Master Plan
Isabella Freedman Jewish Retreat Center
Table of Contents Executive Summary 3 Existing Main Campus Plans Conceptual Main Campus Plans
4-6 7-9
Community Engagement 10 Campus Arrival 11 Conceptual Renderings 12-17 Spiritual Center 18 Existing Farm Campus Plans Conceptual Farm Campus Plans
19 20-22
Phase 1 Diagrams 23-25 Daisy Conceptual Design 26-35 Outdoor Kitchen Precedents 36 Farm Classroom Precedents 37 Phase 2 Diagrams 38-39 Phase 3 Diagrams 40-41 Phase 4 Diagrams 42-43 Phase 5 Diagrams 44-45 Phase 6 Diagrams 46-47 Phase 7 Diagrams 48-50 Phase 8 Diagrams 51-52 Precedent Images 53-54 Appendices 55
Isabella Freedman - Hazon: Table of Contents METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
2
Hazon Master Plan Executive Summary Hazon’s master plan is a bold vision for the Isabella Freedman Jewish Retreat Center (Isabella Freedman), that demonstrates on every level Hazon’s vision for a healthier and more sustainable Jewish community. It is an iterative, phased plan that provides a model for growth and sustainability for the retreat center for the next 50 -100 years. Isabella Freedman is a place where participants have powerful, transformative experiences; where inspiration and life-changing programs happen on a regular basis. It is truly a jewel for the Jewish community both locally and nationally. Given the significant stakes, we embarked on a master planning process that contained three key goals: 1. Develop a facility design that is a model for an environmentally sustainable retreat center. 2. Develop a plan that aligns with a financially sustainable business model. 3. Expand overall capacity - both in occupancy and in programs spaces - so that more people will be able to experience and be transformed by Hazon programs and by Isabella Freedman. The master plan explicates a conceptual approach that includes both site and cultural influences. It organizes our essential activities thematically and logically together - arrival, community, farm, play, hub/eat, pray, retreat/learn, work, live, camp, and outdoor learning. These thematic groupings have helped guide our approach, and help to summarize the plan’s focal points: Increase Campus Capacity A key element of the master plan is to expand the capacity of Isabella Freedman, in order to enhance the impact and quality of our programming and strengthen our financial model. The master plan almost doubles guest capacity and triples the amount of program space, including our dining space. The plan provides for a range of accommodations for differing income levels and family structures. The expansion includes major infrastructure investment (water, power, septic) to support this growth in capacity. Pedestrian Friendly A critical value of the master plan is that guests are welcomed and experience campus in a warm and peaceful way. This is accomplished by providing a safer crossing at Johnson Road, and by establishing a corridor through the middle of campus that is only for pedestrians and cyclists. In addition, there is an expanded parking lot that moves the busyness of check-in/check-out off the main path through campus and directly into the Main Hall, thus providing a clear and welcoming entry sequence for the arrival of guests. There is a new road along the edge of campus with access to the new Main Hall for truck access and deliveries, and for drop off at guest buildings. We also included bike repair, bike rental and bike parking areas, highlighting our value of a campus intended for pedestrians and cyclists, rather than cars and trucks.
Isabella Freedman - Hazon: Executive Summary METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
Sustainable Planning and Design As The Jewish Lab for Sustainability, Hazon’s master plan reflects our mission to create a healthier and more sustainable Jewish community, and a healthier and more sustainable world for all. Our commitment to sustainability is incorporated throughout the master plan and is represented in a variety of ways. This includes building design, where we seek to design and build state of the art facilities that are a model for retreat centers and camps through energy efficient systems for heating and cooling and green features such as lighting and building materials. It also includes the infrastructure, insuring that the systems to power and operate campus are as sustainable as possible. Finally, the master plan reflects the way that we approach land use, minimizing our collective footprint, and living and teaching sustainable ideas such as composting and using compostable products. Relationship with Nature Sustainability and land stewardship are core to the campus design approach, as well as to each individual component of the master plan. The plan emphasizes the relationship between the campus, the lake, and the mountains in a connected and integrated way - facilitating a deeper nature experience for visitors. Direct access to the lake through footpaths, sitting steps at the water’s edge, and multiple docks are intended to get people closer to, and into, the water. There are new spaces for outdoor learning and exploration, which access wooded areas and trails in an enhanced, intentional way. Spiritual Center A critical goal of the master plan is to provide multiple opportunities and spaces for worship. The spiritual center includes a cluster of three synagogues designed to provide areas for solitude, worship and social interaction, as well as a range of program space capacities. A central outdoor patio and fire pit give structure to our programmatic theme of inclusivity and Jewish pluralism, and provide opportunities for multiple uses, both as social and outdoor prayer spaces. Each synagogue has views of the lake and are oriented towards the East. Farm Expansion The Adamah Farm is one of the anchors of the retreat experience. We plan to expand access to and usage of the farm as key experiential and educational features by developing a classroom building on the farm. On central campus, the master plan provides an outdoor cooking kitchen area and expanded greenhouse as an opportunity for guests to be involved in the farm-to-table concept through learning and participating. The plan also expands the area where farm animals reside on campus, enabling greater guest engagement. The Hazon Master Plan Team, consisting of lay leaders, Hazon staff, Metcalfe Architecture & Design and Allied Engineering, and informed by key stakeholders, has worked closely over the course of a year to develop a master plan that we hope and believe reflects the values and dreams of our community. Please refer to the appendices at the end of this document for summary data. 3
181 BEEBE HILL RD. FARM AND HOUSE
FARM CAMPUS BE
EB
JOH
NSO
E
H
IL
LR
D.
NR
D.
. N RD
SO JOHN
LAKE PHIL
LAKE MIRIAM
Isabella Freedman - Hazon: Existing Site METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
4
MAIN CAMPUS
19
17 7
6
1
18
15 20
5
13
6
2
16 11
8
3
71 6
25 12 14 4
9
10
21
22
23
24
Isabella Freedman - Hazon: Main Campus - Existing METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
5
1. Staff Cottage - RENOVATE 2. Main Office Building - RENOVATE 3. Old Canteen - RECOMMENDED DEMO 4. Chestnut - RECOMMENDED DEMO 5. Pool and Canteen - DEMO 6. Greenhouse - DEMO/RELOCATE 7. Outdoor Oven - DEMO/RELOCATE 8. Arts and Crafts - RECOMMENDED DEMO 9. Great Hall - RENOVATE/DEMO 10. Synagogue - RENOVATE 11. Weinburg - RECOMMENDED DEMO 12. Cedar - DEMO 13. Maple and Blue Heron - RENOVATE 14. Scheuer - RENOVATE 15. Pines - RENOVATE/DEMO PORTION 16. Beige Yurt - RELOCATE/DEMO 17. Kaufman - RENOVATE/DEMO 18. Cedar - DEMO 19. Staff Housing - RENOVATE 20. Barnyard Buildings - RECOMMENDED DEMO 21. Red Yurt - RELOCATE 22. Lake House - DEMO 23. May - RENOVATE/2ND FLOOR ADDITION 24. Camping Cabins - RECOMMENDED DEMO 25. Tent - DEMO
71 6
AFTERNOON
Isabella Freedman - Hazon: Main Campus - Existing Site Analysis METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
MORNING
6
LIVE
FARM WORK LIVE
ARRIVE COMMUNITY RETREAT/ LEARN
HUB/EAT
PLAY
FARM
PRAY
OUTDOOR LEARNING TO REMAIN UNDEVELOPED
CAMP LIVE
Isabella Freedman - Hazon: Main Campus - Conceptual Programming METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
7
36
Primary Pedestrian and Bike Seconary Pedestrian and Bike Vehicular Traffic-Maintenance
22
Vehicular Traffic-Delivery Vehicular Traffic-Guest Drop-Off Vehicular Traffic-Access Road 16 1
11 4
14
24 15
12
3
35
13
23
20
6
71
19
2 18
37
17
8
21 6
7
10
25
9
34 5
26
31
21 30
33
40 Farm/Outdoor Activity
29
32
Programming/Retreat Living
27 28
Support
Isabella Freedman - Hazon: Main Campus - Circulation METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
8
1. COMMUNITY BUILDING - Bookstore, Spa Registration, Juice and Coffee Bar, Bike Repair, Woodshop and Crafting 2. GOLF CART SERVICE REQUEST CENTER 3. MAIN PARKING 4. MAIN HALL - Registration, Kitchen and Dining, Demo Kitchen and Small Dining, IF/H Offices, Making: Cheesemaking, Pickling/Canning, Syrup Making, Honey Making 5. BOAT HOUSE - Canoe and Kayak Storage, Dock, Swimming area 6. PLAY - Treehouses, Nature Play Area, Tiered Seating with Lake View 7. GREAT HALL AND LIBRARY - Catering/Staging Kitchen 8. BEIT KNESSET - House of Gathering with outdoor fire pit 9. BEIT MIDRASH - House of Study 10. BEIT RINAH - House of Song 11. GREENHOUSE - Demo Garden, Outdoor Oven, Syrup Shack, and
Orchard 12. CHILDREN’S HALL 13. CLASSROOM 01 14. CLASSROOM 02 - Shared outdoor fire pit 15. CONFERENCE CENTER 16. MAINTENANCE BUILDING - Workshop, Housekeeping, Storage 17. MIKVEH 18. SCHEUER LIVING 19. DAISY LIVING 20. NEW DAISY LIVING 21. WELL HOUSE 22.LONG TERM HOUSING 23. UTILITY OUT BUILDING 24. BARNYARD - Animal Education Center, Pasture 25. ADAMAH/TEVA HOUSE- Residences, classroom 26. OUTDOOR LEARNING 27. CAMP GROUND - Yurt glamping, tents, platforms, central fire pit 28. BUNK AND BATH HOUSE 29. LIVING 30. MAY LIVING 31. LAKE HOUSE LIVING 32. CHALET LIVING 33. GREEN CEMETERY - Small Chapel 34. QUIET RETREAT 35. SPA AND HEALTH CENTER 36. FARM 37. GERRY SAVAGE MEMORIAL ORCHARD 38. WELL HOUSE 39. BRIDGE & LOOKOUT STRUCTURE 40. ADA LAKE LOOP TRAIL
6
71
Isabella Freedman - Hazon: Main Campus - Views and Outdoor Spaces METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
9
C10
COMMUNITY ENGAGEMENT
C12
ENTRY
E EB BE
C11
LL HI
Isabella Freedman wants its campus to be visible and accessible to its surrounding Falls Village community-its location on a wooded site off a small road makes this challenging. We have concluded that providing a public face at the intersection of Johnson Road and Beebe Hill Road, immediately adjacent to the retreat’s entry, would provide an initial friendly connection and opportunity for community interaction. A farm stand, juice and coffee bar, and adjacent parking lot will make it easy for neighbors to run by the retreat to grab some pickled vegetables, honey, goat cheese and conversation (C2). Additional nodes of community engagement can be found at the adjacent bike share and repair, and bookstore (even though they are primarily dedicated for the use of the Isabella Freedman community) (C3). We imagine that these connections with the community will create a gateway and sense of arrival to the retreat, replacing its non-descript entry that is so easily passed by.
AD RO
C16 C9
This amplified entry to the campus will also provide an arrival for I/F visitors to the spa, cemetery and quiet retreat areas. These features are the most intimate components of this campus. The lake side of the community interaction provides a more sequestered and elegant area for arrival, where guests can register for the spa and the quiet retreat, use the wood shop for crafts, or visit the cemetery.
C13
PEDESTRIAN SAFETY
C13
C15
A major goal for this master plan is to provide a safe corridor for pedestrians and cyclists through the middle of campus. This safe corridor will begin at the intersection of Johnson and Beebe with the following changes to pedestrian and vehicle circulation:
C20 C2
JOHNSO
•Vehicles entering the main campus will be directly fed into a new parking lot, adjacent to arrival/sign-in for the retreat (C7). This will clarify the current arrival sequence, creating an obvious location for check-in, while keeping vehicles off the main campus road. •Create a secondary path for cyclists and pedestrians to access the farm area at Beebe Hill and the Community Interaction area on their own dedicated path with a beautiful view of Lake Phil (C4). •Provide a safe pedestrian and bicycle crossing at the west side of the intersection of Johnson Road and Beebe Hill Road (C16). Johnson Road will be equipped with traffic calming devices such as signage, pavement texture and color change, encouraging drivers to slowdown (C9). Adamah workers on their way to work the fields and guests visiting the farm or viewing the sunset will be able to safely cross this sometimes-busy street. The slowing drivers will also become more aware of the retreat and tell visitors that they are about to Arrive!
N ROAD
C1 C23
C14
C3 C7 C5 C18
C22 C20 C8
C4 C6
C17
View Vehicular traffic Vehicular traffic to S. side of lake
LAKE PHIL
Main pedestrian and bike path
C19
Secondary pedestrian and bike path
C21
Vehicular traffic Vehicular traffic to S. side of lake Public traffic to Community Bldg Secondary pedestrian and bike path
Isabella Freedman - Hazon: Community Engagement METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
10
C1. Community Parking Spaces (5 + 1 ADA) C2. Street level: Bookstore/ Juice and Coffee Bar; Lower level: Spa registration, cemetery office C3. Street level: Bike Share/Repair and Farm Stand; Lower level: wood shop and crafts C4. Bike/pedestrian path from main campus to farm (ADA accessible up to patio from main campus) C5. Boardwalk to Spa, quiet retreat area and cemetery (ADA accessible) C6. Spa and Health Center with massage, sauna, lounge, hot tub, and extended deck overlooking Lake Phil C7. Main Parking Area (85 + 4 ADA) C8. Golf Cart Service Request Center and Office- first floor, Full-time Staff Residence – second floor; Teva residence transition space; Guest use office center – first floor option C9. Traffic Calming Area; paving texture and color change C10.Pedestrian and Bike path on farm; ADA accessible; safe from traffic on Beebe Hill Road C11.Existing Adamah Gate as entry to farm
C12.Fence at farm, modify to accommodate new entries, clean up understory and shrubs along Johnson Road C13.Road signage for Isabella Freedman for both directions of traffic on Johnson Road C14.Main automobile entry – cars only, bicycles may use this as an alternate route C15.Automobile entry to community engagement structures for public C16.Painted crosswalk to farm for pedestrians and bicycles C17.Existing solar array C18.Expanded solar array – provide power to community engagement buildings or supplement spa C19.Gerry Savage Memorial Orchard C20.Bicycle parking C21.Vehicle access to residential buildings on south side of lake for loading/unloading only C22.Paving change/road narrows to direct vehicle flow to main parking lot C23. Lower level patio, access to boardwalk and outdoor crafts
CAMPUS ARRIVAL
A26 A8
A27 A9
A10 A6 A2
A1
A29
A3
A4
A5
A11
A7
A25 A29
A24
A23 A24
A20
A30
A15 A22
A12 A14
A17 A13
A19 A16
A21 A31
A18
View Vehicular traffic Vehicular traffic to S. side of lake Main pedestrian and bike path Secondary pedestrian and bike path
Isabella Freedman - Hazon: Campus Arrival METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018 Vehicular traffic
11
A28
The master plan addresses the following improvements to the existing Arrive! sequence: • Clear understanding of the sequence of arrival-parking, check-in and unpacking. The current arrival sequence for guests is confusing. With minimal signage and wayfinding, ambiguous marking at Johnson Road, undefined parking areas, and no clear indication for visitors of which building hosts the check-in process, new visitors start their stay with confusion. Our proposed entry off Johnson Road (see the Community Engagement plan) along with the new main parking area provides a clear understanding of an arrival sequence for guest vehicles arriving on site. As a visitor pulls into the parking lot there is an entry plaza, and welcoming building inviting new guests to check-in to an environment that lets them know they are entering a community of natural beauty and welcome. • Clear and separate navigation through campus for vehicles and pedestrians/bicycles. The current experience is confused. Our master plan proposes that when a guest is assigned a room, they will drive along dedicated roads for vehicles, parking near their room, dropping their luggage and returning their car to the main parking area (A26, A1). After parking their car, they can wander along a well-marked motor vehicle-free main boulevard through campus (A20). Pedestrians and bicycles will rule the road, moving safely along this path through connecting outdoor spaces to the buildings along the way where they will sleep, eat, worship, learn and play. • The campus does not utilize its relationship to nature. Everyone understands the power of the forest and water to rejuvenate the spirit. The greatest asset of this campus is its relationship to nature, yet it is sometimes hard to appreciate this asset as the campus is currently laid out. We are proposing to remove buildings that obstruct views of the lake and mountains so as visitors enter the campus, they can understand the beauty and character of I/F upon check-in. A large expanse of glass and high ceiling at the check-in building will make visitors feel immersed in the trees, mountains and water from the first instant they arrive. A1. Main Parking Area (85) A2. ADA Parking Spaces (4) A3. Golf Cart Service Request Center and Officefirst floor, Full-time Staff Residence – second floor; Teva residence transition space; Guest use office center – first floor option A4. Walkway/Entry Plaza – Access from parking lot to check-in A5. Main Hall – check-in, guest services, kitchen, dining (400 ppl), demonstration kitchen and small dining (50 ppl), IF/H offices, cheese making, pickling/canning, syrup making, honey making, storage; wedding- 300 person dining + dance area A6. Loading/delivery area with overhang – at grade level A7. Outdoor Dining Patio and Cafeteria Entry Plaza A8. Greenhouse A9. Outdoor brick oven and maple sugar shack A10. Herb and Demonstration Raised Bed Gardens A11. Children’s Hall/Camp Teva Use A12. Great Hall/Library; Catering support space; Grass roof/structure tucked into hillside – Walkout/views to lake; Views over structure from main path (A20); Wedding cocktails for 300 ppl. A13. Outdoor patio with direct access to the Great Hall/Library; Sukkah and Outdoor Wedding for 300 ppl A14. Beit Rinah: House of Song – Renovated existing Synagogue, 80 ppl, addition for restrooms – Flexible Program Space A15. Beit Knesset: House of Gathering – 150 ppl Flexible Program Space A16. Relocated Gazebo A17. Treehouses, nature play area and spray play area A18. Boat House with Canoe and Kayak Storage,
dock and swimming area A19. Tiered Seating at Lake, built into the hillside A20. Main Path (ADA accessible), pedestrians and bicycles only, new underground infrastructure corridor A21. Lakeside Path (ADA accessible), pedestrians and bicycles only, clear select areas along lake edge A22. Well House; mostly below ground, views of lake from main path over well house; pump for spray play area A23. Gerry Savage Memorial Orchard A24. Directional Arrow Signage (five locations) A25. Dumpster/Recycling Area (Fence/Block wall) A26. Internal vehicle road A27. Orchard Trees A28. Synagogue Patio Area with Firepit – At lakeside path level A29. New trees as parking area buffer (varying heights/types) A30. Rain Garden for parking area run-off A31. Pedestrian/bicycle path to Community Engagement Area and Farm A32. Pedestrian/bicycle/vehicle road to residential area on south side of lake A22. Well House: half below grade, can see over it, pump for water play area A23. Gerry Savage memorial orchard A24. Directional area signage (5 locations) A25. Bike parking A26. Main Vehicular Path A27. Trash and Recycling Storage A28.Outdoor Prayer Space A29. Landscape Buffer A30. Path to Community Engagement A31. Vehicular and Pedestrian Path to South side of Lake
Isabella Freedman - Hazon: Entry View METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
12
Isabella Freedman - Hazon: Main Path View METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
13
Isabella Freedman - Hazon: Great Hall View METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
14
Isabella Freedman - Hazon: Overhead View 01 METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
15
Isabella Freedman - Hazon: Overhead View 02 METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
16
Isabella Freedman - Hazon: Main Hall View METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
17
SPIRITUAL CENTER
S7
Isabella Freedman’s basis is in prayer and worship. A critical goal of the masterplan is to provide multiple opportunities for worship, accommodating the many variations found in the Jewish faith. The spiritual center is in a cluster of synagogues designed to provide areas for solitude, worship AND social interaction; where differences between worshippers dissolve with gathering and conversation. An outdoor patio and firepit provide opportunities for multiple uses, both as social and outdoor prayer spaces. While each synagogue has views to the lake, they are also oriented towards the east and double as flexible program spaces.
S12 S8
The spiritual center is accessible from the two paths that run through the main part of campus. This area is visible from all public/program components of the main campus, emphasizing the spiritual basis for the campus. Both the main and lakeside paths provide ADA accessible entry on multiple levels to each of the synagogues (S9, S10). Beit Midrash (S3) also includes an elevator for a shortcut to the lower level at mid-campus for those who cannot easily navigate the steps. This elevator will be accessible to non-worshippers while being used for services. The multiple synagogues, allowing for different forms of worship, provide the flexibility for many groups to use the campus at once, and to simultaneously worship. Isabella Freedman’s message of inclusive worship is embodied in this important and central part of campus – at the heart.
S11 S10
S15
S2 S5
S4
S1
S3
S1. Beit Rinah: House of Song – Renovation/addition to existing Synagogue- (80 ppl); flexible program space; offices/ storage at bottom level S2. Beit Knesset: House of Gathering (150 ppl); flexible program space; offices/storage at bottom level S3. Beit Midrash: House of Study (120 ppl); flexible program space; offices/storage at bottom level; elevator/access to outdoor prayer space S4. Outdoor prayer space and firepit/plaza, ‘Ner Tamid’ S5. Great Hall/Library; Catering support space; Grass roof/ structure tucked into hillside – Walk-out/views to lake; Views over structure from main path (S10); Wedding cocktails for 300 ppl. S6. Outdoor patio with direct access to the Great Hall/Library; Sukkah and Outdoor Wedding for 300 ppl
S6 S9
S14
S13
View Vehicular traffic Vehicular traffic to S. side of lake Main pedestrian and bike path Secondary pedestrian and bike path
Vehicular traffic Vehicular traffic to S. side of lake Isabella Freedman - Hazon: Spiritual Center
Public traffic to Community Bldg
and bike2018 path METCALFE ARCHITECTURE & Secondary DESIGN • pedestrian #1654 • AUGUST
18
S7. Main Hall –check-in, guest services, kitchen, dining (400 ppl), demonstration kitchen and small dining (50 ppl), IF/H offices, cheese making, pickling/canning, syrup making, honey making, storage; wedding- 300 person dining + dance area S8. Children’s Hall/Camp Teva Use S9. Lakeside Path (ADA accessible), pedestrians and bicycles only, clear select areas along lake edge S10. Main Path (ADA accessible), pedestrians and bicycles only, new underground infrastructure corridor S11. New trees to define edge of outdoor zones S12. Outdoor Dining Patio and Cafeteria Entry Plaza S13. Bird Sanctuary Island S14. Bridge and lookout structure (ADA accessible) S15. Boardwalk access to Beit Midrash
SUNSET VIEWS
Primary Pedestrian and Bike Vehicular Traffic
AFTERNOON
Isabella Freedman - Hazon: Farm Campus - Existing METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
MORNING
19
FARM
ARRIVE COMMUNITY
Isabella Freedman - Hazon: Farm Campus - Conceptual Programming METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
20
Primary Pedestrian and Bike Seconary Pedestrian and Bike Vehicular Traffic
Isabella Freedman - Hazon: Farm Campus - Proposed Analysis METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
21
F3 F3
F1. Existing adamah gate with plantings F2. ADA path F3. Cultivated field F4. Greenhouse F5. Barn F6. Farmhouse classroom at base of view tower F7. Tiered seating oriented towards sunset views F8. Access road with parking (5 spaces) F9. Mown grass path F10. Community building with farm stand F11. Traffic calming devices: Changed paving patterns, crosswalk F12. Bike Path
F3 F8
F5 F4 F3
F3
F7 F4
F3
F6 F3
F2
F9
F1 F11 F12 Farm/Outdoor Activity
F10
Programming/Retreat Living Support
Isabella Freedman - Hazon: Farm Campus - Proposed METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
22
1I
1J
1H 1L
D3
D1
1E
6
71
1A 1B
1K
1G
1F
1C
1D
PHASE 1
• 1A. Daisy ($2 mill) • 1B. Scheuer Renovation ($336k) • 1C. New dock, Mikvah, and Beach ($154k) • 1D. Lake edge seating/steps ($75k) • 1E. Outdoor Kitchen and Relocated Greenhouse ($97k) • 1F. Play Area ($36k) • 1G. Dock Replacement ($45k) (COMPLETED 2018) • 1H. Farm Classroom ($448k) • 1I. 181 Beebe Hill Rd. House ($1 mil) • 1J. 181 Beebe Hill Rd. Farm ($300k) • 1K. Restroom Renovation ($88k) • 1L Beige Yurt Replacement ($73k) • Select Landscaping ($115k)
D2
DEMO
• D1. Relocate beige yurt • D2. Demolish Lakeside Cabin • D3. Demolish Main Campus Greenhouse
Isabella Freedman - Hazon: Phase 01 METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
Conceptual Cost: $4.775 mill ($5.276 mill w/escalation) Guest Beds: 55 queen/king, 110 twin/pullout couch (May, Weinberg, Maple, Blue Heron, Pine, Scheuer, Kaufman, Elm, Daisy, Cedar) Staff Beds: 7 queen/king, 25 twin/pullout couch (not incl cottage) Program spaces: 7 (Yurts (2), Synagogue, Library, Great Hall, Arts-craft, farm classroom)
23
PHASE 1
1I
1J
• 1A. Daisy ($2 mill) • 1B. Scheuer Renovation ($336k) • 1C. New dock, Mikvah, and Beach ($154k) • 1D. Lake edge seating/steps ($75k) • 1E. Outdoor Kitchen and Relocated Greenhouse ($97k) • 1F. Play Area ($36k) • 1G. Dock Replacement ($45k) (COMPLETED 2018) • 1H. Farm Classroom ($448k) • 1I. 181 Beebe Hill Rd. House ($1 mil) • 1J. 181 Beebe Hill Rd. Farm ($300k) • 1K. Restroom Renovation ($88k) • 1L Beige Yurt Replacement ($73k) • Select Landscaping ($115k) Conceptual Cost: $4.775 mill ($5.276 mill w/escalation) Guest Beds: 55 queen/king, 110 twin/pullout couch (May, Weinberg, Maple, Blue Heron, Pine, Scheuer, Kaufman, Elm, Daisy) Staff Beds: 7 queen/king, 25 twin/pullout couch (not incl cottage) Program spaces: 7 (Yurts (2), Synagogue, Library, Great Hall, Arts-craft, farm classroom)
1H
Isabella Freedman - Hazon: Phase 01 - Farm METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
24
DEMO
• D1. Relocate beige yurt • D2. Demolish Lakeside Cabin • D3. Demolish Main Campus Greenhouse
1I 1J 181 Beebe Hill Rd.
C LEGEND
1H Farm
Sanitary Sewer Electric/Communications Water
A B G 1E
F 1L
G E
A D
H 1A 6
71
1B
1K
1G
1F
1D 1C
KEY NOTES (Building, & Site)
1A Daisy 1B Scheuer Renovation 1C New Dock/Mikvah/Beach 1D Office Addition/Bathroom 1E Outdoor Kitchen/ Greenhouse 1F Play Area 1G Dock Replacement (Completed 2018) 1H Farm Classroom 1I 181 Beebe Hill Rd. House 1J 181 Beebe Hill Rd. Farm 1K Renovate Existing Bathrooms 1L Beige Yurt Replacement
Isabella Freedman - Hazon: Phase 01 Infrastructure METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
25
KEY NOTES (Infrastructure)
A Below Grade Utility Vault (Future Electric/ Communications) B Temporary Generator for Daisy (19) C Existing Utility Pole/Transformer D Temporary Connection to Existing Water Main E Septic Tank F Pump Chamber G Tie to Existing Leach Field H D-Box/Drywell (Outdoor Kitchen)
Isabella Freedman - Hazon: Phase 01 - Daisy Conceptual Design METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
26
Isabella Freedman - Hazon: Phase 01 - Daisy Conceptual Design METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
27
Isabella Freedman - Hazon: Phase 01 - Daisy Conceptual Design METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
28
Isabella Freedman - Hazon: Phase 01 - Daisy Conceptual Design METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
29
Isabella Freedman - Hazon: Phase 01 - Daisy Conceptual Design METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
30
Isabella Freedman - Hazon: Phase 01 - Daisy Conceptual Design METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
31
719
2
73
71 7
ELM CABIN
1
73
72
9
717
0
73
6
72
72
8
2
727
72
72
9
PINES CABIN
715 71 4
71
3
727
8
723
72
5
72 6
72
4
72
3
72
729
2
72
720
1
72
8
71
719
728
717 6 71 715
714 3 71
727
726
725
721
722 3
72
4
72
72
5
5
72
LAKE MIRIAM 72
4
72
3
721
720
9
SCHEUER CABIN
719
721
0 72
722
71
8
BOAT DOCK
717 71
4
71
3
71
715
716
Isabella Freedman - Hazon: Daisy Site Plan Isabella Freedman - Hazon: Phase 01 - Daisy Conceptual Design - Site Plan METCALFE ARCHITECTURE & DESIGN • 1654 • FEBRUARY 28, 2018 METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
32
5 72
4
72
3
72
2
72
1
72
Second Floor Unit Entry
720
8
71
719
717 6 71 715
714 3 71
Second Floor Unit Entry
Ground Floor Unit Entry
Ground Floor Unit Entry
Community Room Entry Second Floor Unit Entry
721
722 3
72
72 4
5 72
Isabella Freedman - Hazon: Daisy Ground Floor Plan Isabella Freedman - Hazon: Phase 01 - Daisy Conceptual Design - Ground Floor Plan METCALFE ARCHITECTURE & DESIGN • 1654 • FEBRUARY 28, 2018 METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
33
PD RAM OWN
BACK GARDEN
BACK GARDEN
BACK GARDEN VESTIBULE
BACK GARDEN
KING BED
P DO
RAM
RESTROOM ADA RESTROOM
KING BED
STEPS/SEATING
E BAR
E COFF
OUTDOOR GATHERING SPACE
SLEEPER SOFA
COMMUNITY ROOM RAM P DO
METCALFE ARCHITECTURE & DESIGN • 1654 • FEBRUARY 28, 2018 METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
SLEEPER SOFA
FRONT GARDEN FRONT GARDEN
WN
Isabella Freedman - Hazon: Daisy Room Layout Diagram Isabella Freedman - Hazon: Phase 01 - Daisy Conceptual Design - Plan Diagram
STEPS/SEATING OUTDOOR GATHERING SPACE
JANITOR’S CLOSET
VESTIBULE
FRONT GARDEN
ADA BATH
CLOSET
BATH
ET
CLOS
JC
ELEC.
VESTIBULE
CLOSET
WN
MECHANICAL
34
Isabella Isabella Freedman Freedman -- Hazon: Hazon: Phase Daisy01 Precedent Images Design - Precedents - Daisy Conceptual METCALFE METCALFE ARCHITECTURE ARCHITECTURE && DESIGN DESIGN •• #1654 1654 ••FEBRUARY AUGUST 2018 28, 2018
35
Isabella Freedman - Hazon: Phase 01 - Outdoor Kitchen - Precedents METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
36
Isabella Freedman - Hazon: Phase 01 - Farm Classroom - Precedents METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
37
2B 2A D4
2B D3
6
71
D5 D6
D2 2A 2E D7
2G
2H
2C
2D
2F
PHASE 2
2J
DEMO
• D2. Demolish old canteen/offices • D3. Demolish pool and spa • D4. Demolish greenhouse • D5. Demolish Cedar cabin • D6. Demolish existing path • D7. Demolish Chestnut cabin
Isabella Freedman - Hazon: Phase 02 METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
• 2A. Main path and infrastructure/ pump house ($877k) • 2B. New parking and access road ($493k) • 2C. Beit Midrash ($803k) • 2D Teva House ($1.7 mill) • 2E. Well House ($262k) • 2F. Glamping Area and Bath House ($206k) • 2G. Treehouse ($95k) • 2H. Plaza and Firepit ($110k) • 2I. Hot Tub ($39k) • 2J. ADA Outdoor Learning Trail ($62k) Conceptual Cost: $4.654mill ($5.631 mill w/escalation) Guest Beds: 52 queen/king, 104 twin/pullout couch, 24 glamping twins (May, Weinberg, Maple, Blue Heron, Pine, Scheuer, Kaufman, Elm, Daisy) Staff Beds: 32 twin/pullout couch (not incl cottage) Program spaces: 9 (Yurts (2), Synagogue, Library, Great Hall, Arts-crafts, Beit Madrash, Farm Classroom, Teva Classroom)
38
A
LEGEND Sanitary Sewer Electric/Communications Water
2B 2A
G
C
A G
C
2B
J F
C C
2E
2I
B
C 2H
2G
A
G
K
6
71
E
C
B
C
B
A
2A A
A
2C
D
E D
2D
2J
KEY NOTES
2F E
D I H F
Isabella Freedman - Hazon: Phase 02 Infrastructure METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
2J
39
A Below Grade Utility Vault (Future Electric/ Communications) KEY NOTES (Building & Site) Temporary Connection to Existing Water B 2A Main Path/Infrastructure Main and Pump House C Water Valve (Future Connection) 2B New Parking/Access Road D Septic Tank 2C Beit Midrash E Pump Chamber 2D Teva House F Tie to Existing Leach Field 2E Well House G Cap New Utilities for Future Connections 2F Glamping Area/Bath House H Existing Septic Tank 2G Treehouse I Tie New Bath House to Existing Water and Electric Service 2H Plaza/Firepit J Tie Electric/Water to Existing Connections 2I 16 Person Hot Tub from Removed Pool/Spa Structure 2J ADA Accessible Outdoor K To New Leaching Field (Size for Expansion) Learning Trail
3D 3B D4 3A
D5 6
71
3D
D6 3C
D2
D3
D1
PHASE 3
• 3A. Main Hall ($10.6 mill) • 3B. Greenhouse/Gardens/Misc. ($32k) • 3C. Renovation at north side of Great Hall - new entry ($110k) • 3D. Landscape buffer ($36k) • Infrastructure Upgrade ($165k) Conceptual Cost: $10.939 mill ($14.385 w/escalation) Guest Beds: 52 queen/king, 104 twin/pullout couch, 24 glamping twins (May, Weinberg, Maple, Blue Heron, Pine, Scheuer, Kaufman, Elm, Daisy) Staff Beds: 32 twin/pullout couch (2nd floor office bldg., Burbs, New Lake House) (not incl cottage) Program spaces: 10 (Yurts (2), Synagogue, Library, Great Hall, Beit Madrash, small dining, old cafeteria, farm classroom, Teva classroom)
DEMO
• D1. Demolish RR and partial kitchen • D2. Demolish Arts and Crafts building • D3. Demolish Service road • D4. Relocate Greenhouse • D5. Demolish tent and mulch groundcover • D6. Demolish path
Isabella Freedman - Hazon: Phase 03 METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
40
West Campus New Power Grid New Water Service New Sanitary Service
LEGEND Sanitary Sewer Electric/Communications Water
C
East Campus Existing Power Grid New Water Service Existing Sanitary Service
H
J 3B B
3A
A
G
6 71
I F
F D
E
3C
KEY NOTES KEY NOTES (Building & Site)
3A Main Hall 3B Greenhouse/Gardens 3C Renovation of North Side of Great Hall 3D Landscape Buffer
Isabella Freedman - Hazon: Phase 03 Infrastructure METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
41
A Below Grade Utility Vault (Electric/ Communications) B Generator for West End of Campus C Existing Utility Pole/Transformer D Connect Existing Dining Hall Septic Tank to New Sanitary Line E Connect Existing Weinberg Septic Tank to New Sanitary Line F Septic Tank G Connect Sanitary Line to Existing Line up to Existing Leach Field H Install New Effluent Pumps I Grease Traps J Transformer/Vault
4D
4E
6
71
4I 4F 4G D1 4A
4H
4B
4C
4J
PHASE 4
• 4A. Raze Great Hall/Library – new Great Hall Library with grass roof and lake side plaza ($2.77 mill) • 4B. Renovated Synagogue ($288k) • 4C. Lakeside ADA path ($80k) • 4D. Maintenance Building/Housekeeping ($2.0 mill) • 4E. Orchard ($18k) • 4F. Gerry Savage Memorial Orchard (optional in earlier phase) ($24k) • 4G. Service Tunnel to basement of Hub (optional) (NIC) • 4H. Play Area/Treehouses ($595k) • 4I. Golf Cart Service Request Center and Office ($289k) • 4J. Lake seating ($121k) • Infrastructure Upgrade (1$95k)
DEMO
• D1. Demolish Great Hall & Library
Isabella Freedman - Hazon: Phase 04 METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
Conceptual Cost: $6.401 mill ($9.09 mill w/escalation) Guest Beds: 52 queen/king, 104 twin/pullout couch, 24 glamping twins (May, Weinberg, Maple, Blue Heron, Pine, Scheuer, Kaufman, Elm, Daisy) Staff Beds: 32 twin/pullout couch (2nd floor office bldg., Burbs, New Lake House) (not incl cottage) Program spaces: 9 (Yurts (2), Synagogue, Library, Great Hall, Beit Madrash, small dining, Farm classroom, Teva classroom)
42
West Campus New Power Grid New Water Service New Sanitary Service
LEGEND Sanitary Sewer Electric/Communications Water
East Campus New Power Grid New Water Service New Sanitary Service
B D 4D A
D
C
4I F
6
71
D
E 4G D 4H
4A
4B 4C
4J
KEY NOTES
A Below Grade Utility Vault (Electric/ Communications) New Great Hall Library w/ B Generator for East End of Campus Grass Roof and Lake Side C Existing Septic Tank Plaza D Septic Tank Renovated Synagogue E Remove Existing Dining Hall Septic Tank, Lakeside ADA Path Pump Chamber and Grease Traps Maintenance Building/ F Increase Leaching Field to Accommodate Housekeeping Additional Buildings Orchard Gerry Savage Memorial Orchard Service Tunnel (Optional) Play Area/Treehouses Golf Cart Center/Office Lakeside Seating
KEY NOTES (Building)
4A 4B 4C 4D 4E 4F 4G 4H 4I 4J
Isabella Freedman - Hazon: Phase 04 Infrastructure METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
43
D2 5C
D3 5B 5G 6
71
5H
D1
5F 5A
5E
D3
PHASE 5
• 5A. Beit Knesset ($850k) • 5B. Community interaction Building (farmers market, arts/crafts, bikes, offices, lake side patio, parking) ($1.577 mill) • 5C. Renovate cottage for offices, bookstore and coffee/juice bar ($288k) • 5D. Lake Front Residential ($2.5 mill) • 5E. Road system to south side of lake ($458k) • 5F. Pedestrian/bicycle path to community engagement/farm ($56k) • 5G. Expanded solar array ($50k) • 5H. Landscape buffer ($36k) • Demolition of noted structures ($47k)
DEMO
5D
Conceptual Cost: $5.872 mill ($8.955 mill w/escalation) Guest Beds: 60 queen/king, 96 twin/pullout couch, 24 glamping twins (May, Maple, Blue Heron, Pine, Scheuer, Kaufman, Elm, Daisy, Yurts (3), Lakefront) Staff Beds: 32 twin/pullout couch (2nd floor office bldg., Burbs, New Lake House) Program spaces: 9 (Synagogue, Library, Great Hall, Beit Madrash, small dining, arts/crafts (new), Beit Knesset, Farm classroom, Teva classroom)
• D1. Demolish Weinberg cabin • D2. Demolish existing road • D3. Demolish deck, relocate yurt
D2
Isabella Freedman - Hazon: Phase 05 METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
44
LEGEND Sanitary Sewer Electric/Communications Water
B 5C 5B 5G 6
71
5F 5A
B
5E
KEY NOTES KEY NOTES (Building)
5A Beit Knesset 5B Community Building 5C Renovated Cottage (offices, Bookstore, etc.) 5D Lake Front Residential 5E Road to South Side Lake 5F Pedestrian/Bicycle Path 5G Expanded Solar Array 5H Landscape Buffer
A F 5D B A
E
E
A
C A
D
Isabella Freedman - Hazon: Phase 05 Infrastructure METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
G
45
A Below Grade Utility Vault (Electric/ Communications) B Septic Tank C Pump Chamber D Tie to Existing Leaching Field E Water Valve (Future Connection) F Upgrade Existing Pump House/Well G Tie to New Leaching Field
D2 6E 6A 6
71
6K
6B
6F
D1
6I 6C
D4
PHASE 6
• 6A. Children’s Hall/Camp Teva Use, pathways ($1.82 mill) • 6B. Mikveh dock/enclosure ($146k) • 6C. Boathouse Renovation in former Mikveh ($15k) • 6D. Bunkhouse and public shower/toilets ($1.66 mill) • 6E. Livestock farm/classroom ($639k) • 6F. Adamah house/classroom ($1.26 mill) • 6G. Lake House Residential ($1.2 mil) • 6H. Glamping Area ($189) • 6I. Bridge and bird watch structure ($192k) •6J. Glamping Area Connector Trail ($25k) •6K. Indoor Mikveh ($121k)
6G
DEMO
• D1. Demolish dock • D2. Demolish barn and farm buildings • D3. Demolish kfar • D4. Demolish/Relocate Glamping and Bath House
6H 6D 6J D3
Isabella Freedman - Hazon: Phase 06 METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
46
Conceptual Cost: $7.269 mill ($11.848 mill w/escalation) Guest Beds: 72 queen/king, 186 twin/pullout couch, 24 glamping twins (May, Maple, Blue Heron, Pine, Scheuer, Kaufman, Elm, Daisy, Yurts (3), Lakefront, Bunkhouse, Lakehouse) Staff Beds: 47 twin/pullout couch (2nd floor office bldg., Burbs, New Lake House, Adamah House, Teva House) Program spaces: 12 (Synagogue, Library, Great Hall, Beit Madrash, small dining, arts/crafts (new), Beit Knesset, Children’s Hall (2), Farm classroom, Adamah Classroom, Teva Classroom)
LEGEND Sanitary Sewer Electric/Communications Water
6E
A 6A
B 6
71
A
6K
6B
A
6I 6C
KEY NOTES KEY NOTES (Building)
6G
6J 6H
6D A
Isabella Freedman - Hazon: Phase 06 Infrastructure METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
B
47
A Septic Tank B Pump Chamber
6A Children’s Hall/Camp Teva 6B Mikveh Dock/Enclosure 6C Boathouse Renovation 6D Bunkhouse and Public Shower/Toilets 6E Livestock Farm/Classroom 6F Adamah House/Classroom 6G Lake House Residential 6H Glamping Area 6I Bridge/Bird Viewing Structure 6J Glamping Area Connector Trail 6K` Indoor Mikveh
6F
D1
D2 7A
7A
7B
7C
6
71
7D
PHASE 7
• 7A. Maple and Blue Heron convert from residence to program space, new path system ($546k) • 7B. Conference Center ($617k) • 7C. Spa and Health Center ($735k) • 7D. Quiet Retreat, chapel, pods, lily pads ($332k) • 7E. Cemetery ($67k) • 7F. May Addition ($1.9 mill) • 7G. New twin Chalets (3) ($1.577 mill) • 7H. Barn ($87k) • 7I. Outdoor view seating and classroom/pathway system ($130k) • Infrastructure Upgrade ($126k)
7E
7G
7F
DEMO
Conceptual Cost: $6.120 mill ($10.618 mill w/escalation) Guest Beds: 84 queen/king, 186 twin/pullout couch, 24 glamping twins (May, Scheuer, Kaufman, Elm, Daisy, Yurts (3), Lakefront, Bunkhouse, Chalets (3), Lakehouse Staff Beds: 47 twin/pullout couch (2nd floor office bldg., Burbs, New Lake House, Adamah House, Teva House) Program spaces: 16 (Synagogue, Library, Great Hall, Beit Madrash, small dining, arts/crafts (new), Beit Knesset, Children’s Hall (2), Farm classroom, Adamah Classroom, Maple, Blue Heron, conference center (2), agriculture classroom, Teva Classroom)
• D1. Demolish portion of Pines cabin • D2. Demolish pathways
Isabella Freedman - Hazon: Phase 07 METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
48
Farm
7H 7I
LEGEND Sanitary Sewer Electric/Communications Water
7A B
7A
7B
A
A 6
71
7C
7D
KEY NOTES KEY NOTES (Building)
7A Conversion of Maple/ Blue Heron (Program) 7B Conference Center 7C Spa/Health Center 7D Quiet Retreat/Chapel 7E Cemetery
A 7E
B
7G
A
7F
7F May Renovation (Second Floor Added) 7G Chalets 7H Barn 7I Outdoor Seating/Classroom/ Pathway System
B
C
Isabella Freedman - Hazon: Phase 07 Infrastructure METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
A Septic Tank B Pump Chamber C Expand Existing Leaching Field to Accommodate New Development
49
PHASE 7
• 7A. Maple and Blue Heron convert from residence to program space, new path system ($546k) • 7B. Conference Center ($617k) • 7C. Spa and Health Center ($735k) • 7D. Quiet Retreat, chapel, pods, lily pads ($332k) • 7E. Cemetery ($67k) • 7F. May Addition ($1.9 mill) • 7G. New twin Chalets (3) ($1.577 mill) • 7H. Barn ($87k) • 7I. Outdoor view seating and classroom/pathway system ($130k) • Infrastructure Upgrade ($126k) Conceptual Cost: $6.120 mill ($10.618 mill w/escalation) Guest Beds: 84 queen/king, 186 twin/pullout couch, 24 glamping twins (May, Scheuer, Kaufman, Elm, Daisy, Yurts (3), Lakefront, Bunkhouse, Chalets (3), Lakehouse Staff Beds: 47 twin/pullout couch (2nd floor office bldg., Burbs, New Lake House, Adamah House, Teva House) Program spaces: 16 (Synagogue, Library, Great Hall, Beit Madrash, small dining, arts/crafts (new), Beit Knesset, Children’s Hall (2), Farm classroom, Adamah Classroom, Maple, Blue Heron, conference center (2), agriculture classroom, Teva Classroom)
7H 7I
DEMO
• D1. Demolish portion of Pines cabin • D2. Demolish pathways
Isabella Freedman - Hazon: Phase 07 - Farm METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
50
8C
8B
D1 D2
8A
6
71
PHASE 8
• 8A. Daisy East ($2.597 mill) • 8B. New ‘Burbs ($1.686 mill) • 8C. ‘Burbs Renovation ($1.118 mill) • 8D. New twin Chalets (3) ($1.583 mill) • New Access Road from Johnson Rd. ($48k) Conceptual Cost: $7.034 mill ($12.944 mill w/escalation) Guest Beds: 122 queen/king, 164 twin/pullout couch, 36 glamping twins (May, Scheuer, Daisy, Yurts (3), Lakefront, Bunkhouse, Chalets (6), New Lake House, ‘Burbs, New ‘Burbs, Daisy East) Staff Beds: 0 queen/king, 31 twin/pullout couch (2nd floor office bldg., Adamah House, Teva House) Program spaces: 17 (Synagogue, Library, Great Hall, Beit Madrash, small dining, arts/crafts (new), Beit Knesset, Children’s Hall (2), Farm classroom, Adamah Classroom, Maple, Blue Heron, conference center (2), agriculture classroom, Teva Classroom)
DEMO
• D1. Demolish Kaufman cabin • D2. Demolish Elm cabin
8D
Isabella Freedman - Hazon: Phase 08 METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
51
8C 8C C
LEGEND
8B
Sanitary Sewer Electric/Communications Water
D 8B
A 8A A
6
71
KEY NOTES KEY NOTES (Building)
8A 8B 8C 8D
A
B
8D
Isabella Freedman - Hazon: Phase 08 Infrastructure METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
52
Daisy East New ‘Burbs’ ‘Burbs’ Renovation New Chalets
A B C D
Septic Tank Pump Chamber Underground Utility Vault Existing Septic Tank
Isabella Freedman - Hazon: Precedent Images METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
53
Isabella Freedman - Hazon: Precedent Images METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
54
Appendix 1 Beds/Program Space Growth Guest Beds KQ / Tw P.O. Existing: Phase 1: Phase 2: Phase 3: Phase 4: Phase 5: Phase 6: Phase 7: Phase 8:
45/ 100 55 (+10)/110 (+10) 52(-3)/104(-6) 52/104 52/104 60 (+8)/96 (-8) 72(+12)/186 (+90) 84 (+12)/186 122 (+38)/162 (-24)
Staff beds KQ / Tw. 7 /25 7 /25 0(-7)/32(+7) 0/32 0/32 0/32 0/47 (+15) 0/47 0/31 (-16)
Glamping Twins
0 0 24 (+24) 24 24 24 24 24 36 (+12)
Program Spaces -- 6 6 9 (+3) 10 (+1) 9 (-1) 9 12 (+3) 16 (+4) 17 (+1)
*Counts do not incl. tent campers (guests), Beebe Hill Rd property (guests) or use of the cottage (staff)
Appendix 2
Appendix 3
Dining Capacity Existing: 120 Dining Hall+ Proposed: 400 Dining Hall*
Total Cost of Master Plan Implementation: Phase 1: $4.775 mill. ($5.276 mill. escalated) Phase 2: $4.654 mill. ($5.631 mill. escalated) Phase 3: $10.939 mill. ($14.385 mill. escalated) Phase 4: $6.401 mill. ($9.09 mill. escalated) Phase 5: $5.872 mill. ($8.955 mill. escalated) Phase 6: $7.269 mill. ($11.848 mill. escalated) Phase 7: $6.120 mill. ($10.618 mill. escalated) Phase 8: $7.034 mill. ($12.944 mill. escalated)
+ ++ +++ * ** ***
100 Library++ 50 Small Dining**
300 tent+++ 300 terrace/library/great room***
Used as main dining hall through Phase 2. In Phase 3, becomes extra program space. Demolished in Phase 4. Library used to increase capacity when desired – however, this eliminates a program space when used. Not used for dining overflow at Phase 3. Tent demolished in Phase 3. 400 person dining can be divided into two spaces for 200+200. Can also be used for 300 person weddings and dance floor. Count does not include outdoor café tables at ground level. Phase 3. Count does not include outdoor seating on roof terrace. Phase 3. This is intended to be used for wedding ceremonies/cocktail receptions, not for sit down meals. Phase 3.
Isabella Freedman - Hazon: Appendices METCALFE ARCHITECTURE & DESIGN • #1654 • AUGUST 2018
TOTAL:
55
$53.067 mill. ($78.747 mill. escalated)