DRAWING SCHEDULE:
SheetNo: Drawing: Rev: RevisionDate:
A000 Cover B 13/5/24
A101 SitePlan B 13/5/24
A102 DemolitionSitePlan B 13/5/24
A103 Set-outSitePlan B 13/5/24
A201 FloorPlan-Type1-Units1-4 B 13/5/24
A202 FloorPlan-Type2-Units5-6&10 B 13/5/24
A203 FloorPlan-Type3-Units7-9 B 13/5/24
A204 FloorPlan-Type4-Units11-12 B 13/5/24
A205 FloorPlan-Type5-Units13-14 B 13/5/24
A206 FloorPlan-Type6-Units15-17 B 13/5/24
A207 RCP&ElecPlans-Type1-Units1-4 B 13/5/24
A208 RCP&ElecPlans-Type2-Units5-6&10 B 13/5/24
A209 RCP&ElecPlans-Type3-Units7-9 B 13/5/24
A210 RCP&ElecPlans-Type4-Units11-12 B 13/5/24
A211 RCP&ElecPlans-Type5-Units13-14
B 13/5/24
A212 RCP&ElecPlans-Type6-Units15-17 B 13/5/24
A301 Elevations-Type1-Units1-4 B 13/5/24
A302 Elevations-Type2-Units5-6
A303 Elevations-Type3-Units7-9
A304 Elevations-Type4-Units10-12
A305 Elevations-Type5-Units13-14
B 13/5/24
B 13/5/24
B 13/5/24
B 13/5/24
A306 Elevations-Type6-Units15-17 B 13/5/24
A401 TypicalBathroomElevations-Sheet1
A501 TypicalSections-Sheet1
A502 TypicalSections-Sheet2
A503 TypicalSections-Sheet3
A601 TypicalDetails-Sheet1
A602 TypicalDetails-Sheet2
B 13/5/24
B 13/5/24
B 13/5/24
B 13/5/24
B 13/5/24
B 13/5/24
A901 Schedules B 13/5/24
A902 GeneralNotes
13/5/24
LOCATION PLAN
B
BRICK&CASTLE ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 Cover 8-10PetcheyStreet Brick&Castle DD A0001:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B P ET C H EY ST R E ET KING STREET
PetcheyStreetDevelopment 8-10PetcheyStreet
N O R T H 8-10PETCHEYSTREET BELLERIVETAS7018
2.ALLVEGETATIONOUTSIDETHEBUILDINGENVELOPEWILLBE RETAINED
SEDIMENT CONTROL FENCE NOTES
CONSTRUCTSEDIMENTFENCEASCLOSEASPOSSIBLE TOPARALLELTOTHECONTOURSOFTHESITE
2 DRIVE1.5MLONGSTARPICKETSINTOGROUND@MAX3.0M SPACINGS
3 DIGA150MMDEEPTRENCHALONGTHEUPSLOPELINEOFTHE FENCEFORTHEBOTTOMOFTHEFABRICTOBEENTRENCHED
4 BACKFILLTRENCHOVERBASEOFFABRIC
5 FIXSELF-SUPPORTINGGEOTEXTILETOUPSLOPESIDEOFPOSTS WITHWIRETIESORASRECOMMENDEDBYGEOTEXTILE MANUFACTURER
6 JOINSECTIONSOFFABRICATASUPPORTPOSTWITH150MM OVERLAP
SEDIMENT RETENTION NOTES
FLOWSHOULDBEDIVERTEDAROUNDTHEWORKSITEWHERE POSSIBLE (B) ALLDRAINAGEEROSIONANDSEDIMENTCONTROLSTOBE INSTALLEDANDBEOPERATIONALBEFORECOMMENCING
EROSIONISCONTROLLEDAND70%PERMANENTSOIL COVERAGEISOBTAINEDOVERALLUPSTREAMDISTURBED LAND
(E).INAREASWHERERUNOFFTURBIDITYISTOBECONTROLLED EXPOSEDSURFACESTOBEEITHERMULCHEDCOVEREDWITH EROSIONCONTROLBLANKETSORTURFEDIFEARTHWORKS AREEXPECTEDTOBEDELAYEDFORMORETHAN14DAYS
(F) STRAWBALESEDIMENTTRAPSAREASECONDARYOPTION WHICHGENERALLYSHOULDNOTBEUSEDIFOTHEROPTIONS AREAVAILABLE
2 SEDIMENTFENCE:
(A) NOTTOBELOCATEDINAREASOFCONCENTRATEDFLOW
(B) NORMALLYLOCATEDALONGTHECONTOURWITHA MAXIMUMCATCHMENTAREA0.6HAPER100MLENGTHOF FENCE
(C) WOVENFABRICSAREPREFERREDNON-WOVENFABRICSMAY BEUSEDONSMALLWORKSITESI.E.OPERATIONALPERIOD LESSTHAN6MONTHSORONSITESWHERESIGNIFICANT SEDIMENTRUNOFFISNOTEXPECTED
(D) WHEREFENCESNEEDTOBELOCATEDACROSSTHECONTOUR THELAYOUTSHALLCONFORMTO'TYPICALLAYOUTACROSS GRADE'
(E) FENCESAREREQUIRED2MMINFROMTOEOFCUTORFILL BATTERSWHERENOTPRACTICALONEFENCECANBEATTHE TOEWITHASECONDFENCE1MMINAWAYFENCESHOULD NOTBELOCATEDPARALLELWITHTOEIFCONCENTRATIONOF FLOWWILLOCCURBEHINDTHEFENCE
3 TEMPCONSTRUCTIONENTRY/EXITSEDIMENTTRAP (A).ADJACENTSTORMWATERRUNOFFTOBEDIVERTEDAWAY FROMENTRY/EXIT (B) WHEEL-WASHORSPRAYUNITMAYBEREQUIREDDURING WETWEATHER
4.SAFETYISSUESMUSTBECONSIDEREDATALLTIMES INCORPORATETRAFFICCONTROLDEVICESTOTHE SATISFACTIONOFTHESUPERINTENDENT
5.ALLDIMENSIONSINMILLIMETRESUNLESSINDICATED OTHERWISE
N O R T H ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 SitePlan 8-10PetcheyStreet Brick&Castle DD A101 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW 19 19 18 18 18 18 18 19 19 20 20 21 21 21 22 22 23 20 20 20 .VStormwatermanhole in20.74Lid.Vout20.51 21.29 .VStormwatermanhole in23.02Lid.Vout22.56 23.57 Powerpole Petchey Street Nailinkerb Petchey Street RBMNailinbitumen .L19.43A.H.D LidSewerI.O 19.08 Nail 24Ridge .08 Gutter25.60 Gutter26.38Ridge27.88 Gutter26.42 Gutter24.52 Ridge26.62 Gutter22.07 Ridge23.54 House House House House House House House House Commpit Commpit Comm pit Waterconnection 22Ridge .81 Building Palingfence Palingfence Metalfence Paling fence Palingfence Palingfence Palingfence Palingfence Palingfence Palingfence Gutter20.41 Gutter20.41 .VGratedpit in17.97.Vout17.90 .VStormwatermanhole in(sw)18.07.VI.Vin(se)18.09 out18.05Lid18.94 .VStormwatermanhole in(sw)20.38.V.Vin(se)20.23 out19.67Lid21.33 .VSewermanhole in(s)17.61.V.Vin(w)17.89 out17.58Lid19.54 valveWater Bitumen Bitumen Bitumen Bitumen Bitumen Bitumen Bitumen Bitumen Bitumen Bitumen Bitumen Concrete Stonepath Nailinwall18.06 Nailinkerb20.98 Picket fence Picket fence Stormwaterpipe150mm Stormwaterpipe150mm Stormwaterpipe 150mm Stormwaterpipe 150mm Sewerpipe 100mm Sewerpipe150mm Power pole 21.17 23.43 17.76 Rivetinwall17.55 18.56 18.49 C B A D Rivetinwall17.45 18.37 18.40 18.37 18.44 18.46 18.47 18.48 18.48 18.43 18.05 17.68 17.27 17.03 17.47 17.89 18.21 17.90 16.88 17.28 17.34 FL17.76 FL17.78 .VSewermanhole in15.95Lid.Vout15.87 16.96 Sewerpipe 150mm Shed Shed Carport Artificialturf Concrete Deck IStormwatermanhole .V.Vin(sw)18.95 in(se)18.95Lid.Vout18.63 19.87 18.83 19.05 19.71 20.49 21.11 21.34 21.71 22.30 23.21 23.14 21.37 21.13 21.08 20.93 20.45 Nail18.89 Gutter22.20 Nail21.60 Gutter26.10 Gutter27.58 Ridge28.35 Ridge22.31 Gutter21.09 Ridge22.17 22.62 22.51 Gutter20.97 Nail21.12 Nail21.63 Nail19.24 17.23 18.69 18.28 17.98 17.72 17.45 17.70 17.55 Walltop21.23 Gutter21.31 Ridge22.01 Ridge21.50 Gutter20.99 17.27 16.46 16.92 Stormwateroutlet16.91 17.16 17.25 17.03 16.76 17.43 17.64 17.67 17.58 17.52 17.44 17.36 17.28 17.19 17.30 Stomwateroutlet17.15 17.28 17.33 Stormwateroutlet17.25 Stormwateroutlet17.34 17.44 17.52 17.61 17.89 17.90 17.85 17.75 17.73 17.89 18.16 FL18.33(doorstep) 17.85 17.66 17.62 17.52 17.48 17.51 17.69 17.7817.75 17.67 17.5617.54 FL18.35(doorstep) Gutter 22.18 Ridge25.11 Rivet17.52 18.18 18.15 18.44 18.43 Brickwall Topofwall 23.25 Wall top22.02 0 3 6 15 30 METRES centimetreonthisdrawingrepresents3metreontheground(i.e1:300) AREAOFGROUNDDISTURBANCE =±220SQM(SHOWNSHADED) GENERAL: (A).TEMPORARYDRAINAGECONTROL
(C)
(D)
UP-SLOPEEARTHWORKS
ALLCONTROLMEASURESTOBEINSPECTEDATLEASTWEEKLY ANDAFTERSIGNIFICANTRUNOFFPRODUCINGSTORMS
CONTROLMEASURESMAYBEREMOVEDWHENON-SITE
SOIL & WATER MANAGEMENT NOTES
.ALLRUNOFF&SEDIMENTCONTROLSTRUCTURESWILLBE INSPECTEDEACHWORKINGDAY&MAINTAINEDINAFUNCTIONAL CONDITION
SEDIMENT FENCE - ELEVATION (N.T.S) GEOTEXTILEFABRIC POSTSorSTEELPICKETSDRIVEN 600mmINTOGROUND 100mmMinVERTICALOVERLAPOFFABRIC UND STURBED AREA BACKFILL D STURBED AREA 3000Max 6000 Max. 200 Directionofflow
existingwaterservicestobe cappedandterminatedto TasWaterapproval
existingauroraservicestobe terminatedtoAurorasapproval
existingtelstrapitterminate redundantconnectionto Teltraapproval
allexistingfrontfencestobe removedbuildertoerectbuilders hoarding/fencingtoperimetreof site
allexistingbuildingsshowndotted tobedemolishedallslabstobe brokenupandremovedterminate andremoveallredundantservices
existingtelstrapit,terminate redundantconnectionto Teltraapproval
existingcrossovertoremain duringdemolitionandutilised assiteassessduringdemolition
existingstormwateroutlet tokerbabdchanneltobe removed
existingkerb&gutter showndottedtobe removed
buildertoremoveexistingfence& postremoveallfootingsandmake goodtogroundlevelsaccoridianly buildertobenewtemporaryfence onboundarylineasnoted
allexistingsewerlinestobe locatedonsiteandmarked buildertoensureallpipesare protectedduringdemolition works
existingconcretesteps retainingwalls,footingand gardenbedstobebroken upandremoved
allexistingstormwaterlinesto belocatedonsiteandmarked buildertoensureallpipesare protectedduringdemolition worksreferengineersdrawings forallnewStormwater&Sewer servicesalterations
generallyallexistingbitumen hardstandsfootingsand groundfeaturestobebroken upandremoved oncedemolitionhasbeen completedvacantsiteto begradedforfutureworks
THISDRAWINGHASBEENCONSTRUCTEDUSING SURVEYINFORMATIONBYOTHERS-FILENo4848
WALL LEGEND
DESCRIPTION MARK
EXISTINGWALLSTOBERETAINED
EXISTINGWALLSTOBEDEMOLISHED.
EXISTINGFIREHOSEREEL(FHR) ex.FHR
EXISTINGWALLMOUNTEDFIREEXTINGUISHER ex.FE 20.123 EXISTINGSPOTLEVEL.
GENERALLYDEMOLITIONWORKSMUSTBECARRIEDOUTIN ACCORDANCEWITHAS2601-2001:DEMOLITIONOFSTRUCTURES& REGULATIONS4546&47OFTHEBUILDINGREGULATIONS(Tas.)2016
PROCEDURES&METHODSOFDEMOLITIONMUSTBEADEQUATETO PREVENTINJURYTOPERSONS&AVOIDDAMAGETONEIGHBORING PROPERTIES
ALLDEMOLISHEDMATERIALSRUBBISH&DEBRISSHALLBEREMOVED FROMTHESITEONCOMPLETIONOFDEMOLITION
existinggratedpittoremain provideprotectionatalltime duringdemolition
existingstormwaterservicetobe locatedcappedandterminated tocouncilapproval
BEFOREREMOVINGEXISTINGWALLSSHOWNTOBEDEMOLISHED BUILDERSHALLCONFIRMON-SITEWHETHERTHEYARELOADBEARING/ BRACINGORNOT
IFITISFOUNDTHATTHEYARELOADBEARING/BRACINGASTRUCTURAL ENGINEERMUSTBEENGAGEDTODETERMINEANYBEAMSREQUIREDTO SUPPORTTHESEEXISTINGLOADS
ALLREDUNDANTSTORMWATERSEWERANDWATERCONNECTIONS ASSOCIATEDWITHTHEDEMOLITIONSHALLBECUT&SEALEDTOTHE SATISFACTIONOFCOUNCIL'SSENIORPLUMBINGINSPECTOR
THEREMOVALOFEXISTINGPLUMBINGFIXTURESSHALLINCLUDEALL ASSOCIATEDWASTE&VENTPIPESFLOORDRAINSWATERSERVICE PIPEWORKBRACKETSSUPPORTSetc&SEALOFFEXISTINGSERVICES SEALOFF&MAKEGOODALLFLOOR,WALL&ROOFPENETRATIONS GENERALLYMAKEGOODTOEXISTINGFLOORSWALLS&CEILINGS WHEREALLDEMOLITIONWORKOCCURSTOMATCHEXISTINGAS& WHEREREQUIRED
ASBESTOS NOTES IMPORTANT:
IFNOTINPLACEATHOROUGHINSPECTIONISTOBEUNDERTAKENBYA SUITABLY'COMPETENT'PERSON&RECORDEDINDETAILINANASBESTOS REGISTER
ASBESTOSREMOVALSHALLBECARRIEDOUTBYQUALIFIEDPERSONNEL ONLYINACCORDANCEWITHRELEVANTSTANDARDS/CODESOF PRACTICE(PREFERABLY'CLASSA'ASBESTOSREMOVALLICENCE HOLDERSONLY)WITHATHOROUGH'ASBESTOSMANAGEMENTPLAN'IN PLACE
FURTHERMOREIFMORETHAN10sqmOFASBESTOSISTOBEREMOVED AVISUALCLEARANCECERTIFICATEFORMNo:AR4ISTOBECOMPLETED &SUBMITTEDTOTHEBUILDINGSURVEYOR.RECORDSOFCORRECT DISPOSALARETOBESUBMITTEDTOTHEBUILDINGSURVEYORFORANY ASBESTOSREMOVED DEMOLITION NOTES
N O R T H ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 DemolitionSitePlan 8-10PetcheyStreet Brick&Castle DD A102 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW 19 19 18 18 18 18 18 19 19 20 20 21 21 21 22 22 23 20 20 20 Brickwall House Building Building Brick wall IGratedpit18.Vout .88 19FL.48 ep)(doorst Bitumen Bitumen Concrete Concrete Concrete Concrete Palingfence Palingfence Palingfence 9119 20.55 20.65 2020.55 .57 19.58 19.60 20.21 FL19.58(doorstep) FFL19.42(doorstep) Stormwater pipe 230mm S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S
property boundary propertyboundary property boundary property boundary propertyboundary
boundary-25.23m boundary-27.06m boundary19.63m boundary-19.63m boundary-45.03m 0 3 6 15 30 METRES centimetreonthisdrawingrepresents3metreontheground(i.e1:300)
IDENTIFYASBESTOSORASBESTOSCONTAININGMATERIALS(ACM'S)AT THESITE IFINPLACEREFERTOTHEASBESTOSREGISTERFORDETAILS.
N O R T H ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 Set-outSitePlan 8-10PetcheyStreet Brick&Castle DD A103 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B 0 3 6 15 30 METRES centimetreonthisdrawingrepresents3metreontheground(i.e1:300) SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW 19 19 18 18 18 18 18 19 19 20 20 21 21 21 22 22 23 20 20 20 .VStormwatermanhole in20.74Lid.Vout20.51 21.29 .VStormwatermanhole in23.02Lid.Vout22.56 23.57 Powerpole Petchey Street Nailinkerb Petchey Street RBMNailinbitumen .L19.43A.H.D LidSewerI.O 19.08 Nail 24Ridge .08 Gutter25.60 Gutter26.38Ridge27.88 Gutter26.42 Gutter24.52 Ridge26.62 Gutter22.07 Ridge23.54 House House House House House House House House Commpit Commpit Comm pit Waterconnection 22Ridge .81 Building Palingfence Palingfence Metalfence Paling fence Palingfence Palingfence Palingfence Palingfence Palingfence Palingfence Gutter20.41 Gutter20.41 .VGratedpit in17.97.Vout17.90 .VStormwatermanhole in(sw)18.07.VI.Vin(se)18.09 out18.05Lid18.94 .VStormwatermanhole in(sw)20.38.V.Vin(se)20.23 out19.67Lid21.33 .VSewermanhole in(s)17.61.V.Vin(w)17.89 out17.58Lid19.54 valveWater Bitumen Bitumen Bitumen Bitumen Bitumen Bitumen Bitumen Bitumen Bitumen Bitumen Bitumen Concrete Stonepath Nailinwall18.06 Nailinkerb20.98 Picket fence Picket fence Stormwaterpipe150mm Stormwaterpipe150mm Stormwaterpipe 150mm Stormwaterpipe 150mm Sewerpipe 100mm Sewerpipe150mm Power pole 21.17 23.43 17.76 Rivetinwall17.55 18.56 18.49 C B A D Rivetinwall17.45 18.37 18.40 18.37 18.44 18.46 18.47 18.48 18.48 18.43 18.05 17.68 17.27 17.03 17.47 17.89 18.21 17.90 16.88 17.28 17.34 FL17.76 FL17.78 .VSewermanhole in15.95Lid.Vout15.87 16.96 Sewerpipe 150mm Shed Shed Carport Artificialturf Concrete Deck IStormwatermanhole .V.Vin(sw)18.95 in(se)18.95Lid.Vout18.63 19.87 18.83 19.05 19.71 20.49 21.11 21.34 21.71 22.30 23.21 23.14 21.37 21.13 21.08 20.93 20.45 Nail18.89 Gutter22.20 Nail21.60 Gutter26.10 Gutter27.58 Ridge28.35 Ridge22.31 Gutter21.09 Ridge22.17 22.62 22.51 Gutter20.97 Nail21.12 Nail21.63 Nail19.24 17.23 18.69 18.28 17.98 17.72 17.45 17.70 17.55 Walltop21.23 Gutter21.31 Ridge22.01 Ridge21.50 Gutter20.99 17.27 16.46 16.92 Stormwateroutlet16.91 17.16 17.25 17.03 16.76 17.43 17.64 17.67 17.58 17.52 17.44 17.36 17.28 17.19 17.30 Stomwateroutlet17.15 17.28 17.33 Stormwateroutlet17.25 Stormwateroutlet17.34 17.44 17.52 17.61 17.89 17.90 17.85 17.75 17.73 17.89 18.16 FL18.33(doorstep) 17.85 17.66 17.62 17.52 17.48 17.51 17.69 17.7817.75 17.67 17.5617.54 FL18.35(doorstep) Gutter 22.18 Ridge25.11 Rivet17.52 18.18 18.15 18.44 18.43 Brickwall Topofwall 23.25 Wall top22.02 4815 6145 8340 2400 5310 2400 4795 1765 2550 4955 5385 5820 3680 3630 3625 3025 3030 3655 3100 5450 2700 6460 6300 6095 25450 3585 35456290 6235 6390 7945 Unit 1 FL18.75 Unit 2 FL18.75 Unit 3 FL18.75 Unit 4 FL18.75 Unit 5 FL20.00 Unit 6 FL20.00 Unit 7 FL19.80 Unit 8 FL20.30 Unit 9 FL20.68 Unit 10 FL21.20 Unit 11 FL21.70 Unit 12 FL22.20 Unit 13 FL21.84 Unit 14 FL21.34 Unit 15 FL20.84 Unit 16 FL19.85 Unit 17 FL19.85
CONTRACTORTOSPECIFYFINALTREATMENTTOEXISTINGCONCRETE FLOORSSEALANDWATERPROOFWHEREREQUIRED; WHEREPOSSIBLECONTRACTORTOUTILISEEXISTINGGLAZING ANDDOORSYSTEMSINNEWPLANCONFIGURATION
ALLEXISTINGCONDITIONSSHOWNINDICATIVELYONLYALLDIMENSIONS SHOULDBECONFIRMEDONSITEANDANYDISCREPANCIES COMMUNICATEDTOARCHITECTFORREVIEW
ALLWINDOWDIMENSIONSTOALUMINIUMTOBECONFIRMEDONSITE
ALLGLAZINGTOCOMPLYWITHAS1288&AS2047
ALLWETAREASTOBECOMPLYWITHNCCSECTIONH4D2ANDAS3740
ALLTIMBERFRAMINGTOCOMPLYWITHNCCH1D6ANDAS1684
ALLWORKSTOBEINCOMPLIANCEWITHNCCSECTIONH6ENERGY EFFICIENCY.
WINDOWLOCATIONDIMENSIONTAKENFROMEXTERNALSTUDFRAME
PART H4D9 - CONDENSATION MANAGEMENT
ALLPLIABLEBUILDINGMEMBRANESINSTALLEDINAEXTERNALWALLMUSTBEIN ACCORDANCEWITHPARTH4D9(NCC2022)&PART10.8(HOUSINGPROVISIONS 2022)AS4200.1&AS4200.2
WHEREINSTALLEDINCLIMATEZONES67&8THEPLIABLEMEMBRANEMUSTBE AVAPOURPERMEABLEMEMBRANE
PLIABLEMEMBRANESMUSTBELOCATEDONTHEEXTERIORSIDEOFTHE PRIMARYINSULATIONLAYEROFTHEWALLASSEMBLIESTHATFORMTHE EXTERNALENVELOPEOFTHEBUILDINGTOCOMPLYWITH10.8.1
ALLKITCHENBATHROOM,SANITARYCOMPARTMENTSORLAUNDRYMUSTBE INSTALLEDINACCORDANCEWITHPART10.8.2(HOUSINGPROVISIONS2022)
EXHAUSTFROMABATHROOM,SANITARYCOMPARTMENTORLAUNDRYMUSTBE DISCHARGEDVIADUCTTOOUTDOORAIRORTOROOFSPACETHATIS
VENTILATEDINACCORDANCEWITHPART10.8.2(HOUSINGPROVISIONS2022)
ALLROOFSPACESMUSTBEINACCORDANCEWITHNCCPART10.8.3(HOUSING PROVISIONS2022)
WHEREEXHAUSTFROMBATHROOM,SANITARYCOMPARTMENTSORLAUNDRY AREDISCHARGEDINTOROOFSPACETHEROOFMUSTBEVENTILATEDTO OUTDOORAIRTHROUGHEVENLYDISTRIBUTEDOPENINGS
OPENINGSMUSTHAVEATOTALUNOBSTRUCTEDAREATOSATISFYTABLE10.8.3 (HOUSINGPROVISIONS2022)
VENTILATIONOPENINGSARESPECIFIEDASAMINIMUMFREEOPENAREAPER METRELENGTHOFTHELONGESTHORIZONTALDIMENSIONOFTHEROOF FORTHEPURPOSESOFTHISTABLEHIGHLEVELOPENINGSAREOPENINGS
PROVIDEDATTHERIDGEORNOTMORETHAN900MMBELOWTHERIDGEOR HIGHESTPOINTOFTHEROOFSPACEMEASUREDVERTICALLY
ROOFSHEETING: CUSTOMORB® FINISH: COLORBONDCOLOURASSELECTED SIDELAPS: 1CLIP/2FASTNERS FIXINGTOTIMBER: M6-11X65ROOFZIPS#4-10X65T17HH
EV: 50ØEFFLUENTVENTWITHDEKTITEASREQ DP: 90ØRAINWATERDOWNPIPECOLORBONDFINISH
HALFROUNDSMOOTHLINEEXTERNALGUTTERSCOLORBONDFINISH COLOURTBC
ALLBOXGUTTERSRAINHEADSSUMPSANDOVERFLOWSTOROOF MANUFACTURESSPECIFICATIONSINACCORDANCEWITHAUSTRALIAN STANDARDS
ALLDRAINAGETOCOMPLYWITHAS/NZS3500
ENSURE60M2OFROOFAREADISPERSEDEVENLYTOEACHDP
ENSURENOMORETHAN12MOFGUTTERLENGTHFOREACHRWP
METALROOFCLADDING&FLASHINGPROVIDED&INSTALLEDINACCORDANCE WITHAS1562.1,PART3.5.1OFTHE&STRICTLYINSTALLEDACCORDINGTO PRODUCTMANUFACTURERSSPECIFICATIONS&FIXINGGUIDELINES N.B.:METALROOFSHEETING&CLADDING:(SEEALSOBCATABLE3.5.1.1A) -LESSTHAN100MFROMBREAKINGSURF:COLORBOND'MONUMENT' ALLRIDGESFASCIAS,BARGEENDSHIPENDS&ROOFPENETRATIONSMUSTBE PROPERLYFLASHED&SEALED(I.EWATERTIGHT)REFERTOARCHITECTURAL DWGSFORTYPICALSARKINGDETAILS&EXTENTOFROOFCLADDINGS TYPICALLYSHEETTRAYENDSTURNEDUP/DOWN;REFERTOARCHITECTURAL DETAILS ALLGUTTERSANDDOWNPIPESSHALLBEDESIGNED&CONSTRUCTEDIN ACCORDANCEWITHAS/NZS3500.3ORAS/NZS3500.5(DOMESTIC INSTALLATIONSSECTION5)&PART3.5.2OFTHEBCA2016REFERTO ARCHITECTURALDWGSFORTYPICALGUTTER&FASCIADETAILS
ALLROOF/WALLJUNCTIONSMUSTBEFULLYSEALEDREFERTO ARCHITECTURALDETAILSALLROOFSHEETINGCAPPINGS&FLASHINGSARETO BE'COLORBOND'
PRECASTCONCRETEEXTERNALPANELTOENGINEERS SPECIFICATIONANDDETAILS,20mmSHAFTLINER90x45 TIMBERSTUDWORKR2.5HDWALLINSULATIONBATT 10MMFLUSHPLASTERBOARDLINING
CEMENTSHEETEXTERNALCLADDING70x35CAVITY BATTENS,18mmCAVIBATTSYSTEMINSTALLEDTO MANUFACTURERSSPECIFICATIONS90x45TIMBER STUDWORKR2.5HDWALLINSULATIONBATT10MMFLUSH PLASTERBOARDLINING
20mmSHAFTLINERTOFACEOFSHAREDPRECASTPANEL 90x45TIMBERSTUDWORKR2.5HDWALLINSULATION BATT10MMFLUSHPLASTERBOARDLINING
90x45TIMBERSTUDWORK,R2.5HDWALLINSULATION BATT10MMFLUSHPLASTERBOARDLININGTOBOTHSIDE, BUILDERTOALLOWFORMOISTURERESISTANT PLASTERBOARDINALLWETAREAS
ANYWORKORSHOPDRAWINGS
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 FloorPlan-Type1-Units1-4 8-10PetcheyStreet Brick&Castle DD A201 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B 900 12000 62 cladding 11696 90 1100 1100 3900 1001100 1780 120 90 4745 living 1250 1650 laundry 20 1220 powder 90 LIVING tf KITCHEN tf DINING tf PWD ct LNDY ct 8100 1000 100 800 1960 1235 90 3455 1081 90 DECK tf 12000 900 900 8100 4900 1980 2200 6500 3000 1200 90 2398 90 90 1250 90 1058 1400 90 100 16 @ 187 .5R x 250G UP W1.1 1800 2700 D1.2 3025 2700 W1.2 1100 2700 W1 .3 W1.4 925 2700 62 cladding 90 120 170cladding 90 D1.1 900 2700 900 90 62 cladding 90 62 cladding 62 cladding 6346 62 cladding 62 cladding 90 90 90 62cladding 62cladding 170cladding 4165 stair setout FALL 1° 12000 5250 1100 840 CORR tf BATH ct ENS ct 5100 1050 800 1050 4688 bed3 BED1 ca 13000 1000 900 5100 600 3910 1500 5250 1000 2548 3138 2420 3548 BED2 ca BED3 ca 2800 600 162 3686 1968 127090 901270 300 800 300 800 900 300 900 300 900 5790 3548 90 90 2420 3320 3138 90 2630 90 16 @ 187 .5R x 250G DN W1.5 W1 .6 W1 .7 W1 .8 W1.9 800 1800 W1.10 800X1800 W1.11 800 1800 820 720 720 820 820 W1 .12 170cladding90 90 62cladding 90 62 cladding 90 62cladding 90 170cladding 90 62cladding 90 62cladding 90 170cladding 90 62 cladding 90 62 cladding 90 62 cladding 90 62 cladding 90 62 cladding 3320 90 90 90 90 3138 90 5830 4165 stair setout 3900 stair opening 0 12 5 METRES centimetreonthisdrawingrepresents metreontheground(i.e1:100) FALL 15° FALL 15° LYSAGHT®CUSTOMORB0.48BMT roofing,installedtomanufacturer's specifications,COLORBOND®finish TocomplyingwithAS1562.1 (TYPICAL.) rwp half round gutter min 1-500 fall rwp rwp rwp GROUND FLOOR PLAN - 61 sq.m Unit1-FL=18.750 Unit2-FL=18.750 Unit3-FL=18.750 Unit4 FL=18.750 FIRST FLOOR PLAN - 59 sq.m Unit -FL=21.750 Unit2-FL=21.750 Unit3-FL=21.750 Unit4 FL=21.750 ROOF PLAN TYPE1PLANS SETOUT NOTES ALL'EXISTING'DIMENSIONSARETOBECONFIRMEDON-SITE ANYANOMALIESARETOBEDIRECTEDTOTHEDESIGNER
WALL LEGEND
USEWRITTENDIMENSIONSONLY(ieDONOTSCALEDRAWINGS) CHECKALLLEVELSDATUM'S&DIMENSIONSBEFORECOMMENCING
ROOFING NOTES 720 720 NOTES
NOTES
CONTRACTORTOSPECIFYFINALTREATMENTTOEXISTINGCONCRETE FLOORSSEALANDWATERPROOFWHEREREQUIRED; WHEREPOSSIBLECONTRACTORTOUTILISEEXISTINGGLAZING ANDDOORSYSTEMSINNEWPLANCONFIGURATION
ALLEXISTINGCONDITIONSSHOWNINDICATIVELYONLYALLDIMENSIONS SHOULDBECONFIRMEDONSITEANDANYDISCREPANCIES COMMUNICATEDTOARCHITECTFORREVIEW
ALLWINDOWDIMENSIONSTOALUMINIUMTOBECONFIRMEDONSITE
ALLGLAZINGTOCOMPLYWITHAS1288&AS2047
ALLWETAREASTOBECOMPLYWITHNCCSECTIONH4D2ANDAS3740
ALLTIMBERFRAMINGTOCOMPLYWITHNCCH1D6ANDAS1684
ALLWORKSTOBEINCOMPLIANCEWITHNCCSECTIONH6ENERGY EFFICIENCY.
WINDOWLOCATIONDIMENSIONTAKENFROMEXTERNALSTUDFRAME
PART
ALLPLIABLEBUILDINGMEMBRANESINSTALLEDINAEXTERNALWALLMUSTBEIN ACCORDANCEWITHPARTH4D9(NCC2022)&PART10.8(HOUSINGPROVISIONS 2022)AS4200.1&AS4200.2
WHEREINSTALLEDINCLIMATEZONES67&8THEPLIABLEMEMBRANEMUSTBE AVAPOURPERMEABLEMEMBRANE
PLIABLEMEMBRANESMUSTBELOCATEDONTHEEXTERIORSIDEOFTHE PRIMARYINSULATIONLAYEROFTHEWALLASSEMBLIESTHATFORMTHE EXTERNALENVELOPEOFTHEBUILDINGTOCOMPLYWITH10.8.1
ALLKITCHENBATHROOM,SANITARYCOMPARTMENTSORLAUNDRYMUSTBE INSTALLEDINACCORDANCEWITHPART10.8.2(HOUSINGPROVISIONS2022)
EXHAUSTFROMABATHROOM,SANITARYCOMPARTMENTORLAUNDRYMUSTBE DISCHARGEDVIADUCTTOOUTDOORAIRORTOROOFSPACETHATIS
VENTILATEDINACCORDANCEWITHPART10.8.2(HOUSINGPROVISIONS2022)
ALLROOFSPACESMUSTBEINACCORDANCEWITHNCCPART10.8.3(HOUSING PROVISIONS2022)
WHEREEXHAUSTFROMBATHROOM,SANITARYCOMPARTMENTSORLAUNDRY AREDISCHARGEDINTOROOFSPACETHEROOFMUSTBEVENTILATEDTO OUTDOORAIRTHROUGHEVENLYDISTRIBUTEDOPENINGS
OPENINGSMUSTHAVEATOTALUNOBSTRUCTEDAREATOSATISFYTABLE10.8.3 (HOUSINGPROVISIONS2022)
VENTILATIONOPENINGSARESPECIFIEDASAMINIMUMFREEOPENAREAPER METRELENGTHOFTHELONGESTHORIZONTALDIMENSIONOFTHEROOF FORTHEPURPOSESOFTHISTABLEHIGHLEVELOPENINGSAREOPENINGS
PROVIDEDATTHERIDGEORNOTMORETHAN900MMBELOWTHERIDGEOR HIGHESTPOINTOFTHEROOFSPACEMEASUREDVERTICALLY
ROOFSHEETING: CUSTOMORB® FINISH: COLORBONDCOLOURASSELECTED SIDELAPS: 1CLIP/2FASTNERS FIXINGTOTIMBER: M6-11X65ROOFZIPS#4-10X65T17HH
EV: 50ØEFFLUENTVENTWITHDEKTITEASREQ DP: 90ØRAINWATERDOWNPIPECOLORBONDFINISH
HALFROUNDSMOOTHLINEEXTERNALGUTTERSCOLORBONDFINISH COLOURTBC
ALLBOXGUTTERSRAINHEADSSUMPSANDOVERFLOWSTOROOF MANUFACTURESSPECIFICATIONSINACCORDANCEWITHAUSTRALIAN STANDARDS
ALLDRAINAGETOCOMPLYWITHAS/NZS3500
ENSURE60M2OFROOFAREADISPERSEDEVENLYTOEACHDP
ENSURENOMORETHAN12MOFGUTTERLENGTHFOREACHRWP
METALROOFCLADDING&FLASHINGPROVIDED&INSTALLEDINACCORDANCE WITHAS1562.1,PART3.5.1OFTHE&STRICTLYINSTALLEDACCORDINGTO PRODUCTMANUFACTURERSSPECIFICATIONS&FIXINGGUIDELINES
N.B.:METALROOFSHEETING&CLADDING:(SEEALSOBCATABLE3.5.1.1A) -LESSTHAN100MFROMBREAKINGSURF:COLORBOND'MONUMENT'
ALLRIDGESFASCIAS,BARGEENDSHIPENDS&ROOFPENETRATIONSMUSTBE PROPERLYFLASHED&SEALED(I.EWATERTIGHT)REFERTOARCHITECTURAL DWGSFORTYPICALSARKINGDETAILS&EXTENTOFROOFCLADDINGS
TYPICALLYSHEETTRAYENDSTURNEDUP/DOWN;REFERTOARCHITECTURAL DETAILS
ALLGUTTERSANDDOWNPIPESSHALLBEDESIGNED&CONSTRUCTEDIN ACCORDANCEWITHAS/NZS3500.3ORAS/NZS3500.5(DOMESTIC INSTALLATIONSSECTION5)&PART3.5.2OFTHEBCA2016REFERTO ARCHITECTURALDWGSFORTYPICALGUTTER&FASCIADETAILS
ALLROOF/WALLJUNCTIONSMUSTBEFULLYSEALEDREFERTO ARCHITECTURALDETAILSALLROOFSHEETINGCAPPINGS&FLASHINGSARETO BE'COLORBOND'
PRECASTCONCRETEEXTERNALPANELTOENGINEERS SPECIFICATIONANDDETAILS,20mmSHAFTLINER90x45 TIMBERSTUDWORKR2.5HDWALLINSULATIONBATT 10MMFLUSHPLASTERBOARDLINING
CEMENTSHEETEXTERNALCLADDING70x35CAVITY BATTENS,18mmCAVIBATTSYSTEMINSTALLEDTO MANUFACTURERSSPECIFICATIONS90x45TIMBER STUDWORKR2.5HDWALLINSULATIONBATT10MMFLUSH PLASTERBOARDLINING
20mmSHAFTLINERTOFACEOFSHAREDPRECASTPANEL 90x45TIMBERSTUDWORKR2.5HDWALLINSULATION BATT10MMFLUSHPLASTERBOARDLINING
90x45TIMBERSTUDWORK,R2.5HDWALLINSULATION BATT10MMFLUSHPLASTERBOARDLININGTOBOTHSIDE, BUILDERTOALLOWFORMOISTURERESISTANT PLASTERBOARDINALLWETAREAS
ALL'EXISTING'DIMENSIONSARETOBECONFIRMEDON-SITE ANYANOMALIESARETOBEDIRECTEDTOTHEDESIGNER
USEWRITTENDIMENSIONSONLY(ieDONOTSCALEDRAWINGS)
CHECKALLLEVELSDATUM'S&DIMENSIONSBEFORECOMMENCING ANYWORKORSHOPDRAWINGS WALL
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 FloorPlan-Type2-Units5-6&10 8-10PetcheyStreet Brick&Castle DD A202 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B LIVING tf KITCHEN tf DINING tf PWD ct LNDY ct DECK tf 16 @ 187 .5R x 250G UP W2.1 2600 2700 D2.1 900 2700 D2.2 3575 2700 W2.4 1225X2700 W2 .3 1400 2700 W2.2 1100 2700 720 720 1000 12000 62 cladding 11696 90 1150 1150 4750 1001100 1780 120 5578 1320 1642 20 1220 powder 90 9000 1000 100 938 2600 1200 90 4388 1048 90 12000 1000 900 9000 4850 2880 2200 6500 3000 1200 90 2398 90 90 1250 90 1058 1400 90 100 62 cladding 90 120 170cladding 90 900 90 62 cladding 90 62 cladding 62 cladding 6346 62 cladding 62 cladding 90 90 90 62cladding 62cladding 162 170cladding 90 4250 stair setout 3900 stair opening FALL 1° 12000 5250 800 2778 CORR tf BATH ct ENS ct 1770 BED1 ca 12900 900 6000 1600 5000 1500 5250 11848 2247 6148 90 3120 BED2 ca BED4 ca 1200 800 2720 1868 3630 90 900 900 900 4600 4238 90 90 2820 2120 3147 90 16 @ 187 .5R x 250G DN BED3 ca 748 90 90 1770 6000 1050 800 950 300 800 300 800 1000 1868 4698 1600 90 90 300 300 W2.5 W2.6 W2.7 W2 .8 W2 .9 W2 .10 W2.11 1600 1800 W2.12 1600 1800 W2 .13 820 720 720 820 720 820 90 62cladding 90 62cladding 90 62cladding 90 170cladding 90 62cladding 90 62cladding 90 170cladding 90 170cladding 90 62 cladding 90 62 cladding 90 62 cladding 90 62 cladding 90 62 cladding 90 62 cladding 4250 stair setout 3900 stair opening GROUND FLOOR PLAN - 72 sq.m Unit5-FL=20.000 Unit6-FL=20.000 Unit10-FL=21.200 FIRST FLOOR PLAN - 70 sq.m Unit5-FL=23.000 Unit6-FL=23.000 Unit10-FL=24.200 ROOF PLAN FALL 15° FALL 15° LYSAGHT®CUSTOMORB0.48BMT roofing,installedtomanufacturer's specifications,COLORBOND®finish TocomplyingwithAS1562.1 (TYPICAL.) rwp half round gutter min 1-500 fall rwp rwp rwp TYPE2PLANS 0 12 5 METRES centimetreonthisdrawingrepresents metreontheground(i.e1:100)
ROOFING NOTES
SETOUT NOTES
LEGEND
H4D9 - CONDENSATION MANAGEMENT
NOTES
CONTRACTORTOSPECIFYFINALTREATMENTTOEXISTINGCONCRETE FLOORSSEALANDWATERPROOFWHEREREQUIRED; WHEREPOSSIBLECONTRACTORTOUTILISEEXISTINGGLAZING ANDDOORSYSTEMSINNEWPLANCONFIGURATION
ALLEXISTINGCONDITIONSSHOWNINDICATIVELYONLYALLDIMENSIONS SHOULDBECONFIRMEDONSITEANDANYDISCREPANCIES COMMUNICATEDTOARCHITECTFORREVIEW
ALLWINDOWDIMENSIONSTOALUMINIUMTOBECONFIRMEDONSITE
ALLGLAZINGTOCOMPLYWITHAS1288&AS2047
ALLWETAREASTOBECOMPLYWITHNCCSECTIONH4D2ANDAS3740
ALLTIMBERFRAMINGTOCOMPLYWITHNCCH1D6ANDAS1684
ALLWORKSTOBEINCOMPLIANCEWITHNCCSECTIONH6ENERGY EFFICIENCY.
WINDOWLOCATIONDIMENSIONTAKENFROMEXTERNALSTUDFRAME
PART H4D9 - CONDENSATION MANAGEMENT
ALLPLIABLEBUILDINGMEMBRANESINSTALLEDINAEXTERNALWALLMUSTBEIN ACCORDANCEWITHPARTH4D9(NCC2022)&PART10.8(HOUSINGPROVISIONS 2022)AS4200.1&AS4200.2
WHEREINSTALLEDINCLIMATEZONES67&8THEPLIABLEMEMBRANEMUSTBE AVAPOURPERMEABLEMEMBRANE
PLIABLEMEMBRANESMUSTBELOCATEDONTHEEXTERIORSIDEOFTHE PRIMARYINSULATIONLAYEROFTHEWALLASSEMBLIESTHATFORMTHE EXTERNALENVELOPEOFTHEBUILDINGTOCOMPLYWITH10.8.1
ALLKITCHENBATHROOM,SANITARYCOMPARTMENTSORLAUNDRYMUSTBE INSTALLEDINACCORDANCEWITHPART10.8.2(HOUSINGPROVISIONS2022)
EXHAUSTFROMABATHROOM,SANITARYCOMPARTMENTORLAUNDRYMUSTBE DISCHARGEDVIADUCTTOOUTDOORAIRORTOROOFSPACETHATIS
VENTILATEDINACCORDANCEWITHPART10.8.2(HOUSINGPROVISIONS2022)
ALLROOFSPACESMUSTBEINACCORDANCEWITHNCCPART10.8.3(HOUSING PROVISIONS2022)
WHEREEXHAUSTFROMBATHROOM,SANITARYCOMPARTMENTSORLAUNDRY AREDISCHARGEDINTOROOFSPACETHEROOFMUSTBEVENTILATEDTO OUTDOORAIRTHROUGHEVENLYDISTRIBUTEDOPENINGS
OPENINGSMUSTHAVEATOTALUNOBSTRUCTEDAREATOSATISFYTABLE10.8.3 (HOUSINGPROVISIONS2022)
VENTILATIONOPENINGSARESPECIFIEDASAMINIMUMFREEOPENAREAPER METRELENGTHOFTHELONGESTHORIZONTALDIMENSIONOFTHEROOF
FORTHEPURPOSESOFTHISTABLEHIGHLEVELOPENINGSAREOPENINGS
PROVIDEDATTHERIDGEORNOTMORETHAN900MMBELOWTHERIDGEOR HIGHESTPOINTOFTHEROOFSPACEMEASUREDVERTICALLY
ROOFSHEETING: CUSTOMORB® FINISH: COLORBONDCOLOURASSELECTED SIDELAPS: 1CLIP/2FASTNERS
FIXINGTOTIMBER: M6-11X65ROOFZIPS#4-10X65T17HH
EV: 50ØEFFLUENTVENTWITHDEKTITEASREQ DP: 90ØRAINWATERDOWNPIPECOLORBONDFINISH
HALFROUNDSMOOTHLINEEXTERNALGUTTERSCOLORBONDFINISH COLOURTBC
ALLBOXGUTTERSRAINHEADSSUMPSANDOVERFLOWSTOROOF MANUFACTURESSPECIFICATIONSINACCORDANCEWITHAUSTRALIAN STANDARDS
ALLDRAINAGETOCOMPLYWITHAS/NZS3500
ENSURE60M2OFROOFAREADISPERSEDEVENLYTOEACHDP
ENSURENOMORETHAN12MOFGUTTERLENGTHFOREACHRWP
METALROOFCLADDING&FLASHINGPROVIDED&INSTALLEDINACCORDANCE WITHAS1562.1,PART3.5.1OFTHE&STRICTLYINSTALLEDACCORDINGTO PRODUCTMANUFACTURERSSPECIFICATIONS&FIXINGGUIDELINES
N.B.:METALROOFSHEETING&CLADDING:(SEEALSOBCATABLE3.5.1.1A) -LESSTHAN100MFROMBREAKINGSURF:COLORBOND'MONUMENT'
ALLRIDGESFASCIAS,BARGEENDSHIPENDS&ROOFPENETRATIONSMUSTBE PROPERLYFLASHED&SEALED(I.EWATERTIGHT)REFERTOARCHITECTURAL DWGSFORTYPICALSARKINGDETAILS&EXTENTOFROOFCLADDINGS
TYPICALLYSHEETTRAYENDSTURNEDUP/DOWN;REFERTOARCHITECTURAL DETAILS ALLGUTTERSANDDOWNPIPESSHALLBEDESIGNED&CONSTRUCTEDIN ACCORDANCEWITHAS/NZS3500.3ORAS/NZS3500.5(DOMESTIC INSTALLATIONSSECTION5)&PART3.5.2OFTHEBCA2016REFERTO ARCHITECTURALDWGSFORTYPICALGUTTER&FASCIADETAILS
ALLROOF/WALLJUNCTIONSMUSTBEFULLYSEALEDREFERTO ARCHITECTURALDETAILSALLROOFSHEETINGCAPPINGS&FLASHINGSARETO BE'COLORBOND'
PRECASTCONCRETEEXTERNALPANELTOENGINEERS SPECIFICATIONANDDETAILS,20mmSHAFTLINER90x45 TIMBERSTUDWORKR2.5HDWALLINSULATIONBATT 10MMFLUSHPLASTERBOARDLINING
CEMENTSHEETEXTERNALCLADDING70x35CAVITY BATTENS,18mmCAVIBATTSYSTEMINSTALLEDTO MANUFACTURERSSPECIFICATIONS90x45TIMBER STUDWORKR2.5HDWALLINSULATIONBATT10MMFLUSH PLASTERBOARDLINING
20mmSHAFTLINERTOFACEOFSHAREDPRECASTPANEL 90x45TIMBERSTUDWORKR2.5HDWALLINSULATION BATT10MMFLUSHPLASTERBOARDLINING
90x45TIMBERSTUDWORK,R2.5HDWALLINSULATION BATT10MMFLUSHPLASTERBOARDLININGTOBOTHSIDE, BUILDERTOALLOWFORMOISTURERESISTANT PLASTERBOARDINALLWETAREAS
SETOUT NOTES
ALL'EXISTING'DIMENSIONSARETOBECONFIRMEDON-SITE ANYANOMALIESARETOBEDIRECTEDTOTHEDESIGNER USEWRITTENDIMENSIONSONLY(ieDONOTSCALEDRAWINGS)
CHECKALLLEVELSDATUM'S&DIMENSIONSBEFORECOMMENCING ANYWORKORSHOPDRAWINGS
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 FloorPlan-Type3-Units7-9 8-10PetcheyStreet Brick&Castle DD A203 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B LIVING tf KITCHEN tf DINING tf PWD ct LNDY ct DECK tf 16 @ 187 .5R x 250G UP D3.2 W3.4 925X2700 W3 .3 W3.2 W3.1 1800 2700 720 720 900 12000 62 cladding 11696 90 1100 1100 3900 1001100 1780 120 90 4740 1250 1650 20 1220 90 8100 1000 100 800 1960 1235 90 3450 1081 90 12000 900 900 8100 4900 1980 2200 6500 3000 1200 90 2398 90 90 1250 90 1058 1400 90 100 62 cladding 90 120 170cladding 90 900 90 62 cladding 62 cladding 6346 62 cladding 62 cladding 90 90 90 62cladding 62cladding D3.1 170cladding 3635 stair setout 3900 stair opening FALL 1° CORR tf BATH ct ENS ct BED1 ca BED2 ca BED3 ca 16 @ 187 .5R x 250G DN W3.5 800 1800 W3.6 800X1800 W3.7 800 1800 W3 .8 W3 .9 W3 .10 W3.11 W3 .12 820 720 720 820 820 12000 5250 1100 840 5100 1050 800 1050 4688 bed3 13000 1000 900 5100 600 4700 1500 5250 1000 2438 2800 600 162 3686 1968 127090 901270 300 800 300 800 900 300 900 300 900 5000 3438 90 90 2520 3320 3148 90 2630 90 170cladding90 90 62cladding 90 62 cladding 90 62cladding 90 170cladding 90 62cladding 90 62cladding 90 170cladding 90 62 cladding 90 62 cladding 90 62 cladding 90 3148 90 5930 3635 stair setout 3900 stair opening GROUND FLOOR PLAN - 61 sq.m Unit7-FL=19.800 Unit8-FL=20.300 Unit9-FL=20.680 FIRST FLOOR PLAN - 59 sq.m Unit7-FL=22.800 Unit8-FL=23.300 Unit9-FL=23.680 ROOF PLAN FALL 15° FALL 15° LYSAGHT®CUSTOMORB0.48BMT roofing,installedtomanufacturer's specifications,COLORBOND®finish TocomplyingwithAS1562.1 (TYPICAL.) rwp half round gutter min 1-500 fall rwp rwp rwp TYPE3PLANS
ROOFING NOTES
WALL LEGEND
NOTES
CONTRACTORTOSPECIFYFINALTREATMENTTOEXISTINGCONCRETE FLOORSSEALANDWATERPROOFWHEREREQUIRED; WHEREPOSSIBLECONTRACTORTOUTILISEEXISTINGGLAZING ANDDOORSYSTEMSINNEWPLANCONFIGURATION
ALLEXISTINGCONDITIONSSHOWNINDICATIVELYONLYALLDIMENSIONS
SHOULDBECONFIRMEDONSITEANDANYDISCREPANCIES COMMUNICATEDTOARCHITECTFORREVIEW
ALLWINDOWDIMENSIONSTOALUMINIUMTOBECONFIRMEDONSITE
ALLGLAZINGTOCOMPLYWITHAS1288&AS2047
ALLWETAREASTOBECOMPLYWITHNCCSECTIONH4D2ANDAS3740
ALLTIMBERFRAMINGTOCOMPLYWITHNCCH1D6ANDAS1684
ALLWORKSTOBEINCOMPLIANCEWITHNCCSECTIONH6ENERGY EFFICIENCY.
WINDOWLOCATIONDIMENSIONTAKENFROMEXTERNALSTUDFRAME
ALLPLIABLEBUILDINGMEMBRANESINSTALLEDINAEXTERNALWALLMUSTBEIN ACCORDANCEWITHPARTH4D9(NCC2022)&PART10.8(HOUSINGPROVISIONS 2022)AS4200.1&AS4200.2
WHEREINSTALLEDINCLIMATEZONES67&8THEPLIABLEMEMBRANEMUSTBE AVAPOURPERMEABLEMEMBRANE
PLIABLEMEMBRANESMUSTBELOCATEDONTHEEXTERIORSIDEOFTHE PRIMARYINSULATIONLAYEROFTHEWALLASSEMBLIESTHATFORMTHE EXTERNALENVELOPEOFTHEBUILDINGTOCOMPLYWITH10.8.1
ALLKITCHENBATHROOM,SANITARYCOMPARTMENTSORLAUNDRYMUSTBE INSTALLEDINACCORDANCEWITHPART10.8.2(HOUSINGPROVISIONS2022)
EXHAUSTFROMABATHROOM,SANITARYCOMPARTMENTORLAUNDRYMUSTBE DISCHARGEDVIADUCTTOOUTDOORAIRORTOROOFSPACETHATIS
VENTILATEDINACCORDANCEWITHPART10.8.2(HOUSINGPROVISIONS2022)
ALLROOFSPACESMUSTBEINACCORDANCEWITHNCCPART10.8.3(HOUSING PROVISIONS2022)
WHEREEXHAUSTFROMBATHROOM,SANITARYCOMPARTMENTSORLAUNDRY AREDISCHARGEDINTOROOFSPACETHEROOFMUSTBEVENTILATEDTO OUTDOORAIRTHROUGHEVENLYDISTRIBUTEDOPENINGS
OPENINGSMUSTHAVEATOTALUNOBSTRUCTEDAREATOSATISFYTABLE10.8.3 (HOUSINGPROVISIONS2022)
VENTILATIONOPENINGSARESPECIFIEDASAMINIMUMFREEOPENAREAPER METRELENGTHOFTHELONGESTHORIZONTALDIMENSIONOFTHEROOF
FORTHEPURPOSESOFTHISTABLEHIGHLEVELOPENINGSAREOPENINGS
PROVIDEDATTHERIDGEORNOTMORETHAN900MMBELOWTHERIDGEOR HIGHESTPOINTOFTHEROOFSPACEMEASUREDVERTICALLY
ROOFSHEETING: CUSTOMORB® FINISH: COLORBONDCOLOURASSELECTED SIDELAPS: 1CLIP/2FASTNERS FIXINGTOTIMBER: M6-11X65ROOFZIPS#4-10X65T17HH EV: 50ØEFFLUENTVENTWITHDEKTITEASREQ DP: 90ØRAINWATERDOWNPIPECOLORBONDFINISH
HALFROUNDSMOOTHLINEEXTERNALGUTTERSCOLORBONDFINISH COLOURTBC
ALLBOXGUTTERSRAINHEADSSUMPSANDOVERFLOWSTOROOF MANUFACTURESSPECIFICATIONSINACCORDANCEWITHAUSTRALIAN STANDARDS
ALLDRAINAGETOCOMPLYWITHAS/NZS3500
ENSURE60M2OFROOFAREADISPERSEDEVENLYTOEACHDP
ENSURENOMORETHAN12MOFGUTTERLENGTHFOREACHRWP
METALROOFCLADDING&FLASHINGPROVIDED&INSTALLEDINACCORDANCE WITHAS1562.1,PART3.5.1OFTHE&STRICTLYINSTALLEDACCORDINGTO PRODUCTMANUFACTURERSSPECIFICATIONS&FIXINGGUIDELINES
N.B.:METALROOFSHEETING&CLADDING:(SEEALSOBCATABLE3.5.1.1A) -LESSTHAN100MFROMBREAKINGSURF:COLORBOND'MONUMENT' ALLRIDGESFASCIAS,BARGEENDSHIPENDS&ROOFPENETRATIONSMUSTBE PROPERLYFLASHED&SEALED(I.EWATERTIGHT)REFERTOARCHITECTURAL DWGSFORTYPICALSARKINGDETAILS&EXTENTOFROOFCLADDINGS
TYPICALLYSHEETTRAYENDSTURNEDUP/DOWN;REFERTOARCHITECTURAL DETAILS
ALLGUTTERSANDDOWNPIPESSHALLBEDESIGNED&CONSTRUCTEDIN ACCORDANCEWITHAS/NZS3500.3ORAS/NZS3500.5(DOMESTIC INSTALLATIONSSECTION5)&PART3.5.2OFTHEBCA2016REFERTO ARCHITECTURALDWGSFORTYPICALGUTTER&FASCIADETAILS
ALLROOF/WALLJUNCTIONSMUSTBEFULLYSEALEDREFERTO ARCHITECTURALDETAILSALLROOFSHEETINGCAPPINGS&FLASHINGSARETO BE'COLORBOND'
PRECASTCONCRETEEXTERNALPANELTOENGINEERS SPECIFICATIONANDDETAILS,20mmSHAFTLINER90x45 TIMBERSTUDWORKR2.5HDWALLINSULATIONBATT 10MMFLUSHPLASTERBOARDLINING
CEMENTSHEETEXTERNALCLADDING70x35CAVITY BATTENS,18mmCAVIBATTSYSTEMINSTALLEDTO MANUFACTURERSSPECIFICATIONS90x45TIMBER STUDWORKR2.5HDWALLINSULATIONBATT10MMFLUSH PLASTERBOARDLINING
20mmSHAFTLINERTOFACEOFSHAREDPRECASTPANEL 90x45TIMBERSTUDWORKR2.5HDWALLINSULATION BATT10MMFLUSHPLASTERBOARDLINING
90x45TIMBERSTUDWORK,R2.5HDWALLINSULATION BATT10MMFLUSHPLASTERBOARDLININGTOBOTHSIDE, BUILDERTOALLOWFORMOISTURERESISTANT PLASTERBOARDINALLWETAREAS
SETOUT NOTES
ALL'EXISTING'DIMENSIONSARETOBECONFIRMEDON-SITE ANYANOMALIESARETOBEDIRECTEDTOTHEDESIGNER USEWRITTENDIMENSIONSONLY(ieDONOTSCALEDRAWINGS)
CHECKALLLEVELSDATUM'S&DIMENSIONSBEFORECOMMENCING ANYWORKORSHOPDRAWINGS WALL
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 FloorPlan-Type4-Units11-12 8-10PetcheyStreet Brick&Castle DD A204 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B 62 cladding 962 10350 10046 1100 5640 100 3000 100 LIVING tf KITCHEN tf DINING tf LNDY ct 9000 1000 100 1200 2400 4449 1300 DECK tf 10188 900 900 6000 4900 3100 900 1438 7750 1000 1286 1020 16 @ 187 .5R x 250G UP 100 100 90 90 3528 1970 90 DP DP DP DP W4.1 2400 2700 D4 .1 900 2700 W4 .2 W4.3 1325X2700 D4.2 3525X2700 720 170cladding 90 62 cladding 90 62 cladding 90 162 170cladding 90 110cladding 90 170cladding 90 62cladding 90 62 cladding 3245 stair setout 3900 stair opening FALL 1° 10350 4475 1050 1868 CORR tf BATH ct ENS ct 1770 BED1 ca 10350 6000 1500 4850 1500 4375 1920 BED2 ca 900 1050 3630 90 900 900 900 2200 3398 90 90 2120 4348 16 @ 187 .5R x 250G DN BED3 ca 1770 6000 1600 800 1600 800 2720 90 2778 1500 90 90 300 300 1200 4826 90 90 3120 DP DP DP DP 820 720 720 820 W4.4 1500 1800 W4.5 1500 1800 W4 .6 W4 .7 W4 .8 W4.9 1600 1800 W4.10 1600 1800 W4 .11 62 cladding 90 62 cladding 90 62cladding 90 62cladding 90 170cladding 90 62 cladding 90 62 cladding 90 62cladding 90 170cladding 90 3250 stair setout 3900 stair opening GROUND FLOOR PLAN - 55 sq.m Unit11-FL=21.700 Unit12-FL=22.200 FIRST FLOOR PLAN - 56 sq.m Unit11-FL=24.700 Unit12-FL=25.200 ROOF PLAN FALL 15° LYSAGHT®CUSTOMORB0.48BMT roofing,installedtomanufacturer's specifications,COLORBOND®finish TocomplyingwithAS1562.1 (TYPICAL.) half round gutter min 1-500 fall rwp rwp FALL 15° half round gutter min 1-500 fall rwp rwp TYPE4PLANS
ROOFING NOTES
LEGEND
PART H4D9 - CONDENSATION MANAGEMENT
NOTES
CONTRACTORTOSPECIFYFINALTREATMENTTOEXISTINGCONCRETE FLOORSSEALANDWATERPROOFWHEREREQUIRED; WHEREPOSSIBLECONTRACTORTOUTILISEEXISTINGGLAZING ANDDOORSYSTEMSINNEWPLANCONFIGURATION
ALLEXISTINGCONDITIONSSHOWNINDICATIVELYONLYALLDIMENSIONS
SHOULDBECONFIRMEDONSITEANDANYDISCREPANCIES COMMUNICATEDTOARCHITECTFORREVIEW
ALLWINDOWDIMENSIONSTOALUMINIUMTOBECONFIRMEDONSITE
ALLGLAZINGTOCOMPLYWITHAS1288&AS2047
ALLWETAREASTOBECOMPLYWITHNCCSECTIONH4D2ANDAS3740
ALLTIMBERFRAMINGTOCOMPLYWITHNCCH1D6ANDAS1684
ALLWORKSTOBEINCOMPLIANCEWITHNCCSECTIONH6ENERGY EFFICIENCY.
WINDOWLOCATIONDIMENSIONTAKENFROMEXTERNALSTUDFRAME
PART H4D9 - CONDENSATION MANAGEMENT
ALLPLIABLEBUILDINGMEMBRANESINSTALLEDINAEXTERNALWALLMUSTBEIN ACCORDANCEWITHPARTH4D9(NCC2022)&PART10.8(HOUSINGPROVISIONS 2022)AS4200.1&AS4200.2
WHEREINSTALLEDINCLIMATEZONES67&8THEPLIABLEMEMBRANEMUSTBE AVAPOURPERMEABLEMEMBRANE
PLIABLEMEMBRANESMUSTBELOCATEDONTHEEXTERIORSIDEOFTHE PRIMARYINSULATIONLAYEROFTHEWALLASSEMBLIESTHATFORMTHE EXTERNALENVELOPEOFTHEBUILDINGTOCOMPLYWITH10.8.1
ALLKITCHENBATHROOM,SANITARYCOMPARTMENTSORLAUNDRYMUSTBE INSTALLEDINACCORDANCEWITHPART10.8.2(HOUSINGPROVISIONS2022)
EXHAUSTFROMABATHROOM,SANITARYCOMPARTMENTORLAUNDRYMUSTBE DISCHARGEDVIADUCTTOOUTDOORAIRORTOROOFSPACETHATIS
VENTILATEDINACCORDANCEWITHPART10.8.2(HOUSINGPROVISIONS2022)
ALLROOFSPACESMUSTBEINACCORDANCEWITHNCCPART10.8.3(HOUSING PROVISIONS2022)
WHEREEXHAUSTFROMBATHROOM,SANITARYCOMPARTMENTSORLAUNDRY AREDISCHARGEDINTOROOFSPACETHEROOFMUSTBEVENTILATEDTO OUTDOORAIRTHROUGHEVENLYDISTRIBUTEDOPENINGS
OPENINGSMUSTHAVEATOTALUNOBSTRUCTEDAREATOSATISFYTABLE10.8.3 (HOUSINGPROVISIONS2022)
VENTILATIONOPENINGSARESPECIFIEDASAMINIMUMFREEOPENAREAPER METRELENGTHOFTHELONGESTHORIZONTALDIMENSIONOFTHEROOF
FORTHEPURPOSESOFTHISTABLEHIGHLEVELOPENINGSAREOPENINGS PROVIDEDATTHERIDGEORNOTMORETHAN900MMBELOWTHERIDGEOR HIGHESTPOINTOFTHEROOFSPACEMEASUREDVERTICALLY
EV: 50ØEFFLUENTVENTWITHDEKTITEASREQ DP: 90ØRAINWATERDOWNPIPECOLORBONDFINISH
HALFROUNDSMOOTHLINEEXTERNALGUTTERSCOLORBONDFINISH COLOURTBC
ALLBOXGUTTERSRAINHEADSSUMPSANDOVERFLOWSTOROOF MANUFACTURESSPECIFICATIONSINACCORDANCEWITHAUSTRALIAN STANDARDS
ALLDRAINAGETOCOMPLYWITHAS/NZS3500
ENSURE60M2OFROOFAREADISPERSEDEVENLYTOEACHDP
ENSURENOMORETHAN12MOFGUTTERLENGTHFOREACHRWP
METALROOFCLADDING&FLASHINGPROVIDED&INSTALLEDINACCORDANCE WITHAS1562.1,PART3.5.1OFTHE&STRICTLYINSTALLEDACCORDINGTO PRODUCTMANUFACTURERSSPECIFICATIONS&FIXINGGUIDELINES
N.B.:METALROOFSHEETING&CLADDING:(SEEALSOBCATABLE3.5.1.1A) -LESSTHAN100MFROMBREAKINGSURF:COLORBOND'MONUMENT' ALLRIDGESFASCIAS,BARGEENDSHIPENDS&ROOFPENETRATIONSMUSTBE PROPERLYFLASHED&SEALED(I.EWATERTIGHT)REFERTOARCHITECTURAL DWGSFORTYPICALSARKINGDETAILS&EXTENTOFROOFCLADDINGS TYPICALLYSHEETTRAYENDSTURNEDUP/DOWN;REFERTOARCHITECTURAL DETAILS ALLGUTTERSANDDOWNPIPESSHALLBEDESIGNED&CONSTRUCTEDIN ACCORDANCEWITHAS/NZS3500.3ORAS/NZS3500.5(DOMESTIC INSTALLATIONSSECTION5)&PART3.5.2OFTHEBCA2016REFERTO ARCHITECTURALDWGSFORTYPICALGUTTER&FASCIADETAILS ALLROOF/WALLJUNCTIONSMUSTBEFULLYSEALEDREFERTO ARCHITECTURALDETAILSALLROOFSHEETINGCAPPINGS&FLASHINGSARETO BE'COLORBOND'
PRECASTCONCRETEEXTERNALPANELTOENGINEERS SPECIFICATIONANDDETAILS,20mmSHAFTLINER90x45 TIMBERSTUDWORKR2.5HDWALLINSULATIONBATT 10MMFLUSHPLASTERBOARDLINING
CEMENTSHEETEXTERNALCLADDING70x35CAVITY BATTENS,18mmCAVIBATTSYSTEMINSTALLEDTO MANUFACTURERSSPECIFICATIONS90x45TIMBER STUDWORKR2.5HDWALLINSULATIONBATT10MMFLUSH PLASTERBOARDLINING
20mmSHAFTLINERTOFACEOFSHAREDPRECASTPANEL 90x45TIMBERSTUDWORKR2.5HDWALLINSULATION BATT10MMFLUSHPLASTERBOARDLINING
90x45TIMBERSTUDWORKR2.5HDWALLINSULATION BATT10MMFLUSHPLASTERBOARDLININGTOBOTHSIDE, BUILDERTOALLOWFORMOISTURERESISTANT PLASTERBOARDINALLWETAREAS
ALL'EXISTING'DIMENSIONSARETOBECONFIRMEDON-SITE ANYANOMALIESARETOBEDIRECTEDTOTHEDESIGNER USEWRITTENDIMENSIONSONLY(ieDONOTSCALEDRAWINGS)
CHECKALLLEVELSDATUM'S&DIMENSIONSBEFORECOMMENCING ANYWORKORSHOPDRAWINGS
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 FloorPlan-Type5-Units13-14 8-10PetcheyStreet Brick&Castle DD A205 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B LIVING tf KITCHEN tf DINING tf PWD ct LNDY ct DECK tf 16 @ 187 .5R x 250G UP 900 12000 62 cladding 11696 90 1100 1100 3900 1001100 1780 120 90 4745 living 1250 1650 laundry 20 1220 powder 90 8100 1000 100 800 1960 1235 90 3455 1081 90 12000 900 900 8100 4900 1980 2200 6500 3000 1200 90 2398 90 90 1250 90 1058 1400 90 100 62 cladding 90 120 170cladding 90 900 90 62 cladding 90 62 cladding 62 cladding 6346 62 cladding 62 cladding 90 90 90 62cladding 62cladding D5.2 3025 2700 W5.4 925 2700 W5 .3 W5.2 1100 2700 W5.1 1800 2700 D5.1 900 2700 720 720 170cladding 4165 stair setout 3900 stair opening FALL 1° CORR tf BATH ct ENS ct BED1 ca BED2 ca BED3 ca 16 @ 187 .5R x 250G DN 12000 5250 1100 840 5100 1050 800 1050 4688 bed3 13000 1000 900 5100 600 3910 1500 5250 1000 2548 3138 2420 3548 2800 600 162 3686 1968 127090 901270 300 800 300 800 900 300 900 300 900 5790 3548 90 90 2420 3320 3138 90 2630 90 170cladding90 90 62cladding 90 62 cladding 90 62cladding 90 170cladding 90 62cladding 90 62cladding 90 170cladding 90 62 cladding 90 62 cladding 90 62 cladding 90 62 cladding 90 62 cladding 3320 90 90 90 90 3138 90 5830 W5.5 2800 1800 W5 .6 W5 .7 W5 .8 W5.9 800 1800 W5.10 800X1800 W5.11 800 1800 W5 .12 1500 X 500 820 720 720 820 820 4165 stair setout 3900 stair opening FALL 15° FALL 15° LYSAGHT®CUSTOMORB0.48BMT roofing,installedtomanufacturer's specifications,COLORBOND®finish TocomplyingwithAS1562.1 (TYPICAL.) rwp half round gutter min 1-500 fall rwp rwp rwp GROUND FLOOR PLAN - 61 sq.m Unit13-FL=21.840 Unit14-FL=21.340 FIRST FLOOR PLAN - 59 sq.m Unit13 FL=24.840 Unit14-FL=24.340 ROOF PLAN TYPE5PLANS ROOFSHEETING: CUSTOMORB® FINISH: COLORBONDCOLOURASSELECTED
1CLIP/2FASTNERS
SIDELAPS:
FIXINGTOTIMBER: M6-11X65ROOFZIPS#4-10X65T17HH
ROOFING NOTES
SETOUT NOTES
WALL LEGEND
NOTES
CONTRACTORTOSPECIFYFINALTREATMENTTOEXISTINGCONCRETE FLOORSSEALANDWATERPROOFWHEREREQUIRED; WHEREPOSSIBLECONTRACTORTOUTILISEEXISTINGGLAZING ANDDOORSYSTEMSINNEWPLANCONFIGURATION
ALLEXISTINGCONDITIONSSHOWNINDICATIVELYONLYALLDIMENSIONS
SHOULDBECONFIRMEDONSITEANDANYDISCREPANCIES COMMUNICATEDTOARCHITECTFORREVIEW
ALLWINDOWDIMENSIONSTOALUMINIUMTOBECONFIRMEDONSITE
ALLGLAZINGTOCOMPLYWITHAS1288&AS2047
ALLWETAREASTOBECOMPLYWITHNCCSECTIONH4D2ANDAS3740
ALLTIMBERFRAMINGTOCOMPLYWITHNCCH1D6ANDAS1684
ALLWORKSTOBEINCOMPLIANCEWITHNCCSECTIONH6ENERGY EFFICIENCY.
WINDOWLOCATIONDIMENSIONTAKENFROMEXTERNALSTUDFRAME
ALLPLIABLEBUILDINGMEMBRANESINSTALLEDINAEXTERNALWALLMUSTBEIN ACCORDANCEWITHPARTH4D9(NCC2022)&PART10.8(HOUSINGPROVISIONS 2022)AS4200.1&AS4200.2
WHEREINSTALLEDINCLIMATEZONES67&8THEPLIABLEMEMBRANEMUSTBE AVAPOURPERMEABLEMEMBRANE
PLIABLEMEMBRANESMUSTBELOCATEDONTHEEXTERIORSIDEOFTHE PRIMARYINSULATIONLAYEROFTHEWALLASSEMBLIESTHATFORMTHE EXTERNALENVELOPEOFTHEBUILDINGTOCOMPLYWITH10.8.1
ALLKITCHENBATHROOM,SANITARYCOMPARTMENTSORLAUNDRYMUSTBE INSTALLEDINACCORDANCEWITHPART10.8.2(HOUSINGPROVISIONS2022)
EXHAUSTFROMABATHROOM,SANITARYCOMPARTMENTORLAUNDRYMUSTBE DISCHARGEDVIADUCTTOOUTDOORAIRORTOROOFSPACETHATIS
VENTILATEDINACCORDANCEWITHPART10.8.2(HOUSINGPROVISIONS2022)
ALLROOFSPACESMUSTBEINACCORDANCEWITHNCCPART10.8.3(HOUSING PROVISIONS2022)
WHEREEXHAUSTFROMBATHROOM,SANITARYCOMPARTMENTSORLAUNDRY AREDISCHARGEDINTOROOFSPACETHEROOFMUSTBEVENTILATEDTO OUTDOORAIRTHROUGHEVENLYDISTRIBUTEDOPENINGS
OPENINGSMUSTHAVEATOTALUNOBSTRUCTEDAREATOSATISFYTABLE10.8.3 (HOUSINGPROVISIONS2022)
VENTILATIONOPENINGSARESPECIFIEDASAMINIMUMFREEOPENAREAPER METRELENGTHOFTHELONGESTHORIZONTALDIMENSIONOFTHEROOF
FORTHEPURPOSESOFTHISTABLEHIGHLEVELOPENINGSAREOPENINGS PROVIDEDATTHERIDGEORNOTMORETHAN900MMBELOWTHERIDGEOR HIGHESTPOINTOFTHEROOFSPACEMEASUREDVERTICALLY
ROOFSHEETING:
FIXINGTOTIMBER: M6-11X65ROOFZIPS#4-10X65T17HH
EV: 50ØEFFLUENTVENTWITHDEKTITEASREQ
DP: 90ØRAINWATERDOWNPIPECOLORBONDFINISH
HALFROUNDSMOOTHLINEEXTERNALGUTTERSCOLORBONDFINISH COLOURTBC
ALLBOXGUTTERSRAINHEADSSUMPSANDOVERFLOWSTOROOF MANUFACTURESSPECIFICATIONSINACCORDANCEWITHAUSTRALIAN STANDARDS
ALLDRAINAGETOCOMPLYWITHAS/NZS3500
ENSURE60M2OFROOFAREADISPERSEDEVENLYTOEACHDP
ENSURENOMORETHAN12MOFGUTTERLENGTHFOREACHRWP
METALROOFCLADDING&FLASHINGPROVIDED&INSTALLEDINACCORDANCE WITHAS1562.1,PART3.5.1OFTHE&STRICTLYINSTALLEDACCORDINGTO PRODUCTMANUFACTURERSSPECIFICATIONS&FIXINGGUIDELINES
N.B.:METALROOFSHEETING&CLADDING:(SEEALSOBCATABLE3.5.1.1A) -LESSTHAN100MFROMBREAKINGSURF:COLORBOND'MONUMENT' ALLRIDGESFASCIAS,BARGEENDSHIPENDS&ROOFPENETRATIONSMUSTBE PROPERLYFLASHED&SEALED(I.EWATERTIGHT)REFERTOARCHITECTURAL DWGSFORTYPICALSARKINGDETAILS&EXTENTOFROOFCLADDINGS TYPICALLYSHEETTRAYENDSTURNEDUP/DOWN;REFERTOARCHITECTURAL DETAILS ALLGUTTERSANDDOWNPIPESSHALLBEDESIGNED&CONSTRUCTEDIN ACCORDANCEWITHAS/NZS3500.3ORAS/NZS3500.5(DOMESTIC INSTALLATIONSSECTION5)&PART3.5.2OFTHEBCA2016REFERTO ARCHITECTURALDWGSFORTYPICALGUTTER&FASCIADETAILS ALLROOF/WALLJUNCTIONSMUSTBEFULLYSEALEDREFERTO ARCHITECTURALDETAILSALLROOFSHEETINGCAPPINGS&FLASHINGSARETO BE'COLORBOND'
PRECASTCONCRETEEXTERNALPANELTOENGINEERS SPECIFICATIONANDDETAILS,20mmSHAFTLINER90x45 TIMBERSTUDWORKR2.5HDWALLINSULATIONBATT 10MMFLUSHPLASTERBOARDLINING
CEMENTSHEETEXTERNALCLADDING70x35CAVITY BATTENS,18mmCAVIBATTSYSTEMINSTALLEDTO MANUFACTURERSSPECIFICATIONS90x45TIMBER STUDWORKR2.5HDWALLINSULATIONBATT10MMFLUSH PLASTERBOARDLINING
20mmSHAFTLINERTOFACEOFSHAREDPRECASTPANEL 90x45TIMBERSTUDWORKR2.5HDWALLINSULATION BATT10MMFLUSHPLASTERBOARDLINING
90x45TIMBERSTUDWORKR2.5HDWALLINSULATION BATT10MMFLUSHPLASTERBOARDLININGTOBOTHSIDE, BUILDERTOALLOWFORMOISTURERESISTANT PLASTERBOARDINALLWETAREAS
ALL'EXISTING'DIMENSIONSARETOBECONFIRMEDON-SITE ANYANOMALIESARETOBEDIRECTEDTOTHEDESIGNER USEWRITTENDIMENSIONSONLY(ieDONOTSCALEDRAWINGS)
CHECKALLLEVELSDATUM'S&DIMENSIONSBEFORECOMMENCING ANYWORKORSHOPDRAWINGS
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 FloorPlan-Type6-Units15-17 8-10PetcheyStreet Brick&Castle DD A206 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B LIVING tf KITCHEN tf DINING tf PWD ct LNDY ct DECK tf 16 @ 187 .5R x 250G UP 1000 12000 62 cladding 11696 90 1150 1150 4750 1001100 1780 120 90 5578 1320 1642 20 1220 powder 90 9000 1000 100 938 2600 1200 90 4388 1048 90 12000 1000 900 9000 4850 2880 2200 6500 3000 1200 90 2420 90 90 1250 90 1058 1400 90 100 62 cladding 90 120 170cladding 90 900 90 62 cladding 90 62 cladding 62 cladding 6324 62 cladding 62 cladding 90 90 90 62cladding 62cladding 162 170cladding D6.2 3575X2700 W6.4 1225X2700 W6 .3 W6.2 1100 2700 W6.1 D6.1 900 2700 720 720 4250 stair setout 3900 stair opening FALL 1° CORR tf BATH ct ENS ct BED1 ca BED2 ca BED4 ca 16 @ 187 .5R x 250G DN BED3 ca 12000 5250 1200 2778 1770 12900 900 6000 1500 5000 1500 5250 11848 2247 6148 90 3120 600 1200 2720 1868 3630 90 900 900 900 4600 4238 90 90 2820 2120 3147 90 748 90 90 1770 6000 750 1500 650 600 1500 1000 1868 4698 1500 90 90 300 300 90 62cladding 90 62cladding 90 62cladding 90 170cladding 90 62cladding 90 62cladding 90 170cladding 90 170cladding 90 62 cladding 90 62 cladding 90 62 cladding 90 62 cladding 90 62 cladding 90 62 cladding W6.5 1500 1800 W6.6 1500 1800 W6 .7 W6 .8 W6 .9 W6.10 1500 1800 W6.11 1500 1800 W6 .12 4250 stair setout 3900 stair opening GROUND FLOOR PLAN - 72 sq.m Unit15 FL=20.840 Unit16-FL=19.850 Unit17-FL=19.850 FIRST FLOOR PLAN - 70 sq.m Unit15 FL=23.840 Unit16-FL=22.850 Unit17-FL=22.850 ROOF PLAN FALL 15° FALL 15° LYSAGHT®CUSTOMORB0.48BMT roofing,installedtomanufacturer's specifications,COLORBOND®finish TocomplyingwithAS1562.1 (TYPICAL.) rwp half round gutter min 1-500 fall rwp rwp rwp TYPE6PLANS
COLORBONDCOLOURASSELECTED
CUSTOMORB® FINISH:
SIDELAPS: 1CLIP/2FASTNERS
ROOFING NOTES
SETOUT NOTES
WALL LEGEND
PART H4D9 - CONDENSATION MANAGEMENT
CEILING&LIGHTINGNOTES:
Dimmerswitchestobeinstalledonlightsin bedroomslivinganddiningareas
Externallightsmustbecontrolledbyadaylightsensor (asshown),orhaveanaveragelightsourceefficacy ofnotlessthan40lumens/W
Bathroomfanstobefittedwithbackdraught dampers/shuttersandductedtooutsideviawall vent
ReferLightingCalculatorforEnergyEfficiency compliance
NaturalLighting&Ventilatiion -RefertoSchedules
ProvideExhaustFansinToiletsBathroomsanda rangehoodabovekitchenhotplates(tobeselected byowner)Installandducttooutsideairin accrodancewithAS1668.2Referplansforlocation
Allelectricalworkshallbecarriedout&testedin accordancewithallrelevantaustralianstandards AS/NZS3008&localauthoritiesrules/regulations. Provideartificiallightingtoallroomsinaccordance withAS/NZS1680.0.Finallightinglayouttobe co-ordinatedbetweentheownerandbuilder
allceilingexhaustfans/rangehoodstobe ductedtooutsideofbuilding
allelectricalinstallationstobe inaccordancewithAS3000 confirmlocationofNBNconnectionsandboxes withclientpriortoinstallation
GPOlocationshownindicatively
Contractortoconfirmallfinallocationsonsitewith clientpriortorough-inMountingheightpointstobe 300mmAFFLunlessnominatedotherwiseorlocated withinjoineryorabovebenches
NOTES:
10mmPlasterboardceilingliningsinstalledto manufacturer'sspecificationsPaintfinish
10mmPlasterboardinternalwallliningsinstalledto manufacturer'sspecificationsPaintfinish 10mmMoistureResistantPlasterboardor6mm VILLABOARDinternalwallliningstoallwetarea wallsinstalledtomanufacturer'sspecificationspaint finish
Externaldoorsandoperablewindowsmustbefitted withrestrictairinfiltrationseal bottomedgeofexternalswingdoorand/orinternal
IXLTasticCombinationLight. Fan&heatlampunit(4Lamp) 4x275WHeatlamps(notincludedincalc.) 1x6WLEDcentrelight DaylightSensor. (tomeetBCAequirementthatexternal lightsbecontrolledbydaylightsensor.)
AcousticSoundInsulationinWalls (ShownDashed)
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 RCP&ElecPlans-Type1-Units1-4 8-10PetcheyStreet Brick&Castle DD A207 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B DL DL DL C01 C01 C03 C03 Tolights above sa DL DL DL DL DL DL DL DL DL DL LED under overheads DL DL DL C01 C04 DL DL DL DL DL sa toswitch below DL DL DL DL DL C02 C02 C02 C02 C05 C05 0 12 5 METRES centimetreonthisdrawingrepresents metreontheground(i.e1:100) TYPE1REFLECTEDCEILING&ELECTRICALPLANS INSULATIONREQUIREMENTS: externalwalls =R2.8min reflectivesarking =R0.43 R2.5wallbatts =R2.5 achievedvalue =R2.93 ROOFANDCEILING: minrequirmentR4.6 basedonsolarabsorptionvalueof0.45 BCAvalueforpitchedroofandflatceiling =R0.21 permastopreflectivesarking =R1.3 R5.0ceilingbatts =R5.0 achievedvalue R6.51 R2.5insulationtointernalgaragewalls CEILING LINING SCHEDULE: C01 Finishedceilinglevel:2700mm 10mmPlasterboardceilinglining Paintfinish. Installedtomanufacturer'sspecification ReferSectionforfixingdetails C02 Finishedceilinglevel:RAKED 10mmPlasterboardceilinglining Paintfinish. Installedtomanufacturer'sspecification ReferSectionforfixingdetail C03 Finishedceilinglevel:2700mm 10mmAquachekceilinglining(orsimilar approved)Paintfinish Installedtomanufacturer'sspecification ReferSectionforfixingdetails C04Finishedceilinglevel:2400mm 10mmPlasterboardceilinglining Paintfinish. Installedtomanufacturer'sspecification ReferSectionforfixingdetails C05 Finishedceilinglevel:2400mm 10mmAquachekceilinglining(orsimilar approved)Paintfinish Installedtomanufacturer'sspecification ReferSectionforfixingdetails CEILING & LIGHTING LEGEND: SmokeAlarmsmustbeHardwiredwith batterybackupTocomplywithPart3.7.2 s.a.oftheNCC2016Allsmokealarmsmustbe interconnected.Mustbelocatedonthe ceilinginalllevelsofthebuilding SingleLightswitch(2w=2wayswitch) MultipleLightswitch DL RecessedDownlight DL ExternalWallLight-WL ceilingexhaustfan-SEALED LEDpendantbar-LPB Selectedfeaturependant Selectedbattenfittingwithfeature pendant
garagedoormusthavedraftprotectiondevice (ravenorequivalent)
TV OV CT RH FR DW UB AB AB WM DR AB AB HWC WP WP NOTES: mainswitchboard singlegpo doublegpo gpo(abovebench) gpo(weather-proof) televisionconnection telephoneinternet connection 315Lt4.8kWRheem hotwatercylindertwin element internal/external electrichotwater system
providedlocationtobec.o.s
AllceilingsandwindowsanddoorsSquareSet.
dishwasher/fridgeandmicrowavegpotobe
HAGER ® Silhouette power outlets and switches throughout all lights to be dimmable, and on dimmers rough in for electrical window furnishings throughout TV ob wp HWC
CEILING PLAN FIRST FLOOR
PLAN GROUND FLOOR ELECTRICAL PLAN FIRST FLOOR ELECTRICAL PLAN NOTE: ALL ELECTRICAL & LIGHTING DRAWINGS ARE DIAGRAMATIC AND ARE TO BE CONFIRMED WITH THE ELECTRICAL CONTRACTOR.
GROUND FLOOR REFLECTED
REFLECTED CEILING
CEILING&LIGHTINGNOTES:
Dimmerswitchestobeinstalledonlightsin bedroomslivinganddiningareas
Externallightsmustbecontrolledbyadaylightsensor (asshown),orhaveanaveragelightsourceefficacy ofnotlessthan40lumens/W
Bathroomfanstobefittedwithbackdraught dampers/shuttersandductedtooutsideviawall vent
ReferLightingCalculatorforEnergyEfficiency compliance
NaturalLighting&Ventilatiion -RefertoSchedules
ProvideExhaustFansinToiletsBathroomsanda rangehoodabovekitchenhotplates(tobeselected byowner)Installandducttooutsideairin accrodancewithAS1668.2Referplansforlocation
Allelectricalworkshallbecarriedout&testedin accordancewithallrelevantaustralianstandards AS/NZS3008&localauthoritiesrules/regulations. Provideartificiallightingtoallroomsinaccordance withAS/NZS1680.0.Finallightinglayouttobe co-ordinatedbetweentheownerandbuilder
dishwasher/fridgeandmicrowavegpotobe providedlocationtobec.o.s
allceilingexhaustfans/rangehoodstobe ductedtooutsideofbuilding
allelectricalinstallationstobe inaccordancewithAS3000 confirmlocationofNBNconnectionsandboxes withclientpriortoinstallation
GPOlocationshownindicatively Contractortoconfirmallfinallocationsonsitewith clientpriortorough-inMountingheightpointstobe 300mmAFFLunlessnominatedotherwiseorlocated withinjoineryorabovebenches HAGER
NOTES:
10mmPlasterboardceilingliningsinstalledto manufacturer'sspecificationsPaintfinish
10mmPlasterboardinternalwallliningsinstalledto manufacturer'sspecificationsPaintfinish 10mmMoistureResistantPlasterboardor6mm VILLABOARDinternalwallliningstoallwetarea wallsinstalledtomanufacturer'sspecificationspaint finish
Externaldoorsandoperablewindowsmustbefitted withrestrictairinfiltrationseal bottomedgeofexternalswingdoorand/orinternal garagedoormusthavedraftprotectiondevice
Fan&heatlampunit(4Lamp) 4x275WHeatlamps(notincludedincalc.) 1x6WLEDcentrelight
DaylightSensor. (tomeetBCAequirementthatexternal lightsbecontrolledbydaylightsensor.)
AcousticSoundInsulationinWalls (ShownDashed)
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensionsonsite allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 RCP&ElecPlans-Type2-Units5-6 &10 8-10PetcheyStreet Brick&Castle DD A208 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B DL DL DL C01 C01 C03 C03 DL DL DL DL DL DL DL DL DL DL LED under overheads DL DL DL DL DL Tolights above sa C04 DL DL DL DL DL sa toswitch below DL DL DL DL DL DL DL C02 C02 C02 C02 C05 C05 C02 C02 0 12 5 METRES 1centimetreonthisdrawingrepresents 1metreontheground(i.e1:100) INSULATIONREQUIREMENTS: externalwalls =R2.8min reflectivesarking =R0.43 R2.5wallbatts =R2.5 achievedvalue =R2.93 ROOFANDCEILING: minrequirmentR4.6 basedonsolarabsorptionvalueof0.45 BCAvalueforpitchedroofandflatceiling =R0.21 permastopreflectivesarking =R1.3 R5.0ceilingbatts =R5.0 achievedvalue =R6.51 R2.5insulationtointernalgaragewalls CEILING LINING SCHEDULE: C01 Finishedceilinglevel:2700mm 10mmPlasterboardceilinglining Paintfinish. Installedtomanufacturer'sspecification ReferSectionforfixingdetails C02 Finishedceilinglevel:RAKED 10mmPlasterboardceilinglining Paintfinish. Installedtomanufacturer'sspecification ReferSectionforfixingdetail C03 Finishedceilinglevel:2700mm 10mmAquachekceilinglining(orsimilar approved)Paintfinish Installedtomanufacturer'sspecification ReferSectionforfixingdetails C04Finishedceilinglevel:2400mm 10mmPlasterboardceilinglining Paintfinish. Installedtomanufacturer'sspecification ReferSectionforfixingdetails C05 Finishedceilinglevel:2400mm 10mmAquachekceilinglining(orsimilar approved)Paintfinish Installedtomanufacturer'sspecification ReferSectionforfixingdetails CEILING & LIGHTING LEGEND: SmokeAlarmsmustbeHardwiredwith batterybackupTocomplywithPart3.7.2 s.a.oftheNCC2016Allsmokealarmsmustbe interconnected.Mustbelocatedonthe ceilinginalllevelsofthebuilding SingleLightswitch(2w=2wayswitch) MultipleLightswitch DL RecessedDownlight-DL ExternalWallLight-WL ceilingexhaustfan-SEALED LEDpendantbar LPB Selectedfeaturependant Selectedbattenfittingwithfeature pendant IXLTasticCombinationLight.
(ravenorequivalent) AllceilingsandwindowsanddoorsSquareSet. NOTES: mainswitchboard singlegpo doublegpo gpo(overbench) gpo(weather-proof) televisionconnection telephone/internet connection 315Lt4.8kWRheem hotwatercylindertwin element internal/external electrichotwater system
® Silhouette power outlets and switches throughout all lights to be dimmable, and on dimmers rough in for electrical window furnishings throughout TV ob wp HWC
CEILING PLAN FIRST FLOOR
CEILING PLAN GROUND FLOOR ELECTRICAL PLAN FIRST FLOOR ELECTRICAL PLAN TV OV CT RH FR DW UB AB AB WM DR AB AB HWC WP WP TYPE2REFLECTEDCEILING&ELECTRICALPLANS NOTE: ALL ELECTRICAL & LIGHTING DRAWINGS ARE DIAGRAMATIC AND ARE TO BE CONFIRMED WITH THE ELECTRICAL CONTRACTOR.
GROUND
FLOOR REFLECTED
REFLECTED
CEILING&LIGHTINGNOTES:
Dimmerswitchestobeinstalledonlightsin bedroomslivinganddiningareas
Externallightsmustbecontrolledbyadaylightsensor (asshown),orhaveanaveragelightsourceefficacy ofnotlessthan40lumens/W
Bathroomfanstobefittedwithbackdraught dampers/shuttersandductedtooutsideviawall vent
ReferLightingCalculatorforEnergyEfficiency compliance
NaturalLighting&Ventilatiion -RefertoSchedules
ProvideExhaustFansinToiletsBathroomsanda rangehoodabovekitchenhotplates(tobeselected byowner)Installandducttooutsideairin accrodancewithAS1668.2Referplansforlocation
Allelectricalworkshallbecarriedout&testedin accordancewithallrelevantaustralianstandards AS/NZS3008&localauthoritiesrules/regulations. Provideartificiallightingtoallroomsinaccordance withAS/NZS1680.0.Finallightinglayouttobe co-ordinatedbetweentheownerandbuilder
ductedtooutsideofbuilding
allelectricalinstallationstobe inaccordancewithAS3000 confirmlocationofNBNconnectionsandboxes withclientpriortoinstallation
GPOlocationshownindicatively Contractortoconfirmallfinallocationsonsitewith clientpriortorough-inMountingheightpointstobe 300mmAFFLunlessnominatedotherwiseorlocated withinjoineryorabovebenches
NOTES:
10mmPlasterboardceilingliningsinstalledto manufacturer'sspecificationsPaintfinish
10mmPlasterboardinternalwallliningsinstalledto manufacturer'sspecificationsPaintfinish 10mmMoistureResistantPlasterboardor6mm VILLABOARDinternalwallliningstoallwetarea wallsinstalledtomanufacturer'sspecificationspaint finish
Externaldoorsandoperablewindowsmustbefitted withrestrictairinfiltrationseal bottomedgeofexternalswingdoorand/orinternal
pendant
IXLTasticCombinationLight. Fan&heatlampunit(4Lamp) 4x275WHeatlamps(notincludedincalc.) 1x6WLEDcentrelight
DaylightSensor. (tomeetBCAequirementthatexternal lightsbecontrolledbydaylightsensor.)
AcousticSoundInsulationinWalls (ShownDashed)
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 RCP&ElecPlans-Type3-Units7-9 8-10PetcheyStreet Brick&Castle DD A209 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B TV OV CT RH FR DW UB AB AB WM DR AB AB HWC WP WP 0 12 5 METRES centimetreonthisdrawingrepresents metreontheground(i.e1:100) INSULATIONREQUIREMENTS: externalwalls =R2.8min reflectivesarking =R0.43 R2.5wallbatts =R2.5 achievedvalue =R2.93 ROOFANDCEILING: minrequirmentR4.6 basedonsolarabsorptionvalueof0.45 BCAvalueforpitchedroofandflatceiling =R0.21 permastopreflectivesarking =R1.3 R5.0ceilingbatts =R5.0 achievedvalue R6.51 R2.5insulationtointernalgaragewalls CEILING LINING SCHEDULE: C01 Finishedceilinglevel:2700mm 10mmPlasterboardceilinglining Paintfinish. Installedtomanufacturer'sspecification ReferSectionforfixingdetails C02 Finishedceilinglevel:RAKED 10mmPlasterboardceilinglining Paintfinish. Installedtomanufacturer'sspecification ReferSectionforfixingdetail C03 Finishedceilinglevel:2700mm 10mmAquachekceilinglining(orsimilar approved)Paintfinish Installedtomanufacturer'sspecification ReferSectionforfixingdetails C04Finishedceilinglevel:2400mm 10mmPlasterboardceilinglining Paintfinish. Installedtomanufacturer'sspecification ReferSectionforfixingdetails C05 Finishedceilinglevel:2400mm 10mmAquachekceilinglining(orsimilar approved)Paintfinish Installedtomanufacturer'sspecification ReferSectionforfixingdetails CEILING & LIGHTING LEGEND: SmokeAlarmsmustbeHardwiredwith batterybackupTocomplywithPart3.7.2 s.a.oftheNCC2016Allsmokealarmsmustbe interconnected.Mustbelocatedonthe ceilinginalllevelsofthebuilding SingleLightswitch(2w=2wayswitch) MultipleLightswitch DL RecessedDownlight DL ExternalWallLight-WL ceilingexhaustfan-SEALED LEDpendantbar-LPB Selectedfeaturependant Selectedbattenfittingwithfeature
garagedoormusthavedraftprotectiondevice (ravenorequivalent) AllceilingsandwindowsanddoorsSquareSet. NOTES: mainswitchboard singlegpo doublegpo gpo(overbench) gpo(weather-proof) televisionconnection telephone/internet connection 315Lt4.8kWRheem hotwatercylindertwin element internal/external electrichotwater system
dishwasher/fridgeandmicrowavegpotobe providedlocationtobec.o.s allceilingexhaustfans/rangehoodstobe
HAGER ® Silhouette power outlets and switches throughout all lights to be dimmable, and on dimmers rough in for electrical window furnishings throughout TV ob wp HWC
FLOOR REFLECTED CEILING PLAN FIRST FLOOR REFLECTED CEILING PLAN GROUND FLOOR ELECTRICAL PLAN FIRST FLOOR ELECTRICAL PLAN DL DL DL C01 C01 C03 C03 Tolights above sa DL DL DL DL DL DL DL DL DL DL LED under overheads DL DL DL C01 C04 DL DL DL DL DL sa toswitch below DL DL DL DL DL C02 C02 C02 C02 C05 C05 TYPE3REFLECTEDCEILING&ELECTRICALPLANS NOTE: ALL ELECTRICAL & LIGHTING DRAWINGS ARE DIAGRAMATIC AND ARE TO BE CONFIRMED WITH THE ELECTRICAL CONTRACTOR.
GROUND
CEILING&LIGHTINGNOTES:
Dimmerswitchestobeinstalledonlightsin bedroomslivinganddiningareas
Externallightsmustbecontrolledbyadaylightsensor (asshown),orhaveanaveragelightsourceefficacy ofnotlessthan40lumens/W
Bathroomfanstobefittedwithbackdraught dampers/shuttersandductedtooutsideviawall vent
ReferLightingCalculatorforEnergyEfficiency compliance
NaturalLighting&Ventilatiion -RefertoSchedules
ProvideExhaustFansinToiletsBathroomsanda rangehoodabovekitchenhotplates(tobeselected byowner)Installandducttooutsideairin accrodancewithAS1668.2Referplansforlocation
Allelectricalworkshallbecarriedout&testedin accordancewithallrelevantaustralianstandards AS/NZS3008&localauthoritiesrules/regulations. Provideartificiallightingtoallroomsinaccordance withAS/NZS1680.0.Finallightinglayouttobe co-ordinatedbetweentheownerandbuilder
dishwasher/fridgeandmicrowavegpotobe providedlocationtobec.o.s
allceilingexhaustfans/rangehoodstobe ductedtooutsideofbuilding
allelectricalinstallationstobe inaccordancewithAS3000 confirmlocationofNBNconnectionsandboxes withclientpriortoinstallation
GPOlocationshownindicatively Contractortoconfirmallfinallocationsonsitewith clientpriortorough-inMountingheightpointstobe 300mmAFFLunlessnominatedotherwiseorlocated withinjoineryorabovebenches
NOTES:
10mmPlasterboardceilingliningsinstalledto manufacturer'sspecificationsPaintfinish
10mmPlasterboardinternalwallliningsinstalledto manufacturer'sspecificationsPaintfinish 10mmMoistureResistantPlasterboardor6mm VILLABOARDinternalwallliningstoallwetarea wallsinstalledtomanufacturer'sspecificationspaint
Externaldoorsandoperablewindowsmustbefitted
1x6WLEDcentrelight
DaylightSensor. (tomeetBCAequirementthatexternal lightsbecontrolledbydaylightsensor.)
AcousticSoundInsulationinWalls (ShownDashed)
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 RCP&ElecPlans-Type4-Units 11-12 8-10PetcheyStreet Brick&Castle DD A210 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B C01 DL DL DL DL DL DL DL DL LED under overheads DL DL DL DL DL DL DL C01 C04 C03 DL DL DL DL sa toswitch below DL DL DL DL DL DL C02 C02 C02 C05 C05 C02 0 12 5 METRES centimetreonthisdrawingrepresents metreontheground(i.e1:100) INSULATIONREQUIREMENTS: externalwalls =R2.8min reflectivesarking =R0.43 R2.5wallbatts =R2.5 achievedvalue =R2.93 ROOFANDCEILING: minrequirmentR4.6 basedonsolarabsorptionvalueof0.45 BCAvalueforpitchedroofandflatceiling =R0.21 permastopreflectivesarking =R1.3 R5.0ceilingbatts =R5.0 achievedvalue R6.51 R2.5insulationtointernalgaragewalls CEILING LINING SCHEDULE: C01 Finishedceilinglevel:2700mm 10mmPlasterboardceilinglining Paintfinish. Installedtomanufacturer'sspecification ReferSectionforfixingdetails C02 Finishedceilinglevel:RAKED 10mmPlasterboardceilinglining Paintfinish. Installedtomanufacturer'sspecification ReferSectionforfixingdetail C03 Finishedceilinglevel:2700mm 10mmAquachekceilinglining(orsimilar approved)Paintfinish Installedtomanufacturer'sspecification ReferSectionforfixingdetails C04Finishedceilinglevel:2400mm 10mmPlasterboardceilinglining Paintfinish. Installedtomanufacturer'sspecification ReferSectionforfixingdetails C05 Finishedceilinglevel:2400mm 10mmAquachekceilinglining(orsimilar approved)Paintfinish Installedtomanufacturer'sspecification ReferSectionforfixingdetails CEILING & LIGHTING LEGEND: SmokeAlarmsmustbeHardwiredwith batterybackupTocomplywithPart3.7.2 s.a.oftheNCC2016Allsmokealarmsmustbe interconnected.Mustbelocatedonthe ceilinginalllevelsofthebuilding SingleLightswitch(2w=2wayswitch) MultipleLightswitch DL RecessedDownlight DL ExternalWallLight-WL ceilingexhaustfan-SEALED LEDpendantbar-LPB Selectedfeaturependant Selectedbattenfittingwithfeature pendant IXLTasticCombinationLight. Fan&heatlampunit(4Lamp) 4x275WHeatlamps(notincludedincalc.)
finish
withrestrictairinfiltrationseal
garagedoormusthavedraftprotectiondevice (ravenorequivalent)
NOTES: mainswitchboard singlegpo doublegpo gpo(overbench) gpo(weather-proof) televisionconnection telephone/internet connection 315Lt4.8kWRheem hotwatercylindertwin element internal/external electrichotwater system
bottomedgeofexternalswingdoorand/orinternal
AllceilingsandwindowsanddoorsSquareSet.
® Silhouette power outlets and switches throughout all lights to be dimmable, and on dimmers rough in for electrical window furnishings throughout TV ob wp HWC
CEILING PLAN FIRST
CEILING PLAN GROUND FLOOR ELECTRICAL PLAN FIRST FLOOR ELECTRICAL PLAN TV OV CT RH FR DW UB AB AB WM DR HWC WP WP UB TYPE4REFLECTEDCEILING&ELECTRICALPLANS NOTE: ALL ELECTRICAL & LIGHTING DRAWINGS ARE DIAGRAMATIC AND ARE TO BE CONFIRMED WITH THE ELECTRICAL CONTRACTOR.
HAGER
GROUND FLOOR REFLECTED
FLOOR REFLECTED
CEILING&LIGHTINGNOTES:
Dimmerswitchestobeinstalledonlightsin bedroomslivinganddiningareas
Externallightsmustbecontrolledbyadaylightsensor (asshown),orhaveanaveragelightsourceefficacy ofnotlessthan40lumens/W
Bathroomfanstobefittedwithbackdraught dampers/shuttersandductedtooutsideviawall vent
ReferLightingCalculatorforEnergyEfficiency compliance
NaturalLighting&Ventilatiion -RefertoSchedules
ProvideExhaustFansinToiletsBathroomsanda rangehoodabovekitchenhotplates(tobeselected byowner)Installandducttooutsideairin accrodancewithAS1668.2Referplansforlocation
Allelectricalworkshallbecarriedout&testedin accordancewithallrelevantaustralianstandards AS/NZS3008&localauthoritiesrules/regulations. Provideartificiallightingtoallroomsinaccordance withAS/NZS1680.0.Finallightinglayouttobe co-ordinatedbetweentheownerandbuilder
dishwasher/fridgeandmicrowavegpotobe providedlocationtobec.o.s allceilingexhaustfans/rangehoodstobe ductedtooutsideofbuilding
allelectricalinstallationstobe inaccordancewithAS3000 confirmlocationofNBNconnectionsandboxes withclientpriortoinstallation
GPOlocationshownindicatively Contractortoconfirmallfinallocationsonsitewith clientpriortorough-inMountingheightpointstobe 300mmAFFLunlessnominatedotherwiseorlocated withinjoineryorabovebenches
NOTES:
10mmPlasterboardceilingliningsinstalledto manufacturer'sspecificationsPaintfinish 10mmPlasterboardinternalwallliningsinstalledto manufacturer'sspecificationsPaintfinish 10mmMoistureResistantPlasterboardor6mm VILLABOARDinternalwallliningstoallwetarea wallsinstalledtomanufacturer'sspecificationspaint
4x275WHeatlamps(notincludedincalc.) 1x6WLEDcentrelight
DaylightSensor. (tomeetBCAequirementthatexternal lightsbecontrolledbydaylightsensor.)
AcousticSoundInsulationinWalls (ShownDashed)
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 RCP&ElecPlans-Type5-Units 13-14 8-10PetcheyStreet Brick&Castle DD A211 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B DL DL DL C01 C01 C03 C03 Tolights above sa DL DL DL DL DL DL DL DL DL DL LED under overheads DL DL DL C04 DL DL DL DL DL sa toswitch below DL DL DL DL DL C02 C02 C02 C05 C05 C02 0 12 5 METRES centimetreonthisdrawingrepresents metreontheground(i.e1:100) INSULATIONREQUIREMENTS: externalwalls =R2.8min reflectivesarking =R0.43 R2.5wallbatts =R2.5 achievedvalue =R2.93 ROOFANDCEILING: minrequirmentR4.6 basedonsolarabsorptionvalueof0.45 BCAvalueforpitchedroofandflatceiling =R0.21 permastopreflectivesarking =R1.3 R5.0ceilingbatts =R5.0 achievedvalue R6.51 R2.5insulationtointernalgaragewalls CEILING LINING SCHEDULE: C01 Finishedceilinglevel:2700mm 10mmPlasterboardceilinglining Paintfinish. Installedtomanufacturer'sspecification ReferSectionforfixingdetails C02 Finishedceilinglevel:RAKED 10mmPlasterboardceilinglining Paintfinish. Installedtomanufacturer'sspecification ReferSectionforfixingdetail C03 Finishedceilinglevel:2700mm 10mmAquachekceilinglining(orsimilar approved)Paintfinish Installedtomanufacturer'sspecification ReferSectionforfixingdetails C04Finishedceilinglevel:2400mm 10mmPlasterboardceilinglining Paintfinish. Installedtomanufacturer'sspecification ReferSectionforfixingdetails C05 Finishedceilinglevel:2400mm 10mmAquachekceilinglining(orsimilar approved)Paintfinish Installedtomanufacturer'sspecification ReferSectionforfixingdetails CEILING & LIGHTING LEGEND: SmokeAlarmsmustbeHardwiredwith batterybackupTocomplywithPart3.7.2 s.a.oftheNCC2016Allsmokealarmsmustbe interconnected.Mustbelocatedonthe ceilinginalllevelsofthebuilding SingleLightswitch(2w=2wayswitch) MultipleLightswitch DL RecessedDownlight DL ExternalWallLight-WL ceilingexhaustfan-SEALED LEDpendantbar-LPB Selectedfeaturependant Selectedbattenfittingwithfeature pendant IXLTasticCombinationLight. Fan&heatlampunit(4Lamp)
finish
AllceilingsandwindowsanddoorsSquareSet. NOTES: mainswitchboard singlegpo doublegpo gpo(overbench) gpo(weather-proof) televisionconnection telephone/internet connection 315Lt4.8kWRheem hotwatercylindertwin element internal/external electrichotwater system
Externaldoorsandoperablewindowsmustbefitted withrestrictairinfiltrationseal bottomedgeofexternalswingdoorand/orinternal garagedoormusthavedraftprotectiondevice (ravenorequivalent)
HAGER ® Silhouette power outlets and switches throughout all lights to be dimmable, and on dimmers rough in for electrical window furnishings throughout TV ob wp HWC
PLAN FIRST FLOOR
PLAN GROUND FLOOR ELECTRICAL PLAN FIRST FLOOR ELECTRICAL PLAN TV OV CT RH FR DW UB AB AB WM DR AB AB HWC WP WP TYPE5REFLECTEDCEILING&ELECTRICALPLANS NOTE: ALL ELECTRICAL & LIGHTING DRAWINGS ARE DIAGRAMATIC AND ARE TO BE CONFIRMED WITH THE ELECTRICAL CONTRACTOR.
GROUND FLOOR REFLECTED CEILING
REFLECTED CEILING
CEILING&LIGHTINGNOTES:
Dimmerswitchestobeinstalledonlightsin bedroomslivinganddiningareas
Externallightsmustbecontrolledbyadaylightsensor (asshown),orhaveanaveragelightsourceefficacy ofnotlessthan40lumens/W
Bathroomfanstobefittedwithbackdraught dampers/shuttersandductedtooutsideviawall vent
ReferLightingCalculatorforEnergyEfficiency compliance
NaturalLighting&Ventilatiion -RefertoSchedules
ProvideExhaustFansinToiletsBathroomsanda rangehoodabovekitchenhotplates(tobeselected byowner)Installandducttooutsideairin accrodancewithAS1668.2Referplansforlocation
Allelectricalworkshallbecarriedout&testedin accordancewithallrelevantaustralianstandards AS/NZS3008&localauthoritiesrules/regulations. Provideartificiallightingtoallroomsinaccordance withAS/NZS1680.0.Finallightinglayouttobe co-ordinatedbetweentheownerandbuilder
allceilingexhaustfans/rangehoodstobe ductedtooutsideofbuilding
allelectricalinstallationstobe inaccordancewithAS3000 confirmlocationofNBNconnectionsandboxes withclientpriortoinstallation
GPOlocationshownindicatively Contractortoconfirmallfinallocationsonsitewith clientpriortorough-inMountingheightpointstobe 300mmAFFLunlessnominatedotherwiseorlocated withinjoineryorabovebenches
NOTES:
10mmPlasterboardceilingliningsinstalledto manufacturer'sspecificationsPaintfinish
10mmPlasterboardinternalwallliningsinstalledto manufacturer'sspecificationsPaintfinish
10mmMoistureResistantPlasterboardor6mm VILLABOARDinternalwallliningstoallwetarea wallsinstalledtomanufacturer'sspecificationspaint finish
Externaldoorsandoperablewindowsmustbefitted withrestrictairinfiltrationseal bottomedgeofexternalswingdoorand/orinternal garagedoormusthavedraftprotectiondevice (ravenorequivalent)
4x275WHeatlamps(notincludedincalc.) 1x6WLEDcentrelight
DaylightSensor. (tomeetBCAequirementthatexternal lightsbecontrolledbydaylightsensor.)
AcousticSoundInsulationinWalls (ShownDashed)
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 RCP&ElecPlans-Type6-Units 15-17 8-10PetcheyStreet Brick&Castle DD A212 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B DL DL DL C01 C01 C03 C03 Tolights above sa DL DL DL DL DL DL DL DL DL DL LED under overheads DL DL DL DL DL C04 DL DL DL DL DL sa toswitch below DL DL DL DL DL DL DL C02 C02 C05C05 C02 C02 0 12 5 METRES centimetreonthisdrawingrepresents metreontheground(i.e1:100) INSULATIONREQUIREMENTS: externalwalls =R2.8min reflectivesarking =R0.43 R2.5wallbatts =R2.5 achievedvalue =R2.93 ROOFANDCEILING: minrequirmentR4.6 basedonsolarabsorptionvalueof0.45 BCAvalueforpitchedroofandflatceiling =R0.21 permastopreflectivesarking =R1.3 R5.0ceilingbatts =R5.0 achievedvalue R6.51 R2.5insulationtointernalgaragewalls CEILING LINING SCHEDULE: C01 Finishedceilinglevel:2700mm 10mmPlasterboardceilinglining Paintfinish. Installedtomanufacturer'sspecification ReferSectionforfixingdetails C02 Finishedceilinglevel:RAKED 10mmPlasterboardceilinglining Paintfinish. Installedtomanufacturer'sspecification ReferSectionforfixingdetail C03 Finishedceilinglevel:2400mm 10mmAquachekceilinglining(orsimilar approved)Paintfinish Installedtomanufacturer'sspecification ReferSectionforfixingdetails C04Finishedceilinglevel:2400mm 10mmPlasterboardceilinglining Paintfinish. Installedtomanufacturer'sspecification ReferSectionforfixingdetails C05 Finishedceilinglevel:2400mm 10mmAquachekceilinglining(orsimilar approved)Paintfinish Installedtomanufacturer'sspecification ReferSectionforfixingdetails CEILING & LIGHTING LEGEND: SmokeAlarmsmustbeHardwiredwith batterybackupTocomplywithPart3.7.2 s.a.oftheNCC2016Allsmokealarmsmustbe interconnected.Mustbelocatedonthe ceilinginalllevelsofthebuilding SingleLightswitch(2w=2wayswitch) MultipleLightswitch DL RecessedDownlight DL ExternalWallLight-WL ceilingexhaustfan-SEALED LEDpendantbar-LPB Selectedfeaturependant Selectedbattenfittingwithfeature pendant IXLTasticCombinationLight. Fan&heatlampunit(4Lamp)
AllceilingsandwindowsanddoorsSquareSet. NOTES: mainswitchboard singlegpo doublegpo gpo(overbench) gpo(weather-proof) televisionconnection telephone/internet connection 315Lt4.8kWRheem hotwatercylindertwin element internal/external electrichotwater system
dishwasher/fridgeandmicrowavegpotobe providedlocationtobec.o.s
HAGER ® Silhouette power outlets and switches throughout all lights to be dimmable, and on dimmers rough in for electrical window furnishings throughout TV ob wp HWC
FLOOR
CEILING PLAN FIRST FLOOR
CEILING PLAN GROUND FLOOR ELECTRICAL PLAN FIRST FLOOR ELECTRICAL PLAN TV OV CT RH FR DW UB AB AB WM DR AB AB HWC WP WP TYPE6REFLECTEDCEILING&ELECTRICALPLANS NOTE: ALL ELECTRICAL & LIGHTING DRAWINGS ARE DIAGRAMATIC AND ARE TO BE CONFIRMED WITH THE ELECTRICAL CONTRACTOR.
GROUND
REFLECTED
REFLECTED
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 Elevations-Type1-Units1-4 8-10PetcheyStreet Brick&Castle DD A301 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B FirstCeilingLevel24.150 FirstFloorLevel21.750 GroundFloorLevel18.750 GroundCeilingLevel21.450 Max.RoofHeight25.380 RoofHeight24.850 proprietary'HEKAHOOD' installedtomanufacuruers specificationorsimilarto approval UNIT1 UNIT2 UNIT3 UNIT4 NGLshowdashed NGLshowdashed W1.5 W1.6W1.7 W1.1 D1.1 W1.5 W1.6W1.7 W1.1 D1.1 W1.5 W1.6W1.7 W1.1 D1.1 W1.5 W1.6W1.7 W1.1 D1.1 FirstCeilingLevel24.150 FirstFloorLevel21.750 GroundFloorLevel18.750 GroundCeilingLevel21.450 Max.RoofHeight25.380 RoofHeight24.850 UNIT1 UNIT2 UNIT3 UNIT4 NGLshowdashed NGLshowdashed W1.11 W1.2 D1.1 W1.1 W1.11 W1.2 D1.1 W1.1 W1.11 W1.2 D1.1 W1.1 W1.2 D1.1 W1.1 W1.11 W1.8 W1.9 W1.10 EXTERNAL MATERIALS & FINISHES 1 9mm'JAMESHARDIE'HARDIETEXPANELFACADESYSTEM. SMOOTHRENDERFINISH'DULUX'WHITE INSTALLATIONTOMANUFACTURERSSPECIFICATIONS DOUBLEGLAZEDALUMINIUMWINDOW&DOORFRAMES POWDERCOATFINISHASSELECTED 2 3 4 5 6 PRECASTCONCRETEPANEL,SMOOTHRENDERFINISH,WHITE 7 ALUMINIUMLOUVREDSCREENINGINFOLDEDALUMINIUMSURROUND (HEKAHOODORSIMILARTOAPPROVAL)PPCFINISHASSELECTED. NOTE: PROPRIETARYWALLING/CLADDINGSYSTEMSARETOBEINSTALLEDIN ACCORDANCEWITHTHEMANUFACTURERSINSTRUCTIONS/SPECIFICATIONS FEATUREINFILLPANEL. COLORBONDCUSTOMORBROOFING-COLOUR:MONUMENT. COLORBONDCAPPINGSFLASHINGSGUTTERSDOWNPIPES &ACCESSORIESASSELECTEDCOLOURASSELECTED TIMBERDECKING SPECIESTOBESELECTED 8 FOLDEDALUMINIUMWINDOWSURROUNDS(HEKAHOODORSIMILAR TOAPPROVAL)PPCFINISHASSELECTED NOTE: WINDOWANDDOORNUMBERSANDCONFIGUATIONSARETYPICALFORALL UNITSPERTYPE,REFERDRAWINGA901FORALLSCHEDULES 3 FirstCeilingLevel24.150 FirstFloorLevel21.750 GroundFloorLevel18.750 GroundCeilingLevel21.450 Max.RoofHeight25.380 RoofHeight24.850 UNIT1 UNIT4 NGLshowdashed NGLshowdashed NGLshowdashed W1.12 ELEVATIONSUNITS1-4 4 6 1 8 4 3 4 6 1 8 4 4 2 8 1 5 4 1 8 5 6
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 Elevations-Type2-Units5-6 8-10PetcheyStreet Brick&Castle DD A302 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B NGLatbuildingedge FirstCeilingLevel25.400 FirstFloorLevel23.000 GroundFloorLevel20.000 GroundCeilingLevel22.700 Max.RoofHeight26.770 RoofHeight26.100 UNIT6 UNIT5 UNIT6 UNIT5 proprietary'HEKAHOOD' installedtomanufacuruers specificationorsimilarto approval NGLshowdashed D1.1 W2.2 W2.7 W2.6 W2.5 D1.1 W2.2 W2.7 W2.6 W2.5
W2.12 W2.11 W2.12 W2.11 D2.2 W2.4 W2.2 D2.2 W2.4 W2.2 NGLatbuildingedge FirstCeilingLevel25.400 FirstFloorLevel23.000 GroundFloorLevel20.000 GroundCeilingLevel22.700 Max.RoofHeight26.770 RoofHeight26.100 UNIT6 UNIT5 NGLshowdashed W2.10 W2.9 W2.8 W2.3
NGLshowdashed
W2.13 ELEVATIONSUNITS5-6 EXTERNAL MATERIALS & FINISHES 1 9mm'JAMESHARDIE'HARDIETEXPANELFACADESYSTEM. SMOOTHRENDERFINISH'DULUX'WHITE INSTALLATIONTOMANUFACTURERSSPECIFICATIONS DOUBLEGLAZEDALUMINIUMWINDOW&DOORFRAMES POWDERCOATFINISHASSELECTED 2 3 4 5 6 PRECASTCONCRETEPANEL,SMOOTHRENDERFINISH,WHITE 7 ALUMINIUMLOUVREDSCREENINGINFOLDEDALUMINIUMSURROUND (HEKAHOODORSIMILARTOAPPROVAL)PPCFINISHASSELECTED. NOTE: PROPRIETARYWALLING/CLADDINGSYSTEMSARETOBEINSTALLEDIN ACCORDANCEWITHTHEMANUFACTURERSINSTRUCTIONS/SPECIFICATIONS FEATUREINFILLPANEL. COLORBONDCUSTOMORBROOFING-COLOUR:MONUMENT. COLORBONDCAPPINGSFLASHINGSGUTTERSDOWNPIPES &ACCESSORIESASSELECTEDCOLOURASSELECTED TIMBERDECKING SPECIESTOBESELECTED 8 FOLDEDALUMINIUMWINDOWSURROUNDS(HEKAHOODORSIMILAR TOAPPROVAL)PPCFINISHASSELECTED NOTE: WINDOWANDDOORNUMBERSANDCONFIGUATIONSARETYPICALFORALL UNITSPERTYPE,REFERDRAWINGA901FORALLSCHEDULES 1 1 1 1 1 2 4 4 4 4 3 3 3 3 4 1 5 8 1 1 4 4 4 4 6 4 8 8
NGLshowdashed
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 Elevations-Type3-Units7-9 8-10PetcheyStreet Brick&Castle DD A303 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B NGLatbuildingedge FirstCeilingLevel25.200 FirstFloorLevel22.800 GroundFloorLevel19.800 GroundCeilingLevel22.500 RoofHeight25.900 Max.RoofHeight26.430 FirstCeiling25.700 FirstFloor23.300 GroundFloor20.300 GroundCeiling23.00 RoofHeight26.400 Max.RoofHeight26.930 UNIT9 UNIT8 UNIT7 FirstCeilingLevel26.080 FirstFloorLevel23.680 GroundFloorLevel20.680 GroundCeilingLevel23.380 Max.RoofHeight27.310 RoofHeight26.780 W3.5 W3.6 W3.7 W3.1 D3.1 W3.5 W3.6 W3.7 W3.1 D3.1 W3.5 W3.6 W3.7 W3.1 D3.1 NGLshowdashed NGLatbuildingedge FirstCeilingLevel25.200 FirstFloorLevel22.800 GroundFloorLevel19.800 GroundCeilingLevel22.500 RoofHeight25.900 Max.RoofHeight26.430 FirstCeiling25.700 FirstFloor23.300 GroundFloor20.300 GroundCeiling23.00 RoofHeight26.400 Max.RoofHeight26.930 UNIT9 UNIT8 UNIT7 FirstCeilingLevel26.080 FirstFloorLevel23.680 GroundFloorLevel20.680 GroundCeilingLevel23.380 Max.RoofHeight27.310 RoofHeight26.780 W3.2 D3.2 W3.11 W3.4 W3.2 D3.2 W3.11 W3.4 W3.2 D3.2 W3.11 W3.4 NGLshowdashed NGLatbuildingedge FirstCeilingLevel25.200 FirstFloorLevel22.800 GroundFloorLevel19.800 GroundCeilingLevel22.500 RoofHeight25.900 Max.RoofHeight26.430 UNIT9 UNIT7 NGLshowdashed W3.12 FirstCeilingLevel26.080 FirstFloorLevel23.680 GroundFloorLevel20.680 GroundCeilingLevel23.380 Max.RoofHeight27.310 RoofHeight26.780 W3.10 W3.9 W3.8 W3.3 ELEVATIONSUNITS7-9 EXTERNAL MATERIALS & FINISHES 1 9mm'JAMESHARDIE'HARDIETEXPANELFACADESYSTEM. SMOOTHRENDERFINISH'DULUX'WHITE INSTALLATIONTOMANUFACTURERSSPECIFICATIONS DOUBLEGLAZEDALUMINIUMWINDOW&DOORFRAMES POWDERCOATFINISHASSELECTED 2 3 4 5 6 PRECASTCONCRETEPANEL,SMOOTHRENDERFINISH,WHITE 7 ALUMINIUMLOUVREDSCREENINGINFOLDEDALUMINIUMSURROUND (HEKAHOODORSIMILARTOAPPROVAL)PPCFINISHASSELECTED. NOTE: PROPRIETARYWALLING/CLADDINGSYSTEMSARETOBEINSTALLEDIN ACCORDANCEWITHTHEMANUFACTURERSINSTRUCTIONS/SPECIFICATIONS FEATUREINFILLPANEL. COLORBONDCUSTOMORBROOFING-COLOUR:MONUMENT. COLORBONDCAPPINGSFLASHINGSGUTTERSDOWNPIPES &ACCESSORIESASSELECTEDCOLOURASSELECTED TIMBERDECKING SPECIESTOBESELECTED 8 FOLDEDALUMINIUMWINDOWSURROUNDS(HEKAHOODORSIMILAR TOAPPROVAL)PPCFINISHASSELECTED NOTE: WINDOWANDDOORNUMBERSANDCONFIGUATIONSARETYPICALFORALL UNITSPERTYPE,REFERDRAWINGA901FORALLSCHEDULES 3 4 6 1 8 4 3 4 6 1 8 4 4 1 8 5 6 4 2 8 1 5
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 Elevations-Type4-Units10-12 8-10PetcheyStreet Brick&Castle DD A304 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B NGLatbuildingedge UNIT12 UNIT11 UNIT10 FirstCeilingLevel27.600 FirstFloorLevel25.200 GroundFloorLevel22.200 GroundCeilingLevel24.900 Max.RoofHeight29.100 RoofHeight28.300 FirstCeilingLevel26.600 FirstFloorLevel24.200 GroundFloorLevel21.200 GroundCeilingLevel23.900 RoofHeight27.300 Max.RoofHeight27.965 FirstCeiling27.100 FirstFloor24.700 GroundFloor21.700 GroundCeiling24.400 RoofHeight27.800 Max.RoofHeight28.600 D1.1 W2.2 W2.7 W2.6 W2.5 W4.5 W4.4 W4.1 W4.5 W4.4 W4.1 NGLatbuildingedge FirstCeiling27.100 FirstFloor24.700 GroundFloor21.700 GroundCeiling24.400 RoofHeight27.800 Max.RoofHeight28.600 UNIT12 UNIT11 UNIT10 FirstCeilingLevel27.600 FirstFloorLevel25.200 GroundFloorLevel22.200 GroundCeilingLevel24.900 Max.RoofHeight29.100 RoofHeight28.300 FirstCeilingLevel26.600 FirstFloorLevel24.200 GroundFloorLevel21.200 GroundCeilingLevel23.900 RoofHeight27.300 Max.RoofHeight27.965 W2.12 W2.11 D2.2 W2.4 W2.2 W4.10 W4.9 D4.2 W4.3 W4.10 W4.9 D4.2 W4.3 NGLatbuildingedge FirstCeiling27.100 FirstFloor24.700 GroundFloor21.700 GroundCeiling24.400 RoofHeight27.800 Max.RoofHeight28.600 UNIT11 W4.11 FirstCeilingLevel27.600 FirstFloorLevel25.200 GroundFloorLevel22.200 GroundCeilingLevel24.900 Max.RoofHeight29.100 RoofHeight28.300 UNIT12 W4.8W4.7W4.6 1 1 4 4 3 3 1 4 4 1 4 1 4 3 1 4 3 3 1 4 3 1 4 4 1 4 4 EXTERNAL MATERIALS & FINISHES 1 9mm'JAMESHARDIE'HARDIETEXPANELFACADESYSTEM. SMOOTHRENDERFINISH'DULUX'WHITE INSTALLATIONTOMANUFACTURERSSPECIFICATIONS DOUBLEGLAZEDALUMINIUMWINDOW&DOORFRAMES POWDERCOATFINISHASSELECTED 2 3 4 5 6 PRECASTCONCRETEPANEL,SMOOTHRENDERFINISH,WHITE 7 ALUMINIUMLOUVREDSCREENINGINFOLDEDALUMINIUMSURROUND (HEKAHOODORSIMILARTOAPPROVAL)PPCFINISHASSELECTED. NOTE: PROPRIETARYWALLING/CLADDINGSYSTEMSARETOBEINSTALLEDIN ACCORDANCEWITHTHEMANUFACTURERSINSTRUCTIONS/SPECIFICATIONS FEATUREINFILLPANEL. COLORBONDCUSTOMORBROOFING-COLOUR:MONUMENT. COLORBONDCAPPINGSFLASHINGSGUTTERSDOWNPIPES &ACCESSORIESASSELECTEDCOLOURASSELECTED TIMBERDECKING SPECIESTOBESELECTED 8 FOLDEDALUMINIUMWINDOWSURROUNDS(HEKAHOODORSIMILAR TOAPPROVAL)PPCFINISHASSELECTED NOTE: WINDOWANDDOORNUMBERSANDCONFIGUATIONSARETYPICALFORALL UNITSPERTYPE,REFERDRAWINGA901FORALLSCHEDULES 6 8 6 8 6 8 8 8 8 2 8 1 5 4 1 8 5 6 4
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 Elevations-Type5-Units13-14 8-10PetcheyStreet Brick&Castle DD A305 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B NGLatbuildingedge UNIT13 UNIT14 UNIT15 FirstCeilingLevel27.240 FirstFloorLevel24.840 GroundFloorLevel21.840 GroundCeilingLevel24.540 Max.RoofHeight28.470 RoofHeight27.940 FirstCeilingLevel26.240 FirstFloorLevel23.840 GroundFloorLevel20.840 GroundCeilingLevel23.540 RoofHeight26.940 Max.RoofHeight27.610 FirstCeiling26.740 FirstFloor24.340 GroundFloor21.340 GroundCeiling24.040 RoofHeight27.440 Max.RoofHeight27.970 W5.11 W5.10 W5.9 W5.1 D5.1 W5.11 W5.10 W5.9 W5.1 D5.1 W6.11 W6.10 W6.1 W6.1 NGLatbuildingedge UNIT13 UNIT14 UNIT15 FirstCeilingLevel27.240 FirstFloorLevel24.840 GroundFloorLevel21.840 GroundCeilingLevel24.540 Max.RoofHeight28.470 RoofHeight27.940 FirstCeilingLevel26.240 FirstFloorLevel23.840 GroundFloorLevel20.840 GroundCeilingLevel23.540 RoofHeight26.940 Max.RoofHeight27.610 FirstCeiling26.740 FirstFloor24.340 GroundFloor21.340 GroundCeiling24.040 RoofHeight27.440 Max.RoofHeight27.970 W5.5 W6.6 W5.2 W5.4 D5.2 W5.5 W5.2 W5.4 D5.2 W6.5 W6.2 W6.4 D6.2 FirstCeilingLevel27.600 FirstFloorLevel25.200 GroundFloorLevel22.200 GroundCeilingLevel24.900 Max.RoofHeight29.100 RoofHeight28.300 UNIT15 W5.12 4 6 1 8 4 3 4 6 1 8 4 4 2 8 1 5 4 1 8 5 6 3 4 6 1 8 4 3 4 6 1 8 4 3 4 6 1 8 4 3 4 6 1 8 4 3 UNIT13 FirstCeilingLevel27.240 FirstFloorLevel24.840 GroundFloorLevel21.840 GroundCeilingLevel24.540 Max.RoofHeight28.470 RoofHeight27.940 NGLatbuildingedge W5.8 W5.7 W5.6 W5.3
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 Elevations-Type6-Units15-17 8-10PetcheyStreet Brick&Castle DD A306 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B NGLatbuildingedge FirstCeilingLevel25.250 FirstFloorLevel22.850 GroundFloorLevel19.850 GroundCeilingLevel22.550 Max.RoofHeight26.620 RoofHeight25.950 W6.11 W6.10 W6.1 D6.1 W6.11 W6.10 W6.1 D6.1 UNIT17 UNIT16 W6.6 W6.5 W6.2 W6.4 D6.2 W6.6 W6.5 W6.2 W6.4 D6.2 UNIT17 UNIT16 UNIT17 UNIT16 NGLatbuildingedge FirstCeilingLevel25.250 FirstFloorLevel22.850 GroundFloorLevel19.850 GroundCeilingLevel22.550 Max.RoofHeight26.620 RoofHeight25.950
NGLatbuildingedge
W6.9 W6.8 W6.7 W6.3 W6.12 4 6 1 8 4 3 4 6 1 8 4 3 4 6 1 8 4 3 4 6 1 8 4 3 4 2 8 1 5 4 2 8 5 6 EXTERNAL MATERIALS & FINISHES 1 9mm'JAMESHARDIE'HARDIETEXPANELFACADESYSTEM. SMOOTHRENDERFINISH'DULUX'WHITE INSTALLATIONTOMANUFACTURERSSPECIFICATIONS DOUBLEGLAZEDALUMINIUMWINDOW&DOORFRAMES POWDERCOATFINISHASSELECTED 2 3 4 5 6 PRECASTCONCRETEPANEL,SMOOTHRENDERFINISH,WHITE 7 ALUMINIUMLOUVREDSCREENINGINFOLDEDALUMINIUMSURROUND (HEKAHOODORSIMILARTOAPPROVAL)PPCFINISHASSELECTED. NOTE: PROPRIETARYWALLING/CLADDINGSYSTEMSARETOBEINSTALLEDIN ACCORDANCEWITHTHEMANUFACTURERSINSTRUCTIONS/SPECIFICATIONS FEATUREINFILLPANEL. COLORBONDCUSTOMORBROOFING COLOUR:MONUMENT. COLORBONDCAPPINGSFLASHINGSGUTTERSDOWNPIPES &ACCESSORIESASSELECTEDCOLOURASSELECTED TIMBERDECKING SPECIESTOBESELECTED 8 FOLDEDALUMINIUMWINDOWSURROUNDS(HEKAHOODORSIMILAR TOAPPROVAL)PPCFINISHASSELECTED NOTE: WINDOWANDDOORNUMBERSANDCONFIGUATIONSARETYPICALFORALL UNITSPERTYPE,REFERDRAWINGA901FORALLSCHEDULES
NGLatbuildingedge
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 TypicalBathroomElevations-Sheet1 8-10PetcheyStreet Brick&Castle DD A401 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B 1800 CL 900 1200 600 450 430 CL 1000 10 100 1800 CL 900 1200 600 390 10 450 1800 CL 900 1200 600 450 430 CL 1000 10 435 CL 1000 100 BATHROOM - B1 - ELEVATION 01 BATHROOM - B1 - ELEVATION 02 BATHROOM - B1 - ELEVATION 03 BATHROOM - B1 - ELEVATION 04 BATHROOM - B2 - ELEVATION 01 BATHROOM - B2 - ELEVATION 02 BATHROOM - B2 - ELEVATION 03 BATHROOM - B2 - ELEVATION 04 ENSUITE - E1 - ELEVATION 01 ENSUITE - E1 - ELEVATION 02 ENSUITE - E1 - ELEVATION 03 ENSUITE - E1 - ELEVATION 04 ENSUITE - E2 - ELEVATION 01 ENSUITE - E2 - ELEVATION 02 ENSUITE - E2 - ELEVATION 03 ENSUITE - E2 - ELEVATION 04 1400 900 300 200 600 CL 1000 1400 900 300 200 600 CL obs obs obs obs 1000 900 300 200 600 LC 1000 1800 1200 600 430 CL 1000 100 1800 1200 600 obs obs 1000 1800 CL 900 1200 600 390 10 450 SH1 WC1 B1 M2 M1 B1 M1 SH1 WC1 B1 M1 M2 B1 M1 SH1 WC1 SH1 M2 B1 M1 M1 WC1 B1 M1 M1 B1 SH1 SH1 WC1 M2
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 TypicalSections-Sheet1 8-10PetcheyStreet Brick&Castle DD A501 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B NGLatbuildingedge Firstceilingpitchpoint FirstFloorLevel GroundFloorLevel GroundCeilingLevel Max.RoofHeight(varies) RoofHeight 2700 300 2450 650 01 A502 01 A502 01 A502 TYPICAL SECTION UNITS1-4(typical) PART H4D9 - CONDENSATION MANAGEMENT ALLPLIABLEBUILDINGMEMBRANESINSTALLEDINAEXTERNALWALLMUSTBEIN ACCORDANCEWITHPARTH4D9(NCC2022)&PART10.8(HOUSINGPROVISIONS 2022)AS4200.1&AS4200.2 WHEREINSTALLEDINCLIMATEZONES67&8THEPLIABLEMEMBRANEMUSTBE AVAPOURPERMEABLEMEMBRANE PLIABLEMEMBRANESMUSTBELOCATEDONTHEEXTERIORSIDEOFTHE PRIMARYINSULATIONLAYEROFTHEWALLASSEMBLIESTHATFORMTHE EXTERNALENVELOPEOFTHEBUILDINGTOCOMPLYWITH10.8.1 ALLKITCHENBATHROOM,SANITARYCOMPARTMENTSORLAUNDRYMUSTBE INSTALLEDINACCORDANCEWITHPART10.8.2(HOUSINGPROVISIONS2022) EXHAUSTFROMABATHROOM,SANITARYCOMPARTMENTORLAUNDRYMUSTBE DISCHARGEDVIADUCTTOOUTDOORAIRORTOROOFSPACETHATIS VENTILATEDINACCORDANCEWITHPART10.8.2(HOUSINGPROVISIONS2022) ALLROOFSPACESMUSTBEINACCORDANCEWITHNCCPART10.8.3(HOUSING PROVISIONS2022) WHEREEXHAUSTFROMBATHROOM,SANITARYCOMPARTMENTSORLAUNDRY AREDISCHARGEDINTOROOFSPACETHEROOFMUSTBEVENTILATEDTO OUTDOORAIRTHROUGHEVENLYDISTRIBUTEDOPENINGS OPENINGSMUSTHAVEATOTALUNOBSTRUCTEDAREATOSATISFYTABLE10.8.3 (HOUSINGPROVISIONS2022) VENTILATIONOPENINGSARESPECIFIEDASAMINIMUMFREEOPENAREAPER METRELENGTHOFTHELONGESTHORIZONTALDIMENSIONOFTHEROOF FORTHEPURPOSESOFTHISTABLEHIGHLEVELOPENINGSAREOPENINGS PROVIDEDATTHERIDGEORNOTMORETHAN900MMBELOWTHERIDGEOR HIGHESTPOINTOFTHEROOFSPACEMEASUREDVERTICALLY
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 TypicalSections-Sheet2 8-10PetcheyStreet Brick&Castle DD A502 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B NGLatbuildingedge FirstCeilingLevel FirstFloorLevel GroundFloorLevel GroundCeilingLevel Max.RoofHeight(varies) RoofHeight 2700 300 2400 700 TYPICAL SECTION UNITS13-15 PART H4D9 - CONDENSATION MANAGEMENT ALLPLIABLEBUILDINGMEMBRANESINSTALLEDINAEXTERNALWALLMUSTBEIN ACCORDANCEWITHPARTH4D9(NCC2022)&PART10.8(HOUSINGPROVISIONS 2022)AS4200.1&AS4200.2 WHEREINSTALLEDINCLIMATEZONES67&8THEPLIABLEMEMBRANEMUSTBE AVAPOURPERMEABLEMEMBRANE PLIABLEMEMBRANESMUSTBELOCATEDONTHEEXTERIORSIDEOFTHE PRIMARYINSULATIONLAYEROFTHEWALLASSEMBLIESTHATFORMTHE EXTERNALENVELOPEOFTHEBUILDINGTOCOMPLYWITH10.8.1 ALLKITCHENBATHROOM,SANITARYCOMPARTMENTSORLAUNDRYMUSTBE INSTALLEDINACCORDANCEWITHPART10.8.2(HOUSINGPROVISIONS2022) EXHAUSTFROMABATHROOM,SANITARYCOMPARTMENTORLAUNDRYMUSTBE DISCHARGEDVIADUCTTOOUTDOORAIRORTOROOFSPACETHATIS VENTILATEDINACCORDANCEWITHPART10.8.2(HOUSINGPROVISIONS2022) ALLROOFSPACESMUSTBEINACCORDANCEWITHNCCPART10.8.3(HOUSING PROVISIONS2022) WHEREEXHAUSTFROMBATHROOM,SANITARYCOMPARTMENTSORLAUNDRY AREDISCHARGEDINTOROOFSPACETHEROOFMUSTBEVENTILATEDTO OUTDOORAIRTHROUGHEVENLYDISTRIBUTEDOPENINGS OPENINGSMUSTHAVEATOTALUNOBSTRUCTEDAREATOSATISFYTABLE10.8.3 (HOUSINGPROVISIONS2022) VENTILATIONOPENINGSARESPECIFIEDASAMINIMUMFREEOPENAREAPER METRELENGTHOFTHELONGESTHORIZONTALDIMENSIONOFTHEROOF FORTHEPURPOSESOFTHISTABLEHIGHLEVELOPENINGSAREOPENINGS PROVIDEDATTHERIDGEORNOTMORETHAN900MMBELOWTHERIDGEOR HIGHESTPOINTOFTHEROOFSPACEMEASUREDVERTICALLY
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 TypicalSections-Sheet3 8-10PetcheyStreet Brick&Castle DD A503 1:100 FORCONSTRUCTION J008392 JE JEConstructionIssue 13/5/24 B B
FirstCeilingpitchpoint FirstFloorLevel GroundFloorLevel GroundCeilingLevel 2700 300 2450 01 A502 TYPICAL SECTION UNITS1-4 TYPICAL CARPORT SECTION PART H4D9 - CONDENSATION MANAGEMENT ALLPLIABLEBUILDINGMEMBRANESINSTALLEDINAEXTERNALWALLMUSTBEIN ACCORDANCEWITHPARTH4D9(NCC2022)&PART10.8(HOUSINGPROVISIONS 2022)AS4200.1&AS4200.2 WHEREINSTALLEDINCLIMATEZONES67&8THEPLIABLEMEMBRANEMUSTBE AVAPOURPERMEABLEMEMBRANE PLIABLEMEMBRANESMUSTBELOCATEDONTHEEXTERIORSIDEOFTHE PRIMARYINSULATIONLAYEROFTHEWALLASSEMBLIESTHATFORMTHE EXTERNALENVELOPEOFTHEBUILDINGTOCOMPLYWITH10.8.1 ALLKITCHENBATHROOM,SANITARYCOMPARTMENTSORLAUNDRYMUSTBE INSTALLEDINACCORDANCEWITHPART10.8.2(HOUSINGPROVISIONS2022) EXHAUSTFROMABATHROOM,SANITARYCOMPARTMENTORLAUNDRYMUSTBE DISCHARGEDVIADUCTTOOUTDOORAIRORTOROOFSPACETHATIS VENTILATEDINACCORDANCEWITHPART10.8.2(HOUSINGPROVISIONS2022) ALLROOFSPACESMUSTBEINACCORDANCEWITHNCCPART10.8.3(HOUSING PROVISIONS2022) WHEREEXHAUSTFROMBATHROOM,SANITARYCOMPARTMENTSORLAUNDRY AREDISCHARGEDINTOROOFSPACETHEROOFMUSTBEVENTILATEDTO OUTDOORAIRTHROUGHEVENLYDISTRIBUTEDOPENINGS OPENINGSMUSTHAVEATOTALUNOBSTRUCTEDAREATOSATISFYTABLE10.8.3 (HOUSINGPROVISIONS2022) VENTILATIONOPENINGSARESPECIFIEDASAMINIMUMFREEOPENAREAPER METRELENGTHOFTHELONGESTHORIZONTALDIMENSIONOFTHEROOF FORTHEPURPOSESOFTHISTABLEHIGHLEVELOPENINGSAREOPENINGS PROVIDEDATTHERIDGEORNOTMORETHAN900MMBELOWTHERIDGEOR HIGHESTPOINTOFTHEROOFSPACEMEASUREDVERTICALLY
NGLatbuildingedge
20mmVentedbattensystemonoutside ofProctorWrapvapourpermeable wrapinstalltomanufacturers specificationsBattensTypically140x45 MGP10@max600mmctrs,screw fixedinstalltomanufacturers specificationsprovideantiponding flashingunderwrap.
20mmVentedbattensystemonoutsideof ProctorWrapvapourpermeablewrapinstall tomanufacturersspecificationsBattens Typically140x45MGP10@max600mmctrs screwfixedinstalltomanufacturers specificationsprovideantipondingflashing underwrap.
Typically0.6mmfoldedcolorbond parapetcappingsthroughout,install tomanufacturersinstallationguides topofthecappingtohavemin5˚ falltoboxgutter
min100(D)x300(W) x .2mm316 stainlesssteelboxgutter,min1:200 falltosump&DPmusthaveintergal flashings(i.eonepiece)16mm structaflor&30x1mmstraps&min 450ctrstosupportboxgutter
0.48mmBMTCustomOrbroof
Supportspacings: Endspan: 1300mm Internalspan: 1700mm
referengineersdrawingsforall structuraldetailsandsizes
150mmprecastconcretepanel referengineersdrawingsfor allstructuraldetailsandsizes, smoothfinishPaintfinishas selected
referengineersdrawingsforall structuralfootingdetailsand sizes
Typically0.6mmfolded colorbondflashingsthroughout installtomanufacturers installationguidesprovidecast inregletforflashing
Gyprockshaftlinerpanelin RondoH& tracks(no penetrationspermittedthrough shaftliner)installtomanufactuers specificationsanddetails
minR2.5(90mm)'PINK' H.D.wallinsulationbatts
TasOaktimberflooringover concretefloorstructurerefer engineersdrawingsfordetails
ConcreteSlabrefer engineersdrawingsforall structuraldetailsandsizes
10mmPBceilingpaintfinishon 16mmfuringchannels@450 ctrs(directfixingclipswhere required) R5.0(215mm) PINK' ceilinginsulationbatts
Doubleglazedaluminiumframed windowspowdercoatfinishDulux monument,windowshopdrawings tobeapprovedpriorto manufactering RondoP50Shadowline stoppingangletoperimetre ofallwindowsanddoors
10mmPBceilingpaintfinishon 16mmfuringchannels@450ctrs (directfixingclipswhererequired) R5.0(215mm) PINK'ceiling insulationbatts
10mmP.Bwallliningpaint finishasselected(lowVOC), RondoP50Shadowline stoppingangletoperimetre ofallwindowsanddoors
Gyprockshaftlinerpanelin RondoH& tracks(no penetrationspermittedthrough shaftliner)installtomanufactuers specificationsanddetails
minR2.5(90mm)'PINK' H.D.wallinsulationbatts
referengineersdrawings forallstructuralfooting detailsandsizes
20mmVentedbattensystemonoutsideof ProctorWrapvapourpermeablewrapinstall tomanufacturersspecificationsBattens Typically140x45MGP10@max600mmctrs screwfixed,installtomanufacturers specificationsprovideantipondingflashing underwrap.
TypicallyLysaght0.55BMTQuad guttersthroughoutinstalledto manufacturersspecificationsprovide allrequiredstraps&fixingsrequired
16mm'Cavibat'systemonoutside ofwallwrapinstallto manufacturersspecifications
Vapour-permeablewallwrap
70x45F7KDTPH3cavity battens@max600mmcts
0.6mmcolorbondheadflashing carryupwallmin100mm
LouvreTec300mmMaxiLouvre @45˚anglefixedtoframewith proprietaaryfixings,PPCfinish asselected PowdercoatedAluminiumlouvre framePPCfinishasselected
unlessnotedotherwise: 90x45MPG10plates&ribbonplates 90x35MPG10noggingsmid-height 90x35MPG10studs@450cts
minR2.5(90mm)'PINK' H.D.wallinsulationbatts
10mmP.Bwallliningpaintfinishas selected(lowVOC),RondoP50 Shadowlinestoppingangleto perimetreofallwindowsanddoors
10mmPBceilingpaintfinishon16mm furingchannels@450ctrs(direct fixingclipswhererequired) R5.0 (215mm) PINK'ceilinginsulationbatts
unlessnotedotherwise: 90x45MPG10plates&ribbonplates 90x35MPG10noggingsmid-height 90x35MPG10studs@450cts
10mmP.Bwallliningpaintfinishas selected(lowVOC),RondoP50 Shadowlinestoppingangleto perimetreofallwindowsanddoors
Concreteslabrefer engineersdrawingsforall structuraldetailsandsizes
10mmPBceilingpaintfinishon16mm furingchannels@450ctrs(direct fixingclipswhererequired) R5.0 (215mm) PINK'ceilinginsulationbatts
'Hardie'Texbasesheetwith renderedfinishtomatchexisting texture&colourconfirmcolour onsitetomatchexisting
min100(D)x450(W) x1.2mm316 stainlesssteelboxgutter,min1:200 falltosump&DPmusthaveintergal flashings(i.eonepiece)16mm structaflor&30x1mmstraps&min 450ctrstosupportboxgutter
Typically0.6mmfoldedcolorbond ridgecappingsthroughout. PPCfinishasselectedinstallto manufacturersinstallationguides
LysaghtVENT-A-ROOFVentilation system(orsimilartoapproval) installedtomanufacturers specificationsPPCfinishtomatch roofing
0.2'ForteconMembraneorsimilartoapproval min20mmsandblinding100mmminhardcore onapprovedsub-gradeReferengineers drawingsforallstructuralfooting&slabdesigns R2.27(75mm)StyrothermXPSboardto undersideofentireconcreteslab-canbeabove orbelowforteconmembraneorsimilarto approval
FORCONSTRUCTION
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 TypicalDetails-Sheet2 8-10PetcheyStreet Brick&Castle DD A602 1:100
J008392 JE JEConstructionIssue 13/5/24 B B
Bathroomarea
Showerarea
Allworkstobecarriedoutbyalicensedplumber plumber/buildertotakelevelspriortoconstruction toensuredrainagelinescanbeconnectedtolegal pointsofdischarge(connectionpoints)
Coldwatersupplylinefrommetertohouse25mmdia. coldwaterbranches-16mmdia hotwatermainline-20mmdia hotwaterbranches-16mmdia.
vacuumbreakerbackflowdevicestofittedtoall outsidetaps
Installinspectionopeningsatmajorbendsfor stormwaterandalllowpointsofdownpipesAll plumbing&drainagetobeinaccordancewithlocal Councilrequirements Providesurfacedraintobackofbulkexcavationto drainlevelledpadpriortocommencingfooting excavation
SERVICES
Theheatedwatersystemmustbedesignedand installedwithPartB2ofNCCVolumeThree-Plumbing CodeofAustralia
Thermalinsulationforheatedwaterpipingmust: A)beprotectedagainsttheeffectsofweatherand sunlight;and B)beabletowithstandthetemperatureswithinthe piping;and C)usethermalinsulationinaccordancewithAS/NZS 4859.1
Heatedwaterpipingthatisnotwithinaconditioned spacemustbethermallyinsulatedasfollows: 1.Internalpiping a)Allflowandreturninternalpipingthatisi)withinanunventilatedwallspace ii)withinaninternalfloorbetweenstoreys;or iii)betweenceilinginsulationandaceilingMusthavea minimumR-Valueof0.2(ie9mmofclosedcell polymerinsulation)
2Pipinglocatedwithinaventilatedwallspace,an enclosedbuildingsubfloororaroofspace a)Allflowandreturnpiping b)ColdwatersupplypipingandReliefvalvepipingwithin500mmoftheconnectiontocentralwater heatingsystemmusthaveaminimumR-Valueof0.45 (ie19mmofclosedcellpolymerinsulation)
3Pipinglocatedoutsidethebuildingorinan unenclosedbuildingsub-floororroofspace a)Allflowandreturnpiping b)ColdwatersupplypipingandReliefvalvepipingwithin500mmoftheconnectiontocentralwater heatingsystemmusthaveaminimumR-Valueof0.6 (ie25mmofclosedcellpolymerinsulation)
Pipingwithinaninsulatedtimberframedwallsuchas thatpassingthroughawallstud,isconsideredto complywiththeaboveinsulationrequirements
Provideagdrainandbackfillbehindanyretaining wall"Geofabrics-Megaflo"subsoildrainagesystem
StormwaterLine(100UPVC) @Min1%Falls
SewerLine(100UPVC) @Min1.65%Falls.
WetAreasshownhatched ReferWaterproofingdetails
DWM Dishwashingmachine (Drainhosetosinktrap)
CWM Clotheswashingmachine (Drainhosetotroughtrap)
FloorWasteGully
WasteStack(100UPVC)
Downpipe(90UPVC) PIT 300sqx450dStormwaterpit. (Removablegalvgrate.) AG AgriculturalPipedrain (Mustdraintopit.)
a) COLDWATER-COPPERTUBETYPEBTOAS3795 b) HOTWATER COPPERTUBETYPEBTOAS3795
HOTWATERATHIGHTEMPERATURE(65°C)TOKITCHENANDLAUNDRY HOTWATERSUPPLYTOBATHROOMSTOBETEMPEREDTO45°CIN ACCORDANCEWITHAS3500
ELECTRICALSUPPLY&LOCALISOLATORTOHOTWATERCYLINDERSTOBE
THESEDRAWINGSTOBEREADINCONJUNCTIONWITHARCHITECTURALAND OTHERSERVICESDRAWINGS.
3 AAVventin cupboard .O 2 6 DN100 stack from above DN100 DN100 DP DP DP TrafficableInspectionoutlet cover-RiIndustriesType1 coverorsimilartoapproval ORG& tapover DN100stackwith DN50ventabove DP DP DP 0 12 5 METRES 1centimetreonthisdrawingrepresents 1metreontheground(i.e1:100) DRAINAGEPLANS-UNITS1-4,13-14&5-6,10 GROUND FLOOR DRAINAGE PLAN - UNITS 1-4 & 13-14 FIRST FLOOR DRAINAGE PLAN - UNITS 1-4 & 13-14
PLUMBING NOTES:
SANITARY PLUMBING TO AS 3500.2 TABLE 6.1: FIXTURE UNIT RATINGS: Mark:
Outletpipesize: 1. WaterClosetPan DN100 2. Basin DN40 3. Sink DN50 4. Shower DN40orDN50 5. Trough-laundry DN40orDN50 6. Dishwasher DN50
Fixture:
PLUMBING LEGEND:
I.O
ORG
FW
WS
ALLHOT&COLDWATERPLUMBINGWORKTOBECARRIEDOUTINACCORDANCE WITHTHETASMANIANPLUMBINGREGULATIONSAS3500(CURRENTEDITIONS) ANDLOCALCOUNCILREQUIREMENTS THELOCATIONOFEXISTINGSERVICESAREAPPROXIMATEONLYANDHAVEBEEN BASEDONACOMBINATIONOFSITESURVEYANDAVAILABLERECORDSTHE LOCATIONOFALLSERVICESARETOBECONFIRMEDON-SITEPRIORTOTHE
Inspectionopening
OverflowReliefGully
DP
COMMENCEMENTOFANYEXCAVATIONWORKS. FINALCONNECTIONLOCATIONSARETOBEDETERMINEDWITHHYDRAULIC ENGINEERANDARCHITECT UNLESSNOTEDOTHERWISEALLWATERPIPESSHALLBEASFOLLOWS:
PROVIDEDBYELECTRICALCONTRACTOR.EXTERNALWEATHERPROOFGPOTOBE INSTALLEDFOREACHINSTANTANEOUSGASWATERHEATER
PROVIDESAFETRAYSUNDERALLINTERNALHOTWATERCYLINDERSINCLUDING SAFEDRAINSDISCHARGINGINACCORDANCEWITHAS3500
WATER SUPPLY NOTES AS 3500.2 - Table 3.2 MINIMUM GRADIENT OF SEWER DRAINS SIZEOFGRADED SECTIONOFPIPE(DN) 40 50 65 100 MINIMUMGRADE (%) 2.50 2.50 2.50 .65 RATIO(GRADIENT) 1in40 1in40 1in40 1in60 AS 3500.3 - Table 3.2 MINIMUM GRADIENT OF STORMWATER DRAINS SIZEOFGRADED SECTIONOFPIPE (DN) 90 100 MINIMUMGRADE (%) .00 .00 RATIO(GRADIENT) 1in100 1in100 3 AAVventin cupboard ORG&tapover 1 2 6 DN100 stack from above DN100 DN100 .O TrafficableInspectionoutlet cover-RiIndustriesType1 coverorsimilartoapproval DP DP DP DN100stackwith DN50ventabove DP DP DP GROUND FLOOR DRAINAGE PLAN - UNITS 5, 6 & 10 FIRST FLOOR DRAINAGE PLAN - UNITS 5, 6 & 10 NOTE: DRAWINGS ARE DIAGRAMATIC AND TO BE CONFIRMED ONSITE, PLUMBER TO PROVIDE AS INSTALLED DRAWINGS FOR APPROVAL.
DOMESTIC
PLUMBING NOTES:
Allworkstobecarriedoutbyalicensedplumber plumber/buildertotakelevelspriortoconstruction toensuredrainagelinescanbeconnectedtolegal pointsofdischarge(connectionpoints)
Coldwatersupplylinefrommetertohouse25mmdia. coldwaterbranches-16mmdia hotwatermainline-20mmdia hotwaterbranches-16mmdia.
vacuumbreakerbackflowdevicestofittedtoall outsidetaps
Installinspectionopeningsatmajorbendsfor stormwaterandalllowpointsofdownpipesAll plumbing&drainagetobeinaccordancewithlocal Councilrequirements Providesurfacedraintobackofbulkexcavationto drainlevelledpadpriortocommencingfooting excavation
SERVICES
Theheatedwatersystemmustbedesignedand installedwithPartB2ofNCCVolumeThree-Plumbing CodeofAustralia
Thermalinsulationforheatedwaterpipingmust: A)beprotectedagainsttheeffectsofweatherand sunlight;and B)beabletowithstandthetemperatureswithinthe piping;and C)usethermalinsulationinaccordancewithAS/NZS 4859.1
Heatedwaterpipingthatisnotwithinaconditioned spacemustbethermallyinsulatedasfollows: 1.Internalpiping a)Allflowandreturninternalpipingthatisi)withinanunventilatedwallspace ii)withinaninternalfloorbetweenstoreys;or iii)betweenceilinginsulationandaceilingMusthavea minimumR-Valueof0.2(ie9mmofclosedcell polymerinsulation)
2Pipinglocatedwithinaventilatedwallspace,an enclosedbuildingsubfloororaroofspace a)Allflowandreturnpiping b)ColdwatersupplypipingandReliefvalvepipingwithin500mmoftheconnectiontocentralwater heatingsystemmusthaveaminimumR-Valueof0.45 (ie19mmofclosedcellpolymerinsulation)
3Pipinglocatedoutsidethebuildingorinan unenclosedbuildingsub-floororroofspace a)Allflowandreturnpiping b)ColdwatersupplypipingandReliefvalvepipingwithin500mmoftheconnectiontocentralwater heatingsystemmusthaveaminimumR-Valueof0.6 (ie25mmofclosedcellpolymerinsulation)
Pipingwithinaninsulatedtimberframedwallsuchas thatpassingthroughawallstud,isconsideredto complywiththeaboveinsulationrequirements
Provideagdrainandbackfillbehindanyretaining wall"Geofabrics-Megaflo"subsoildrainagesystem
PLUMBING LEGEND:
StormwaterLine(100UPVC) @Min1%Falls
SewerLine(100UPVC) @Min1.65%Falls.
WetAreasshownhatched ReferWaterproofingdetails
DWM Dishwashingmachine (Drainhosetosinktrap)
CWM Clotheswashingmachine (Drainhosetotroughtrap)
FloorWasteGully
WasteStack(100UPVC)
Downpipe(90UPVC) PIT 300sqx450dStormwaterpit. (Removablegalvgrate.) AG AgriculturalPipedrain (Mustdraintopit.)
UNLESSNOTEDOTHERWISEALLWATERPIPESSHALLBEASFOLLOWS: a) COLDWATER-COPPERTUBETYPEBTOAS3795 b) HOTWATER COPPERTUBETYPEBTOAS3795
HOTWATERATHIGHTEMPERATURE(65°C)TOKITCHENANDLAUNDRY HOTWATERSUPPLYTOBATHROOMSTOBETEMPEREDTO45°CIN ACCORDANCEWITHAS3500
ELECTRICALSUPPLY&LOCALISOLATORTOHOTWATERCYLINDERSTOBE
THESEDRAWINGSTOBEREADINCONJUNCTIONWITHARCHITECTURALAND OTHERSERVICESDRAWINGS.
3 AAVventin cupboard .O 2 6 DN100 stack from above DN100 DN100 TrafficableInspectionoutlet
ORG& tapover DP DP DP DP DRAINAGEPLANS-UNITS7-9&11-12 GROUND FLOOR DRAINAGE PLAN - UNITS 7-9 FIRST FLOOR DRAINAGE PLAN - UNITS 7-9
cover RiIndustriesType1 coverorsimilartoapproval
SANITARY PLUMBING TO AS 3500.2 TABLE 6.1: FIXTURE UNIT RATINGS: Mark:
Outletpipesize: 1. WaterClosetPan DN100 2. Basin DN40 3. Sink DN50 4. Shower DN40orDN50 5. Trough-laundry DN40orDN50 6. Dishwasher DN50
Fixture:
I.O
ORG
FW
WS
ALLHOT&COLDWATERPLUMBINGWORKTOBECARRIEDOUTINACCORDANCE WITHTHETASMANIANPLUMBINGREGULATIONSAS3500(CURRENTEDITIONS) ANDLOCALCOUNCILREQUIREMENTS THELOCATIONOFEXISTINGSERVICESAREAPPROXIMATEONLYANDHAVEBEEN BASEDONACOMBINATIONOFSITESURVEYANDAVAILABLERECORDSTHE LOCATIONOFALLSERVICESARETOBECONFIRMEDON-SITEPRIORTOTHE
Inspectionopening
OverflowReliefGully
DP
COMMENCEMENTOFANYEXCAVATIONWORKS. FINALCONNECTIONLOCATIONSARETOBEDETERMINEDWITHHYDRAULIC ENGINEERANDARCHITECT
PROVIDEDBYELECTRICALCONTRACTOR.EXTERNALWEATHERPROOFGPOTOBE INSTALLEDFOREACHINSTANTANEOUSGASWATERHEATER PROVIDESAFETRAYSUNDERALLINTERNALHOTWATERCYLINDERSINCLUDING SAFEDRAINSDISCHARGINGINACCORDANCEWITHAS3500
DOMESTIC WATER SUPPLY NOTES AS 3500.2 - Table 3.2 MINIMUM GRADIENT OF SEWER DRAINS SIZEOFGRADED SECTIONOFPIPE(DN) 40 50 65 100 MINIMUMGRADE (%) 2.50 2.50 2.50 .65 RATIO(GRADIENT) 1in40 1in40 1in40 1in60 AS 3500.3
Table 3.2 MINIMUM GRADIENT OF STORMWATER DRAINS SIZEOFGRADED SECTIONOFPIPE (DN) 90 100 MINIMUMGRADE (%) .00 .00 RATIO(GRADIENT) 1in100 1in100 GROUND FLOOR DRAINAGE PLAN - UNITS 11-12 FIRST FLOOR DRAINAGE PLAN - UNITS 11-12
-
DN50ventabove DP& RWH DP RWH DN100stackwith DN50ventabove DP& RWH DP& RWH DP DP DP DP DP DP 0 12 5 METRES 1centimetreonthisdrawingrepresents 1metreontheground(i.e1:100) NOTE: DRAWINGS ARE DIAGRAMATIC AND TO BE CONFIRMED ONSITE, PLUMBER TO PROVIDE AS INSTALLED DRAWINGS FOR APPROVAL.
DN100stackwith
PLUMBING NOTES:
Allworkstobecarriedoutbyalicensedplumber plumber/buildertotakelevelspriortoconstruction toensuredrainagelinescanbeconnectedtolegal pointsofdischarge(connectionpoints)
Coldwatersupplylinefrommetertohouse25mmdia. coldwaterbranches-16mmdia hotwatermainline-20mmdia hotwaterbranches-16mmdia.
vacuumbreakerbackflowdevicestofittedtoall outsidetaps
Installinspectionopeningsatmajorbendsfor stormwaterandalllowpointsofdownpipesAll plumbing&drainagetobeinaccordancewithlocal Councilrequirements Providesurfacedraintobackofbulkexcavationto drainlevelledpadpriortocommencingfooting excavation
SERVICES
Theheatedwatersystemmustbedesignedand installedwithPartB2ofNCCVolumeThree-Plumbing CodeofAustralia
Thermalinsulationforheatedwaterpipingmust: A)beprotectedagainsttheeffectsofweatherand sunlight;and B)beabletowithstandthetemperatureswithinthe piping;and C)usethermalinsulationinaccordancewithAS/NZS 4859.1
Heatedwaterpipingthatisnotwithinaconditioned spacemustbethermallyinsulatedasfollows: 1.Internalpiping a)Allflowandreturninternalpipingthatisi)withinanunventilatedwallspace ii)withinaninternalfloorbetweenstoreys;or iii)betweenceilinginsulationandaceilingMusthavea minimumR-Valueof0.2(ie9mmofclosedcell polymerinsulation)
2Pipinglocatedwithinaventilatedwallspace,an enclosedbuildingsubfloororaroofspace a)Allflowandreturnpiping b)ColdwatersupplypipingandReliefvalvepipingwithin500mmoftheconnectiontocentralwater heatingsystemmusthaveaminimumR-Valueof0.45 (ie19mmofclosedcellpolymerinsulation)
3Pipinglocatedoutsidethebuildingorinan unenclosedbuildingsub-floororroofspace a)Allflowandreturnpiping b)ColdwatersupplypipingandReliefvalvepipingwithin500mmoftheconnectiontocentralwater heatingsystemmusthaveaminimumR-Valueof0.6 (ie25mmofclosedcellpolymerinsulation)
Pipingwithinaninsulatedtimberframedwallsuchas thatpassingthroughawallstud,isconsideredto complywiththeaboveinsulationrequirements
Provideagdrainandbackfillbehindanyretaining wall"Geofabrics-Megaflo"subsoildrainagesystem
6. Dishwasher DN50
PLUMBING LEGEND:
StormwaterLine(100UPVC) @Min1%Falls
SewerLine(100UPVC) @Min1.65%Falls.
WetAreasshownhatched ReferWaterproofingdetails
DWM Dishwashingmachine (Drainhosetosinktrap) CWM Clotheswashingmachine (Drainhosetotroughtrap) I.O Inspectionopening ORG OverflowReliefGully FW FloorWasteGully WS WasteStack(100UPVC) DP Downpipe(90UPVC)
PIT 300sqx450dStormwaterpit. (Removablegalvgrate.)
AG AgriculturalPipedrain (Mustdraintopit.)
HOTWATERATHIGHTEMPERATURE(65°C)TOKITCHENANDLAUNDRY HOTWATERSUPPLYTOBATHROOMSTOBETEMPEREDTO45°CIN ACCORDANCEWITHAS3500
ELECTRICALSUPPLY&LOCALISOLATORTOHOTWATERCYLINDERSTOBE
DN100stackwith DN50ventabove DP DP DP 3 AAVventin cupboard .O 1 2 6 DN100 stack from above DN100 DN100 DP DP TrafficableInspectionoutlet cover-RiIndustriesType1 coverorsimilartoapproval ORG& tapover DP DP DRAINAGEPLANS-UNITS15-17
FLOOR DRAINAGE PLAN - UNITS 15-17 FIRST FLOOR DRAINAGE PLAN - UNITS 15-17
GROUND
SANITARY PLUMBING TO AS 3500.2 TABLE 6.1: FIXTURE UNIT RATINGS: Mark:
DN100 2. Basin DN40 3. Sink DN50 4. Shower DN40orDN50 5.
DN40orDN50
Fixture: Outletpipesize: 1. WaterClosetPan
Trough-laundry
ALLHOT&COLDWATERPLUMBINGWORKTOBECARRIEDOUTINACCORDANCE WITHTHETASMANIANPLUMBINGREGULATIONSAS3500(CURRENTEDITIONS) ANDLOCALCOUNCILREQUIREMENTS THELOCATIONOFEXISTINGSERVICESAREAPPROXIMATEONLYANDHAVEBEEN BASEDONACOMBINATIONOFSITESURVEYANDAVAILABLERECORDSTHE LOCATIONOFALLSERVICESARETOBECONFIRMEDON-SITEPRIORTOTHE COMMENCEMENTOFANYEXCAVATIONWORKS. FINALCONNECTIONLOCATIONSARETOBEDETERMINEDWITHHYDRAULIC
ENGINEERANDARCHITECT UNLESSNOTEDOTHERWISEALLWATERPIPESSHALLBEASFOLLOWS: a) COLDWATER-COPPERTUBETYPEBTOAS3795 b) HOTWATER COPPERTUBETYPEBTOAS3795
PROVIDEDBYELECTRICALCONTRACTOR.EXTERNALWEATHERPROOFGPOTOBE
SAFEDRAINSDISCHARGINGINACCORDANCEWITHAS3500
OTHERSERVICESDRAWINGS. DOMESTIC WATER SUPPLY NOTES AS 3500.2 - Table 3.2 MINIMUM GRADIENT OF SEWER DRAINS SIZEOFGRADED SECTIONOFPIPE(DN) 40 50 65 100 MINIMUMGRADE (%) 2.50 2.50 2.50 .65 RATIO(GRADIENT) 1in40 1in40 1in40 1in60 AS 3500.3 - Table 3.2 MINIMUM GRADIENT OF STORMWATER DRAINS SIZEOFGRADED SECTIONOFPIPE (DN) 90 100 MINIMUMGRADE (%) .00 .00 RATIO(GRADIENT) 1in100 1in100 0 12 5 METRES 1centimetreonthisdrawingrepresents 1metreontheground(i.e1:100) NOTE: DRAWINGS ARE DIAGRAMATIC AND TO BE CONFIRMED ONSITE, PLUMBER TO PROVIDE AS INSTALLED DRAWINGS FOR APPROVAL.
INSTALLEDFOREACHINSTANTANEOUSGASWATERHEATER PROVIDESAFETRAYSUNDERALLINTERNALHOTWATERCYLINDERSINCLUDING
THESEDRAWINGSTOBEREADINCONJUNCTIONWITHARCHITECTURALAND
NOTES:
1
2
3 BUILDER/GLAZINGSUPPLIERSHALLCONFIRMALLWINDOW&DOORFRAMESIZESONSITEBEFOREANYINSTALLATION
4
5 NOTE:ALLGLAZINGTOBEGENERICALUMINIUMDOUBLEGLAZEDFRAMESARGONFILL TYPEAGLAZINGINCLUDES:REFERWINDOW/DOORSCHEDULES
UNITTYPE4 GF LIVING
UNITTYPE4-GF LIVING
UNITTYPE4-FF BED 2700x1000 2700x1325
UNITTYPE4 FF BED
UNITTYPE4-FF
ENSUITE
UNITTYPE4-FF BED2
UNITTYPE4 FF BED2
UNITTYPE4-FF BED2
UNITTYPE4-FF BED3
UNITTYPE4 FF CORRIDOR 500x1500
ALUMINIUMFRAMEDFIRERATEDWINDOW-/60/-FIXED 1800x1500 1800x1500 1800x1600 1800x1600
ALUMINIUMFRAMEDDOUBLEGLAZEDA/F
ALUMINIUMFRAMEDDOUBLEGLAZEDA/F-INTERNALOPERATEDSHUTTERS
ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED-INTERNALOPERATEDSHUTTERS
ALUMINIUMFRAMEDDOUBLEGLAZEDA/F INTERNALOPERATEDSHUTTERS
ALUMINIUMFRAMEDDOUBLEGLAZEDA/F
ALUMINIUMFRAMEDDOUBLEGLAZEDA/F
WINDOW SCHEDULE - UNIT TYPE 5 (UNITS 13-14)
UNITTYPE5 GF LIVING
UNITTYPE5-GF LIVING
UNITTYPE5-GF LIVING
W5.5
UNITTYPE5 FF BED
UNITTYPE5-FF BED
UNITTYPE5-FF BED
UNITTYPE5 FF ENSUITE
UNITTYPE5-FF BED2
UNITTYPE5-FF BED2
UNITTYPE5 FF BED3
UNITTYPE5-FF CORRIDOR
ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED
ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED
ALUMINIUMFRAMEDDOUBLEGLAZEDA/F
ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED
ALUMINIUMFRAMEDDOUBLEGLAZEDA/F 1800x800
INTERNALOPERATEDSHUTTERS
ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED-INTERNALOPERATEDSHUTTERS
ALUMINIUMFRAMEDDOUBLEGLAZEDA/F-INTERNALOPERATEDSHUTTERS
ALUMINIUMFRAMEDFIRERATEDWINDOW-/60/-FIXED
WINDOW SCHEDULE - UNIT TYPE 6 (UNITS 15-17) No ROOM SIZE (H x W) TYPE
W6.1
UNITTYPE6-GF LIVING
UNITTYPE6-GF LIVING
UNITTYPE6 GF LIVING
UNITTYPE6-FF BED
UNITTYPE6-FF BED
UNITTYPE6 FF ENSUITE
UNITTYPE6-FF BED2
UNITTYPE6-FF BED2
UNITTYPE6 FF BED3
UNITTYPE6-FF BED4
UNITTYPE6-FF CORRIDOR
ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED
ALUMINIUMFRAMEDDOUBLEGLAZEDA/F
ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED-INTERNALOPERATEDSHUTTERS
ALUMINIUMFRAMEDDOUBLEGLAZEDA/F
EXTERNAL DOOR SCHEDULE - UNIT 3 (UNITS 7-9)
No ROOM SIZE (H x W) TYPE
D3.1
D3.2 ALUMINIUMDGFRAMEDGLAZEDDOORD-STACKSLIDING(OOX)COORDINATEWITHWINDOW 2700x3025 2660x820
GF DINING UNITTYPE2 GF LIVING SOLIDTIMBERFEATUREENTRYDOOR-TBC
EXTERNAL DOOR SCHEDULE - UNIT 4 (UNITS 11-12) No ROOM SIZE (H x W) TYPE D4.1 D4.2 ALUMINIUMDGFRAMEDGLAZEDDOORD-STACKSLIDING(OOX)COORDINATEWITHWINDOW 2700x3525
UNITTYPE4 GF DINING UNITTYPE4-GF LIVING
2660x820
SOLIDTIMBERFEATUREENTRYDOOR-TBC
EXTERNAL DOOR SCHEDULE - UNIT 5 (UNITS 13-14)
No ROOM SIZE (H x W) TYPE
D5.1
D5.2
UNITTYPE5 GF DINING UNITTYPE5-GF LIVING
2660x820
SOLIDTIMBERFEATUREENTRYDOOR-TBC
ALUMINIUMDGFRAMEDGLAZEDDOORD-STACKSLIDING(OOX)COORDINATEWITHWINDOW 2700x3025
EXTERNAL DOOR SCHEDULE - UNIT 6 (UNITS 15-17)
No ROOM SIZE (H x W) TYPE
D6.1
D6.2
UNITTYPE6 GF DINING UNITTYPE6-GF LIVING
2660x820
SOLIDTIMBERFEATUREENTRYDOOR-TBC
UNITTYPE2-GF DINING UNITTYPE2 GF LIVING SOLIDTIMBERFEATUREENTRYDOOR TBC NOTES:
ALUMINIUMDGFRAMEDGLAZEDDOORD-STACKSLIDING(OOX)COORDINATEWITHWINDOW 2700x3575
1.ALLINTERNALDOORSTOBEMDFFLUSHPANELDOORPRE-PRIMEDPAINTFINISHEDASSELECTED 2 TYPICALLYALLDOORSDIMENSIONSTOBECONFIRMEDONSITEPRIORTOCONSTRUCTION D-STACKSLIDINGDOORS-REBATEDOORTRACKSFLUSHWITHFINISHEDFLOORSURFACE,ALLOWADDITIONAL HEIGHTTODOORSYSTEMTOSUIT
WINDOW SCHEDULE - UNIT TYPE 1 (UNITS 1-4) No ROOM SIZE (H x W) TYPE FINISH W1.1 UNITTYPE1-GF DINING 2700x1800 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED/FIXED W1.2 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED W1.3 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED W1.4 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED W1.5 1800x2800 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDA/F/A W1.6 1800x900 W1.7 1800x900 PPC W1.8 1800x900 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDA/F INTERNALOPERATEDSHUTTERS PPC W1.12 500x1500 PPC W1.11 1800x800 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDA/F W1.10 1800x800 ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED W1.9 1800x800 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDA/F PPC UNITTYPE1 GF LIVING UNITTYPE1-GF LIVING UNITTYPE1-GF LIVING UNITTYPE FF BED1 2700x1100 2700x1400 2700x925 UNITTYPE -FF ENSUITE UNITTYPE -FF ENSUITE UNITTYPE FF BED2 UNITTYPE -FF BED3 UNITTYPE -FF BED3 UNITTYPE FF BED3 UNITTYPE FF CORRIDOR ALUMINIUMFRAMEDFIRERATEDWINDOW-/60/-FIXED ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED-INTERNALOPERATEDSHUTTERS ALUMINIUMFRAMEDDOUBLEGLAZEDA/F-INTERNALOPERATEDSHUTTERS EXTERNAL DOOR SCHEDULE - UNIT 1 (UNITS 1-4) No ROOM SIZE (H x W) TYPE D1.1 D1.2 ALUMINIUMDGFRAMEDGLAZEDDOORD-STACKSLIDING(OOX)COORDINATEWITHWINDOW 2700x3025 2660x820 FINISH PPC CLEAR UNITTYPE1-GF DINING UNITTYPE1 GF LIVING SOLIDTIMBERFEATUREENTRYDOOR TBC ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 Schedules 8-10PetcheyStreet Brick&Castle DD A901 1:100
J008392 JE JEConstructionIssue 13/5/24 B B WINDOW SCHEDULE - UNIT TYPE 2 (UNITS 5-6 & 10) No ROOM SIZE (H x W) TYPE FINISH W2.1 UNITTYPE2 GF DINING 2700x2600 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED W2.2 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED W2.3 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED W2.4 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED W2.5 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDA/F W2.6 1800x900 W2.7 1800x900 PPC W2.8 1800x900 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDA/F-INTERNALOPERATEDSHUTTERS PPC W2.12 1800x1600 PPC W2.11 1800x1600 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDA/F W2.10 1800x800 ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED-INTERNALOPERATEDSHUTTERS W2.9 1800x800 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDA/F INTERNALOPERATEDSHUTTERS PPC UNITTYPE2-GF LIVING UNITTYPE2-GF LIVING UNITTYPE2 GF LIVING UNITTYPE2-FF BED1 2700x1100 2700x1400 2700x1225 UNITTYPE2-FF BED1 UNITTYPE2 FF BED1 UNITTYPE2-FF ENSUITE UNITTYPE2-FF BED2 UNITTYPE2 FF BED2 UNITTYPE2-FF BED3 UNITTYPE2-FF BED4 ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED ALUMINIUMFRAMEDDOUBLEGLAZEDA/F W2.13 500x1500 PPC UNITTYPE2 FF CORRIDOR ALUMINIUMFRAMEDFIRERATEDWINDOW-/60/-FIXED ALUMINIUMFRAMEDDOUBLEGLAZEDA/F 1800x800 WINDOW SCHEDULE - UNIT TYPE 3 (UNITS 7-9) No ROOM SIZE (H x W) TYPE FINISH W3.1 UNITTYPE3-GF DINING 2700x2600 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED W3.2 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED W3.3 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED W3.4 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED W3.5 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDA/F W3.6 1800x900 W3.7 1800x900 PPC W3.8 1800x900 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDA/F INTERNALOPERATEDSHUTTERS PPC W3.12 PPC W3.11 1800x2800 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDA/F/A W3.10 1800x800 ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED-INTERNALOPERATEDSHUTTERS W3.9 1800x800 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDA/F-INTERNALOPERATEDSHUTTERS PPC UNITTYPE3 GF LIVING UNITTYPE3-GF LIVING UNITTYPE3-GF LIVING UNITTYPE3 FF BED1 2700x1100 2700x1400 2700x925 UNITTYPE3-FF BED1 UNITTYPE3-FF BED1 UNITTYPE3 FF ENSUITE UNITTYPE3-FF BED2 UNITTYPE3-FF BED2 UNITTYPE3 FF BED3 UNITTYPE3-FF CORRIDOR ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED ALUMINIUMFRAMEDDOUBLEGLAZEDA/F 1800x800 500x1500 ALUMINIUMFRAMEDFIRERATEDWINDOW-/60/-FIXED
SCHEDULE - UNIT TYPE 4 (UNITS 11-12) No ROOM SIZE (H x W) TYPE FINISH W4.1 UNITTYPE4-GF DINING 2700x2400 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED W4.2 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED W4.3 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED W4.4 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDA/F W4.5 PPC
FORCONSTRUCTION
WINDOW
W4.6 1800x900 W4.7 1800x900 PPC W4.8 1800x900 PPC
PPC W4.11 PPC W4.10
W4.9 PPC
PPC
No ROOM SIZE (H x W) TYPE FINISH
PPC
PPC
W5.3 PPC
W5.4 PPC
W5.1 UNITTYPE5-GF DINING 2700x1800
ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED W5.2
ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED
PPC
W5.6 1800x900 W5.7 1800x900 PPC W5.8 1800x900 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDA/F
PPC W5.12 PPC W5.11 1800x2800 PPC
ALUMINIUMFRAMEDDOUBLEGLAZEDA/F/A W5.10 1800x800
1800x800 PPC
W5.9
PPC
2700x1100 2700x1400 2700x925
500x1500
FINISH
UNITTYPE6 GF DINING 2700x2600 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED W6.2 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED W6.3 PPC
W6.4 PPC
W6.5 PPC
W6.6 1800x900 W6.7 1800x900 PPC W6.8 1800x900 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDA/F INTERNALOPERATEDSHUTTERS PPC W6.12 1800x1500 PPC W6.11 1800x1500 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDA/F W6.10 1800x1500
ALUMINIUMFRAMEDDOUBLEGLAZEDFIXED
ALUMINIUMFRAMEDDOUBLEGLAZEDA/F
W6.9 1800x1500 PPC ALUMINIUMFRAMEDDOUBLEGLAZEDA/F-INTERNALOPERATEDSHUTTERS PPC
2700x1400 2700x1225
2700x1100
500x1500
ALUMINIUMFRAMEDFIRERATEDWINDOW-/60/-FIXED
BUILDERTOPROVIDESHOPDRAWINGSFORALLWINDOWSANDGLAZEDDOORSFORAPPROVAL
DOORHEADHEIGHTNOTEDABOVEFINISHEDFLOORLEVEL(F.F.L.)
BUILDERTOADVISEARCHITECTSOFANYDESCREPANCIESNOVARIATIONSWILLBEAPPROVED.
BUILDERTOREFERTOELEVATIONSFORALLWINDOWGLAZEDDOORS&SIDELIGHTSCONFIGURATIONS
TYPE A GLAZING VALUES: U-VALUE=4.5 SHGC=0.50 TYPEBGLAZINGINCLUDES:REFERWINDOW/DOORSCHEDULES TYPE B GLAZING VALUES: U-VALUE=4.5 SHGC=0.61
No
SIZE (H
TYPE D2.1 D2.2
FINISH PPC CLEAR
EXTERNAL DOOR SCHEDULE - UNIT 2 (UNITS 5-6 & 10)
ROOM
x W)
ALUMINIUMDGFRAMEDGLAZEDDOORD-STACKSLIDING(OOX)COORDINATEWITHWINDOW 2700x3575 2660x820
FINISH PPC CLEAR UNITTYPE2
FINISH PPC CLEAR
FINISH PPC CLEAR
FINISH PPC CLEAR
GENERAL NOTES
WHENCARRYINGOUTTHEBUILDINGWORKABUILDER(orownerbuilder)SHOULD BEFAMILIARWITHGENERALCONSTRUCTIONPRACTICES,THEREQUIREMENTSOF THENATIONALCONSTRUCTIONCODE(NCC2022)HOUSINGPROVISIONS2022AS WELLASLOCALCOUNCILRULES/REG'S
ACOPYOFALLPLANNINGBUILDING&PLUMBINGPERMITSANDDRAWINGS STAMPED"APPROVED"BYTHELOCALAUTHORITYMUSTBEKEPTONSITE
PART H1D3 - SITE PREPARATION
CUT&FILLGRADESTOBETORELEVANTSAACODES,SUITABLEFORSOIL CLASSESENCOUNTERED(REFERTYPICALDIAGRAM)
THEBUILDERISRESPONSIBLEFORENSURINGTHENEWBUILDINGWORKSARE SETOUTBYAREGISTEREDSURVEYORINACCORDANCEWITHTHEDRAWINGS
PART 3.2.1 UNPROTECTED
PART H1D6 - STRUCTURAL STEEL MEMBERS
ALLSTRUCTURALSTEELFLOORWALL&ROOFCONSTRUCTIONSHALLBECARRIED OUTINACCORDANCEWITHPARTH1D6(NCC2022)PART6.3(HOUSING PROVISIONS2022)ANDAS4100 DESIGN&CERTIFICATIONTOBEBYAN
ACCREDITEDPRACTICINGSTRUCTURALENGINEER
ALLEXTERNALSTRUCTURALSTEELMEMBERS&FIXINGSHALLBEPROTECTEDFROM CORROSIONINACCORDANCEWITHPART6.3.9OFHOUSINGPROVISIONS2022
GENERALLYHOTDIPGALVANISEDUNLESSNOTEDOTHERWISE
PART H1D6 - ROOF & WALL CLADDING
METALROOFCLADDINGPROVIDED&INSTALLEDINACCORDANCEWITHAS1562.1& PARTH1D6(NCC2022)&PART7(HOUSINGPROVISIONS2022)
COLORBONDFINISHTOSHEETROOFS(uno)ASSELECTEDBYOWNERALLRIDGES FASCIAS,BARGEENDSHIPENDSANDROOFPENETRATIONSMUST BEPROPERLYFLASHEDANDSEALED(i.ewatertight)REFERTOARCHITECTURAL DWGSFORTYPICALSARKINGDETAILSANDEXTENTOFROOFCLADDINGS
ALLGUTTERSANDDOWNPIPESSHALLBEDESIGNEDANDCONSTRUCTEDIN ACCORDANCEWITHPART7.4OFTHEHOUSINGPROVISIONSAS/NZS3500.3or AS/NZS3500.5(domesticinstallationsSection5)
REFERTOARCHITECTURALDWGSFORTYPICALGUTTER&FASCIADETAILS
PREFABRICATEDTIMBERROOFTRUSSESTOBEINSTALLEDINACCORDANCEWITH MANUFACTURERSSPECIFICATIONSCERTIFIEDTRUSSDESIGNCRITERIA&PLAN SHOWINGFIXING&BRACINGDETAILSTOBESUBMITTEDTOTHEBUILDING
SURVEYORPRIORTOFRAMEINSPECTION&INCLUDEANYVARIATIONREQUIREDTO LINTELS&STUDSTOACCOUNTFORCONCENTRATEDLOADS
WALLCLADDINGTOBEINSTALLEDINACCORDANCEWITH7.5OFTHEHOUSING PROVISIONS2022&TOSPECIFICMANUFACTURERSSPECIFICATIONS
FLASHINGTOWALLOPENINGSINEXTERNALWALLCLADDINGINACCORDANCEWITH PART7.5.6OFTHEHOUSINGPROVISIONS2022USINGMATERIALSTHATCOMPLY WITHAS2904
- FACILITIES
FACILITIESTOCOMPLYWITHPARTH4D5(NCC2022)&PART10.4(HOUSING PROVISIONS2022)
THEDOORTOAFULLYENCLOSEDSANITARYCOMPARTMENTMUSTOPENOUTWARDS,SLIDEORBEREADILYREMOVABLEFROMTHEOUTSIDEOF THECOMPARTMENTUNLESSTHEREISACLEARSPACEOFATLEAST1.2m MEASUREDINACCORDANCEWITHFIGURE10.4.2BETWEENTHECLOSETPAN WITHINTHESANITARYCOMPARTMENTANDTHEDOORWAY
H4D6 - LIGHT
NATURALLIGHTINGREQUIREMENTSINACCORDANCEWITHPARTH4D6(NCC2022) &PART10.5(HOUSINGPROVISIONS2022)
PROVIDEARTIFICIALLIGHTINGTOSANITARYCOMPARTMENTSBATHROOMS SHOWERROOMSAIRLOCKS&LAUNDRIESIFNATURALLIGHTINGREQUIREMENT CANNOTBEACHIEVEDASPER10.5.3OFHOUSINGPROVISIONS2022(a)ATARATEOFNOTLESSTHANONELIGHTFITTINGPER16m²OFFLOORAREA;OR (b)INACCORDANCEWITHAS/NZS1680.0
PART H4D7 - VENTILATION
VENTILATIONREQUIREMENTSINACCORDANCEWITHPARTH4D7(NCC2022)&PART 10.6(HOUSINGPROVISIONS2022)
PROVIDEEXHAUSTFANSINTOILET,BATHROOMSANDARANGEHOODABOVE KITCHENHOTPLATESINSTALLANDDUCTTOOUTSIDEAIRINACCORDANCEWITHAS 1668.2REFERTOPLANSFORLOCATION
PART H4D9 - CONDENSATION MANAGEMENT
ALLPLIABLEBUILDINGMEMBRANESINSTALLEDINAEXTERNALWALLMUSTBEIN ACCORDANCEWITHPARTH4D9(NCC2022)&PART10.8(HOUSINGPROVISIONS 2022),AS4200.1&AS4200.2
WHEREINSTALLEDINCLIMATEZONES67&8THEPLIABLEMEMBRANEMUSTBE AVAPOURPERMABLEMEMBRANE
PLIABLEMEMBRANESMUSTBELOCATEDONTHEEXTERIORSIDEOFTHE PRIMARYINSULATIONLAYEROFTHEWALLASSEMBLIESTHATFORMTHE EXTERNALENVELOPEOFTHEBUILDINGTOCOMPLYWITH10.8.1
PART H5D3 - BALUSTRADES & HANDRAILS
BALUSTRADECONSTRUCTIONSHALLCOMPLYWITHTHEREQUIREMENTS OFPARTH5D3(NCC2022)&PART11.3(HOUSINGPROVISIONS2022)
PROVIDE1000mmHIGH(Min.)BALUSTRADETOANYDECK,LANDING,BALCONY OR THELIKE1000mmORMOREABOVEADJOININGFLOORORFINISHEDGROUND LEVEL;&PROVIDE865mmHIGH(Min.)BALUSTRADETOSTAIRS;&NOOPENINGS WITHINANYPARTOFTHEBALUSTRADEARETOBEGREATERTHAN124mm PROVIDE865mmHIGH(Min.)CONTINUOUSHANDRAILTOATLEASTONESIDE OFFLIGHTOFSTAIRSORRAMPS
WIREBALUSTRADESMUSTBECONSTRUCTEDINACCORDANCEWITHPART 11.3.6(HOUSINGPROVISIONS2022)SPECIFICALLYCLAUSE11.3.4(9)& TABLE11.3.6a.
TYPICALLY(TABLE11.3.6-WIREBALUSTRADECONSTRUCTION):
TYPICALLYWIREØ3.0mm-7x7LAY-Max 80mmWIRESPACINGS POSTS@Max 1500mmcts(MinREQUIREDTENSION=1083N)
TYPICALLYWIREØ3.0mm-1x19LAY-Max80mmWIRESPACINGS POSTS@Max1200mmcts(MinTENSION=1025N)
GLASSBALUSTRADESTOCOMPLYWITHAS1288SECTION7(2006)
NOTES:
1 RETAININGWALLSOROTHERTYPESOFSOILRETAININGMETHODSMUSTBE INSTALLEDWHERE(a) THEEMBANKMENTSLOPEISSTEEPERTHANTHATDESCRIBEDINTHIS TABLE;OR (b) THESOILTYPEISNOTDESCRIBEDINTHISTABLE
2 EMBANKMENTSTHATARETOBELEFTEXPOSEDATTHEENDOFTHE CONSTRUCTIONWORKSMUSTBESTABILISEDBYVEGETATIONORSIMILAR WORKSTOPREVENTSOILEROSION
PART H1D4 - FOOTINGS & SLABS
FOOTINGORSLABCONSTRUCTIONSHALLBEDESIGNEDANDCONSTRUCTED INACCORDANCEWITHAS2870,ANDMUSTCOMPLYWITHPARTH1D4OFTHE NCC2022&PART4OFTHEHOUSINGPROVISIONS2022
PILEDFOOTINGSTOBEDESIGNEDINACCORDANCEWITHAS2159
DESIGN&CERTIFICATIONOFFOOTINGS&SLABSTOBEBYANACCREDITED PRACTICINGSTRUCTURALENGINEER
GLAZEDASSEMBLIES(INTERNAL&EXTERNAL)ARETOPOSSESSINDUSTRY STANDARDCOMPLIANCELABELLING(THATCANBEIDENTIFIEDDURINGAN INSPECTION)orACERTIFICATEOFCOMPLIANCETOAUSTRALIANSTANDARDSAS 1288(glass-safety)&AS2047(windows-weatherproofing)WILLHAVETOBE PROVIDED GLAZINGSHALLALSOCOMPLYWITHPART8.2(HOUSINGPROVISIONS 2022)
THEINSTALLATIONOFGLAZEDASSEMBLIESISTOCORRESPONDWITHTHETOTAL U-VALUE&SHGCQUANTITIESSPECIFIEDWITHINTHEAPPROVEDGLAZING CALCULATORS PRIORTOTHEISSUEOFTHECERTIFICATEOFFINALINSPECTIONA STATEMENTCONFIRMINGTHATTHESPECIFIEDGLAZINGHASBEENINSTALLEDIS TOBESUBMITTEDTOTHEBUILDINGSURVEYOR
GLAZINGINBATHROOMS,INCLUDINGSHOWERSCREENSSHOWERDOORS,BATH ENCLOSURES&ASSOCIATEDWINDOWSTHATAREUNDER2mMEASUREDFROM THEFLOORLEVELUPMUSTBEINACCORDANCEWITHPART8.4.6(HOUSING PROVSIONS2022)
ALLKITCHENBATHROOM,SANITARYCOMPARTMENTSORLAUNDRYMUSTBE INSTALLEDINACCORDANCEWITHPART10.8.2(HOUSINGPROVISIONS2022)
EXHAUSTFROMABATHROOMSANITARYCOMPARTMENTORLAUNDRYMUSTBE DISCHARGEDVIADUCTTOOUTDOORAIRORTOROOFSPACETHATIS VENTILATEDINACCORDANCEWITHPART10.8.2(HOUSINGPROVISIONS2022)
ALLROOFSPACESMUSTBEINACCORDANCEWITHNPART10.8.3(HOUSING PROVISIONS2022)
WHEREEXHASUTFROMBATHROOM,SANITARYCOMPARTMENTSORLAUNDRY AREDISCHARGEDINTOROOFSPACETHEROOFMUSTBEVENTILATEDTO OUTDOORAIRTHROUGHEVENLYDISTRIBUTEDOPENINGS
OPENINGSMUSTHAVEATOTALUNOBSTRUCTEDAREAOF1/300OFTHE RESPECTIVECEILINGAREAIFTHEROOFPITCHISMORETHAN22˚,OR1/150OF THERESPECTIVECEILINGAREAIFTHEROOFPITCHISNOTMORETHAN22˚
ALLRELEVANTBUILDINGWORKSSHALLCOMPLYWITHPARTH6(energyefficiency) OFTHENCC2022&PART13OFTHEHOUSINGPROVISIONS2022 NOTE:GARAGEAREASARENOTREQUIREDTOCOMPLYWITHTHISSECTION
REQUIREDMINIMUMTOTALR-VALUESTOCOMPLYWITHPARTS13.2-BUILDING FABRICFORCLIMATEZONE7
ALLBULK&REFLECTIVETHERMALINSULATIONMUSTCOMPLYWITHAS/NZS 4859.1,ANDSHALLBEINSTALLEDINACCORDANCEWITHPART13.2(HOUSING PROVISIONS2022)TOFORMACONTINUOUSBARRIERWITHTHEROOFCEILINGS WALLS&FLOORS
BUILDINGSEALINGMUSTCOMPLYWITHPART13.4(HOUSINGPROVISIONS2022) ALLOPENABLEWINDOWSASHESANDAROUNDEDGESOFEXTERNALDOORS SHALLBEFITTEDWITHSELFADHESIVEFOAMORRUBBERCOMPRESSIBLESEALS ROOFSEXTERNALWALLS,EXTERNALFLOORSANDANYOPENINGSUCHASA WINDOWORDOORINANEXTERNALWALLMUSTBECONSTRUCTEDTOMINIMISE AIRLEAKAGEBYENSURINGINTERNALLININGSATCEILING,WALLANDFLOOR JUNCTIONSARECLOSEFITTINGORSEALEDBYCAULKING,SKIRTING ARCHITRAVES,CORNICESORTHELIKE
EXHAUSTFANSMUSTBEFITTEDWITHASEALINGDEVICESUCHASA SELF-CLOSINGDAMPERFILTERORTHELIKE
HOTWATERSUPPLYSYSTEMSHALLBEDESIGNED&INSTALLEDINACCORDANCE WITHSECTION8OFAS/NZS3500.4orCLAUSE3.38OFAS/NZS3500.5
FURTHERMORETHECLEARANCEBETWEENTHEGROUNDSURFACE&THE UNDERSIDEOFTHELOWESTFLOORFRAMINGMEMBERMUSTNOTBELESS THAN150mm PART H2D5 - SUB-FLOOR VENTILATION
PROVIDESUB-FLOORVENTILATIONTOSUSPENDEDFLOORSTRUCTURETO COMPLYWITHPARTH2D5OFTHENCC2022&PART6.2.1OFHOUSING PROVISIONS2022ATARATEOFNOTLESSTHAN6000mm² PERMETERLENGTH OFWALL;ANDENDVENTSARENOTTOBEINSTALLEDFURTHERTHAN600mm AWAYFROMEXTERNALCORNERS
PART H1D6 - TIMBER FRAMING
ALLTIMBERFLOOR,WALL&ROOFCONSTRUCTIONSHALLBECARRIEDOUTIN ACCORDANCEWITHPARTH1D6OFTHENCC2022ANDAS1684.2
DESIGN&CERTIFICATIONTOBEBYANACCREDITEDPRACTICING STRUCTURALENGINEER
SMOKEALARMSSHALLCOMPLYWITHPARTH3D6(NCC2022)&PART9.5 (HOUSINGPROVISIONS2022)&AS3786ANDMUSTBEDIRECTLYHARDWIRED INTOTHEELECTRICALSYSTEM(MUSTPOSSESSBATTERYBACK-UP) LOCATIONSASPERCLAUSE9.5.2OFTHEHOUSINGPROVISIONS2022
REFERTOFLOORPLANSFORLOCATIONS PART H3D6 - SMOKE ALARMS
PART H4D2 - WET AREAS
WATERPROOFINGOFALLINTERNALWETAREASSHALLBEINACCORDANCEWITH PARTH4D2(NCC2022),PART10.2(HOUSINGPROVISIONS2022)& AS3740-WATERPROOFINGOFWETAREASINRESIDENTIALBUILDINGS
PROVIDETHEFOLLOWINGASSUBSTRATES:-
1) TIMBERFLOORS-19mm'YELLOWtongueR-flor'OR 18mm'CEMINTEL'F.CCOMPRESSEDSHEETWETAREAFLOORINGor EQUIVALENT
2) WALLS-6mm'CEMINTEL'F.CWALLBOARDWETAREALININGor 10mm'GYPROCKAQUACHEK'WETAREAPLASTERBOARD
ALLFINISHESTOBESELECTEDBYOWNERS
30%OFTHETOTALUNOBSTRUCTEDAREAREQUIREDMUSTBELOCATEDNOT MORETHAN900MMBELOWRIDGEORHIGHESTPOINTOFTHEROOFSPACE, MEASUREDVERTICALLYWITHTHEREMAININGREQUIREDAREAPROVIDEDBY EAVESVENTS
PART HD2 - STAIR CONSTRUCTION
STAIRSSERVINGHABITABLEROOMSINCLUDINGEXTERNALSTAIRSMUST COMPLYWITHPARTH5D2(NCC2022)&PART11.2.2(HOUSINGPROVISIONS2022)
IFOPENTREADSARETOBEINCORPORATEDINTOTHESTAIRDESIGN THENTHEMax OPENAREAOFTHERISERISNOTTOEXCEED124mm
STAIRTREADSMUSTHAVEASLIP-RESISTANTFINISHORASUITABLENON-SKID STRIPNEARTHEEDGEOFTHENOSINGS
STAIRTREADS- Min240mm Max355mm
STAIRRISERS- Min115mm Max190mm SLOPERELATIONSHIP: 2RISERS+1GOING= Min550mm Max700mm
DOORSOPENINGOUTWARDSEXTERNALLYMUSTOPENTOALANDING (Min750mmWIDE)WHERETHEDIFFERENCEINLEVELSISGREATERTHAN570mm
THEFIRST500mmOFPIPEFROMANYHOTWATERSTORAGEUNITMUSTBE INSULATEDWITHMin 19mmOFCLOSEDCELLPOLYMER(insidebuilding)OR 25mmOFCLOSEDCELLPOLYMER(outsidebuilding)
MINIMUMCEILINGHEIGHTSMUSTCOMPLYWITHPARTH4D4(NCC2022)& PART10.3(HOUSINGPROVISIONS2022)
GENERALLY2.4mUNLESSINAKITCHENHALLBATHROOMLAUNDRYOR GARAGEWHEREAMINIMUMOF2.1mISACCEPTABLE PART H4D4 - ROOM HEIGHTS
ADDRESS CLIENT DWG DESCRIPTION DATE REVISION ISSUE DWG# SCALE@ DRAWN CHKD donotscaleoffplans alldimensionsinmillimetres confirmalldimensions site allworktorelevantNCCandAS PROJECT# SGroup ©Copyright2021 T 0363111403 E info@sgroup.com.au sgroup.com.au Level 10-14Patersonst Launceston 6/100Elizabethst Hobart 83LangridgestCollingwood, Melbourne ISOA2 GeneralNotes 8-10PetcheyStreet Brick&Castle DD A902 1:100
J008392 JE JEConstructionIssue 13/5/24 B B
FORCONSTRUCTION
NCC 2022 - CLASS 1 & CLASS 10 BUILDINGS (GENERAL NOTES)
PART H6 - ENERGY EFFICIENCY
PART H1D8 - GLAZING
SOILTYPE
STABLEROCK(A#) SAND(A#) SILT(P#) CLAY SOFTSOILS(P#) COMPACTED FILL(seePart4.2) CUT 3:3 EMBANKMENTSLOPESH:L 8:1 1:2 1:2 1:4 1:4 1:2 1:1 FIRMCLAY SOFTCLAY NOTSUITABLE 2:3 NOTSUITABLE NOTSUITABLE
(#seePart4.2.2formaterialdescription)
EMBANKMENTS (HOUSING PROVISIONS) H L FILL H=lessthan2m CUT H=lessthan2m L H
EARTHWORKSSHALLBECARRIEDOUTINACCORDANCEWITHPARTH1D3OF THENCC2022&PART3.2OFTHEHOUSINGPROVISIONS2022
PART
H4D5
L