HENLEY SUMMERHOUSE HENSUM01 / HENSUM02
11 6
ISSUE 0109
120mm
120mm 120mm 160mm
160mm
120mm 120mm
160mm 3200mm
120mm 120mm
The Henley Summerhouse must be built on a level concrete base approximately 100 to 150mm thick.
2780mm
3040mm
REQUIRED TOOLS : (NOT SUPPLIED)
12
6 24
35mm
13
DRILL
Tack
Loose roof boards
POZI DRIVE SCREWDRIVER SHARP KNIFE TO CUT ROOF FELT
TURN AROUND THE FIRST LAYER OF SHINGLES SO THAT THERE IS A STRAIGHT EDGE AT THE OVERHANG
35mm 35mm
SPIRIT LEVEL
TAPE MEASURE
35mm 35mm
REPEAT UNTIL ROOF IS COMPLETE
COVER EACH ROOF PANEL STARTING AT THE BOARD FURTHEST FROM THE CENTRE. REPEAT UNTIL ROOF IS COMPLETELY COVERED
E
CUT INDIVIDUAL TILES TO COVER THE EDGES.
14
Spindle
Fixing for the door furniture are supplied with each item.
Forest Garden plc. Units 291 & 296 Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB General Enquiries: 0844 248 9853 E-mail: info@forestgarden.co.uk www.forestgarden.co.uk
Thank you for choosing this garden building manufactured by the UK's largest manufacturer of timber garden products. In order to gain the most benefit from it, please note the following: - Exercise particular care and follow instructions whilst cutting felt tiles. If they are cut incorrectly, additional felt tiles can be inexpensively purchased from most good DIY retailers or garden centres. - This building is pressure treated. For extra protection from the elements we recommend that you treat your building using a wood preservative treatment. Apply in accordance with the manufacturers instructions. - Please ensure that you thoroughly check all component parts for quantity and quality before you commence building the product. If there are any missing parts, please contact the help line as shown immediately. The manufacturer cannot be held liable for damaged items once any part of the product has been fitted or altered in any way (e.g. Painted) - Timber is a natural material. It will shrink and swell as a result of varying moisture content. - Please keep all plastic bags and small parts away from children in order to reduce the risk of suffocation. - Important Note : Do not lean or stand on roof during assembly. Roof is not load bearing. - If there are any technical queries with the product, please contact our customer help line on 0844 248 9853 between the hours of 8.30 am and 5.00 pm Monday to Friday.
HAMMER
x1
Door Panel HENSUMDPC
X6
Rafter HENSUMRAF
2 or 5
4 or 0
Plain Panel HENSUMPP
Loose roof boards HENSUMRBP
Upright and Covering Strip HENSUMUP HENSUMCS
Window Panel HENSUMWPC
X6
X6
X6
x1
Roof Section HENSUMRF
X6
x1
Floor Plug HENSUMFLP
Floor Section HENSUMFS
Finial HENSUMFIN
FIXING PACK (HENSUMFIXP)
X5
6 120mm
Eye
67 35mm
Hook
Felt tile pack 17 tiles per pack HENSUMSHINP
100s Tack
75mm
18 20mm
36
1
1
6
1
2
6
Floor Section
35mm
6
6
18
20mm
12
Covering Strip
35mm
Roof Section
1 MUST PRE DRILL Floor Plug
35mm
REPEAT UNTIL ALL 6 INSETS ARE FILLED WITH COVERING A STRIP
35mm 35mm
35mm
35mm
35mm
20mm
35mm 35mm
35mm
35mm
35mm
35mm
35mm
20mm
20mm COVERING STRIPS MAY NEED TO BE CUT TO FIT
6
3
75mm
75mm
2
4
8
1
6
35mm
1
Roof Section
Rafter
14mm 35mm
Upright
35mm
35mm
35mm
35mm
75mm
1
75mm
MAKE SURE THE POST TOP ANGLES THE SAME WAY AS THE PANEL
35mm
DO NOT FIX Window Panel
75mm 75mm
25mm 75mm
4
5
5 30
All other panels
Upright
75mm
9
1
10 18
Finial
35mm
3 75mm 75mm Roof Sections 75mm
2 75mm Rafter
75mm
INSERT FINIAL DO NOT FIX
75mm
REPEAT UNTIL WALL CONSTRUCTION COMPLETE
3
2
7
COMPLETE ROOF CONSTRUCTION SEE STAGE 7
Rafter