2 minute read

Modal Transfer Center CETRAM Mitras

Model Transfer Center CETRAM Mitras

Advertisement

Studio: Tutor: Period: Mention: Location: Team Work: Catedra Blanca XXXIII | Master´s Degree Final Project Arch. Agustin Landa Aug-Dec 2019 Outstanding Project Monterrey, Nuevo Leon Arch Gustavo Ramirez

Model tranfer center CETRAM Mitras is a complex where differente public transportation systems converge. It is located in the center of Mitras, Monterrey, a strategic point with issues management in between the subway stop, ecovia stop and the informal bus stop, beacuse there is not an aproppiate infraestructure to cover the influx of persons.

The project revolves around a main plaza, keeing the actual infraestructure of the superficial subway and generating a new covering which brings light and better quality for the users. To put order in this place, the plaza stays free just for pedestrian and bike users, and the ecovia plus bus stops are transformed to an appropiate bus station in the ground floor of one building. Furthermore, the complex has series of ramps that invite the bike user to travel around the building.

Finally, to bring life and economy support in this place, the buildings are used as a mall and offices in the upper levels. It counts with a market, commercial locals, restaurant zone and all the necessary equipment.

ELÉCTRICO

Connection

To connect the two roundabout, it is generated a plaza in the center, exactly where the subway is located

Rules

Node

This location is important because differente public transportation systems converge. The main line of the subway and bus routes.

Plaza

The project starts with a plaza that allowed the users to identify clearly where is the subway and create an esplanade for future activities.

Order

To put order in the bus routes (Ecovia), it is created a bus station that is directly connected with the subway

METRO ECOVIA

METRO

METRO PARADERO DE AUTOBUSES ECOVIA

Ramps

To promote a healthy lifestyle, the project has ramps, that allows the user to tour through the building by bike. It also has bike parking, in this way, you can leave your bike and take the subway or bus.

Cores

To take advantage of the inverting, the rest of the building is used as offices. In the ground floor you can take the elevators to go to the skylobby located in the third floor, where you can select the elevator to go directly to the building where you are working.

Graduated

Starting in the main plaza, the new build- ings are graduated with the objective of re- specting the esplanade and generate a more open space.

BICIS BICIS

METRO

BICIS BICIS

METRO

METRO

First Floor

Plaza

This article is from: