ARCHITECTURAL PORTFOLIO Name: Hiu Tik Li, Harrison Application for Master of Architecture at University of Manchester
Personal info
Name: Hiu Tik Li, Harrison Region: Hong Kong Contact: +852 96476683 Email: harrisonlihiutik@gmail.com
Academic background 2006-2010 HKCEE 2011-2014 Higher Diploma in Architectural Design and Technology (Merit), Institute of Vocational Education, Tsing Yi 2015-2017 Bachelor of Architectural Studies (1st), University of Central Lancashire
Professional Practice 2014-2015 Architectural practice in Hong Kong WCWP International Limited Position: Architectural Technician
Content � SEMESTER 1 • YEAR TWO • 2015
Threshold - Surreal museum P.3
� SEMESTER 2 • YEAR TWO • 2016
2017-2019 Architectural practice in Hong Kong Atkins Position: Architectural Assistant 2019-2020 Architectural practice in Hong Kong NEWS-D Limited Position: Architectural Assistant 2020-Present Integrated Design Limited Position: BIM Coordinator
Accreditation Royal Institute of British Architects part 1 validation since September 2017
Software skils
•Rhino •Sketchup •Indesign •Photoshop •Revit •Illustrator •Enscape •Vray •Autocad •Revizto •Naviswork •BIM360
Interestsz
•Heterotopia • Psychoanalysis • Urban morphology • Technology • Volunteer (SoCO-Charity Origanization) • Competition - Architecture Thesis: Transgression of architecture: Trans-programming with heterotopia via psychoanalysis
Ephemeral / Magician / Stage / Curtain House P.7
� SEMESTER 4 • YEAR THREE • 2017
Transitional frame as the otherness to create a social condenser for the resilience of junctional field P.11
� NOVEMBER 2019 TO DECEMBER 2019
Competition - Nursery school at Finland P.18
� Professional practice & others P.22
P. 2
� THRESHOLD •
SURREAL MUSEUM
SEMESTER 1 • YEAR TWO • 2015
Conceiving the hurly burly city blocks as hollow mass and transform into conceptural section as an idea to incorporate the play&think space in the museum.
P. 3
British barracks Village
T h re s h o l d
Temporary objects Visitor
+
Stanley historical development
Enclosed form Exhibition space
8. Blake pier
1842s first opium war
2 1
Japanese army
3 4
9
9. Murray House After 1995s Before 1950s
5
8 6 Nowaday Seeing a piano
Playing the piano
British front line 1941s Battle of Hong Kong
Exhibition space
Exhibition space
Traditional
Alternative experience
Invasion from Imperial Janpan. The British, Canadians, Indians and the Hong Kong Volunteer Defence Forces resisted the Japanese invasion.
7
1. Tin Hau Temple
2. Maryknoll Accommodation
Site 3. Carmelite Monastery
The design is questioning the traditional museum design which has different artefacts and people walking through the circulation. The design is proposing that the visitors can generate activities in the enclosed spaces. So, they have rooms to rethink and unleash their imagination. The sculptural form encourages the fluctuation of emotion in dynamic void area and echoes to its historical identity. For hurly-burly citizen, we are always finding a place to exhaust our stress and fueled our spirit. This design is to envision an informal space that is located in one of the famous tourist spots in Hong Kong. People can experience privacy within the designated void area as a way to reconcile the inner soul and outer world.
4. Colonial Police station Residential zone
Tai Tam Bay (Main beach)
M
ain
dr ive
wa y
5. St. Anne’s Catholic Church
2 Residential zone 3
nle yp
Regular void
3 types of void
Stanley Bay
Dynamic void
Sculptural form
6. Pat Kan UK
5
Sta Angle void
1
rom
6 4
ena
de
1. Bus station 2. Monastery 3. Government composite building 4. Colonial listed building ( Police station ) 5. Flea market 6. Marine school
7. St. Stephen college
P. 4
Section A 18000
23000
Bruder Klaus Field Chapel at German by Peter Zumthor “In order to design buildings with a sensuous connection to life, one must think in a way that goes far beyond form and construction.” Bruder Klaus Field Chapel / Peter Zumthor
Piano
Reception
Work desk
Sofa
Bed
Toilet
Toilet A
Toilet
Control room
Dinning table
Plants
Bath tub
Sun lounger
In the fully enclosed area, the daylight furniture would be catalyst to activate activity.
void and the the
Model material: Metal, cardboard, Clay
P. 5
Daylight penetrate the skylight
Bottom view
Setting out of void
0.022
to
abnormalities
0 Minimal surface
to
Clay brick
- 0.022 abnormalities
Morning
Bottom view
Setting out of void
Concrete 0.022 abnormalities
to
0 Minimal surface
to
Afternoon
- 0.022 abnormalities
Night
Room Circulation
Bottom view
Room array
Sectional Isometric
Interior view
P. 6
� EPHEMERAL /
MAGICIAN /
STAGE /
CURTAIN HOUSE SEMESTER 2 • YEAR TWO • 2016
Group work: Abtract site model is to record the crowd and amplify the retangular ports nearby the site and community
P. 7
Stage as a concept to design an artist house in Sham Shui Po for a magician to live and provide a performance space as part of his livelihood. This design is questioning what would happen if people live along with the ephemeral space which is associated with magical life. The ephemeral space as a stage and part of the inner space to enhance the interaction with outer space as a tactic to blurr the boundary between indoor and outdoor.
Grid street
Sham Shui Po site plan Back lane
Public geenery area
Magic trick - Sleight of hand High density cluster Collage with ephemeral activities
P. 8
elevated ground floor
Divide massing and interior zonings
Curtain house by Shigeru
Use curtain instead of traditional enclosed facade design for enhancing the interaction between indoor and outdoor
Roof garden to reduce density and create harmony between neighbours
tal izon
Hor
3
1
Vectical
4
2
1 2 1 Ephemeral space / Semi-open / Multi-function 2 Enclosed space / Privated space 3 Green roof / Sky garden 4 Circulation
Pad
ng
ti foo
Structural framing
Sham Shui Po street culture P. 9
Wake up
walk down through stair/home lift
Meal time at multi-function area
Live magician show
Negative space
Curtain closed
Routine
Flea market
Sectional perspective
1200
0300
Create a new node point
0900
e
m i- p riv Se r i v a t e at P
Living and bedroom Multi-function area Roof garden Stage Flea market Before flea market open After flea market open
Building cluster Sham Shui Po have accommodated modern and historical culture. It is representing the old Hong Kong and providing the way to people to get familiar with the evolution of old Hong Kong. Amount of people
There would be two new distinctive aspects in urban space. One is the green area opposite to the front elevation is going to be a temporary Seating area for gathering the audience to interact with stage performance and the flea market would also attract people to look around and create a new node point.
0600
The curtain as part of the envelope to open up the connection with outdoor and indoor. This is also interact with ground floor public area and questioning what is the restrainted of architecture itself. The house is temporaryily lost their privacy but that will be resumed once the curtain is closed.
Spatial property
Peak hour
0 Curtain Curtain open close (time)
Curtain open Elevation perspective
P. 10
� TRANSITIONAL FRAME AS THE OTHERNESS TO CREATE A SOCIAL CONDENSER FOR THE RESILIENCE OF JUNCTIONAL FIELD
SEMESTER 4 • YEAR THREE • 2017
Initial drawing of the project highlighed the proximity of infrastructure and transportation networks as the ignition of the design process
P. 11
Indigenous Village Wetland ecological park
Railiway Station
Brewery
New Territories Kowloon
Site Agriculture area
Hong Kong Island
Lantau Island
Community Centre
Main vehicle drive way Main path cross three zones Railway
This is to design a brewery in yuen long that is one of the districts of new territory. After an interview with the real client, we understand that their intention is like to share the happiness of brewing and nurturing the culture of local draft beer. The site nearby the wetland ecological park. It is a natural habitat as many species are living over there which is rarely found in Hong Kong. So, it is attracting visitor coming from different areas.
Site Analysis
N
Direction to agricultural area
Village Direction to community centre High-rise residential block
Site
Railway station
ce
pa
gs
win Bre
Village
on
i nct
fu lti-
ce
spa
Mu
Symbolic site model
Existing brewery Group work: Metal have infinate possibility that can transformed into different shape and function. This is analogical to the site condition and design theme in junctional field.
P. 12
Transgression of architecture Trans-programming with heterotopia via psychoanalysis
Hiu Tik Li, 2017, The distorted view of carnival in Hong Kong.
Figure 5. Parc de la Villette
‘‘Architectural programming is infused with the hybridized urban environment, which reveals the architectural disorder in our city. Then, the oppositions of internal and external space are eventually mediated and turn to the method that form the architectural program. This evolution goes beyond the expectation of social order as it composes the space through different correlations, position, function, and transformation, instead of followed the precedent to design a new architecture. This is an act that has not responded to the urban evolution. The reason was that architecture is not just the reflection of the superficial entity, but the progress of transformation from individually to collectively or vice versa. Tschumi’s spatial polemic argued the fundamental notion of space is the obstruction to design new space. He advocated that the trans-programming is a way to transcend the architectural notion and simultaneously question the fragmentation of the city.’’ Quotes from thesis: Transgression of architecture: Transprogramming with heterotopia via psychoanalysis
Intersection of outdoor corridor
Cube with frame
Frame
Collage of Frame and village
Combine 1.
Solid cube
Combine 2.
Transitional Object The study model is associated with the planning of space. It inspired the sense for orientations, forms, material and circulation.
The experiment of unfinished cube Collage of Frame and corridor
Figure 6. Advertisement for architecture, Bernard Tschumi 1976-77.
Philosophical concept
Fragmented objects to inspire the design approach.
Frame as decoration to question the form and interactivity with outdoor corridor between Indigenous house
Combine soild cubes with frame. Some frames are the decoration, some as the function of building.
DESIGN AND RESEARCH APPROACH P. 13
10.
THE RESILIENCE OF JUNCTIONAL FIELD
1. Argicultural / Ecological area
1. Wind mill 2. Fish farming 3. Solar energy 4. Farming 5. Pavilion 6. Brewing facilities 7. Office 8. Residential 9. Kiln 10. Playground 11. Cafe& Bar 12. Running track 13. Workshop 14. Market 15. Classroom 16. Basketball court 17. Parking
5. 11.
5km Semi-public 6.
1
12.
1.
Site / Indigenous field
13. 2.
Neighborhood Walking distance
7.
Life
14.
Brewery
Semi-public
Society
3.
Site 2
Ecology
8.
15.
5km 16.
9.
3
PUBLIC TRANSPORTATION People from different area
4.
2. Railway Station
3. Yuen Long Community Centre 17.
Activities Analysis The diagram conceives a matrix of architectural program that is able to serve the function of brewery as well as the community. It would directly influence the activities of everyday life.
Ecology Semi-public
5km Brewery
Society
P. 14
Before
Brewery with multi-functions are able to serve the community
1
7
2
3
4
2 5
1.Park 2.Basketball court 3.Community centre 4.Market 5.Sunken plaza 6.Playground 7.Running track
People bypass the area
Pemeable planning
6
Public area
4
1
1.Green house /Workshop 2.Fish farm 3.Pavilion 4.Brewing facilities 5.Office 6.Tourist centre
5
3 6
Indoor/Semi public area
Space between
Detail refer to page 17
P. 15
2
1
3
4
5 7
6
9
10
8 9
11
1. Community centre 2. Basketball court 3. Planting area 4. Fish farm 5. Grocery 6. Pavilion 7. Brewing area 8. Reception 9. Food and beverage 10. Office 11. Playground
The urbanistic brewery brings new architectural typology to the region as a meeting point to enhance the relationship between ecology, modern city and rural.
Ground floor plan
P. 16
Glass balustrate capping
Exhaust Air duct
FAD.
Roof Detail
Fresh Air duct
EAD.
Fresh Air duct
FAD.
Roof tile Screeding
LED downlight
Tile
Baffle timber ceiling
M10 anchor bolt
Weather sealant
Waterproofing sheet membrance
Conference room
Stainless steel spider
Aluminum panel with PVDF coating
Curved fritted glass wall Gravel M10 anchor bolt
Bay window frame with PVDF coating
Stainless steel R.H.S Setting block
Floor tile Screeding
Wall Section Detail
Wall Section Detail P. 17
koulukeskus
kouluja koulussa ja reittejä välillä
koulukylä
nuorisoparlamentti Youth parliament
huone koti
�
kylä
NURSERY SCHOOL 4 PEOPLE GROUP WORK COMPETITION CONTRIBUTION: • CONCEPT • PLAN • RENDER • DIAGRAM
This is a team effort to deliver the design strategy for a Finland nursery school which is located at Kangasala, Tampere. Translation part and brief reading are done by Finland tutor
P. 18
Aerial view Inspired by finland housing context
Nursery school This design has to incroporate the identity of local context with new urban zone in finland while concieving the tectonic architecture in Kangasala, Tampere. The design layout has to fullfil diferent aspects, such as serving different age group kid, preseve local architectural identity and public amenity. We splited up the massing into different cluster at the beginning but then we found that the disperse of cluster has made no connection between space. So, the public stadium and town hall concept are combined to deliver the internal space and we echoes to the traditional finland pitch roof concept in our external massing design.
Conceptual massing sketches
P. 19
Town hall interior view This public space is serving their neighbour and the nursery which is creating a social engaging point for people coming from different background
Elevation South
Interior view A Section A
A
P. 20
The classroom and play area are integrated as the program of internal space and the featured void area is designed with a special form of installation as a catalyst to increase the interaction with kids and people around. The circular public area would be the centre of the building for public and community gathering. Nursery school can provide this as the intermediate space between public and private for facilitating the communication with new neighbourhood and city.
Historical arch typology
P. 21
� PROFESSIONAL PRACTICE & OTHERS
Even the designer of temporary architectural installations believes they will endure through various forms of documentation—photos, film, even reconstructions—and thus finds sanctuary in denial. By Inevitable Architecture, Lebbeus woods
P. 22
Professional practice Professional rendering from consultant Precedent: Everyman theatre by Haworth Tompkins scoops
Option 1
Option 2
Company: NEWS-D limited Position: Architectural assistant lOCATION: Cheungdu, China Project stage : Concept
N Section 0003
Section 0002
Section 0001
B Section 0010
Section 0004
A
Section 0005
Section 0006
Section 0008
Section 0009
Section 0007
The project is to renovate an abandoned factory in Chengdu, China. Our design is intending to restore the existing truss inside the old building as a historical feature. Also, it is critical and difficult to remove the structure from an old building. So, this approach is the better way to redesign the whole building while adding some new features on the external facade.
Final option
Duties: -produce design document -3D modeling -generate design idea
铝板
铝板
TERRACE 铝板
STORE
GAME HALL
STORE
TERRACE
STORE
砖
砖
燈具
燈具
STORE
铝板
砖
OFFICE
Section A 1:250
OFFICE
玻璃
玻璃 铝板
砖
砖
铝板 铝板
OFFICE
OFFICE 玻璃
燈具 铝板
OFFICE
铝板
铝板
燈具
GAME HALL
COMMERCIAL
OFFICE MULTI-FUNCTION ROOM
STORE
玻璃
EXTERIOR
STORE
EXTERIOR 玻璃
COMMERCIAL
Section B 1:250
Section 0001
P. 23
Professional practice - Team work
JN3
1
COMPANY: ATKINS POSITION: ARCHITECTURAL ASSISTANT LOCATION: SINGAPORE PROJECT STAGE : TENDERING
2 B1
3
4
E
5
F
ALS/0302
7
G
B8
ALS/0302
6
8
H
ALS/0302
9
10 J
C1
ALS/0302
JN2
JN4
JS7
JN1
JS8
JN5
ALS/0302
JS9
C5 JS10
15000
15000
15000
15000
15000
15000
15000
15000
JS11
ENTRANCE B
CA
15000
LADDER TEL CLOSET
LANDING VALVE
BA
TEL CLOSET
LADDER
SLAB OPENING FOR CABLES FROM BELOW ELEC RISER
SLAB OPENING FOR CABLES FROM BELOW
LANDING VALVE
JS12
ELEC RISER ENTRANCE C
ACCESSIBLE WASHROOM
JS13
N
KEY PLAN SCALE 1:50000
FER
F TOILET
M TOILET
A DOMESTIC WATER TANK & PUMP RM
7800
D
ALS/0301
B
AFC-DB CLOSET
3950
B
ALS/0300
CLEAN GAS RM SPRINKLER & HOSE REEL WATER TANK
UP
DB RM
LSC RM
UP
FIRST AID RM
PSC
SHOP
REPEATER PANEL
POLICE RM / COMMAND CENTRE
STATION STORE
DB RM TSO
CONCOURSE PAID AREA
UP
FER
UP
CONCOURSE PAID AREA
AFC STORE
MAINTENANCE OFFICE
UP
CONDENSER SPACE
MAINTENANCE STORE
SMR
CE / ISCS RM
7800
D
Professional rendering from consultant
MDS
MDF RM
BABY CARE RM
3950
C
UPS RM
EPS RM
SHOP
(F) STAFF CHANGING RM
STAFF RM
ECS CONTROL RM
FIRE PUMP RM
E
STAFF TOILET(F)
CLEANER'S STORE
(M) STAFF CHANGING RM
19937
ELEC RISER ELEC RISER
SLAB OPENING FOR CABLES FROM BELOW
TEL CLOSET
TEL CLOSET
LADDER
ENTRANCE A
ENTRANCE D
LADDER
56 58
AA
.1
x;53 0 .x;16 9 3 .x;54 0 3
x;53 0 .x;18 9 3 .x;51 0 3
LANDING VALVE
LANDING VALVE
SLAB OPENING FOR CABLES FROM BELOW
0m 2.5m
13m
1
25m
ALP/0221
SCALE
N
KEY PLAN NTS
CONCOURSE LEVEL GENERAL ARRANGEMENT PLAN
FOR TENDER
1 : 250
SCALE 1: 250 Qualified Person Endorsement :
CONSULTANT : 2
A
B
C
D
168 Jalan Bukit Merah #25-00, Connection One, Singapore 150168 Tel: +65 6248 1288 www.surbanajurong.com Company Reg No: 199701398K
E 43437
7800
3950
3950
7800
CONTRACT J112 DESIGN AND CONSTRUCTION OF STATIONS JS11, JS12 AND VIADUCT FOR JURONG REGION LINE
ETFE SKYLIGHT Designed
MAINTENANCE WALKWAY WITH CONTINUOS CABLE FALL ARREST SYSTEM
Rev.
04/10/2017 Date
SM Drawn By
Designed By
Description
Chk'd
App'd
Checked
ZXJ
MAZ
JO
Scale
Drawn
Date
1:250
SM
LIGHTNING ROD Drawing No. :
ROOF ACCESS LADDER ACCESS HATCH TO ROOF
KEY PLAN NTS
Rev.
T / 112 / JS11 / ALP / 0221
-
Sheet
1 of
STANDING SEAM :METAL ROOF CAD File Name
650 X 600MM RAIN WATER RUN OFF WITH SIPHONIC DISCHARGE SYSTEM
FALL ARREST SYSTEM TO SPECIALIST'S DETAIL 6000
PRIMARY STEEL STR. AS PER ENGINEER'S DETAIL HHPSD OTHERS)
ENTRANCE A ROOF
(BY
CENTRE LINE OF TRACK EXIT STAIRCASE
TRIPLE BANK LOUVERS WITH IN CHARCOAL ALUMINIUM FRAME 04 PLATFORM LEVEL
1655
CORBEL TO ENGINEER'S DETAIL
TOP OF RAIL
1080
03 UNDER PLATFORM LEVEL
1120
FFL +132.800 m
TOR +131.720 m
FFL +130.600 m
2345
2345
HHPSD OTHERS)
EXIT STAIRCASE
TRIPLE BANK LOUVERS WITH IN CHARCOAL ALUMINIUM FRAME
TERRACOTTA PANEL CLADDING SYSTEM
TERRACOTTA PANEL CLADDING SYSTEM
GLASS PANELS
CORBEL TO ENGINEER'S DETAIL
COLOURED ENTRANCE PORTAL VITREOUS ENAMEL PANELS
POB ROOF
PRIMARY STEEL STR. AS PER ENGINEER'S DETAIL
50 X 50 mm TERRACOTTA BAGUETTES
1200MM HIGH GLAZED BALUSTRADE S/S RAILING
UNPROTECTED EXIT PASSAGEWAY
9150
25200
(BY
PRIMARY STEEL STR. AS PER ENGINEER'S DETAIL
1655
EXIT STAIRCASE
EXIT STAIRCASE
02 CONCOURSE LEVEL
8700
FFL +123.650 m
GLASS LOUVERS GLASS PANELS
1200MM HIGH GLAZED BALUSTRADE AND S/S RAILING
TERRACOTTA PANEL CLADDING SYSTEM FALL ARREST SYSTEM TO SPECIALIST'S DETAIL ENTRANCE B ROOF
PRECAST PLANTER TO STRUCT. DESIGN DETAIL
FAIR FACED CONCRETE COLUMN
RC BEAM AS PER STR. ENGINEER'S DETAIL
COLOURED ENTRANCE PORTAL VITREOUS ENAMEL PANELS
00 ENTRANCE B LEVEL 1175
FFL +114.950 m
01 STREET LEVEL ENTRANCE B 01 ENTRANCE A LEVEL
FFL +113.600 m
ROOF OF HIGH LINKWAY
175
1092
FFL +113.775 m
ROOF OF COVERED LINKWAY
00 STREET LEVEL ENTRANCE A
APRON DRAIN
LINKWAY COLUMN
FFL +112.508 m
APRON DRAIN
SOUTH BOUND
ROOF OF COVERED LINKWAY
NORTH BOUND
LINKWAY COLUMN
UNDERPASS
0m 1.0m
5m
10m
E
ALS/0336
ENLARGED SECTION E
FOR TENDER
1 : 100
N
SCALE
SCALE 1: 100 ATTACHED REFERENCE FILE:
P1003SWD-RAL9000A.DGN P1003SWD-RAL9001A.DGN LJRLCWD-SV0059A.DGN P1003CWD-VIADUCT.RVT J1003_P_A_JS12_ENVELOPE.RVT
Qualified Person Endorsement :
Consultant :
168 Jalan Bukit Merah #25-00, Connection One, Singapore 150168 Tel: +65 6248 1288 www.surbanajurong.com Company Reg No: 199701398K
Drawing Title :
1 A1
T112JS11-ALP0221-.DGN
ROOF EAVE WITH LOUVERED SYSTEM
1350
Duties: -Responsible for production of drawings -revise design and technical issue together with director -Ensure the compliance is apply to the detail of drawings -Ensure the precision of project data
05 ROOF LEVEL
10
FALL ARREST SYSTEM TO SPECIALIST'S DETAIL
ROOF EAVE WITH LOUVERED SYSTEM
RL +138.800 m
04/10/2017
8
JS11 STATION C ARCHITECTURAL E CONCOURSE LEVEL GENERAL ARRANGEMENT PLAN
GLASS LOUVERS
650 X 600MM RAIN WATER RUN OFF WITH SIPHONIC DISCHARGE SYSTEM
This is a railway project located in Singapore (JRL), the project are using full BIM technology to integrate the design and technical aspect and review the model with senior regarding the compliance issue from time to time.
Approved
6
A
19937
Project Title :
LTA Endorsement :
General Note:
4
E
AA Drawing Title :
N
ATTACHED REFERENCE FILE:
P. 24
Sketchs during the design studio at year 2 semester 2 to study the scenegraphy.
Art work - Beyond order
Building Technology study ETFE facade and Steel truss system
1:50 ETFE FACADE MODEL
P. 25