Phoebe Leung
Licensed Architect #001.026174 State of Illinois
(+1) 917-963-5205
phoebe.hiunam@gmail.com
Professional Experience
Sept 2017 - Present
San Francisco CA
Solomon Cordwell Buenz SCB
Architect
Experience in mixed-used, multi-family residential, office high -rises and student housing projects in the West Coast. Engaged in all phases of projects ranging from medium to large scale, commerical to pro bono, managed team and project tasks on daily basis, code analysis, prepared and managed drawing set and model, details development, led con sultant coordinations, led innovative design research, attended industry conferences, knowledge sharing and tutorials on Revit and Enscape, mentoring.
|555 Bryant st
Mixed-use apartment high-rise in SoMa San Francisco CA
- Job Captain through SD to CD; Target Completion in 2025
|24th & Waverly
Mixed-use apartment high-rise in Uptown Oakland CA
- Concept Design, Entitlement, SD to CD; Target Completion in 2024
|Trinity Tower
Mixed-use church and condominium high-rise in First Hill Sea ttle WA
- Concept Design, Design Review Process, SD to DD; Entitled
|University of California, Riverside North District Phase II
Mid-rise joint student housing and campus development in Rivers ide CA
- Planning, Concept Design, Programming, Test fit
|The Residences at Bishop Place
Conversion of existing office high-rise to apartment in Downtow n Honolulu HI
- Job Captain through Concept Design to SD; Built in 2022
| Construction Administrations
- Shop drawing reviews, RFIs , BIM coordination, punchlist f or various residential and office high-rises in California including Park Tower at Transbay SF, Prism SF, Forma Oakland, Cumulus District LA.
|Pro Bono Services for non-profit local community organizations
- United Playaz Clubhouse, West Bay Pilipino Multi-Service Center in SoMa SF
- Programming, Concept Design, Interior renovation , Due Diligence, etc.
Aug 2015 - Aug 2016
UNStudio
Amsterdam, The Netherlands Architectural Intern - One-year
Hong Kong Museum preliminary concept design and programming, design research, construction documents, material specifications and on-site construction adm inistration, etc.
|“Wayfinding as design tool” Research, UNStudio Knowledge Platform;
| Jewish Museum New York, New York City NY
|UNStudio Hong Kong Office, Hong Kong; Design and Built
May 2014 - Aug 2014
San Francisco CA
IwamotoScott Architecture
Architectural Intern - Summer
Schematic design set, design development set, material specific ations, etc.
|Genentech HQ Interactive Display Wall, South San Francisco CA
Dec 2012 - Aug 2013
Hong Kong
CL3 Architects Ltd
Architectural Assistant - Year-Out
Residential building design, tender submission, construction do cuments, facade renovation design, interior design, etc.
|The Hemisphere Residential apartment high-rise, Hong Kong; Built
|Murray Building Conversion (from institutional to luxury hospitality),Hong Kong
|Harbour Pinnacles Building Facade Renovation, Hong Kong; Built
Sep 2012 - Nov 2012
Tokyo, Japan
Education
Class of 2017
Atelier Bow Wow
Architectural Intern
Physical models(sketch,design development,final presentation mo dels & construction
Class of 2012
University of Pennsylvania
Stuart Weitzman School of Design
Master of Architecture
The University of Hong Kong
Bachelor of Arts in Architectural Studies
Research Assistant, Community Project Workshop, Faculty of Architecture 2011
Awards, Exhibitions & Publications
Apr2023
Apr2017
Jan2015
AI Competition 2023 - Artificial Nature by Arch Hive
Honourable Mention , “ Artificial Nature of the Mudane”
7th LIXIL International Student Architectural Competition, Chief Ju ror Kengo Kuma
The Award of Excellence , “Spa in the nature”, Memu Meadows, Hokkaido, Japan
Dales Traveling Fellowship Competition 2014-15, University of Pennsylvania
First Place Scholarship
Jan2014-Jan2015 “ Wall” Pavilion
2013-2017
Slought Gallery, Philadelphia, USA
Pressing Matters 3,4,6
Department of Architecture publication, University of Pennsylvania
Featured studio projects ”Respiratory Objects” ,“ Levitation Velodrome”, “Morphic Collectives” and “Wall pavilion”
25May-31May2011
ArtAsiaPacific Magazine Booth & Furniture
Hong Kong Art Fair 2011, Hong Kong Convention & Exhibition Centre, Hong Kong
Dec2009-Jan2010 “ Animation” Pavilion
Bi-City Biennale of Urbanism/Architecture 2009 , West Kowloon Cultural District , Hong Kong
Languages English Full professional proficiency
Cantonese Native Mandarin Full professional proficiency
Skills BIM Revit
3D Modeling Rhino, Maya, Sketchup, Zbrush, Grasshopper Rendering Enscape, Vray, Keyshot, Maxwell, 3ds Max
2D Drawing AutoCad, Adobe Creative Suite, Bluebeam
Physical Model 3D print, CNC milling , Laser-cut, etc.
Others Microsoft/ Google Office, Unreal Engine and VR
Housing Sustainability District Application Drawings 555-585 Bryant Street San Francisco, CA 94107 G - 002 AERIAL SITE VIEW 4THSTREET BRYANT STREET BRANNANSTREET WELSHSTREET ZOEST RITCHST 3RDST DWIGHTD EISENHOWERHWY IMAGE KEY PROJECT SITE Scope of Work Job Captain through SD to CD Project Info Type I-A | 160’-0”|494,270sqft | 501 Units | 16-Story with Rooftop Amenity Terrace & Basement Parking Expedited Housing State Density Bonus
Status Target Completion in 2025
Architect Solomon Cordwell Buenz | Owner Strada Investment Group | Contractor Swinerton
Apartment High-Rise in SoMa San Francisco CA
555 Bryant Mixed-Use
1/2" DIM PT 07 2500 08 4400 STRUCTURAL SILICONE ANGLE TAPE FINISH FLOORING 1/4" MAX 1/8" PROVIDE WEEPS DIM PT DIM PT (ACM) WALL PANEL ALUMINUM WINDOW 07 2500 (ACM) WALL PANEL 1/4" MAX 3/4" 08 4400 STAINLESS STEEL SHEET METAL UNIT 7" 1/2" per slope 1/2" per slope DIM PT DIM PT 08 4400 08 4400 (ACM) WALL PANEL 1/2" DIM PT 1/4" PMMA COATING @ BAY 07 2500 08 4400 EXTRUDED ALUMINUM FRAME DIM PT 1" 1/2" 08 4400 (ACM) WALL PANEL ANGLE TAPE FINISH FLOORING ALUMINUM WINDOW FLASHING HORIZ MIN 08 4400 DIM PT DIM PT 1/2" DIM PT 1/4" 08 4400 08 4400 (ACM) WALL PANEL Drawn By: Project Number: Number: WW DETAILS 555 BRYANT SAN FRANCISCO, 555 BRYANT PL 3 WW -2" METAL SLAB COVER 1 WW -BAY SOFFIT SCALE: 3" = 1'-0" 6 WW -BAY ROOF SCALE: 3" 1'-0" 4 WW -5" METAL PANEL SLAB COVER WITH VENT 7 WW -GLASS SLAB COVER AT SLOT DETAIL IS VE OPTION FOR COURTYARD METAL PANEL AND NTERMEDIATE SLAB COVER 5 WW -FLUSHED METAL SLAB COVER AT 2 WINDOW WALL (L2 EAST COURTYARD) -SILL @ PLANTING NO.DATE 508.26.2022CONSTRUCTION SCALE: 3" = 1'-0" 8 WW -BAY ROOF -IN-SLAB DUCT------2 LEVEL EL:22' - 11"LEVEL EL:51' - 8"EL:80' - 5" LEVEL 10-LEVEL 13 EL:118' - 9"-A3.53 A3.53 F F F F LEVEL EL:22' - 11"LEVEL EL:51' - 8"EL:80' - 5" LEVEL 10-LEVEL 13 EL:118' - 9"-11" 7" 7" A4.42 A4.14 FEL:42' - 1" LEVEL-LEVEL EL:80' - 5"LEVEL 12 EL:109' - 2"EL:137' - 11"10' 11" 7" 7" A4.41 A4.41 F Drawn By: Checked By: Project Number: Number: 2022 Solomon Cordwell Buenz WINDOW WALL (WW) - SOUTH TYP 555 BRYANT ST SAN FRANCISCO, CA 94107 555 BRYANT A3.41 PL LK 2020040 SCALE: 1 AXON -WW -SOUTH TYP SCALE: 1/4" 1'-0" 2 ELEV -WW -SOUTH TYP SCALE: 1/4" = 1'-0" 4 SECTION -WW -SOUTH TYP SCALE: 1/4" 1'-0" 3 SECTION -WW -SOUTH TYP 508.26.2022CONSTRUCTION DOCUMENT 80%
Site Plan Scope of Work Concept Design, Entitlement, SD to CD Project Info Type I-B (12-STORY Light-Gauge Steel Construction) OVER TYPE I-A (4-STORY) | 180’-0” | 413,000sqft | 330 Units
Status Target Completion in 2024
Apartment High-Rise in Uptown Oakland CA
Architect Solomon Cordwell Buenz | Owner & Builder Holland Partner Group
24th & Waverly Mixed-Use
Concrete Shear Walls Light Gauge Steel System 12-Story Concrete Slab & Column 4-Story Mat Foundation Tech Unit Urban Unit Tech Unit
Trinity Tower
Mixed-Use Church and Condominium High-rise in First Hill Seattl e WA
Scope of Work
Project Info Type I-A| 240,000sqft | 266 Units | 31-Story with Rooftop Amenity Terrace & Basement Parking | Existing Parish Church Air Right
Architect Solomon Cordwell Buenz | Owner Caydon | Trinity Parish Church
PRIVATE PATIO 6" KITCHEN 11' 7" 7' 3/4" 1/2" M BATHROOM 0" 5' 11 1/2" 10' 6" 10' 10' 3/4" 21' 29' 0" 0" L3 L4 L5 L2 L1 & L1 MEZZ KEY PLAN 2023 Solomon Cordwell Buenz MARINA SHORES 04/12/23 2021053 ONNI GROUP UNIT A.1 BEDROOM -UNIT A.1 UNIT COUNT263 L3 L4 L5 L2 L1 & L1 MEZZ KEY PLAN 21' 10 3/4" 9' 6" 6' 11 1/4" 10' 3/4" 7' 0" 10' 3/4" 3' 6" 6' 10" 16' 1/2" 0" BATHROOM 9' 0" 3' 6" BATHROOM 9' 0" 3' 0" 35' 11 3/4" 27' 6" 31' 10" 30' 6 3/4" 3' 11 1/4" 4' 7" Movable Island 9" 10' 11 1/2" KITCHEN 10' 2" BATHROOM 6' 9" K C H N 4' 7" 2023 Solomon Cordwell Buenz MARINA SHORES 04/12/23 2021053 ONNI GROUP UNIT C.9 2 BEDROOM -UNIT C.9 UNIT AREA1063 SF UNIT COUNT6 Scope of Work Job Captain DD to CD Project Info Type V-A (3-STORY) OVER TYPE I-A (2.5-STORY) |GSF 887,739sqft |Residential NSF 434,100 GSF 6-Story | 587 Units| 1132 Parking Spaces Architect Solomon
Status Target Completion in 2026
Mixed-Use Apartment High-Rise in Uptown Oakland CA
Cordwell Buenz | Owner & Builder Onni Group
MARINA SHORES
PROJECT MATERIAL BOARD FEBRUARY 9 2023 PLANNING PERMIT APPLICATION LONG BEACH, CA 6 Representation of color may vary due to printing limitations. Actual metal samples are available upon request. Rawhide Rustic Rawhide Rustic Rawhide blends exceptionally well with architectural styles and materials by pairing warm colors and texture to deliver an unparalleled metal finish. Rustic Rawhide presents the beauty of typical weathered metal without the traditional deterrents of rust runoff or compromised performance. FEATURES AND BENEFITS: Offered in 24ga metal roof and wall panels. Dura Tech Rawhide coating technology system. Choose from proprietary fluorocarbon coating over a ZINCALUME or TruZinc (galvanized) substrate. Offering up to 30-Year Limited Warranty on coating. Offered with 20-Year ZINCALUME® Limited Warranty. Available as a special order with minimum order requirements and extended lead time. For use in exterior and interior applications. Excellent corrosion protection. Hartford SRI 23 LRV Chili Powder Apache SRI 27 LRV Hickory SRI 49 LRV 29 Coal Black SRI 24 LRV Ash Gray Dark Walnut Slate Gray SRI 42 LRV 20 Burnished Slate SRI 28 • LRV There are nine rich colors to choose from in the Rawhide coated metal palette. Durability, high-performance, excellent adhesion, and formability are among the qualities this textured metal collection possesses. The added benefit of this group is the outstanding resistance to solvents. FEATURES AND BENEFITS: Offered in 22ga, 24ga, 26ga metal roof and wall panels. Rawhide coating technology system. Choose from proprietary fluorocarbon coating over a ® (galvanized) substrate. Offering up to 30-Year Limited Warranty on coating. Limited Warranty. Available as a special order with minimum order requirements and extended lead time. For use in exterior and interior applications. Excellent corrosion protection. Rustic Rawhide SRI 32 LRV METAL CLADDING PLANKS CEILING WHITE PAINT COATING COATING WHITE 3-COAT PLASTER VINYL WINDOW BLACK LOUVER SUNSHADE PAINTED FAUX WOOD CLEAR GLAZING LOW-IRON CLEAR GLAZING WITH CERAMIC FRITS LEVEL 01 - BLDG A EL:0" LEVEL 1M EL:11' - 0" LEVEL 02 EL:21' - 0" 11' 10' 0" 11' 0" A3.41 LEVEL 01 - BLDG B EL:6" A8.31 3 A8.31 4 A8.31 13 08 3213 ALUMINUM LIFT AND SLIDE DOOR 05 5200 E-RAIL-02 STEEL PICKET RAILING 09 2400 E-PL-02 CEMENT PLASTER CEILING LEVEL 01 - BLDG A EL:0" LEVEL 03 EL:32' - 0" LEVEL 04 EL:44' - 8" LEVEL 05 EL:55' - 0" ROOF EL:66' - 0" MEZZ PARAPET EL:68' - 6" LEVEL 1M EL:11' - 0" LEVEL 02 EL:21' - 0" 2' 6" 11' 0" 10' 4" 12' 8" 11' 0" 10' 0" 11' 0" 1 A3.20 A3.40 1 LEVEL 01 - BLDG B EL:6" 68' 6" A8.31 1 A8.31 2 A8.31 16 B2080.02 LOUVERED ALUMINUM SUNSHADES 05 7300 METAL FRAME AND GLASS INFILL GUARDRAIL 08 3300 MOTORIZED COILING DOOR 08 3300 MOTORIZED COILING DOOR 05 7300 METAL FRAME AND GLASS INFILL GUARDRAIL 03 4123 PRECAST CONCRETE STAIRS 05 5200 E-RAIL-02 STEEL PICKET RAILING 09 5426 E-WD-01 LINEAR WOOD CEILINGS B2010.01a PRE-FINISHED STANDING SEAM METAL WALL PANELS @ METAL CIP CONCRETE STAIRS 09 5426 E-WD-01 LINEAR WOOD CEILINGS B2020.01 GLAZED ALUMINUM-FRAMED SYSTEM B2020.02VINYL WINDOWS SYSTEM B2020.01 GLAZED ALUMINUM-FRAMED SYSTEM B2020.01 GLAZED ALUMINUM-FRAMED SYSTEM B2020.01 GLAZED ALUMINUM-FRAMED SYSTEM 09 5426 E-WD-01 LINEAR WOOD CEILINGS 07 4243 ALUMINUM FACED COMPOSITE WALL PANEL ALT E-ST-01 PORCELAIN TILE PANEL 093013 - BLDG A EL:0" LEVEL 1M EL:11' - 0" EL:21' - 0" Sheet Number: © 2023 Solomon Cordwell Buenz Project Number: Drawn By: Checked By: BUILDING A OVERALL ELEVATIONS 6500 PACIFIC COAST HWY LONG BEACH, CA 90803 MARINA SHORES A3.01 2021053 YOUR INITIALS PM/PD (edit this) SCALE: 1/16" = 1'-0" 2 SOUTH ELEVATION SCALE: 1/16" = 1'-0" 1 WEST ELEVATION NO.DATE DESCRIPTION 111/22/2250% SCHEMATIC DESIGN 212/16/22100% SCHEMATIC DESIGN 301/30/2325% DESIGN DEVELOPMENT 403/01/2350% DESIGN DEVELOPMENT 504/07/2375% DESIGN DEVELOPMENTA3.01 A A P P 15 15 17 17 18 18 32 A3.21 XA XC CLUBROOM FITNESS COWORKING A3.10 A3.20 TRASH CORRIDOR ELECT TRASH ELECT ELECT 1 A2.01.A1 1 A2.01.A2 1 A2.01.B1 1 A2.01.B2 16 16 19 19 31 A3.02 A3.02 A3.11 X1 X2 X3 X4 X5 X6 X7 X9 X10 X11 X12 X13 X14 X15 PEDESTRIAN BRIDGE POOL E-B3 E-B1 UNIT-B.1 UNIT-B.1 UNIT-B.1 UNIT-B.1 UNIT-A.1 UNIT-A.2 UNIT-A.1 UNIT-A.1 UNIT-A.1 UNIT-A.1 UNIT-C.4 UNIT-A.1UNIT-A.1UNIT-A.1 UNIT-A.6 UNIT-A.1UNIT-A.1UNIT-A.1UNIT-A.1UNIT-A.1UNIT-A.1UNIT-A.1UNIT-A.1 UNIT-A.1 UNIT-A.3 UNIT-A.3 UNIT-A.1 UNIT-A.1 UNIT-A.1 UNIT-A.1 MEDIA ROOM AV CLOSET ROOM RR UNIT-C.3 STAIR S-A2 CONFERENCE RR POD POD WELNESS UNIT-A.1 UNIT-C.3 UNIT-B.1 UNIT-A.1 UNIT-B.1 UNIT-A.2 UNIT-A.1 UNIT-B.1 UNIT-A.1 UNIT-B.1 UNIT-A.1 UNIT-A.1 UNIT-A.5 UNIT-A.1 UNIT-A.4 UNIT-A.1UNIT-A.1 UNIT-A.3 UNIT-A.1UNIT-A.1 UNIT-A.1 UNIT-A.1 UNIT-B.1 UNIT-A.2 UNIT-B.1 UNIT-A.1 UNIT-B.1 UNIT-A.1 UNIT-B.1 UNIT-C.8 UNIT-A.1UNIT-A.1 UNIT-A.1UNIT-D.2 UNIT-A.6 UNIT-A.1 UNIT-A.1 UNIT-A.2 UNIT-A.1 UNIT-A.1 UNIT-A.1 UNIT-C.10 UNIT-C.4 3 3 4 5 6 7 8 9 9 10 10 11 11 12 12 13 13 14 14 20 21 22 23 24 25 26 27 28 29 30 C C D D E E F F G G H H J J K K L L L.5 L.5 M.5 M.5 3.7 4.7 5.7 6.7 7.7 M M O O K.5 K.5 2 2 1 1 B B ELECT 24' 9" 22' 22' 0" 22' 0" 22' 0" 22' 0" 22' 0" 22' 22' 22' 0" 22' 0" 22' 0" 22' 0" 23' 0" 21' 2" 47' 0" 21' 2" 45' 4" 22' 0" 22' 0" 22' 0" 22' 0" 22' 22' 22' 0" 22' 0" 22' 0" 35' 4" 21' 2" 17' 15' 22' 0" 22' 22' 22' 22' 22' 22' 0" 10" 13' 10" 13' 2" 10" 31' 17'-----22J.4 J.4 N N X8 8.7 UNIT-A.7 XB 1 A2.03.A2 A2.03.B2 1 A2.03.A1 5 1/8" PEDESTRIAN BRIDGE UNIT-B.1 CONFERENCE AV CLOSET PRIVATE DINING A1 A2 B1 B2 Sheet Number: © 2023 Solomon Cordwell Buenz Project Number: Drawn By:Checked By: KEY PLAN LEVEL 03 OVERALL FLOOR PLAN 6500 PACIFIC COAST HWY LONG BEACH, CA 90803 MARINA SHORES A2.03 2021053 Author Checker SCALE: 3/64" 1'-0" 1 LEVEL 03 OVERALL FLOOR PLAN NO.DATE DESCRIPTION 301/30/2325% DESIGN DEVELOPMENT 403/01/2350% DESIGN DEVELOPMENT 504/07/2375% DESIGN DEVELOPMENT
2022 SOLOMON CORDWELL BUENZ 100’ 200’ Spaces Spaces beds Total 3,000 1,500 Buenz IDE & RCCD | 12 -8 -2022 100200 NORTH DISTRICT MASTER PLAN -FUTURE PHASE | UCR RCCD NORTH DISTRICT - PHASE II | UC RIVERSIDE CA p.24 BLAINE STREET LINDEN STREET CHERRY STREET (RELOCATED) 44’-0” CANYON CREST DRIVE PROPOSED FIRE STATION WATKINS AVENUE CENTRAL PARK REC FIELD II PHASE I (EXISTING) 120YD X 75YD NCAA STANDARD PHASE II BUILDING B PHASE II BUILDING A NORTH DISTRICT MASTER PLAN | COMPLETE 40’-0” STRUCTURED PARKING REC FIELD I 120YD X 75YD NCAA STANDARD CHERRY STREET (PREVIOUS LOCATION) © 2022 SOLOMON CORDWELL BUENZ DRAFT REVIEW UCR RCCD NORTH DISTRICT - PHASE II UC RIVERSIDE CA p.37 MASSING PERSPECTIVE © DRAFT REVIEW | UCR RCCD NORTH DISTRICT PHASE II | UC RIVERSIDE CA p.19 3 BD / 2 BA DOUBLE OCCUPANCY Scope of Work Planning, Concept Design, Programming, Test fit Client University of California Riverside and Riverside City College Project Info GSF 408,530sqft |ASF 306,400sqft |5 to 7-Story | 436 Units
Status Target Completion in 2025 UC RIVERSIDE NORTH DISTRICT - PHASE II Mid-Rise Joint Student Housing and Campus Development in Rivers ide CA
Architect Solomon Cordwell Buenz
© 2022 SOLOMON CORDWELL BUENZ 14' 4" 9" 10' 8" 10' 8" 7' 8" 6' 3" SINGLE OCCUPANCY MICRO UNIT 1BED l 1BATH [RATIO 1:1] 8' 11" 9' 11" 1BR/1BA 1BED l 1BATH [RATIO 1:1] 10' 6" 9' 11" 2" 14' 6" UCR/RCCD NORTH-DISTRICT 2 1BR/1BA 2BED l 1BATH [RATIO 1:1] 10' 0" 11' 10" 11' 10" 8' 2" 13' 9" UCR/RCCD 2BR/1BA 4BED l 1BATH [RATIO 4:1] 11' 10" 11' 10" 10' 11" 13' 9" 2022049 UCR/RCCD NORTH-DISTRICT 2 UCR.02 2BR/1BA 4BED l 1BATH [RATIO 4:1] 9' 1" 9' 1" 10' 2" 9' 1" 9' 1" 10' 6" 8' 2" 2022049 UCR/RCCD NORTH-DISTRICT 2 4BR/2BA 4BED l 2BATH [RATIO 2:1] 11' 10" 11' 10" 12' 7" 11' 10" 2022049 UCR/RCCD NORTH-DISTRICT 2 UCR.05 3BR/2BA 6BED l 2BATH [RATIO 3:1] 9' 1" 9' 1" 12' 3" 9' 5" 8' 1" 10' 11' 1" 6' 8" 2022049 UCR/RCCD NORTH-DISTRICT 2 UCR.08 3BR/2BA 3BED l 2BATH [RATIO 1.5:1] DRAFT REVIEW | UCR RCCD NORTH DISTRICT - PHASE II | UC RIVERSIDE CA p.8 1 BED 300 ASF 42 Units 1 BED 360 ASF 12 Units 4 BED 900 ASF 28 Units 3 BED 770 ASF 29 Units 6 BED 1085 ASF 31 Units 2 BED 480 ASF 35 Units 4 BED 730 ASF 67 Units 4 BED 600 ASF 190 Units MICRO 1BD / 1BA 4BD / 2BA 3BD / 2BA 3BD / 2BA 1BD / 1BA 2BD / 1BA 2BD / 1BA
© 20’ 40’ DRAFT REVIEW UCR RCCD NORTH DISTRICT PHASE II UC RIVERSIDE CA p.30 GROUND FLOOR PLAN SITE B ELEV STAIR STAIR STAIR 8 5A 3B 3H 3C 3C 3D 8 3D 3 3F 3G 3E 4A 1F 1D 1D 1D 1F 1F 1F 1F LOGGIA TRASH 8A CENTRAL PARK 1 UNIT TYPE 1A 2Bd/1Ba (Double Occupancy) 1B - 3Bd/2Ba (Double Occupancy) 1C 1Bd/1Ba (Double Occupancy) 1D 4Bd/2Ba (Double Occupancy) 1E - 3Bd/2Ba (Single Occupancy) 1F Micro (Single Occupancy) 1G 1Bd/1Ba (Single Occupancy) 1H 2Bd/1Ba (Double Occupancy) (Efficiency) 2 RESIDENCE LIFE STAFF 2A - Resident Director 2B Faculty in Residence Apartment 3 RESIDENTIAL SERVICE OFFICES 3A - Front Desk/Waiting 3B Front Desk Support 3C Front Desk Staff Office 3D - Resident Director Office 3E Conference Room 3F RSO Student Workroom 3G RA Student Workroom 3H Mail/Receiving 4 LAUNDRY 4A - Laundry Room 5 COMMUNITY 5A - Entry Lobby/Main Lounge 5B Multi-Purpose 5C MP Storage 5D - Recreation/Gaming 5E Fitness 6 RETAIL 6A - Cafe 7 LIVING LEARNING 7A Group Study/Lounge 7B Conference/Meeting Rooms - L 7C - Conference/Meeting Rooms S 7D - Seminar L 7E Seminar S 7F Storage 8 SUPPORT & MAINTENANCE 8A - Bike/Gear Storage 8B Trash/Recycling 8C Maintenance Storage 8D Maintenance Shop 8E Break Room 8F Offices 8G Custodial Storage 8H Custodial Closets © 2022 SOLOMON CORDWELL BUENZ 20’ 40’ DRAFT REVIEW UCR RCCD NORTH DISTRICT PHASE II UC RIVERSIDE CA p.27 GROUND FLOOR PLAN SITE A 6A 7D 7E 7C 5B 4A 5D 1B 1H 1H 1H 1H 1H 1E 1A 1A 1A 1A 1C 1C 1C 1C 1C 1C 1C 1C 1C 1C 1E 7A ELEV STAIR STAIR PLAZA PLAZA 8A SITE A 5E TRASH 8 STAIR 1 UNIT TYPE 1A 2Bd/1Ba (Double Occupancy) 1B - 3Bd/2Ba (Double Occupancy) 1C 1Bd/1Ba (Double Occupancy) 1D 4Bd/2Ba (Double Occupancy) 1E - 3Bd/2Ba (Single Occupancy) 1F Micro (Single Occupancy) 1G 1Bd/1Ba (Single Occupancy) 1H 2Bd/1Ba (Double Occupancy) (Efficiency) 2 RESIDENCE LIFE STAFF 2A - Resident Director 2B Faculty in Residence Apartment 3 RESIDENTIAL SERVICE OFFICES 3A - Front Desk/Waiting 3B Front Desk Support 3C Front Desk Staff Office 3D - Resident Director Office 3E Conference Room 3F RSO Student Workroom 3G RA Student Workroom 3H Mail/Receiving 4 LAUNDRY 4A - Laundry Room 5 COMMUNITY 5A - Entry Lobby/Main Lounge 5B Multi-Purpose 5C MP Storage 5D - Recreation/Gaming 5E Fitness 6 RETAIL 6A - Cafe 7 LIVING LEARNING 7A Group Study/Lounge 7B Conference/Meeting Rooms - L 7C - Conference/Meeting Rooms S 7D - Seminar L 7E Seminar S 7F Storage 8 SUPPORT & MAINTENANCE 8A - Bike/Gear Storage 8B Trash/Recycling 8C Maintenance Storage 8D Maintenance Shop 8E Break Room 8F Offices 8G Custodial Storage 8H Custodial Closets © 2022 SOLOMON CORDWELL BUENZ 20’ 40’ DRAFT REVIEW UCR RCCD NORTH DISTRICT PHASE II UC RIVERSIDE CA p.28 TYPICAL FLOOR PLAN SITE A 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1H 1B 1B 1H 1H 1H 1H 1H 1E 1E 1A 1A 1A 1A 1A 7A 1A 1C 1C 1C 1C 1C 1C 1C 1C 1C 1C 1B STAIR STAIR 8 ELEV STAIR TRASH 1 UNIT TYPE 1A 2Bd/1Ba (Double Occupancy) 1B - 3Bd/2Ba (Double Occupancy) 1C 1Bd/1Ba (Double Occupancy) 1D 4Bd/2Ba (Double Occupancy) 1E - 3Bd/2Ba (Single Occupancy) 1F Micro (Single Occupancy) 1G 1Bd/1Ba (Single Occupancy) 1H 2Bd/1Ba (Double Occupancy) (Efficiency) 2 RESIDENCE LIFE STAFF 2A - Resident Director 2B Faculty in Residence Apartment 3 RESIDENTIAL SERVICE OFFICES 3A - Front Desk/Waiting 3B Front Desk Support 3C Front Desk Staff Office 3D Resident Director Office 3E Conference Room 3F RSO Student Workroom 3G RA Student Workroom 3H Mail/Receiving 4 LAUNDRY 4A - Laundry Room 5 COMMUNITY 5A - Entry Lobby/Main Lounge 5B Multi-Purpose 5C MP Storage 5D - Recreation/Gaming 5E Fitness 6 RETAIL 6A Cafe 7 LIVING LEARNING 7A - Group Study/Lounge 7B Conference/Meeting Rooms - L 7C - Conference/Meeting Rooms S 7D - Seminar - L 7E Seminar S 7F Storage 8 SUPPORT & MAINTENANCE 8A - Bike/Gear Storage 8B Trash/Recycling 8C Maintenance Storage 8D Maintenance Shop 8E Break Room 8F Offices 8G Custodial Storage 8H Custodial Closets © 20’ 40’ DRAFT REVIEW UCR RCCD NORTH DISTRICT PHASE II UC RIVERSIDE CA p.31 TYPICAL FLOOR PLAN SITE B ELEV TRASH STAIR STAIR 1F 1D 1D 1D 1F 1F 1F 1F 1H 1H 1H 1H 1H 1H 1A 1A 1A 1C 1C 1B 1B 1E 8 1G 1 UNIT TYPE 1A 2Bd/1Ba (Double Occupancy) 1B - 3Bd/2Ba (Double Occupancy) 1C 1Bd/1Ba (Double Occupancy) 1D 4Bd/2Ba (Double Occupancy) 1E - 3Bd/2Ba (Single Occupancy) 1F Micro (Single Occupancy) 1G 1Bd/1Ba (Single Occupancy) 1H 2Bd/1Ba (Double Occupancy) (Efficiency) 2 RESIDENCE LIFE STAFF 2A - Resident Director 2B Faculty in Residence Apartment 3 RESIDENTIAL SERVICE OFFICES 3A - Front Desk/Waiting 3B Front Desk Support 3C Front Desk Staff Office 3D Resident Director Office 3E Conference Room 3F RSO Student Workroom 3G RA Student Workroom 3H Mail/Receiving 4 LAUNDRY 4A - Laundry Room 5 COMMUNITY 5A - Entry Lobby/Main Lounge 5B Multi-Purpose 5C MP Storage 5D - Recreation/Gaming 5E Fitness 6 RETAIL 6A Cafe 7 LIVING LEARNING 7A - Group Study/Lounge 7B Conference/Meeting Rooms - L 7C - Conference/Meeting Rooms S 7D - Seminar - L 7E Seminar S 7F Storage 8 SUPPORT & MAINTENANCE 8A - Bike/Gear Storage 8B Trash/Recycling 8C Maintenance Storage 8D Maintenance Shop 8E Break Room 8F Offices 8G Custodial Storage 8H Custodial Closets © 2022 SOLOMON CORDWELL BUENZDRAFT REVIEW UCR RCCD NORTH DISTRICT PHASE II UC RIVERSIDE CA p.29 UPPER FLOOR PLAN | SITE A 1H 1H 1H 1H 1H 1H 1H 1G 1H 1H 1H 1H 1B 1E 1E 1A 1A 1A STAIR ELEV STAIR 8 7A 1 UNIT TYPE 1A 2Bd/1Ba (Double Occupancy) 1B - 3Bd/2Ba (Double Occupancy) 1C 1Bd/1Ba (Double Occupancy) 1D 4Bd/2Ba (Double Occupancy) 1E 3Bd/2Ba (Single Occupancy) 1F Micro (Single Occupancy) 1G 1Bd/1Ba (Single Occupancy) 1H 2Bd/1Ba (Double Occupancy) (Efficiency) 2 RESIDENCE LIFE STAFF 2A - Resident Director 2B Faculty in Residence Apartment 3 RESIDENTIAL SERVICE OFFICES 3A - Front Desk/Waiting 3B Front Desk Support 3C - Front Desk Staff Office 3D - Resident Director Office 3E Conference Room 3F RSO Student Workroom 3G RA Student Workroom 3H - Mail/Receiving 4 LAUNDRY 4A - Laundry Room 5 COMMUNITY 5A - Entry Lobby/Main Lounge 5B Multi-Purpose 5C - MP Storage 5D - Recreation/Gaming 5E Fitness 6 RETAIL 6A - Cafe 7 LIVING LEARNING 7A Group Study/Lounge 7B Conference/Meeting Rooms L 7C - Conference/Meeting Rooms S 7D Seminar L 7E Seminar - S 7F - Storage 8 SUPPORT & MAINTENANCE 8A - Bike/Gear Storage 8B Trash/Recycling 8C Maintenance Storage 8D - Maintenance Shop 8E Break Room 8F Offices 8G Custodial Storage 8H - Custodial Closets © 20’DRAFT REVIEW UCR RCCD NORTH DISTRICT PHASE II UC RIVERSIDE CA p.32 UPPER FLOOR PLAN | SITE B ELEV TRASH STAIR STAIR 1F 1D 1D 1D 1F 1F 1F 1F 1H 1G 1H 1H 1C 1B 1E 1 UNIT TYPE 1A 2Bd/1Ba (Double Occupancy) 1B - 3Bd/2Ba (Double Occupancy) 1C 1Bd/1Ba (Double Occupancy) 1D 4Bd/2Ba (Double Occupancy) 1E 3Bd/2Ba (Single Occupancy) 1F Micro (Single Occupancy) 1G 1Bd/1Ba (Single Occupancy) 1H 2Bd/1Ba (Double Occupancy) (Efficiency) 2 RESIDENCE LIFE STAFF 2A - Resident Director 2B Faculty in Residence Apartment 3 RESIDENTIAL SERVICE OFFICES 3A - Front Desk/Waiting 3B Front Desk Support 3C - Front Desk Staff Office 3D - Resident Director Office 3E Conference Room 3F RSO Student Workroom 3G RA Student Workroom 3H - Mail/Receiving 4 LAUNDRY 4A - Laundry Room 5 COMMUNITY 5A - Entry Lobby/Main Lounge 5B Multi-Purpose 5C - MP Storage 5D - Recreation/Gaming 5E Fitness 6 RETAIL 6A - Cafe 7 LIVING LEARNING 7A Group Study/Lounge 7B Conference/Meeting Rooms L 7C - Conference/Meeting Rooms S 7D Seminar L 7E Seminar - S 7F - Storage 8 SUPPORT & MAINTENANCE 8A - Bike/Gear Storage 8B Trash/Recycling 8C Maintenance Storage 8D - Maintenance Shop 8E Break Room 8F Offices 8G Custodial Storage 8H - Custodial Closets © 2022 SOLOMON CORDWELL BUENZ 0 20’ 40’ DRAFT REVIEW | UCR RCCD NORTH DISTRICT - PHASE II | UC RIVERSIDE CA p.30 GROUND FLOOR PLAN | SITE B ELEV 8 STAIR STAIR STAIR 8 5A 3A 3B 3H 3C 3C 3D 2A 2A 8 3D 3 3F 3G 3E 4A 1F 1D 1D 1D 1D 1F 1F 1F 1F LOGGIA ZONE TRASH 8A CENTRAL PARK 1 UNIT TYPE 1A - 2Bd/1Ba (Double Occupancy) 1B - 3Bd/2Ba (Double Occupancy) 1C - 1Bd/1Ba (Double Occupancy) 1D - 4Bd/2Ba (Double Occupancy) 1E - 3Bd/2Ba (Single Occupancy) 1F - Micro (Single Occupancy) 1G - 1Bd/1Ba (Single Occupancy) 1H - 2Bd/1Ba (Double Occupancy) (Efficiency) 2 RESIDENCE LIFE STAFF 2A - Resident Director 2B - Faculty in Residence Apartment 3 RESIDENTIAL SERVICE OFFICES 3A - Front Desk/Waiting 3B - Front Desk Support 3C - Front Desk Staff Office 3D - Resident Director Office 3E - Conference Room 3F - RSO Student Workroom 3G - RA Student Workroom 3H - Mail/Receiving 4 LAUNDRY 4A - Laundry Room 5 COMMUNITY 5A - Entry Lobby/Main Lounge 5B - Multi-Purpose 5C - MP Storage 5D - Recreation/Gaming 5E - Fitness 6 RETAIL 6A - Cafe 7 LIVING LEARNING 7A - Group Study/Lounge 7B - Conference/Meeting Rooms - L 7C - Conference/Meeting Rooms - S 7D - Seminar - L 7E - Seminar - S 7F - Storage 8 SUPPORT & MAINTENANCE 8A - Bike/Gear Storage 8B - Trash/Recycling 8C - Maintenance Storage 8D - Maintenance Shop 8E - Break Room 8F - Offices 8G - Custodial Storage 8H - Custodial Closets
UNIT TYPE | SUMMARY