorebar Avenue
78
5
Parks & Gardens
Dog Off-Leash Area (Collina)
79
5
City Strategy
Banna Lane Street Art
80
5
Governance
Livestreaming of Council Meetings
81
5
Fleet
Brake Roller Tester-New Workshop
82
5
Fleet
Suspension Shaker-New Workshop
83
5
Fleet
Solar Power System-New Workshop
84
5
Fleet
Walk Behind Scrubber Sweeper-New Workshop
85
5
Fleet
2 x New Boom Gates-New Workshop
86
5
Fleet
Guilotine-Welders Workshop
87
5
Fleet
Internal Pallet Racking-Store
88
5
Public Cemeteries
New Amenities Building-Yenda Cemetery
Rates/
Grants/
Charges/
Contributions
Reserves
Loans
Project Total
Fees Lower priority but necessary in medium / longer term, fund from general purpose revenue Lower priority but necessary in medium / longer term, fund from general purpose revenue Lower priority but necessary in medium / longer term, fund from general purpose revenue Lower priority but necessary in medium / longer term, fund from general purpose revenue/NSW Dept of Industry grant & contribution from business houses Lower priority but necessary in medium / longer term, fund from general purpose revenue Lower priority but necessary in medium / longer term, fund from general purpose revenue Lower priority but necessary in medium / longer term, fund from general purpose revenue Lower priority but necessary in medium / longer term, fund from general purpose revenue Lower priority but necessary in medium / longer term, fund from general purpose revenue Lower priority but necessary in medium / longer term, fund from general purpose revenue Lower priority but necessary in medium / longer term, fund from general purpose revenue Lower priority but necessary in medium / longer term, fund from general purpose revenue Lower priority but necessary in medium / longer term, fund from general purpose revenue Total
2018/19
21,900
21,900
21,900
15,000
15,000
15,000
50,000
50,000
50,000
105,000
105,000
17,000
17,000
17,000
75,000
75,000
75,000
25,000
25,000
25,000
20,000
20,000
20,000
5,000
5,000
5,000
8,000
8,000
8,000
35,000
70,000
2,400
2,400
2,400
28,500
28,500
28,500
60,000
60,000
432,800
432,800
60,000 362,800
70,000
0
Longer Term Capital Items Not Considered Further Due To Lack Of Funding New Signage
Rates/
Grants/ Contributions
Reserves
Loans
2018/19
6
Pioneer Park Museum
90
2
Parks & Gardens
Upgrade Filtration & Chlorination System at "Splash Pad" (City Needed to maintain service level, fund from general purpose revenue Park)
91
3
Parks & Gardens
2 x New BBQ''s-Willow Park
Needed to maintain service level, fund from general purpose revenue
92
3
Parks & Gardens
2 x New BBQ''s-Lake Wyangan Picnic Area
Needed to maintain service level, fund from general purpose revenue
93
6
Parks & Gardens
New Artificial Christmas Tree-Griffith Memorial Park
Lower priority but necessary in medium / longer term, fund from general purpose revenue Needed to maintain service level, fund from general purpose revenue
15,000
15,000
15,000
Needed to maintain service level, fund from general purpose revenue
250,000
250,000
250,000
Needed to maintain service level, fund from general purpose revenue
363,508
390,265
363,508
50,000
50,000
33,000
33,000
33,000
30,000
30,000
30,000
120,000
120,000
120,000
50,000
50,000
50,000
20,000
20,000
20,000
5,000
5,000
5,000
28,000
28,000
28,000
0
2,048,800
94
3
Parks & Gardens
95
3
Parks & Gardens
New Toilet Block - Dalton Park (Inc demolition of existing one
96
3
Parks & Gardens
Dalton Park Drainage Upgrade
97
3
Pioneer Park Museum
Sewer Connection-Extension
98
6
Economic Development
Installation of WiFi in the CBD
99
3
Urban Stormwater
Crook Rd Drainage Upgrade
100
3
Urban Stormwater
Rae Rd Drainage Upgrade
101
5
Roads & Bridges
50/50 Sealing of Roads
Lower priority but necessary in medium / longer term, fund from general Installation of 2 Solar Lights-Infant Section of Griffith Cemetery purpose revenue
102
5
Public Cemeteries
103
5
Art Gallery
Installation of Storage Space-Shipping Container
104
5
Art Gallery
Display Cases-National Contemporary Jewellery Collection
105
5
Urban Stormwater
106
6
Roads & Bridges
107
6
Economic Development
108
3
Theatre
109
5
Fleet
110
5
Urban Stormwater
111
5
Urban Stormwater
112
5
Urban Stormwater
113
5
Urban Stormwater
114 115 116
5 6 6
City Strategy Parks & Gardens Parks & Gardens
Lower priority but necessary in medium / longer term, fund from fees and charges (50%) & PRMF Grant (50%) Lower priority but necessary in medium / longer term, fund from general purpose revenue Lower priority but necessary in medium / longer term, fund from general purpose revenue Lower priority but necessary in medium / longer term, fund from general purpose revenue Lower priority but necessary in medium / longer term, fund from general purpose revenue (50%) & private person/entity (50%)
Urban Drainage Problems ("Nuisance Flooding")
Lower priority but necessary in medium / longer term, fund from general purpose revenue Lower priority but necessary in medium / longer term, fund from general purpose revenue Priority to be determined but necessary in medium / longer term, fund from Urban Stormwater Management Reserve once Yambil Street loan repayment is completed in 2019/20
6,000
6,000
6,000
15,000
15,000
15,000
7,530
7,530
7,530
7,530
7,530
7,530
0
50,000
25,000
25,000
Can only be funded from general purpose revenue if available
110,250
1,386,713
110,250
Signage Strategy Renewal
Lower priority but necessary in medium / longer term, fund from general purpose revenue
36,000
66,000
36,000
Elevated Work Platform
Needed to maintain service level, fund from general purpose revenue
35,631
35,631
35,631
Fibre to Depot (Visitors Centre to Drainage Reserve)
Needed to maintain service level, fund from general purpose revenue
50,000
50,000
50,000
0
1,554,372
Priority to be determined but necessary in medium / longer term, fund from general purpose revenue Priority to be determined but necessary in medium / longer term, fund from Urban Drainage Problems Yenda Stage 2, 3A, 3B, 3C, 4, 5 general purpose revenue Priority to be determined but necessary in medium / longer term, fund from Urban Drainage Problems Yoogali Stage 2, 3, 4, 5, 6 general purpose revenue Priority to be determined but necessary in medium / longer term, fund from Urban Drainage Problems Hanwood Stage 1A, 1B, 1C, 2, 3, 4 general purpose revenue Cultural Precent Masterplan Implementation (Includes the Clock Restaurant)
Escalated level of service, possible funding from major projects fund
Unisex Disabled Toilet (In Existing Building) - City Park
Lower priority but necessary in medium / longer term, fund from general purpose revenue
City Entrance Improvement Strategy
Lower priority but necessary in medium / longer term, possible funding from major projects fund Total
2019/20
2020/21
50,000
Rural Sealed - Heavy Patching
Detention Systems North of CBD
0
Total
89
Installation of Potable Water Supply including Bubbler, Tap & Concrete Pad-Dog Off Leash Area
0
Project
Fees Lower priority but necessary in medium / longer term, fund from general purpose revenue
2020/21
0
Total Capital Items Not Part of Original 2018/19 Capex Budget
Charges/
2019/20
26,757
115,763
121,551 15,000
368,777
381,684
613,000
633,000
0
2,398,000
421,000
749,000
0
2,200,000
910,000
600,000
0
3,000,000
2,000,000
1,000,000
50,000
50,000
50,000
200,000
100,000
13,791,516
1,803,449
100,000 855,881
0
0
421,000
328,000
100,000
0
Total Capital Items Not Considered Further Due To Lack Of Funding
4,412,296
2,851,234
Items Identified At Strategic Planning Think Tank-Held on 15 December 2016
Linkage to Delivery Program/ Community Strategic Plan
Department
A
Aquatic Facilities
50 Metre Outdoor Pool
B
Public Cemeteries
C
City Strategy
D
Parks & Gardens
City Entrances Improvement Works
Refer item 114
E
Roads & Bridges
Southern Section Of Industrial Link Road
Refer item 27
Parks & Gardens
Multi Purpose Sports Facility-Secondary Education Option
Refer item 9
-
Parks & Gardens
Multi Purpose Sports Facility-Showground Redevelopment (Crown Reserve)
Not in existing 10 Year Capex Program
-
F
Project
Comments
Estimated Cost
Item
Refer item 6
5,500,000
New Lawn Cemetery-Rifle Range Road
Refer item 3
1,500,000
Central Business District Upgrade & Carpark
Refer item 29
5,000,000 4,000,000
City Strategy
Cultural Precincts-War Memorial, Pioneer Park, Clock Building, Refer item 112 Art Gallery & Library
City Strategy
Lake Wyangan-Walk/Cycle Track & Need for Other Upgraded Further discussion with Lake Wyangan & Catchment Management Committee. Facilities Not in existing 10 Year Capex Program
-
I
City Strategy
Hermits Cave Development
Not in existing 10 Year Capex Program
-
J
Parks & Gardens
Multi Purpose Community Facilities
Refer items 16 & 17
-
Governance
Installation of Solar Energy for Council Owned Buildings & Facilities
Refer item 37
-
Library
Installation of Solar Energy for Council Owned Buildings & Facilities
Refer item 40
-
Aged Care Facilities-Need for Public Pathways & Cycleways for Residents & Visitors
Refer items 64, 65, 66, 67, 68, 69
-
G H
K
100,000
L
Footpaths & Cycleways
M
City Strategy
Council Funding For Community Based Improvement Priorities Not in existing 10 Year Capex Program
-
N
City Strategy
Affordable Housing Options
Refer to operating budget in 2018/19. Ledger account 054117.0111.100 ($15K)
-
Road Network Maintenance
Grant application lodged & being assessed by RMS. Not in existing 10 Year Capex Program
-
O
Roads & Bridges
Capital Works Program Waste Fund Year 1 Funding
Type of Works
Item
Project
Linkage to Delivery Program/ Community Strategic Plan
Improved LOS
Growth Works
Rates / Grants/ Asset Charges/Fee Renewal Contributions s
Reserves
Project Totals
Loans
1
2
3
2018/19
2019/20
2020/21
Plant 1 Griffith
Plant Replacement Program - Waste (Net)
10.3.1
100%
985,000
4,393,500
985,000
435,000
125,000
200,000
250,000
10,000
10,000
10,000
20,000
20,000
20,000
10,000
10,000
10,000
30%
20,000
20,000
20,000
40%
60%
60,000
60,000
60,000
20%
80%
200,000
200,000
200,000
10.3.1
100%
200,000
200,000
200,000
10.3.1
100%
60,000
2,260,000
60000
Open Quarry Pit 101
10.3.1
100%
0
400,000
400,000
11
New Landfill Cell Construction
10.3.3
200,000
200,000
12
Construct Outbound Weighbridge
10.3.3
2
Replacement of Landfill Access Control
10.3.1
50%
3
Landscaping Landfill Workshop/Team Room
10.3.1
100%
4
Replacement of Air Conditioners in Landfill Workshop
10.3.1
5
Concreting a Section of each 4 Bays at TWTS
10.3.1
70%
6
New Landfill Engineering & Restoration
10.3.1
7
Construction of New Landfill Cell
10.3.1
8
Preparation Quarry Floor
9
Existing Landfill Restoration
10
50% 100%
100% 100%
0
600,000
0
250,000
13
Bin Replacements 240L Residential
10.3.3
10%
90%
30,000
300,000
30,000
30,000
30,000
14
Bin Replacements 240L Commercial
10.3.3
10%
90%
12,500
125,000
12,500
12,500
12,500
15
Bin Replacements 660L Commercial
10.3.3
10%
90%
12,500
125,000
12,500
12,500
12,500
16
Bin Replacements 1100L Commercial
10.3.3
10%
90%
10,000
100,000
10,000
10,000
10,000
17
Purchasing of Hook Lift Bins with Hydraulic Lids
10.3.3
10%
45,000
45,000
45,000
18
Waste Sundry Tools
10.3.1
40%
60%
10,000
100,000
10,000
10,000
10,000
19
Signs
10.3.1
40%
60%
0
25,000
20
New Mobile Pressure Washer
10.3.1
60%
90%
40% Total Capital
18,260 1,703,260
0
0
0
5,000
18,260
18,260
9,261,760
1,703,260
1,315,000
650,000
Improved LOS
393,456
97,456
6,000
4,000
Growth Works
3,799,804
541,304
806,500
456,500
Renewals
5,068,500
1,064,500
502,500
189,500
9,261,760
1,703,260
1,315,000
650,000
9,261,760
1,703,260
1,315,000
650,000
200,000
200,000
0
0
600,000
0
200,000
200,000
0
0
0
0
0
0
0
0
8,461,760
1,503,260
1,115,000
450,000
9,261,760
1,703,260
1,315,000
650,000
Total Summary Total Capital Expenditure New Loans Funded from Unspent Loans Funded from Grants/ Contributions Funded from Reserve Funded by Rates, Fees & Charges Total Capital Spend funded
Capital Works Programme Water Fund Type of Works
Item
Griffith WTP 1 2
Project
Upgrade (Elec/Mech/Civil) Griffith WTP Upgrade Capacity Griffith WTP (15Ml) Construction of a Second Outlet from Griffith WTP 3 to Trunk Main 4 Upgrade Sand Filters & Water T/Plant Griffith Reservoirs 5 Refurbish Reservoir 30ML (1986) 6 Refurbish Reservoir 14ML (1977) 7 Refurbish Reservoir 9ML (1949) 8 Refurbish Reservoir (Scenic Hill)-Raw Water 9 New 15 ML Storage (Scenic Hill) Yenda 10 Upgrade (Elec/Mech) Yenda WTP 11 Membrane Replacement Reticulation Renewals 12 Potable Reticulation Mains Renewals 13 Potable Trunk Mains Renewal 14 Raw Mains Renewals 15 Raw Water Pump Stations 16 Potholing for Forward Design of Water Mains Water Meter Etc Renewals 17 Water Meter Etc Renewals Program 18 New Water Meters/ RPZ's (Purchase) 19 New Water Meters/ RPZ's (Install) 20 Electronic Water Meter Reading Program Mains Extensions - Potable 21 New Reticulation Mains (Potable) 22 Miscellaneous New/Replacement Mains New Trunk Mains 23 New Trunk Mains (Potable) Miscellaneous 24 Replace Elec/ Mech Equip P/Stations 25 Scada/Telemetery System 26 Capital Salaries 27 Plant Replacement Program - Water (Net) 28 Sundry Tools 29 Additional Unforeseen Capital Requirements 30 Investigation & Forward Planning 31 Chlorine Probes Replacement
Linkage to Delivery Program/ Community Strategic Plan 8.1.1 8.1.1
Improved LOS
Growth Works
Year 1 Funding
Asset Renewals
40%
60% 100%
Rates / Charges/Fees
Grants/ Contributions
Reserves
Loans
1
2
3
2018/19
2019/20
2020/21
140,000 4,150,000
20,000
20,000
50,000
100,000
100,000 3,000,000
3,000,000
Project Totals
20,000 0
8.1.1
100%
100,000
8.1.1
100%
1,500,000
8.1.1 8.1.1 8.1.1 8.1.1 8.1.1
100% 100% 100% 50%
0 0 0 0 0
177,000 800,000 332,000 200,000 3,000,000
50% 100%
0 100,000
100,000 100,000
100% 100% 100% 100% 100%
607,800 252,000 506,000 0 20,000
3,177,030 2,271,700 1,406,000 40,000 200,000
607,800 252,000 506,000
100%
75,000 45,000 45,000 0
750,000 450,000 450,000 1,500,000
0 20,000
795,000 180,000
0
2,690,000
0 10,000 78,975 167,000 14,000 40,000 10,000 0
65,000 120,000 894,751 2,331,400 148,000 520,000 100,000 62,500
8.1.1 8.1.1
50% 100% 25%
25%
8.1.1 8.1.1 8.1.1 8.1.1 8.1.1 8.1.1 8.1.1 8.1.1 8.1.1
50% 50% 100%
8.1.1 8.1.1
100%
100%
8.1.1 8.1.1 8.1.1 8.1.1 8.1.1 8.1.1 8.1.1 8.1.1 8.1.1
50% 50%
100% 40% 40% 20% 50% 20% 50% 50%
30% 50%
30%
Total Capital
60% 30% 30% 100% 50% 50% 50% 50%
3,610,775
10,500,000 1,500,000
0
800,000 332,000 200,000
100,000 538,280 408,500 100,000
20,000
130,950 211,200 100,000 40,000 20,000
75,000 45,000 45,000
75,000 45,000 45,000
75,000 45,000 45,000
20,000
235,000 20,000
20,000
336,000
714,000
10,000 78,975 167,000 14,000 40,000 10,000
65,000 10,000 81,429 222,900 14,000 50,000 10,000 12,500
30,000 83,465 285,000 15,000 50,000 10,000
37,750,381
3,610,775
5,275,979
6,269,245
Improved LOS
2,823,200
112,795
247,536
116,193
Growth Works
11,749,376
99,488
674,715
824,733
Renewals
23,177,805
3,398,493
4,353,729
5,328,320
37,750,381
3,610,775
5,275,979
6,269,245
0
0
Total Summary Total Capital Expenditure
37,750,381
3,610,775
5,275,979
6,269,245
New Loans
0
0
0
0
Funded from Unspent Loans
0
0
0
0
Funded from Grants/ Contributions Funded from Reserve Funded by Rates, Fees & Charges Total Capital Spend funded
0
0
0
0
7,500,000
1,500,000
3,000,000
3,000,000
30,250,381
2,110,775
2,275,979
3,269,245
37,750,381
3,610,775
5,275,979
6,269,245
Capital Works Programme Sewer Fund
Item
Griffith 1 2 3
Project
Type of Works Linkage to Delivery Improved Growth Asset Program/ LOS Works Renewals Community Strategic Plan
Year 1 Funding Rates / Grants/ Charges/Fees Contributions
Reserves
Loans
Project Totals
1
2
3
2018/19
2019/20
2020/21
-
100%
0
1,900,000
Replacement of GWRP Elec /Mech Equipment
8.1.2
100%
30,000
300,000
30,000
30,000
30,000
Griffith WRP - Various, landscaping
8.1.2
50%
20,000
140,000
20,000
20,000
20,000
100%
30,000
370,000
30,000
30,000
100,000
Griffith WRP Membrane Replacement
4 Upgrade of Pump Stations (Civil & Electrical) New Pump Stations 5 Pump Station G21 (Murrumbidgee Av) 6 Pump Station (Farm 12 Collina) 7 Pump Station G32 ( South of GWRP) Yenda 8 Pump Station YE4 Lake Wyangan 9 New Rising Main (G7 To GWRP) 10 Pump Station (LW1, LW2) 11 Trunk Reticulation Tharbogang 12 Sewerage for Villages Sewer Renewals & New Sewers 13 Renewals of Gravity Sewers 14 Renewals of Rising Mains Miscellaneous 15 Upgrade SCADA & Telemetry Systems 16 Plant Replacement Program - Sewer (Net) 17 Purchase Low Pressure Grinder Pumps 18 Miscellaneous - Capital 19 Capital Salaries 20 Sundry Tools 21 Investigation & Forward Planning
50%
8.1.2 8.1.2 8.1.2 8.1.2
100% 100% 100%
0 0 0
350,000 450,000 500,000
8.1.2
100%
300,000
300,000
300,000
8.1.4 8.1.4 8.1.4
100% 100% 100%
0 40,000 0
900,000 440,000 500,000
40,000
8.1.4
100%
937,280
1,616,000
1,616,000
8.1.2 8.1.2 8.1.1 8.1.2 8.1.2 8.1.2 8.1.2 8.1.2 8.1.2
80%
60% 20%
900,000 200,000
400,000 300000
100% 100%
100,000 600,000
1,500,000 3,750,000
100,000 600,000
100,000 600,000
100,000 600,000
20% 100%
50,000 214,000 0 50,000 58,839 15,000 10,000
180,000 1,419,500 90,000 500,000 671,054 150,000 100,000
50,000 214,000 0 50,000 58,839 15,000 10,000
10,000 47,000 10,000 50,000 61,110 15,000 10,000
10,000 94,000 10,000 50,000 62,638 15,000 10,000
16,126,554
3,133,839
2,533,110
2,101,638
Improved LOS
858,211
112,768
81,222
81,528
Growth Works
5,578,632
1,994,303
1,599,666
1,050,583
Renewals
9,689,711
1,026,768
852,222
969,528
16,126,554
3,133,839
2,533,110
2,101,638
16,126,554
3,133,839
2,533,110
2,101,638
0
0
0
0
0
0
0
0
678,720
678,720
0
0
100% 80% 20% 40% 50%
678,720
300,000 450,000
20% 20% 40% 50%
Total Capital
2,455,119
678,720
0
0
Total Summary Total Capital Expenditure New Loans Funded from Unspent Loans Funded from Grants/ Contributions Funded from Reserve Funded by Rates, Fees & Charges
0
0
0
0
15,447,834
2,455,119
2,533,110
2,101,638
Total Capital Spend funded
16,126,554
3,133,839
2,533,110
2,101,638
Griffith City Council 1 Benerembah Street Griffith NSW 2680 P: 6962 8100 F: 6962 7161 E: admin@griffith.nsw.gov.au W: griffith.nsw.gov.au