[2004-2013 | Professional Works and Academic Works]
PORTFOLIO
OF HONGYI YU
Project 1
XITANG HOTEL Professional Practice in Chinese Academic of Science | 2008 Status: Competation Loction: Jiashan, Zhejiang, China Tutor: Mr. Yu Peng Role: Conceptual Design Schematic Design, Drawing
1.Maximize the use of bases
STEP 1
Determining the basic formation of overall the hotel, which follows with the "red line" of the site.
2.Semi-open central courtyard
STEP 2
Introducing the main traditional inhabitation space -water, into the center of the hotel.
3.Central courtyard enclosed
STEP 3
Setting the main traditional inhabitation vegertable space into the hotel.
4.Auxiliary enclosed courtyard
STEP 4
Setting other additional inhabitation spaces, forming the basic shape of the hotel.
1-Lobby 16-Commercial aisle 2-Aisle 17-Washroom 3-Water Courtyard 18-Garage entrance 4-Inhibation Space 5-Reception 6-Luggage storage room 7-Dining lobby 8-Dining room 9-Pantry 10-Fresh air machinery room 11-Guest room 12-Meeting 13-Kitchen 14-Commercial 15-Western restaurant
Project 2
'LADDER' Yellow River Geological Culture Museum Design Personal academic work | 2009 Graduate design Loction: Ji Xian, ShangXi, China Tutor: Prof. Bai Yin
Formation history of the Yellow River
320 million years to 300 million years ago, the Yellow River area planation surface developed below 1,000 meters above sea level.
240 million years ago, the disintegration of planation surface, altitude plateau rising about 2000 meters.
Site analysis Base is located in the foothills, elevation within the building there are significant differences by analysis of the base elevation, to start the overall planning and design.
160 million years ago, tectonic upheaval period, continue to rise above sea level
1
2
3
Ground height
1-2 elevation change
Ground height
2-3 elevation change
Ground height
1-3 elevation change
SITE
The formation of Yellow River due to geological changes...... Geological changes due to the Yellow River flow...... Culture nurtured by the Yellow River flow...... The formation of three ladder due to geological changes...... Yellow geological and cultural changes reflected in the three ladder...... Thus, the ladder is the mean idea of the geological culture museum
The Ladder--shape
U
1
2
The Ladder--transation
sing the site height to layout the three ladders. At the same time, determining the external and internal features to perform the museum in the building design. According to the different characteristics of each ladder and the transition between the characteristics of ladder, I create a show of the construction that people can feel inherent of each ladder. Finally, the introduction of the external shape of the imprint of the Yellow River runs through the building to reflect the particular site in the natural sense.
In the flowing process of the Yellow River, the three ladder of the transition point reflects the characteristics of the Yellow River. The design of the transition point should reflect the characteristics.
3 First-class ladder *Concept sketches The transition from the first ladder to the second ladder Main features: a high degree of variation
Second-class ladder
Third-class ladder
*Concept sketches The transition from the second ladder to third ladder Main features: the Yellow River width abruptly
[Internal flow lines]
A
clear line of flow is an important aspect of the museum design. In this project, I consider this problem from the early stages of planning that would make sure all of flows can seperate. At least, as is shown in the figure, the main flow line completely isolated.
Elevation of 6.5 m plan
Elevation of 3.5 m plan
Tour route Staff route Collection route Escalator Elevator Elevation of 0 m plan
Flow analysis
Project 3
YANYUN BUILDING Works in VK Consulting | 2009 Status: Under Construction Loction: Xingtai, HeBei, China Tutor: Mr. Wang Xin Cooperator: Li Peng Role: Conceptual Design Schematic Design, Drawing
STEP 1 Full use of the site
STEP 2 Concessions out of the square in front of the building.
STEP 3
Concessions out of the landscape behind the building.
STEP 4
Deal the space at the entrance to the garage
STEP 5
Re-integration of space and volume.
F
ret, which is an ver y important traditional element in everywhere. It means endless, with a lingering tradition of longevity auspicious far-reaching implication. In this project, I used a fret as the most fundamental element of the facade of Evolution.
Imitation roof brackets
Fret decoration
路Window frames
路traditional fret using
In the residential and commercial part this project of, fret is mainly used in decorative details, such as roof, window sill, decorative columns.
路Details of residential area
路China red
Window frame
I
n this semi-enclosed space for landscape design, I still use a fret as the main design element to create a strong cultural atmosphere and a full of fun space. Providing a leisure and chatting place for the office. Meanwhile, I consider the traditional Chinese feng shui theory into the design. Of course, the pleasant atmosphere of scale garden design has always been the core.
1-Aerial view of the south 2-View of the Aiming St. 3-View along the Tuanjie W St. 4-Aerial view of the east 5-Entrance perspective 6-Entrance perspective
1
1 Elevation
Wall detail drawing
2
1 4
3 5 6
Project 4
SHANGJINGGUOJI PLAZA Works in VK Consulting |2009-2010 Status: Competation Loction: Langfang, HeBei, China Tutor: Mr. Wang Xin Cooperator: Yun lei, Li Peng Role: Conceptual Design Schematic Design, Drawing
[Commercial space] 1.
Division of commercial and office areas.
Determine the main entrance.
5.
Commercial Entrance
2. pathway
3.
Division of the pathway, to determine the initial shape.
Determine the form of commercial distribution and transportation organizations.
4.
Determine the organization of commercial square.
6.
Auxiliary entrance and the main flow of the organization.
7.
Refinement Square and architectural form.
8.
Shape scrutiny.
Within Square
Square
The basic two tower
Gradient
Link the two tower
?How to make office integration. Body mass scrutiny
I
n the office building, in order to form an integrated whole, we first carried out on the building's Shape scrutiny, as the sculpture-like Shape sculpture, making it seamless. We then conducted a detail of its design, the texture as a theme, into the traditional Chinese elements, highlighting the building's signature. Formed body mass
Project 5
WANDU CITY Works in VK Consulting | 2010-2011 Status: Under Construction Loction: Hengshui, HeBei, China Scale: 120,000 sqm Cooperator: Yun Lei, Qu Xingnuo Role: Chief Designer
[Investigation] The basic idea: following with the customer needs
Customer
Market
Design
Source of potential customers
Macro environment
Project orientation
Customer segmentation
Value of the land
Product solutions
Customer needs
Competitive Analysis
Architectural design
=10 sample
I
n the real estate development, how to create economic benefits is an important prerequisite for the developer. Architectural design should meet customer and market needs. How to design a project to meet customer needs as much as possible? Before the design started, we carried out the entire city carpet-sample survey. We need to extract the design conditions.
Radius of 1 km, choosing the highend residential to access
[Overall planning]
I
n the overall planning, the project not only need to meet the economic interests of developers, but it also need to meet design specifications. Meanwhile, as an architect, it is the fundamental responsibility to meet various needs of users and the aesthtic perspective.
Planning process After dozens of discussions on the initial program planning to determine the direction, we then deepen the design to meet the sunshine and variety of design specifications, and finally to determine the final plan.
Step1. Direction exploring
Step2. Project determining
Sunshine analysis
[Unit design]
I
n order to meet the housing needs of different customers, our units in the project design with variety of products, including small size, big house, duplex units and large luxury apartment. At the same time, we need to meet the different units of different clients in-depth study of design, such as A type to meet the needs of the middle mainly three-bedroom in the economy to achieve, B type of duplex units to meet the young people interesting and varied mainly special.
a
b c
FLOOR PLAN | A type
路A type
section a
section b
section c
FLOOR PLAN | B type- communal plan
FLOOR PLAN | B type- private plan
路B type
Project 6
TAOYUAN RESIDENCE Works in Panda Studio | 2011 Status: Design Development Loction: Handan, Heibei, China Scale: 340,000 sqm Cooperator: Li Peng, Ruan Yuanbo Role: Chief Designer
[Site Analysis]
Yin g
bin
gS
SITE ua
5m
5m
50m
5m
5m
50m
2.5m
20m
o
Zh
2.5m
M
in
CAR
BUS PEOPLE
600 cars/hr 100 buses/hr
500 people/hr
Traffic analysis of Zhonghua St.
CAR
BUS PEOPLE
500 cars/hr 90 buses/hr
450 people/hr
Traffic analysis of Yingbing St.
CAR
BUS PEOPLE
200 cars/hr 60 buses/hr
200 people/hr
Traffic analysis of Mingshan St.
h ng
gs
ha
n
St
.
.
St
t.
[Facade design]
W
hen it comes to the facade of the program design, developers and we reached a consensus - to create a reflection of the atmosphere of the modern Chinese residential area. Therefore, in the design, we introduced a lot of detail to reflect the Chinese elements, such as brackets, Chinese texture, profile roof. In materials, mainly red brick with strong Chinese means to do the main material, supplemented by color contrast warm and comfortable stone image of high quality real estate.
Commercial effect
Plaza effect
Entrance of residential
Top of residential
Project 7
SPIRIT SYMBOL & MEDITATION SPACE IIT Studio work | Fall 2012 Merit School of Music Loction: Chicago, IL, USA Scale: 54,000 sqf Studio Prof: Andew Metter / David Brininstool
PARK
SITE
OLD MERIT SCHOOL OF MUSIC
Music Is Not About Architecture, It Is About People. What People Need Is What Architecture Should Be.....
School, What Is School? The word school derives from Greek "σχολή" originally meaning "leisure" and also "that in which leisure is employed" but later "a group to whom lectures were given".
When people stay with music, they......
RELAX
PERFORMER LISTENER
PEOPLE
SMILE PEACEFUL SERENE
EXTERIOR
BUILDING FOR MUSIC INTERIOR
+
INSPIRING
=
BUILDING FOR MUSIC SCHOOL
where has the special spirit exterior.... where is the inspiring place.... where has the meditation space....
COAT CHECK
TICKET
LOBBY
LIBRARY
DEAN
1 PRACTISE
AUDITORIUM
RESTROOM
CAFE
PUBLIC
RECEPTION
CLASSROOM
OFFICE
MAIL ROOM
2 PRACTISE
CONFERENCE
4 PRACTISE
PRIVATE
2" rigid insulation 4" black brick
WATER PROOF
AIR SPACE
water proof
ROOF (H=26')
2" RIGID INSULATION
ROOF (H=26')
water proof
4" BLACK BRICK
T.O.S.
T.O.S.
CEILING
concrete bearing wall
AIR SPACE
2" RIGID INSULATION
CORRIDOR
P.R
GLASS
4" BLACK BRICK
LEVEL 2(H=14')
2" air space
LEVEL 2(H=14') T.O.S.
T.O.S.
wood surface
wood surface
P.R
CORRIDOR
metal frame
WOOD PLATE RIGID INSULATION
LEVEL 1(H=2') T.O.S.
LEVEL 1(H=2') T.O.S.
FIRESAFING
frosted glass GROUND(H=0') T.O.S.
clear glass
C.R
C.R
concrete column
COLUMN
earth UNDERGROUND(H=-16') T.O.S.
UNDERGROUND(H=-16') T.O.S.
* SOLID WALL DETAIL
* GLASS WALL DETAIL
Project 8
SPIRIT SYMBOL & MEDITATION SPACE IIT Studio work | Spring 2013 Pod Hotel Loction: New York, NY, USA Scale: 150,000 sqf Studio Prof: Thomas Brock
170'
100' 120'
20' 45'
125'
PROGRAM: Guest Rooms Lobby Eating Business Center Fitness Administration Service
GUEST FLOW
OFFICE FLOW
Employee Facilities Receiving Mechanical Circulation Commercial Space
SERVICE FLOW
ZONE 1
ZONE 1
PUBLIC SPACE
PUBLIC SPACE
ZONE 2
PUBLIC SPACE
ZONE 2
PUBLIC SPACE
ZONE 2
PUBLIC SPACE
PUBLIC SPACE
ZONE 3
ZONE 3
PUBLIC SPACE
ZONE 3
PUBLIC SPACE
BASE
PUBLIC SPACE
BASE
*PUBLIC SPACE DISTRIBUTION
*SITE
ZONE 1
BASE
*SPECIAL GARDAN SPACE
*CIVIC SPACE
*SWIMMING POOL
*CANTILEVERED SPACE
*FITNESS
*BUSSNIESS CENTER
*MASSING
WATER PROOF
ROOF (H=n')
WATER PROOF
T.O.S.
ROOF (H=n') T.O.S.
OFFICE
HOETL ROOM
AIR SPACE
2" RIGID INSULATION
AIR SPACE
4" BLACK STONE
2" RIGID INSULATION
LEVEL n(H=n') T.O.S.
4" PRECAST LIMESTONE
LEVEL n(H=n') T.O.S.
RESTAURANT
*Detail of the garden
AIR SPACE
2" RIGID INSULATION
WOOD PLATE
4" BLACK STONE
LEVEL 2(H=14')
HOETL ROOM
T.O.S.
STORE
GLASS
LEVEL n(H=n') T.O.S.
GROUND(H=0') T.O.S.
AIR SPACE
2" RIGID INSULATION
HOETL ROOM
4" PRECAST LIMESTONE
MECHANICAL ROOM
COLUMN
WOOD PLATE
UNDERGROUND(H=-16') T.O.S.
*Detail of the base
LEVEL 2(H=14') T.O.S.
*Detail of the hotel
*DETAIL