Hao Zhuang Portfolio 2019- 2021

Page 1

PORTFOLIO 2019 - 2021 Hao Zhuang


Experience Hotel Le Récit

University of Melbourne, Australia 2019 - current Master of Architecture

Living Peace Centre OLI Architecture, Shanghai Office, China 2017 - 2018 Site Architect Cosmopolis #1.5 Exhibition Collaboration with Centre Pompidou, Chendu, China

Architectural Assistant

Gimme Sheltte

Shangyu Porcelain Culture Village, Shangyu, China Yongjia Shiweiyan Culture Center, Yongjia, China DingFeng Sauce Factory MasterPlan, Shanghai, China Taohuawu Woodblock Museum Competition, Suzhou, China

Newcastle University, UK 2014 - 2017

Stairway to Heaven

Bachelor of Architecture

School of in-between


Site Analysis

Hotel Le Récit Hotel Le Recit is a project located at 600 Collings Street in Melbourne CBD. the proposed design is a 5-star hotel with 500 keys 27 storey high building. The design brief include building design as well as hotel room interior design. The design features a unique theme which can be seen from façade, floorplan and even inside hotel room.

54% 20-29 years old

41.9% Bachelor degree or above

85.7% born oversea (24.9% China)

74.1% never married

45.2% no religion

30.8% speak Mandarin

Melbourne CBD

Shop & Attraction

Transportation

Restaurant

Hotel & Airbnb

Wind

Daylight

Population: 37,321 Median: age:26 Median weekly incomes: $434


Street View Distance

Street View Close


Main Entrance

Concierge


Floor plan & Section

Section & Axonometric


Hotel Room Interior

Living Room

Bedroom

Bathroom Corridor

Bedroom 500mm

1000mm

2000mm

Living Room

Bathroom


Living Memorial The aim of this thesis is to incorporate the healing power and regenerative capacity of nature into architecture to rebuild the humannature connection, creating a place that offers recovery from conflict, appreciation of nature and reflection of peace. This project will integrate the architectural programs with natural elements to offers a contrasting interpretation of nature compared to the Shrine landscape as the materialisation of peace, to convert the site into a living peacekeeping centre that explore the possibility of both spontaneous exploration and participation, producing a spatial-temporal experience choreographed through the landscape elements.


Design Development

Site Plan


Cafe

Amphitheatre


Greenhouse

Greenhouse

Library


Greenhouse Short Section

Greenhouse Long Section

Cafe Section

Library Section

Detail Section

Axon


Site & Brief

Gimme Shelter Gimme Shelter project requires to design a temporary canopy structure over the concrete square between the MSD building and the Union House inside the University of Melbourne campus to host a music festival. The design needs to create a covered space for performance and bar area while allowing access from various points.

Accesses

The design needs to be a attraction on its own as part of marketing strategy and will be designed and detail parametrically as an demonstration of digital fabrication. In my design solution, I will be using grasshopper and other plug-ins to generate a dome-like structure with weaved pattern.

Union Square

Movement


Design Development

NGon

Kangaroo

Ivy

OpenNest

Base mesh

Form finding + Remesh

Weave pattern + Unroll

Shop drawings

Galapagos Structure optimization

Karamba Structural analysis

Pseudocode

Grasshopper Definition

Workflow


Rendering

Outside View

Inside View

Aerial View

Side View


Construction

Initial Displacement at 1.0032 cm

Displacement Minimized to 0.2249 cm

Structural Optimisation

Click Here for the virtual Space Laser Cutting

Strip

Assemble

Layers


Site & Brief

Stairway to Heaven Redmond Barry Building The Redmond Barry Building is the Faculty of Medicine, Dentistry and Health Sciences, located at the Elgin Street, next to MSD. This project requires to design a staircase extension on the west side of the building and enclose it. The buildings is 11 story high with 3 sets of floor height, therefore, it is a large scale structure. The staircase will be located in an alley between the Redmond Barry building and the Baldwin Spender building, the access to the pathway needed to be maintained with the proposed staircase, so the new construction will not occupy the entire alleyway.

Baldwin Spencer Building


Grasshopper Definition

Workflow

Staircase

Columns

Main Facade

Beams

Staircase

Parameters

Frameworks

Daylight Analysis

Construction Detail

Landings

Columns

Side Facade Facade

Side Wall


Rendering

Facade

Ground View

Interior View

Section


Construction Detail

Daylight Analysis & Optimisation

Daylight Analysis & Optimisation

Click Here for the virtual Space


School of in-between School of in-between is a unique project .This project is to design a primary school located inside the UN buffer zone in Nicosia, Cyprus, which separated the Turkish and Greek side of the country since the 1974 war. This project propose a primary school inside the no-man zone offering a common space between the next generations of both people as a symbol of reconciliation and peace.


Exterior Space

Class Room


Book Tunnel

Library


South Elevation

North Elevation


Axon

Model


MORE PROJECTS VISIT www.howardzhuang.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.