Selected Works Portfolio Hanxiong Liu B.Arch | Southern Polytechnic State University M.Arch | University of California, Los Angeles ACBI, RGA, Electric Bowery
1020 Doreen Place, Apt 4 Venice, CA 90291 (770)209-2264 hanxiong.ryan.liu@gmail.com
PROJECT 01
CYAN on Peachtree Atlanta, GA
Professional Work Rafael A Garcia and Associates Architect, Inc. June 2013 - March 2014 SPACES A 329 unit, 23 story luxury rental apartment building designed to fit a prosperous, dynamic urban environment on Peachtree Road, the principal Avenue of Atlanta, in the prestigious Buckhead neighborhood. This project features studio, one, two, and three bedroom units and includes a seven story parking deck, pool amenity deck, amenity pavilion, and roof terrace overlooking Peachtree Road. VIEWS This highly visible building is designed to provide a vantage point to view the beautiful surrounding skyline, while also contributing to it. The building’s orientation on the site engages access to public transit, while also providing unique spaces to enjoy activities such as the Peachtree Road Race and July 4th Fireworks. SUSTAINABLE This building is designed to LEED certification standards.
1
50ft
1
3
4
5
6
7
8
9
10
11
12 13
14
15
16 17 18 19
0ft
20
21 22
23 24 24.3 25
26
* Drawings, specifications and other documents including those in electronic form, prepared by the Architect and the Architect’s consultants are Instruments of Service for use solely with respect to this Project. The architect and the Architect’s consultants shall be deemed the authors and owners of their respective Instruments of Service and shall retain all common law, statutory and other reserved rights, including copyrights.
2 _____________________________________________________________________________________
A3.01
1B
1 _____________________________________________________________________________________
ELEV. CTR RM 217' - 1"
A3.01
1 ?
TYP.
1
TYP.
ROOF 210' - 4" LEVEL 23 200' - 0"
1
LEVEL 22 190' - 0" Level 21 180' - 0" Level 20 170' - 0" Level 19 160' - 0"
P2
P3
P4P5
P6
P7
Level 16 130' - 0" Level 15 120' - 0"
2
P8
architectural + skin
Level 14 110' - 0"
P9
Level 13 100' - 0" Level 12 90' - 0"
10 TYP.
11
LEVEL 6 30' - 0" LEVEL 5 20' - 0" LEVEL 4 10' - 0" LEVEL 3 - LOBBY 0' - 0" LEVEL 2 -10' - 0" LEVEL 1 -20' - 0"
19 79 85 85 85 82 55
TYP.
1
TYP.
2
TYP.
Level 11 80' - 0"
2 _____________________________________________________________________________________
A3.03
LEVEL 7 40' - 0" 5 7
ASI 2
2 A2.04
Date 8/9/13 9/16/13 10/28/13 3/21/14 7/2/14
LEVEL Level D 8 50' - 0"
2S 9
TYP.
Description FOUNDATION PERMIT PERMIT SET CONSTRUCTION SET REVISION 1 ASI 2
Level 9 60' - 0"
TYP.
ASI 2
10
8
No.
Level 10 70' - 0" 1
17' - 7 1/2"
LEVEL 7 40' - 0"
5
3380 PEACHTREE ROAD ATLANTA, GEORGIA 30305
2
P1
Level 17 140' - 0"
4
CYAN AT 3380 PEACHTREE
Level 18 150' - 0" 4
3
4
LEVEL 6 30' - 0" LEVEL 5 20' - 0" LEVEL 4 10' - 0" LEVEL 3 - LOBBY 0' - 0" LEVEL 2 -10' - 0" LEVEL 1 -20' - 0" LOWER ST. LEVEL -32' - 8"
2 A2.01
WEST BUILDING ELEVATION 3/64" = 1'-0"
PRECAST PARKING DECK BY OTHERS. FOR ELEVATIONS SEE A0.61, A0.62
WEST ELEVATION Project number Date Drawn by Checked by
12009.00 21 MARCH, 2014 APH / NW RAGC
A2.01 Scale
structural 2
DETAILS1 I worked on the typical unit, stairs, and amenity lobby design. And I’m honored to design the lobby ceiling and produced the detail drawings under direct by firm principal. MODELING2 The fastest way to learn a building system is to read the model, build the model, and monitoring the model. I learned Revit on this project, which gave me a comprehensive understanding of the functions of the program and its possibility.
3/64" = 1'-0"
PROJECT 02
High-rise Residential Phase 3 Nanqu, Shenyang
China
Professional Work Architects Crang & Boake International June 2011 - August 2011 SPACES A PUD of 70 high-rise residential towers with 3 stories commercial along the street. Underground Parking for each tower and commercial. One water system connected 3 ponds in master planning. The green area covered 70% of land of property. LIVING A 3000 m2 Community center provided entertainment, sports, and library for residents. In the rapidly developing city, an oasis for the peoples who live there. TYPES There are 3 types of tower. Each elevator serves one unit at each level.
20m
10m
5m
0m
1
2
PLAN1 I drew the tower core and furniture layout in the plan. This is a great opportunity to learn the space and circulation. MODELING2 SketchUp is a great tool for quick modeling and presenting. In the schematic design phase, I modeled 2 types of tower based on the plan provided by other colleagues.
PROJECT 03
Van Ness Residences
Los Angeles, CA
Professional Work Electric Bowery, Ltd. October 2015 - Current SPACES This project consists of 2 rows of townhouse with 12 units. A linear courtyard with water features surrounded by the 2 townhouses. Each unit has 4 stories high with full height facing the courtyard and roof deck for grill. The split-level design provided dramatic spaces for living space and master suite. COZY the simplest materials and large glazing giving residents a sense of belonging. The benches along to the water feature in the courtyard as informal spaces for communications, which increased the community cohesion.
Architect of Record 2 A2.11 A1
B1
C1
D1
E1
F1
G1
126' - 0" 21' - 0"
21' - 0"
21' - 0"
21' - 0"
21' - 0"
21' - 0"
PL
EXIT GATE ONLY 1
2
A3.10
A3.20
1 A1.11
1 A1.12
A
B
B
C
D
UNIT 1
UNIT 2
UNIT 3
C
UNIT 4
UNIT 5
UNIT 6 ACCESSIBLE
UNIT 7
UNIT 8
UNIT 9
UNIT 10
ACCESSIBLE UNIT 11 UNIT 12
E
F
G
F
G
H
Designer Electric Bowery Ltd. 801 Coeur D'Alene Avenue, Venice, CA 90291 Tel 310.439.1771 Architect
1
1
2
2
3
3
Electric Bowery Ltd. 801 Coeur D'Alene Avenue, Venice, CA 90291 Tel 310.439.1771 Client
2 A3.30
4
4
5
5
6
6
7
7
8
8
9
9
10
SEE ENLARGED PLANS, A1.11 - A1.14
UNIT 2 TYPE B
UNIT 4 TYPE B
UNIT 3 TYPE C
UP
UP
UP
UNIT 5 TYPE C
UP
UNIT 6 TYPE D
UP
DO NOT SCALE DRAWINGS. THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND REPORT ANY DISCREPANCIES BEFORE PROCEEDING WITH THE WORKS.
LEGEND EXHAUST FAN ABOVE TEMPERED GLASS
T
12 13
DN
Contractor
FANS SHALL BE ENERGY STAR COMPLIANT AND BE DUCTED TO TERMINATE TO THE OUTSIDE OF THE BUILDING. FANS, NOT FUNCTIONING AS A COMPONENT OF A WHOLE HOUSE VENTILATION SYSTEM, MUST BE CONTROLLED BY A HUMIDITY CONTROL.
11
UNIT 1 TYPE A
UP
12 13
VAN NESS PARTNERS I, LLC 618 S Van Ness Ave, Los Angeles, CA 90005
EXHAUST FAN NOTES:
10
11
1 A3.30
KEY PLAN - UNIT NUMBER + TYPE
SD
SMOKE DETECTOR
SD
SMOKE DETECTOR / CARBON MONOXIDE DETECTOR
CM
14
14
DN
DN
DN
DN
PL 1 A2.10
DN
DN UP
UP
UP
1
1
A2.11
A2.12
UP
Date
PLAN CHECK CORRECTION FIELD REVISION 1
5/31/2017 1/29/2018
By
A2.10
UP
UP DN
DN
UP DN
DN
DN
DN
DN
PL Stamp
3 A4.03
15
15
16
16
UNIT 7 TYPE E
UP
17
UP
UNIT 8 TYPE F
UNIT 9 TYPE G
UP
UP
UNIT 10 TYPE F
UNIT 11 TYPE G
UP
UP
UNIT 12 TYPE H
17
18
18
19
19
20
20
21
21
22
22
23 2
Revisions
1 4
2'-6" COURTYARD FF
WATER FEATURE
1
No.
2
DN
UP
A3.40
EMERGENCY ESCAPE + RESCUE
E
1 A4.06
1 A4.03
Copyright Note
23
24
Electric Bowery Ltd. Retains Design Copyright over Design Drawings & Specifications.
24
A3.40 25
25 26 9"
26
27
20
'-
27 17 '-
28
11
1/4
"
EXIT GATE ONLY
1 A1.14
1 A1.13 21' - 3 1/2"
21' - 0"
21' - 0"
21' - 0"
21' - 0"
21' - 0"
Project Title
VAN NESS RESIDENCES 610, 618 S. VAN NESS AVE LOS ANGELES, CA 90005
28
Drawing Title
PROPOSED GROUND FLOOR PLAN
126' - 3 1/2"
1
2 A2
B2
A3.10
C2
A3.20
PL
Scale
2 D2
A2.12
E2
F2
G2
Date Project No. North
1/8" = 1'-0" 03/21/2018 00053 Drawing No.
Drawn By Checked By
HL
A1.01
PROJECT 04
Bluestone Lane
Multiple Places, CA Professional Work Electric Bowery, Ltd. October 2015 - Current
LOCATIONS New York-based coffee shop Bluestone Lane enlisted Electric Bowery to design their first west coast locations. Set in San Francisco’s energetic Financial District and Union Square neighborhoods, these casual cafés provide a peaceful, light-filled respite in the city. And after that, Electric Bowery won other two coffee shops design in Los Angeles. CONTEXTS Electric Bowery drew inspiration from the historic buildings in which these coffee shops are housed, as well as from Bluestone Lane’s Australian roots. The spaces combine a neutral material palette of concrete, wood and steel with playful lighting, colorful tile, and abundant greenery.
FRP-1
CM-1
1' - 2"
F-5 SINK-5
F-2 SINK-2
SLIM JIM
SINK-4
ALCOHOL STORAGE I U-LINE SHELVES Architect of Record
6
A5.10
8' - 0 3/4"
25' - 9 1/4"
8' - 0"
26' - 11" 4' - 5 1/4"
EXPOSE EXISTING BRICK WALL
(E) ELEC. BELOW
4' - 1 1/2"
SHELF ABOVE
Architect IM
CM-2 BAR
TAP-1
(E) CLEAN OUT IN FLOOR
F/S IB
UCR-1 BELOW
172 SF POS
SSU
F/S BELOW
A5.10 UCR-1 BELOW
3
Electric Bowery Ltd. 720 Hampton Drive, Venice, CA 90291 Tel 310.439.1771
002
Client
EXIT SIGN ABOVE DOOR
Bluestone Lane 259 W. 10th Street, Apt. 1C, New York, NY 10014 Tel 917.213.1357
(E) TRENCH DRAIN IN FLOOR
SINK-4
6
Contractor
LIQUOR STORAGE
DRY STORAGE
RETAIL
2 001
A5.11
4' - 0"
CG-1
CG-2
16' - 0"
4 7
OPEN FOR PRE-ORDER SHELVING
2 8
A5.11
004
CM-1
WALL ABOVE
2
A5.10
FULL HEIGHT SHELVING ELEC. PANEL
5
005
1' - 8"
1 A2.00
A5.13
EMPLOYEE LOCKERS
SLIM JIM
248 SF F-2 SINK-2
PLANTER TO BE HAND-IRRIGATED. PROVIDE DRAIN.
4
3' - 0"
1
3
8 1
A5.12
SEATING
A5.11
7
A5.12
2
483 SF
5
6 ø 5' - 0"
ø 5' - 0"
3
DO NOT SCALE DRAWINGS. THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND REPORT ANY DISCREPANCIES BEFORE PROCEEDING WITH THE WORKS.
006
10' - 2 1/4"
24' - 3 3/4"
249 SF
PASS THROUGH
RP
KITCHEN
(E) SEWER IN FLOOR
F-5 SINK-5
3' - 8"
OUTDOOR SEATING
F-3 SINK-3
3
UCR-1 BELOW
F-1 SINK-1
KO
PASTRY
4 A5.11
001
1
4' - 6"
003
F/S
F/S
1/4" = 1'-0"
Electric Bowery Ltd. 720 Hampton Drive, Venice, CA 90291 Tel 310.439.1771
RODENT PROOF
EXIT SIGN ABOVE DOOR
UCR
INTERIOR ELEVATION
Designer
26' - 10 1/2"
(E) SEWER IN FLOOR
UCF BELOW
UCR-1 BELOW
UCR-3
UCR
9 A5.12
PL-1 WOMEN'S RESTROOM
82 SF
84 SF
EQ
EQ
EQ
EQ
1' - 6"
MEN'S RESTROOM
39' - 9 1/2"
4' - 0"
PRE-CAST CONCRETE PLANTERS PROVIDED BY SWEETGREEN
8' - 1"
8' - 4" No.
Issues / Revisions
Date
By
5' - 6"
3' - 6"
TL-1
WD-1
DUCT
Stamp
CONDIMENT C
5
A5.10
INTERIOR ELEVATION 1/4" = 1'-0"
Copyright Note Electric Bowery Ltd. Retains Design Copyright over Design Drawings & Specifications.
NOTE: SEE KITCHEN DRAWINGS FOR FULL EQUIPMENT SPECS
BEVERAGE AIR, 48"W X 29-1/4"D X 31-1/2"H, MODEL NO. UCR48A ORDER 3" CASTER
OWNER PROVIDED, G.C. INSTALLED
OWNER PROVIDED, G.C. INSTALLED
20X20
58
57
56
26
27
28
20X20
29
54
20X20
EXTERIOR UNCOVERED PATIO M 317 SF
53 20X20
23
21
HANGING PLANTS ABOVE
24
24" D
25
19
20
52
30
34
31
35
32
36
47
33
18
46
49 20X20
EXTERIOR COVERED PATIO L 104 SF
003
37 72X34
MAIN DINING A 496 SF
20X20
14
42
39
20X20
13 A4.20
45
12 20X20
2' - 0"
3' - 7"
4' - 10"
4
HANGING SHELVING, ABOVE
1 36X34
2
002
1
UNDERCOUNTER 60.25"
UNDERCOUNTER 72 5/8" TURBO AIR TST-72SD-N
1
1 3
1-HR FIRE RATED SHAFT
ICE STORAGE B-570
LOCKERS
DISH WASH STATION D 113 SF
24"
4' - 4"
317
14
496
45
266
0
WC CORRIDOR
79
0
SERVICE CORRIDOR
242
0
WOMEN'S WC
52
0
MEN'S WC
50
0
KITCHEN
205
0
DISH WASH STATION
113
0
STORAGE
21
0
DRY STORAGE
77
0
WALK-IN COOLER
40
0
2,062
63
Bluestone Lane 259 W. 10th Street, Apt. 1C, New York, NY 10014 Tel 917.213.1357
UCR-3
Engineer Tuscher Engineering Group. Inc. 5318 E. Second Street #539, Long Beach, CA 90803 Tel 310.613.9980
CG-1
DO NOT SCALE DRAWINGS. THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND REPORT ANY DISCREPANCIES BEFORE PROCEEDING WITH THE WORKS.
LEGEND PROPERTY LINE SETBACK LINE EXISTING WALL NEW WALL
4
A5.10
INTERIOR ELEVATION
POS PASTRY
S
3 A3.00
SNEEZE
CCTV
POS ETHERNET
1/4" = 1'-0"
SPEAKER HARDWIRE
No.
Revisions
Date
By
WALK-IN COOLER J
Stamp
SERVICE CORRIDOR H
Copyright Note 2
006
Electric Bowery Ltd. Retains Design Copyright over Design Drawings & Specifications.
10' - 8 1/4"
24" GSW SH24241D 30"X72-1/8"X45"H
20
19
Project Title
8' - 5 1/4"
3 LONG-TERM BIKE PARKING
2
BEAM ABOVE
24"
WALK-IN COOLER J 40 SF
UNCOVERED
BAR
Client
24"
3
NOT PART OF SCOPE
4
Electric Bowery Ltd. 720 Hampton Drive, Venice, CA 90291 Tel 310.439.1771
FROSTED GLASS
7 A4.40
SERVICE CORRIDOR H 242 SF
0' - 6" ENTRY LEVEL DROP POINT LOW VOLTAGE CLIPBOARD
104
Architect
4' - 0 1/4"
005
COVERED
Electric Bowery Ltd. 720 Hampton Drive, Venice, CA 90291 Tel 310.439.1771
TURBO AIR TWR-60SD-D2-N
KITCHEN C 205 SF
ICE MACHINE ID-0906A
ALCOHOL STORAGE I 21 SF
421
SEATS
MAIN DINING
TOTAL
5' - 8 1/2"
WOMEN'S WC F 52 SF 0' - 6" ENTRY LEVEL
3 A3.00
8 A4.40
1 A2.10
AREA (SF)
Designer
3' - 8"
003
1 MEN'S WC G 50 SF 0' - 6" ENTRY LEVEL
0' - 0" GROUND LEVEL
1/4"
SHELVING, ABOVE
16-3/8"
004
AWNING ABOVE
9-3/4"
WC CORRIDOR K 79 SF 1
BAR B 266 SF
11' - 10
3
6
HANGING SHELVING, ABOVE
2' - 8 1/2"
56X34
7
12 A4.30
0' - 6" ENTRY LEVEL 3' - 0"
1' - 6"
10 5
FULL HEIGHT SHELVING
24"
24"
UNDERCOUNTER FREEZ .UNDERCOUNTER REF. TRUE TUC-24F-HC TRUE TUC-24F-HC
72X34
8
EXTERIOR PATIO
50
ENTRANCE
004
44
41
9
51 20X20
43
40
11
ROOM
2' - 2"
13
001
0' - 6" ENTRY LEVEL
38
S
CAFE AREA / SEATING
24 11/16"
15
16
SEE KITCHEN DRAWINGS FOR EQUIPMENT SCHEDULE.
48
20X20
2 A3.00
TE R
6. 7.
20X20
20X20
17
PL AN
0' - 0" GROUND LEVEL
30"
22
AA CL
A1.10
55
20X20
6 A4.10
OWNER PROVIDED, G.C. INSTALLED
2 A2.10
20X20
59
GROUND FLOOR PLAN
8' - 6"
1
001
60
24 11/16"
1
1
- ALL KITCHEN EQUIPMENT TO BE REVIEWED AND APPROVED BY BLUESTONE LANE PRIOR TO PURCHASE / INSTALLATION 20X20
NEW PARTITION WALLS TO U/S STRUCTURE 3 5/8" @24" O.C., WITH 1/2" GWB BOTH SIDES. WALL, FLOOR AND CEILING SHALLDrawing NOT EXCEED THE FLAME SPREAD CLASSIFICATIONS IN CBC T-803.9. 1 HOUR FIRE RATED WALLS UL 419 3 5/8" METAL STUDS @ 24" O.C. TO U/S STRUCTURE C/W 5/8" TYPE X Title GWB BOTH SIDES TENANT IS TO VERIFY ALL UTILITY POINTS OF CONNECTION, INCLUDING ELECTRICAL, GAS, SEWER, WATER, ETC. GLASS AND GLAZING: APPLIES TO DOOR R, ITS SIDELIGHTS, AND OTHER HAZARDOUS AREAS AS APPLICABLE. EACH PANE OF SAFETY GLAZING INSTALLED IN HAZARDOUS LOCATIONS SHALL BE IDENTIFIED BY A MANUFACTURER'S DESIGNATION SPECIFYING WHO APPLIED THE DESIGNATION, THE MANUFACTURER OR INSTALLER AND THE SAFETY GLAZING STANDARD. THE FOLLOWING SHALL BE CONSIDERED SPECIFIC HAZARDOUS LOCATIONS FOR THE PURPOSED OF SAFETY GLAZING. GLAZING IN : ((CBC)2406 a. SWING DOORS Drawn Scale b. FIXED AND SLIDING PANELS OF SLIDING ASSEMBLIES AND PANELS ByIN SLIDING AND BI-FOLD CLOSET DOOR ASSEMBLIES. Checked Date c. STORM DOORS By d. UNFRAMED SWINGING DOORS e. N/A Project f. FIXED OR OPERABLE PANELS ADJACENT TO A DOOR WHERE THE NEAREST EXPOSED EDGE OF THE No. GLAZING IS WITHIN 24" ARC OF EITHER VERTICAL EDGE OF THE DOOR IN A CLOSED POSITION AND North Drawing WHERE THE BOTTOM EXPOSED EDGE OF THE GLAZING IS LESS No. THAN 60" ABOVE THE WALKING SURFACE. READ CODE FOR EXCEPTIONS. g. FIXED OR OPERABLE PANEL OTHER THAN DESCRIBED IN ITEMS e AND f, WHICH MEETS ALL OF THE FOLLOWING CONDITIONS (READ CODE FOR EXCEPTION WITH SPECIAL INSTALLATION). i. EXPOSED AREA OF AN INDIVIDUAL PANE GREATER THAN 9 SQ. FT. ii. EXPOSED BOTTOM EDGE LESS THAN 18" ABOVE FLOOR. iii. EXPOSED TOP EDGE GREATER THAN 36" ABOVE THE FLOOR iv. ONE OR MORE WALKING SURFACES WITHIN 36" HORIZONTALLY OF THE PLANE OF THE GLAZING ALL EXTERIOR WINDOWS ARE PREMANENTLY FIXED. ALL DOORS ARE SELF-CLOSING, TIGHT-FITTING, AND VERMIN PROOF.
1/4" = 1'-0" 01.23.18 00062.01
OWNER PROVIDED, G.C. INSTALLED
SEE SPEC BOOK
3' - 0"
COFFEE GRINDER
UNDER COUNTER REFRIGERATOR
PLANTERS
KNOCK CHUTE
OWNER PROVIDED, G.C. INSTALLED
SEE SPEC BOOK
1
NOTE:
OWNER PROVIDED, G.C. INSTALLED
63 62 G.C. INSTALLED OWNER PROVIDED, 61
MAHLKOENIG, 22"W X 18-1/2"D X 28-1/4"H, MODEL NO. KENIA / GUATEMALA
RINSER
KO
OWNER PROVIDED, G.C. INSTALLED
20X20
MAZZER, 9-3/4"W X 18-1/2"D X 28-1/4"H, MODEL NO. ROBUR
ICE - 9324-61, ESPRESSO - 9797-50
1
AWNING ABOVE RIN
3' - 8"
MAZZER, 9-1/2"W X 16-1/2"D X 24"H, MODEL NO. SUPER JOLLY
A2.20
WATER FILTER
WF-1
3' - 9 1/2" OWNER PROVIDED, G.C. INSTALLED
FETCO, 12-3/4"W X 20-3/8"D X 36-3/4"H, MODEL NO. CBS-2151XTS
Architect of Record
9' - 0"
A3.00
OWNER PROVIDED, G.C. INSTALLED
LA MARZOCCO, LINEA 3 GROUP
4.
OWNER PROVIDED, G.C. INSTALLED
30"
TBD
1. 2. 3.
5.
TBD
1
1
PATCH & SEAL AS REQUIRED
GENERAL NOTES:
1' - 6"
TAP DISPENSER
OWNER PROVIDED, G.C. INSTALLED
3' - 0"
OWNER PROVIDED, G.C. INSTALLED
TAP DISPENSER
TAP-2
24"
CG-3
UCR-1
OWNER PROVIDED, G.C. INSTALLED
BEVERAGE AIR DIRECT DRAW DISPENSER, MODEL NO: DD94, 95"W X 28 3/16"D X 37 1/4"H
SALAD SANDWICH UNIT
TAP-1
1
8' - 8 1/2"
1
OWNER PROVIDED, G.C. INSTALLED
TURBO AIR, 48-1/4"W X 30"D X 37"H, MODEL NO. MST-48 (CONFIRM SS / BLK)
1
OWNER PROVIDED, G.C. INSTALLED
3' - 0"
1
COFFEE GRINDER
MANITOWOC, NEO 310 UNDERCOUNTER ICE MACHINE, 30"W X 28"D X 38 1/2"H
1
OWNER PROVIDED, G.C. INSTALLED
REGENCY, SPRAY FAUCET MODEL NO. 600FPRS8
UNDER COUNTER ICE MACHINE
SSU
OWNER PROVIDED, G.C. INSTALLED
FISHER, 8" ADJUSTABLE WALL MOUNT MODEL NO. 3251
1' - 6"
1
COFFEE GRINDER
CG-2
1
IM
PLUMBER TO SUPPLY, G.C. INSTALLED
KOHLER, K-7505, CHROME FINISH
TBD
EXISTING SOFFIT FRAMING TO REMAI PAINTED WHITE
180 SOUTH LA BREA AVE, LOS ANGELES, CA 90036 BRICK WALL EXPOSE EXISTING
OWNER PROVIDED, G.C. INSTALLED
3' - 0"
COFFEE MAKER
CG-1
OWNER PROVIDED, G.C. INSTALLED
3' - 0"
CM-2
BEVERAGE AIR, 27"W X 29-1/4"D X 34-1/2"H, MODEL NO. UCF27 (CONFIRM SPEC)
8' - 6 1/2"
1
1
3' - 0"
1
COFFEE MAKER
1
UNDER COUNTER FREEZER
9' - 10"
FAUCET -MOP SINK
REFRIGERATED SELF SERVICE CASE
UCF
3' - 8"
F-4
CM-1
TBD
UCR-3
PLUMBER TO SUPPLY, G.C. INSTALLED
7' - 5"
1
PLUMBER TO SUPPLY, G.C. INSTALLED
7' - 6 1/4"
1
FAUCET - PREP SINK
1
9' - 8 1/2"
1
FAUCET
F-3
UNDER COUNTER REFRIGERATOR
3' - 8"
1
FAUCET
F-2
TBD
UCR-2
3' - 0"
MOP SINK
F-1
REGENCY 1 COMP SINK 18"X18"X14"D WITH 18" RIGHT DRAINBOARD 18"
Project Title
NOTES
PLUMBER TO SUPPLY, G.C. INSTALLED
5' - 0"
SNK-4
L&J, MODEL NO. LJ1216-3RL, W/ FC-10
5' - 0"
1
SIDE SETBACK
1
PREP SINK
MANUFACTURE / MODEL NO.
18"
3 COMPARTMENT SINK
SNK-3
QTY.
3D
SNK-2
ELKAY, AVADO 16" X 18-1/2" X 10" UNDERMOUTN SINK, MODEL NO. EFRU131610
DISCRIPTION
18"
1
ITEM
GSW SH1824 90-3/8"
HANDWASHING SINK
NOTES
18"
SNK-1
EQUIPMENT SCHEDULE
MANUFACTURE / MODEL NO.
12-1/2"
QTY.
14-3/8"
DISCRIPTION
14' - 0"
EQUIPMENT SCHEDULE ITEM
DRY STORAGE E 77 SF
BLUESTONE LANE COFFEE
2' DIA. W.H.
8100 W 3RD ST LOS ANGELES, CA 90048
002
6' - 10"
Drawing Title
14' - 10 1/4" 9 A4.50
PROPOSED FLOOR PLAN
2 A2.20
10' - 0" SETBACK FRONT
Scale Date Project No. North
1/4" = 1'-0" 04/16/18 00062.04 Drawing No.
Drawn By Checked By
HL/AF
A1.10
WOMEN'S WC F
F-1 SINK-1
CG-1 CM-2
TAP-1
DesignerIC
POS
SERVICE CORRIDOR H
LM-1
WD-1
DISH WASH STATION D
OPEN TO BEYOND
UCR
LM-1
KITCHEN C
Level 1 0' - 0"
A5.10
3
OVEN
F-3 SINK-3
Bluestone Lane 259 W. 10th Street, Apt. 1C, New York, NY 10014 Tel 917.213.1357
IM
Electric Bowery Ltd. 720 Hampton Drive, Venice, CA 90291 Tel 310.439.1771
Electric Bowery Ltd. URC-1 720 Hampton Drive, Venice, CA 90291 Tel 310.439.1771
UCR-1
INTERIOR ELEVATION ENTRY LEVEL 1/4" = 1'-0"
A5.20
0' - 6" GROUND LEVEL 0' - 0"
Client
90291 Tel 310.439.1771 Client
SSU
Contractor
DO NOT SCALE DRAWINGS. THE CONTRACTOR SHALL CH AND VERIFY ALL DIMENSIONS AND REPORT ANY DISCRE BEFORE PROCEEDING WITH THE WORKS.
Architect UCR-2
3
Contractor
1' -
CG-2
DO NOT SCALE DRAWINGS. THE CONTRACTOR SHALL C AND VERIFY ALL DIMENSIONS AND REPORT ANY DISCRE BEFORE PROCEEDING WITH THE WORKS.
Level 1 0' - 0"
URF
EXISTING BRICK WALL, PATCH & REPAIR AS REQUIRED
L14
L14
Bluestone Lane 259 W. 10th Street, Apt. 1C, New York, NY 10014HOOK FOR L4 ELECTRICAL CORD Tel 917.213.1357 PENDANTS SUSPENDED ABOVE CANOPY, SEE LIGHTING SCHEDULE, VERIFY LOCATION IN FIELD
EQ
MAX C.L. LEVEL 21' - 0"
Engineer
DROPPED ACRYLIC CANOPY TO PROVIDE SCRUBBABLE SURFACE 9' EQ
Tuscher Engineering Group. Inc. EQ 5318 E.4"Second Street #539, Long Beach, CA 90803 3/ Tel '310.613.9980 - 11
- 7"
NEW DUCT,SEE MEP DRAWINGS ACRYLIC PANELS TO PROVIDE SCRUBBABLE SURFACE
3 A3.00
SECTION
PL-1
EQ
A4.20
COUNTER
BANK OF BENCH SEATING
L12
BUILT-IN PLANTER BOX
3' - 0"
1' - 6"
2
A5.10
8 MAIN DINING
10"
No.
Revisions
INTERIOR ELEVATION
TL-3
Copyright Note
3' - 6"
6' - 0"
WD-1
Level 1 0' - 0"
Stamp
3' - 6"
2"
SIM
3' - 0"
3' - 0"
L8
3' - 4"
11 A5.20
WD-1
3' - 2"
A3.00
A5.20
PL-1
TL-1
MIN C.L LEVEL 9' - 0" 4' - 0"
24 11/16"
24 11/16"
3
4
24"
24"
Date
Electric Bowery Ltd. Retains Design Copyright over Design Drawings & Specifications.
Level 1 0' - 0"
Project Title
180 SOUTH LA BREA A LOS ANGELES, CA 900
By
1/4" = 1'-0"
A
Copyright Note
ENTRY LEVEL 0' - 6" GROUND LEVEL 0' - 0"
2' - 2"
IN,
9
A4.20
BAR B
A4.20
3' - 8"
ACRYLIC + STEEL BACKSPLASH
A5.20
4
4
2
PL-1
Stamp
A3.00
A4.20
1/2" = 1'-0"
Drawing Title
GROUND LEVEL DETAILS Electric Bowery Ltd. Retains Design Copyright over Design Drawings & Specifications. 0' - 0"
12 BARACRYLIC ELEVATION 11 AXONOMETRIC-DROPPED + STEEL SOFFIT OVER BAR
BOTTOM OF THE TRUSS BEAM 14' - 0"
Project Title
N.T.S. 01.23.18
Scale Date
Drawn By Checked By
AA CL
180 SOUTH LA BREA A 00062.01 LOS ANGELES, CA 900 Project No. North
Drawing No.
A5.20
BOTTOM OF THE TRUSS BEAM 14' - 0" Drawing Title
A5.20
SECTION 1/4" = 1'-0"
MIN C.L LEVEL 9' - 0"
MIN C.L LEVEL 9' - 0"
INTERIOR ELEVATION
BRK
12
4' - 0"
CM-1
Scale
A4.20 ADD DOOR PANELS TO EXISTING STOREFRONT
Copyright Note 3' - 0"
ST-2
2 14-3/8"
E GUARD 16-3/8"
9-3/4"
L3
Level 1 0' - 0"
A3.00
12-1/2"
L8
7
A5.10
L8
INTERIOR Project ELEVATION
Level 1 0' - 0"
Title 1/4" = 1'-0"
Project No. North
1/4" = 1'-0" 01.23.18 00062.01
Drawn By Checked By
AA CL
Drawing No.
A5.10
BLUESTONE LANE COFFEE
3' - 6"
L9 L5
WC CORRIDOR K
Electric Bowery Ltd. Retains Design Copyright over Design Drawings & Specifications.
10"
Date
8100 W 3RD ST LOS ANGELES, CA 90048
MAIN DINING A
ENTRY LEVEL 0' - 6" GROUND LEVEL 0' - 0"
A4.20
ENLARGED KEY PLAN 1/2" = 1'-0" 1 A3.00
SECTION
BUILDING SECTIONS
1/4" = 1'-0" 04/16/18 Project 00062.04 No. Scale Date
North
1/4" = 1'-0"
Drawing No.
Drawn By Checked By
HL
A3.00BAR 11
A4.20 ' - 0"
13
Drawing Title
3' - 0"
CG-2
SUSPENDED ACRYLIC + STEEL SOFFIT GRID
MAX C.L. LEVEL 21' - 0"
1
2' - 0"
D
D
Stamp
FRP-1
1
Issues / Revisions
Issues / Revisions
BOTTOM OF THE TRUSS BEAM 14' - 0"
MIN C.L LEVEL 9' - 0"
UNDERCOUNTER FREEZ .UNDERCOUNTER REF. TRUE TUC-24F-HC TRUE TUC-24F-HC
L8
No.
No.
EQ
DO NOT SCALE DRAWINGS. THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND REPORT ANY DISCREPANCIES BEFORE EQ PROCEEDING WITH THE WORKS.
BOTTOM OF THE TRUSS BEAM 14' - 0"
1/4" = 1'-0"
EQ
17
AXON
7 A5.20
SI
PROJECT 05
Atlanta Culinary Art School Atlanta, GA
Student Work Southern Polytechnic State University Spring 2012 INTENT ACAS (Atlanta Cuisine Art School) is a proposed project located in Midtown Atlanta. The building forms surrounding are rectangular blocks with courtyards inside. The contexts should be followed during the design but integrating and reflecting the project’s unique and innovative spirit. It also has another role to be a community node to provide a place for community activities, like kids gardening class and public cooking learning lecture. CONCEPT The concept of design comes from a dinner. I was eating Spaghetti with a fork. While I twirling fork, I just got the inspiration from the motion. Imagining the three cores as the fork tines. The circulation just like Spaghetti noodles. To develop my initial idea, I made three circulation prototypes and three evolutions. Different spaces can influence human on psychological. In this design, the function of this building is teaching and learning. Exploring different spaces to find the best way for different activities in the school is very important. While traveling through different spaces, vision is also changing, which helping people to get abundant experiences.
s eating inspira-
tion just I made
student/faculty circulation
+
+
+
+
+
+
+
+
[FLOOR R PLAN] A
B A
01
0 4 04
5 05
A
+
+
+
hanging ga
public circulation
06
02 0 2
+
A
0 7 07
03 0 3
B
FORM EVOLUTION N
0 5 10 20
llow this
40
60
25
10 FEET
ded the m.
ograms hlighted. ral.
rams to
SITE
overall e.
PROGRAM EVOLUTION
lly.
ing and way for
+
+
+
+
+
=
=
=
=
=
re also nces.
SPACE EVOLUTION
s
SEC
ardens
A
vertical circulation
social spaces
C
D
SCENE C 01 lobby 02 court yar 03 bake shop 04 administrative office 05 equipment room 06 receiving area 07 trash area 08 lecture hall 09 restroom 10 pastry kitchen 11 teaching kitchen (American) 12 teaching kitchen (Italian)
04
01
13 teaching kitchen (Mexican) 14 teaching kitchen (France) 15 library 16 class room 17 demonstration laboratory 18 teaching kitchen (Thai) 19 teaching kitchen (Japanese) 20 restaurant kitchen 21 wine room 22 restaurant 23 hanging garden 01
05
06
10
B
18
SCENE E
E
19
23
5
16
11
20
16 15
08
15
8 13
09
23
D
9
21
9
C
+17 FT
22 14
23
23
+30 FT
08 07
06
E
SCENE D
12 11
B
10
12
10 11
09
11
9
+43 FT
23
+56 FT
15
12 13
17
14
14
17
17
13
18 09
19
20
21
22
09
09
UNFOLDED PLAN (INTERIOR) 08
08
15
15 16
16
00
CTION A
UNFOLDED PLAN (EXTERIOR)
26
SECTION B
PROJECT 06
Hyperloop Hyper Media Los Angeles, CA
Student Work University of California, Los Angeles Fall 2014 - Spring 2015 PROTOTYPE Hyperloop, a new type of transportation system, which should act as a media connecting other transportation systems and activate the opportunities of urba development. In our scheme, Los Angeles station is an inter-station between Las Vegas and San Diego. The Sprial machine counts the time accuratly and provided non-stop experience to all the passengers. STEPS The design of the Hyperloop station design involves considering the design of the capsule. Step 1 - Choosing how one would enter the capsule. We chose cartridge. Step 2 - We engineered a new spiral mechanism that would be able to dispatch capsules and cartridges in and out fluidly. Step 3 - Having modular platforms to provide easy access for dropoff and pickup. Step 4 - We thought of introducing a first class capsules for the business man, or any VIP guest. Thus the seating being more private, spacious, comfort, and entertainment.
01
02
03
04
05
06
07
08
01-03. The CNC mill process. 4. Variations of the ring sizes at 7, 8 and 9 feet. 5. Assembling the frame for the moduleĂs base. 6. Fitting the moduleĂs base onto the frame.
7. Bolting the rib pieces onto the first moduleĂs base. 8. Placing the cross pieces that connect the three rings.
HYPERLOOP FULL SCALE MOCK UP
09
10
11
12
13
9. Completion of the first module on December 5th, 2014. 10. The top part for the next two modules was per-assembled. 11-13. The three modules were completed on December 15th, 2014.
CAPSULE MOCK UP First time designed and led a team built up three modules of hyperloop full scale mock up. It was a big challenge to us to have the things ready for use from a scratch in a very limited time.