CHRIS BAUMBACH
CHRIS BAUMBACH Architect, LEED AP, CCCA California Massachusetts Vermont c@cknjb.net (802) 505-3046
oil pastel on paper
rendering for mixed-use development : TLCD Architecture
renderings for mixed-use development : TLCD Architecture
women’s staff residences for teaching hospital in Pakistan : Payette
drawings
design and modeling for city hall expansion : Archilogix
design and modeling for city hall expansion : Archilogix
site plan and renderings for Montessori school : TLCD Architecture
design models
BARREL STORAGE
TANKERS
POMACE
TRUCK DOCK
HOLDING / BARREL LINE
BARREL AREA
HOLDING
PRESS
HOLDING / PRE-BLENDING
SPECIALTY
BOTTLING LINE #1
DRY GOODS DE-STEM
BLENDING
RED FERMENTATION
M.L.
BOTTLING TANKS
RED WHITE FERMENTATION
WHITE WHITE SETTLING
PRESS
FINING
BOTTLING LINE #2 FILTER
COLD STABILIZATION
TRUCK DOCK
TANK AREA
RECEIVING
BOTTLING
POMACE TANKERS
process flow diagram
winery programming diagram and rendering : RRM Design Group
Clos du Bois Winery Expansion NOT TO SCALE 2005.02.25
DOCK
renderings for bank renovation : TLCD Architecture
renderings for bank renovation : TLCD Architecture
maps for transit authority : TLCD Architecture
renderings for primary school : TLCD Architecture
photography
DIVISION STAKEHOLDER GROUPS Alcohol and Drug Services Connie Moreno-Peraza and Team
Comprehensive Services for Older Adults Kristin Brown and Team
Child Welfare Services Linda Canan and Team Self Sufficiency Services Teresa Zimny and Team HHSA Administration Mitch Wippern and Staff Cmte.
Mental Health Jaye Vanderhurst and Team Public Health Dr. Karen Smith, M.D. and Team
HHSA Core Group HHSA Director Executive Cmte. Facilities Leaders
Napa County Management Team and Oversight Don Ridenhour Hillary Gitelman Larry Florin Molly Rattigan Mitch Wippern
Napa County Project Manager Juan Arias OWNER TEAM Community Stakeholders and Public Review DESIGN TEAM TLCD Project Manager Brian Wright *
SITE PLANNING AND DESIGN Napa Design Partners : Community Liaison Stephen Cuddy
Chaudhary : Civil Engineering * Arvin Chaudhary and John Stitt
Miller Pacific : Geotechnical Engineering Michael Morisoli
Quadriga : Landscape Architecture * Bill Mastick and Shannon Sobeck
Spark : Change Managment Marina van Overbeek
Gilleran Energy : LEED Consulting Kevin Gilleran
Page & Turnbull : Historic Consulting Ruth Todd and Rebecca Fogel
Catalyst : Security Kevin Wood
GnuGroup : Wayfinding Tom Donnelly
Davis Langdon : Cost Estimating * Gary Holland and Paul Abernathy
ZFA : Structural Engineering Kevin Zucco
Costa : Mechanical Engineering * Tony Costa and Chris Del Core
Kleinfelder : Materials Testing Charlie Almestad
O’Mahony & Myer : Electrical Engineering * Paul Carey and Jan Myer Charles Salter : Acoustics / AudioVisual * Ken Graven
BUILDING PLANNING AND DESIGN
marketing / proposal diagrams : TLCD Architecture
TLCD Project Team Alan Butler * Programmer/Master Planning Nate Bisbee * Project Architect/Lead Designer Suzanne Nagorka * Planning / Interior Design / Furniture
* “Core Experience” team members from the Napa Valley College master planning and buidling projects (see p. 7).
discovery (2 mo.)
programming (3 mo.)
master planning and conceptual design (6 mo.)
schematic design (4 mo.)
STEP 1
design development (2 mo.) design-build docs (5 mo.) construction (20 mo.)
STEP 2 RFP document planning & pre-qualification
environmental impact report
observations & surveys
document existing conditions
historic analysis
develop design vocabulary
stakeholder input
assist county with analysis of alternates
integrate EIR findings
cost estimate
issue STEP 1 report
cost estimate
occupancy
STEP 3
outline specs and performance documents
specifications and performance documents
activities
select D/B team issue STEP 2 report
review D/B documents
construction administration support
cost estimate
cost estimate
county standards & guidelines public outreach
kickoff
public outreach
public udpate
public meeting
prepare design program
develop site master planning alternatives
develop and select preferred site plan
building design and design documents (bridging documents)
workshop
workshop
workshop
workshop
public udpate
design development of bridging documents (potential additional phase)
owner team Napa County Project Manager Napa County Management Team HHSA Core Group HHSA Stakeholder Groups
design team TLCD Project Manager Site Planning and Design Building Planning and Design
public
renderings for cancer treatment center : TLCD Architecture
renderings for cancer treatment center : TLCD Architecture
photography
digital painting