Architectural-Designer Portfolio Guillermo Medina

Page 1

Guillermo Medina Banderas

ARCHITECT PORTFOLIO



index

1. CV 2. ARCHITECTURE PROJECTS 3. ENTREPRENEURSHIP 4. MORE ABOUT ME


Guillermo Medina Banderas

Architect, designer and entrepreneur

WHAT DO YOU GET WITH ME Honestly, I strongly believe I can be extraordinarily useful for you: I am a very positive, social, and optimistic energy guy as normal. I proved to myself with my previous jobs that I can be the typical person you would like to have in your team because of my inherent personality (easy-going person, resolutive, proactive, always willing to support with a smile, ready to learn...). In order to challenge me, I forced myself to work abroad at an early stage in such a different country like Vietnam for one main reason: I knew I could have higher job responsibilities there so it would help me to learn and grow faster personally and professionally. Since I arrived in Vietnam, I have worked through all the different phases of the project, working as Project Manager or Team Leader, but also working as part of the team ready to support wherever it was necessary. Because I love understanding the different cultures and how Planet Earth works, I usually understand quickly how the climate and cultural conditions in a specific place are, so it helps me to propose an architecture design accordingly. Moreover, because I spend normally my spare time listening to architecture podcasts, watching documentaries, learning new things about society, the design, or our culture, my mind is full of possible ideas, project solutions, creative designs, and inspirational ways to resolve a project. In addition to this, I like interacting with people and understanding the way we think, so I am usually good at dealing, negotiating, and taking care of clients. Architecture, as most of the business in our world, is about people as well. Finally, as you can see, I made the most of my education and job experiences to maximize my learnings around the world (Spain, Turkey, Chile, India, Vietnam, New Zealand...). It gave me a great capacity to adapt and think differently. Then, after almost three years in Vietnam, I am moving to a new country to stay, minimum the next five years looking forward to keep developing my skills and devote my passion to the right office

SOFTWARE

PERSONAL SKILLS

AutoCAD ArchiCAD Ad. Photoshop Ad. Illustrator Ad. After Effects Ad. Audition Ad. Premiere Ad. Indesign Excel Lumion 3D SketchUp Revit

Ability to communicate Ability to deal/understand clients Ability to work for challenges Adaptability Capacity for group work Creativity Enthusiasm Leadership Learning capacity Optimism Proactivity Resolution problems capacity

LANGUAGES SPANISH

Mother language

GERMAN

Beginner Level

ENGLISH Fluent

FRENCH

Beginner Level

CONTACT

HOBBIES & INTERESTS

guillemediba1356@gmail.com Sustainability

Reading

People

Guitar

Trees

Yoga

Frugality

+34 667 96 54 81 linkedin/guillemedinabanderas Currently: Spain

Running

Photography

Structures

Materials

Trekking

Communication

Landscape


WORK EXPERIENCE APR 2020 -MAR 2022

ARCHITECT AND PROJECT MANAGER

OCT 2019 -APR 2020

ARCHITECT AND PROJECT MANAGER

NOV 2018 -OCT 2019

ARCHITECT

SEP 2013 -OCT 2018

GRAPHIC DESIGNER AND CREATIVE MANAGER

SEP 2012 -SEP 2014

ENTREPRENEUR

at T3 Architects Ho Chi Minh City, Vietnam A medium-size team obliges us to work through all the phases of the projects so we learn what is needed at every stage. From the Pre-Concept stage, directly dealing with the client’s needs, working then as Project Manager coordinating the different actors, developing details design or specifications. Focused on renovation projects with a strong sustainable approach, mostly for Hospitality, Housing, and F&B projects at The BIM Factory Ho Chi Minh City, Vietnam As a team leader my responsibilities were: to develop, work and present to the client the Pre-Concept ideas, then, organize the tasks for the team depending on the workload and communicate directly with the clients. The company was trying to get as much as workload as possible so during several months I became proficient in developing and presenting a different concept Idea every single week for a different client at Independent work Malaga, Spain Once I graduated I started working as a freelancer and as independent work, all the responsibilities and challenges were direct to me, which made me grow and learn quicker. I worked making many technical reports for houses that needed to be renovated, and moreover, worked in two full renovation houses including construction management learning about building, construction issues, processes and management at Independent work and Brandbi Eventos Malaga, Spain I have worked as a freelance designer for most of my University years designing several orders, improving my capacity to communicate graphically making logos, posters, schemes, or images. I also co-founded a company of events where I was in charge of giving a unique and creative design to the events and the communication. About design I can say I feel true pleasure when things are well designed at Thirteenfiftysix 13.56 Malaga, Spain When I was 19, starting with a budget of 0 dollars, I co-founded a project with a mixture of technology and design that allowed us to be published in some of the most important magazines around the world, reaching more than 60 countries counting sponsors, news and new contacts. It meant an immense opportunity to learn about entrepreneurship, project management, work teams management, budgets, clients, and creativity

EDUCATION NOV 2018 - OCT 2019

ARCHITECTURE MASTER BIM MANAGEMENT

JAN 2017 - FEB 2017

ASSITANT IN THE ARCHIPRIX WORKSHOP

SEP 2011 - MAR 2018

ARCHITECTURE DEGREE

at INESEM Business School Granada, Spain I successfully completed this postgraduate Master’s Degree in Building Information Modelling and Management which supposed me a clear understanding of how BIM works, the master especially focuses on BIM Architecture on Revit and introduces about BIM Structure and BIM MEP at CEPT University Ahmedabad, India I assisted in this famous architectural workshop celebrated in India. During these days we worked around the city, closely working with other architects from different countries and receiving lectures in the famous CEPT University designed by the Pritzker Awarded Architect BV Doshi at School of Architecture of Málaga + Yasar University, Turkey + Universidad Mayor, Chile Spain Turkey Chile I successfully completed my architecture degree through three different Schools to maximize my learnings. In Spain, they taught me very technical knowledge, in Turkey, different cultural scenarios, and Chile was important to understand how to get a good architecture with low resources

ADDITIONAL LEARNINGS JUNE 2021 - AUG 2021

ARCHITECTURAL PHOTOGRAPHY

MAR 2018 - APR 2018

NATURAL BASED SOLUTIONS AND GREEN INFRASTRUCTURE

at Domestika, Jesús Granada Malaga, Spain In this course, I was able to learn the bases and the main tips about Photography of Architecture. The course was taught by the great photographer Jesús Granada who has already an international path. I could apply what I learned to my final project successfully. at FGUMA University of Málaga Malaga, Spain I learned how Natural Based Solutions works in order to protect, restore or create an ecosystem, and how it helps with the current challenges we face, re-naturing our cities and modifying the way we interact with our resources and ecosystem, working with it, instead of against it.


01. DOJO SAIGON JAPANESE JUDO PLACE Sport Architecture Ho Chi Minh City, Vietnam T3 Architects, 2020 - Built Lead Architect and Project Manager Photographs: Hiroyuki Oki


*

This project supposed the first Dojo in Saigon (Vietnam). The project started with a good mix of cultures: “ Dojo “ is the Japanese name of the building which means that the building will be built with a certain of Japanese traditional rules for the right practice of Judo. Then, the Dojo is located in the garden of an old French style Villa, and all this together in the dynamic city of Ho Chi Minh, Vietnam. Designed and built with the main sustainable principles in mind from the beginning, we placed the Dojo correctly on the garden using the existing Villa to be protected and right-oriented to avoid the main heavy rains/winds and designing the openings accordingly. As the existing Villa will be rented as part of the Dojo office and as a co-working space for Judo practitioners we decided to do the main circulation through the existing building where a new changing room is placed. Moreover, we decided to relocate the main entrance creating a new gate in the alley

next to the plot avoiding an existing dangerous road. In addition to this, as first intentions, we took care to place the Dojo to keep all the old existing trees creating three different gardens around the plot. As the building is air-conditioned, the Dojo is built with full insulation in its walls, double glazing in all the openings and rice husk insulation for the roof, which is an ecological and affordable material. Thanks to all of this, the building has high-level energy efficiency providing a low-energy consumption to the clients. For the last but not least, taking in consideration the dynamic and changeable times we all live, the project has been designed to be dismountable (main structure, flooring, walls, tatami...) to provide the client with the option to move the whole building to another plot in case it is needed. Sustainable principles commented above, the beauty of the practice of Judo, and the creative and functional design make finally a meaningful project with a very competitive budget.


Layout, Sections and Elevation | Images

Ground Floor

Cross Section

South Elevation From Street

Longitudinal Section



Concept Diagrams | Images

Existing Condition:

French Style Villa with the access in a heavy traffic road junction

First Intentions:

- Create a secondary gate to avoid busy road - Keep existing old trees - Place DOJO in the right position and right-oriented using the existing Villa to be protected

Roofing:

- Asian style roof to get indirect light - Extension to be fully covered from rain and wind - Full insulation with rice husk layer



Elevations, Gate details | Images

North Elevation

West Elevation

South Elevation

East Elevation

PROJECT:

DOJO

CLIENT:

SORAYA AND BENJAMIN NGUYEN

DESIGN COMPANY

ADDRESS: Family garden - 28. THAO DIEN STREET THAO DIEN - DISTRICT 2 - Ho Chi Minh City t3architects.com

GENERAL DIRECTOR

Charles Gallavardin Mob.: +84-(0)1-22-71-91-877 Email : contact@t3architects.com

NOTES:

 Contractor to validate samples of finish with client and designer (in a sample board)

 Detail drawings to be prepared by contractor for confirmation by client and designer

 All designs are copyright of T3 ARCHITECTS

and cannot be used without their permission  Do not scale drawings  Measurements must be checked on site by the contractor.  Design is based on existing drawings and are subject to issues on site with regards to structural and mechanical  All materials and fixtures to be installed as per manufacturers recommendations and specifications

 To be specified or to be checked

New Entrance Details

REV. n.

DATE OF MODIFICATION

00

10/07/2020

CONTENT OF MODIFICATION

Submission Detail Design

PHASE

DRAWING NAME

DETAIL 01 NEW GATE PAPER SIZE: A3 SCALE : 1/100 REVISION : R00

COMPLETED: 10/07/2020

002



02. WEEKEND BIOCLIMATIC VILLA Secondary Weekend Home Ho Tram City, Vietnam T3 Architects, 2021 - Under Construction Lead Architect and Project Manager


Designed with a truly Sustainable approach tailor-made for Tropical conditions: hot weather, heavy rains, insects and wildlife, wind (as we are close to the sea). The existing site is partially covered by a forest, then the villa is installed under the trees (to get shadow and thermal comfort), but having the main facade on the forest’s line to get a very nice view of the tropical garden and pool. Bedrooms are placed under the trees while the family living space is on the front. Guests have their own buildings to get privacy. It also creates a buffer area from the small road (to block the potential noise and keep a high degree of privacy). The Architecture follows bioclimatic principles, with a large insulated roof to cover the different functions of the house. The common area is naturally ventilated (no AC, just efficient ceiling fans) to save energy and preserve the tropical feeling. The 2 bedrooms are properly insulated (rice husk for the roof, light concrete blocks for

walls, double-glazing) to keep the cold from the AC. The main wall of the East facade is made of local earth sourced locally. It brings inertia to the house and makes it unique with a Frugal approach (low carbon footprint + geo-sourced materials). In terms of Interior, the design is voluntary minimalist (to limit maintenance and make operation easy), Tailor-made Cement tiles, loose furniture in solid wood, plywood false ceiling bring both Vietnamese touch and coziness to the Villa. Promoting local trees and plants which doesn’t require a lot of water and maintenance. This is also the best way to get a natural and very well integrated landscape into the large environment. The pool system will be with salt (no chlorine) and the poll level will be 120cm deep (to reduce the cost for equipment and save water). This villa is the perfect place for relaxing during week-end and holidays, at 2h30 driving from the busy Saigon city, and it is the kind of Manifesto of the Contemporary low-tech solution but very meaningful.


Layout | Images

Ground Floor



Sections | Image

Longitudinal Section


Cross Section


03. ABILDGAARD HOUSE Full House Renovation Málaga, Spain Collaboration with MAAAAS Architects, 2019 - Built Architect and Project Manager


It is worth explaining, that the essence of this project is clearly about details and process. Being one of my first real projects after I graduated from Architecture School, it was also needed to be able to manage a 360-grade process. In this case, we found a family from Denmark (Abildgaard Family) who is looking for a second residence in Málaga, Spain. In love with the good weather and good environment of the city, the family is determined to have a friendly place to spend some time on holidays. Although the grandparents are the owners of the property, the whole family that is going to live in the home is completed by the daughter and her husband and two children of them (6 people in total). Talking about the building, it is in a very traditional and local neighborhood and it is located quite near to the city center of Malaga. It is a very traditional building, with a patio in the center and with a local Arabic style from Andalucia. In addition to our designs as architects,

we did extra work to manage all about the house. For example, it was necessary to install a system to help the grandparents to go easily upstairs; they also asked us to install a heating floor system, or for example, it was necessary to resolve heavy moisture from the ground floor. About the style and materiality of the house, we tried to mix the best of the two worlds: the white and minimalist materiality from Denmark and from North-Europe Architecture, with the traditional and local spaces from the South of Spain (Andalucia). In the end, the building has a simple program, trying to get the ground floor as open as possible, increasing the power of the patio; They have also a big desire to understand the process, deciding every single detail of the house and making the whole family part of the project. We took care of every single detail from the moment we found the existing house until they started living there. We made them feel comfortable and enjoy the process so the clients got very satisfied


Diagram, Process Explanation | Image

Project: 1 1

2 Project: 1

1

4 5

6

2 4

7 6

7 10

9

3

Patio heartfor of the open, 5 as Place newhouse: aerotherm plants, lights 6 Movable seats for terrac New laundry

10

8 11

12

15

18 19 19

15

16 17

16

17

21 21

2424

26

23 23

14

renovated and painted

All windows and the main door 14 Bathroom from firstfloor renovated and painted Bathroom from firstfloor renovated 15 All walls from firstfloor r

19

All walls from firstfloor renovated 16 Heating floor in firstfloor Heating floor in firstfloor except ha 17 All floor from firstfloor re All floor from firstfloor replaced wi microcement microcement 18 In-built in Bedroo In-built closet incloset Bedroom N2 19 In-built closet in Bedroo In-built closet in Bedroom N3

20

Get in groundfloor 20 a bathroom Get a bathroom in groun

15 16 17

All groundfloor renovat 21walls Allfrom walls from groundflo Furniture in all south-wall 22 Furniture in all south-wa 23 All floor from groundfloor replaced 23 All floor from groundfloo microcement microcement 24 Heating floor in groundfloor 24 Heating floor as in possible groundf 25 Groundfloor as open 22

25

26

26

360-grades Project Process

13

Stair chairinsulation 9 liftFloor

Patio made of steel 10 railing Wooden floor Floor insulation 11 Glass curtain Wooden floor 12 Facade: fixed, cleaned, Glass curtain 13 Allfixed, windows andpainted the ma Facade: cleaned,

21

26

Exploded Axonometric

8

18

2020 22 22

25

8 Patio railing made of ste Movable seats for terrace

12

14

13

6

11

18

13

7 for Stair liftaerothermy chair Place new system

10

14 12

5

9

3

8 911

2

3 Patiomotorized as heart roof of the hou Retractable made glass and steellights plants, 4 New Outdoor full laundry kitchen

7

3

Outdoor full kitchen

2

4

5

Retractable motorized r glass and steel

26

25 Groundfloor open as Heavy moisture fromas all groundflo resolved 26 Heavy moisture from all

resolved


of

,

m

d

all

ith

ted

d with

oor


Layout Proposal and Explanations | Image

Ground Floor Proposal

Existing Ground Floor Layout

Space Organization

Option when full family stay



04. GARAGE XXI - SECONDARY SCHOOL Renovation, Educational, Sport Malaga, Spain Final Graduation Project, 2018


One of the first intentions is to highlight the existing seafront axis which has a clear sports role that is forcefully interrupted by our study area. In addition to this, and, with notable importance, the progressive extinction of Malaga’s industrial heritage is every year more aggressive. Finally, I decided to re-use existing industrial warehouses to hold the new secondary school program. The warehouses show the versatility and flexibility of industrial buildings and their ability to house different programs thanks to their interior spatial lightness and large spans. At this point, we can appreciate a special sense of the neighborhood towards these industrial buildings that reinforces the constructive value of the buildings, making perceptible the opportunity to create a teaching center together with a neighborhood and sports center in a unique place. Concurrently, during the development of the project, a research on more permeable educational spaces with a clear role

of practical pedagogy and being in contact with the neighborhood and the world around them: living and creative spaces that could encourage the participation in a regularly updated critical-communicator character. In addition to this, we look for a project that is sustainable from its construction, structure, and program, inserting a new metallic structure perfectly aligned to the existing one without overloading it, without stressing it and protecting it. It is also worth noting the promotion of neutral materiality that supposes an honest beginning that will be made to measure by the users that inhabit it. There are learning landscapes brimming with social beings that carry out their activities. These landscapes pour out to intermediate spaces of relationship in a way that helps to provoke an alive and contemporary center. The merger of all these concepts and qualities cause a desired feeling of identity and belonging to the center that creates an educational community with personality


I 9 II 9

IV 8 I 10 II 10

III 6

I 11 II 11

IV 9

III 7 IA

IB

ID

IC

IE

IF

I G II A

II B

II C III A

III B

III D

III C

III E

III F

III H

III G

III I

III J

III K

III L

III M

III N

IV B

IV D

IV C

IV E

IV F

IV G V A

VB

B

Layouts and Elevation | Physical Model and 3D Image

III P IV A

III O

III Ñ

B'

PLANTA CUBIERTA. +11.50 m escala 1:350

NAVE VI: RESID cocina 15 m²

NAVE I: PABELLÓN DEPORTIVO sala 1 50 m²

NAVE II: HALL VERSÁTIL

NAVE III: ZONA DOCENTE

NAVE V: PABEL

NAVE IV-V

NAVE IV: HALL VERSÁTIL

comedor 35 m²

sala 2 100 m² om shanti

18 17 16 15 14 13 12 11

*7

10 09 08 07 06 05 04 03 02

seminario N10 10 m² laboratorio N3 60 m²

laboratorio N2 60 m²

laboratorio N1 60 m²

18 17 16 15 14 13 12 11

informática práctica N2 60 m²

informática teórica N2 60 m²

informática teórica N1 60 m²

18 17 16 15 14 13 12 11

10 09 08 07 06 05 04 03 02 01

informática práctica N1 60 m²

40.00

10 09 08 07 06 05 04 03 02 01

despacho director despacho j.estudios 25 m² 25 m²

seminario N9 10 m² seminario N8 10 m²

sala orientación 20 m²

seminario N7 10 m² seminario N6 10 m²

sala integración 30 m²

sala profesores 50 m²

seminario N5 10 m² seminario N4 10 m²

despacho alumnosdespacho editorial 25 m² 25 m²

seminario N3 10 m²

despacho eventos 25 m²

seminario N1 10 m²

*9

seminario N2 10 m²

*8

FAB-LAB 200 m²

aula co-working 100 m²

despacho APAS 25 m²

18 17 16 15 14

A 17 16 15 14 13 12 11 10

17 16 15 14 13 12 11 10

09 08 07 06 05 04 03 02 01

PISTA DEPORTIVA

aula polivalente N11 80 m²

aula polivalente N10 80 m²

09 08 07 06 05 04 03 02 01

aula polivalente N9 80 m²

16.00

ESPACIOS REUNIÓN Y CONFERENCIAS 80.00

ADMINISTRACIÓN Y BIBLIOTECA

30.00

ESTACIONES A

B

15.00

13 12 11 10 09 08 07 06 05 04 03 02 01

rack

AULAS, FAB-LAB, LABORATORIOS, INFORMÁTICA

ESPACIO EXPOSICIÓN 20.00

aula polivalente N12 80 m²

PLANTA PRIMERA. +3.40 m escala 1:350 ESPACIO 1: APARCAMIENTO

limonero

5.48

6 m²

P12 acceso vehículos profesorado y personal del centro

P13 5.48

P11

P14

P10

P15

8 m²

naranjo

mandarino

limonero

naranjo

pomelo

mandarino

naranjo

mandarino

pomelo

limonero

mandarino

naranjo

mandarino

mandarino

pomelo

2 m²

*5

invernadero N5 22 m²

5.48

membrillo

5.48

ESPACIO 4: AC

ESPACIO 3: ACTIVIDADES DEPORTIVAS: ATLETISMO, RUGBY, BESIBOL, FÚTBOL, HOCKEY HIERBA

ESPACIO 2: HUERTOS manzano

naranjo

limonero

04 03 02 01

mandarino 04 03 02 01

naranjo

limonero

pomelo

naranjo

linea de touch

pomelo

invernadero N4 22 m²

5.48 5.48

pomelo

P16 5.48

P18

P6 membrillo

P19

P5

P20

5.48

P4 5.48

4 m²

4 m²

6 m² 4 m²

5.48

limonero

4 m²

4 m²

4 m²

4 m²

8 m² 4 m²

6 m²

P21

naranjo

2 m² 2 m²

limonero

granado

5.48

5.48

2 m² 2 m²

4 m²

2 m²

8 m²

2 m²

invernadero N2 22 m²

P22

P3

5.48

5.48

P2 5.48

P23

limonero

5.48

P24 M1

P1 E2 4.40

pomelo

4.90

7.3 kW

M7 M8M9M10 M12 ES 4.80

4.40 granado

6 m² 4 m²

8 m² 4 m²

4 m²

mandarino

pista rugby 60x30

linea de touch pista fútbol 7 50x30

2 m² 01

4 m²

02

16 m²

03 04

acceso peatonal

B'

7.3 kW

naranjo

invernadero N1 22 m²

M4 M5M6

linea de pelota muerta

P7

4 m²

naranjo

5.48

5.48

4 m²

postes

5.48

5.48

4 m²

4 m²

linea de gol

5.48

4 m²

invernadero N3 22 m²

P17

naranjo

linea mitad de cancha

P8

postes

mandarino

P9 5.48

linea de pelota muerta

5.48

naranjo

linea de gol

5.48

NAVE VI: RESIDENCIA

E1

acceso vehículos emergencia o abastecimiento

graderío poliv 08

alente N1

07

02 03

05 04

NAVE I: PABELLÓN DEPORTIVO

NAVE II: HALL VERSÁTIL

05 06 07

06 05 04 03 02 01

06 05

02

13 12 11 10 09 08 07

03 04

05

04 03 02

08

01

graderío polivalente N2 5x5

instalación efímera rocódromo 5 m altura

NAVE III: ZONA DOCENTE

07

07 08 09 10 11 12 13

instalación efímera taller de graffitis

01 02 03 04 05 06

01

08

04

03

02 01

graderío polivalente N3 5x5

01 02 03 04 05 06

01

5x5

13 12 11 10 09 08 07

06

06

06 05 04 03 02 01

07 08

07 08 09 10 11 12 13

alente N4

almacén polivalente N1 5x5

graderío poliv

instalación efímera puzzle mapamundi gigante

cafetería 25 m²

5x5

10.00

NAVE IV: HALL VERSÁTIL

NAVE IV-V: ZONA ADMINISTRATIVA NAVE V: PABELLÓN A vestíbulo piscina

vestuario N1 40 m² 8.00

monitor 12 m² vestuario N3 6 m²

vestuario N4 40 m²

vestuario N2 40 m²

08 07 06 05 04 03 02 01

vestíbulo

aula polivalente N5 80 m²

aula polivalente N6 80 m²

aula polivalente N4 80 m²

almacén 30 m²

aula polivalente N3 80 m²

aula polivalente N2 80 m²

aula polivalente N1 80 m²

10.00

vestuario N5 40 m²

8.00

almacén 6 m²

sala proyección 80 m²

08 07 06 05 04 03 02 01

08 07 06 05 04 03 02 01

sala estudio 160 m² laboratorio efímero N4 animales de la granja

laboratorio efímero N2 observación plantas eléctricas

laboratorio efímero N1 catalogación de semillas

*6

40.00

laboratorio efímero N3 brotes frutales

*4

pista N1 baloncesto 28x15 m

filmoteca 50 m²

calefacción 25 m²

hemeroteca 30 m²

A

taller música 100 m²

conserjería 25 m² secretaría 40 m²

10.00

vestuario no docente 25 m²

10 11 12 13 14 15 16 17

09 08 07 06 05 04 03 02 01

aula polivalente N8 100 m²

08 07 06 05 04 03 02 01

aula polivalente N7 100 m²

aula taller N2 100 m²

aula taller plástica 100 m²

aula taller N1 100 m²

08 07 06 05 04 03 02 01

16.00

vestíbulo secretaría

PISTA DEPORTIVA

ESPACIO EXPOSICIÓN acceso directo espacio público 15.00

AULAS, TALLERES

ESPACIOS REUNIÓN Y CONFERENCIAS acceso hall principal

80.00

30.00

ADMINISTRACIÓN Y BIBLIOTECA

ESTACIONES A

B

20.00

helecho

helecho

helecho

helecho

helecho

PLANTA BAJA. ±0.00 m escala 1:350

sala 1

aula co-working

sala 2

pista N1 baloncesto

NAVE I: PABELLÓN DEPORTIVO pista deportiva, salas y vestuario

taller música

NAVE II: HALL VERSÁTIL acceso directo espacio público

aula polivalente N12

calefacción

aula polivalente N8

aula polivalente N11

aula taller N2

aula polivalente N10

aula polivalente N7

aula polivalente N9

despacho APAS

FAB-LAB

aseo

aula taller plástica

NAVE III: ZONA DOCENTE

aula taller N1

NAVE IV: HALL VERSÁTIL

acceso hall principal, espacios de reunión y conferencia

aulas, talleres

SECCIÓN LONGITUDINAL A-A' escala 1:350

R2

students practical secondary school

despacho eventos

filmoteca

seminario N1

hemeroteca

NAVE IV-V: ZONA ADMINISTRATIVA administración y biblioteca


V8

V9

B

VD

VC

VE

VF

VG

50.00

DENCIA ESTUDIANTES DEPORTISTAS DE ALTO RENDIMIENTO habitación N8 25 m²

habitación N7 25 m²

habitación N6 25 m²

10.00

habitación N9 25 m²

14 13 12 11 10 09 08 07 06 05 04 03 02 01

habitación N10 25 m²

14 13 12 11 10 09 08 07 06 05 04 03 02 01

5.00

5.00

5.00

40.00

30.00

30.00

LLÓN ACUÁTICO

A'

30.00

ACUÁTICAS 50.00

CTIVIDADES DEPORTIVAS: FÚTBOL SALA, BASKET, BADMINTON, VOLLEY BALL mandarino

naranjo

pomelo

pomelo

limonero

naranjo

mandarino

pomelo

pomelo

naranjo

mandarino

pista N2 baloncesto 28x15

mandarino

pista N3 baloncesto 28x15

pomelo

naranjo pista fútbol sala 20x40

pomelo

mandarino

pomelo

naranjo 50.00

06 05 04 03 02 01

habitación N4 25 m²

habitación N3 25 m²

habitación N2 25 m²

15.00

06 05 04 03 02 01

habitación N5 25 m²

5.00

habitación N1 25 m²

10.00

A ESTUDIANTES DEPORTISTAS DE ALTO RENDIMIENTO

5.00

remo 50 m² -1,50 m 23ºC

waterpolo natación sincronizada 200 m² -3,00 m 23ºC

saltos apnea 100 m² -7,00 m 23ºC

40.00

aqua gym 100 m² -1,50 m 23ºC

30.00

30.00

ACUÁTICO

hidroterapia 75 m² nado libre 250 m² -1,00 m 15ºC -2,00 m 23ºC

A' ocio 125 m² -2,00 m 23ºC

30.00

ACUÁTICAS 50.00

helecho

helecho


Construction Details | Urban axonometric, Structure Details

e

ct05

ct05

ct05

ct05

GARAGE XXI

ct05

Guillermo Medina Banderas · PFG · marzo 2018 · Escuela Arquitectura Málaga CONSTRUCCIÓN 02 · escala 1:25 ct04

ct04

ct04

ct04

ct04

ce06

ce06

ce06

ce06

ce06

ce04

ce04

ce04

ce04

ce03

ce03

ce03

ce03

ce02

ce02

ce02

ce02

ce01

ce01

ce01

ce01

ce05

ce05

ce05

ce05

ce05

ca06

ca06

ca06

ca06

ca06

em03

em03

em03

em03

em05

em05

em05

em05

ca03

ca03

ca03

ca03

ca01

ca01

ca01

ca01

em01

em01

em01

em01

cámara de aire

LINE de doble

t01 ct01 en carpintería de

s en frío m t02instalación ct02

t03

ct03

ado en frio

ALLE C DETALLE C

ct01

ct01

ct01

ct02

ct02

ct02

ct03

ct03

ct03

DETALLE C

DETALLE C ct01

galería sur 4 m luz galería sur 4 galería m luz sur 4 m luz galería sur 4 m luzgalería sur 4 m luz cortina separadora recogida cortina separadoracortina recogida separadora recogida cortina separadora recogida cortina separadora recogida

ct02

a

ct03

mc08

mc08

mc06

n

mc08

mc06

mc07

mc08

mc06

DETALLE C

mc07

mc07

ct05

ce03 ct04

mc07

fc01

fc02

fc01 fc03

fc02 fc04fc01 fc03fc02 fc04 fc01 fc03 fc02 fc04 fc01 fc03

fc03

fc04

em03

ce04

ca03

ce02 ce01

fc01

fc02

ca01

galería sur 4 m luz

fc03

6 W 500 LM luminaria N4

6 W 500 LM luminaria N4

6 W 500 LM luminaria N4

6 W 500 LM luminaria N4

6 W 500 LM luminaria N2

6 W 500 LM luminaria N2

6 W 500 LM luminaria N2

6 W 500 LM luminaria N2

em01

ca06

pizarra blanca móvil 2.20pizarra m blanca móvil pizarra 2.20 m blanca móvil 2.20 pizarra m blanca móvil 2.20pizarra m blanca móvil 2.20 m

em03

cortina separadora recogida

fc04

6 W 500 LM luminaria N4

ce05

mc07

fc02 fc04

ce01

em05 aulace03 polivalente N10 aula80 polivalente m2 aulaN10 polivalente 80 m2 aula N10 polivalente 80 m2 N10 aula80 polivalente m2 N10 80 m2

mc06

gún DB-HS,

ce02

ce06

mc08

mc06

ce04

em05

aula polivalente N10 80 m2

ca03 mc08

proyección 2x1.20m

ca01

proyección 2x1.20m proyección 2x1.20m proyección 2x1.20m

em01

mc07

1 y de 4% de

proyección 2x1.20m

*12 ethan *12 ethan *12 ethan *12 ethan *12 ethan 30 años 30 años 30 años 30 años 30 años

6 W 500 LM luminaria N4

mc06

o según HS-1 con

6 W 500 LM luminaria N2

pizarra blanca móvil 2.20 m

william 17 años

e cubierta minal

william 17 años

william 17 años

william 17 años jacob 17 años

william 17 años jacob 17 años

jacob 17 años

carmen carmen carmen carm jacob 17 años 17 años 17 años 17 a 17 añosmesa proyección 2x1.20m maderamesa compartida aula compartida N4 2x1.50x0.5 madera mesa compartida aula N4 2x1.50x0.5 madera mesa aula compartida N4 2x1.50x0.5 maderamesa aula compartida N4 2x1.50x0.5 madera mesaaula compartida N4 2x1.50x0.5 maderamesa aula comp N2 2

jacob 17 años

mesa compartida maderamesa aula compartida N6 2x1.50x0.5 madera mesa compartida aula N6 2x1.50x0.5 madera mesa aula compartida N6 2x1.50x0.5 maderamesa aula compartida N6 2x1.50x0.5 madera aula N6 2x1.50x0.5

*12 ethan 30 años

favorecer

efireLux ico 24 V

ado espesor 7

em04

em04

em04

em04

em04

em02

em02

em02

em02

em02

ca03

ca03

ca03

ca03

ca03

3.40 m

ca06

ca06

ca06

ca06

em06

em06

em06

em06

ca06

ca06

ca06

ca06

ca07

ca07

ca07

ca07

ca03

ca03

ca03

ca03

DETALLE B

la viga, 12 cm

fc01

em02

fc01 fc03

fc02 fc04fc01 william fc03fc02 fc04 fc01 fc03 fc02 fc04 fc01 fc03

3.40 m

3.40 m

em03

3.40 m

ca01 miguel 30 años

miguel 30 años

miguel 30 años

miguel 30 años

ca01

fc04 carmen 17 años

em03

em03

em03

mesa compartida madera aula N4 2x1.50x0.5

em03

em03

r

fc01

fc02

fc03

fc04

ca06

panelem03 pladur plegable 70panel cm pladur plegable pane pl7

em03

ca07

ca06

p

ca03

em06

ca01

DETALLE B

ca01

ca08

ca08

ca08

ca08

em01

em01

em01

em01

6 W 500 LM luminaria N5

aula taller N2 100 m2

6 W 500 LM luminaria N5

6 W 500 LM luminaria N5

6 W 500 LM luminaria N5

6 W 500 LM luminaria N5

6 W 500 LM luminaria N3

6 W 500 LM luminaria N3

6 W 500 LM luminaria N3

6 W 500 LM luminaria N5

em01

ca01

6 W 500 LM luminaria N3

ca08

mc06

em01

mc06

mc03

mc03

noah 15 años

noah 15 años

noah 15 años

mc03

entación y solera

luis 15 años

mc02

según espacio) grupar a un pb01 mc05 mc05

pb01 pb02 pb01 ci06

luis 15 años

luis 15 años

luis 15 años

isaac 16 años

orman el mc01 NE EN 14195 y

mc01

mesa madera taller N8 1.50x1.20 mesa madera15taller mesa N8 1.50x1.20 madera taller N8mesa 1.50x1.20 madera taller N8 1.50x1.20 mesa mesamadera maderataller tallerN8N51.50x1.20 1.50x1.20 mesa madera tallermesa N5 1.50x1.20 madera taller N5mesa 1.50x1.20 madera taller N5 1.50x1.20 mesa madera años

isaac 16 años

p

mesa madera taller N8 1.50x1.20

p

mesa madera taller N5 1.50x1.20

p

p

p

pb01

pb02

ci06

ci07

ci09

ci08 ci10 ca03 ci08

DETALLE A mc04

isaac 16 años

luis 15 años

cie de 150 kg/m2 mc04

isaac 16 años

isaac 16 años

pb02ci07 pb01 ci06pb02 ci09 ci07 ci06 pb01 ci08pb02 ci09 ci07 ci06ci08 ci10 ci09 pb02ci07 ci08 ci06 ci09 ca03 ci10 ci07ci08ci10ci09 ca03

mc05

sor 80 mm. dada de 10 a 70

miriam 55 años

noah 15 años

luis 15 años

mc02

edosado 2se apoyan sobre

noah 15 años

noah

isaac 16 años

mc02

6 W 500 LM

panelluminaria pladur plegab N3

ca08

ca03

miguel 30 años

o conservado

mesa co em03

em03

ca06 em06

ca03 DETALLE Baula DETALLE B aula Baula 3.40 mtaller N2 100aula taller N2B100DETALLE aula m2 taller N2 100DETALLE taller m2 N2 100 m2 m2 taller N2 100 m2

ca01

em03

ca07

miguel 30 años

espesor 5 mm

mc06 e formato y color

fc03

jacob 17 años

mesa compartida madera aula N6 2x1.50x0.5

ca06

m

fc02 fc04

17 años

3.40 m

em04

fc02

ca03 ci10 ci10

0.00 m

ca03

ca03

DETALLE A DETALLE A

0.00 m

ci01

0.00 m

ci02 ci01

ci03ci01ci02

0.00 m

ci03 ci01 ci02

0.00 m

0.00 m

DETALLE A

ci03 ci02 ci01

ci01

ci02

ci03 ci02

p

ci03

p

ci03

DETALLE A

DETALLE A

mc04

mc01

do elastificado ntros de una m. Según DB HR.

R.

N

Norma UNE EN

te la

E EN 520. parapb04 facilitar ci10

pb04 ci10

tarse primero el ci01de ci01 ún guía 2. Tipo de techos

l forjado.

s

pb04

em01

em01

em01

ca01 pb04

ca01 pb04 ca01

ca08

ci10

ca08

ci10 ca08

ca03

ci01

ca03

ci01 ca03

ci10 ci01

ce06

em01

ca01

em04

ct03

ct03

ct03 ce06

ct03 ce06

ct03 ce06

ca06

ct02

ct02

ct02 ct04

ct02 ct04

ct04 ct02

ct01

ct01

ct01

ct01

ct01

em01 em01 ca08 ca01 em04

em01

em01

em04

em04

ca08 ca06

ca08 ca06

ca06

ca06

ca03 em03

ca03 em03

em03

em03

em06

em06

em06

em06

em02

em02

em02

em02

ca03

ca03

ca03

ca03

em05

em05

em05

ca08

ca08

ca08

em05PB DETALLE A. Encuentro carpintería escala 1:10 ca08

ct03

em01

em01 em01 ca01 em04

ca03

em01

em04 em03 ca06 em06

ct02 ct01

ct04

ce06

ce06

ct04

ct04

ca10

em02 em03

ca03 em06

em02

em05

em02

ca10

ca10

ca06

ca06

ca09

ca09

ca10

ca10

ca10

ca06

ca06

ca06

ca03 ca09

ca09

ca09

ca09

ca01

ca08

ca03

em05 DETALLE B. Encuentro vigas y pilar escala ca08 1:10

ca06

em02

DETALLE C. Cubierta, cercha y muro escala 1:10

em02

em02

ca03 em02

DETALLE D. Carpintería y viga P1 escala 1:10 ca01

ca03 em02

ca03

ca01

ca01

ca03 pl15 ca01

pl15

pl14

ca03

Partición hú pl14 DETALLE pl15pl13 E. pl14 pl15 escala ca01 1:10

DETALLE A. Encuentro DETALLE A. Encuentro PB carpintería PB DETALLE B. Encuentro vigas pilar ntería DETALLE Encuentro PB A. carpintería Encuentro PBcarpintería PB carpintería DETALLE B. Encuentro DETALLE vigas B.DETALLE yEncuentro pilar B. vigas Encuentro y pilar vigas y pilar DETALLE B. yEncuentro vigas y DETALLE pilar DETALLE C. Cubierta, cercha muro cercha y muro DETALLE D. Carpintería y viga P1 DETALLE Carpintería y viga P1 C. Cubierta, y muro DETALLE C. yCubierta, DETALLE D.DETALLE Carpintería D.y Carpintería viga P1 yD. viga P1 DETALLE D. Carpintería y viga P1DETALLE E. Partición húmeda-seca conhúm E. tecP C. Cubierta, DETALLE cercha C.DETALLE Cubierta, y muro cercha y murocercha DETALLE E.DETALLE Partición escala 1:10 escala 1:10 escala 1:10 escala 1:10 escala 1:10 escala 1:10 escala 1:10 escala 1:10 escala 1:10 escala 1:10 escala 1:10 escala 1:10 escala 1:10 escala 1:10 escala 1:10 escala 1:10 escala 1:10 escala 1:10 escala 1:10 escala 1:10 escala 1:10

14

students practical secondary school

14

14 14

14

14

students practical students secondary practical students school secondary practical students secondary school practical students school secondary practical school secondary school


ct08

ct08

ct08

ce06

ce06

ct09

ct09

ct09

ce05

ce05

ct10

ct10

ct10

ce06 ce05 NUEVO SAN ANDRES

INDUSTRIAL NUEVO SAN ANDRES

ct11

SAN CARLOS CONDOTE

C14

D14

cial PB+3

Residencial

C7

Guillermo Medina Banderas PFG · marzo 2018 · Escuela Málaga Guillermo Medina·Banderas · PFG · marzo 2018Arquitectura · Escuela Arquitectura Málaga RESUMEN 01 01 · escala 1:900 Residencial PB+5 URBANISMO

ial PB+5 C18 Residenc

GIRON

VISTAFRANCA

HAZA ONDA

ce04

ce04

ce04

LA LUZ

os

ARDIRA

C19

C5

te

ce05

em07

em07

em07

ca06

ca06

ca01

ca01

em05

ce03 ce02

cortina separadora desplegada

DETALLE D

ca06

ca03

em05

calle pacíficio

Acero

parada

Basket

Nave V PB+1 Pabellón acuático 12 horas Basket

Fútbol

Hockey

Beisbol

Rugby

Pacífico Comercial Polígono del Rio Barrio Torre

ión bloque

Arena Acerado

calle pacíficio

parada

línea construcc

paseo marítimo

eje deportivo

viviendas

ón bloque

paseo marítimo

viviendas

paseo marítimo

línea construcci

eje deportivo

ra 35x50

articulado

ento deportivo equipami 11 pista fútbol

paseo marítimo

ento deportivo y padel

equipami

ón bloque

TERC/HOTELERO PB+10 Nueva construcción Existente en Plan Parcial 24 horas

del Barrio Torre

a

ial La Térmic

Barrio Industr

2. Plan parcial 2006 3. Proyecto académico fin de grado. Demolición naves industriales y construcción de 1.Traslado centro de enseñanza ya nte Vicen-PlaCentro de enseñanza como centro del barrio en un edificios residenciales, edificio sector terciario/hotelero paseo y marítimo Restaura eje deportivo planificación de equipamiento escolar. lugar con identidad y tradición arraigada en el lugar.

PB+8

marítimo tenis paseode viviendaspistas

línea construcci

Rio

PB+10

a 35x50

plaza recibidora

4. Gestión de la manzana junto Plan Parcial 2006 2. Incorporación parte residencial del plan parcial Unificación de edificios residenciales del plan

articulador

nto deportivo equipamie tenis y padel pistas de

5. Gestión de la manzana junto Plan Parcial 2006 3. Equipamiento público del barrio y equipamiento Rio Torre del residencial. a Barrio Térmic 4. Incorporación edificio hotelero Plan Parcial 2006 ial La del Barrio Industr en el eje de edificios construidos del paseo marítimo.

nto deportivo equipamie 11 pista fútbol

6. Funcionamiento manzana polo formativo-deportivo

DESCRIPCIÓN SITUACIONES: *1 (Panel 2, Urbanismo 01) Joaquín, 45 años. Es vecino del barrio y hace tres meses que tiene algunas verduras P1 Dormitorios Dormitorios yDormitorios hortalizas sembradas enPBla zona de Dormitorios huertos e invernaderos. Sale de nuevo a la hall versátil y exposiciones, que tiene acceso directo al laboratorio laboratorio informática informática informática Despachos espacio público y donde se ha sorprendido PB+7 m 40 40 PB+4 50 P1 m m Sala 1, Sala 2 coworking aula polivalente aula polivalente aula polivalente fab-lab seminarios SIPS al ver los últimos trabajos expuestos de los PB+7 Hall versátil Conserjería Pabellón acuático aula polivalente aula polivalente Pista deportiva, Hall versátil aula polivalente aula polivalente aula polivalente Elementos estructurales: ia PB+4 PB vive en un secundar alumnosdeenagua este hall. Joaquín reunión y conferencias Biblioteca Actividades vestuarios espacio exposición taller música taller taller taller plástica taller PB+7 práctica a Res. de enseñanz m m bloque residencial y no tiene Sótano de instalaciones Centro PS jardín. Le 80 80 PB+22 PB+10 PB+22 satisface NAVE I NAVE II NAVE III NAVE IV NAVE V alquilar su pequeño terreno tan PB+22 PABELLÓN DEPORTIVO HALL VERSÁTIL ZONA DOCENTE HALL VERSÁTIL ZONA ADMINISTRACIÓN PABELLÓN ACUÁTICO m m cerca de casa. Además, su mujer es muy Cercha Howe 80 80 Cercha Pratt m deportista y siempre acaba con unas series Res. m m 15 20 PB+1 20 Muros de carga Pórticos metálicos de atletismo después de correr por el paseo PB+1 marítimo junto a su grupo de corredores. TIPOS DE USUARIOS Los dos están encantados de que el barrio VI 6. Funcionamiento manzana polo formativo-deportivo 5. Gestión de la manzana junto Plan Parcial 2006 4. Gestión de la manzana junto Plan Parcial 2006 3. Proyecto académico fin de grado. PB+10 05. Cabeza Marítima - vecino deportista Nos encontramos con unaesté atractiva zonadedevida Málaga, - alumnos de 12 a 18residencial. años - profesores de 24 a 65 años tan lleno y de que el centro de 3. Equipamiento público del barrio y equipamiento 2. Incorporación parte residencial del plan parcial 1.Traslado centro de enseñanza Almacenaje cereales 2010-2018 (nivel ciudad) la primera en población deenseñanza la ciudad en los últimossuponga un polo (estudiantes del centro) (procedencia global) secundaria 4. Incoporación edificio hotelero del Plan Parcial 2006 en el eje de Unificación de edificios residenciales del plan Centro de enseñanza como centro del barrio en un lugarAdjunción con identidad de fachada metálica años, con un alto nivel de formativo-deportivo oportunidades y conpara todos los barrios Estado actual NAVE NAVE IV NAVE I NAVE IV I II III V Plan 2. Plan parcial 2006 arraigada en el lugar. 6. Funcionamiento manzana polo formativo-deportivo 5. Gestión de la manzana junto PlanI Parcial 2006 4. Gestión deIV la manzanaedificios junto Parcial 2006 3. Proyecto académico fin de grado. construidos del paseo marítimo. NAVE I y tradición PB+10 interesantes variables: una importante masa de NAVE V NAVE II NAVE V NAVE II NAVE V colindantes 3. Equipamiento público del barrio y equipamiento residencial. 2. Incorporación parte residencial del plan parcial 1.Traslado centro de enseñanza Demolición naves industriales y construcción de edificios personas con edad media activa, una presencia de NAVE III PISTAS HUERTOS 4. Incoporación edificio hoteleroPISTAS del Plan Parcial 2006 en el eje de NAVE III PISTAS HUERTOS Unificación de edificios residenciales del plan Centro de enseñanza como centro del barrio en un lugar con identidad residenciales, edificio sector terciario/hotelero y planificación de extranjeros considerable y un crecimiento general de En el proceso evolutivo y sus distintas fases afluencia: ALTA marítimo. afluencia: ALTA afluencia: ALTA edificios construidos del paseo arraigada equipamiento escolar. la ciudad que será moderado, pero positivo. Sería constructivas encontramos unay tradición forma clara de en el lugar. VI - vecino bienvenido - deportistas de alto rendimiento - movilidad reducida y rehabilitación positivo fomentar acciones que permitan integrar crecimiento y modificación según la necesidad del (barrios colindantes) (barrios colindantes) (estudiante becado de la UNI Laboral) momento. Esto nos muestra además la versatilidad personas con riesgo de exclusión social (centros students practical secondary school activos donde convivan personas de distintas y flexibilidad de estas naves para albergar distintos NAVE I NAVE IV NAVE I NAVE II-exposiciones Estado modificado I II III IV V nacionalidades) y evitar manzanas de uso único programas gracias a su ligereza estructural y sus NAVE II NAVE V PISTAS NAVE V NAVE III-talleres residencial que desequilibren la densidad y la grandes luces. Con mirada detallada e investigación NAVE III NAVE students practical secondary schoolVI HUERTOS PISTAS NAVE IV-biblioteca HUERTOS complejidad de la ciudad . podemos reconocer los distintos elementos. afluencia: MEDIA afluencia: ALTA afluencia: MEDIA PB+22

PROCESO EVOLUTIVO DE LA MANZANA

PB+22

01. Empresa desconocida

50

m

PB+22

PB+22

PB+22

40

PB+1

80

02. Fábrica de los Tubos Industrial 1973-1989

Primer asentamiento Construcción de Nave V Elementos estructurales: Res.

SIPS

PB+7

PB+10

Centro

m

Res.

m

Escolar

Cercha diente de sierra Cercha Howe plana longitudinal Terc/Hot Muros de carga

2. Plan parcial 2006 Res. 04. Cabeza Marítima Demolición naves industriales y construcción de edificios Almacenaje y depósitos 1998-2010 residenciales, edificio sector terciario/hotelero y planificación de crujías de la Nave V Derribe de tres 1.equipamiento Manzana actual escolar. Construcción de la Nave IV

PB+22

za práctica

Ampliación del conjunto Construcción de nuevas naves (Nave I, Nave III) PB+7

ria

secunda

de enseñan

50

03. Cabeza Marítima Agencia Aduanas PB+7y Transporte 1989-1998

PROGRAMA El nombre en inglés Garage XXI puede traducirse como ¨taller¨, ¨estudio¨ del siglo 21 y busca acercarse a la idea de un centro de enseñanza práctico contemporáneo e innovador. Se busca que los estudiantes convivan entre paisajes de aprendizaje y un ambiente vivo de enseñanza práctica envuelto en una atmósfera de colaboración entre personas, actividades y convivencia sana con un patente rol deportivo. Se encuentra en el deporte la línea principal para el reto de combinar la escala del estudiante con un equipamiento atractivo a nivel de ciudad. Buscando un programa sostenible que maximice el número de horas activo se incorporan los alumnos residentes deportistas de alto rendimiento de la UNI Laboral.

Cambio de empresa PB+22 Construcción de nuevas naves (Nave II, Nave VI)

40

Elementos estructurales:

m

PB+22

m

10

PB+22

m

02

Elementos estructurales:

Pórtico metálico doble

Cocina comedor Cafetería

NAVE VI RESIDENCIA ESTUDIANTES calle desdeDEPORTISTAS la Nave 2-

02

+11.50 m

+11.50 m

+9.00 m

+10.00 m +9.00 m

+7.00 m

+7.00 m

+3.45 m +3.00 m

+3.00 m

+0.00 m hueco existente de antiguo acceso. acristalado no practicable

ohamed años

mohamed 18 años

NAVE VI. RESIDENCIA ESTUDIANTES DEPORTISTAS ALTO RENDIMIENTO 10.00

NAVE VI. RESIDENCIA

acceso vehículos profesorado y personal del centro

45.00

ALZADO NORESTE. CALLE AYAMONTE escala 1:350

em04

NAVE I. PABELLÓN DEPORTIVO

acceso vehículos abastecimiento 10.00

45.00

40.00

ALZADO SUROESTE. AVENIDA MOLIERE escala 1:350

+11.50 m +10.00 m +9.00 m

em01

+7.00 m

+3.45 m +3.00 m

+0.00 m

NAVE III. ZONA DOCENTE. AULAS, TALLERES Y LABORATORIOS NAVE II. HALL VERSÁTIL. EXPOSICIONES

NAVE I. PABELLÓN DEPORTIVO

ompartida madera aula N2 2x1.50x0.5

em03

em03

em03

ca03

ca03

ca03

ca03

ca03

em06

em06

ca04

acristalado no practicable

ca03

acceso directo espacio público 15.00

20.00

NAVE IV. HALL VERSÁTIL. REUNIÓN Y CONFERENCIAS

hueco existente de antiguo acceso. acristalado no practicable 80.00

hueco existente de antiguo acceso. acristalado no practicable acceso hall principal

NAVE V. PABELLÓN ACUÁTICO

acristalado no practicable

30.00

50.00

ALZADO SURESTE. CALLE PACÍFICO escala 1:350 +11.50 m +10.00 m +9.00 m +7.00 m 08

ca06

ca06

ca06

NAVE VI. RESIDENCIA ESTUDIANTES DEPORTISTAS ALTO RENDIMIENTO

29

03

02

12

01

11

21

10

20

19

27

28

09

+0.00 m instalación efímera taller de graffitis 80.00

10.00

10.00

5.00 1.25

1.25

1.25

5.00

1.25

1.25

1.25

1.25

1.25

1.25

10.00 5.00

1.25

1.25

1.25

1.25

cortina oscurecedora recogida

mueble madera N1 estante material y ropero

steve 16 años

6 W 500 LM miriam 55 años

09

2 W 100 LM

14

em03

ca03

ca08 aula polivalente N7 100 m2

3.75

3.75

1.25

cortina oscurecedora recogida

1.25

ca07

GARAGE XXI

5.03

III PN C3

III PN G3

4.05 I 6 II 6

6.07

4.05

mesa compartida madera aula N7 2x1.50x0.5

4.05

I 7 II 7

I 8 II 8

10.13

4.05

pl02

4.05

IA

pb04

IF

II C III A

5.03

III B

5.03

III PN F6

III PN G6

5.03

III PN H6

III D

III C

5.03

III PN M2

III PN L3

III PN M3

III PN N2

III PN Ñ2

Solera armada H=15 cm Armadura superior #Ø5 a 15cm

III PN Ñ3

III PN O3

III PN J6

III E

III F

5.03

III PN K6

III H

III G

5.03

5.03

III PN L6

III I

III J

5.03

III PN M6

III PN N6

III K

13

5.03

III L

5.03

III PN Ñ6

III PN O6

5.03

5.03

students practical secondary school III M

III N

V2

V3

V4

NAVE V IV PE F5

IV PE G5 V PE A5

IV PN G6

IV PN G7

V6

V PN B7

IV PE C9

IV PE D9 IV 9

4.83

III P IV A

IV B

4.83

IV D

IV C

planta detalle 1:40

IV PN G8

IV PE E9

IV PE F9

4.83

V7

Hueco de ascensor (ver detalle 09) V PN B8

Armadura de montaje de ábaco (detalle 07)

IV PE B9

4.83

IV E

IV F

V8

Entrega de zanca de escalera (ver detalle 05)

Muro existente de ladrillo de espesor 50cm

IV PE G9

V9

4.83

6.03

4.02

IV G V A

VB

10.06

Factor Seguridad a=1.10

Normal

Ejecución

G=1.33

Normal

/

G=1.00

Tipo

Límite Elástico

Resist. Trac. Ac. Soldadura

S275 JR

275 N/mm2

420 N/mm2

Q=1.50/1.33

Efecto Desfavorable

--

--

Q=0.00

Efecto Favorable

--

--

/

La estrategia estructural se basa en combinar la intención de trabajar únicamente donde se desarrolle el nuevo programa, alineándose a la estructura existente, sin sobrecargarla y protegiendola; al mismo tiempo que se consigue un proyecto versátil y con una seriación interesante y luces potentes. Reduciendo así la cimentación por losa exclusivamente a los espacios donde encontramos el programa del proyecto. Así, anclaremos la estructura metálica ligera a la losa de cimentación suponiendo un sistema capaz de responder al doble caracter de versatilidad buscado.

Viga HEB 140

Viga Continua HEB 200

320x210x15 0.07

200

IPE 200

15

0.60

Nivel Control

Consistencia

Tamaño máx. árido

c=1.50

HA-30

Fluida (10-15 cm)

20 mm

c=1.50 3.94 3.94

Estadístico

Ejecucuón (Acciones)

Normal

Vigas utilizadas escala 1: 20

3.75

Blanda HA-30 30 mm 3.94 3.94 3.94 (8-9 cm) 3.94 3.94 3.94 Blanda c=1.50 HA-30 30 mm (8-9 cm) con muro pantalla Encuentro de losa de cimentacion G=1.50 (ver detalle 02) Q=1.60

0.52

HA-30 HA-30

c=1.50

HA-30

c=1.50

HA-30

3.94 3.94

3.94

3.94 3.94

Fluida (10-15 cm) Blanda (8-9 cm) Fluida (10-15 cm) Blanda (8-9 cm)

20 mm

IIIa

30 mm

II

35

70

Normal

Coef. Ponde. s=1.15

VI PN A2, VI PN A4 VI PN B2, VI PN B4 VI PN C2, VI PN C4 VI PN D2, VI PN D4 VI PN E2, VI PN E4 VI PN F2, VI PN F4 VI PN G2, VI PN G4 VI PN H2, VI PN H4 VI PN I2, VI PN I4 VI PN J2, VI PN J4 VI PN K2, VI PN K4

3.94

3.94

3.94

3.94

3.94

3.94

3.94

3.94

3.94

3.94

3.94

3.94

3.94

3.94

3.94

3.94

3.94

3.94

3.94

3.94

3.94

Armado pilar

Tipo

Pilar

B 500S

35

70

Normal

s=1.15

B 500S

20 mm

35

70

Normal

s=1.15

B 500S

30 mm

35

70

Normal

s=1.15

B 500S

Junta de hormigonado rugosa, limpia y humedecida antes de hormigonar

Armado base superior losa #Ø12 a 15cm

≥0.30

≥0.30 Montaje 3eØ6 en arranque pilar ≥0.20

≥0.20

45º

1.50

Armado base superior losa #Ø10 a 15cm ≥0.30

0.10

Losa maciza

1.00 Armado base superior losa #Ø10 a 15cm

Losa maciza

0

≥0.3

0.24

Armado base inferior losa #Ø10 a 15cm

Armado base inferior losa #Ø12 a 15cm

Base compactada

Hormigón de limpieza ≥10cm

Calzas de apoyo de parrilla ≥5cm

1.00

0.80

DETALLE 04. Arranque de pilar central con refuerzo en losa de cimentación (nueva construcción) escala 1: 20

0

≥0.3

≥0.40

≥0.40

Patés ded apoyo de la parrilla superior

0.80

Armado de reparto superior #Ø10 a 15cm

≥0.40

Armadura superior e inferior #Ø12 cada 15cm

pl03

≥0.30

Armado de reparto inferior #Ø10 a 15cm

Junta de hormigonado rugosa, limpia y humedecida antes de hormigonar

Hormigón de limpieza ≥10cm

Armado base inferior losa #Ø10 a 15cm

DETALLE 03. Foso de ascensor (nueva construcción) escala 1: 20

DETALLE 07. Armadura de montaje de ábaco (nueva construcción) escala 1:40

Base compactada

DETALLE 06. Cambio de pendiente en losa inclinada de piscina (nueva construcción) escala 1:50

Armado muro Muro Patés ded apoyo de la parrilla superior

Armado base superior losa #Ø10 a 15cm

Armadura refuerzo inferior 4Ø20

Armado pantalla

Losa maciza

0.25

Armado base superior losa #Ø12 a 15cm

0.39 1.20

pl04

Armado base superior losa #Ø10 a 15cm

Picado ≥0.10

30

Armado base superior losa #Ø10 a 15cm

Muro pantalla

Superficie limpia, rugosa Armadura de conexion y y humedecida antes de cortadura Ø≥12 a 20cm hormigonar

1.00

Losa maciza Armadura superior e inferior

≥0.

≥0.20

30

≥0.

Armado base inferior losa #Ø10 a 15cm

Calzas de apoyo de parrilla inferior ≥5cm

Muro pantalla

Armado pantalla

Armado base inferior losa #Ø12 a 15cm Armado pantalla

Armadura refuerzo inferior

DETALLE 01. Encepado de pilotes (nueva construcción) escala 1: 25

Armado base inferior losa #Ø10 a 15cm

Hormigón de limpieza ≥10cm

Losa maciza en rampa

DETALLE 05. Arranque y entrega de zanca de escalera (nueva construcción) escala 1: 20

Base compactada

≥0.20

0.40

0.25 Hormigón de limpieza ≥10cm

0.15

pl07

escala 1:10

DETALLE G. Partición DETALLE seca-seca G. Partición con suelo seca-seca con suelo DETALLE G. Partición seca-seca con suelo escala 1:10 escala 1:10 escala 1:10

3.94

Control Características

Tamaño Exposición Recubrimiento Recubrimiento nominal Nivel sobre el terreno máx. árido Ambiente nominal Control

Consistencia

Losa maciza en rampa

≥0.30

pl04

3.94

Calzas de apoyo de parrilla ≥5cm

Calzas de apoyo de parrilla ≥5cm Base compactada

Base compactada

Muro pantalla

DETALLE 02. Encuentro de losa de cimentación con muro pantalla (nueva construcción) escala 1: 20

Armado base inferior losa #Ø10 a 15cm

Losa maciza

Hormigón de limpieza ≥10cm

0.35

pl04 pl06DETALLE G. Partición pl06 seca-seca con suelo

pl04

V PN B2 V PN B3 V PN B4 V PN B5 V PN B6 V PN B7 V PN B8

0.60

pl06

pl05

escala 3.94 1: 25

0.24

≥0.30

DETALLE F. Partición seca-seca con techo DETALLE F. Partición seca-seca DETALLE con techo F. Partición seca-seca con techo escala 1:10 escala 1:10 escala 1:10

Características Tipo

c=1.50 c=1.50

Estadístico Estadístico

0.60

≥0.50

≥0.20

0.48

≥0.20

≥0.50

pl07

pl05

Pilar metálico IPE 270

Diensiones

≥0.40

pl07

pl02

6.6mm

Placa de apoyo y de anclaje

45º Armado base inferior losa #Ø12 a 15cm

0.15

0.15

Coef. Ponde.

Estadístico Estadístico

Muro Pantalla Losa de cimentación

0.10

pl06

pl05

pl07

Pernos de anclaje Rebosadero Ø80 Soldadura

Acero

Control Nivel Control

Pilote Encepado

0.15

pl03

B 500S

3.94

3.94

Hormigón

Materiales

≥0.05

0.40

DETALLE F. Partición seca-seca con techo escala 1:10

pl05

pl03

pl02 pl03

pl02 pl03

pl03

B 500S

Encepado de pilotes PILAR IPE 200 IV-1,5PE A5,detalle 01) II PE A1, II PE B1 m A1, IV PE(ver Pernos de anclaje IV PE A9, IV PE B1 II PE A2, II PE B2 IV PE B5, IV PE B9 II PE A3, II PE B3 Rebosadero Ø80 II PE A4, II PE B4 IV PE C1, IV PE C5 Soldadura II PE A5, II PE B5 IV PE C9, V PE D1 II PE A6, II PE B6 IV PE D5, IV PE D9 II PE A7, II PE B7 IV PE E1, IV PE E5 II PE A8, II PE B8 IV PE E9, IV PE F1 8.5mm 5.6mm II PE A9, II PE B9 IV PE F5, IV PE F9 -7,00 m Pilar metálico II PE A10, II PE B10 IV PE G1, IV PE G5 Losa maciza IPEH=60cm 200 II PE A11, II PE B11 IV PE G9 Armadura superior e inferior VI PE A1, VI PE A5 #Ø10 a 15cm Placa de apoyo VI PE C1, VI PE C5 y de anclaje VI PE E1, VI PE E5 VI PE G1, VI PE G5 VI PE I1, VI PE I5 VI PE K1, VI PE K5

Placa de apoyo y de anclaje

Armado viga Calzas de apoyo de inferior ≥4Ø8 parrilla inferior ≥5cm

0.60

pl03

pl02

Patillas en las armaduras de flexión (opcional)

Viga

Armado base inferior losa #Ø10 a 15cm

45º

cho (baños)

pl03

pl02

pl02 pl07

0.90 1.45

Junta de hormigonado rugosa, limpia y humedecida antes de hormigonar

0.30

úmeda-seca con techo (baños)

pl02

pl11

Calzas de apoyo de parrilla inferior ≥5cm

B 500S

s=1.15

PLANTA BAJA. -3.40 m escala 1:250

0.60

pl03

pl03

≥0.05

≥0.40

1.60

Pilar

0.45

Tipo

s=1.15 3.94s=1.15

Normal

3.94

Armado viga superior ≥4Ø12 Estribos de 4 ramas

0.35

1.45 0.90

l03

pl02

1.45 0.90

pl13

pl02

0.55

l02

pl07

≥0.40

≥0.40

.45

Ø0

Nivel Control

0.60

Armado base superior losa #Ø10 a 15cm

Elemento

≥0.40

.45

.45

Ø0

3.94

70

CARACTERÍSTICAS DE LOS MATERIALES

Armado base superior losa #Ø12 a 15cm

Losa maciza de cimentación

Ø0

pl11

70 3.94

10

students practical secondary school

0.55

3.94

Características

Coef. Ponde.

Normal 3.94 Normal 3.94

70 3.94

35

3.94

Encuentro de viga y jácena con pilar escala 1: 20

DETALLE 14. Encuentro de forjado de losa maciza y losa de cimentación con muro pantalla (nueva construcción) escala 1: 20

Arranque de escalera metálica

35

3.94

Adaptado a la Instrucción EHE

3.94

400x400x15

12

15 200

0.10

Armado pantalla 0.60

DETALLE 13. Arranque de pilar metálico en losa (nueva construcción) escala 1: 20

3.94

3.94

IIIa

200

SÓTANO

Muro pantalla

Calzas de apoyo de parrilla ≥5cm

Hormigón de limpieza ≥10cm

35

IIIa

Control

Recubrimiento nominal sobre el terreno

Recubrimiento nominal

IIIa

15

≥0.20

Base compactada

Armado base inferior losa #Ø12 a 15cm

Exposición Ambiente

3.94

Losa maciza H=100cm Encuentro de forjado de losa maciza y losa deHEB 200 Armadura e inferior PILAR I PN A1 IV PN E2 III PN A2,superior III PN A3, III PN A5, III PN A6 III PE A4 cimentación con muro pantalla #Ø10 15cm Pernos de anclaje I PN A2 III PNaB2, III PN B3, III PN B5, III PN B6 III PE B4 IV PN G2 (ver detalle 14) I PN B1 IV PN E3 III PN C2, III PN C3, III PN C5, III PN C6 III PE C4 Rebosadero Ø80 I-1,00 PNmB2 -2,00 m III PN D2, III PN D3, III PN D5, III PN D6 III PE D4 IV PN G3 Soldadura I PN C1 III PN E2, III PN E3, III PN E5, III PN E6 III PE E4 IV PN E4 3.94 3.94 I PN C2 III PE F4 III PN F2, III PN F3, III PN F5, III PN F6 IV PN G4 3.94 I PN D1 III PE G4 IV PN E5 III PN G2, III PN G3, III PN G5, III PN G6 I PN D2 III PE H4 III PN H2, III PN H3, III PN H5, III PN H6 IV PN G5 15mm Foso de ascensor 9mm I PN E1 III PE I4 III PN I2, III PN I3, III PN I5, III PN I6 IV PN Encuentro de losa de cimentacion con muro deE6 piscina (ver detalle 03) Arranque de zanca de escalera I PN E2 III PE J4 III PN J2, III PN J3, III PN J5, III PN(ver J6 detalle 08) IV PN G6 (vermetálico detalle 05) Pilar I PN F1 III PE K4 III PN K2, III PN K3, III PN K5, III PN K6 IV PN E7 HEB 200 I PN F2 III PE L4 III PN L2, III PN L3, III PN L5, III PN L6 IV PN G7 I PN G1 III PE M4 III PN M2, III PN M3, III PN M5, III PN M6 IV PN E8 Placa de apoyo I PN G2 III PE N4 y de anclaje III PN N2, III PN N3, III PN N5, III PN N6 IV PN G8 Arranque de pilar central con refuerzo en losa de cimentación III PE Ñ4 III PN Ñ2, III PN Ñ3, III PN Ñ5, III PN Ñ6 -3.40 m (ver detalle 04) III PE O4 III PN O2, III PN O3, III PN O5, III PN O6 Cuadro de pilares III PE P4 III PN P2, III PN P3, III PN P5, III PN P6

140

Base compactada

10.2mm -3,00 m

Pilar metálico IPE 330

3.94

Losa maciza

aprox 133 mm

0.60

Armado base inferior losa #Ø12 a 15cm

Calzas de apoyo de parrilla inferior ≥5cm

133

0.35 0.60 0.10

Armado base inferior losa #Ø10 a 15cm

Hormigón de limpieza ≥10cm

Angular 80x80x8 de apoyo provisional en montaje

Junta de hormigonado rugosa, limpia y humedecida antes de hormigonar el forjado y la 2ª fase de la viga

Viga de coronación Hormigonada en dos fases ≥0.20

Patés de apoyo de la parrilla superior

Viga HEB 140 Soldadura

Soldadura

PILAR IPE 270 NAVE V -1,5 m V PE A5 V PE C5 V PE D5 V PE E5 Cambio de pendiente en losa inclinada de piscina V PE F5 (ver detalle 06)

Pernos de anclaje

Soldadura

Pilar HEB 200

Viga HEB 200

200

Pilar HEB 200

Angular 80x80x8 de apoyo provisional en montaje

≥0.20

≥0.20

Rebosadero Ø80

3.94

Armado base superior losa #Ø10 a 15cm

Armado base superior losa #Ø12 a 15cm

3.94

530x700x15

3.94

PILAR EMPRESILLADO

Armado base superior losa #Ø12 a 15cm

Pilar HEB 200

Espacio para mortero de nivelación expansivo Perno de anclaje

Características Tipo

Estadístico Estadístico

Losa Maciza

3.94

0.60 0.10

140

12 90

Acero

Control Coef. Ponde.

Muro Pantalla Losa de cimentación

Elemento

200

Empalme a tope de pilar escala 1: 20

DETALLE 12. Arranque de escalera metálica (nueva construcción) escala 1: 20

Hormigón

Materiales

70

Soldadura

Pilar HEB 200

DETALLE 11. Encuentro de losa de cimentación (nueva construcción) con muro existente escala 1: 20

Viga HEB 200

Viga Continua HEB 200

CARACTERÍSTICAS DE LOS MATERIALES 140

Pilar HEB 200

Patés de apoyo de la parrilla superior

Armado base inferior losa #Ø12 a 15cm

Viga HEB 200

Encuentro de viga y jácena de mismo canto escala 1: 20

Armado base superior Losa maciza losa #Ø10 a 15cm

Base compactada

Zapata corrida de mampostería

Placa de transición

0.15

0.50 Viga Continua HEB 200

Viga Cortada HEB 140

Empalme a tope de pilar

UPE 180

Hormigón de limpieza

Viga HEB 200

Viga Continua HEB 200

Placa de transición 0.15 Soldadura

Viga Continua HEB 200

Encuentro de viga y jácena de distinto canto escala 1: 20

Armado base superior losa #Ø12 a 15cm

SÓTANO

Tuerca y contratuerca para nivelar alturas e inclinaciones

pl07

VG

Viga Continua Viga HEB 200 HEB 200

Viga Continua HEB 200 Placa de transición

0.15

3.94

Junta de separación con relleno compresible

Armado pantalla

DETALLE 10. Encuentro de muro pantalla (nueva construcción) y losa maciza con muro existente escala 1: 20

pl02

VF

Soldadura

Soldadura

Viga Cortada Viga Continua HEB 140 HEB 200

IPE 140

0.35

Armado de reparto superior #Ø10 a 15cm Solera armada

0.60

pl07

VE

Angular de apoyo

Mortero de ligazón

l07

10.06

Angular de apoyo provisional en montaje

Losa maciza

Muro pantalla

pl11

VD

VC

Soldadura Muro de ladrillo de dos pies con aparejo gótico flamenco

Junta de hormigonado rugosa, limpia y humedecida antes de hormigonar el forjado y la 2ª fase de la viga

Viga de coronación Hormigonada en dos fases

Zapata corrida de mampostería

pl11

10.06

3.94

Ac. Laminado

Todos

Enfoscado de cal

Mortero de ligazón

pl04 pl07

10.06

3.94

Nivel Control

Descripción

Pernos, chapas y perfiles (salvo indicado)

Armado base superior losa #Ø10 a 15cm

Armado base inferior losa Calzas de apoyo de parrilla inferior ≥5cm #Ø10 a 15cm

pl04

V5

V PN B6

Losa maciza H=35cm Armadura superior e inferior #Ø10 a 15cm

Placa de transición

pl04

V PE F5

Arranque de pilar metálico en losa (ver detalle 13)

*12 (Panel 14, Construcción 02) Ethan, 30 años, estadounidense, profesor de Filosofía y Moralidad prepara el proyector para analizar en inglés las últimas noticias sobre la velocidad de implantación en la sociedad de las nuevas IV PN E7 tecnologías. Los alumnos despliegan lasIVcortinas para 7 oscurecer levemente la clase. Son alumnos de último curso y esto se hace más evidente al estar en la planta superior. Ethan les cuenta que como enseñanza práctica prepararán entre todos una instalación que se expondrá en la Nave 2 sobre el temario de este mes. Se volverán a ver todos juntos IV PN E8 IV 8 en la sala coworking.

0.15

pl07

V PE E5

3.94

Elementos

Muro de ladrillo de dos pies con aparejo gótico flamenco Enfoscado de cal

pl04

V PE D5

V PE C5

V PN B5

OPTIMIZACIÓN ESTRUCTURAL:

Acero estructural

≥0.20

l04

Encuentro de muro pantalla y de losa maciza con muro existente (ver detalle 10)

Muro existente de ladrillo de espesor 50cm

V PN B4

400x300x15

pb04

pl04

VI 3 VI 4

VI 5 V1

PLANTA BAJA. ±0.00 m escala 1:250

DETALLE G

pl04

VI 1 VI 2

VI PE K5

V PN B3

IV PN G4

IV PN E6

IV 6

VI PE I5

VI PE G5

V PN B2

IV PN G3

IV 4 16 años, *11 (Panel 13, Construcción 01) Laura, española. Acaban de terminar su clase de matemáticas aplicada a la economía circular y el consumo de NAVE IV materiales. Aprovecha los cinco minutos de descanso de intercambio de clases para disfrutar leyendo el libro ¨ IV PE B5 IV PE D5 IV PE E5 IV PE C5 homo sapiens¨. Saca una de las sillasIV 5a la galería suroeste y se coloca junto al acristalamiento. A diferencia de las otras dos galerías, esta es más pequeña y controlada, se concentra entonces mientras ve los árboles de la calle agitarse.

4.83

III O

III Ñ

IV PN G2

Losa de cimentación H=60cm Armadura superior e inferior #Ø10 a 15cm

IV PN E4

III PN P6

5.03

VI PE E5

VI PE C5

miguel 30 años

Arranque de pilar metálico en losa (ver detalle 13)

IV PN E3

IV 3

DESCRIPCIÓN SITUACIONES:

III PN P3

VI PE A5

Encuentro de forjado de losa maciza y losa de cimentación con muro pantalla (ver detalle 14)

IV PN E2

IV 2

III PN P2

III PN O2

Arranque de pilar metálico en losa (ver detalle 13)

III PN N3

IV PE G1

3.94

ci04

III PN L2

Arranque de escalera metálica (ver detalle 12) III PN K3

IV PE F1

3.94

pb02

III PN K2

Foso de ascensor (ver detalle 03)

III PN I6

cactus, perejil, poto IV PE E1 aloe vera, margaritas hierba buena, tomillo hiedra, albahaca, ficus

IV PE D1 IV 1

Encuentro solera armada con muro existente y losa de cimentación (ver detalle 11)

5.03

CARACTERÍSTICAS DE LOS MATERIALES

ci05

III PN J3

IV PE A9 5.03

II B

III PN J2

III PN I3

5.03

7.35

I G II A

III PN I2

mc08IV PE C1

3.94

ca03

IE

III PN H3

Muro existente de ladrillo de espesor 50cm

II PE B11

III 7 7.35

VI PN K4

3.94

ci04

ID

IC

3.07

VI PN K2

VI PN J4

3.94

pb02

3.42

VI PE K1

VI PN J2

VI PN I4

3.94

ci04

3.42

5.03

ce01 ce02

VI PN I2

Arranque de escalera metálica (ver detalle 12)

3.94

ci04 ci05 pb02

IB

3.42

VI PN H4

3.94

ci05 pb02

3.42

VI PN H2

VI PN G4

VI K

5.03 VI PE I1

VI PN G2

3.94

pb04

3.07

VI PN F4

3.94

pb04

pb04

II PE A11

I 11 II 11

5.03

VI PE G1

6

VI PN E4

3.94

pl04 pl07 G DETALLE

16 años

ca03

5.03

VI J

3.94

pb04

I 10 II 10

ca03

4.05

4.05

I 9 II 9

III PN H2

PARTICIONES YESO LAMINADO (pl) pl09 Cemento cola para agarre de los azulejos pl01 Partición placa de yeso laminado seco-seco o húmedo-seco (según espacio) pl010 Bandas de refuerzo. Film estanco para reforzar mecánicamente espesor 10 cm con guías en extremos (según espacio) para agrupar a un la estanqueidad de encuentros de paramentos en ángulo. extremo del aula o taller NAVE III pl11 Placa de yeso laminado tipo H1 de espesor 10 mm según UNE pl02 Placa de yeso laminado atornillada sobre la perfilería del trasdosado III PE F4 III PE H4 III PE I4 III PE J4 III PE K4 III PE L4 III PE M4 III PE N4 III PE P4 IV PE A5 III PE G4 III PE Ñ4 III PE O4 EN 520. autoportante de espesor 10 mm. Cada una de las hojas (que se apoyan sobre pl12 Visaga incorporada en extremos a la placa de yeso laminado las bandas) tienen que tener una masa por unidad de superficie de 150 kg/m2 Solera armada H=15 cm para facilitar movimiento entre placas como máximo. Armadura superior pl13 Placa de yeso laminado de 15 mm o 2 x 12'5 mm. Debe pl03 Material absorbente acústico de lana mineral de roca de espesor 80 mm. #Ø5 a 15cm ejecutarse primero el elemento de separación vertical y Resistividad al flujo del aire ≥ 5kPa.s/m2. Densidad recomendada de 10 a 70 después el falso techo. Según guía de aplicación del DB kg/m3. III PN F5 III PN H5 III PN I5 III PN J5 III PN K5 III PN L5 III PN M5 III PN N5 III PN P5 III PN G5 III PN Ñ5 PN O5 HR Protección frente al Ruido Tabla 2.1.4.12. Tipo de IIItechos pl04 Perfilería metálica galvanizada separada cada 600 mm. Conforman el suspendido. entramado portante de las placas de yeso laminado según UNE EN 14195 y Arranque de pilar metálico en losa detalle 13)anclada al pl14FosoEstructura auxiliar suspendida de tirantes(vermetálicos con marcado “N” de AENOR. de ascensor pl05 Junta expansiva ejecutada con banda de poliestireno expandido elastificado (ver forjado. detalle 03) Losa de cimentación H=60cm la transmisión de las vibraciones en los encuentros de una pl15 Cámara de aire de espesor mayor que 100 mm. que interrumpe Armadura superior e inferior pl16 Soporte estructura partición con suelos, techos y otras particiones. Espesor 10 mm. Según DB HR. #Ø10 a 15cm pl06 Sellado. pl07 Tornillería de sujeción perfilería metálica-placa de yeso según Norma Arranque de escalera metálica UNE EN 14 566. (ver detalle 12) pl08 Azulejo cerámico de espesor 10 mm

ESTRUCTURA METÁLICA (em) II PE A5 II PE B5 CARPINTERÍA (ca) em01 Pilar metálico HEB200 em02 Viga metáliga HEB 200 ca01 Vidrio aislante especial FLEX GLASSLINE de doble hoja con cámara de aire NAVE II em03 Viga metálica jácenas HEB 140 6-12-6 mm, en carpinteríaNAVE fija I em04 Forjado colaborante. Canto 12cm ca02 Vidrio aislante especial acristalamiento fachada FLEX GLASSLINE de doble III PE B4 III PE D4 III PE E4 II PE A6 II PE B6 III PE A4 III PE C4 III 4 Angular 80x80x10 de apoyo provisional en montaje em05 hoja 15-15 mm, en carpintería fija em06 Soldadura viga en pilar: aproximadamente 2/3 de la altura de la viga, 12 cm ca03 Carpintería de aluminio em07 Placa de terminación 10 mm ca04 Barandilla ligera de vidrio FLEX GLASSLINE 5mm terminada en carpintería de em08 Soporte de escalera UPN180 aluminio y pasamanos. Soportada mediante perfiles laminádosIIen frío PE A7 II PE B7 em09 Peldaños, chapa de hierro plegada de espesor 8mm ca05 Portal puerta aluminio blanco FLEX FRAMELESS caja 100 mm instalación Solera armada H=15cm eléctrica integrada III PN A5 III PN B5 III PN D5 III PN E5 III PN C5 Armadura III 5 CONSERVADO (mc) MURO ca06 Soporte perfil laminado ensuperior frío #Ø5 a 15cm mc01 Zapata de piedra Arranque de pilar metálico en losa ca07 Eje acero galvanizado riel cortina unido a soporte perfil laminado en frio II PE A8 II PE B8 (verdedetalle 13) mc02 Conglomerante cimentación, mortero de cal con tierra ca08 Cortina oscurecedora 3m de alto mc03 Fábrica de ladrillo de dos pies con aparejo gótico flamenco, de formato y color Solera armada H=15cm ca09 Atornillado carpinterías Armadura superior irregular de espersor medio 50 cm a lo largo del muro interior. ca10 Soporte metálico cableado eléctrico luminarias #Ø5 a 15cm mc04 Conector (vertical) de acero Ø12mm cada 60-100 cm aprox II PE A9 II PE B9 (según diseño en muro) CERCHA EXISTENTE CUBIERTA (ce) mc05 Platabanda de acero 150x150x12 mm ce01 Cordón inferior metálica perfil HEB 200 Arranque de escalera metálica mc06 Revestimiento de morteto de cal ce02 Montante. Perfil metálico HEB 100 (ver detalle 12) mc07 Malla entutoradora 7 m de alto incorporada a muro conservado II PE A10 II PE B10 III PN A6 III PN B6 III PN C6 III PN D6 III PN E6 III 6 Enredadera vegetal hiedra incorporda puntualmente a muro conservado mc08

5.03 VI PN F2

6.4 Arranque de pilar metálico en losa (ver detalle 13)

VI PN D4

VI PN C4

VI I

5.06

III PN G2

III PN F3

Losa de cimentación H=60cm Armadura superior e inferior #Ø10 a 15cm

III PN D3

5.03 VI PE E1

VI PN D2 VI PN E2 aparcamiento bicicletas 6 plazas

Arranque de escalera metálica (ver detalle 12)

VI PN B4

VI H

VI G

5.06

III PN F2

III PN E3

8.10

III PN B3

mc07

arreglo jardinería semanal

Muro existente de ladrillo de espesor 50cm

III PN E2

Arranque de escalera metálica (ver detalle 12) III PN A3

6.07

I 5 II 5

III PN D2

III PN C2

II PE B4

III 3

IV PE B1

5.06

4.05 4.05

15 años

III PN B2

Arranque de pilar metálico en losa (ver detalle 13)

II PE B3

4.05

I PN G2 II PE A3

A1 mc03IV PEmc06

mc02

costilla de adán poto, aloe vera hiedra

Encuentro solera armada con muro existente y losa de cimentación (ver detalle 11)

III PN A2

III 2

I PN F2

5.03

ce01 ce02

VI PN C2

6

Foso de ascensor (ver detalle 03)

VI F

5.06

I PN E2

5.03 VI PE C1

VI PN B2

VI PN A2

6.4

6.4

VI E

NAVE VI

martín 28 años

II PE B2

Losa de cimentación H=60cm Armadura superior e inferior #Ø10 a 15cm I PN D2

I PN C2

LEYENDA CONSTRUCTIVA (combina Muro con Panel 15,deConstrucción 02)50cm existente ladrillo de espesor

5.03

VI PE A1

ce01 ce02

6

VI D

VI C

5.06

I PN B2

II PE A4

I 4 II 4

VI B

VI PN A4

ca02

II PE A2

Arranque de escalera metálica (ver detalle 12) I PN A2

PLANTA DETALLE PLANTA BAJA escala 1:40

I 3 II 3

1.50 VI A

phillip 16 años

*11

II PE B1

III 1

5.00

5.06

I PN G1 II PE A1

1.60

5.00

5.06

I PN F1

6.08

4.05

I PN E1

Arranque de pilar metálico en losa muro de dos pies con aparejo gótico flamenco. 50 cm (ver detalle 13)

em01

01 3.40

1.20

I PN D1

I 2 II 2

55 años

LE G

I PN C1

03 02

2 W 100 LM

10.00

emilio 15 años

laura 16 años

I PN B1

05 04

luminaria N3

em01

5.00

luis 15 años

Foso de ascensor (ver detalle 03)

07 06

2 W 100 LM

pl02

gonzalo 14 años

em01

1.25

ce01 ce02 Guillermo Medina Banderas · PFG · marzo 2018 · Escuela Arquitectura Málaga 6.4 ESTRUCTURA 03 · escala 1:250 6

ce01 ce02

6

6.4

09 08

pl03

dani 12 años

pl01

ca05

3.75

5.00

ce01 ce02

6

I PN A1

ca08

10.00

6.4

I 1 II 1

ca01

luminaria N2

cortina oscurecedora desplegada

3.75

5.00

ce01 ce02

em01

0.65

ca05

elena 14 años

mesa compartida madera mesa aulacompartida N7 2x1.50x0.5 madera mesa aulacompartida N7 2x1.50x0.5 madera aula N7 2x1.50x0.5 ller N2 1.50x1.20 mesa madera taller N2 1.50x1.20 mesa madera taller N2 1.50x1.20 adam

pl05

pl03

0.60

ca01

luis 17 años

pl04

fede 12 años

pl01 em01

lidia 15 años

pl011

pl04

pl02

ca03

carlos 14 años

adam 15 años

0.60

pizarra

ca01

4 W 200 LM

pl07

pl011

pl01

isaac 16 años

pl07

0.60

mesa compartida madera aula N6 2x1.50x0.5

10

pl07

maría 16 años

carlos 16 años

luminaria N1

pl08

nadia 16 años

m

2 W 100 LM

pl15

6 W 500 LM

pl02

ca05

12 11

6 W 500 LM

mohamed 15 años

pl03

13

luminaria N1 luminaria N6

pl04 2.20 blanca móvil

15 14

em03

1.20

jacob 15 años luminaria N5

álvaro 29 años

isahia 15 años

abraham 15 años

16

21

0.60

mesa compartida madera aula N5 2x1.50x0.5

kevin 15 años

william 16 años

pl011

mueble madera N2 estante material y ropero

pl04

20

6 W 500 LM

0.60

alejandro 15 años

6 W 500 LM mesa madera taller N9 1.50x1.20

mesa madera taller N8 1.50x1.20

jude 15 años

2 W 100 LM

19

luminaria N4

22

luminaria N6

6 W 500 LM mesa madera taller N7 1.50x1.20

luminaria N4

18

mesa compartida madera aula N8 2x1.50x0.5

mueble madera N2 estante material y ropero

ca03

17

mesa madera taller N6 1.50x1.20

mica 15 años

2 W 100 LM

16

14 6 W 500 LM

luminaria N3

15 pizarra blanca móvil 2.20 m

mesa compartida.28madera aula N4 2x1.50x0.5

luminaria N3

luminaria N2

13

1

noah 15 años

4 W 200 LM

12

0.60

mesa madera taller N5 1.50x1.20

2 W 100 LM

11.3

6 W 500 LM

mesa madera taller N4 1.50x1.20

min-jun 15 años

10.00

nadia 16 años ci05 nadia

0.55

luminaria N1

luminaria N1

laura 17 años

1.40

isaac 14 años

11

0.60

6 W 500 LM

5.00

nadia 16 años pb04

0.50

08

6 W 500 LM

0.60

.28

pizarra blanca móvil 2.20 m

pizarra blanca móvil 2.20 m

luminaria N4

14

luminaria N3

aula taller N2 100 m2

pl06

10

luminaria N2

carmen 15 años

em03

1.25

nadia 16 años pb04

0.50

0.85

luminaria N1

lucas 15 años

em01

pl03

0.50

javier 15 años

1.50 isabel 12 años

4.38

mesa madera taller N3 1.50x1.20

07

0.60

mesa madera taller N2 1.50x1.20

mesa compartida madera aula N2 2x1.50x0.5

6 W 500 LM

mesa madera taller N1 1.50x1.20

mesa compartida madera aula N1 2x1.50x0.5

luminaria N2

6 W 500 LM

pl07

mesa madera taller N2 1.50x1.20

0.50

05 06

em03

luminaria N1

em03

mueble madera N2 estante material y ropero

0.50

04

0.60

em01

em01

mueble madera N2 estante material y ropero

0.50

03

0.60

ca03

luminaria N5

pl05

0.55

02

em02

pizarra blanca móvil 2.20 m

em01

pizarra blanca móvil 2.20 m

em01

ca01

pl06

1.25

0.60

em02

em03

aula polivalente N8 100 m2

6 W 500 LM luminaria N1

pl03

1.25

mueble madera N2 estante material y ropero

helena 15 años

maría 15 años

0.63

01

4.65

02

adam 15 años

5.06

03

5.06

04

5.06

05

5.06

05

5.06

04

5.06

03

1.20

02

lara 16 años

6 W 500 LM luminaria N1

5.00

5.00

1.25

cortina oscurecedora semidesplegada

01

01

ca01

1.45

ca06

1.25

0.65

ca01

5.00

1.25 mueble madera N2 estante de herramientas taller

mesa compartida madera aula N7 2x1.50x0.5

pl011

20.00

Guillermo Medina Banderas · PFG · marzo 2018 · Escuela Arquitectura Málaga students practical secondary school CONSTRUCCIÓN 01 · escala 1:40

ca03

clara 16 años

pl02

NAVE I. PABELLÓN DEPORTIVO acceso pabellón

470x335x15

em06

ethan 30 años

pl011

NAVE II. HALL VERSÁTIL. EXPOSICIONES salida directa a calle ayamonte 15.00

instalación efímera rocódromo 5 m altura

3.94

ca03

pl01

adam 15 años miriam

+3.45 m +3.00 m

acristalado no practicable

34

GARAGE R1 XXI

ca03

ca03 ca01

6 W 500 LM luminaria N1

30

35

SAPIENS

ca03

aula polivalente N8 aula100 polivalente m2 N8 aula100 polivalente m2 N8 100 m2

mueble madera N1 estante de herramientas taller

DETALLE F

15

04

13

22

31

24

25

5.06

em03

DETALLE F

6 W 500 LM pl012 luminaria N1

16

05

14

23

32

36

26

NAVE III. ZONA DOCENTE. AULAS, TALLERES Y LABORATORIOS instalación efímera puzzle mapamundi gigante

NAVE IV. HALL VERSÁTIL. REUNIÓN Y CONFERENCIAS acceso hall principal acristalado no practicable 30.00

50.00

06

33

37

ALZADO NOROESTE. PISTAS DEPORTIVAS escala 1:350

pl01

ble 70 cm

07

17

mesa compartida madera aula N3 2x1.50x0.5

l012 LE F

em04

em06 18

mohamed 18 años

x12

bloque

ya

40.00

em04

paseo marítimo

planta prototipo

te Vicen-Pla

NAVE V. PABELLÓN ACUÁTICO

em04

de viviendas

*Proporciones reales en la manzana

+0.00 m

clara 17 años

bloque

Plaza de la Constitución 3000 m²

Restauran

Agroindustrial SITUACIÓN ACTUAL Y1956-1973 POSIBLE RESOLUCIÓN: PB+4

ca04

ión bloque

línea construcc

eje peatonal

AXONOMETRÍA URBANA escala 1:900

SITUACIÓN ACTUAL Y POSIBLE RESOLUCIÓN:

secundaria

plaza recibidora

paseo marítimo

1. Manzana actual 70% de ocupación libre. naves de caracter industrial connotación simbólica del barrio

AXONOMETRÍA URBANA escala 1:900

práctica

planta prototipo

Museo CAC 4000 m²

ESTRATEGIA ¨WIN-WIN¨ ENTRE ACTORES IMPLICADOS Empresa constructora: (-) Tres edificios residenciales PB+22 en tercera línea (-) Nuevas gestiones necesarias para las modificaciones (+) Un bloque residencial PB+7 con vistas desde PB+2 (altura naves) (+) Un hotel PB+10 en primera línea. (Siguiendo eje de las 12 edificaciones residenciales en el paseo) (+) Equipamiento deportivo, social y natural para los edificios residenciales o El Espigón Chiringuit (+) Complejo de las naves como centro de barrio, da servicio a los vecinos Administración implicada: (=) Expropiación por compensación + rehabilitación Ciudadanos del barrio: (+) Complejo de las naves como centro de barrio, da servicio a los vecinos. (+) Buena interacción entre turistas hoteleros como nuevos clientes para restaurantes del paseo. El Espigón Chiringuito Restaurante Vicen Playa, Chiringuito Litoral Sacaba, Amitabha Chiringuito. Ciudad: (+) Mantener skyline patrimonial de Málaga del siglo XIX (+) Posible solución a final interrumpido del paseo marítimo y acercamiento con Sacaba (+) Conexión programática con Martín Carpena, Estadio e Inacua (+) Aumento de interés parcelas colindantes vacías Usuarios del proyecto: (+)Reutilización de patrimonio industrial. Sentimiento de comunidad e identidad con el propio centro (+)Participar de una comunidad colaborativa entre enseñanza, deporte, residencia y formación

PB+22

PB+7

de enseñanza

Catedral de Málaga 9000 m² Plaza de Toros Malagueta 12000 m²

bus L40

PB+22

Centro

comercia

paseo marítimo

TERC/HOTELERO PB+10 Nueva construcción Res. Existente PB+1 en Plan Parcial 24 horas

PB+1 Res.

l

Polígono PB+1

ial Pacífico o Comerc Polígon del Rio Barrio Torre

ANÁLISIS DE ESCALA Con el fin de comprender mejor la manzana completa de trabajo y tener una primera impresión de sus dimensiones, dado además que la manzana se encuentra actualmente libre al 70% de su superficie y sin referencias inemdiatas de sus proporciones realizamos un análisis de escala con espacios conocidos que ayuden a conseguir este objetivo. Usamos para ello las superficies de Catedral de Málaga, Plaza de Toros de la Malagueta, el Museo del CAC y la Plaza de la Constitución. Una vez relacionado con la manzana nos hacemos una mejor idea de las oportunidades que ofrece la parcela.

*

Hormigón

PB+7 Res.

PB+22

PB+22

PB+22

Terc/Hot

em01

ca04

Chapa

SIPS

PB+7

PB+10

Escolar

70% de ocupación libre. naves de caracter industrial connotación simbólica del barrio

ca04

al

o comerci

Polígon PB+1

Nave VI PB+1 Residencia deportistas alto rendimiento 24 horas Fútbol sala

Nave IV PB+1 Hall Versátil 12 horas

PB+22

PB+4

eje peatonal

PB+1

mueble madera N1 estante material y ropero

Se aprecia la existencia de un eje de paseo marítimo con actividad intensa y un claro rol deportivo que se interrumpe de manera contundente a la altura del barrio de Torre del Rio. A su vez existe una desconexión de este eje deportivo con el existente Polo Ciudad Deportiva y con el barrio Sacaba Beach. Zona de una progresiva extinción del patrimonio industrial malagueño.

viviendas

x12

Nave V PB+1 Pabellón acuático

nto deportivo equipamie tenis y padel pistas de

del Rio

DESCRIPCIÓN SITUACIONES: *1 (Panel 2, Urbanismo 01) Joaquín, 45 años. Es vecino del barrio y hace tres meses que tiene algunas verduras y hortalizas sembradas en la zona de huertos e invernaderos. Sale de nuevo a la calle desde la Nave 2- hall versátil y exposiciones, que tiene acceso bus L40al ver los últimos trabajos directo al espacio público y donde se ha sorprendido parada expuestos de los alumnos en este hall. Joaquín vive en un bloque residencial y no 1 tiene jardín. Le satisface alquilar su pequeño terreno tan cerca de casa. Además, su mujer es muy deportista y siempre acaba con unas series de atletismo después de correr por el paseo marítimo junto a su grupo de corredores. Los dos están encantados de que el barrio esté tan lleno de vida y de que el centro de enseñanza secundaria suponga un polo formativo-deportivo para todos los barrios colindantes

Árboles puntuales Vallas metálicas, murete

eje deportivo

Res.

em01

Vegetación natural

bus L40

paseo marítimo

PB+8

Edificio rehabilitado, patrimonio heredado: P1. Tabacalera (Museo Ruso, Museo Autom., Polo Contenidos Digitales, Promálaga) P2. La Térmica (Centro cultural, talleres, conferencias, exposiciones)

SITUACIÓN ACTUAL Y POSIBLE RESOLUCIÓN:

Escolar

em01

Barrio Industrial

Barrio Torre

nte

*1

Institutos y Colegios: C12. CEIP Vicente Aleixandre C1. Ave María C13. CEIP Victoria Kent C2. IES Fernando de los Ríos C14. Divino Pastor C3. IES Litoral C15. Colegio Los Guindos C4. IES Emilio Prados C16. Tartesos C5. Escuela Superior Artes Escénicas C17. IES Mare Nostrum C6. IES Ciudad Melilla C18. Colegio Constitución 1978 C7. IES José María Torrijos L40 C8. Colegio Rosario Moreno parada bus C19. Colegio Ardira C20. Colegio Nuestra Señora de la Luz C9. CEIP Paulo Freire C10. IES Belén C11. CEIP Virgen de Belén

D12. Club Baloncesto C. Melilla D13. Escuela Fútbol Puerta Blanca D14. AQA El Torcal Equipamiento verde: V1. Parque Litoral V2. Jardines de 28 de Junio ad de Juegos V3. Parque Infantil m2 oportunid espacio verde 10000 entoCentro V4.equipami Parque Salud V5. Parque Brigadas Internacionales V6. Parque del Oeste V7. Parque Gregorio Sánchez V8. Huertos Urbanos 28 de Junio

de viviendas

o El Espigón

Chiringuit

ra 35x50

Espacio deportivo N1

AXONOMETRÍA URBANA Nave II PB+1 Hall Versátil escalaNave1:1500 12 horas I PB+1

d m2 oportunida espacio nto verde 10000 equipamie

1. Manzana actual 70% de ocupación libre. naves de caracter industrial connotación simbólica del barrio

clara 17 años

paseo marítimo

Nave IV PB+1 Hall Versátil 12 horas

paseo marítimo

articulado

La Térmica

Restaura

MATERIALIDAD

Chimenea La Térmica Patrimonio industrial

Equipamiento deportivo: D1. Inacua Málaga D2. Inacua Centro Raqueta D3. Estadio Ciudad de Málaga D4. Palacio de Deportes Carpena D5. Final Paseo Marítimo D6. Pista deportiva Sacaba D7. Pista futbito y parque juegos D8. Campo Fútbol Juval D9. Pista deportiva D10. Unicaja Baloncesto D11. Equipamiento deportivol

Terc/Hot

clara 17 años

viviendas

plaza recibidora

Pabellón 12 horas

LUGAR

ca06

ca01

clara 17 años

ión bloque

línea construcc

Nave III PB+1 Zona Docente 8 horas nto deportivo equipamie 11 pista fútbol

Huertos e invernaderos públicos alquiler Vicen-Playa

Aparcamiento profesorado y personal del centro

d 1800 m2 oportunida Limasa-Endesa a espacio bioeléctric central

PB+4

ca05

eje deportivo

Basket

Fútbol

Hockey

Beisbol

Rugby

Nave III PB+1 Zona Docente 8 horas

em05

mueble madera N1 estante material y ropero

2x1.50x0.5

Nave II PB+1 Hall Versátil 12 horas

bloque

Basket

Espacio deportivo N2 12 horas

Nave I PB+1 Pabellón 12 horas

PLANTA DE SITUACIÓN escala 1:10000

galería central 12 m luz laboratorio práctico/exposición docente

ca06

mueble madera N1 estante material y ropero

ión bloque

Atletismo

TERC/HOTELERO PB+10 Nueva construcción Existente en Plan Parcial 24 horas paseo marítimo

Atletismo

Chimenea La Térmica Patrimonio industrial

em07

ca05

planta prototipo

bus L40

Fútbol sala

paseo marítimo

línea construcc

eje peatonal

eje deportivo

PB+4

ca05

parada

Nave VI PB+1 Residencia deportistas alto rendimiento 24 horas viviendas

Huertos e invernaderos públicos alquiler

D6 SACABA BEACH

BUTANO

ce05

ca05

PB+4

Espacio deportivo N2 calle pacíficio

bus L40

parada

Aparcamiento profesorado y personal del centro

D2

ce01

ca01

comerci

*1

ad oportunid 10000 m2 espacio ento verde equipami

Espacio deportivo N1

MINERVA

al

Polígono PB+1

Residencial

de la térmica

cortina separadora desplegada cortina separadora desplegada cortina separadora desplegada

em05

mueble madera N1 estante material y ropero

camino

INDUSTRIAL LA TÉRMICA

1800 m2 ad oportunid Limasa-Endesa espacio ca bioeléctri central

galería central 12galería m luz central 12galería m luz central 12 m luz laboratorio práctico/exposición laboratorio práctico/exposición laboratorio práctico/exposición docente docente docente

ct06

D5 TORRE DEL RIO

D3

D1

Nave V PB+1 Pabellón acuático 12 horas

PB+4

l Pacífico Comercia Polígono del Rio Barrio Torre

POLO FORMATIVO-DEPORTIVO

POLO DEPORTIVO Instalaciones Limasa

Residencial

Chimenea La Térmica Patrimonio industrial

PALACIO DEPORTES

300 m

12 horas

Nave II PB+1 Hall Versátil 12 horas

Nave I PB+1 Pabellón 12 horas

na a Barrio Almude ial La Térmic Barrio Industr

Oficina de Endesa

te mon e Aya Call

ce05

nte

mon

ce05

le Aya

ct07 ca03

ce01

Cal

ca03

ce01

re

DETALLE D ca03

ce01

V3 V2

D9

FINCA EL PATO

D4

olie

ca06

V8 V1

Instalaciones Limasa

Nave VI PB+1 Residencia deportistas alto rendimiento 24 horas

Basket

Fútbol sala

Nave IV PB+1 Hall Versátil

Fútbol Basket Beisbol Hockey Atletismo Rugby Nave III PB+1 Zona Docente 8 horas

1800 m2 ad oportunid Limasa-Endesa a espacio bioeléctric central

C2

Oficina de Endesa

ce02 300 m

ce04

RESIDENCIAL PB+22 Nueva construcción Existente en Plan Parcial 24 horas

POLIGONO COMERCIAL PACIFICO

ial PB+4 ALMUDENA Residenc

Huertos e invernaderos públicos alquiler

Aparcamiento profesorado y personal del centro

D7

re

ca06

ce02

Espacio deportivo N1

POLO CULTURAL

V5

olie Av.M

ca06

ce02

ce03

PB+4

Av.M

ct10

ce03

P2

LOS GUINDOS C12 V4

de la térmica

D10

iere

DETALLE D

ce03

ct07

Residencial

cial PB+7

Residen

Parque SAN CARLOS Almudena

C15

camino

C17

Barrio AlmudenaLa Térmica Barrio Industrial

SAN ANDRES

Espacio deportivo N2

Mol

DETALLE D

ct07

Ayamo

camino

SANTA ISABEL V6

de la térmica

SANTA PAULA

C16

ena a MALAGA 2000 Barrio Almud ial La Térmic Barrio Industr

Calle

V6

RESIDENCIAL PB+22 Nueva construcción Existente en Plan Parcial 24 horas

C13

Av.

ct07

ce05

ial PB+5

Residenc

Bar

V7

C4

PUERTA BLANCA

MAINAKE

ct09

Guillermo Medina Banderas · PFG · marzo 2018 · Escuela Arquitectura Málaga URBANISMO 01 · escala 1:900

ial PB+5

Residenc

RESIDENCIAL PB+22 Nueva construcción Existente en Plan Parcial 24 horas

ial PB+3

POLIGONO COMERCIAL VALDICIO

ce06

ct06 ct08

cial PB+7

PACIFICO

C1

PARQUE MEDITERRÁNEO Residenc

POLIGONO INDUSTRIAL LOS GUINDOS

D13

POLIGONO INDUSTRIAL CARRANZA

GARAGE XXI

Parque Almudena

Residen

C9 C8 LA PAZ

C3

ct06

D8

Parque Almudena

PB+4 VIRGEN DE BELEN Residencial

POLIGONO INDUSTRIAL GUADALJAIRE

ial PB+4

ct06

AVE MARIA

SIXTO

LOS GIRASOLES

Residenc

Los Guind Barrio Pacífico rcial Almudena Barrio Polígono Come

Residen

CORTIJO VALLEJO

C10

C11

PB+5

cial PB+7

GUADALJAIRE

POLIGONO INDUSTRIAL SANTA BARBARA

Residencial

POLO TECNOLOGICO

D6 LAS DELICIAS

EL HIGUERAL

ial PB+5

Residenc

P1 TABACALERA

D11

C20

PB+4

GARAGE XXI XXI GARAGE

25 AÑOS DE PAZ

EL TORCAL

BARCELO NUEVO Residen SAN ANDRES 2

Viga perimetral

Viga perimetral

DETALLE 09. Hueco de ascensor (nueva construcción) escala 1: 40

0.45

DETALLE 08. Encuentro de losa de cimentación con muro de piscina (nueva construcción) escala 1: 20

0.45

Pilote perforado in situ Ø450. 27 metros

ESTRATEGIA ¨WIN-WIN¨ ENTRE ACTORES IMPLICADOS Empresa constructora: (-) Tres edificios residenciales PB+22 en tercera línea (-) Nuevas gestiones necesarias para las modificaciones

(+)SITUACIONES: Un bloque residencial PB+7 con vistas desdeESTRATEGIA PB+2 (altura naves) ¨WIN-WIN¨ ENTRE ACTOR DESCRIPCIÓN (+) Un hotel eje de lasconstructora: 12 edificaciones residenciales *1 (Panel 2, Urbanismo 01) PB+10 en primera línea. (Siguiendo Empresa (+) Equipamiento deportivo, social y natural para(-)los edificios residenciales Tres edificios residenciales PB+22 en te Joaquín, 45 años. Es vecino del barrio y gestiones necesarias para las m (+)que Complejo de lasverduras naves como centro de barrio,(-)daNuevas servicio a los vecinos hace tres meses tiene algunas (+) Un bloque residencial PB+7 con vistas d y hortalizas sembradas en la zona de Administración implicada: (+) Un hotel PB+10 en primera línea. (Sigui huertos e invernaderos. Sale de nuevo a la (=) Expropiación por compensación + rehabilitación (+) Equipamiento deportivo, social y natura calle desde la Ciudadanos Nave 2- hall versátil y del barrio: las vecinos. naves como centro de exposiciones, (+) queComplejo tiene acceso al como centro de barrio,(+)daComplejo de directo las naves servicio de a los Administración implicada: espacio público y donde se ha sorprendido (+) Buena interacción entre turistas hoteleros como nuevos clientes para restaurantes de al ver los últimos trabajos expuestos de los (=) Expropiación por compensación + rehab Restaurante Vicen Playa, Chiringuito Litoral Sacaba, Amitabha Chiringuito. alumnos en este hall. Joaquín vive en un Ciudadanos del barrio: Ciudad: bloque residencial y no tiene jardín. Le (+) Complejo de las naves como centro de (+) su Mantener de Málaga del siglo XIX interacción entre turistas hotelero satisface alquilar pequeñoskyline terreno patrimonial tan (+) Buena Posiblesusolución final interrumpido del paseoRestaurante marítimo yVicen acercamiento con Sacaba cerca de casa.(+) Además, mujer esamuy Playa, Chiringuito Litora (+) Conexión programática deportista y siempre acaba con unas series con Martín Carpena, Estadio Ciudad: e Inacua (+) Aumento de por interés parcelas colindantes vacías de atletismo después de correr el paseo (+) Mantener skyline patrimonial de Málaga marítimo juntoUsuarios a su grupodel de corredores. proyecto: (+) Posible solución a final interrumpido del Los dos están (+)Reutilización encantados de que barrio (+) Conexión programática con Martín Carp deelpatrimonio industrial. Sentimiento de comunidad e identidad con el pr esté tan lleno de vida y de que centro de (+)enseñanza, Aumento dedeporte, interés parcelas colindante (+)Participar de eluna comunidad colaborativa entre residencia y form enseñanza secundaria suponga un polo Usuarios del proyecto: formativo-deportivo para todos los barrios (+)Reutilización de patrimonio industrial. Se colindantes (+)Participar de una comunidad colaborativ


05. COCOA COFFEE BOUTIQUE AND OFFICE Renovation, F&B, Office Ho Chi Minh City, Vietnam T3 Architects, 2021 - Built Lead Architect and Project Manager


In this case, we faced a very peculiar project, on one hand: the client is a company who produces original Vietnamese chocolate to different companies and decided to open a coffee shop in the middle of the city to introduce their products to the Vietnamese people and also to talk about their production process showing some of their original machines and even having there, a small production line. Then, they had an existing building that was working as a lighting showroom before, so the natural light was extraordinarily low and most of the building was covered by gypsum boards making the place very dark. After we studied the building, we discovered the big building was actually formed by an old Vietnamese style Villa built in the 60s, made by concrete, and an additional part, recently added, made by a steel structure. Then, trying to highlight the original structure and at the same time increase the quality of the space, we decided to demolish part of the new light

steel structure generating new volumes and bringing much more natural light. As a secondary step, regarding the materiality, we proposed to the client a way to save cost by scratching the walls and just removing the gypsum instead of removing it plus adding new finishes for their project. With this, we created a new moodboard by using the original materiality of the building for free getting the factory and industrial environment that match with the chocolate factory and kind of ¨underground style¨ coffee shop that the clients wanted. The way we placed the program of the project along the building was to place a Mekong Delta Garden (where they have the farms where they collect the cocoa fruits) on the front, creating a buffer zone from the busy street and presenting the first step to get a chocolate drink: a cocoa tree. After that, two levels of a coffee shop, and at the back of the building are the chocolate production line with a chocolate workshop plus the offices from the client and staff room.


Renovation Process, Layout, Materiality, Section | Images

3

2

EXISTING BUILDING: 36x8 FOOTPRINT TWO EXISTING VOIDS LOW NATURAL LIGHT

EXISTING BUILDING: ORIGINAL CONCRETE VILLA ADDITIONAL STEEL STRUCTURE BUILDING

FIRST RENOVATION STEP: HIGHLIGHT ORIGINAL VILLA DIVIDE THE BUILDING INTO THE GARDEN (1)- COFFEE AREA (2) AND OFFICE + PRODUCTION AREA (3)

1

Ground Floor Plan

BLACK CLADDING

GEY GYPSUM

BLUE WALL PAPER

EXISTING MATERIALITY

Materiality process: scratching to the original

Longitudinal Section

OLD PAINTS SCRATCHING PROCESS

OLD BRICKS

OLD STEEL STRUCTURE

OLD PAINTS

OLD PAINT+LIME PAINT PROPOSED MATERIALITY

OLD PAINT+LIME PAINT

OLD PAINT+LIME PAINT



06. VILLA PATRICK Secondary Weekend Home Ho Tram City, Vietnam T3 Architects, 2021 - Under Construction Lead Architect and Project Manager


The goal for this particular project was to create a peaceful, quiet, and functional countryside Villa that connects the family and friends with nature at the same time that it serves as a weekend residence for the owner. Having in mind the main Sustainable Principles, after studying the main winds, rains, and sun direction, and trying to get the most out of the plot, we decided to structure the home with two volumes: one airconditioned so fully insulated with rice husk for the roof, light concrete blocks for walls and double-glazing, and another one naturally ventilated and open to the garden. Then, combining these two volumes with a kind of ” T” shape, we easily integrated a more private volume (for airconditioned bedrooms and one office) with a public/open family space. Moreover, as the private volume is placed perpendicularly to the plot, on the front, facing the road and entrance, it is creating a barrier, providing the Villa with a buffer zone

to be far from the potential nuisances from the road and giving more privacy to the family garden. Then, accessing the Living Family Area, we designed a big space with kitchen, dining, and living room all together, with sliding doors on both sides and ceiling fans to get the comfort of the traditional tropical houses and save energy at the same time. This volume is integrated into the family garden where there is outdoor dining with BBQ, the pool and a fitness room are combined. Moreover, following the bioclimatic principles, all the building is designed with a large and insulated roof with the proper overhangs to protect the Villa from the main rains, sun, and main winds providing shadows and protection. Last but not least, the Landscape design is done with care to provide a Tropical environment choosing at the same time local species which will bring local biodiversity and low maintenance plants and trees which will ensure the functionality of the garden for such a weekend Villa.


Construction Detail | Images

Longitudinal Section



07. BELGO BELGIAN CRAFT BEER AND OFFICE Renovation, F&B, Brewery Ho Chi Minh City, Vietnam T3 Architects, 2021 - Built Architect and Project Manager


We designed and built the new successful BELGO Brewery Pub in Saigon. Located in a humble neighborhood, the main challenge for us was to get another successful F&B place for Belgo but with a lower budget than usual due to the pandemic consequences and with poor quality spaces existing building. Then, we have to keep the DNA of BELGO (old factory, second-hand brick, Belgian cultural designs, and pieces of Arts). The big movement from the design was to demolish the existing staircases and elevator to get a more efficient layout, besides this, we kept the original building saving a huge quantity of grey energy. All furniture and lamps have been specially designed by T3/ELEK Team for Belgo. We highlighted the industrial character of the Pub by giving a special place to all brewery equipment and technical elements. This European Industrial atmosphere from the early 20th Century helps to create an unique environment to appreciate Beers and Belgium fusion

food. From of poor existing Concrete structure, we turned the Building into an industrial contemporary style, with a very clear layout where all the ¨service area¨ is placed at the back of the building and the seating area is placed at the front, facing the street. Then, the new staircase, the food lift, and the restrooms are placed in the back, together with a small area for the waitress. Regarding the program, we proposed to place the kitchen in the Semi-Basement floor, connected with the Food Lift, then, Ground and First Floor are closed and insolated to be able to be airconditioned. The Second Floor is was we called ¨Garden Floor¨as it is completely open, naturally ventilated by ceiling fans, and open to the big tree from the street. Finally, on the last floor, Belgo Office is located with a minimalist interior design style to reduce cost and construction process. In the end, we can consider we have achieved our main goal after we saw the new Belgo is already operating and quite busy with people every evening


Program, Bar, Table and Seat Details, Layout Process | Images

Kitchen and Storage

Bar 01: 51 pax

Bar 02: 41 pax

Garden Floor: 54 pax

Belgo Office: 20 pax

Basement Floor

Ground Floor

First Floor

Second Floor

Third Floor

Existing Plan - Existing staircases and elevator to be removed

New Functional Layout - Service area at the back - Served area at the front

General Proposal - Service Area - Seating Area



08. NAMIA RIVER SANCTUARY RESORT 5* Hospitality and Wellness Hoi An City, Vietnam T3 Architects, 2021 - Under Development Pre-Concept and Concept Architect + Project Manager Landscape: LJ-Asia


Situated on a beautiful five-hectare private island off the banks of the Thu Bon river, less than 2km from the Hoi An Ancient Town, Namia River Sanctuary is a luxury sustainable wellness Resort project. In total, we were commanded to design two types of Villas, one main Restaurant together with BOH and Technical Building, one Pool Bar, and one Spa and Wellness Building. With 38 private pool villas, resort facilities include a wellness & herbology center, plant-based dining & academy, and an organic bio-pool. Starting with the Site analysis to optimize the design and ensure a low carbon footprint approach, we decided first to preserve the natural river banks which have been reinforced by bamboo sticks and mangroves which help to stabilize the natural soil without using the concrete or heavy infrastructure. Our intention was to get some inspiration from the fishermen and countryside houses around Hoi An, so we studied carefully the ver-

nacular architecture typologies and revisit it to create a unique design inspired by the past but clearly contemporary and much more efficient in terms of resilience, comfort, and sustainability. The Villas use a timber structure for the roof and the main facade and masonry to bring inertia. The lodge is made in timber structure (FSC label), covered by wooden tiles, and offers a panoramic experience with 360 degrees views. Energy consumption is divided by 3 compared to the average of 5* Resorts in Vietnam, no plastic, no VOC, certified wood, no chemicals… The Restaurant on the mainland and the two Reception are made in timber structures and are naturally ventilated (no AC). The purpose is always to promote bioclimatic design, avoid Air Conditioning wherever it is not necessary, and reduce energy consumption by proper sun protection and insulation. Namia retreat Sanctuary will be probably one of the best experiences you can find in Vietnam in terms of sustainable and wellness 5* Hospitality


REET

ONG ST

MasterPlan | Concept Schemes

HAN T TRAN N 1 A

2 D B B

C

1

5

A

E

G

D 3

F

4

7

6

8 H

LANDSCAPE AMENITIES

BUILDING

1

ENTRANCE

A

PARKING

2

DROP-OFF

B

BOH

3

VEGETABLE GARDEN

C

TECHNICAL ROOM

4

NIPA LOUNGES

D

RECEPTION

5

BRIDGE

E

MAINLAND CAFE

6

MAIN PATHWAY

F

POOL BAR

7

BIO-POND

G

NIPA LODGES

8

BIO-POOL

H

RIVER VILLAS

9

NIPA SAUNA

I

SPA

10

DECK

J

FINE DINING

NAMIA NAMIA RIVER NAMIA RIVER SANCTUARY RIVER SANCTUARY SANCTUARY

I NAMIA RIVER SANCTUARY I PRELIMINARY CONCEPT I 13/01/2021 I

TH

UB

ON

RIV

ER

DESIGN DESIGN DESIGN INTENTIONS INTENTIONS INTENTIONS


TRA

NN

HAN

TON

G ST

REET

I 9

AMIANAMIA RIVER SANCTUARY RIVER SANCTUARY NAMIA RIVER SANCTUARY

F 6 DESIGN INTENTIONS DESIGN INTENTIONS DESIGN INTENTIONS

G

J 10

LJ-ASIA I 31

SITE | | p.6/7 SITE ANALYSIS | p.6/7 SITEANALYSIS ANALYSIS p.6/7


Image | Main Restaurant Layout and Sections

Restraurant - Ground Floor Layout

Restaurant and Reception - Front Elevation


Restaurant - Trasnversal Section


Images | River Villa Layout and Sections

Ground Floor Layout

River Side Elevation


Transversal Section


Images | Main Reception Layout, Elevations, Sections

Main Reception Ground Floor Layout

Main Reception Elevations


Main Reception Sections


09. ENTREPRENEURSHIP: THIRTEENFIFTYSIX - NFC WRISTBAND Entrepreneurship, Technology, Design Malaga, Spain Independent work, 2014 Co-Founder and Communication Manager


When I was 19, starting with a budget of 0 dollars, I co-founded the ¨thirteenfiftysix¨ entrepreneurial project, a mixture of technology and design that allowed us to be published in some of the most important magazines around the world, reaching more than 60 countries counting sponsors, news and new contacts. It meant an immense opportunity to learn about entrepreneurship, project management, work teams management, budgets, clients, and creativity. We designed 13.56 as a new revolutionary product that brings personal technology to your wrist, control, and protection of your smartphone. Thirteenfiftysix was born to the union of four classmates in the same workgroup University. The work of our group of the university requires us to spend a lot of time together, all this time together made us realize the number of things we had in common. The four companions were passionate about gadgets, music, sport, and positive energy, we also like being updated

about the technology that surrounds our world. Moreover, we were pretty aware of how hard we should work for what we love to achieve results quality. Regarding the product: we created one wristband that was able to hold many different apps. The wristband works depending on the status of your smartphone. For example, if you are listening to music you can play or pause the song or turn up or down the volume. If the alarm sounds you can postpone or turn off it. All wristbands can do the same functions, the only thing that changes is the appearance. The idea was that 13.56 became part of your body, you could always take it with you and bring technology to your own wrist. Its battery life is endless, you can always use it. Incredible but real, and the weight was insignificant so it was really easy to wear daily. The creation of this technology wristband was possible because we maximize and take to the limits the possibilities of NFC Technology, reinventing the way it was used until that moment.


10. MORE ABOUT ME: MATERIAL RESEARCHER RAMMED EARTH SAMPLE As part of the extra activities I did on the previous offices I organized myself, convincing a local Vietnamese contractor, to make a rammed earth workshop to learn this old technique of building to include one rammed earth wall with the local earth in one of our future projects, specifically, in the Weekend Bioclimatic Villa presented before, as part of our sustainable approach. I could learn directly from the local workers and contractors on how to build this Ecological and Sustainable wall. This way of construction is very typical in Africa, some places in India, South America, and even North Vietnam. Besides the good thermal insulation they provide to our buildings, using

RECIC these kinds of walls made by the local earth, we avoid the transportation/pollution to move out all the sand we got digging for the foundation. In the current era of massive construction techniques globalization, local know-how in construction is a treasure we have to take care of. They are also beautiful, natural, and impressive, and it is so good we have this local resource so close. This workshop is part of my personal philosophy of knowing more and researching about the local materials of a specific place, then, I will always try to enrich my knowledge in this way whenever I am located to know how to apply a more coherent and natural architecture.

During th ching a n material office, a used the we used cost pro Bar in on resistant course, t


CLED PLASTIC - BUILDING FURNITURE

RICE HUSK - ECOLOGICAL INSULATION

he time I spent in Vietnam, I discovered a couple of guys that were launnew company where they recycled the plastic waste to create building ls and boards. Proving my usual proactivity, I introduced them to my and together we tried their products in several projects. Specifically, we eir materials to build doors, office tables, mirror frames...for example, d a corrugated recycled board instead of the typical metal sheet for lowojects, and even this corrugated board we used it to build the front of the ne of our projects, which looks beautiful. We proved that they are highly t, waterproof, and beautiful, offering a big quantity of possibilities. Of there is no need to say the benefits of expanding the life circle of plastic.

We applied the use of Rice Husk as roof insulation in several projects. Only Vietnam produced more than 90 Million tonnes of Rice Husk every year so there is a big opportunity in the future with this cheap bio-sourced material, already used in different European countries like France. After throwing the rice husk we have also to spread a bit of Diatomaceous Earth powder which avoid insects and animals to get interested in the Rice Husk.Some of the specifications are: Good thermal resistance: Rice Husk = 0,05 W/m*K / glass fiber insulation : 0,04 W/m*K. Fire Resistance EuroClass C - Not a lot of air available, which gives it a retarding effect in case of fire. Very resistant to moisture (due to 20% of opaline silica).No industrial transformations, very low “grey energy”


Lyttelton, New Zealand

Arthur Pass, New Zealand

Atacama Desert, Chile

Christchurch, New Zealand

Christchurch, New Zealand

Christchurch, New Zealand

Chiloé Island, Chile

Valparaíso, Chile

Valparaíso, Chile

Santiago, Chile

Cajón del Maipo, Chile

Rio Ibañez, Chile

11. MORE ABOUT ME: PHOTOGRAPHS


Pacific Ocean, Perú

Geyser, Bolivia

Atacama Desert, Chile

Christchurch, New Zealand

Christchurch, New Zealand

Malaga, Spain

Cinqueterre, Italy

Ho Chi Minh City, Vietnam

Ahmedabad, India

Laguna Colorada, Bolivia

Ho Chi Minh City, Vietnam

Ninh Vinh, Vietnam


12. MORE ABOUT ME: PROFICIENCY AND LOVE FOR DRAWINGS



ARCHITECTURE

SUSTAINABLE ARCHITECTURE

PERSONAL GROWTH

KNOWLEDGE

13. MORE ABOUT ME: FAVORITE READINGS



contact guillemediba1356@gmail.com +34 667 96 54 81 linkedin/guillemedinabanderas


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.