Selected Works Vol. 2
2021 - 2023
Het Shah
Curriculum Vitae
As a recent graduate in architecture, I bring a vibrant and enthusiastic energy to the field. With a genuine passion for learning and personal growth, I am eager to contribute my creative ideas and knowledge to realworld projects. I have a solid foundation in architectural design principles and a strong desire to acquire new skills and techniques. Attention to detail is one of my strengths, and I take pride in delivering high-quality work. I am excited about the opportunity to collaborate with experienced professionals and contribute to meaningful projects in a friendly and supportive environment.
Het Shah
Architect 21/01/2000 Age: 23 Anand, Gujarat, India (+91) 88669 66303 hetshah2121@gmail.com
Professional Experience Studio Lotus, Delhi (2023) Architect Studio Lotus, Delhi (2021) Architectural Intern
Conventions ANC (2023) Phagwara, Punjab ANC (2022) Bengaluru, Karnataka Modern Heritage - Frame Conclave Panjim, Goa
Documentation Chandigarh, Punjab (2022) Pune, Maharashtra (2022) Palakkad, Kerala (2021) Mandu, Madhya Pradesh (2019)
Co-Curricular NASA - Writing Architecture Trophy (2022) Individual Trophy NASA - CP Kukreja Trophy (2022) Trophy Lead - Graphics, Renders & Design NASA - G-Sen Trophy (2021) Trophy Lead - Graphics, Design NASA - ANDC Trophy (2020) Graphics, Design Environmental Day Competition - A.P.I.E.D. (2019) Special Mention
Education Bachelor’s in Architecture (2023) D.C Patel School of Architecture, APIED, Vallabh Vidhyanagar, Gujarat GSEB - HSC (2018) Charotar English Medium School, Anand, Gujarat GSEB - SSC (2016) Pintos’ High School, Anand, Gujarat
Language Proficiencies English, Hindi, Gujarati
Software Skills AutoCAD SketchUp Rhino3D Lumion V-Ray Enscape Photoshop Illustrator InDesign
Advanced Advanced Beginner Advanced Intermediate Intermediate Advanced Intermediate Intermediate
Curricular Achievements Year 4 (#2) Studio VIII - Housing Studio (#1) Studio VII - Professional Practice (#2) Studio III - Material Studio (#3)
Het Shah - Selected Works 3
Index Villas in the Sky Ahmedabad, Gujarat Housing Studio (2022) The Tidal Jewel of the East Coast Visakhapatanam, Andhra Pradesh CP Kukreja Trophy - NASA (2022) MAX Estates Experience Center Gurugram, Haryana Studio Lotus (2023) Sunstar NAB Noida, Uttar Pradesh Studio Lotus (2021) Selected Extras Images from other projects
Villas in the Sky Ahmendabad, Gujarat Housing Studio (2021)
TITLE
Het Shah - Selected Works 5
Info Place: Year: Type:
Riverfront, Ahmedabad, Gujarat 2021 High End Housing
The site is situated in the Riverfront district along the banks of the Sabarmati River. The objective was to create an upscale residential development featuring three types of units: 4BHKs, 3BHKs, and Studio Apartments. Given the context of a youthful population and its central city location, the objective was well-suited. Before beginning the design process, a comprehensive site analysis was conducted. This analysis was essential in setting the stage for the subsequent design development. These revelations in particular brought to light a discernible tendency in urban situations that is developing: In spite of the expanding urbanisation, it became increasingly clear that there is a strong desire to create living spaces that provide relief and a true contact with nature. By striving to eradicate the sense of living in ordinary apartments in favour of a setting that profoundly suggests living on the ground floor, in quiet proximity to nature, this design aimed to reset the experience of life.
6 Villas in the Sky 16 16
88 44 00
Roof Plan
Het Shah - Selected Works 7
Carving out space at the center for a Community green area.
Breaking the mass for more perforation and mutual shading.
Sculpting the towers for more exposure to the view.
Breaking the top portions to have a staggered disintegrating form.
Massing Evolution
Initial Sketches
The concept for the project involved incorporating a densely landscaped common green area at the center, with staggered masses. Vehicular access was efficiently integrated beneath the structure. The building comprises three towers, each providing panoramic views of the river and the city, while ensuring ample privacy for residents. The design also explored various unit types to introduce diversity across the building and enhance the overall massing strategy. Mutual shading is observed due to the form of the structure which would impact on the overall efficiency & thermal comfort of the building.
Conceptual Design
Ground Floor Plan
Typical Basement Floor Plan
8 Villas in the Sky 16 16
88 44 00
Tower C
Tower B
Tower A
Typical Floor Plan
Het Shah - Selected Works 9
4BHK Flat 3BHK Duplex Circulation Staircase Lift Core Gathering Space
Floor Plate Alternatives
3BHK Duplex Cluster Layout
4BHK Flat Cluster Layout
Exploded Cluster Stacking
Cluster Tower A
10 Villas in the Sky Podium level Community Forest Amenities Vehicular Circulation Peripheral Access Tower A
Parking Gathering Area Circulation Lift Core
Lvl +30
Staircase
Residences
Tower B
Lvl +02
Tower C
4BHK Duplex
3BHK Duplex
4BHK Flat
3BHK Flat
Studio
Schematic Isometric
Het Shah - Selected Works 11
3BHK Flat 4BHK Duplex Circulation Staircase Lift Core Gathering Space
4BHK Duplex Cluster Layout
Floor Plate Alternatives
3BHK Flat Cluster Layout
Exploded Cluster Stacking
Cluster Tower B
12 Villas in the Sky
4BHK Flat
3BHK Flat
4BHK Duplex
0
2
4
8
Het Shah - Selected Works 13
Studio Apartment
3BHK Duplex
Unit Plans
14 Villas in the Sky
View from the Community forest
Isometric View
Het Shah - Selected Works 15
Studio Apartment Circulation Staircase Lift Core Gathering Space
Floor Plate Alternatives
Exploded Cluster Isometric
Cluster Tower C
The Tidal Jewel of the East Coast Visakhapatanam, Andhra Pradesh CP Kukreja Trophy (2022)
Het Shah - Selected Works 17 N
ECKED BY : SR REV. NO.
100 at A1
Info Place: Year: Type: Team:
Visakhapatanam Harbor
Visakhapatanam, Andra Pradesh 2022 Installation - Urban Void 3 People
Visakhapatnam is one of India’s coastal cities. Also known as Vizag, is a glorious heritage paradise. It was transformed from a fishing village to a bustling city with streets & ports. The city is an ideal blend of historic & modern developments. The Installation is located at the junction of the axes connecting the municipal office & the town hall, making it conveniently accessible to the user groups. A water tower is an elevated structure that supports a water tank and exists as an underutilized Urban Void. By re-purposing the water tank as a location for economic & socio-cultural activities, it could be transformed into a meaningful space.
THE SITE
EASTERN NAVAL HQ
HAWA MAHAL
MUNICIPAL OFFICE
TOWN HALL
EASTERN NAVAL HQ RK BEACH FISHING COMMUNITY
18 The Tidal Jewel of the East Coast
The design conceptualizes the tank into two halves. The grid of columns and beams reflects town’s journey, while the tank represents the Indian navy, the “Pride of India.” Several features of the town are exhibited in different planes, progressively escorting the user to the top, making a journey through Vizag’s tremendous growth. These planes represent Visakhapatanam town and the navy’s achievement and victories. Elements like nets, slides, walls, bridges, ramps and vertical circulation connecting the planes, form a network that invites the user group to climb, slide, crawl, and scramble through the maze tower. These planes are built by reusing the shipping cargo containers found from the location, hence reducing the waste at ports.
As navy works cohesively ‘It has it eye on sky Hands on earth Foot under the water’ To honour the navy’s versatility and independence, solid circular rings have been built inside the glass cube on the tank to depict the essence of water. The spiral staircase encasing the water tank takes the user around and provides panoramic views. The glass platform is the last part of the journey symbolizing the ocean’s surface water making the user feel like floating above the space. The installation acts as an interactive and engaging space for the youth of the town.
Het Shah - Selected Works 19
20 TITLE
Max Estates Experience Center Gurugram, Haryana Studio Lotus (2023)
Het Shah - Selected Works 21
Info Place: Year: Type: Role:
Gurugram, Haryana 2023 Sales Lounge Concept Design & Resolution
The directive was clear: the client sought to establish an Experience Center for a Housing Scheme proposed on the land. Given the project’s temporary nature, Dry Wall Construction was suggested for the Center. Positioned discreetly in a corner plot on the site, access is through a lengthy boulevard, flanked by an inviting landscape and events lawn in the front yard. The underlying concept centers on crafting the customer’s journey experience, with the development of a welcoming Interior Mood board being a key aspect of the process. The ground floor encompasses various lounges, while the first floor houses sample apartments and the employee BOH area.
22 Max Estates Experience Center
Het Shah - Selected Works 23 NOTES: 1. All dimensions are in millimeters. 2. All levels are in meters. 3. This drawing is a copyright and property of the architect, is not to be produced, copied, handed over to third party or used for any other purpose other than for which it is intended. 4. This drawing is to be read and not to be scaled. 5. All dimensions shall be verified onsite prior to start of work any discrepancy shall be brought to the notice of the Architect. 6. The Contractor / Project Manager must check all dimensions and details and be responsible for the same. Any discrepancy shall be notice of the Architect. 7. This drawing shall be read in conjunction with all relevant architectural, structural and services drawings. Any discrepancy noticed shall be brought to the attention of the consultants and resolved as soon as possible, but always prior to procurement / execution of works. 8. All the services ducts / cut-outs are to be covered after services provisions. 9. Drawing approval is for the conformity with outline design intent and does not relieve the contractor/ subcontractor from full responsibility for the accuracy, integration and fitness for purpose of design. 10. Construction Manager/Project Manager to revert back within 7 working days of receiving the drawings on coordination and buildability issues. If otherwise it would be deemed that they have understood and accepted the drawing/ design and own full responsibility for the works carried out accordingly.
IDE GREEN BELT B
AIRLOCK
B
1
CP LOUNGE
CP LOUNGE
DROP-OFF
5
6
5840
CP LOUNGE
C'
COVERED PATHWAY
7
A
3600
W2
POWDER TOILET
POWDER W2 TOILET
W2
W1
W1
2350
7000
CP LOUNGE
1600
CP LOUNGE
RECEPTION
CP LOUNGE
W4
POWDER TOILET
POWDER TOILET
W1
POWDER TOILET
E
POWDER TOILET
WAITING AREA
WAITING AREA
JANITOR CLOSET
SITE MODEL
SALES LOUNGE (MEL)
JANITOR CLOSET
F
W2
SALES SPACE LOUNGE(ASL) (MEL)
SALES LOUNGE (ASL)
GREEN COURT
SALES LOUNGE (MEL)
A'
UP
SALES LOUNGE (MEL)
A'
F-301, First Floor, Ch. Prem Singh House, 6050 Lado Sarai, New Delhi - 110030 PH. NO : 011 - 4057 0808 www.studiolotus.in SALES LOUNGE (MEL)
UP
G
W2
MEP CONSULTANT :
UP
H
UP
SALES LOUNGE (MEL)
EVENTS LOUNGE
DW2
W2
STRUCTURAL CONSULTANT :
I
4750
PORCH
SALES LOUNGE (MEL)
V2
TODDLER'S ROOM
MAINTENANCE STAFF STAIRCASE
STORE ROOM
EVENTS LOUNGE
MALE WASHROOM
FEMALE WASHROOM
TODDLER'S ROOM
W3
MAINTENANCE STAFF STAIRCASE GREEN COURT
W2 STORE ROOM
1880
1.8M SETBACK
J
COFFEE BAR
D'
KITCHEN
B'
K
V1
LANDSCAPE CONSULTANT :
D' KITCHEN
GREEN COURT
1800
D1
D1
FEMALE WASHROOM
J
BOH CONSULTANT
3928
MALE WASHROOM
I
COFFEE BAR
3928
W3
3200
D
NCE STAFF
BACK
F
LOUNGE (MEL)
H
PORCH
W2
SALES W2 PRINCIPAL DESIGN CONSULTANT :
4750
SALES LOUNGE (ASL)
W2
E
CLIENT : MAX ESTATES LTD.
G
SALES LOUNGE (ASL)
D
W4
MODEL SPACE (MEL)
4750
MODEL
GREEN COURT
POWDER TOILET
SITE : SECTOR 36A, GURGAON
LIFT CORE
MODEL SPACE (MEL)
A
C
PROJECT : 36A - EXPERIENCE CENTER
SALES LOUNGE (ASL)
W2
W4
W1
POWDER TOILET
Date
B
POWDER TOILET
LIFT CORE
MODEL SPACE (ASL)
C'
W4
4750
SALES LOUNGE (ASL)
ACE
CP LOUNGE
W1
LIFT CORE
W4
SALES LOUNGE (ASL)
CP LOUNGE
A
2350
JANITOR CLOSET
6250
W4
LIFT CORE
W2
D
W1
SITE MODEL
Purpose
W2
C CP LOUNGE
C
JANITOR CLOSET
Revision
W2
WAITING AREA
WAITING AREA
POWDER TOILET
6415
B AIRLOCK
POWDER TOILET
4650
VISUAL COURT
DW1
POWDER TOILET
8
5150
4300
RECEPTION
4 3600
2350
CP LOUNGE
3 5150
1600
CP LOUNGE
2 4650
2350
7000 CP LOUNGE
8 4650
4750
VISUAL COURT
7000
7 5150
4750
7000
6 3600
FEATURE WALL
COVERED PATHWAY
5 5840
4750
4 3600
4750
3 5150
3200
2 4650
4300
1
K
DRAWING TITLE :
N
GROUND FLOOR PLAN
B'
0
2.5
5
10
DRAWN BY :
20
SA
CHECKED BY : SR
(MEL)
COFFEE BAR UP
D'
UP
KITCHEN
24 Max Estates Experience Center GREEN COURT
DRAWING TITLE :
K SALES LOUNGE (MEL)
B' PORCH
H
W2
EVENTS LOUNGE
DW2
V2
TODDLER'S ROOM STORE ROOM
GROUND FLOOR PLAN
N
DRAWN BY :
SA
DRAWING NO.
EC-A-102
MAINTENANCE STAFF DATE: STAIRCASE
21/10/2023
I
D
W3
MALE WASHROOM
FEMALE WASHROOM
W3
D1 KITCHEN
CHECKED BY : SR
8
REV. NO.
BOH
SCALE: 1:100 at A1
J COFFEE BAR
STRU
4750
FEMALE WASHROOM
1800
4
LAND
D'
2
W2 GREEN COURT D1
1.8M SETBACK
1880
BACK
(ASL)
MALE WASHROOM
3200
2750
3928
1200
3928
2400 2700
V1
K
0
DRA
GRO
B'
DRA
DRAW
DAT
Ground Floor Plan
(MEL)
COFFEE BAR
D'
UP
KITCHEN
GREEN COURT
DRAWING TITLE :
K SALES LOUNGE (MEL)
B' PORCH
H Het Shah - Selected Works 25
W2
EVENTS LOUNGE
DW2
V2
TODDLER'S ROOM STORE ROOM
GROUND FLOOR PLAN
N
DRAWN BY :
SA
DRAWING NO.
EC-A-102
MAINTENANCE STAFF DATE: STAIRCASE
21/10/2023
I
D
W3
MALE WASHROOM
FEMALE WASHROOM
W3
D1 KITCHEN
CHECKED BY : SR
8
REV. NO.
BOH
SCALE: 1:100 at A1
J COFFEE BAR
STRU
4750
UP
3200
FEMALE WASHROOM
4
LAND
D' 3928
BACK
(ASL)
MALE WASHROOM
3928
2750
2
W2 GREEN COURT D1
1.8M SETBACK
1880
1200
1800
2400 2700
V1
K
0
DRA
GRO
B'
DRA
DRAW
DAT
First Floor Plan
26 Max Estates Experience Center
Section through Courtyard
Section through Events Lounge & Sample Apartment
Volume Design
Het Shah - Selected Works 27
Model Display
Events Lounge
28 Max Estates Experience Center
Interior Mood board
Het Shah - Selected Works 29
30 Max Estates Experience Center
Interior Mood board
Het Shah - Selected Works 31
Sunstar - NAB Noida, Uttar Pradesh Studio Lotus (2021)
Het Shah - Selected Works 33
Info Place: Year: Type: Role:
Noida, Uttar Pradesh 2021 Office Building Drafing Construction Drawings & Solving Details
Sunstar Industrial Site encompasses an Adaptive Reuse project of a former Industrial Plant, with NAB (New Administration Building) being a part of its master-plan. The site, dedicated to industrial activities, including the production of electric vehicles, showcases a steel structure utilizing alternative construction technology. Key considerations during the design process involved the use of I-Sections for columns and Castellated Beams for beams. For the exterior cladding, Corten Steel Sheets were chosen, providing a rustic and industrial aesthetic. The interiors feature exploration in glazing and dry wall partitions, contributing to the overall industrial character of the Sunstar Industrial Site.
5
D3A
1700
2400+FL
-
2
-
6
W6
5440
AS/SITE
1400
-
1
6
D4
850
2400
-
4
4
7
W7
8380
AS/SITE
1400
-
1
8
W8
8380
AS/SITE
1400
-
34 Sunstar - NAB
DW1
8380
AS/DET
AS/DET
1
-
9
W9
5440
AS/SITE
1400
-
1
2
DW2
8380
AS/DET
AS/DET
1
-
10
W10
1425
2400
0
-
1
3
DW3
5435
AS/DET
AS/DET
1
-
PARTITION SCHEDULE
4
DW4
8380
AS/DET
AS/DET
1
-
1
P1
3015
0
4
-
5
DW5
6425
AS/DET
AS/DET
-
1
2
P1A
2050
1500
0
1
-
3
P2
6650
AS/DET
AS/DET
1
-
VENTILATOR SCHEDULE
E
2875
675
1120
1220
1120
1220
1170
1220
2
4
P2A
6650
AS/DET
AS/DET
1
-
1
2
5
P3
2045
AS/DET
AS/DET
-
1
1400
-
1
6
P4
4980
AS/DET
AS/DET
-
2
4
V4
3565
AS/SITE
1400
-
1
7
P4A
6200
-
1
5
V5
8250
AS/SITE
1400
-
2
8
P5
600
AS/DET
AS/DET
-
2
2000 V6
2395
AS/SITE 3325
1400
-
2
9
P6
7210
AS/DET
AS/DET
-
10
P7
7175
AS/DET
AS/DET
-
1220
1170
C'
6
A 1220
1120
1220
C
8400
BAS/DET
AS/DET
NAB FIRST FLOOR PLAN
B'
A
55251
DRAWN BY : KK DWG NO : -
2875
1
DATE :
8400
C -
1170
3515
1220
1120
8250
3125x3940 FFL +600
770
975 2625
1975
DETAIL D
11970
1805
DETAIL E
DETAIL E
PRINCIPAL DESIGN CO
4
DETAIL B
PROPOSED LANDSCAPE LVL +300
01
2. 3.
NAB GROUND FLOOR PLAN
-
1
2400
0
6
-
2
4
2
W2
1220
1200
1200
2
-
-
1
-
3
W3
5440
AS/SITE
2400
1
-
3
D2B
1050
2100
-
1
-
4
W4
8380
AS/SITE
2400
1
-
4
D3
1700
2400
-
1
1
5
W5
3125
AS/SITE
2400
1
8250
5
D3A
17008250 2400+FL
-
2
-
2395 5440
AS/SITE 2345 1400
-
1
V5
6
D4
V5 850
-
4
4
AS/SITE
1400
-
1 C DETAIL
2740
760
8
W8
83804950AS/SITE
1400
-
1
110 PLB
110 9
W9
5440
1400
-
1
0
-
1
D4
1
2
1
2
760
3015
2545
110
12MM DROP
1 2 3
4
-
D4 2050
1500
0
1
-
1 1
DETAIL D -
-
1
6650
AS/DET 3775 AS/DET
AS/DET
6650
P3
2045
AS/DET
AS/DET
D3 V3
1220
AS/SITE
1400
-
1
6
P4
4980
AS/DET
AS/DET
V4
3565
AS/SITE
1400
-
1
7
P4A
6200
AS/DET
AS/DET
-
5
V5
8250
AS/SITE
1400
-
2
8
P5
600
AS/DET
AS/DET
-
6
V6
2395
AS/SITE
1400
-
2
9
P6
7210
AS/DET
AS/DET
-
1
10
P7
-
1D202
7175
AS/DET
-
2 1 DETAIL A 2
01
GOOD FOR 2'
2
21-06-202 D Internal an
6600
FFL +4600
3455
DRAWN BY : KK DATE : Rev. R1
B -
6200
16680x8445
DRAWING TITLE:
NAB GROUND FLOOR PLA
DWG NO : -
C
V1
W7
W6
8400
RECEPTION BELOW FFL +600
110 5445
1820
3
DETAIL A
1135 D2
BALCONY
5850
11970
FFL +4600
DETAIL E
1805
DETAIL E
PRINCIPAL DESIGN CO
4
DETAIL B
SITE: GREATER NOIDA, UTTAR
CLIENT: SUNSTAR PRECISION FOR
3000
8400
PROJECT:
NEW ADMINIST
160
16660
STUDIO LOTUS F-301, First Floor, La Ch. Prem Singh Hou New Delhi - 110030 Mobile (direct): +91
STRUCTURAL CONSU NNC DESIGN INTERN B- 2, Jaswant Chamb New Delhi, Delhi 110 Contact Number: 011 email:nnc.mail7@gm
A -
First Floor Plan
1'
8445
AS/DET
WORKSTATION
CAFE BELOW FFL +600
11970
AS/DET
4
DETAIL D
1805
D201
0
5
1
1 B
1500
P2 2205 4 P2A
DETAIL D 770
DROP
V2
3015
3
WAITING AREA BELOW FFL +600
DETAIL B
1425 2400 MALE TOILET
P1 1555 12MM P1A
290
-
W10
PARTITION SCHEDULE
110
FEMALE TOILET
AS/SITE
1700
-
1945
-
1
110
1
110
-
AS/DET
VENDING ZONE AS/DET AS/DET
580
10
1
AS/DET
8380
8380
975
2325
V6
2625
W7
5435
5700x3025 5 DW5 AS/DET AS/DET 6425 FFL +4600 ELEC VENTILATOR SCHEDULE 2385 1 V1 6200 AS/SITE 2400 110 110 2 V2 2625 AS/SITE 2400
D
7
1365
L1
110 850
110
V6
2100
2100
W6
110
110
3505 545
W8
3525x4915
D2
BALCONY FFL +4600
6 510
P5
110
110
P4
110 545
5455
DW4
-
110
-
610
FFL +4600
3435
545
1810
110
110
545
1135 DETAIL A
3435x4915
FFL +4600
5600 W9
1700
ST-1 W= 1800 R= 166 T= 300
DIRECTOR OFFICE 3
110
4905
6200
110
3795
DW3 D4
1
DETAIL F 2395
2345
P6
1700
3455
3455
P4
TL
160
900
400
2755
DIRECTOR OFFICE 4
FFL +4600
2255
870 2670
FHC
1045
DN
1700
P7
3 Cut-out in 550 floor for TFA 4
110
P4A
V1
710 250
FFL +4600 P3
DW5 EXECUTIVE LOUNGE 5600x4915
40
650
3525x4915
4725
GREEN COURT BELOW
110
2310
3525
1405
110 110
2400
2385 DOOR WINDOW SCHEDULE 5820 110 1 DW1 8380 AS/DET AS/DET PANTRY 2 DW2 8380 AS/DET AS/DET 2385x2260 850
A P5
REMARKS
770
D -
C -
1220
D203
1
-
D200
-
5400
TL
W1
2400
870
FFL +4600
FIRST FLR
2400
DIRECTOR OFFICE 1
790
3800x8735
GROUND FLR
2400+FL
FFL +4600
110
MD OFFICE
NO. OF OPENINGS
HEIGHT
1050
3435x4915
110
2875 SILL LVL.
WIDTH
WINDOW SCHEDULE
2850
DIRECTOR OFFICE 2
2670
5525S.NO. OPENING NAME 8400
REMARKS
FIRST FLR
1050
FFL +4600
1185
1050
3225
NO. OF OPENINGS GROUND FLR
D2A
3435
110
110 DETAIL A
SILL LVL.
HEIGHT
8400
D1
600 1635
D2
WIDTH
D2
1145
850
12MM DROP
OPENING NAME
DOOR SCHEDULE 1
110
1935
2125
EXECUTIVE WASHROOM
1000
1050
S.NO.
A
3
E 160 165 250
D4
110
110
Cut-out in floor for TFA 610 550
B'
2
D204
110
110 2800
2375 RECORD ROOM 2260x2920
2940
110
2345
110
110 905
400
2745
110
665
D2
160
V4
PLB
1650
3800x2620
3565
L1
855
160 2615
RESTING SPACE
FFL +4600
DETAIL D
610
V3
DETAIL C
V2
510
3325 6000
DETAIL F 1220
2000
8400
B SCHEDULE OF OPENINGS :
2050
675
C
5000
5525 8400
2345
C'
D D'
1975
E
2875
intended. This drawing is to be All dimensions shall b work any discrepancy Architect. 6. The Contractor must be responsible for th LANDSCAPE CONSUL notice of the Project 7.STUDIO This drawing 818 shall be architectural, structu discrepancy noticed s the consultants and r always prior to procu 8. All the services ducts services provisions. 9. Drawing approval is f intent and does not r from full responsibili fitness for purpose o 10. Contractor to revert receiving the drawing buildability issues to would be deemed th accepted the drawing for the works carried 4. 5.
400
E'
All levels are in millim This drawing is a cop
MEPnotCONSULTANT to be produced, c for any other pu DJBused CONSULTANTS
Scale: 1:75
F
STUDIO LOTUS F-301, First Floor, La Ch. Prem Singh Hou New Delhi - 110030 Mobile (direct): +91
STRUCTURAL CONSU NNC DESIGN INTERN B- 2, Jaswant Chamb New Delhi, Delhi 110 NOTE: Contact Number: 011 1.email:nnc.mail7@gm All dimensions are in
A -
Ground Floor Plan
SITE: GREATER NOIDA, UTTAR
CLIENT: SUNSTAR PRECISION FOR
D2A
VERANDAH
FFL +600 W10
3
DETAIL A
1135
230
D1
2050
290 1820
CAFE
5850
110
1845
375
3115
13845x2870 W10
11970
5000
1945 110
580
2100
FFL +600
1805
DETAIL B
1365
6975
3000
2100
DW3
DW2
13845x2870 DETAIL D
160
110
UP
WAITING AREA
B -
V1
6980
D Internal an
PROJECT:
1050
RECEPTION FFL +600
D2
VERANDAH FFL +600
Rev. R1
NEW ADMINIST
1050 375
6990x6490 FFL +600
P2A
FFL +600 6335
110
300
5550
MEETING ROOM
TRAINING ROOM
6335x6490
110
DW1
1050
2
6600
110
CONFERENCE ROOM P2
3180
3335 5455
110
1405 110 2600
1705 6200
110
1200
110
W3
1810
2'
PROPOSED LANDSCAPE LVL +300
W5
3030 1135
R1
D202
FFL +600
110
DETAIL A
6070
DETAIL A
3125
375
DW4
2100
1'
21-06-2021
This drawing is a cop not to be produced, c used for any other pu intended. 4. This drawing is to be 5. All dimensions shall b work any discrepancy Architect. The Contractor must CHECKED BY : 6.SR be responsible for th notice of the Project SCALE: REV NO : 7. This drawing shall be 1:75@A1 architectural, structu discrepancy noticed s the consultants and r always prior to procu 8. All the services ducts services provisions. 9. Drawing approval is f intent and does not r from full responsibili fitness for purpose o 10. Contractor to revert receiving the drawing buildability issues to would be deemed th accepted the drawing for the works carried
C
3125x2900
ST-1 W= 1800 R= 166 T= 300
230
W4
8400
D3A
300
1050
1860
D2B
MEETING ROOM WORKSTATION 14325x8445 FFL +600
3775
PASSAGE
110
RECORD ROOM 2225x2950 FFL +600
D4
2205
110
FFL +600
110
14325
12MM DROP
1
B
D201
V2
6490
D3
1555
110
2545
110
MALE TOILET
110
110
110
760
12MM DROP
110 850
110
710 110
110
110
110
D4
FFL +600
2385
4950
110 PLB
2100
110 Cut-out above for TFA as/HVAC
760
FEMALE TOILET
VENDING ZONE
ELEC
900
110
350
1875
D4
5700x3025
FHC
2435
110
2325
770
110
2235
650
165
110
P1
2235
D4
160
Cut-out above for TFA as/HVAC
W2
3015
40
2255
3015
3015
HOD CABIN 2435x2970
2385x2260
W2
110
110
850
P1
2435
D3A
1460
HOD CABIN 2235x2970
110 SERVER ROOM
850
2050
2235
110
HOD CABIN 2235x2970
DOUBLE HEIGHT GREEN COURT
110
5820
610 P1
2235
160
P1
2385
W1
1700
600
HOD CABIN 2435x2970
W1
3015
HOD CABIN 2235x2970
P1A
2950
1
2400
AS/SITE
D200
1120
W1
3015
PLB
W1
3015
110 855
W1
665 110 110 HOD CABIN 2235x2970
3015
3015
PRINTING ZONE
1625
D -
2400
AS/SITE
1220
DETAIL C W1
DETAIL A
AS/SITE
2625
V3
6000
E 160
DETAIL C
6200
V2
8400
D204
8400
1220
V1
3
D D'
5525
2345
1 2
3.
DRAWING TITLE:
D
E'
1500
NOTE:
1. All dimensions are in GOOD FOR CONSTRUCTION 2. All levels are in millim
D203
F
1
1
N
DOOR WINDOW SCHEDULE
NAB FIRST FLOOR PLAN
MEP CONSULTANT DJB CONSULTANTS
Scale: 1:75
SCHEDULE OF OPENINGS : S.NO.
OPENING NAME
WIDTH
HEIGHT
SILL LVL.
2850
2400
-
NO. OF OPENINGS GROUND FLR
FIRST FLR
1
-
DOOR SCHEDULE 1
D1
REMARKS
S.NO.
OPENING NAME
WIDTH
HEIGHT
SILL LVL.
2400
0
NO. OF OPENINGS GROUND FLR
FIRST FLR
6
-
WINDOW SCHEDULE 1
W1
1220
REMARKS
LANDSCAPE CONSUL STUDIO 818
Het Shah - Selected Works 35
Top of Structural Ridge +11.250M (111.250M)
WS 06 GD 02
Top of Beam +9540 (109.540M)
GD 02
Top of Beam +8700 (108.700M) Top of Angular Beam +8075 (108.075M) GD 01
WS 07
GD 01
DOUBLE HT. WAITING AREA NAB01 G01
DIRECTOR'S OFFICE NAB01 F06
PASSAGE NAB01 F14
DIRECTOR'S OFFICE NAB01 F06
Top of Tie Beam +7755 (107.755M) Top of Beam +7240 (107.240M)
V5
EXTERIOR FINISH NAB01 EX01
FIRST FLOOR F.F.L. +4625 MM
FLOORING AS PER SPECS. DECK SLAB AS PER STRUCTURE
First Floor FFL +4625 (104.625M) First Floor T.O.S +4525 (104.525M) Top Of Beam +4400(104.400M)
CS 01 DOUBLE HT. WAITING AREA NAB01 G01
WORKSTATION NAB01 G05
GROUND FLOOR F.F.L. +700 MM
HOD CABIN NAB01 G07
FLOORING AS PER SPECS. DECK SLAB AS PER STRUCTURE
Ground FFL Level +700 mm (100.700M) Top of Slab +525 (100.525M) Top of Plinth Beam +325 mm (100.325M) Proposed Landscape Level +300 mm (100.300M) Exsiting Road Level ±00 mm (100.0M)
5 D204
SECTION EE' 1:75
PCC AS PER STRUCTURE PLINTH BEAM AS PER STRUCTURE DECK SLAB AS PER STRUCTURE
Section EE’
1 D203
Overall Section
KEY PLAN 1:250
6
W6
5440
AS/SITE
1400
-
1
4
7
W7
8380
AS/SITE
1400
-
1
8
W8
8380
AS/SITE
A'1400
-
8380
AS/DET
AS/DET
1
-
9
W9
5440
AS/SITE
2
DW2
8380
AS/DET
AS/DET
1
-
10
W10
1425
2400
3
DW3
5435
AS/DET
AS/DET
1
-
PARTITION SCHEDULE
8380
AS/DET
AS/DET
1
-
1
P1
3015
1500
0
4
-
6425
AS/DET
AS/DET
-
1
2
P1A
2050
1500
0
1
-
3
P2
6650
AS/DET
AS/DET
1
-
P2A
6650
AS/DET
AS/DET
1
AS/DET
AS/DET
C'
-
2045
-
1
C
2400
D
1
AS/SITE
2400
1
D' 2
3
V3
1220
AS/SITE
1400
-
1
6
P4
4980
AS/DET
AS/DET
-
2
4
V4
3565
AS/SITE
1400
-
1
7
P4A
6200
AS/DET
AS/DET
-
1
5
V5
8250
AS/SITE
1400
-
2
8
P5
6
V6
2395
AS/SITE
1400
-
2
3
ALIGN 1
FFL +700mm 7
A
3
C/C Dim.
ALIGN
UP B A
DN B
CB2 MB4
MB4
FFL +4625mm
2'
ISMB 525
125mm Thk. RCC Base
19
9
FFL +3145mm
FFL +3145mm 15
15
Railing as per detail
7
100mm thk. VDF Flooring as per appr. specs.as per C caping apprv. sample 125mm Thk. RCC Base
ISMB 525
1
7
Railing as per detail
CB2 in Elevation
DETAIL A (FOR PROTOTYPE) DETAIL A (FOR PROTOTYPE) SCALE- 1:5 SCALE- 1:5 Railing as per detail
Perforated metal sheet at bottom as per apprv. sample
9
TREAD: 280mm RISER: 164mm WIDTH: 1800mm
7
A
UP
B
MS Steel Welding
TOP LANDING LEVEL PLAN + STRUCTURE SCALE- 1:50 TREAD: 280mm FFL +700mm 3
FFL +700mm
1
1
UP B
A
UP
A
TREAD: 280mm RISER: 164mm WIDTH: 1800mm
RISER: 164mm WIDTH: 1800mm
B
DETAIL B (TYPICAL SCALE- 1:5
ISMC150
Perforated metal sheet at bottom as per apprv. sample
Perforated metal sheet at bottom as per apprv. sample
MS Steel wedge Welding as/structure
MS Steel wedge Welding as/structure
B (TYPICAL STEP DE TOP LANDING LEVEL PLAN + STRUCTURE DETAIL B (TYPICAL DETAIL STEP DETAIL FOR PROTOTY TOP LANDING LEVEL PLAN + STRUCTURE SCALE- 1:5 SCALE1:50 Landing Lvl Plan SCALE- 1:5 SCALE- Staircase 1:50
3
NOTE: Landing edge to be aligned with Window edge. Refer plan.
1000mm High Railing Refer Detail C
MB1
ISMB 300 (TOB- 3060mm) ISMB 300 in Elevation
ISMB 300 (TOB- 3060mm) ISMB 300 in Elevation
ISMB 300 in Elevation 10mm metal Packing plate and M.S plate welded to ISMB as per structure
TREAD: 280mm RISER: 164mm WIDTH: 1800mm
TREAD: 280mm RISER: 164mm WIDTH: 1800mm
Planter box as per Detail
Cement board Perforated metal sheet asseating supported per approved sampleon metal
framework as per Vendor Perforated metal sheet as 15 per approved sample
15
15
13
13
10mm metal Packing plate and M.S plate 10mm metal Packing welded to ISMB as per plate and M.S plate structure welded to ISMB as per
11
B ISMC150 in Elevation
ISMC150 in Elevation ISMC150 in Elevation
5mm thick Perforated Metal sheet as per apprv. sample
B
9
5mm thick Perforated Metal sheet as per apprv. sample
5mm thick Perforated Met sheet as per apprv. samp
5mm thick Perforated Metal 3 sheet as per apprv. sample
ISMC150 welded to MS base plate. Refer structure drg.
5
A ISMC150 welded to MS base plate. Refer structure drg.
1
ISMC150 welded to MS base plate. Refer structure drg.
ISMC 150 in Elevation as/approved finish
5
5 3
3 1
A
3
A
1
Perforated Metal sheet at bottom as per apprv. sample
3 Steps made of 5mm thick Perforated Metal sheet as per apprv. sample
SECTION BB' SCALE- 1:30
Pe bottom
5
MS Ste Weldi MS Steel wedge Welding as/structure Steps made of 5mm thick 3 Perforated Metal sheet as per Steps made o apprv. sample
1
1
7
7
7 5
MS Steel wedge
wedge 5 MS Steel Welding as/structure Welding as/structure
5mm thick Perforated Metal sheet as per apprv. sample
9
9 77
5mm thick Perforated MetalMetal 5mm thick Perforated 7 as per apprv. sample sheet assheet per apprv. sample
D
11
B
9
9
MS Steel wedge Welding as/structure
15
13
11
11
structure
LIFT SHAFT
LIFT SHAFT
LIFT SHAFT
13
ISMC 150
ISMB 300 (TOB- 3060mm)
TREAD: 280mm RISER: 164mm WIDTH: 1800mm
TREAD: 280mm RISER: 164mm WIDTH: 1800mm
TREAD: 280mm RISER: 164mm WIDTH: 1800mm
C
1000mm High Railing Refer Detail C
Cement board seating supported on metal framework as per Vendor
Planter box as per Detail
50mm Thk.150 Fibre cement board as ISMC per apprv. sample
TREAD: 280mm RISER: 164mm WIDTH: 1800mm
C
Planter box as per Detail
C
GI framing to support FC50mm Board Thk. Fibre cement board as of FC Board to be per apprv.NOTE:bottom sample Perforated aligned with stringer beam bottom. metal sheet as per approved sample
ISMC 150
3
3
NOTE: Landing edge to be aligned with Window edge. Refer plan.
MB1
GI framing to support FC Board
50mm Thk. Fibre cement board as per apprv. sample
3
3
Cement board seating supported on metal GI framing to support FC Board as per Vendor framework
Staircase Section AA’
TREAD: 280mm RISER: 164mm WIDTH: 1800mm
ISMC150
caping as per NOTE: Landing edge toCbe apprv. sample aligned with Window edge. Refer plan.
NOTE:bottom of FC Board to be aligned with stringer beam bottom.
SECTION AA' SCALE- 1:30
Railing as per detail
11
5
3
1000mm High Railing Refer Detail C
SECTION AA' SCALE- 1:30
MS framework fixed with a base plate. Refer structural drg for detail.
1000mm High Railing Refer Detail C
MB1
NOTE:bottom of FC Board to be aligned with stringer beam bottom.
SECTION AA' SCALE- 1:30
DETAIL A (FOR PRO SCALE- 1:5
ISMC150
5
MB4 In Elevation
CB2 in Elevation
Ground FFL Lvl +700 mm
Ground FFL Lvl +700 mm
17
FFL +700mm
TREAD: 280mm RISER: 164mm WIDTH: 1800mm
100mm thk. VDF Flooring as per appr. specs.
100mm thk. VDF Flooring as per appr. specs.
13
13
9
C caping as per apprv. sample
CB2 in Elevation
19
CB2A
16
MID LANDING
MID LANDING
16
16
11
1000mm High Railing Refer Detail C
1000mm High Railing Refer Detail C
STEP 2
STEP 1
CB2A
ISMC 150 (In slope)
MB4
MB4
21
MB1
24
21
17
MB4 In Elevation
MB4 In Elevation
19
FFL +4625mm
23
FFL +3145mm
MID LANDING SEATING
2
ISMB 525
R1
Ground FFL Lvl +700 mm
21
DN
24
ISMC 150 (In slope)
PLANTER BOX 13
3
125mm Thk. RCC Base
100mm thk. VDF Flooring as per appr. specs.
21-06-2021
STEP 2
23
3
2
100mm thk. VDF Flooring as per appr. specs.
DATE :
CHECKED5mm BYthick : Perforated SR Metal sheet as per apprv. sample supported on MS framework. SCALE: REV NORefer : structural drg. 100mm thk. VDF Flooring as 1:75@A1 per appr. specs.
CB2A
DN
23
ISMC 150 (In slope)
MB4
CB2A MB1
MID LANDING SEATING
B
MS box section framework. (Refer structure drg.)
DWG NO : -
24
ISMC 150 (In slope)
CB1
2
2'
NAB FIRST FLOOR PLAN
MS box section framework. (Refer structure drg.)
DRAWN BY : KK
MB4
MB4
MB1
MB4 MB4
MB4 CB2
MB4 MB4
TOP LANDING
16
GROUND FLOOR PLAN + STRUCTURE GROUND FLOOR PLAN + STRUCTURE Staircase SCALEGround Plan1:50 1:50 FloorSCALE-
2'
15
TOP LANDING
5
TREAD: 280mm RISER: 164mm WIDTH: 1800mm
1
A
UP
CB1
NOTE: Landing edge to be aligned with Window edge
11
B
B A'
MID LANDING SEATING
PLANTER BOX
3
FFL +700mm
1
1
CB2A
ISMC 150
17
GROUND FLOOR PLAN + STRUCTURE SCALE- 1:50 ALIGN FFL +700mm 3
CB2
19
ISMC150 to be connected with base plate aligned with plinth beam. Refer structure drg.
5 ISMC150 to be connected with base plate aligned with plinth beam. Refer structure drg.
5
1
-
PLANTER BOX
NOTE: Landing edge to be aligned with Window edge
NOTE: All stringer ISMC 150 placed facing outwards.
9
-
AS/DET
C
FFL +4625mm
MID LANDING
ISMC150 to be connected with base plate aligned with plinth beam. Refer structure drg.
11
UP
ISMC 150 (In slope)
ISMC 150
ISMC 150 (In slope)
ISMB 300
2
AS/DET CB1
AS/DET
TOP LANDING
DN
21
Railing as per detail
ISMC 150 (In Slope- Refer Section)
ISMC 150 (In Slope- Refer Section)
3
ISMC 150 (in slope)
5
3
FFL +3145mm
13 NOTE: All stringer ISMC 150 placed facing outwards.
11
7
15
ISMB 300
ISMB 300
-
AS/DET
DRAWING TITLE: STEP 3
17
ISMC CB2A300
FFL +3145mm
AS/DET
7210 7175
STEP 3
C
NOTE: Landing edge to be aligned with Window edge
CB1
Railing as per detail
LVL +3595mm
AS/DET
P6 P7
A'
23
16
ISMC 150
ISMC 300
ISMC 150
ISMB 300
13
C/C Dim.
17
LVL +3595mm MID LANDING SEATING
7
C/C Dim.
ISMC 150
placed facing outwards.
MID LANDING 9
24
FFL +4625mm
ISMB 300 ISMB 19 300
ISMC150 150 ISMC 150 ISMC (In Slope- Refer Section)
ISMC 150
ISMC 150 (in slope)
ISMC 300
15
FFL +3145mm 21
PLANTER BOX NOTE: All stringer ISMC 150
MID LANDING SEATING 11 MID LANDING
17 16
ISMCISMC 300 150
ISMC 150 ISMC 150
ISMC 300
ISMB 300 13
ISMC 150 (in slope)
2
2
TOP LANDING
23
ISMB 300
FFL +4625mm TOP LANDING
19
600
9 10
CB1
Railing as per detail
DNRailing as per detail
24 Railing as per detail
15
PLANTER BOX
9
LVL +3595mm
MID LANDING SEATING MID LANDING
ISMC 150
ISMB 300
D'
P3
MB4 MB4
21
ISMC 150 (In slope)
TOP LANDING PLANTER BOX
D 4 C' 5
GOOD FOR CONSTRUCTION
MB4
B
Railing as per detail
FFL +4625mm
2
MB4
AS/SITE
2625
MB4
6200
V2
ISMC 150 (In slope)
ISMC 150 (In slope)
2'
V1
DN
23
B A'
1 2
CB2
C
Railing as per detail
A'
1
5
ISMC 150 (In slope)
C'
1
-
DW4 Railing as4per detail DW5
B
1
CB1 0
-
ISMC 150 (In slope)
DW1
MB4
1
1400
CB2
-
4
CB2
2
-
ISMC 150 (In slope)
-
2400
VENTILATOR SCHEDULE
D'
24
2'
2400+FL
850
ISMC 300
D C'
D'
2
D
1700
D4
DOOR WINDOW SCHEDULE
2'
36 Sunstar - NAB
B
D3A
N
A'
5 6
ISMC 150 in Elevation (C facing outwards) 1 Covered with 5mm thick Perforated Metal sheet as per apprv. sample
Perforated M
ISMC 150 in Elevation apprv. sampl (C facing outwards) Covered with 5mm thickISMC Perforated 150 in El Metal sheet as per apprv. sample
(C facing out Covered with Metal sheet a
SECTION BB' SCALE- 1:30
SECTION BB' SCALE- 1:30
Staircase Details
8
5
D3A
1700
2400+FL
-
2
-
6
D4
850
2400
-
4
4
C
495
720
9
W9
5440
AS/SITE
1400
-
1
2
DW2
8380
AS/DET
AS/DET
1
-
10
W10
1425
2400
0
-
1
3
DW3
5435
AS/DET
AS/DET
1
-
4
DW4
8380
AS/DET
AS/DET
1
-
0
4
5
DW5
6425
AS/DET
AS/DET
-
1
1
V1
6200
AS/SITE
2400
1
2
2
V2
2625
AS/SITE
2400
1
2
3
V3
1220
AS/SITE
1400
-
1
4
V4
3565
AS/SITE
1400
-
1
5
V5
8250
AS/SITE
1400
-
2
6
V6
2395
AS/SITE
1400
-
2
1 S
F.D.
410
CL
CL
540
CL
1'
2
TLP
FFL +104.613
B
A CL EXECUTIVE WASHROOM LAYOUT 1:25 CL
FL
975
3110
D4
150
SG
Rev.
SK
CF
MP
1200
Top of Tie FINISH Beam DUMMY PIPE AS/APPROVED +7755 AND VENDOR SHOP DWG(107.550M)
700
1000
500
PILLAR COCK AS/SELECTION SOAP DISPENSER PRE-LAMAS/SELECTION PARTITION
500
MT
850
CL
200
200 1000
SK
SG
CL
WF
SK
SG
Internal Elevation 2 4 A802
SECTION A 1:25
WF
Top Of Beam +4400(104.40
MIRROR AS/SELECTION UNDER-COUNTER BASIN AS/SELECTION COUNTER AS/DESIGN URINAL PARTITION AS/APPROVED SHOP DWG URINAL AS/APPROVED SELECTION COUNTER TOP LVL +850 (FROM FFL)
WF TLP
FLOOR MOUNTED W.C. AS/ SELECTION
SG
First Floor FFL +4625 (104.625M) First Floor T.O.S +4525 (104.525M)
S
CF
V3
MT
LANDSCAPE CONSULTANT STUDIO 818
First Floor FF (104.625M) First Floor T.O +4525 (104.
PILLAR COCK AS/SELECTION
MEP CONSULTANT DJB CONSULTANTS
CL
CL
Top of Angul +7800 (107.8
Top of Tie Be +7755 (107.5
Top of Beam +7240 (107.2
Top Of Beam +4400(104.400M)
MP
WF TLP
CL
CL
CL
600x1200 SERVICE DOOR FOR ACCESS FLOOR MOUNTED W.C. AS/ SELECTION
CL
HEALTH FAUCET AS/SELECTION 130
COUNTER AS/DESIGN
MT
SK
First Floor FFL +4625 (104.625M) URINAL PARTITION AS/APPROVED First Floor T.O.S SHOP DWG +4525 (104.525M) URINAL AS/APPROVED
SG
410
410
310
410
125 MM FILLING IN SUNKEN AREA
410
140
S
TISSUE HOLDER AS/SELECTIO
First Floor FF (104.625M) First Floor T.O +4525 (104.
SELECTION
150
Top Of Beam COUNTER TOP LVL +850 +4400(104.400M) (FROM FFL)
WF TLP
650
Top of Beam +7240 (107.240M) PRE-LAM PARTITION AS/APPROVED SHOP DWG
STRUCTURAL CONSULTANT NNC DESIGN INTERNATIONAL B- 2, Jaswant Chamber, 16 Okhla,SK New Delhi, Delhi 110025 Contact Number: 011 2692 0197 email:nnc.mail7@gmail.com IN SUNKEN AREA 125 MM FILLING
UNDER-COUNTER BASIN UNDER-COUNTER BASIN AS/SELECTION AS/SELECTION
CL 850
Top of Tie Beam +7755 (107.550M)
1:25
COUNTER PILLAR AS/DESIGN COCK AS/SELECTION
2000
FLOOR MOUNTED W.C. AS/ SELECTION
SK
SG
390
125 MM FILLING IN SUNKEN AREA
SECTION A 1:25
Top of Angular Beam +7800 (107.800M)
COUNTER MIRROR TOP LVL AS/SELECTION +850 (FROM FFL)
S
4 A802
URINAL AS/APPROVED SELEC
CL
AS/APPROVED SHOP DWG
125 MM FILLING IN SUNKEN AREA 800
Internal Elevation 1
600x1200 SERVICE DOOR FO ACCESS
Date
400
1000
1000
Top of Beam +7240 (107.240M)
800
SECTION D 6 SK 1:25 SG A802
MT
STUDIO LOTUS C CL L F-301, First Floor, Lado- Sarai Ch. Prem800Singh House, 800 New Delhi - 110030 Mobile (direct): +91-9437184477
B
600
150
850
1000 600
Top of Tie Be +7755 (107.5
CLIENT: SECTIONFORGE C 6 PRECISION SUNSTAR LTD.
Top of Angular Beam
MIRROR AS/SELECTION +7800 (107.800M)
MP
MT
Top of Angul +7800 (107.8
390
A
WF
150
600
Top of Tie Beam +7755 (107.550M)
1005
400
R1
2
SITE: GREATER NOIDA, UTTAR PRADESH
Top Of Beam +4400(104.400M)
Top of Beam +7240 (107.240M)
1000
21-06-2021
PROJECT:
2310
CL
500
WF
DATE :
460
WALL LIGHT AS/SELECTION
1920
SCALE: 1:75@A1
125 MM FILLING IN SUNKEN AREA NEW ADMINISTRATIVE BUILDING
1000
CL
600
2310
SR
REV NO :
MP
Detail
SG
A802
MP
CL
CHECKED BY :
DWG NO : -
PRINCIPAL DESIGN CONSULTANT
1005
CF
DRAWN BY : KK
URINAL PARTITION AS/APPRO SHOP DWG
975
2
CF
NAB FIRST FLOOR PLAN
PRE-LAM PARTITION WITH AC DOORS AS/APPROVED SHOP D
WF
First Floor FFL +4625 (104.625M) First Floor T.O.S +4525 (104.525M)
1
2'
2050
2'
-
FLOOR MOUNTED W.C. AS/ SELECTION
2
Top of Angular Beam +7800 (107.800M)
EXECUTIVE WASHROOM - FINISHES LAYOUT 1:25
1
Top of Beam +7240 (107.2
1920
3 A802
AS/DET
1. AS/DET All dimensions are in millimeters. 1 2. AS/DET All levels are1 in millimeters. 12MM 3. AS/DET This drawing is 6 P4 4980 AS/DET 2 is a copyright and property of the architect, DROP not to -be produced, copied, handed over to third party or 7 P4A 6200 AS/DET AS/DET 1 used for 8 P5 600 AS/DET AS/DET - any2 other purpose other than for which it is 9 intended. P6 7210 AS/DET AS/DET 1 10 4. AS/DET This drawing P7 AS/DET 1 is to be read and not to be scaled. 7175 5. All dimensions shall be verified on site prior to start of work any discrepancy shall be brought to the notice of the Architect. 6. The Contractor must check all dimensions and details and C be responsible Lfor the same. Any discrepancy shall be EQ notice of the Project Manager. EQ 7. This drawing shall be read in conjunction with all relevant architectural, structural CL and services drawings. Any discrepancy noticed F.T. shall be brought to the attention of the consultants and resolved as soon as possible, but always prior to procurement / execution of works. 8. All the services ducts / cut-outs are to be covered after services provisions. 9. Drawing approval is for the conformity with outline design intent and doesLAYOUT not relieve the contractor/ subcontractor EXECUTIVE WASHROOM - FLOORING 2 from full responsibility for the accuracy, integration and A802 1:25 fitness for purpose of design. 10. Contractor to revert back within 7 working days of receiving the drawings on any coordination and 2' 1' If otherwise it 1 buildability issues to the Project Manager. would be deemed that they have understood and accepted the drawing/design and own full responsibility 1975 2050 975 for the works carried out accordingly.
COUNTER AS/DESIGN 600
SK
1'
HT: 75-BOFC
AS/DET
400
MT
AS/DET
2045
DRAWING TITLE:
COUNTER TOP +LVL 850 (FROM FFL)
1975
WF
2' SG HT: 0-75
6650
P3
390
SECTION B 1:25 SK
AS/DET
P2A
5
GOOD FOR CONSTRUCTION
FFL +104.613
1
400
4 A802
1975
6650
4
NOTE:0
UNDER-COUNTER BASIN AS/SELECTION
Flooring Layout - Plan D 2
1500
PILLAR COCK AS/SELECTION
EXECUTIVE WASHROOM - FLOORING LAYOUT 125 MM FILLING IN SUNKEN AREA 1:25
2 A802
2050
P2
HAND-DRYER AS/SELECTION
850
2050
SG
P1A
3
Het Shah - Selected Works 37
VDF
-
MIRROR AS/SELECTION
MT CL
B
A
SK
CL
1455
SG
2
FL
CF
EQ
F.T.
300
SK
390
S
1'
MT
CL
EQ
C
WF
1485
WF TLP HT: 75-BOFC
1500
PRE-LAM PARTITION AS/APPROVED SHOP DWG
12MM DROP
SG HT: 0-75 WF
3015
2'
MP
WF TLP
P1
Top of Beam +7240 (107.240M)
1
FFL +104.613
SK
Top of Tie Beam +7755 (107.550M)
VDF
CF
1
900
D
D
PARTITION SCHEDULE
1000
C
Top of Angular Beam +7800 (107.800M) 2
2050
U.T. 150
1975
1 A802
130
CL
FL
-
400
CL
1
A
600
E
AS/DET
B
390
150
995
CL
AS/DET
650
F.T.
1
8380
975
1000
1
-
DW1
305
995
1
-
1400
1975
CL 2000
-
1400
AS/SITE
1
VENTILATOR SCHEDULE
1975
1975
CL
495
305
D
2'
2050
1910
2310
975
2
1400
AS/SITE
8380
300
450
2'
AS/SITE
8380
W8
650
1'
5440
W7
8
3110
EXECUTIVE TOILET 2985X4840 MM
305
1
CL
W6
First Floor FFL +4625 (104.625M) First Floor T.O.S +4525 (104.525M) Top Of Beam +4400(104.400M)
Top Of Beam +4400(104.40
GOOD FOR CONSTRUCTION SECTION E 6 A802
1:25
DRAWING TITLE: EXECUTIVE TOILET DETAIL SHEET 1 DRAWN BY : KK DWG NO :
CHECKED BY :
N
800
DOOR WINDOW SCHEDULE
6 7
N
C
SR SCALE:
Toilet Details
JAMB FINISH AS/DESIGN
DETAIL 10X10MM PRECOATEDVENDOR MS SOLID BAR BEADING WELDED TO MS FRAME 50MMx25MM M.S. FRAME
MS COVERING PLATE BOLTED TO SHUTTER FRAME AS/ OPENING
25
50MMx25MM M.S. FRAME HINGE AS/SELECTION
25
25
DETAIL 04
OUTSIDE 10X10MM PRECOATED
MS SOLID BAR BEADING Fixing 05 Detail 02 FIXING DETAIL 07 FIXING DETAIL FIXED BY 0204
HE 25 25 25
750
25
250 25 750
25
25
HEIGHT AS/DOOR SCHEDULE
25 25 BALANCE
BALANCE
250 HEIGHT AS/DOOR SCHEDULE 25
BALANCE
HEIGHT AS/DOOR SCHEDULE
25
250
50MMx25MM M.S. FRAME
Scale: 1:2
DETAIL D5AS/SELECTION HINGE ELEVATION FOR DOOR 100 Scale: 1:20
SECTION A
10 25 10 10 25 10
Scale: 1:10
DETAIL FOR DOOR D3
Scale: 1:20
2MM SPACING FOR RUBBER GASKET JAMB FINISH AS/DESIGN AS/VENDOR
50MMx25MM M.S. FRAME
ELEVATION INTERIOR CLADDING AS/DESIGN SGL PANEL (6MM THK) AS PER APPROVED SPECS 10X10MM PRECOATED MS SOLID BAR 5MMx5MM GROOVE FILLED WITH PUTTY BEADING FIXED BY COUNTERSUNK SCREW MS SOLID BAR 10X10MM PRECOATED JAMBTO FINISH AS/DESIGN MSWELDED FRAME BEADING TO MS FRAME 50MMx25MM M.S. FRAME 250x100x50 M.S. HANDLE AS/VENDOR DETAIL 2MMBOXED SPACING FOR RUBBER GASKET 50MMx25MM M.S. FRAME 200x25 CUTOUT IN M.S. BOXING FORAS/VENDOR GRIP AS/DESIGN MS COVERING PLATE BOLTED TO SHUTTER 10X10MM PRECOATED MS SOLID BAR BEADING FIXED BY FRAME (SINGLE SIDE) COUNTERSUNK SCREW TO SPECS MS FRAME SGL PANEL (6MM THK) AS PER APPROVED 10 25 10 2MM SPACING FOR RUBBER GASKET AS/VENDOR 10X10MM PRECOATED MS SOLID BAR SGL PANELBEADING (6MM THK) AS PER APPROVED SPECS 10 25 10 WELDED TO MS FRAME 10X10MM PRECOATED MS SOLID BAR BEADING WELDED 50MMx25MM M.S. TOFRAME MS FRAME 200x25 CUTOUT IN M.S. BOXING FOR GRIP AS/DESIGN MS COVERING PLATE50MMx25MM BOLTED TO SHUTTER M.S. FRAME FRAME MS COVERING PLATE BOLTED TO SHUTTER FRAME LGFS WALL AS/ VENDOR
Fixing Detail 03 0805 06 FIXING FIXING DETAILDETAIL 05
Scale: 1:4Scale: 1:2
25
Scale: COUNTERSUNK Scale:1:2 1:10 SCREW TO MS FRAME (INSIDE) & WELDING (OUTSIDE)100
MS COVERING PLATE BOLTED TO SHUTTER
10X10MM PRECOATED MS SOLID BAR BEADING WELDED TO MS FRAME
PLINTH FIN LVL + 675
25
BEADING FIXED BY COUNTERSUNK SCREW TO MS FRAME
10X10MM PRECOATED MS SOLID BAR BEADING WELDED TO MS FRAME
25
750
FIXING DETAIL 02
SECTION B
FFL LVL + 700
LGFS WALL AS/ VENDOR 10X10MM PRECOATED MS SOLID BAR INTERIOR CLADDING AS/DESIGN BEADING FIXED BY COUNTERSUNK SCREW 5MMx5MM GROOVE FILLED WITH PUTTY TO MS FRAME
5MMx5MM GROOVE FILLED WITH 10X10MM PUTTY PRECOATED MS SOLID BAR
SGL (6MM THK) AS/ PER APPROVED SPECS SGL PANEL AS/ APPROVED SPECS INSIDE SGL PANEL (6MM THK) AS PER APPROVED SPECS DETAIL 05 250 x 100 x 50 M.S. BOX HANDEL AS/
25
HEAT STRENGTHENED SGL AS/ APPROVED SPEC. (6MM THK)
Scale: 1:10
50MMx25MM M.S. FRAME
50MMx25MM M.S. FRAME AS/ APPR. (EXTERNAL FRAME) 2MMFINISH SPACING FOR RUBBER GASKET 2MM SPACING FOR RUBBER GASKET AS/VENDOR 50MMx25MM AS/VENDOR M.S. FRAME AS/ APPR. FINISH(SHUTTER)
SECTION A SGL PANEL AS/ APPROVED SPECS
HEAT STRENGTHENED SGL AS/ APPROVED SPEC. (6MM THK)
25
B
25
A
250 750
FFL M.S. 50MMx25MM FRAME 2MM SPACING FOR RUBBER GASKET AS/VENDOR HINGE AS/SELECTION
FIXING DETAIL 04
INTERIOR CLADDING AS/DESIGN 50MMx25MM M.S. FRAME
10X10MM PRECOATED MS SOLID BAR BEADING FIXED BY COUNTERSUNK SCREW AS/DESIGN JAMB FINISH TO MS FRAME
750
750
BALANCE
25 25 25
07
25
25 250 25 25
HEIGHT AS/DOOR SCHEDULE
25 925
(6MM THK)
FIXING DETAIL 04
JAMB FINISH AS/DESIGN
DETAIL 05
JAMB FINISH AS/DESIGN
50MMx25MM M.S. FRAME M.S. PLATE COVERING LGFS WALLPRECOATED AS/ VENDORMS SOLID BAR 10X10MM BEADING FIXED BY COUNTERSUNK SCREW INTERIOR CLADDING AS/DESIGN SGL PANEL (6MM THK) AS PER APPROVED SPECS TO MS FRAME 5MMx5MM GROOVE FILLED WITH PUTTY DETAIL 06 10X10MM PRECOATED MS SOLID BAR BEADING WELDED TO MS FRAME 2MM SPACING FOR RUBBER GASKET HEAT STRENGTHENED SGL HEAT STRENGTHENED SGL JAMB FINISH AS/DESIGN AS/ APPROVED SPEC. AS/ APPROVED SPEC. AS/VENDOR 50MMx25MM M.S. FRAME (6MM THK) (6MM THK) 375 375 50MMx25MM M.S. FRAME 10X10MM MS SOLID MS COVERING PLATE BOLTED TO SHUTTER SGL PANELPRECOATED AS/ APPROVED SPECSBAR 50 50 BEADING FIXED BY COUNTERSUNK SCREW FRAME 10X10MM PRECOATED MS SOLID BAR HEAT STRENGTHENED SGL HEAT STRENGTHENED SGL TO MS FRAME AS/ APPROVED SPEC. AS/ APPROVED SPEC. BEADING WELDED TO MS FRAME (6MM THK)
HEAT STRENGTHENED SGL AS/ APPROVED SPEC. (6MM THK)
200
5MMx5MM GROOVE FILLED WITH PUTTY
5MMx5MM GROOVE FILLED WITH PUTTY
25
925
25
25
BALANCE
25 250 750 25
07
INTERIOR CLADDING AS/DESIGN
5MMx5MM GROOVE FILLED WITH PUTTY
HEAT STRENGTHENED SGL 50 AS/ APPROVED SPEC. (6MM THK)
HEAT STRENGTHENED SGL AS/ APPROVED SPEC. (6MM THK)
03
02
INTERIOR CLADDING AS/DESIGN
INTERIOR CLADDING AS/DESIGN
HEAT STRENGTHENED SGL AS/ APPROVED SPEC. (6MM THK)
2MM SPACING FOR RUBBER GASKET HEAT STRENGTHENED SGL AS/ APPROVED SPEC. AS/VENDOR (6MM THK) 455
0504 Fixing Detail
LGFS WALL AS/ VENDOR
LGFS WALL AS/ VENDOR
LGFS WALL AS/ VENDOR
10X10MM PRECOATED MS SOLID BAR BEADING FIXED BY COUNTERSUNK SCREW TO MS FRAME HEAT STRENGTHENED SGL AS/ APPROVED SPEC. (6MM THK)
ELEVATION
DETAIL FOR DOOR D2
Scale: 1:20
CL
JAMB FINISH AS/DESIGN
25
Scale: 1:20
PLINTH FINISH LVL + 675
PLINTH FINISH LVL + 675
DETAIL 0
25
SECTION B
FFL LVL + 700
FFL LVL + 700
250 x 100 x 60 M.S. BOX HAND AS/ VENDOR DETAIL
MS COVERING PLATE BOLTED TO SHUTTER DETAIL 02
LGFS WALL AS/ VENDOR
50MMx25MM M.S. FRAME
25
25
SECTION A
Scale: 1:10
DETAIL FOR DOOR D3 ELEVATION
SECTION B
750
25
FIXING DETAIL 01
SECTION A
Door Detail - Plans, Sections, Elevation 01
25
25 25
250
MS COVERING PLATE BOLTED TO SHUTTER
25
HEAT STRENGTHENED SGL 10X10MM PRECOATED AS/ APPROVED SPEC. THK) MS SOLID BAR(6MM BEADING FIXED BY COUNTERSUNK SCREW ELEVATIONTO MS FRAME (INSIDE) & WELDING (OUTSIDE) HEAT STRENGTHENED SGL AS/ APPROVED SPEC. (6MM THK)
25
25
50 HEAT STRENGTHENED SGL AS/ APPROVED SPEC. (6MM THK)
CL
Scale: 1:10
25
BALANCE 25
25
25
CL
5MMx5MM GROOVE FILLED WITH PUTTY
DETAIL 05
750
450
DETAIL 04
250
HEAT STRENGTHENED SGL AS/ APPROVED SPEC. (6MM THK)
CL
INTERIOR CLADDING AS/DESIGN Detailed Plan 04 FIXING DETAIL 01
AS/ OPENING
DETAIL 05
750
25
50
25
50
25
BALANCE
BALANCE
375
25
25
375
25
750
HEAT STRENGTHENED SGL AS/ APPROVED SPEC. (6MM THK)
250
25 250
HEAT STRENGTHENED SGL AS/ APPROVED SPEC. (6MM THK)
25
750
HEIGHT AS/DOOR SCHEDULE
50MMx25MM M.S. FRAME AS/ APPR. FINISH(SHUTTER) SGL (6MM THK) AS/ PER APPROVED SPECS HEAT STRENGTHENED SGL HEAT STRENGTHENED SGL AS/ APPROVED SPEC. AS/ APPROVED SPEC. HANDEL AS/ 250 x 100 x 50 M.S. BOX (6MM THK) (6MM THK) VENDOR DETAIL DETAIL 06
HEAT STRENGTHENED SGL AS/ APPROVED SPEC. (6MM THK)
04
HEIGHT AS/DOOR SCHEDULE
50MMx25MM M.S. FRAME AS/ APPR. FINISH (EXTERNAL FRAME)
25 925 250
HEIGHT AS/DOOR SCHEDULE
25
25
BALANCE BALANCE HEIGHT AS/DOOR SCHEDULE
JAMB FINISH AS/DESIGN
OUTSIDE
925
HEIGHT AS/DOOR SCHEDULE
25 25
5MMx5MM GROOVE FILLED WITH PUTTY
CL
10X10MM PRECOATED FIXING DETAIL 01 BAR BEADING MS SOLID FIXED BY Scale: 1:10 COUNTERSUNK SCREW TO MS FRAME (INSIDE) & WELDING (OUTSIDE)
04
DETAIL 02 25
B
DETAIL 02
INTERIOR CLADDING AS/DESIGN
INSIDE
02
250 x 100 x 60 M.S. BOX HANDEL AS/ VENDOR DETAIL
SECTION A
25
25 HEAT STRENGTHENED SGL AS/ APPROVED SPEC. (6MM THK)
CL
A
CL
02 OUTSIDE
25
25
25
(REF. DETAILScale: 01) 1:20
CL
25
OUTSIDE
DETAIL 02
DETAIL 02
10X10MM PRECOATED MS COVERING PLATEHEAT STRENGTHENED SGL AS/ APPROVED SPEC. CL MS SOLID BAR CL BEADING CLBOLTED TO SHUTTER 25 25 25 (6MM THK) FIXED 04 BY DETAIL M.S. PLATE COVERING DETAIL 06DETAIL 02 COUNTERSUNK SCREW DETAILTO FOR DOOR D3 MS FRAME PLAN AT (INSIDE) LVL: +900 & WELDING (OUTSIDE) Scale: 1:20 A
DETAIL 02
250 x 100 x 60 M.S. BOX HANDEL AS/ VENDOR DETAIL
DETAIL FOR DOOR D2 PLAN AT LVL: +900
25
B
A
M.S. PLATE COVERING
01
25
25
EQUAL
B
OUTSIDE
250 x 100 x 60 M.S. BOX HANDEL AS/ VENDOR DETAIL
EQUAL
DETAIL 05
250 x 100 x 60 M.S. BOX HANDEL 250 x 60 DETAIL AS/x 100 VENDOR M.S. BOX HANDEL AS/ VENDOR DETAIL
1700 25 25 ELEVATION PLAN AT LVL: 100 100+900 (REF. DETAIL 01) AS/ OPENING
25
HEAT STRENGTHENED SGL AS/ APPROVED SPEC. (6MM THK)
25
25
25
CL
M.S. PLATE COVERING
OUTSIDE INSIDE
250 925
CL
25 OUTSIDE
HEIGHT AS/DOOR SCHEDULE
CL
SECTION B
1050M.S. FRAME 50MMx25MM AS/ APPR. FINISH(SHUTTER) DETAIL 25 03 25 SGL (6MM THK) AS/ PER APPROVED SPECS BALANCE 100 AS/ OPENING PLAN AT LVL: +600 HEAT STRENGTHENED HEAT STRENGTHENED SGL 250 AS/ x APPROVED 100 x 50 M.S. BOX HANDEL AS/ SGL AS/ APPROVED SPEC. SPEC. 25 25 (6MM THK) (6MM THK) VENDOR DETAIL DETAIL 04
INSIDE
DETAIL 04
25
CL
SECTION A
50MMx25MM M.S. FRAME AS/ APPR. FINISH (EXTERNAL FRAME)
25
PLINTH FINISH LVL + 675
250
HEIGHT AS/DOOR SCH
HEIG 25 250 25 750
INSIDE
DETAIL 06
25 25 ELEVATION PLAN 100AT LVL: +900
AS/ APPROVED SPEC.
HEAT STRENGTHENED SGL AS/ APPROVED SPEC. 25 (6MM25 THK)
FFL LVL + 700
25
CL
OUTSIDE
DETAIL 02
HEIGHT AS/DOOR SCHEDULE
25
BALANCE
INSIDE
AS/ APPROVED SPEC.
(6MM THK) M.S. FRAME (6MM THK) 50MMx25MM AS/ FINISH(SHUTTER) INTERIOR CLADDING AS/DESIGN 375 375APPR. 1700 SGL (6MM THK) AS/ APPROVED SPECS 25 PER 25 25 5MMx5MM 25 GROOVE FILLED WITH PUTTY DETAIL 02 50 DETAIL 05 250 x 100 x 50 M.S. 50 BOX HANDEL AS/ EQUAL EQUAL PLAN AT LVL: +600 VENDOR DETAIL JAMB FINISH AS/DESIGN
25
750
EQUAL
100
HEAT STRENGTHENED SGL AS/ APPROVED SPEC. (6MM THK)
1050 M.S. PLATE COVERING
HEIG
250
100
25
25
BALANCE
EQUAL PLAN AT LVL: +600
25
25
INSIDE DETAIL 04
1050
5MMx5MM GROOVE FILLED WITH PUTTY 25 25 HEAT25STRENGTHENED SGL HEAT STRENGTHENED SGL AS/ APPROVED SPEC. AS/ APPROVED SPEC. 02 DETAIL EQ (6MM THK) EQ (6MM THK) JAMB FINISH AS/DESIGN DETAIL 06 50MMx25MM M.S. FRAME AS/ APPR. FINISH (EXTERNAL FRAME) HEAT STRENGTHENED SGL HEAT STRENGTHENED SGL
25
HEAT STRENGTHENED SGL AS/ APPROVED SPEC. (6MM THK)
25
INSIDE
250 x 100 x 60 M.S. BOX HANDEL AS/ VENDOR DETAIL
1700 25 25
25
OUTSIDE
PLAN AT LVL: +600
25
INSIDE
DETAIL 03 50 DETAIL 02
25
INSIDE
25
HEAT STRENGTHENED SGL AS/ APPROVED SPEC.
DETAIL (6MM 04 THK) 25
OUTSIDE
450
Scale: 1:20
DETAIL 04
DETAIL 02
25
25
250 750
925
OUTSIDE
EQUAL
25
DETAIL 05
25
BALANCE
INSIDE
25
750
DETAIL 04
25
25
HEAT STRENGTHENED SGL AS/ APPROVED SPEC. (6MM THK)
HEAT STRENGTHENED SGL 1050 AS/ APPROVED SPEC. (6MM THK)
25 25
1700
25
EQUAL
38 Sunstar - NAB OUTSIDE
25
HEAT STRENGTHENED SGL AS/ APPROVED SPEC. (6MM THK)
25
HEIGHT AS/DOOR SCH
INSIDE
25
25
DETAIL 04
FIXING DETAIL 01 Scale: 1:10
10 25 10 10 25 10
05
FIXING DETAIL 02
Door Detail
Scale: 1:2 25
04
100
SECT
EX COL EX
EXTERIOR FINISH NAB01 EX01
PANEL 01
1
D300
PANEL 29
PANEL 12
PANEL 29
MM
EX
MM
EX
EXTERIOR FINISH NAB01 EX02
EXTERIOR FINISH NAB01 EX02
GL1
MD1
EXTERIOR FINISH NAB01 EX01
EX
GL1
EX
EXTERIOR FINISH NAB01 EX01
MM
EXTERIOR FINISH NAB01 EX02
Het Shah - Selected Works 39
ELEVATION A 1:75
4
3
2
2'
1'
1
1705
Top of Structural Ridge +11.250M (111.250M)
PANEL 11 (AS PER SITE)
PANEL 10 (AS PER SITE)
PANEL 08
PANEL 07
PANEL 09 (AS PER SITE)
PANEL 07
PANEL 09 (AS PER SITE)
PANEL 07
PANEL 11 (AS PER SITE)
PANEL 10 (AS PER SITE)
PANEL 07
GD 02
Top of Beam +8700 (108.700M)
GD 01
PANEL 08
4915
PANEL 25 (AS PER SITE)
EX
MW
EX
EXTERIOR FINISH NAB01 EX03
EX
GL1
Top of Beam +7240 (107.240M)
V2A
PANEL 05
PANEL 05
PANEL 05
PANEL 05
CB
First Floor FFL +4625 (104.625M)
EXTERIOR FINISH NAB01 EX06
PANEL 06
First Floor T.O.S +4525 (104.525M)
EXTERIOR FINISH NAB01 EX05
PANEL 04
PANEL 03
PANEL 03
PANEL 03
PANEL 03
PANEL 04
EX PANEL 26 (AS PER SITE)
EX
EX
D3 PANEL 24
PANEL 02
PANEL 01
PANEL 01
PANEL 01
PANEL 01
Top Of Beam +4400(104.400M)
GL1
EXTERIOR FINISH NAB01 EX07
MW
EXTERIOR FINISH NAB01 EX03
EX COL EXTERIOR FINISH NAB01 EX04
EX
EXTERIOR FINISH NAB01 EX07
Top of Tie Beam +7755 (107.755M)
PANEL 24
PANEL 06
EX CSB
MW
EXTERIOR FINISH NAB01 EX03
Top of Angular Beam +7800 (107.800M)
CB
EXTERIOR FINISH NAB01 EX06
V2
3925
RD 01
Top of Beam +9740 (109.740M)
PANEL 02
Ground FFL Level +700 mm (100.700M) Top of Slab +525 (100.525M) Top of Plinth Beam +325 mm (100.325M) Proposed Landscape Level +300 mm (100.300M) 2
D301
ELEVATION B 1:50
Exsiting Road Level ±00 mm (100.0M)
NW Elevation - Finishes
Cladding Detail - Elevation
Selected Extras Images from other projects
For an in depth dive into the project follow the link:
https://www.behance.net/gallery/188082559/Space-making-Revival-of-Kaleshwari-Temple-Complex
Het Shah - Selected Works 41
Space Making through Natural Elements: Revival of Kaleshwari Temple Complex
Hidimba Forest, Gujarat Undergraduate Thesis (2023) Guided by Ar. Yatin Pandya
42 Selected Extras
Re-Imagining the Development Guidelines of Sector-22 Chandigarh, Punjab - Haryana Urban Design Studio (2022)
Executive Bungalow Dehradun, Uttarakhand Studio Lotus (2023)
Het Shah - Selected Works 43
44 Selected Extras
Cultivating the Urban Fabric
Vadodara, Gujarat NASA G - Sen Trophy (2021) Trophy Head
Portfolio Vol. 1
Het Shah - Selected Works 45
(2019 - 2021)
Link to the entire portfolio:
https://www.behance.net/gallery/188087049/Architecture-Portfolio-Vol-1
Het Shah Anand, Gujarat, India (+91) 88669 66303 hetshah2121@gmail.com