Haidee Ng CV 2017

Page 1

NG NG SZE SZE HAN HAN HAIDEE HAIDEE CU C URRRRICU I C ULU LU M M VVITAE I TA E & & SA S AMMPLE P L E OF OF W WOR O R KK

SZE HAN HAIDEE

U R R ICU LU M VITAE & SA M PLE OF WOR K


Ng SZE HAN Haidee

Architectural Designer Contact: Email: Online portfolio:

(+852) 9319 3115 haideensh@yahoo.com.hk https://issuu.com/haideeng/docs/ng_sze_han_cv_2017_hq

Personal statement Urban-enthusiast. Challenge-embracer. Proactive learner. Enjoy working as a team, and self-learning new skills. Particularly interested in public spaces and urban regeneration projects.

Education University of Hong Kong

2017

Master of Architecture (Hons)

University of Edinburgh, Scotland, United Kingdom

2015

Master of Arts (Hons) (Architecture), RIBA Part I

The Leys School, Cambridge, United Kingdom GCE A Levels

A 2 M a t h e m a t i c s ( A* ) , A 2 Ps y c h o l o g y ( A* ) , A 2 Fu r t h e r M a t h e m a t i c s ( A ) , A 2 P h y s i c s ( A )

True Light Middle School of Hong Kong HKCEE

2011

Additional Mathematics (A), English (A), Physics (A), Biology (B), Chemistry (B), Chinese (B), C o m p u te r P r o g ra m m i n g ( B ) , M a t h e m a t i c s ( B )

2009


Professional Experience University of Hong Kong, Hong Kong Teaching Assistant

Sep-Dec / 2016

Fletcher Joseph Associates, Edinburgh, Scotland, UK RIBA Part I Architectural Intern

Jan-Dec / 2014

Rocco Design Architects, Hong Kong Summer intern

Jul-Aug / 2013

Key Skills Languages

Fluent English, Cantonese, both written and spoken. Good spoken Mandarin.

Softwares

o

Adobe Creative Suite Photoshop InDesign o Rhinoceros Grasshopper V-Ray o SketchUp (SUPodium) o AutoCAD

Illustrator

Premiere Pro

Other interests I have been on the committee for Design for Development (formerly an Article 25 Student Chapter) at University of Edinburgh for 2 years. I have rich experience in organising fundraising events and seminars, including a 20x20 Art Auction (Dec 2012) in which we raised nearly ÂŁ1000 towards a school rebuilding project in Haiti run by Article 25. As a keen musician and singer, I also play the piano, guitar and sing in band regularly. Technical and character references available on request.


Des Voeux Road and the Public Realm

|

Sep - Dec 2015

|

MArch 1 Studio

MASTERS PROJECTS


UNDERGRADUATE PROJECTS W O R K / TECHNICAL EXPERIENCE


ED

OWNER: Verizon

TY

CI

Amount of data created by Internet of Things. Source: Cisco

each rack with 10 x 4u box each rack with 1440TB

e l s i a le t s o ai t o

h

h Assume 384 racks per 1000 sqm each 1000 sqm can have 552,960TB ie. Capacity = ~ 553 TB/sqm

CENTRALISED

Frankfurt, Germany Dubai, UAE

Microsoft Quincy

Virginia, US Silicon Valley, US

DECENTRALISED

DISTRIBUTED

1

reception reception

Singapore Sydney, Australia Tokyo, Japan

SOURCE: https://datacenterfrontier.com/internet-things-may-create-new-breed-data-centers/

SOURCE: https://datacenterfrontier.com/internet-things-may-create-new-breed-data-centers/

0

0 0 6

0

CA PA

2020

2015

2011

2010

each 4u box with 36 x 4TB hard disks

e l s i a le d s l i o a c d l o c

Beijing Hangzhou Hong Kong Shanghai Shenzhen Qiandaohu Zhangbei

e l s i a le t s o ai t o

WHATIS ISIN INA ADATA DATACENTRE? CENTRE? WHAT

h

2005

1

2017

OWNER: Digital Realty

WHERE IS ALIBABA?

OR AG E

D I C

2016

2015

2014

2013

home of the Chicago Stock Exchange.

0 0 2 1 0 0 2 1

2012

E R

P DISTRIBUTED

DECENTRALISED both an Internet Exchange and

1500

was built in 1929 originally as a printing plant. It was ret-

134 ZB Financial Exchange point, and

2TB 2TB SE TY SE TY RV PI RV PI ER CA ER CA L RA L RACK CK UN UNIT IT

h

NSA Utah

(codename: Bumblehive) Miami, USA

1:10

1500

CENTRALISED

Floor tiles Floor tiles

1945 ST

COST: $1.5 billion POWER: 100 MW

2010

half which half ofof which isis cooling space cooling space

TotalGFA GFA Total

TE D

storeys

MASTERS MArch 1 THESIS Studio

|

50%server server room 50% room

Perforated Perforated floor tiles floor tiles

Chicago, USA

6

change the pic 1:10

Server racks Server racks

350 East Cermak

Microsoft Quincy

un p

TA DA

| Realm JAN - | JUNESep 2017 Road and the Public - Dec 2015| 1:10

2017

COST: $1.5 billion

uni po

OD

UC

1:10

PR

“CLOUD”?

SD CARD

MICRO SD

USB THUMB DRIVE

1945

1:10

2017?

DENSITY

3.5” FLOPPY DISK

COMPACT DISC

8.5” FLOPPY DISK

VINYL RECORD

change the pic Voeux capaCITY Des

ERICA EU + M AM

office office

NA CHI

E EAST AS IA DL ID

IC CIF PA

NSA Utah

(codename: Bumblehive) Miami, USA

Facebook Prineville Oregon, USA SIZE:

control room control room

COST: $1.5 billion

m ok.co.com cebo ram m w.fa stag p.co ook) ww w.in tsapP: Faceb ww .whaland (IS webnee, Ire Clo newre)s.com tandCloudfa .thes www co, US (ISP:

hk.apple.nextmedia.com

Hong Kong (ISP: Hutchison Global Communications)

www.s

cmp.c Aliba om ba)

m

Microsoft Quincy

n)

NAP of the Americas

Frankfurt, Germany Dubai, UAE Virginia, US Silicon Valley, US

1:10

Miami, USA

ED UC OD

uninterruptible power supply

NA CHI

control room control room backup power supply uninterruptible power supply

server hall

ED OD

UC

uninterruptible power supply

0

0 0 6

DA

TA

PR

“CLOUD”?

TY

6 0

OR AG E ST

TE D

D I C

2017?

reated by Internet of Things. Source: Cisco

CA PA

CI

0 0

0

2

0

1

2

1

e l s i a l t s o ai t o

h

.com/internet-things-may-create-new-breed-data-centers/

MICRO SD

SD CARD

USB THUMB DRIVE 2016

2015

2014

backup power supply

SOURCE: https://datacenterfrontier.com/internet-things-may-create-new-breed-data-centers/

Amount of data created by Internet of Things. Source: Cisco

3.5” FLOPPY DISK

8.5” FLOPPY DISK

COMPACT DISC

2013

1500

1500

2012

RISK OF INTERNET DISCONNECTION Renesys, who first speculated the Syrian government’s role in the Syrian Internet Outrage in 2012, has been analysing each country’s risk of losing Internet access due to political control. The most vulnerable nations have their Internet controlled by a single point which is usually a state agency. For more please read Hesseldahl, A. (2017). Syrian Internet Outage Raises Question “Could It Happen Here?”. AllThingsD. Retrieved 16 June 2017, from http://allthingsd.com/20121130/syrian-internet-outage-raises-questioncould-it-happen-here/ h

011

e

e

bl

bl

Ca

Ca

E PR

2TB 2TB SE TSER TYP RV YP VE IC ER IC R AL RA AL RAC K CK UN UNI T IT

com/internet-things-may-create-new-breed-data-centers/

TA DA

TY CI

TE D

2017?

D I C

2020

2015

2015

2016

VINYL RECORD

e

e

ng

ng

si

si

os

os

Cr

OWNER: Digital Realty

Cr

134 ZB

ia

both an Internet Exchange and Financial Exchange point, and home of the Chicago Stock Exchange.

1:10 ia

was built in 1929 originally as a printing plant. It was ret-

As

INFO-STRUCTURE INFO-STRUCTURE

As

POWER: 100 MW

st

COST: $1.5 billion

st

Kowloon East

storeys

Ea

Tseung Kwan Tseung Kwan O O

Ea

1212

1111 16 16 Kowloon Kowloon WestWest 44 Kowloon East

Asia-Pacific Gateway Cable

1111

FINANCE BUILDINGS FINANCE BUILDINGS

Express ne Cable Asia Submari Express ne Cable Asia Submari Asia-Pacific Gateway Cable

Territories NewNew Territories Hong Island Hong KongKong Island North North

BEACH MANHOLE BEACH MANHOLE

bl

Floor tiles Floor tiles

LOCAL INTERNATIONAL

DATA CENTRE

half which half ofof which isis cooling space cooling space

TotalGFA GFA Total

1:10

TELECOMMUNICATION CABLES TELECOMMUNICATION LOCAL CABLES

INTERNATIONAL

bl

Server racks Server racks

Perforated Perforated floor tiles floor tiles

Chicago, USA

DATA CENTRE

Ca

1:10

350 East Cermak

CABLE LANDING STATION CABLE LANDING STATION

Ca

1:10

50%server server room 50% room

1:10

DENSITY

ng

1:10

ng

1:10

507 ZB

TSEUNG KWAN O TSEUNG KWAN O INDUSTRIAL INDUSTRIAL ESTATE ESTATE

OWNER: Verizon

YAU TONG INDUSTRIAL AREA

si

AMOUNT

DESCRIPTION: Very diverse customer base. Ranging from Subway restaurants to the library of the US Congress and several US government agencies

KWUN TONG KWUN TONG INDUSTRIAL INDUSTRIAL AREA AREA

si

COST: $1.5 billion POWER: 65MW

os

1:10

Miami, USA

FORM

Cr

NAP of the Americas

ia

Kowloon East

INFO-STRUCTURE INFO-STRUCTURE

-

As

ie. Capacity = ~ 553 TB/sqm

Tseung Kwan Tseung Kwan O O

os

Assume 384 racks per 1000 sqm each 1000 sqm can have 552,960TB

1212

1111

1111 16 16 Kowloon Kowloon WestWest 44 Kowloon East

Cr

e l s i a le t s o ai t o

h

h

)

DATA CENTRE

ia

each

Territories NewNew Territories Hong Island Hong KongKong Island North North

As

c SP .co :B rack with 1440TB BC .u k U

FINANCE BUILDINGS

st

n,

MicrosoftBUILDINGS Quincy

Ea

do 4u box with 36 x 4TB hard disks each K (I with 10 x 4u box each rack

BEACH MANHOLE BEACH MANHOLE FINANCE

DATA CENTRE

ss Cable Expre

m

azon )

st

1.co

Am

Ea

w.b b

(ISP:

Asia-Pacific Gateway Cable

a)

w.h k0

tle, US

LOCAL INTERNATIONAL INTERNATIONAL CABLE LANDING STATION CABLE LANDING STATION

Express rine Cable Asia Subma Asia-Pacific Gateway Cable

n

p.com

ore (ISP : Alibab

TELECOMMUNICATION CABLES TELECOMMUNICATION LOCAL CABLES

rine Asia Subma

0

0

2

0 0

1

2 1

ww

Seat

ww

Lo

e l s i a le d s l i o a c d l o c

INFO-STRUCTURE INFO-STRUCTURE

www .scm

e l s i a le t s o ai t o

SUBSTATION SUBSTATION

Hong Kong (ISP: Hutchison Global Communications)

Singap

h

TECHNOLOGY PARK (EXISTING+PROPOSED) TECHNOLOGY PARK (EXISTING+PROPOSED)

hk.apple.nextmedia.com

HK

h

OWNER: Digital Realty AREAS WITH DATA CENTRES/ AREAS WITH DATA CENTRES/

ws.com ndnedfare ) hesta(ISP: Clou www.tcisco , US San Fran

1500

134 ZB

Clon

SE TY SE TY RV PI RV PI ER CA ER CA L RA L RACK CK UN UNIT IT

1500

400MV POWER CABLE 400MV POWER CABLE PR

both an Internet Exchange and REGIONAL BORDER REGIONAL BORDER Financial Exchange point, and home of the Chicago Stock Exchange. MAJOR SUBSTATION MAJOR SUBSTATION

DATA CENTRE DATA CENTRE

om ok.c .com bo ace ram m w.f stag p.co ok) ww w.in atsapP: Facebo w h nd (IS w2TB .w la b 2TB we ee, Ire

TotalGFA GFA Total

ST

RICA ME .A

1:10

SUBMARINE SUBMARINE

S

POWER: 100 MW

half which COST: $780 million half ofof which isis cooling space cooling space

Floor tiles Floor tiles

CA PA

1:10

FIBREOPTIC CABLE was built in 1929 originally asFIBREOPTIC CABLE a printing plant. It was retE

more planned)

50%server server room 50% room Perforated Perforated floor tiles floor tiles

OR AG E

AMERICA N.

ASI A

storeys COST: $1.5 billion

SIZE: Server racks Server racks

EUROPE

350 East Cermak

Changhua County, Taiwan Chicago, USA Singapore

Facebook Prineville Oregon, USA

PR

“CLOUD”?

Dublin, Ireland Eemshaven, Netherlands Hamina, Finland St Ghislain, Belgium

1:10

1:10

0

Lenoir, North Carolina Mayes County, Oklahoma The Dalles, Oregon Berkeley County, South Carolina Montgomery County, Tennessee Quilicura, Chile MICRO SD

SD CARD

USB THUMB DRIVE

3.5” FLOPPY DISK

OWNER: Verizon

6

N. A M

Douglas County, Georgia

1:10

uninterruptible power supply

cable switch cable switch

server hall

1:10

server hall

ICA ER

1:10

507 ZB

DESCRIPTION: Very diverse customer base. Ranging from Subway restaurants to the library of the US Congress and several US government agenJackson ciesCounty, Alabama

IC CIF PA

AMOUNT

POWER: 65MW

E EAST AS IA DL ID

COST: $1.5 billion

TSEUNG KWAN O TSEUNG KWAN O INDUSTRIAL INDUSTRIAL ESTATE ESTATE

YAU TONG INDUSTRIAL AREA

ERICA EU + M AM

green power supply green power supply

EU

KWUN TONG KWUN TONG INDUSTRIAL INDUSTRIAL AREA AREA

Singapore Sydney, Australia Tokyo, Japan

0

ASIA

-

0

Singapore

0

azo

office office

01.co

(ISP : Am

c.co BB .u C) k

P:

Clonee, Ireland Lulea, Sweden

6

(IS

cable switch cable switch

apor e (ISP:

w.hk

w.b b

, UK

server hall

on

cooling system cooling system

nd

Beijing Hangzhou Hong Kong Shanghai Shenzhen Qiandaohu Zhangbei

cooling system cooling system

Sing

ww

Sea ttle , US

ww

Lo

WHATIS ISIN INA ADATA DATACENTRE? CENTRE? WHAT

WHERE IS ALIBABA?

SOURCE: https://datacenterfrontier.com/internet-things-may-create-new-breed-data-centers/

HK

Altoona, Iowa Forest City, North Carolina Prineville, Oregon Fort Worth, Texas Ashburn, Virginia Los Lunas, New Mexico

backup power supply

green power supply green power supply

San Francis

backup power supply

WHERE IS MY “INTERNET”?

reception reception

more planned) COST: $780 million

PE RO

2014

cable s cable s

several US government agencies


capaCITY CENTRALISED

DECENTRALISED

DISTRIBUTED

This thesis searches for new relationship between digital data and the city. It explores the possibility of storing data within downtown of Hong Kong and argues that data centres can be in cities.

1

Digital connectivity is Now so pervasive and accessible to us that their physical existence is not our main consideration. The supporting infrastructure, namely data centres, are built in remote places and away from end-users, capitalising on cheap land cost and proximity to power source. There is no distance or speed concern, they say, because of fibre optics.

WHATIS ISIN INA ADATA DATACENTRE? CENTRE? WHAT

reception reception

a

any

S

U+

M E EAST AS IA DL ID

As a result the Internet is stored in megasize sheds in places where cheap land and power is available. Hong Kong data centres likewise occupy much land which could otherwise be developed for other usage. Meanwhile these are rarely accessed by human and contain mostly empty spaces for cooling. By disaggregating its mass and spreading the structure out it is possible to dissolve the facility into the urban fabric. The thesis proposes an alternative approach to storing the machines so that valuable land can be restored for other purposes.

backup power supply

cooling system cooling system

backup power supply

green power supply green power supply

control room control room

office office

CI PA

Microsoft Quincy

Thesis advisors: Holger Kehne, Jae Hyun Lim, Nasrin SerajiBozorgzad, Roberto Requejo-Belette

1:10

uninterruptible power supply

uninterruptible power supply

1:10

cable switch cable switch

server hall

1:10

server hall

1:10

B

Server racks Server racks

50%server server room 50% room half which half ofof which isis cooling space cooling space

Perforated Perforated floor tiles floor tiles

TotalGFA GFA Total

0

0 0 6 0 0

0

0 2

0

1

2

1

e l s i a le d s l i o a c d l o c

each rack with 10 x 4u box each rack with 1440TB

e l s i a le t s o ai t o

h

h Assume 384 racks per 1000 sqm each 1000 sqm can have 552,960TB ie. Capacity = ~ 553 TB/sqm

SOURCE: https://datacenterfrontier.com/internet-things-may-create-new-breed-data-centers/

1500

1500

e l s i a le t s o ai t o

h

h each 4u box with 36 x 4TB hard disks

SOURCE: https://datacenterfrontier.com/internet-things-may-create-new-breed-data-centers/

2TB 2TB SE TSER TYP RV YP VE IC ER IC R AL RA AL RAC K CK UN UNI T IT

6

AP A

CI

TY

Floor tiles Floor tiles

Amount of data created by Internet of Things. Source: Cisco

Masters of Architecture thesis


capaCITY | Realm JAN - | JUNESep 2017 Des Voeux Road and the Public - Dec 2015|

|

MASTERS MArch 1 THESIS Studio



YURIAGE AFTER | JAN - |JUNESep 2016- Dec|2015 ACADEMIC DRAWING Des Voeux RoadTOHOKU and the Public Realm | MArch 1PROJECT Studio


Arata Isozaki has always been intrigued and haunted by the ruin quality of Hiroshima. He suggested that ruins embody the power to disrupt the otherwise linear, uni-directional movement of time. In the wake of the 3-11 Japan Tohoku earthquake and the subsequent nuclear disaster, a somewhat similar atmosphere to the 1945 Hiroshima has been created. Photographer Arkadiusz Podniesinski has captured some of these moments which have inspired this drawing here.* They feature streets as well as interiors of homes that were abandoned in a hurry. These chaotic elements would now become a permanent feature of the Hiroshima landscape. In this drawing I tried to represent Yuriage, a town almost wiped out in the incident, as a collage of scenes, at the micro (human) scale to macro (urban) scale, of different times: before the tsunami, immediately after, and the present (2016), as some restoration works have begun. Credits: Thomas Tsang (Lecturer)

* For more on Podniesinski’s work on Fukushima, please refer to his official website here: http://www.podniesinski.pl/portal/fukushima/


BEYONG CUTRoad COPY and PASTE: Des Voeux theSOUTH PublicHORIZONS Realm

||

JAN --Dec JUN 2015 2016 Sep

| |

MASTERS MArch 1 STUDIO Studio


PROPOSED SCHEME AXONOMETRIC

B E Y O N D C U T C O P Y PA S T E : S O U T H H O R I Z O N S haidee ng

The studio builds upon previous research by Jason Carlow and Christian J Lange, entitled Cities of Repetition. South Horizons on Ap Lei Chau has been thoroughly researched and studies were done to explore possible alternatives for high-density private housing which steps away from the usual tower-podium typology. In the new design using a branching language, public spaces disperse horizontally and vertically, blurring the dichotomy of podium and towers. Credits: HKU Faculty of Architecture Jason Carlow Studio Spring 2016


RE-READING: ZAHAand HADID KONG PEAK Des Voeux Road the HONG Public Realm

| |

1:50 STUDY MODEL OF THE PEAK LEISURE CLUB (1983)

1:500 REINTERPRETATION MODEL

14

SEP DEC 2015 2016 Sep - Dec

| |

MASTERS MArch 1 STUDIO Studio


GERALDINE BORIO KUMIKO INUI NAGISA KIDOSAKI NASRIN SERAJI KIYOSHI TAKEYAMA MARIKO TERADA

TUTORS/CRITICS TEPPEI FUJIWARA NAGISA KIDOSAKI JAE LIM

STUDENTS LINGDI CHEN LOKYEE CHAN ZHENRONG HUANG KAREN KAN

1

ZHONGQI LI NGAI FUNG MAN HAIDEE NG THEODORE TONG

JEFF TSE MONO TUNG YANESSA WONG HUGH YAO

2

This studio looked at Zaha Hadid’s unbuilt The Peak Leisure Club competition entry (1983). “If you look into collections of competition proposals at the time, it could be obvious that the year between 1982 and 1983 was a period of a paradigm shift in the world of architecture.” -- Kazuhiro Kojima (2016), studio brief Throughout the 4 months, we have studied Zaha’s The Peak, where she came from, where she intended to go and the wider context in 1983 that drove her scheme, and pushed further, revisited, or re-constructed her subjects of interest in a proposal in our time 2016. As a studio we would like to pay tribute to both Professor Kazuhiro Kojima and Dame Zaha Hadid, both unfortunately passed away this year at the height of their careers, yet leaving behind a legacy remarkably rich for the field.

4

“Set over a city, high on a hill, the site rests free from the condensed urban environment yet is still integrated with the

land and water below.”

NOT COUNTRY CLUB BUT ME TROPOLITAN LEISURE CLUB

5

3

1: Zaha Hadid. (1983). The Peak Leisure Club. 2: Reinterpretation model of The Peak 3: Hadid designed a multi-pages cut out artwork for a magazine coverage of her work. (Wallpaper, October 2008) 4: The Peak (1983) intends to sit high on a hill and overlook the densely built-up harbour front of Hong Kong. 5-7: Interpretation of Hadid’s original competition drawing Slabs (1983)

“A lot of [other entries] first accepted the rules. They wanted to put towers on top of the mountain. But really [the mountain] should be cut through.”

6

7

This studio looked at Zaha Hadid’s unbuilt project The Peak Leisure Club (1983). Throughout the 4 months, we have studied Zaha’s The Peak, explored her intents, and pushed further, revisited, or re-constructed her subjects of interest in a proposal in our time 2016. Many are looking at Hadid’s project in terms of its building mass and formal quality, but my work looked at how she used the void in her project to reorganise the spaces in her club to create a new hierarchy. How can this hierarchy of spaces be further broken down in 2016? How else can we use the void to organise activities? Credits: Yokohama GSA Kazuhiro Kojima Teppei Fujiwara HKU Faculty of Architecture Jae Hyun Lim


DES Des VOEUX Voeux ROAD Road AND andTHE the PUBLIC Public REALM Realm

||

SEP Sep -- DEC Dec 2015 2015

||

MASTERS MArch 1 STUDIO Studio


This project is a part of the Pedestrianising Des Voeux Road Central (DVRC) proposal in collaboration with Columbia University. The former Central Market lies near the midpoint of Des Voeux Road Central. The project provides an opportunity to reimagine the market with conservation as a design driver. Conceptually, this proposal is conceived as a subtraction rather than an addition of space, producing an architectural language that is suited to this particular scale. Credits: Columbia University GSAPP Studio-X Jeffrey Johnson DVRC Initiative HKU Faculty of Architecture Oscar Cheung (team partner) Dr Eric Schudenfrei (tutor)


THE PERFORMANCE PRODUCTION -MAY 2015 | UNDERGRADUATE DEGREE Des PIANO VoeuxMAKER: RoadTHE and the PublicOF Realm | | JAN Sep - Dec 2015 | MArch 1 STUDIO Studio

18


How do we encourage performance in the public realm? Is it possible to turn private activities into theatrical spectacles on the street through architecture? Through analysis of these performance spaces in Edinburgh, the production of piano is highlighted in this project because it involves manufacturing and lifting heavy components such as the piano rim and the cast-iron plate. At the same time it requires careful and delicate workmanship. At the public piano workshop, the spaces are permeated with performances carefully framed by the building itself. Credits: ESALA, University of Edinburgh Andy Stoane Studio Spring 2015


FLETCHER ASSOCIATES | JAN |- DEC 2014 | PROFESSIONAL EXPERIENCE Des VoeuxJOSEPH Road and the Public Realm Sep - Dec 2015 | MArch 1 Studio

i ii PROJECT IMAGES i-ii

Dunaskin Mill Student Accommodation, Glasgow

iii - iv

Heriot Watt University Student Residences

v - vii

Union Street Aparthotel, Aberdeen

iv

iii


I worked at Fletcher Joseph Associates in Edinburgh for a year in 20142015. Fletcher Joseph is a small firm based in Edinburgh with 10 full-time staff, busy with a range of projects at various working stages across Scotland, including urban redevelopement masterplans, student accommodations, hotels and zoo facilities.

During the placement I mainly helped with the new 450-bed Heriot Watt Student Residences. The 12 months saw the project going from feasibility stage through to starting on site. I helped with the major planning application, the 3D modelling and visualisations and various construction drawings.

v vi

I was also involved in other adaptation projects which include the conversion of a B-listed building in Aberdeen, Scoatland into a ten-storey aparthotel, and an old flour mill in Glasgow into a 504-bed student accommodation. Credits: Fletcher Joseph Associates

vii


Digital Rhinoceros with Des Voeux Digital SkillsRoad | and themodelling Public inRealm | Grasshoper Sep - and DecKangaroo 2015

|

MArch 1 Studio


During the Masters degree at HKU, I took a course on using grasshopper to model tensile and catenary structures. With another colleague we won a class design competition and led a team to build a small tensile structure installation. The design was displayed on campus for a month in 2016.

Material used: Lycra Steel CHS 3d printed joints

Credits: Ening Liu (Co-team leader) Christian J. Lange (Lecturer) HKU ARCH5305 Class 2016 Summer


Des VoeuxKnowledge Technical Road and the | Public Realm

|

Sep - Dec 2015 50mm clear cavity red multi facing brick

|

MArch 1 Studio 60mm cavity insulation 140mm blockwork

12.5mm plasterboard finish

precast unit connected to concrete slab by metal bracket

18mm thick MDF internal sill board 25mm thick wood batten cavity closer filled with insulation

PPC aluminium sill over precast unit

150mm concrete slab 215x140mm concrete lintol

steel framing packed with insulation

Detail Window to floor junction

From top left clockwise: 1. Foundation calculation for academic project 2. Case Study: Canal Point Student Residences // Fletcher Joseph Associates 3&4. Case Study: Hepworth Wakefield Gallery // David Chipperfield Architects 5. Glulam roof structural detail for academic project



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.