2014 15 budget presentation march 10 2014 board workshop

Page 1

HALF HOLLOW HILLS SCHOOL DISTRICT of Huntington and Babylon

2014-15 Budget Updates from Prior Workshop March 10, 2014 Budget Workshop #3


Budget Overview – Update $228,254,916

$233,200,000* * Changes from information shared at prior workshop is a result of adjustments made to property tax levy cap formula inputs

$4.9 million year-over year $ increase* 2.15% year-over year % increase* 2.42% property tax levy cap increase*

2

2014-15 Budget – Board Workshop March 10, 2014


Tonight’s Discussion Capital Projects

Property Tax Levy Cap Formula

Equipment Highlights

Revenues

2014-15 Budget – Board Workshop March 10, 2014

3


Tonight’s Discussion Capital Projects

Property Tax Levy Cap Formula

Equipment Highlights

Revenues

2014-15 Budget – Board Workshop March 10, 2014

4


2014-15 Capital Projects

1

West Hollow Atrium

2

FGAC Generator

3

High School East Generator

2014-15 Budget – Board Workshop March 10, 2014

5


2014-15 Capital Projects 1. West Hollow Atrium Metal curved structure and three barrel vault skylights need to be replaced. Current skylights are each approximately 18’ x 45’ and constructed of single glazing.

front of West Hollow 2014-15 Budget – Board Workshop March 10, 2014

6


2014-15 Capital Projects 1. West Hollow Atrium Significantly improve energy efficiency by upgrading thermal value of skylights

District unable to patch leaks any further (beyond regular repair/maintenance)

$750,000 Outside contractors unwilling/unable to do repairs due to safety concerns

2014-15 Budget – Board Workshop March 10, 2014

New skylights will incorporate fall protection or high impact glazing and project will address ancillary issues caused by years of leaks 7


2014-15 Capital Projects 2. Fran Greenspan Administration Center Generator When power is lost at the Fran Greenspan Administration Center, the District’s main server equipment is currently powered by a residentialtype (37 kW) generator intended to keep the servers powered and air conditioners running. 2014-15 Budget – Board Workshop March 10, 2014

8


2014-15 Capital Projects 2. Fran Greenspan Administration Center Generator When power is lost at the Fran Greenspan Administration Center, the District’s main server equipment is currently powered by a residentialtype (37 kW) generator intended to keep the servers powered and air conditioners running. 2014-15 Budget – Board Workshop March 10, 2014

9


2014-15 Capital Projects 2. Fran Greenspan Administration Center Generator FGAC houses the District’s main technology servers, which must be always powered and maintained at a certain temperature to prevent overheating and malfunctioning of equipment.

The current 37kW single phase emergency generator is not compatible with multi-phase boiler room equipment. Proper commercial-grade generator will keep mechanical equipment running as well.

$280,000 New diesel powered three-phase emergency generator is estimated at 200 kW and will include an automatic transfer switch. 2014-15 Budget – Board Workshop March 10, 2014

FGAC can continue to serve as the operational “hub” to keep communications flowing during emergency situations even if power is lost. 10


2014-15 Capital Projects • Some Important Background Information on Capital Project #3: • In October 2012 during non-school hours, heavy snow from a storm compromised the roof of the portable/ modular structure which housed four classrooms at Candlewood Middle School. • After deciding that the structure was beyond it’s useful life and the space wasn’t needed, it was torn down. • The District received approximately $650,000 as an insurance recovery. 2014-15 Budget – Board Workshop March 10, 2014

11


2014-15 Capital Projects BEFORE

2014-15 Budget – Board Workshop March 10, 2014

AFTER

12


2014-15 Capital Projects • Since a State or Local Emergency had been called during the storm which caused the roof damage at Candlewood, we began working with FEMA to secure additional funding. • After over a year of work with them, FEMA has conditionally approved approximately $500,000 in reimbursement to the District should we undertake an “emergency planning” type project. 2014-15 Budget – Board Workshop March 10, 2014

13


However from a mechanical systems perspective, essentially running as two separate facilities

2014-15 Capital Projects 3. High School East Standby Generator

Over 300,000 square feet of occupied space

2014-15 Budget – Board Workshop March 10, 2014

14


2014-15 Capital Projects 3. High School East Standby Generator Provide two 300 kW diesel powered emergency generators and automatic transfer switches; at first loss of power to the building, emergency generators will keep the entire building running seamlessly without interruption

Over 50% of the cost expected to be reimbursed by FEMA (but must spend the money to get the money), with potential for the remaining amount to be partially aided through State Aid

$800,000 No loss of instructional time; No reliance on LIPA/National Grid to provide accurate assessment of restoration time during outages; Default “go-to” site for all other buildings with power loss

2014-15 Budget – Board Workshop March 10, 2014

HSE to be designated as our community’s Red Cross Emergency Evacuation Site

15


Tonight’s Discussion Capital Projects

Property Tax Levy Cap Formula

Equipment Highlights

Revenues

2014-15 Budget – Board Workshop March 10, 2014

16


Property Tax Levy Cap Formula • Finalizing “transfer to capital” budget line at $1.83 million caused a modification to data input items related to “capital exclusions for coming year” • Formula input items submitted to State Comptroller March 1st as required • Assumes no “piercing” of the cap

2014-15 Budget – Board Workshop March 10, 2014

17


Property Tax Levy “Cap” Impact

2.42% increase from 2013-14 property tax levy

2014-15 Budget – Board Workshop March 10, 2014

$4.5 million increase from 2013-14 property tax levy

18


Tonight’s Discussion Capital Projects

Property Tax Levy Cap Formula

Equipment Highlights

Revenues

2014-15 Budget – Board Workshop March 10, 2014

19


Revenues 2014-15 Projected Revenue*

Property Tax Levy

$ 192,258,618

State Aid

$ 26,381,067

Use of Fund Balance & Reserves

$

9,500,000

PILOTs

$

3,415,888

Miscellaneous

$

1,602,000

Total projected revenue

$ 233,157,573

Updated from prior workshop based on finalization of “transfer to capital” projects No changes from prior workshop discussion

* Estimated as of March 1, 2014

2014-15 Budget – Board Workshop March 10, 2014

20


Tonight’s Discussion Capital Projects

Property Tax Levy Cap Formula

Equipment Highlights

Revenues

2014-15 Budget – Board Workshop March 10, 2014

21


Equipment Highlights • Three new buses  Average age of District’s bus fleet is 13 years  Buses typically removed from fleet after 300,000+ miles (earlier or later than this general guide based on an individual bus’ condition)

• Instructional technology  Expansion of interactive white board (SmartBoard) initiative  Continuation of technology refresh (laptop carts)

• Security  Continuation of security camera and DVR upgrades District wide

• Grounds Vehicle 2014-15 Budget – Board Workshop March 10, 2014

22


Equipment – Grounds Vehicle • Purchase a new International Heavy Duty 4x2 Dump Truck: $85,000  Existing heavy duty truck has 70,000 “hard” miles on it  Transmission has already been rebuilt twice  12-month-a-year multi-use vehicle  Dump truck  Snow removal  Sanding  Hauling clay for ball fields  Transporting demolition materials to dump  Towing trailers carrying tractors and/or grass cutters 2014-15 Budget – Board Workshop March 10, 2014

23


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.