PORTFOLIO HARITA KAVDIA
HARITA KAVDIA India October 13,1998 Rajsamand, Rajasthan haritakavdia1998@gmail.com +91-7014635252
EDUCATION 2016-Ongoing(4th year)-Undergraduate Architecture Institute of Architecture and Planning, Nirma University, Ahmedabad ,Gujrat,India 2014-2016-Higher Secondary Lakshmipat Singhnia High school (CBSE Board) Rajsamand, Rajasthan,India
WORKSHOPS
SKILLS
2019-Hands on workshop, Khirsu, Uttrakhand
Software skills
2019-Lithography
Adobe Auto-CAD
Adobe Illustrator
2019-Alternative construction techniques
Adobe Photoshop
Rhinoceros
2019-Evolutionary computation
Revit
Grasshopper
2018-Landscape designing
InDesign
Sketch-up
2018-Green building
Lumion
Microsoft Office
2018-Furniture design workshop 2017-Building material hands on wattle &daub 2017-Fundamentals of international business 2017-Building energy calculation 2016-Origami
Hands on skills Model making
Rendering
Hand drafting
Sketching
Calligraphy
3-D Modelling
STUDY TRIPS
INTEREST
Documentation
Photography
Winter 2016-Coorg,Karnataka
Reading
Winter 2017-Banaras,Uttar Pradesh
Sketching
Summer 2018- Ahmedabad ,Gujarat
Travelling
Architectural study trips
LANGUAGE
Summer 2017-Delhi, Agra
English
Summer 2019-Chandigarh
Hindi
CONTENT EXTRA CURRICULUM
STUDIO PROJECTS
01 HOUSE OF KNOWLEDGE
4
WORKING DRAWING
03
COMMUNITY LIVING
04
HERITAGE CELL
12
STUDIO VIl 20
STUDIO lV
STUDIO lll
30
06
34
PARAMETRIC DESIGN
STUDIO VI
02
05 EVOLUTIONARY COMPUTATION
26
ANCILLARY WORKS OTHER WORKS
07
WORKSHOP
08
RELATIVE STUDY PROGRAM
42
HANDS ON WORKSHOP, KHIRSU
AHMEDABAD POL
46
01
Institution House of knowledge Aim was to design House of Knowledge which caters large context of city as well as define the collective spirit of institute. Lush green site of CN Vidyavihar, replete with its natural landscape contains old and the new buildings subtly merge with the entire site. Studio was to understand how concept can be transformed into a design.Exploring structure,form,material,scale,light and volume.
PROJECT BRIEF Site
C.N vidhayalay,Ahmedabad C. N.’s educational philosophy got inspired by Gandhian values. Design problem
House of knowledge-1000m2 -Stack Area,Multimedia Area -Reading Area, Cafeteria -Exhibition, Workshop Concept
-Aim is to create a knowledge center that gives a sense of freedom. -A place for inquisitive minds (children) where they can also think creatively. -Curved wall softly separate inside and outside spaces in order to get the people closely to nature. C.N vidhyalay
CONCEPT DRAWING
8
VIEWS
CONCEPT MODEL
9
GROUND FLOOR PLAN
Design decisions taken for the project considering the concept :-Inside Out connecting nature and buildings. -Playful by playing with forms -Minimum Wall to give a sense of freedom. -Multipurpose spaces -Variety of spaces in terms of scale -Patios for natural ventilation -Semi open spaces connecting different activity.
10
MODEL
SECTION
11 11
02
Working Drawing Institutional Project Aim was to develop construction drawings for Institutional project. Focusing on design details and converting design data into construction information. The basic set includes plan,section,elevation,wall section,toilet ,kitchen,site plan ,electrical layout,door -window detail and junction details.
E F G
Order of arrangement
1110
J
1055
L
7110
1360
7795
W5
A702
GIRLS TOILET 1 +0650 +0575
D
W2 C2
37
00
5
775
520
1525
C23
60
00
1245
A702
348
655
C22
18
65
2
1905
5025
CAFETERIA 1551
+0675 +0600
ADMIN
W3 C1
UP
A202
A201
20
1 2 34 56
3695 1740
4
3
A202
5
C19
3485
885
R5 4
14
63
3160
1895
2
R1
+0675 +0600
F1
15
60
1
R7 62 5
1740
D4
1870
2700
2
805
1730
A201
1450
1900
C21
680
45
30
1175
3125
-Door and window set radially. -Column, wall and beams arranged according to form. -In some cases spaces are organized along the path of an arch with an imaginary center of exterior
500
965
F1
KITCHEN
1
FOR STAI REFER D
5 4 3
1270
815
FOR KITCHEN DETAILS REFER DWG. NO. A601
12
7 6
C24
F1
1050
45
45
18
R
C1
16
+0650 +0575
W3
3950
00
35
W1 C1
16
11 10 9 8
16
37
A701
17
D3
A702
2
A201
19
A
F2
FOR TOILET DETAILS REFER DWG. NO. A501
W3
A701
A701
2700
2680 2290
C7
5
18
R3
16
UP
15 14
09
1485
990
37875
W3
A701
1720
1550
1560
1720
C1
13
R4
5
11
5960
8
16
7
40
6 5
2
2030 1310
355
2845
855
2000
2032
R3
00
0
D5
W2
A702
C4
A702
A702
2900
W2
2875
W3
A701
355
45
61
75
48
850
C2
1305
1850
02
825
2575
535
1455
305
R32
310
2265
1310
305
1310
2230
W2
2000
C3
0 R660
03
50
530
890
C25
A702
+450 +250
46
+0675 +0600
5
05
LIBRARY
37
2
1
R2
1
F1
850
3
A701
07 06
UP
W1 C1
4
995
W3
W3
A701
41
2940
9
SL
51
3685
10
E
OP
A701
A701
76
12
3 2 1
W3
D2
1555
285
10
Geometry
+0525 +0450
C8
W3
990
A201
1788
3
63 80
11
90
C9
251
D3
A702
4
BOYS TOILET 2 +0650 +0575
1
A202
W2
A702
700
1320
1315
C5
R3
00
0
700
D3
A702
The organization spaces is in the form of shapes that form part of a whole 14
3
W2 C2
A202
F3
3
+0650 +0575 GIRLS TOILET 2
760
1215
4
5395
3
W2
A702
W4
A702
C6
700 700 760
01
1210
765
4795
A202
A201
W4
W2
A702
A702
18277
2355
1075
5605
3865
1100
6255
1265
5895
(0,0)
2
47225
A
B C
D
H I
K
M
N
O
S
45165
V
13650
W
6595
First floor plan
6475
1
A202
W5
A702
ENTRY
BOYS TOILET1 +0650 +0575 W2 C2
D3
F2
A702
11
13
12
14 15
10
16
9
17
8
18
7
13
D3
1675
15
STATUE
16 17
19
21
1800
1550
2901
20
23
2700
C20
R3
21 22 23 24
3
2
1 UP
F1
22
00 610
20
3 2 1
W1 C1
18
IRCASE DETAILS DWG. NO. A401
19
6 5 4
A702
14
24
1450
1
1140
1910
A201 UP
28
0
18
1
2
3
ENTRY
UP
+0675 +0600
UP
1905
D5
1 2 34 56
A702
22 21 20
2300
19 18
UP
2835
17 16 15
3585
3 2 1
UP
SLOPE 1:250
+0075 +0000
RAIN WATER TANK
W2
11955
14
4
A702
13 12 11 10 9 8
A202
7 6 5 4 3 2 1
W2
W2
A702
4780
5
0
22 90
57
R4
1195
3445
3350
1405
C17 3440
R8
45
5
W2
A702
3940
4735
D1
F1
610
D1
A702
Staircase plan
10860
2545
915
A702
13 12
910
R8
+0675 +0600
W1 C1
C15 3095
SEMINAR
2670
1440
1615
C16 C18
775
+450 +250
3
281
2
31930
3380
UP 1
3345
9
A702
C1 910 475
F1
EXHIBITION +0675 +0600
135
O
2310
2000
1905
08
C14 1135
D2
M EA D 39
0M
6235
TR AL EQ U 12
20
22
MM D2
75
02
2120
3363
2310
2950
3575
21
M
2220
3
5M
F1
UA L
W1 C1
60
4
EQ
R44
15
04
A201
TR EA
2
605
12
C10
3985
2080
2435
1865 2630
R
1760
ISE
19
5
21 OF
880
LR
18
1075
6
AD
2490
UA
A202
EQ
+0675 +0600
UP
C11
17
7
RE
2785
A701
LT
4235
W3
EXHIBITION
UA
10
16
EQ
3850
15
9
1O
2185
14
+2375 +2325
10
340
MID LANDING
8
4
R3
13
12 11 10
A702
C12
340x230 RCC COLUMN 340THK BRICK WALL
23
2
17
1847 1
UP
1500
24
C20
R10
350
R3
C13
2
A202
01'
+575 +500
2685
465
145
W1
A701 BEAM ABOVE
2400
1860
P
4885
Q
590
R
5885
S
Ground floor plan
4185
T
U
15
100 100 450 500 100 100 450 450 890
W7 W7
+7875 +7875 +7800 +7800 FOR TOILET DETAILS FOR TOILET DETAILS FOR TOILET DETAILS REFER DWG. NO. A501 REFER DWG. NO. REFER A501 DWG. NO. A501
+2325
FOR STAIRCASE DETAILS REFER DWG. NO. A401
+2375 +2325+2375 +2325
TOILET
PASSAGE
W7
+7875 A702 +7875 +7800 +7800
B.O.C OF PLINTH BEAM
3200
W3
W7 W2 W2
A702
A702 A702 A702
450
+3725 +3650
+5975 +5925
W3
W6
06
11 11
11
09
ADMIN
450
150 3500
3200
450 300 1000 250 120
A702
W7 15
18
A702
W3 W3 A702
W3 W3 A702
A702
A702
+7875 +7800
ELEVATION +0150 A702 B.O.C OF PLINTH BEAM
5728
W7 W7 A702
14
W3
A702
W3
W6
04
W3 W3 A702
A702
450
600
TOILET
01 01
+525 +450
+3725 +3650
W3 W3 A702
A702
W3
+3725 +3725 +3650 +3650A702
A702
W3 W3 A702
A702
+7875 +7875 +7800 +7800
W3
A702
W3 W3 A702
A702 TOILET TOILET
23321 23321
300 1000
01
W6 W6 A702 100 908
3650 2199
10311 +0675 +0600
FOR STAIRCASE DETAILS REFER DWG. NO. A401
7570
2099
450 300 1000 250 120 450 300 1000 250 120 3200 3200
LIBRARY
+2325
7920
ELEVATION +3500 B.O.C OF SLAB ELEVATION +3200 B.O.C OF BEAM
A702 A702
+0675 +0600
+2375
PASSAGE
W2 W2
A702
+525 +450
+525 +525 +450 +450
FOR TOILET DETAILS REFER DWG. NO. A501
2SECTION 3 3
D2
A702
A702
+3725 +3650
TOILET
600 9002099 100 908 600 2099450100 908
W3
W3
A702
A702
3200
450 100 100 450 450 3200 890 450450 900 450 2199 450
A702
FOR TOILET DETAILS REFER DWG. NO. A501
890
3650 3650
3200 900 450 2199150
3500 450
A702 +7875 +7800
450
600
450
3200 3200 3500 3500
23321
+7875 +7800
W3 A702 W7
W3
A702
15 18 18
A702
W3 W3 A702
A702
+0675 +0600W2 D2 D2A702 A702 A702 EXHIBITION +0675 +0675 +0600 +0600 21522
W3
W3
A702
A702
LIBRARY LIBRARY
7920 7920
ELEVATION +0150 1:100 B.O.C OF PLINTH SCALE SCALE 1:100 ELEVATION +0150 BEAM
W2
A702
10311 10311
06 06
LIBRARY
7920
23321
GGK
SCALE 1:100
SCALE 1:100
20
16
33
600
150 THK SAND FILLING
1SECTION
150 150
150
150 THK BBCC
RAMMEND EARTH
600 600 450
150 THK RCC SLAB
ELEVATION +3500 B.O.C OF SLAB ELEVATION ELEVATION +3200 +0150 ELEVATION +0150 OF PLINTH B.O.C B.O.C OF BEAM B.O.C OF PLINTH BEAM BEAM
3500
POLYACRYLATE TERRAZZO TOPPING CEMENT BEDDING
ELEVATION +3500 B.O.C OF SLAB ELEVATION +3200 B.O.C OF BEAM
+7875 +7800
A702
W3
GGK
3200
575
15 15
+7875 +7800
TOILET
ELEVATION +3500 ELEVATION +3500 B.O.C OF SLAB B.O.C OF SLAB ELEVATION +3200 ELEVATION +3200 B.O.C OF BEAM B.O.C OF BEAM
5728 5728
W7
W7
450
20MM THK GRANITE 110 MM THK CONCRETE 20 MM THK PLASTER
572
ADMIN ADMIN
11
A702
SCALE 1:100
B.O.C OF SLAB ELEVATION +7450 B.O.C OF BEAM
SLIDING WINDOW GLASS 8 MM THK
W2
7570
14 14 14
GGK
ELEVATION +7750 ELEVATION +7750 B.O.C OF SLAB B.O.C OF SLAB ELEVATION +7450 ELEVATION +7450 B.O.C OF BEAM B.O.C OF BEAM+7750 ELEVATION
Wall section
+525 +450
PASSAGE PASSAGE
SCALE 1:100 SCALE 1:100 SCALE 1:100
ELEVATION +8850 ELEVATION +8850 B.O.C OF SLAB B.O.C OF SLAB
+0675 +0675 +0600 +0600
7570 7570
SECTION 3 2 22SECTION 2SECTION
ELEVATION +8850 B.O.C OF SLAB
500
ADMIN
FOR STAIRCASE DETAILS FOR STAIRCASE DETAILS REFER DWG. NO. A401 REFER DWG. NO. A401
2099 3200 100 908
100 450 100 450 500
150 32003500 900450 2199 450
1792
INSIDE
+0675 +0600
FOR TOILET DETAILS FOR TOILET DETAILS REFER DWG. NO. A501 REFER DWG. NO. A501
GGK
ELEVATION +0150 B.O.C OF PLINTH BEAM
W2
A702 +3725 +3725 +3650 +3650
A702
600 450
3650
2500
3200
150
150 150 450 900150 600
3500
900 600 1050
150
ELEVATION +3500 B.O.C OF SLAB ELEVATION +3200 B.O.C OF BEAM +0150 ELEVATION ELEVATION +0150 ELEVATION +0150 B.O.C OF PLINTH ELEVATION +0150 B.O.C OFOF PLINTH B.O.C PLINTH BEAM B.O.C OF PLINTH BEAM BEAM BEAM
100X40 ANODIZED ALUMINUM FRAME FIXED BY ANCHOR BOLT
OUTSIDE
+2375
+5925
450 300 1000 250 120
150
SILICON SEALENT
3500
20 DIA GROOVE
3500 3500 1792 3500
CONCRETE BEAM 300X450 20 MM THK PLASTER
ELEVATION +3500 ELEVATION +7750 B.O.C B.O.C OF SLABOF SLAB ELEVATION +3500 ELEVATION +7450 ELEVATION +3500 ELEVATION +3200 B.O.C OF SLAB ELEVATION +3500 B.O.CB.O.C OF BEAM OFOF SLAB B.O.C BEAM B.O.C OF SLAB ELEVATION +3200 ELEVATION +3200 B.O.C OF BEAM ELEVATION +3200 B.O.C OF BEAM B.O.C OF BEAM
A7 A
+5925+5975
B.O.C OF BEAM
POLYACRYLATE TERRAZZO TOPPING 150 THK RCC SLB 20 MM THK PLASTER
W
W7 W7
A702 A702
+5975
SCALE 1:100
+4145
18
+3725 +7875 +7875 +3650 +7800 +7800
+7875 +7800
GGK
ELEVATION +7750 B.O.C OF SLAB ELEVATION +10750 ELEVATION +7450 B.O.C OF SLAB B.O.C OF BEAM ELEVATION +10450
15
A702 A702
+5925
2SECTION 1
+ +4220
+7875 +7800
+5975
TOILET TOILET
ELEVATION +8850 B.O.C OF SLAB ELEVATION +8850 B.O.C OF SLAB
5728
W7 W7
14
A702 A702
FOR TOILET DETAILS REFER DWG. NO. A501
890
900 600 450
7570
300 1000
ELEVATION +0150 ELEVATION +0150 B.O.C OF PLINTH ELEVATION +0150 B.O.C OF PLINTH B.O.C OF PLINTH BEAM BEAM BEAM
ADMIN
+7875 +7800
300 1000 300 1000
17
890
150 600 600
SLIDING WINDOW GLASS 8MM THK
3500 3500 3500
B.O.C OF PLINTH BEAM
100 1001050 450 500 900 100 100 450 500
1792
150 150 150
ELEVATION +3500 ELEVATION +3500 B.O.C OF SLAB ELEVATION +3500 B.O.C OF SLAB B.O.C OF SLAB ELEVATION +3200 ELEVATION +3200 B.O.C OF BEAM ELEVATION +3200 B.O.C OF BEAM ELEVATION B.O.C OF BEAM+0150
100 100 450 450 890 450 100 100 450 4501792 890
110 MM THK CONCRETE 20MM THK GRANITE
PASSAGE
890 890
150 150
ELEVATION +3500 ELEVATION +7750 ELEVATION +7750 B.O.C OFOF SLAB B.O.C SLAB B.O.C OF SLAB ELEVATION +7450 ELEVATION +3200 ELEVATION +7450 B.O.C OF BEAM B.O.C OF B.O.C OFBEAM BEAM
3500 3500
20 DIA GROOVE SILICON SEALANT
450
600
150
CONCRETE BEAM 350X450 20 MM THK PLASTER
3500
150 150
ELEVATION +10750 ELEVATION +10750 B.O.C OF SLAB B.O.C OF SLAB ELEVATION +10450 ELEVATION +10450 B.O.C OF BEAM B.O.C OF BEAM
2500 2500
75 MM BBCC 20 MM THK PLASTER
TOILET
3500 900 600 150 1792 450 1792 900 600 450
8MM THK CHINA MOSAIC 75 MM THK CEMENT BEDDING
ELEVATION +7750 ELEVATION +8850 B.O.C OF SLAB ELEVATION +8850 B.O.C OF SLAB B.O.C OF SLAB ELEVATION +7450 B.O.C OF BEAM
6001050 1792 900 450 17923200 900 1050
+7950
+0675 +0600
FOR STAIRCASE DETAILS REFER DWG. NO. A401
450 450 450
+8015
B.O.C OF PLINTH BEAM
2500
SECTIONS
ELEVATION +10750 B.O.C OF SLAB ELEVATION +10450 ELEVATION B.O.C OF +0150 BEAM
01 11
06 +3725 +3725
09 09
10311
W2
W3
A702
A702 LIBRARY
A702
600
150
1050 1700
3500
12MM THK STONE 10 MM THK PLASTER
ELEVATION +3500 B.O.C OF SLAB ELEVATION +3200 B.O.C OF BEAM
600
507 199 843
100 450 500 450 800 100 1700
20MM THK GRANITE
3200
W2
A702
3500
150 3500
1050
ELEVATION +7750 B.O.C OF SLAB ELEVATION +7450 B.O.C OF BEAM
WATER PROOFING 8MM THK CHINA MOSAIC
ELEVATION +3500 B.O.C OF SLAB ELEVATION +3200 B.O.C OF BEAM
450
75 MM THK CEMENT BEDDING
675
W3
+0675 +0600
1700
100 450 500
A702
+3725 +3650
450 800 100 1700
A702
507 199 843
W3A702
A702
A702
W3
W3
W3
W3 W3
A702
+3725 +3650
ELEVATION +7750 B.O.C OF SLAB ELEVATION +7450 B.O.C OF BEAM
ELEVATION +0150 B.O.C OF PLINTH BEAM
3500
W3
A702
A702
A702
+7875 +7800
A702
A702
A702
W7
W7
702
W3
W3
W3
W3
A702
3200
W3
A702
W7
A702
A702
+7875 +7800
200
W7
W7
A702
600
W7
W7
A702
75 MM BBCC
20 DIA GROOVE
+0675 +0600
18
OUTSIDE
8770 450
16619
ELEVATION +0150 B.O.C OF PLINTH BEAM
06
LIBRARY 16619
675
28
8770
06
Parapet detail
02
02
W2
A702
7220
04
150
600 450
1700 100 450 500
04
150 3500
450 3200 450
INSIDE
OUTSIDE
20 MM THK MALA PLASTER
TERRAZZO TOPPING CEMENT BEDDING
150 THK BBCC
150 THK SAND FILLING
3500
150
900 1050
ELEVATION +3500 B.O.C OF SLAB ELEVATION +3200 B.O.C OF BEAM
60 THK PAVING
CINDER FILLING
RAMMEND EARTH
75THK BBCC
RAMMED EARTH
ELEVATION +0150 B.O.C OF PLINTH BEAM
1350
Foundation detail
ELEVATION +7340 B.O.C OF DOME BEAM 5100
350
4001
09
Window detail
01
150 THK RCC SLAB
1
FOR DOME DETAILS REFER DWG. NO. A401
ELEVATION +0150 B.O.C OF PLINTH BEAM
EXHIBITION II
ELEVATION +7750 B.O.C OF SLAB ELEVATION +7450 B.O.C OF BEAM
3500
1660
100 450 450 890
150
600 450 1660
3500 3500
150
900
FOR STAIRCASE DETAILS REFER DWG. NO. A401
ELEVATION +0150 B.O.C OF PLINTH BEAM
7220
01
05
600
+0675 +0600
ELEVATION +0150 B.O.C OF PLINTH BEAM
7286
A702
20MM THK GRANITE
1700
A702
D2
A702
ELEVATION +3500 B.O.C OF SLAB ELEVATION +3200 B.O.C OF BEAM
OPEN
W3
D2
A702
ELEVATION +3500 B.O.C OF SLAB ELEVATION +3200 B.O.C OF BEAM
ELEVATION +8850 B.O.C OF SLAB
800 100 1700
W3
ELEVATION +7750 B.O.C OF SLAB ELEVATION +7450 B.O.C OF BEAM
450 900
FOR STAIRCASE DETAILS REFER DWG. NO. A401
A702
600
+3725 +3650
W3
1050
100 450 450 890
A702
A702
800 100 1700
W3
1700
A702
450 900
1700 100 450 500
ELEVATION +8850 B.O.C OF SLAB
+7875 +7800
EXHIBITION II
EXHIBITION
05
W3
+0000 +0000
OPEN 7286
23321
W3
+0675 +0600
+0000 +0000
EXHIBITION
A702 A702
A702
ELEVATION +3500 B.O.C OF SLAB ELEVATION +3200 B.O.C OF BEAM
3500
450 +0675 +0600
W3 D1
D2
3200
D1
A702
450
W2
A702
150
+3725 +3650 +3725 +3650
17
WALL SECTIONS LAMINATED SAFETY GLASS (TRANSLUCENT) 8MM+8MM
ALUMINUM RING SS CLAMPING BARS
6/6 STAINLESS STEEL EDGE PROFILE
BOLTS
REFER DETAIL 2 BOLTS
ALUMINUM SECTION DETAIL 1 60X35
B 6MM FLAT STEEL
CONCRETE BEAM 260X178
10 MM FLAT STEEL
10 MM FLAT STEEL PLATE
A
Detail A
+10300
CONCRETE BEAM 260X178
+10225
REFER DETAIL 2
300
75 MM THK CONCRETE 55X50ANODIZED ALUMINUM FRAME FIXED BY ANCHOR BOLT
20 DIA GROOVE SILICON SEALENT
AWNING WINDOW DOUBLE GLAZED GLASS
LAMINATED SAFETY GLASS (TRANSLUCENT) 8MM+8MM
2203
EDGE PLATE ALLUMINIUM 4MM THK SILICON
SILICON
20 MM THK MALA PLASTER
EDGE LATE ALUMINUM 4MM
HARD RUBBER ARAMIDE REINFORCED 4MM
FIXED TOUGHENED GLASS 50
450
47 46 45 44 43
Detail B
42 41
1.5 THK BRICK 20 MM THK PLASTER
37
+4220
10 MM GROVE
39
+4145
38
20 MM THK MALA PLASTER
20 MM THK MALA PLASTER
20MM THK GRANITE 110 MM THK CONCRETE
40
150 MM THK CONCRETE
20MM THK GRANITE
MID LANDING
3150
SKIRTING 20MM THK GRANITE
POLYACRYLATE TERRAZZO TOPPING
20MM THK GRANITE 10 MM GROVE
CEMENT BEDDING
55X50ANODIZED ALUMINUM FRAME FIXED BY ANCHOR BOLT
20 DIA GROOVE
150 THK RCC SLB WATER PROOFING 8MM THK CHINA MOSAIC 20 MM THK PLASTER
75 MM THK CEMENT BEDDING
20 MM THK MALA PLASTER
AWNING WINDOW DOUBLE GLAZED GLASS
SILICON SEALENT 75 MM BBCC
CONCRETE BEAM 300X450
20 MM THK MALA PLASTER 1.5 THK BRICK WALL
20 MM THK PLASTER
24
20MM THK GRANITE
450
23
20 DIA GROOVE SILICON SEALENT
22 21
55X50ANODIZED ALUMINUM FRAME FIXED BY ANCHOR BOLT
Detail C
20 19 18
FIXED TOUGHENED GLASS
17
1351
SLIDING WINDOW TOUGHNED GLASS 12 MM THK
16 15 14 13
INSIDE
55X50ANODIZED ALUMINUM FRAME FIXED BY ANCHOR BOLT
LED 20MM THK GRANITE
+2375 +2325
150
OUTSIDE
MID LANDING
20MM THK GRANITE 110 MM THK CONCRETE
20 MM THK MALA PLASTER
20MM THK GRANITE
+575
LED LIGHT
AWNING WINDOW DOUBLE GLAZED GLASS
OUTSIDE
+500
20MM THK GRANITE
INSIDE
1601
CEMENT BEDDING
150 THK RCC SLAB
+575 +500
POLYACRYLATE TERRAZZO TOPPING
CEMENT BEDDING
150 THK BBCC 20MM THK GRANITE
150 THK RCC SLAB 150 THK SAND FILLING
60 THK PAVING
CINDER FILLING
150 THK BBCC 150 THK SAND FILLING RAMMEND EARTH
RAMMEND EARTH
75THK BBCC
RAMMED EARTH
Detail D 18
(i)
(ii)
ELE+13075 B.O.C OF TANK SLAB
CHINA MOSAIC 100THK RCC SLB 1650
20 MM THK PLASTER CONCRETE BEAM 300X450 20 MM THK PLASTER 55X50ANODIZED ALUMINUM FRAME FIXED BY ANCHOR BOLT
REFER DETAIL 2
300
150
1500
ELE+11575 B.O.C OF TANK
20MM THK GRANITE
ELE + 10075 B.O.C OF SLAB ELE+9775 B.O.C OF BEAM
55X50ANODIZED ALUMINUM FRAME FIXED BY ANCHOR BOLT
2200
20 DIA GROOVE SILICON SEALENT
AWNING WINDOW DOUBLE GLAZED GLASS
+7625 +7575
150
20 MM THK MALA PLASTER
ELE+7425 B.O.C OF SLAB ELE+7125 B.O.C OF BEAM
20 MM THK PLASTER
FIXED TOUGHENED GLASS
Part Elevation
300 DIA RCC COLOUM
20MM THK GRANITE 110 MM THK CONCRETE
3465
150 MM THK CONCRETE
10 MM GROVE
+4220 +4145
20MM THK GRANITE
20 MM THK MALA PLASTER
POLYACRYLATE TERRAZZO TOPPING 150 THK RCC SLB 20 MM THK PLASTER CONCRETE BEAM 300X450
20 DIA GROOVE
20 MM THK PLASTER
55X50ANODIZED ALUMINUM FRAME FIXED BY ANCHOR BOLT
SILICON SEALENT
150
+3875 +3825
20 MM THK MALA PLASTER
ELE+3675 B.O.C OF SLAB
AWNING WINDOW DOUBLE GLAZED GLASS
ELE+3375 B.O.C OF BEAM
1.5 THK BRICK WALL
20MM THK GRANITE 55X50ANODIZED ALUMINUM FRAME FIXED BY ANCHOR BOLT
FIXED TOUGHENED GLASS 3450
SLIDING WINDOW TOUGHNED GLASS 12 MM THK
C
20MM THK GRANITE
20MM THK GRANITE 110 MM THK CONCRETE LED LIGHT 20MM THK GRANITE
+575 +500
+575 POLYACRYLATE TERRAZZO TOPPING
+500
CEMENT BEDDING 150 THK RCC SLAB 150 THK BBCC
ELE+350 B.O.C OF SLAB
150 THK SAND FILLING
RAMMEND EARTH
(iii)
Wall Section 19
03
Banaras Housing Community Housing Project The program aimed to create housing scheme for Vaishnav community in Banaras,Uttar pradesh.The focus of the studio was to study the contextual and cultural dimension of space. Taking into consideration influence of climate on the design of dwelling units, their clusters and building elements. It also takes into account the factor of time and investigates how housing will evolve in future.
PROJECT BRIEF Site
Banaras,Uttar Pradesh Site is situated at 700 m from river Ganga . Immediate context includes market place school, traditional residences. Design problem Site area -5500m2
-Unit for 60 families range40-110m2 -Common amenity range-400-500m2
Traditional block
Opening traditional block
Opening the view
Providing terrace to units
Concept
Building for community that responds to the needs of the community and provides joyful livable place for interaction, keeping in mind the flexibility of units and responding to climate.
SECTION AA’
22
SITE PLAN & VIEWS
23
UNIT SIZE
GROUND FLOOR PLA
Type A 40-45m2
A
Type B 60-65m2
Type C 100-110m2
24
AN
A’
25
04
Heritage Cell Material studio Studio explores a design process which revolves around idea that materials play a major role in design generation. It emphasizes on use of only one Material and understanding its scope and limitation . Material used for this project is stone. The focus of the studio was on the Relationship between materials, details and language of the built form.
DESIGN BRIEF Site
Ahmedabad (Heritage city) ,Gujrat Situated in middle of dense fabric of old city. Site is irregular in shape having historic Teen Darvaza ,Jama mosque and market in context. Design problem
Heritage cell of Ahmedabad -500m2 -Exhibition,Seminar , Pantry -Studio of Architect , Meeting room Design process
-Modulating structure to create composition of space and explore the use of material and Structure to create forms
SECTION AA’
28
PLAN & VIEWS
A
A’
29
05 Evolutionary Computation Superquadra- Brasilia Architectural evolutionary system based on Genetic Algorithms is a generative tool to apply in terms of adaptive and evolutionary architecture. It is one an approach to lead the kinetic Architectural structures to behave efficiently. It guarantees the fitness of optimization result by seeking for a large amount of possibilities randomly. Site -Superquadra is a 280m square, Six-story slab apartment buildings. Raised on pilots to promote the integration of landscape and architecture
FITNESS CRITERIA
PSEUDO CODE 280
1
280
A
B
C
D
E
F
2
3
4
1.Maximizing Open space 2.Maximizing residential to residential unit distance 3.Minimizing Ground exposure 4.Maximizing Facade exposure
32
0.8
A 0.8
0.6
G1.01
0.4
E
B
0.2 0
G1.02
A
0.6 0.4
E
G1.03
B
0.2 0
D
C
D
1 0.8 0.6 0.4 0.2 0
E
A
B
C
D
G1.04
1 0.8 0.6 0.4 0.2 0
E
A
B
D
B
0
D
A
0.8
B
G1.08
0.4
E
B
0.2
C
0.8
D
C
A
0.6 0.4
E
G1.06
A
0.6
0
D
A
0.5
E
E
C
1
G1.07
G1.05
1 0.8 0.6 0.4 0.2 0
C
B
0.2
G1.09
0.8
A
0.6 0.4
E
B
0.2
0
0
C D
C
D
C
33
06 Ancillary Works This section includes the works covered alongside the main studio project which helped in design generation and developing different skills. The work has helped to open up the thinking process .Subject includes Architectural Graphic Skills,Basic Design,Structure, Hands on Workshops ,History,Architectural Representation Techniques.
Lithography 36
Slice model
Basic design -Pavilion 37
Model Making
38
Architectural Graphic Skills- Bird Feeder
Basic Design-Sculpture by plane &solid
Basic Construction-Concrete Seating
39
WATTLE &DAUB WORK SHOP
Design by modules-light &space 40
Foundation
Timber frame
Split bamboo weaving
Mud Daubing
Space frame module
FURNITURE WORKSHOP
Table Frame
Table Top Planks
Plan
Table-1200X1200mm
Origami
Footrest Member
Section AA’
Portal Frame Structure 41
07
Hand Made Workshop Khirsu,Uttrakhand Hand-Made was an opportunity to engage with people and building practices of Khirsu, for a hands on experience in making a home-stay which will be run by local Self Help Groups . Khirsu is a calm hill village located in Uttarakhand with a budding potential for tourism. Workshop aimed at experimenting local materials and techniques towards Sustainable practice and promote local handicraft and to generate economy.
PLAN & MODEL V
Ground floor
architecture
First floor 44
VIEWS
1
45
08 Relative study program Dhal ne pol,Ahmedabad Ahmedabad, India’s first World Heritage City, is rich in architectural and cultural heritage and ‘Pols’ are the Intrinsic part of its beauty. Each Pol was socially and architecturally homogeneous and provided a territory for the interaction, co-operation and Interdependence. Houses are mainly multi-storey, usually made of brick and mortar. Massive walls are supported with timber structures. Many of them are ornamented with wooden carvings.
46
Staircase detail
Section AA’
Plan
Elevation
Section BB’
Door detail
ELEVATION-D8
SECTION-D8
Column detail
ELEVATION-C1 ELEVATION-C1
SECTION-C1 SECTION-C1
47
Harita Kavdia haritakavdia1998@gmail.com +91-7014635252