574sp13 hscully finalbooklet

Page 1

CLARENDON CROSSING

HOLDEN SCULLY

ARCH 476 LEVERETT sp2013


REGIONAL ANALYSIS ARLINGTON COUNTY

2010 208,900 people

MASS TRANSIT CONNECTIONS

ORANGE LINE

DI CT

RI

ST

Vienna Dunn Loring West Falls Church East Falls Church Ballston–MU Virginia Square – GMU

OF A

BI M LU CO

Clarendon

CLARENDON STATION

4,838 187,663

USE STATION

USE ORANGE LINE

Court House

Rosslyn Foggy Bottom – GWU Farragut West McPherson Square

Metro Center Federal Triangle

Smithsonian L'Enfant Plaza

ON GT

N LI

AR

Federal Center SW Capitol South Eastern Market Potomac Avenue Stadium–Armory Minnesota Avenue Deanwood Cheverly Landover New Carrollton

NT

U CO Y

DISTRICT OF COLUMBIA

WITHIN A 1/2 MILE RADIUS

44.8 7,316 10,179

USE RAIL ON A DAILY BASIS

RESIDENTS

JOBS

1950 802,178 people

OF THE 4,884 PEOPLE

42.8

42.8% OF POPULATION 25-34 YEARS OF AGE

68.9

68.9% OF HOUSING NON FAMILY HOUSEHOLDS

5.0

5.0% OF HOUSING IS VACANT Since 2000, the number of housing units in Clarendon has grown by almost 300%


SITE ANALYSIS

SITE DESIGN

URBAN DENSITY

SITE 33,000 6,400

30,000

46,000

220,000

5,800 5,000

150,000

41,000

112,000

12,000

38,000 44,000

11,000

108,000

93,000

28,000

24,000 66,000

3,100

160,000 HIGH DENSITY MEDIUM DENSITY

70,000 3,800

66,000

LOW DENSITY

55,000

SITE PROGRAM

CITY GRID LAYOUT HOSPITAL GRID

JEFFERSON GRID

RESIDENTIAL OFFICE COMMERCIAL GOVERNMENT

PUBLIC TRANSIT

GEORGE MASON GRID

CIRCULATION

M


CONCEPT CONCEPT STATEMENT

Looking at the diverse metropolitan of Washington D.C., Clarendon’s Crossing looks to address it as a system of connections. With the site located off of the Orange Line, people from Maryland to Virginia come to work, and play in the vibrant neighborhood. By allowing the city to grow unimpeded by structure, the neighborhood continues to thrive. Adding to the neighborhoods vibrant nightlife is a way to bridge the gap between new residences and locals. This connection for the population gives a since to connection to the neighborhoods itself. To best bring the population into the site, the local park is extended into the site. This landscape band becomes the basis to design off of. It joins the existing fabric and intensifies the connections to allow successful program. The architecture should maintain a presence in the everlasting one of Arlington. Sustainability is a key issue to address. Though LEED certification would be a mean, also using classical architecture fundamentals will achieve this with greater result. Solar analysis of the created spaces shows that a place with light, will be a place with people. The courtyard opens up the entertainment district to be a welcoming place due to light.

THE BUILDING AS A CITY

BUILDING ANALYSIS TRANSFORMATION

SITE

EXTRUDE SITE CONSTRAINTS

1

BRING LANDSCAPE INTO THE SITE

2

LET LANDSCAPE FORM THE BUILDING

3

LIFT CORNER SITE/ OPTIMIZING VISTAS

4

LIFT NORTHSIDE FORM

5

ROUND FORM ALONG CIRCULATION PATTERN

6

CREATE SEPARATION FROM VOLUMES

SUBURB

CITY

COMBINE

AS A LANDMARK 180’ -6”

U.S. CAPITAL


PROGRAM DISTRIBUTION

OFFICE

RESIDENTIAL

PARKING

ENTERTAINMENT

LANDSCAPE

PROGRAM ORGANIZATION

OFFICE

RESIDENTIAL

ENTERTAINMENT

LANDSCAPE

PROGRAM TABULATION

SF

93,137 SF

es

69 55 50 34

ac Sp

1:580 1:580 1:580 1:580

1:580 1:580 1:580 1:580

g in rk

158,500

40,000 29,000 64,137 40,000

Pa

UNITS

69 71 71

ria ite Cr nt g e kin segm

40,000 SF

r Pa

25,000 15,000

l ve

2 3

132

1:580 1:580 1:580

243,000 SF

238

or lo rF t pe fee ea are Ar u

13

32,000 29,000 20,000

LL N C S

Le

5 6 7 8

40,000 41,000 41,260 40,000

sq

2 3 4

44 45 27 47

es

44

ac Sp

1,200

/unit /unit /unit /unit /unit /unit

g in rk

158,500 SF

1.8 1.8 1.8 1.8 1.8 1.8

Pa

1200 1200 1200 1200 1200 1200

ria ite Cr nt g e kin segm

l

132

29,000 29,000 30,000 31,000 31,000 8,500

r Pa

ve

Le

es

24 24 25 26 26 26

or lo rF t pe fee ea are Ar

u sq

ac Sp

m

g se

ria ite Cr nt e

g in

g in

rk Pa

rk Pa

A

s os Gr e it ag Un er er Av rea p

its Un

el

or lo rF t pe fee ea are Ar squ

o nd Co v Le 2 3 4 5 6 7

69 50 111 69 161

Total Parking Required Adjusted Total

886 726

Total Area Existing Site Parking Garage Space (estimate) Landscape

534,637 150,000 290,272 93,137

SF SF SF SF

419 1:580 1:580

43 26 419

243,000

SF

93,137

SF

100,100

SF


PERSPECTIVES





MODEL



DRAWINGS AA LOBBY LOBBY

RETAIL CAFE

RETAIL

RESTAURANT

BAR

RESTAURANT CAFE

NIGHTCLUB

CAFE

LARGE THEATRE BAR

RESTAURANT

SMALL THEATRE

LOBBY

RETAIL

RETAIL

LOBBY

TICKETING

NIGHTCLUB

RETAIL

NIGHTCLUB

RETAIL

BAR

RESTAURANT

RETAIL RETAIL

RESTAURANT

LOBBY

RESTAURANT

GROUND

1:100

50

200

800


TYPICAL

1:100

50

200

800


PARKING

1:100

50

200

800


RESIDENTIAL

OFFICE

RESIDENTIAL

OFFICE

RESIDENTIAL

OFFICE

OFFICE

RESIDENTIAL

OFFICE

OFFICE

OFFICE

ENTERTAINMENT

OFFICE

OFFICE

OFFICE

ENTERTAINMENT

PARKING

ENTERTAINMENT

ENTERTAINMENT

PARKING

PARKING

PARKING

PARKING

ENTERTAINMENT

PARKING

STACKING DIAGRAM

AA SECTION

NW ELEVATION

1:100

50

200

800


ENVIRONMENT ANALYSIS STACKING DIAGRAM

SOLAR RADIATION

WIND VELOCITY (NW)

By using a morphing form, the blending between distinct program districts can occur. With two main blocks being designated for residential development, and the center core being designed for office facilities, the merging of the entertainment district brings the complex together

The traditional box has shown its limits in architecture and its fit in urbanism. Using a wind tunnel, we can analyze the breakdown of vortices that can occur in urban fabric. The use of smooth contours and no strong angles lets the wind be free from these limits. The wind gently goes off of the facade through the streets instead of raging.

An organic site allows organic design to occur. Much of the natural world is organic, why can’t architecture? The box has its limitations,especially in office and residential architecture. Everyone wants access to the views and the sun. By opening the building, every space has equal access to these amenities.

206

BTU/ft

2

454

m/s

103

0 0

Monthly Cooling Load

Annual Weather Averages

Wind Speed Distribution

Monthly Heating Load

Monthly Design Data

Wind Frequency Distribution


HIGH PERFORMANCE ELEMENT VASARI ANALYSIS

SUMMER SUN

Building Performance Location Weather Station Outdoor Temperature Average Lighting Power People Exterior Window Ratio Electrical Cost Fuel Cost

Alexandria, VA 48317 Max 94째F/ Min 5째F 0.62 W/ ft2 114 0.44 $0.08/ kWh $0.93/ therm

Energy Use Intensity Electricity EUI Fuel EUI Total EUI

22 kWh/ sf/ yr 61 kBtu/ sf/ yr 137 kBtu/ sf/ yr

Life Cycle Energy Use/ Cost Life Cycle Electricity Use Life Cycle Fuel Use Life Cycle Energy Cost

29,763,243 kWh 818,393 therms $1,448,797

Sun Chart_ Washington, DC

DEC 21

WINTER SUN

MAR 20

JUN 21

Annual Temperature

1: 10

5

20

40


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.