Shatila Vocational Training Centre

Page 1

PROPOSITIONS CHANGING SHATILA’S FATE?


REACTIONARY SHORT TERM PROPOSTITIONS

WIRELESS The paths of Shatila and other refugee camp are criss-crossed by a network of wires and water pipes, a dangerous combination. A few deaths have

GREEN SPACE Due to the high density and further demand for housing there are no green spaces in the camps

addition the low hanging wires interfere with phone signals inhibiting com munication within the camp boundary.

SHORT/MID TERM INTERVENTION

MID/LONG TERM INTERVENTION Bringing in a team to safely reinstall the wiring would drastically change the day to day lives of the inhabitants of the camps.

in addition to the possibility of food growing. Many rooves already have exterior access. If these are provided in containers they can be moved if a building is being upgraded


COLOUR ME CAMP The majority of the camps are not painted, exposed cinder blocks and concrete are predominant. However the few parts that are painted are noticably more looked after, a sentiment that was echoed by residents asked SHORT TERM INTERVENTION This aesthetic intervention works with the ‘broken window theory’. It is also very simple implementation project. Making camps more permanent by improving building structures for example can cause political issues. However this would only improve the experience


ALTERNATIVES TO CAMPS

ABANDONED BEIRUT Many buildings in Beirut and throughout Lebanon have been abandoned in an incomplete state. The concrete frameworks stand but they are useless spaces. PROPOSITION These structures could potentially be appropriated for housing refugees. The scattered nature of them would avoid the ‘slum’ that camps seem to inevitably become in urban environments. This would create mixed neighbourhoods similar to the mixed tenure properties being built in London today. The ‘Custom Build’ theories can also be applied as just the framework exists, the refugees can customise the space to suit their needs. building and not an expansive section of city is deserted, in addition to green sites not being used.


ONE HOUSEHOLD UNIT

D IS TR I

BU TIO

N

FU

O

O

HI

N S

BU TIO

LD RE

D IS TR I

C

ET

N

C

RE

N

AT IO

E

TIO

SP A C

RE

M M UN ITY

TIV

ITY

LL EC

N

O

N N EC

M A RK

C

C

C

AT IO

SE

ED UC

RE

N


SHATILA SITE SELECTION FACTORS

EXISTING UNOFFICIAL DUMPING GROUND SEMI COLLAPSED BUILDING

EXISTING PUBLIC MEETING PLACE

EXISTING PRIMARY CONNECTIONS

EXISTING WORK AND COMMERCE SPACES

SHATILA PLAN SCALE 1:1000

SHATILA CAMP SCALE 1:2000


ISSUES FACED BY SHATILA RESIDENTS

ISSUES FACED BY REFUGEES

UNEMPLOMENT

BUILDING FOR A FUTURE WITHOUT BUILDING PERMANENCE

LACK OF OPPORTUNITIES

PLANNING FOR A LIFE IN-SITU OR WITH RIGHT TO RETURN

LEBANESE GOVERNMENTAL RESTRICTIONS



SHATILA VOCATIONAL SCHOOL I PROPOSE AN

ADULT SCHOOL FOR VOCATIONAL TRAINING. THIS

DECISION WAS MADE TAKING IN TO ACCOUNT THE MAIN FACTORS THAT RESTRICT THE IMPROVEMENT OF QUALITY LACK OF OPPORTUNITIES IN INHABITANTS HAVE

OF LIFE FOR RESIDENTS OF SHATILA.

EMPLOYMENT AND EDUCATION,

MEAN

NO WAY TO ACTIVELY PROGRESS IN THEIR DAILY LIVES. THIS

PROGRAMME PROVIDES THEM WITH THE

GAINFUL EMPLOYMENT

TOOLS AND SKILLS TO NOT ONLY FIND

BUT ALSO MAKE DRASTIC CHANGES TO THEIR

EXISTING LIVING CONDITIONS, HENCE INCREASING

MORALE

EXISTING SUCCESSFUL VOCATIONAL PROGRAMMES TEACHING SECRETARIAL SKILLS TO WOMEN SETS A PRECEDENT FOR THE SYSTEM. IT ENABLES

THEMSELVES AND FIND ‘RELIEF FROM RELIEF’.

THEM TO HELP


SHATILA PROPOSITION PLACEMENT

PROPOSED SITE

SHATILA PLAN SCALE 1:1000

SHATILA CAMP SCALE 1:2000


VOCATIONAL TRAINING SCHOOL & BUSINESS INCUBATOR CARPENTRY MECHANICS PLUMBING ELECTRICS BUSINESS GUIDANCE IN COLLABORATION WITH LEBANESE GOVERNMENT BUSINESS LAUNCH PLATFORM

ESSENTIAL RULES FOR DESIGN OPEN GROUND FLOOR / STRONG STREET CONNECTION SUBSTANTIAL SHADED EXTERIOR AT BASE MATERIALITY CONNECTION WITH CAMP (CONCRETE & CINDER BLOCK) VARIENT TO EXISTING STURUCTURES CONNECTION TO BEIRUT (AVOID ALIENATION OF LOCAL POPULATION)


INSPIRATION FROM SHATILA



INSPIRATION FROM SHATILA



BEIRUT CONNECTIVITY ISSUES

2.

2K

M

BORL EL BARAJNEH CAMP

APPROX

2KM

X

VOCATIONAL SCHOOL

O

SHATILA CAMP

PR

4KM

AP

OX

R APP

SCALE 1:10,000


MAR ELIAS CAMP

INDENTIFIED DANGER POINTS

ROUTES CURRENTLY WALKED

EXISTING GREEN SPACE

N SCALE 1:10,000


CONNECTIVITY IMPROVEMENT MASTERPLAN

INDENTIFIED DANGER POINTS

ROUTES CURRENTLY WALKED

IMPROVED EXISTING GREEN SPACE

FOOTBRIDGE/IMPROVED PASSAGE SUGGESTED IMPROVED SAFE ROUTE

BORJ EL BARAJNEH CAMP

APPROX

2KM


MAR ELIAS CAMP

X

O PR

M

2K

2.

AP

KM

X4

O PPR

A

SHATILA CAMP VOCATIONAL SCHOOL

SCALE 1:7500


EXAMPLE OF POTENTIAL IMPROVEMENTS MAR ELIAS CAMP

GREEN BARRIER TO MOTORWAY

MAR ELIAS CAMP

KM

X

O

R PP

2 2.

A

PREVIOUS


SLY USED UNSAFE ROUTE

WAYFINDING MARKERS

IMPROVED FOOT PATHS

IMPROVED GREEN SPACE

MOTORWAY OVERPASS IN PLACE AT BUSY JUNCTIONS


SHATILA SATELLITE APPROPRIATED SPACE In order to integrate with the camp, a series of existing empty spaces has been appropriated in order to house test beds and launch pads


EXISTING ASSOCIATED WORKSHOPS

SCALE 1:1000


PHASED CONSTRUCTION STRATEGY

Mechanics Business Incubator and Launch pad Carpentry Administration & Civic Space Plumbing Electrics


Shatila Vocational School Phased constuction plan Using appropriated existing spaces the school has a test bed for each vocation prior to constructing purpose built workshops. This ensures an integrated development of the institution and a soft launch for any unseen outcomes that are associated with ‘top down’ interventions.

Phase 0

-Removal of illegal dumping site and remnants of collapsed building -Appropriation of two empty spaces for carpentry workshops -Appropriation of one empty space for administration and civic centre. -Collaboration with existing mechanics for mechanical training


PHASE 1

Exterior public platform

Carpentry workshop transfered to site

Mechanics workshop transfered to site

Mechanics Business Incubator and Launch pad Carpentry Administration & Civic Space Plumbing Electrics SCALE - 1:1000


SCALE - 1:200


PHASE 2

Enclosed public space

Primary public space transfered to site

Business Incubator test bed

Mechanics trainees transfered to business launchpad

Plumbing test bed

Mechanics Business Incubator and Launch pad Carpentry Mechanics business launchpad

Administration & Civic Space Plumbing Electrics SCALE - 1:1000


SCALE - 1:200


PHASE 3

Exterior public platform

Business Incubator transfered to site

Carpentry trainees transfered to business launchpad Electrics test bed

Plumbing test bed

Mechanics Business Incubator and Launch pad Carpentry Mechanics business launchpad

Administration & Civic Space Plumbing Electrics SCALE - 1:1000


SCALE - 1:200


PHASE 4

Plumbing workshop transfered to site

Electrics test bed

Carpentry business launchpad

Mechanics Business Incubator and Launch pad Carpentry Mechanics business launchpad

Administration & Civic Space Plumbing Electrics SCALE - 1:1000


SCALE - 1:200


PHASE 5

Electircs workshop transfered to site

Electrics business launchpad

Carpentry business launchpad

Plumbing business launchpad

Mechanics Business Incubator and Launch pad Carpentry Mechanics business launchpad

Administration & Civic Space Plumbing Electrics SCALE - 1:1000


SCALE - 1:200


PHASE 5- ELECTRICS WORKSHOP

PHASE 4- PLUMBING WORKSHOP

PHASE 3- BUSINESS INCUBATOR

THE BUILDING WHILST

THIS

BUILDING

HAS

DESIGNED TO

A POINT, IT IS IN THE

KNOWLEDGE

THAT

IT

WILL

SUBJECT TO CHANGE PHASE 2- INTERIOR PUBLIC SPACE

BEEN

THE

COURSE

OF

THE

BE

OVER

PHASED

CONSTRUCTION PROCESS. CONSTANTLY

INFORMED BY SURROUNDINGS AND IMPORTANTLY IT’S USERS PHASE 1 - CARPENTRY AND MECHANICS WORKSHOP

IT’S MOST


BASEMENT LEVEL PLAN

CARPENTRY WORKSHOP

SHATILA VOCATIONAL SCHOOL - SCALE 1:500


GROUND FLOOR PLAN

WC’S

PUBLIC SPACE

MECHANICS WORKSHOP

SHATILA VOCATIONAL SCHOOL - SCALE 1:500


FIRST FLOOR PLAN

PLUMBING WORKSHOP BUSINESS INCUBATOR WC’S

SHATILA VOCATIONAL SCHOOL - SCALE 1:500


SECOND FLOOR PLAN

ELECTRICS WORKSHOP

WC’S

SHATILA VOCATIONAL SCHOOL - SCALE 1:500


ROOF PLAN

PUBLIC ROOF

SHATILA VOCATIONAL SCHOOL - SCALE 1:500


FRONT (SOUTH) ELEVATION


SCALE 1:100


BACK (NORTH) ELEVATION


SCALE 1:100


SECTIONS

A

B


C

D

D C B A

SCALE 1:200


PERSPECTIVE SECTION



PERSPECTIVE SECTION



PERSPECTIVE REPRESENTATION

YS

RE

L

P LTI

ENTR

OO

ESS T

ANC

E TO

PUB

C R AC

RS

CCESS TO

OTHER FLO ORS

PAC E

P OR

I

TER

EX

RIO

EXTE

LIC S

LIC

UB

LOO

F THER

U NM

SO

EA

AR

TO ES

EX

EA

ETING AR

E ATING/M

UBLIC SE TERIOR P

EXTERIOR A

SHATILA BOUNDARY

Y

O AT

TIO

EC

N ON

HC

TH

R

G OU

N-

IL AT SH

CIT

VIEW INTO C

ARPENTRY W

ORKSHOP

NECTION

H CON THROUG

- SHATILA

TO CITY

STREET

ACCE

SSIBLE

MECH

ANICS

WORK

SHOPS


EXTE

RIOR

R RIO

BLI

PU

SO

EA

R CA

NM

I ULT

PLE

PUB

LIC

ARE

AS O

NM

S REY

ULTI

PLE

STO

STO

REY

S

E

EXT

RIOR

EXTE

ACCESS

IBLE MEC

HANICS

ESS ACC

S

OOR

ER FL

TH TO O

INTERIOR

PUBLIC SP ACE

WORKSH

OPS VIEW IN

TO CAR

THR

OU

THRO

N

CTIO

NNE

CO UGH

TILA - SHA

ITY

TO C

EXTERIOR PUBLIC COURTYARD

GH

CO

NN

EC

TIO

N-

SHA TILA

TO

CIT

Y

PENTRY

WORKS

HOP


PERSPECTIVE REPRESENTATION

DE

SHA

ELECTRICIANS WORKSHOP SS

INE

ORS

S BU

FLO

RD

RIOR EXTE

ROOF PUBLIC MEETING AREA

ACC

ESS

TO O

THER

URTYA

TO CO

VIEW IN

R

ATO

B CU

IN

P

PLUMBING WORKSHO

EXTERIOR ACCESS TO OTHER FLOORS

SUN

VIEW INTO COURTYA

RD

EXTER

IOR P

UBLIC

AREA

S ON

MULT

IPLE S

TORE

YS


CONNE

YS WA

CTION

ALK DW

DE

SHA

RS LL FLOO

GH A THROU

VIEW

INTO

COU

A

TYAR

D

LE

SSIB

E CC

S

NIC

HA

C ME

S

OP

KSH

R WO

ACCESSIBLE CARPENTR Y WORKSHOPS

VISUAL

EXTERIO

R ACCE

SS TO O

THER FLO

ORS

ON FROM CONNECTI

STREET TO

P

WORKSHO


VOCATIONAL SCHOOL CIRCULATION


ROOF ACCESS STAIRCASE

SECONDA EXTERNAL STAIRCASE

FIRST FLOOR PERIMETER WALKWAY

PRIMARY EXTERANAL STAIRCASE

THROUGH CONNECTION PATHWAY

ELEVATOR SERVING ALL FLOORS

ACCESS TO CARPENTRY WORKSHOP


Ic ho an m ak tra me e ini ng safe the du wirin e g to out ele side ctr m ici y an

Ic my an i mp tra ini build rove ng ing th e du wa te e to r sup plu ply mb to ers

I a sc m h h be ool app i n inc g as m ier co om ab le y pa min e to ren g h cre ts a om e at r e e h fro a the p m ir pier ow n

I Le am ev ban no ery ese w da y i as frien nc I d las wo s w se s rk w ith ith mo the re m

Ia he m a lau re b ble ch ec to pa aus run ds e i t w my b . as u sta sine rte ss f r d in om the

My inc hu ce ome sba n rtif ied as d n by h ow the e h sc is t as a ho ra ine sta ol d b an le d


Ia fra m ab me le tha to m nk en d st o c my arp ow en n w try i tra ndo ini w ng

Bu im ilding pe prov rip ed the erh al the voc roa a ds qu tiona ali ty l s c of hoo the l

We me no et w co ha mf ve ort a ab pu ly bli c

sp

ac

e

to

It pe is n op ice le wo to rk, be it f ee able ls l ike to pro wa gre tch ss

My to chi l vo pla dren ca y no tio na on w ha l sc v ho the e a ol roo safe sp f of ace the

I fe to el m ha the ore the ve w refu com re ork ge for ed e c tab wi am le li th v p tho be ing se ca nex tha use t t l ive I


CAPABILITY FOR REDUCTION OF PREJUDICE OVER TIME INTEGRATION OF LEBANESE AND PALESTINIAN POPULATIONS WITHIN THE SCHOOL

PALESTINIAN POPULATION

LEBANESE POPULATION

FORCED PROXIMITY CAUSES TENSIONS

AVAILABLILITY OF SHARED CIVIC SPACE POSSIBILITY FOR COMMUNICATION AND INTEGRATION


PREJUDICE OVERCOME THROUGH PROLONGED JOINT WORKING AND ACTIVITIES


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.