2 minute read

Town of Stoughton Chooses CM for New Fire Station

Next Article
Next Issue

Next Issue

Stoughton, MA – CTA Construction Managers announced it was awarded the contract to construct the new 25,145sf fire station for the town of Stoughton.

The new fire station will be located on an undeveloped parcel of land on Prospect Street. It will house offices, training space, larger fire truck bays and dormitories for both male and female firefighters, who currently must use the same facilities for showering and sleeping. The new station will also include an emergency operations center and public health headquarters, which would be able to handle an emergency distribution and vaccination center. Plans also include areas for showcasing historic memorabilia associated with the department’s long history of serving the town.

“We look forward to working on our fourth project with the team at CTA Construction Managers to bring this design to life,” said Donald Walter, principal in charge at Dore & Whittier, the firm that designed the new station. “The design creates a state-of-the-art emergency services

Life Science

HPNE Completes Bioprocessing Facility

Smithfield, RI – Pariseault Builders recently completed substantial renovations to deliver a new state-of-the-art facility for High Purity New England (HPNE), a supplier of single use solutions for the biopharmaceutical industry.

Representatives say the project greatly benefited from an integrated approach with n|e|m|d architects and the collaborative efforts yielded a facility that was strategically built to drive down industry lead times and engineered to accelerate HPNE’s output.

Pariseault Builders worked with HPNE’s team to ensure the 27,000sf of clean room and lab environments, manufacturing space, distribution center, and additional office space provided a new and elite workplace for HPNE to provide their customers with the assemblies they require. The specialized scope called for the architectural, engineering, and construction teams to provide significant preconstruction support regarding the MEP/FP components of the project. “Having delivered so many hospital projects over the years certainly helps our efforts in the biopharma and science and technology space,” said Pariseault’s president, Brian Casey. “We deliver anywhere from 60-80 medical projects each year of varying complexities, so labs/cleanrooms, and pretty much all sensitive spaces are somewhat of a niche for us.”

In addition to a new 8,000sf cleanroom space, the building now offers a number of other features for the company including a mezzanine level, an extensive laboratory featuring four suites, an auditorium, a mock cleanroom for onboarding employees to practice gowning and S.O.P. training, and two facility that will be able to stay up to date with accommodating personnel, equipment, vehicles, and the town’s growing needs for years to come.” Previous projects CTA completed with Dore & Whittier include Weston High School, Webster’s Park Avenue Elementary School, and the Scituate Public Safety Building.

“Necessities like larger truck bays are vital to the town’s ability to respond to a wide range of emergencies,” said Taylor MacDonald, partner at Pomroy Associates, the town’s project management firm. “For example, trucks used today have to accommodate equipment for HAZMAT situations and emergency medical equipment, which the larger bays will be able to accommodate.” floors of warehouse space for materials and finished goods. The facility also had additional office space fit out to provide community space to industry and local organizations such as the Boys & Girls’ Club of RI and RI Bio.

“We are very happy to be moving into the next phase of this project and look forward to breaking ground,” said Fire Chief Michael Carroll.

This will be CTA Construction’s second project for the town of Stoughton. The firm previously built the Stoughton Department of Public Works.

This specialty manufacturing and distribution center facility is HPNE’s third such facility and the newly completed space has increased their manufacturing capacity substantially.

This article is from: