AB | Case History

AB FOR CAIEIRAS

THE GREATEST POWER PLANT IN THE WORLD WITH GE JENBACHER ENGINES FUELLED ON LANDFILL BIOGAS 21 plants fuelled on landfill biogas in Brazil: the most important project ever realized in the landfill sector


2

URBAN WASTE TURNED INTO ELECTRICAL POWER ≤ Enhancing landfill biogas through highly efficient production of electricity, is in most cases the best choice in both technical and financial for these

6 ECOMAX® PLANTS AND THE LOGISTICS STRUCTURE AT MINAS DO LEÃO

types of facilities. With a calorific value averaging between 3.5 and 5.0 kWh/Nm3, the landfill gas is a

The Minas do Leão landfill and related technologies

good fuel for internal combustion engines and can

for the use of biogas mainly exploit the urban

therefore be used effectively for fuelling the power

waste from the city of Porto Alegre, amounting

plants.

to more than 3,500 tons daily. At full capacity

PARTNERSHIP BETWEEN SOLVÍ AND AB

this site generates 8.5 megawatts of electricity, serving the energy needs of more than 200,000 people. Heart of the system are the 6 Ecomax® 14

Solví, the leading ecological waste treatment

Landfill Gas plants of 1,426kWe, with a total power

company in Brazil, together with AB has developed

output of 8,556 kWe. Even for this important job

an ambitious programme for the landfill sector

order, the Ecomax® modular package distributed

development, based on the construction of two

generation solution has confirmed the value of its

power generation sites fuelled on landfill biogas,

features and the advantages that make it a unique

respectively in Minas do Leão, in the Rio Grande do

engineering product in the world, designed and

Sul region, and in Caieiras, in the São Paulo region.

developed entirely by AB.


3

The Solví Group consists of companies that currently operate

in

five

interconnected

and

synergistic

segments: the collection and disposal of urban waste, industrial plants, health technologies, energy recovery and engineering. All the Group companies operate based on a shared philosophy and action model aimed at the population’s welfare and the promotion of harmonious coexistence between the environment and the community. Solví operates in the collection and disposal of waste throughout Brazil (in 171 cities) as well as in 18 cities in Peru, Bolivia and Argentina. In addition, Solví has also established a power generation site at the landfill in Salvador, which is already operational and whose maintenance is performed by AB through its dedicated company AB Service.


4

21 ECOMAX PLANTS

®

IN CAIEIRAS

Caieiras, in the Sao Paulo region, is the largest landfill

voltage public grid.

biogas fuelled power generation site in the world. The

An increase up to a maximum of 36 modules is planned

landfill receives 10-12 thousand tons of waste per day, and

for the future in this site. In this regard, the President of

serves 13 million people.

AB, Angelo Baronchelli, said: “I am particularly proud

The biogas treatment system comprises 3 lines of 7,500

of the great value that these systems bring to Brazil, its

m3 each, with biogas dehumidification at 5 degrees and

environment and its population, and I am proud to have

siloxane treatment with activated carbon.

been able to transfer this great country, and the world,

This site includes 21 Ecomax 14 Landfill Gas plants of

our experience and Italian know-how in a sector, that of

1,407 kWe, with a total capacity of 29,547 kWe, which work

energy efficiency, which is so important both for economic

simultaneously. The electricity produced is sold to the high

development and for our planet’s sustainable future.”

®


5

GENERAL FEATURES OF THE PLANT Installed modules Installed power Biogas consumption Time for installation Opening ceremony

21 Ecomax® 14 BIO 29,55 MW 18.600 Nm3/h 5 months August 2016

BIOGAS TREATMENT PLANT Total capacity Dehumidifying system Biogas treatment system Biogas compression system

21,000 Nmc/h (with predisposition for further 7,000 Nmc/h) 3*175kW chillers (with predisposition for further 1*175kW) Active charcoal filter 3 (+ 1 backup) booster x 7,000 Nmc/h, 200 mbar

PLANT LAYOUT


welcomeadv.it

www.biogaschannel.com

www.cogenerationchannel.com

AB Energy SpA Via Caduti del Lavoro, 13 25034 Orzinuovi BS - Italy T. +39 030 94 00 100 www.gruppoab.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.