Worksample new danye

Page 1

HENG GU | WORKSAMPLE WASHINGTON UNIVERSITY IN ST. LOUIS SAMFOX SCHOOL OF DESIGN& VISUAL ARTS



1

The Wa.L.L

2

Brewery Link

Existing floodwall, Landscape

Existing building, Trestle

3 4 5 6 7 8 9 10 11

Fabric Recycling Existing building, Trestle

Primarschule Transition, Education

Scenic Housing Courtyard, Housing

Dock Reborn Installation, Strueture

Courtyard Housing Material, Structure, Form

Mist Pavilion Material, Open space

Gravity Injection Material, Morphology

Building System Material, Structrue, Form

BIM in Practice Changing with Dimension

Project:

Historical infrastructure rebuild

Category: Academic, individual work Time:

September 2017

Project:

Historical building rebuild

Category: Academic, individual work Time:

February 2016

Project:

Industory area active

Category: Academic, individual work Time:

September 2016

Project:

Primary School design

Category: Academic, individual work Time:

February 2017

Project:

Housing design

Category: Academic, individual work Time:

September 2015

Project:

Dock rebuild design

Category: Academic, individual work Time:

August 2014

Project:

Courtyard design for elder people

Category: Academic, individual work Time:

February 2014

Project:

Pavilion design in the park

Category: Competition, team work Time:

Spetember 2013

Project:

Flexible material research

Category: Academic, team work Time:

October 2013

Project:

Develop the system of studio work

Category: Academic, team work Time:

Spetember 2016

Project:

Revit study and practice

Category: Academic, team work Time:

October 2017


1

The Wa.L.L Existing floodwall, Landscape

Project: Location: Category: Time:

Historical infrastructure rebuild Mississippi River, St louis, USA Academic, individual work September 2017

The Mississippi Rive gave St. Louis a great chance to develop in 19th century unpredictable river was constrained and flooding event become a big problem to the city. The flood wall was built in the 1960s to protect the city. The project is part of a large plan from my another course, in my big plan I will choose some vacant site along the wall to make many functional area to connect the city with the river not see the wall as the insulation. I extend the wall to create a space, shape the space for the traffic and connect the large parking area next to the site.

Site Plan

Axo


The main idea of the project is let people see the beauty of the water instead of the flood image in their head. On the top of the building people will have a good view to see the Arch and the river which can not be see because the wall blocked and in the building the light through the water can have a lot of effect in the space different functional area will have different light effect.

Ground Level Plan


2

Brewery Link Existing building, Trestle

Project: Location: Category: Time:

Historical building rebuild 927 Tyler Street, St louis, USA Academic, individual work February 2016

This is the old building renovation project. The site is located in the north part of St Louis half mile away from the Mississippi river. The site is near the exit of the highway and the trestle. The area is full of the vacant land and the brick five level building used to be the market and bar. The concept of the project is using the existing building as the rest stop for the people walking or biking on the trestle adding the brewery function to offer the food and drink. The building also can be the exit for the trestle.

City Map

Site Plan


Existing building

Vertical brewery

Make the links

Fourth Level Plan

Third Level Plan

Change shape

Second Level Plan

First Level Plan

Using the existing building and put the vertical brewery inside from the top to the bottom.Have four exits link the trestle and ground level and offer a tour to visit the brewery.


3

Fabric Recycling Industory, Housing

Project: Location: Category: Time:

Industory area active Dongdaemun area, Seoul, Sourth Korea Academic, individual work September 2016

The area do not have large factory any more, the workers without working place still live in the street. This project aim to combine the housing with the factory function to crate place for the original workers to use their skill. Base on the residential area will crate lot of the waste fabric, the factory function in this project will be the fabric recycle.

textile

large factory same kinds

microfactory different kinds

large quantity

small quantity

general production

special production

special drape

new material

dyeing

special color used material person design

fashion design weaving

cotton fibre clean spinning clothes disinfect

rive separate

Production Line

Site map

There are two way of recycle fabric, one is special way to used the old fabric to crate new products like bags toys and clothes with the design. The other way is traditional way to crate the new fabric. The special way run into new added boxes on the top of the old building and another is running in the three old building. Pink part is the link between the existing building and red parts are the new added boxes. Concept axo

Section


Riving machine Fifth Floor Plan

Spining machine Special design Studio

Entertainment Space

Fourth Floor Plan

Weaving machine

Special design Studio

Third Floor Plan

Stroe area for individual designer

Cleaning machine & Store

Second Floor Plan

First Floor Plan


4

Primarschule Transition, Education

Project: Location: Category: Time:

Primary School design 40 Thurgauerstrasse Street, Zurich, Switzerland Academic, individual work February 2017

The site is located in a dense urban situation within building of very different scales and functions. The area named Thurgauerstrasse is one of the largest undeveloped land in city of Zurich. It will play an important role in further. The new primary school require 400 children about 18 classes and the building will also several shared public functional area such as sport shall, a library, and a multipurpose room. So the concept is to separate the rooms for children and public, the areas for the public are located near the street and make the school as the connection between the housing and commercial area


There is a large staircase in the courtyard as the passage let people go from the street level to the sport filed level and the courtyard is also open to the public when school is over.


5

Scenic Housing Courtyard, Housing

Project: Location: Category: Time:

Housing design Puente del Rey, Madrid, Spain Academic, individual work September 2015

This is a housing project, the site located in Barcelona. The site is at the west part of the city get a quite view to see the backyard garden of the palace and the south part of the site is the orchard and north part used to be the hunting ground for the royal. The site has quite good view so the concept is to make every apartment get a good view without any block. Start at four boxes split and take the border of the boxes put it on the site and turn the shape then pull up the border put houses on the line.

Unit 1 Plan

Unit 2 Plan

Unit 3 Plan

Site Plan

Unit 4 Plan


Unit combine 1 Plan

Unit combine 3 Plan

The houses are basic in the U shape, they all get itself little garden and with the separate of each housing the little garden will not block by the garden one level above. It also get special type of the housing in cross shape for the large family it also can fit the U shape. Unit combine 2 Plan

Section

Section


6

Dock Reborn Installation, Strueture

Project: Location: Category: Time:

Dock rebuild design Canning Dock, Liverpool, Merseyside,UK Academic, individual work August 2014

The site near the river in the middle part of liverpool the project aim to change the old park to a park offering the people a place spend time and have fun. considering to keep the historical value to create the reproduction of the scene happened in the last century. The idealis to use the structure to reappear the secene that ship berth in the dock, using the line to show the edge of the section of the ship.

Short cut Section

Long cut Section

Concept

Site & City Map

Plan


Belt Stopper

Movable Pulley

Fixed Pulley

Variable Bracing Piece

Gallery Road

Knot Copnnection

The deisgn can be spread into five parts, two drag-lines, two upholders and one gallery road. Consider the strength produce by the middle upholder could be very strong. using pulley to connected because pulley can hold the stength . The main support are the steel part, as the timber part is used to protect the steel from transverse deformation.


7

Courtyard Housing Material, Strueture, Form

Project: Location: Category: Time:

Courtyard design for elder people Ducle Street, Liverpool, Merseyside,UK Academic, individual work February 2014

h

The site located at the southeast part of Liverpool city which is the residence area with many old tradition housings with the tradition material like brick and timber. The ideal is to keep the tradition elements like the front and back yard, lager front windows and the pitched roof. Also add new elements skylight on the roof to bring more light into the building. there are three kinds of apartment can be chose by the owner and put in the place they want. So the outside wall are planned to use concrete which can not be destroy and the apartment made of tomber and brick which can easily be taken down and replace by new one.

h

h

The ideal for the design is to keep the tradition elements like the front and back In yard, window and the thelarge past,front when the economy pitched roof. Also add performed new elements skylight on the roof well, the stock markets

The current market has kinds again to bring more light into fell. the building. There are three surprised investors, however, by surging in recent months despite

of apartment, they can be chose by the owner and put

Concept

into the place they want, in that way the outside wall are strong economic numbers. planned to use concrete which can not be destroy and

In fact the markets climbed above

Detached Housing

Existing Housing

Detached Housing

Existing Housing

Empty space

Block by one floor

Block by one room

In the past, when the economy performed well, the stock markets fell. The current market has again The theme isinvestors, about the 'Mass surprised

however, by surging in on and Void', I tried many way recent months despite strong economic numbers.

skylight like the same open area can have the different

In fact, markets effect withthe different interclimbed design above 2,650 during intra-day trading on Friday,

and it seems that skylight will

figure the problem afterout hitting the low that of 1,991 traditional in May.hose do not have enough light which will let elder Same open way

Study of the skylight

Symmetry open way

people fee lonely.

f

d

ll h

k


Elevation of whole project

The plan of the area can be change with the wish by the resident, the concrete wall can not be changed but the housing part which made of timber and brick are easy taken down and build new one. The outside may look always the same but the inside plan can be always changeable. Section of short side

Plan of whole project

There have been many explanations for the exceptional rise, but economic fundamentals are what count.

1. 115x55x250 mm Red brick 2. 50mm Rusty iron window fram 3.15mm Safety glass 4. 2mm Galvanized steel gutter 5. 300mm Concrete wall 6. 20mm Timber plank 7. 70x70mm Timber frame 8. 70mm Roof insulation 9. 70x130mm Timber frame EZISX Y

1

2

3

4

5

6

7

8

9

Structural detail / Material combination 24


8

Mist Pavilion Material, Open space

Project: Location: Category: Time:

Pavilion design in the park Falkner Square Gardens, Liverpool, Merseyside,UK Competition, team work (responsible for digital model and rendering) Spetember 2013

the site is the small park in Liverpool and the ideal is to make the pavilion like the fog float below the trees. We try many patterns that taken from the nature. the distance between each pattern will create different space like the space for one person sit, for sit and pass, small playground and large area for exhibition. Using the structure to hold the pleces which is cuted become the table for people have rest drinking or reading.

No one of could pass backdrop weakeni

Only for peopleof sit weakeni not for pass backdrop

For people of sit and pass backdrop weakeni

Small fieldof forweakeni play backdrop

Large area for play exhibition backdrop ofand weakeni


9

Gravity Injection Material, Morphology

Project: Location: Category: Time:

Flexible material research N/A Academic, team work October 2013

In this research we are trying to find out the gravity effect on the flexible material in many ways. This model was made by six main step the first we prepare the stick and other material we will use, second we vreate the frame and then we put the flexible material in the frame and chose some point link the material with sticks at last put plaster into the flexible material.

Prepare material

Make the frame

Put net around

Insert the stick

Put flexible material in the frame

Inject the plaster

We chose 13 points and three sticks made the material deformation, 4 points on the top and 9 on the stick. The 9 pionts were divide into three linked as a triangle.


10 Project: Location: Category: Time:

Building System Material, Strueture, Form

Develop the system of Studio work Beijing, China Academic, Team work September 2016


11 Project: Location: Category: Time:

BIM in Practice Changing with Dimension

Revit study and practice N/A Academic, team work October 2017


Name: University: Contact:

Heng Gu Washington University in St Louis heng.gu@wustl.edu heng.gu10@vip.163.com 314-315-2235


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.