hok engineering
1 | HOK
HOK | 2
C ONTENTS 01
HOK ENGINEERING
02
PROJECTS BY MARKET TYPE Healthcare
03
HOK STREAM Healthcare
04
SERVICES AND SPECIALTIES SUSTAINABILITY
EXISTING BUILDINGS
MEP TECHNOLOGY
Energy Modeling
Adaptive Reuse
Displacement Ventilation
Whole-Building Life-Cycle Analysis Renovation
Radiant Heating & Cooling
Net Zero and LEED Platinum
Central Utility Plants
Facade Design and Analysis
SPECIALTY STRUCTURES
Enclosure Thermal Modeling
Canopies
Daylight and Glare Simulation
Pedestrian Bridges
IT INNOVATION
Feature Stairs
Passive Optical Networks
Vibration Analysis
IT Security Systems
DESIGN COMPETITIONS
Underfloor Air Systems
Circadian Facades Stadiums
3 | HOK
HOK ENGINEERING
#1
#1
#1
2019
A/E firm as ranked by ENR
A/E firm as ranked by Architectural Record
Green Building A/E firm as ranked by ENR
One of Fast Company’s Most Innovative Design Firms
HOK’s culture is rooted in design and technical excellence. This is where great engineering lives. For over 50 years, we have delivered exceptional design with architects at HOK and those at other outstanding practices. We engineer HOK’s most complex projects, from the new Terminal B at LaGuardia, the largest P3 project in US history; to KAUST, a 6.5 million square-foot LEED Platinum Lab of the Year; to the first-of-its-kind Mercedes-Benz Stadium Halo Video Board. We thrive by finding creative, integrated solutions whether we are fine-tuning proven, cost-effective building systems, or exploring ambitious, unprecedented design. We want to be your engineers. We want to bring our experience across the spectrum of project type and size, supplemented by next-generation computational techniques developed by our team and sustainable excellence to your project. Let us help you deliver the best for your Client.
5 | HOK
ENGINEERING SERVICES MECHANICAL
STRUCTURAL
• Air distribution systems - VAV, constant volume, Demand
• Blast & vibration analysis
Controlled Ventilation (DCV), displacement ventilation,
• Existing building assessments
underfloor air distribution (UFAD), dual facade
• Foundation design
• Building automation systems-Integrated smart building systems
• Linear and non-linear dynamic analysis • Long-span & special structures
• Central utility plants
• Renovation & retrofit design
• Cooling condensate recovery systems
• Resilience based design
• Energy recovery systems - Air, Water and Steam
• Seismic design
• Fuel-oil systems-above and below ground with
• Structural modeling
containment
• Technical planning & conceptual studies
• Geothermal systems and ground source heat pumps • Heating, ventilation, and air conditioning
ELECTRICAL
• Hydronic distribution systems-building and campus;
• Emergency/Standby generator systems
variable primary or primary/secondary/tertiary
• Energy management and conservation analysis
• Natural ventilation design
• Fire alarm and smoke detection systems
• Radiant systems-Chilled beam systems, radiant ceilings,
• Grounding systems
radiant floors, snow melting
• Lighting / lighting control systems
• Renewable Energy Systems-Solar thermal
• Lightning protection systems
• Resilience Based design-Mission critical systems
• Low-voltage power distribution (600V and below)
• Steam distribution systems-up to 250 psig
• Medium voltage power distribution (4.16kV – 69kV)
• Variable Refrigerant Flow (VRF) systems
• Photovoltaic power systems • Power monitoring • Short circuit calculations, protective device coordination studies, and arc flash studies • Sustainable / LEED Design • Uninterruptible power supply systems
HOK | 6
FACADES • Building enclosure design
PLUMBING / FIRE PROTECTION
• Thermal performance analysis
• Fire pump/Secondary water storage
• Performance Specification
IT & ES SERVICES • Integration of IT&ES into built environment design • Master Planning including IT systems,
tank • Gray/Rain Water retention and reuse system • Hot and Cold domestic water system • Medical/Process compressed air system
Security systems, Airport system,
• Medical/Process special gas systems
etc.
• Medical/Process vacuum system
• Passive & Active infrastructure (network and systems) design • Converged multi-service network design • Wireless LAN (WiFi) and DAS (distributed antenna system) design • Public Address and Digital Signage design • Command & Control Center design • Vulnerability & Threat Assessments • CPTED (Crime Prevention Through Environmental Design) • Access Control and Video Surveillance Systems • Parking Access Revenue Control Systems • Systems Integration planning and management
• Mission critical systems • Natural Gas system • Purified water system • Sanitary waste/vent, grease waste/ vent, and process waste/vent systems • Sprinklers and standpipe • Storm water and overflow systems • Vacuum waste systems
PERFORMANCE MODELING • Climate and micro-climate analysis • Computational Fluid Dynamics (CFD) • Cost analysis • Daylighting analysis • Life cycle cost analysis • Multi-Criteria Performance Analysis
ENERGY MODELING • Energy Infrastructure Master Planning
• Solar resource assessment and levelized cost of energy (LCOE) • Thermal comfort analysis
• Thermal Comfort Analysis • Whole Building Energy Analysis 7 | HOK
Te s t i m o n i a l s “The HOK team delivered a resounding series of design solutions for the airport’s highprofile modernization project. Multiple
challenges
ranging
from complex existing conditions and attention to solutions that
maintain
We’re honored to work with the best clients, designers, and construction firms in the industry. Here’s what a few of them have to say about our shared experiences.
“
uninterrupted
operations, were achieved with talent, energy and enthusiasm,
We are so grateful to the HOK structural team for their partnership on our project to renovate a factory in a state of disrepair for our headquarters. Our vision of a home for our staff and a thriving community space for our partners would not have been accomplished without the commitment of the structural team to build a strong foundation and backbone. They
always found
creative and effective solutions focused on our goal to
combined with a commanding
create a space that would serve Missouri Foundation for
understanding and use of the
Health well now and for many years to come.”
current modeling technologies.” Gary Summerlin, Senior Design
Jill Nowak, CFO Missouri Foundation for Health (MFHH)
Manager, City of Atlanta Department of Aviation
“HOK Structural is an excellent collaborator and has been willing to provide us with a range of options that meet our ideas alongside the various constraints of our project. Their experience with large scale projects has truly been an asset for moving our project forward in an exciting and responsible manner.” Jason Dannenbring, AIA Associate, Snow Kreilich Architects
HOK | 8
“I had the pleasure of working with HOK’s IT&ES (Information Technology and Electronic Systems) team on the LaGuardia Airport Central Terminal Replacement Project. The team worked collaboratively with Skanska, La Guardia Gateway Partners, and the Port Authority of Y& NJ to develop and deliver innovative solutions to facilitate construction and achieve client goals.
Edward D’Angelo Director Information Technology, LaGuardia Gateway Partners
”
“HOK’s engineers contributed significantly to the success of our Phillips 66 Headquarters project and they were key to helping us set project aspirations that will serve us well in the future. They carefully listened to us and they asked us the right questions. They explored and presented us with design options early in the design process and helped guide us to zero in on solutions that were best suited for our needs. Their focused efforts on sustainable design and energy efficiency have resulted in our project achieving LEED Platinum status, Energy Star status and an ASHRAE Technology award. HOK’s engineers worked closely with our P66 team and the construction team in a very collaborative way to deliver a project that we are proud to call our home. My thanks for a job well done!” Jeff French , Director of Facilities Operations Phillips 66
“With knowledge, experience, communications and collaboration, HOK has helped us achieve our goal of having a facility that is consistent, safe and secure.” Capt. Johnny Reed, UDC Transition Team
“Our West Sacramento Headquarters symbolizes CalSTRS’ promise to sustainability while it provides our employees and visitors with a healthy, stimulating and supportive workplace. The 17 story, 409,000 square foot building has maintained its US Green Building LEED® Platinum certification since 2011. The energy efficient building features and the participation of our employees in “green” build-
strengthen and advance environmental responsibility in our community.” ing practices
-CalSTRS
9 | HOK
Engineering partners
Building a successful design team can be as challenging and critical to a project’s success as the design itself. We pride ourselves on being an experienced, collaborative member of any team. We appreciate what everyone brings to the table and enjoy working together to deliver the best for our clients.
“The St. Louis MLS Stadium project gave DMA the opportunity to work on an exciting local project with HOK
engineers
from coast to coast, each with unique experiences and backgrounds. The overall experience was a gainful collaboration for all involved.” Stephanie Spann PE, LEED AP Structural Project Manager David Mason + Associates
“Each time I have had the chance to speak directly with this team I have enjoyed their total focus, I have never felt as if they were in a hurry to get on with something else or had other matters of greater importance to attend to.
Steven Haynes Senior Commissioning Engineer Burns & McDonnell
HOK | 10
”
Over the past 5+ years, HOK and Sykes Consulting have collaborated successfully on the structural design of several projects totaling over $1B in construction cost. The project types and teaming arrangements have varied depending on project and client needs, and the teams have delivered consistently and successfully.
“The expertise of the HOK engineering team and familiarity of our DMA structural engineers with local construction methods and design criteria meshed well to benefit the overall project.” Kara Marfell, PE, SE Structural Project Manager David Mason + Associates
“HOK has been an outstanding partner of SYKES for several years. They continually demonstrate a commitment to team success and promote a shared vision of excellence. Their effective leadership style fosters a collaborative relationship that is built on trust and mutual respect. It is truly an honor and privilege to partner with HOK.” Darien Sykes President, SYKES Consulting
11 | HOK
Construction partners “Through our work at the HJAIA Landside Modernization Project, we had a
great
experience
collaborating
with HOK on the complex engineering requirements for the job. We had a shared focus on doing what is best for our client and delivering an iconic structure for the City of Atlanta. HOK’s design team was always responsive to the project needs and had a great ability to work within the design parameters to drive the project to incredible outcomes.“
“
Successful collaboration with our construction partners, from precon through commissioning, is critical to the projects’ success. We are proud to have strong relationships with some of the best construction firms in the world, developed over years on a range of project types and delivery methods, including Design-Build and CM delivery. We take great pride in our collaborative successes.
We enjoy working with HOK, because we have the same intensity in getting challenges met and we see things with a similar, cooperative attitude. We have been on many projects with HOK, and hope to do many more. Hartsfield was a challenging project, and that’s precisely why HOK and Beck Steel ended up doing it together. Not just anyone could’ve accomplished that, especially in the timeframe we did...in the busiest airport in the world, at night, over an elevated 7-lane existing active roadway. HOK gets a lot of credit not only for enabling the project to go together, but where the project occurred and how it all came together is amazing.” John Beck, Jr.
Justis Brogan, LEED AP
President and CEO, Beck Steel
Project Director | McCarthy Building Companies, Inc.
“HOK’s Structural group was creative, responsive, and provided some of the most accurate information during preconstruction of any team we have worked with. They have been, and continue to be, a valued design partner that we look forward to working with on future endeavors.” ERIKA WINTERS-DOWNEY Senior Engineering Manager,
HOK | 12
McCOWNGORDON
“I had the pleasure of working with HOK’s IT&ES (Information Technology and Electronic Systems) team on the LaGuardia Airport Central Terminal Replacement Project. The team worked collaboratively with
“The success of the Chicago Bears Halas Hall Addition and Renovation was the result of a true partnership between HOK and Mortenson. Having HOK’s structural engineering group as part of the team proved invaluable to the project. As the architect and structural engineer, HOK was able to coordinate closely to achieve the design vision and provide timely resolutions to questions and issues which were key to meeting the project’s challenging fast track schedule. Laura Sables Leber, Director of Design Phase Management, Mortenson
”
SkanskaWalsh JV, LaGuardia Gateway Partners, and the Port Authority of NY& NJ to develop and deliver sustainable and innovative system solutions to facilitate a complex phased construction and achieve client goals.” Ted Jadermark Project Director Skanska
“The Enclosures Team at HOK has been consistently responsive and effective in helping SWJV meet the challenges of the LaGuardia Terminal B Project. Our collaborative efforts have culminated in creating a new and beautiful state-of-the-art facility that will enhance the travel experience for generations of people who live in or travel through New York!“ Douglas C. Maines, Project Director Skanska Walsh Design-Build Joint Venture
13 | HOK
Integrating science and art To create the most imaginative design solutions, HOK blends engineering rigor and optimization strategies with architectural logic and poetry. Our engineers work across every major building typology and provide expert guidance across structural, mechanical, electrical, plumbing and ďŹ re-protection engineering as well as facades, information technology and building physics.
HOK | 14
Mercedes-Benz Stadium Halo The Halo structure, if “unrolled,” would be taller than the Eiffel Tower. HOK Engineering’s design was finished in less than two months and earned the National Council of Structural Engineers Association’s coveted “Most Outstanding Project” award.
Salt Lake City International Airport The energy-efficient airport meets demanding seismic criteria with steel moment frames and buckling restrained braced frames while maintaining long, clear spans for traveler movement and sweeping landscape views.
BP High-Performance Computing Center Designed to accommodate “the world’s largest supercomputer for commercial research,” the facility reached a remarkable power usage effectiveness ratio of 1.1 while providing a highly wind-resistant structure protects the computer while providing serene daylit workspaces.
Sidney & Lois Eskenazi Hospital Daylit interior spaces, green roofs, landscaped courtyards and massive cantilevers define this LEED-gold healthcare facility. The hospital is able to serve 20 percent more patients in less square footage than in the healthcare system’s previous space.
15 | HOK
MEET HOK LEADERS Claire Moore, PE, SE, LEED AP BD+C ENGINEERING PRACTICE LEADER
Claire’s work includes a wide range of experience in structural engineering design, project management and construction administration services. Her technical expertise encompasses both linear and nonlinear analysis, seismic evaluations and retrofits, structural design and BIM modeling. With completed projects ranging from large iconic buildings to small-scale art installations, she has experience in a variety of project types, including higher education, healthcare, justice and aviation. Claire sits on HOK’s Management Board and Technical Board.
Saad Dimachkieh, PE, CLEP, LEED AP ENGINEERING PRACTICE LEADER
An electrical engineer and engineering leader with nearly 40 years of experience, Saad works closely with owners, architects, consultants and contractors to integrate engineering design throughout all phases of project development. His expertise includes engineering management; design and documentation of lighting systems, power distribution systems and fire alarm systems; and coordination with consultants to design security and telecom systems. Saad sits on HOK’s Technical Board.
Gary Kuzma, PE, CEM, LEED AP, GBE ENGINEERING PRACTICE LEADER
Gary is a mechanical engineer with more than three decades of experience leading the mechanical engineering design for many of HOK’s most complex projects. He integrates innovative, highperformance engineering solutions into each building’s design. Gary leads teams in accommodating clients’ program requirements while ensuring system flexibility, reliability, maintainability and ease of operations. He has broad experience in value engineering and life cycle cost analysis, energy analysis and conservation, and sustainable design.
Matt Breidenthal, PE, SE, LEED AP ENGINEERING PRACTICE LEADER
Matt Breidenthal is a structural engineer responsible for delivering award-winning, complex and demanding multi-disciplinary projects. With a strong record of satisfied repeat clients, Matt brings a deep appreciation for interdisciplinary collaboration and is recognized for his ability to bring innovative and creative solutions. Matt has been lead engineer or Engineer of Record on over $10B of construction. He sits on HOK’s Marketing Board and Board of Directors.
HOK | 16
“We often find simple solutions to complex problems through a
AND AN AWARD-
collaborative team approach.”
WINNING ENGINEERING TEAM “It’s fascinating to imagine what a new space looks like, how people experience a building and how the structure interacts with them.”
“We are partners in delivering great design.”
17 | HOK
PROJECTS BY
HOK | 18
MARKET TYPE
19 | HOK
HOK | 84
H EALTHCARE 85 | HOK
HE ALTHCAR E HOK’s interdisciplinary healthcare teams design wellorganized, sustainable spaces to facilitate care and recovery. HOK Engineering is an experienced partner on projects for the healthcare environment. With experience ranging from new hospital campuses and patient care towers to existing building conversions and renovations, we are able to address the full range of challenges that surround these complex projects. Our engineers work with the entire project team from concept design onwards to design facilities that holistically deliver our healthcare clients’ requirements for operational efficiency and state-of-the-art patient treatment. We simultaneously address long span requirements with vibration control for critical areas such as operating rooms and imaging suites. We design to ensure dedicated pathways for operating and imaging equipment replacement. Our engineering team focuses on high-performance yet cost-effective structural solutions. As environmental health is integral to human health, our engineering team conducts life-cycle analyses to quantify carbon emissions, providing feedback to our clients on the environmental impacts of various design options and how to minimize them. We design with intention, always seeking opportunities to optimize the design, enhance the structure’s performance, and maximize its efficiency. Our clients benefit from workflows and custom parametric scripts HOK engineering has developed over years of healthcare projects to inform key design decisions in short periods of time. In addition, we bring expertise in specialized engineering requirements such as seismic design, security and blast design, as well as custom façades specifically for healthcare settings.
HOK | 86
SELECT CLIENTS AND PROJECTS • Duke University
60 ft
• The University of Michigan • Grady Health System • The University of Pittsburgh • Eskenazi Hospital • University of Missouri • Kaiser Permanente
10 %
• Stanford Children’s Hospital
Girder span on Correll Pavilion above four levels of parking serving four levels of hospital services with vibration criteria up to VC-B Embodied carbon reductions on hospital projects utilizing lifecycle analysis
• New York Presbyterian Hospital
Best Projects SE: Atlanta Hawks and Emory Sports Medicine Complex
• Rutgers Cancer Institute • Humana • Indiana University Health • Memorial Sloan-Kettering • South Nassau Communities Hospital • Department of Veterans Affairs
ENGINEERING SERVICES
“Our vision of a home for our staff and a thriving community space for our partners would not have been accomplished without the commitment of the structural team to build a strong foundation and backbone. They always found creative and effective solutions focused on our goal to create a space
• Structural Engineering
that would serve Missouri Foundation for Health well now
• Energy Modeling and Analysis
and for many years to come.”
• Façade Design • IT & Electronic Systems and Security Design
PROJECT TYPES
Jill Nowak, CFO Missouri Foundation for Health (MFHH)
• Health Sciences Facilities
• Academic Medical Centers
• Health + Wellness Centers
• Ambulatory Care / Outpatient Facilities
• Medical Office Buildings
• Behavioral Health Facilities
• Specialty Hospitals
• Community Hospitals
• Strategic Master Plans 87 | HOK
UPMC UNIVERSIT Y OF PIT TSBURGH MEDI CAL CENTER VISION AND REH ABILITAT ION TOWER AT UPMC MERCY Structural Engineering
HOK | 88
89 | HOK
UNIVERSIT Y OF PITTSBURGH MEDICAL C ENT ER (U PMC ) VISION AND REHABI LITATI ON TOWER AT UPMC MERCY Pittsburgh, Pennsylvania 410,000 sq. ft.
Scheduled to open in 2022, the new facility is entirely dedicated to treating blindness and low vision conditions which will include leading-edge clinical spaces for research trials and interdisciplinary research. The structure of the facility consists primarily of a concrete flat slab supported by concrete columns and beams, with certain areas employing steel due to localized design requirements. The concrete floor plate manages the complex spatial variation of floor vibration requirements across use types, due to the significant amount of sensitive equipment used.
HOK | 90
In order to achieve the architectural vision and programing goals, a transition to steel structure in key areas was required. The most notable is the tower bridge which spans over the main entrance drive below. The trusses range in span from sixty-five to one hundred twenty feet and support levels four through eleven (roof). Another integration of the two structural materials occurred on the East side of the building to support the exterior collaboration stair. The glazed conduit was critical to the overall function of the building which provided casual interaction space for occupants of different disciplines.
Lastly, the two multi-story entrance atriums enclosed by glass were framed in steel. Support of the enclosure required columns which extend over sixty feet in height, unbraced. Concrete filled steel tubes were used to maintain the sleek and minimal appearance of the glass enclosure. Other creative structural features of the project are the use of transfer beams, transfer walls, and walking columns to accommodate the loading dock and garage programing with the differing column grid of the clinical program above.HOK’s structural engineering team worked closely with the contractor to allow the foundation construction and fabrication of the steel transfer trusses to start ahead of the full construction documents being submitted, allowing the earliest construction completion date.
91 | HOK
SIDNEY & LOIS ESKENA ZI HOSPITAL Structural Engineering
HOK | 92
93 | HOK
SID NEY & LOIS ESKENAZI H OSPITAL Indianapolis, Indiana 1.3M sq. ft.
After deeming the buildings on its nearly 150-year-old academic medical center beyond renovation, Eskenazi Health traded its outdated facilities for a large parcel of land just west of downtown Indianapolis. Strategically placed windows in patient rooms and visitor areas bring in sunshine and the natural environment, creating a bright, airy feeling. A highly efficient plan enables the new hospital to serve 20 percent more patients than in the old facility—in less square footage. The 37-acre campus, which is one of the world’s largest LEED Gold healthcare campuses, includes a 315-bed hospital, 100-bed emergency department, 275-room outpatient center and a faculty office building. In addition to setting a new standard for public hospitals, the architecture of the campus stands alongside that of the city’s libraries and museums and creates a new civic icon with lush public spaces and sweeping cantilevers.
HOK | 94
The structural team made these dramatic spans possible with story depth trusses between levels 4 and 5. The trusses support loads from oors 4 through 12, yet occupy relatively little space along the building perimeter. The cantlievered building spans a maximum of 60 feet, creating a human-scale approach to the soaring hospital wing.
95 | HOK
GRADY H EALTH SYSTEM CORRELL PAVI LION FOR ADVANCE D SURGICAL SERVI CES Structural Engineering
HOK | 96
97 | HOK
GRADY H EALT H SYSTEM C ORRELL PAVI LION FOR ADVANC ED SURGICAL SERVIC ES Atlanta, Georgia 232,000 sq. ft. surgical center over 348,000 sq. ft. parking
Keen to increase capacity and separate patient care areas by discipline, Grady Health System (GHS), Atlanta’s central community provider and Level One Trauma center engaged HOK’s structural and architectural teams to construct a major outpatient services center downtown. The Correll Pavilion is a new, free-standing ambulatory surgery and clinic center adjacent to GHS Main campus connected to the main hospital by a new pedestrian bridge. The state-of-the-art facility includes four levels of reinforced concrete outpatient medical facility and a mechanical penthouse above four levels of PT parking structure providing
The key structural features include an aggressive double cantilever at the main entry, enabling programmatic requirements and shading entrants to the lobby. Long-span girders of the parking structure support col-
600 parking spaces, and ground-level clinical space.
umns from the patient facility above, allowing a grid system change at level 5. HOK Structures frequently addresses the challenge of placing vibration-sensitive healthcare programming above parking and acheives it through a level of stiff transfer girders. The medical facility is designed to supply specific vibration performance to suit the intended use and equipment requirements of each floor, including operating rooms, imaging, and MRI rooms. The lateral system features a mix of concrete shear walls and moment frames to efficiently control drift while maintaining open space within the facility.
HOK | 98
99 | HOK
UNIVERS ITY OF MICH IGAN CLI NICAL INPAT IENT TOW ER Facade Design Structural Engineering
HOK | 100
101 | HOK
UNIVERSIT Y OF MICH IGAN C LI NICAL INPATI ENT TOWER Ann Arbor, Michigan 695,070 sq. ft.
The Clinical Inpatient Tower (CIT) will be a state-of the art healthcare facility that provides incremental inpatient beds, operating rooms and diagnostic capacity while maintaining a functional connection to the existing Frankel Cardiovascular Center building (CVC). The buildings will be connected by tunnel and elevated pedestrian walkway. The 12-story steel frame structure employs a combination of concentric and eccentric braced frames comprising the majority of the lateral system.
The combination lateral system accomplished the challenging task of providing stiffness in a relatively small core while ensuring all patient room windows were identical and unobscured by braces. Transfer girders at levels 7 and 8 allow the lower half of the building with imaging, operating, community, and mechanical spaces to use a different column grid from the patient room levels above. The program calls for a triangular portion of the building on the south-east side to cantilever from level 6 to level 9 and support a lesser triangular extent hanging from below between levels 4 and 6. The projection is supported by internal vertical and horizontal bracing along each cantilevered gridline in the N-S direction. The structural team led the pursuit of embodied carbon reduction by quantifying the carbon footprint of structural and facade materials used and collaborated with the foundation and geotechnical engineers to devise creative strategies to signiďŹ cantly reduce material and carbon expenditures in the earth retention and
This approach eliminates the emission of three million kg of carbon dioxide to the atmosphere. concrete mix designs.
HOK | 102
103 | HOK
DUKE RALEIG H Structural Engineering
HOK | 104
BED TOWE R
105 | HOK
DUKE RALEIGH BED TOWER Raleigh, North Carolina 202,000 sq. ft.
In the interest of modernizing and expanding the hospital’s services, Duke Health engaged HOK to design an addition that was both accessible to the public and integrated with the existing facility. The design covers 202,000 square feet of hospital space, including a bed tower addition and a 27,000 square foot operating wing. Nestled between the existing hospital and a medical office building, the layout of the new facility corresponds to the challenges involved in fitting the new structure onto a site with limited space availability.
New bed tower inserted amongst several existing facilities New operating wing, loading dock and additional patient entry
Expansion joints at existing structure interfaces Adjacent facilities operational during construction
Significant grade variation, underpinning at existing medical office building New connector to existing facility
New feature entry with canopy
HOK | 106
Moment frames are the primary lateral force resisting system utilized to resist the seismic requirements of the area and critical nature of the facility. HOK engaged SidePlate for moment frame connections that saved interior space for programmatic flexibility and reduced erection time in the field. This system also helped limit deflections which minimized expansion joint sizes between the new and existing hospital buildings, key in maintaining smooth, wheel-friendly hallways. The structure of the South Pavilion includes provisions for construction of a future helipad at the roof. The design of the floors of the bed tower and OR are designed to minimize vibrations due to
occupancy and footfall. The project scope also includes the design of a new Central Energy Plant, replacing the existing, outdated system. HOK preemptively tackled design challenges by proactive coordination with in-house architectural design, early engagement with multiple disciplines, and an emphasis on precise BIM modeling. These approaches encouraged communication between the Owner, Engineer, and Contractor, and assisted in reducing unanticipated conditions in the field.
107 | HOK
HOK | 186
HOK STREAM
03
The future of bui l di ng des ign i s here
HOK STREAM optimization scripts accelerate the design process, saving time, materials, carbon emissions and cost
+
Optimization algorithms help explore hundreds of design possibilities in the ďŹ rst few weeks of a project
+
Standard engineering design processes are automated, accommodating unexpected design changes in hours, not weeks
+
Estimated material quantities during concept design often within 5% of as-built quantities
+
Complex architectural geometry is rationalized into elegant framing schemes, easy to fabricate, erect, and adjust in the ďŹ eld
187 | HOK
HOK has extensive experience in the design and optimization of hospitals, surgical centers, and imaging facilities for project-specific vibration criteria. We use finite element models and modal analysis in tandem with traditional prescriptive methods in order to more accurately determine vibration performance and optimize for it. HOK STREAM is a proprietary parametric tool that links architectural design options with engineering analysis software. It allows us to rapidly generate and analyze a large number of design options, including area-specific velocity and acceleration limits. This allows for relative valuations of interdisciplinary design decisions, and accelerated design iterations based on those decisions: structural costs associated with any design option can be quickly evaluated to determine the option that best aligns with the project goals. STREAM is a substantial differentiator for HOK and our clients: we can develop more optimized solutions faster and more efficiently, including analysis and optimization for Embodied Carbon reduction. Fast Company cited HOK Engineering’s development and
H ealthcare
implementation of STREAM in recognizing HOK as one of its Most Innovative Companies.
Corridor
HOK | 198 98
Operating rooms
Patient rooms
199 | HOK
SERVIC ES AN D SPEC IALTIES
HOK | 202
04
A few of our favorite thi ngs
+HOK’s Engineering team has experience on a wide array of diverse topics, many of which are included in this section. From pedestrian bridges to passive optical networks, from design competitions to displacement ventilation… please reach out if you’re interested to learn more.
203 | HOK
SP E C IALT I E S Ene rgy mo delin g
Energy modeling is an interdisciplinary effor t at HOK, requiring close collaboration between the sustainability, MEP, facade design, and str uctural teams. T he process starts at the macro-scale to determine orientation and for m for passive climate control and becomes more detailed when MEP system selection, facade condensation analysis and ther mal b r idging studies come to the forefront during schematic desi gn and design development.
HOK | 204
87% window-to-
50% window-to-
87% window-to-wall
wall ratio, Royal
wall ratio (WWR)
ratio + extended slab
Caribbean HQ
ed ges = energy p erfor mance of 50% WWR
205 | HOK
Embodied car bon is CO 2 emitted by raw mater ials extraction, materials processing, construction, repair, and endof-ser vice life (landfill, re-use
SPEC IALTIES Li fe-cycl e anal ysis
or recycling) scenarios.
HOK | 206
Unlike operational carbon associated with heating, cooling and lighting, embodied carbon is emitted almost entirely at the beginning of a building project. Quantifying these emissions informs design decisions, resulting in a lower carbon footprint at each stage of the design p rocess.
C ement replacements, sourcing local materials, and multipurpose structural systems are key components of the carbon reduction process. While 5% -10% red uctions will earn the p roject additional LEED credits, HOK aims much higher, making net-zero embodied carbon within reach.
Transpor t
You can only improve what you measure
End of use
Understand As a signatory to the SE 2050 challenge targeting
embodied CO 2 by
net-zero structural car bon emissions by 2050, HOK
life-cycle stage
structures quantifies the embodied emissions of every building project’s structure and enclosure by conducting Whole Building Life Cycle Assessment (WBLCA). T his allows clients and designers to make informed desig n decisions which minimize building embodied car bon over the course of the design process.
Pi np oin t s ou rce s of CO 2 emis s ions by b ui ldi ng sys tem. ..
Materials
Repair
.. .a nd by m a t er i a l Polymers
Windows
Glass
Slabs Shallow Exterior walls
foundations
Steel
C oncrete
207 | HOK
Net-zero and LEED Pl ati num
SPECIALTIES HOK | 208
To achieve a Net Zero Energy Building, HOK has developed the 6-Step process to Integrated Performance Design: Discovery & Definition – Our process kicks-off with a sustainability charrette, where our integrated HOK team will work with you to define roles and responsibilities, set targets for energy, water and waste, identify energy benchmarks, Energy Use Intensity (EUI) targets, financial parameters and alternative financing solutions, and potential solutions and incentives for the project. Climate & Place – The next step is to perform a site and climate analysis for the site to understand external loads, resources and challenges. The analysis should look at topography, geology, biology, and hydrology in addition to context clues, such as cultural norms and systems that are geographically appropriate. The design team will look for opportunities to harvest free water and energy from the site, including rainwater, condensate, natural ventilation, passive solar heating and convection. Load Reduction – The most cost-effective way to reach net zero is to reduce overall building energy loads before designing a renewable energy system to provide sufficient energy for the building. Load reduction will minimize the renewable energy investment by reducing the size of the photovoltaic array or other renewable energy sources. Load reduction may be achieved and through programming and space requirements reduction, site planning, massing and orientation, building envelope optimization, high efficiency HVAC systems and plug load control. The load reduction will be demonstrated through energy modeling and other analytical tools. Integrated Solutions – We use design tools to optimize the building envelope, daylight and thermal comfort. We evaluate MEP and structural systems, site and landscape to minimize energy and water resource use that meet the program requirements set by the client and end users.
Renewable Systems – After building energy demand has been reduced through load reduction and efficient systems, the project can employ renewable energy systems to make up the balance of demand. As each project has it’s own challenges, HOK engineers can help determine the correct renewable energy system for each project. Occupancy – Once the building has been designed to achieve Net Zero Energy over the course of a year, it will be important to monitor, measure and optimize building performance, as well as engage occupants in energy conservation and plug load reduction activities. Building optimization for Net Zero performance is a process rather than a destination.
209 | HOK
SPEC IALTIES
Fac ad e th ermal p erforman c e
HOK | 210
Offset mullion at
Standard mullion
Offset mullio n at
Standard mullio n at
spandrel
at s pandrel
vision g lass
vision g lass
The facade design team blends art and science seamlessly to design facade assemblies, analyzing the c onduction,
convection
and
radiation
that
controls
the
location of the dew point temp erature for each faca destructure condition in the building. Boundary condi tions based upon extensive climate d ata are gleaned from the NFRC and ASHRAE 90.1 to simulate the behavior of the system in research-g rade programs such as THERM.
211 | HOK
HOK | 212
SPEC IALTIES Facade d esign and analysi s
C onstr uctability,
per formance,
and
economy
A beautiful yet high-per for mance build ing skin is scrutinized early in the process for three key reasons: to calculate the weighted average U-value of the assembly, to determine the risk of condensation , and to ens ure constructibility and alignment with the project budget and performance criteria.
213 | HOK
HOK | 214
S PECI ALTI ES Facade thermal performance
65 F and 35%RH = 37F DP 65 F and 35%RH = 45F DP
Academic hospital parapet detail optimization yield ed 5 instead of 4 inches of insulation in the lower lite and replacing metal back pan in lower lite and with insulation tape which raises the temperature of the corner by 14 deg rees. This results in a detail with significantly less risk of c ondensation at this parapet than a standard d etail.
215 | HOK
S P E C IA LT I ES Facad e daylighting performance
Optimize illumance
Minimize glare
Maximize daylig ht autonomy
HOK | 216
Simulation Solemma
of
daylig hting
C limate
Studio
wi th helps
evaluate the trad e off between view and natural light to minimize heat gain and g lare. H OK facades works with the design team to asses options as early in the pro cess as possible to find optimal and
economical
solutions
that
lead to comfortable and productive sp aces
217 | HOK
HOK | 218
SPEC IALTIES Facade innovation
CIRCA DIAN FAÇA DE H OK Facades and WSP Built Eco logy developed a concept based on the Gartner/Permasteelisa Closed Cavity system, curved lites to facilitate automated shading allowing indirect natural light and views at all times. Potential savings
25%
operational
compared
to
energy
convention-
al b uilding. Structural g lass saves 4,000 tons of embodied carbon by reducing need for aluminum i n the mullion framing.
219 | HOK
HOK | 220
SPEC IALTIES Facade innovation
CIRCADIAN FAÇADE
221 | HOK
SPEC IALTIES
HOK | 222
Facade Innovation
S TRU CTU RAL EX TERIO R ENC LO SU RE T his design for a megapanel cladding system which provides lateral stiffness to the primar y structural frame of a high-r ise tower was a collaboration between the str uctural and facades teams. Designed and analysed to meet code per for mance cr iter ia, the cladding concept reduces the tower’s Embodied C arbon significantly by supplementing core dr ift control with a steel braced panel system that suppor ts a shallow glazing system, in place of a conventional aluminum cur tainwall.
223 | HOK
SPEC IALTIES Desi gn comp eti ti ons
HOK | 2 224 24
Let engineer ing be the difference in your winning competition desig n
225 | H HOK OK
SPECIALTIES
Design comp eti ti ons
Don’t limit yourself: let us provide you with options you didn’t know were possible
HOK | 226
The tension and com pression in a bicycle wheel illustrates the concept enab ling th e vast span.
227 | HOK
Desi g n competiti ons
SPECIALTIES HOK | 228
Unparalleled accuracy at the competition phase: let our STREAM wor kflow help you get a head star t
229 | HOK
Existi ng b ui ld ing s
SPECIALTIES HOK | 230
This is an existing 32 story office building in downtown Houston. It is framed with structural steel and served as the offices for El Paso Energy. Since the entire tower was to be upgraded, it was necessary to upgrade the structure as well to bring it up to date with the occupancy. Over the years, significant changes have been made to the wind code, the wind speeds and wind forces had been revised
The challenge was how to strengthen and stiffen the existing structure to bring it in compliance with the new wind codes. An extensive structural analysis to be much greater than those at the time the tower was designed.
was done using the stiffness of the existing masonry core walls. Since these were interior walls and not reinforced with rebar and not grouted, a detail analysis was done taking the reductions in the stiffness of these existing walls. Fortunately, there were sufficient such walls and even with the taken reductions provided sufficient stiffness to meet the code required wind forces.
SPEC IALTIES
Renovation
HOK’s structural team renovated an abandoned thirty-yearold former Sysco Distribution center to become a new home of the Houston Food Bank. This 308,000-sf warehouse building allows HFB to improve their logistic and expand community services. Several existing post-tensioned tilt-up wall panels were cut and removed to create the welcome center and main entrance of the facility from nothing but a
Since most of the wall panels were load-bearing elements, the modiďŹ cation to them required special care. To ensure the safety long line of existing loading docks.
of construction, our structural engineer worked closely with the general contractor to develop step-by-step construction procedure in several critical areas such as where the new monumental stair was added.
231 | HOK
SPEC IALTIES
Renovati on
600 Travis, also known as JPMorgan Chase Tower, is the Houston’s tallest building. The original main lobby featured a 5-story tall vertical curtain wall which are being replaced by a new curtain wall system with a pyramid shape. This renovation allows the lobby depth to be expanded and promotes the circulation and the utilization of the lobby area. It also improved the connectivity of the lobby and the outdoor plaza area. To maintain the operations of the building loading dock and several retails in the basement under the lobby, the new curtain wall frame was designed to be primarily suspended from two existing concrete columns at level 6 which minimized the structural strengthening required on the underside
The boundary conditions of the framing system were strategically designed to maximize the structural efficiency and constructability.
of the ground floor slab.
Besides the pyramid curtain wall, the structural team also worked closely with the landscape team to add several site structures and modified landscape profile of the plaza. The design was coordinated to minimize the required structural modification and keep the project under the budget.
HOK | 232
233 | HOK
Ad ap tive reuse and renovation
SPEC IALTIES
MISSOURI FOUNDAT ION FOR HEALTH
HOK | 234
St. Louis, Missouri
We are so grateful to the HOK structural team for their partnership on our project to renovate a factory in a state of disrepair for our headquarters. Our vision of a home for our staff and a thriving community space for our partners would not have been accomplished without the commitment of the structural team to build a strong foundation and backbone. They always found creative and effective solutions focused on our goal to create a space that would serve Missouri Foundation for Health well now and for many years to come.� -Jill Nowak, CFO, Missouri Foundation for Health (MFHH) 235 | HOK
Ad ap tive reuse and renovation
SPEC IALTIES HOK | 236
TYSON FOOD S D ISCOVERY CENTER AND PILOT PLANT Springdale, Arkansas
This renovation and addition to Tyson Foods’ original 1940s headquarters and Brown’s’ Hatchery provides space for 400 IT employees while
revitalizing
landmark.
a
downtown
Springdale
HOK’s design pays homage to the place where familyowned Tyson got its start.
237 | HOK
Ad ap tive reuse and renovati on
SPEC IALTIES
TYSON FOODS DI SC OVERY CENT ER AND PILOT PLANT Springdale, Arkansas
HOK | 238
Wood reclaimed from the original buildings accents much of the interior, including the reception area, stair treads, walls and landing. Paired with sleek building forms, the reclaimed wood and original brick facades reinforce the connection between innovation and history. Situated along the Razorback Greenway shareduse trail, the building’s location encourages team members to bike or walk to work. A garden on the west side of the facility has shuffleboard, bocce ball and a fire pit that add to the neighborhood’s vibrancy. The Emma Avenue Office is one of several projects for which Tyson Foods has partnered with HOK over the past decade. This renovation and addition to Tyson Foods’ original 1940s headquarters and electric hatchery provides space for 400 IT employees while revitalizing a downtown Springdale landmark. HOK’s design pays homage to the place where familyowned Tyson got its start. A new light-filled, central lobby links the two historic buildings and provides employees and guests with a place to collaborate.
239 | HOK
SPEC IALTIES C anopi es
Delivering iconic, long-span structures while ensuring continuous airport operations is core to HOK’s engineering for aviation practice. As part of the modernization of the world’s busiest airport, HOK delivered a structural and architectural icon for Hartsfield-Jackson Atlanta International. Dual 864’ long structural steel canopies clad in ETFE flank the existing terminal and suspend new pedestrian bridges over the existing roadways, with complex existing conditions at each end of the span.
HOK | 240
While the truss chords appear to consist of a consistently varying curvature, they are actually comprised of discrete constant-curvature sections, significantly less expensive to fabricate. The truss splice connections were designed with internal bolts erected during a midnight-to-5am schedule to minimize lane closures, concealed with welded cover plates afterwards. This innovative design process delivered what the airport General Manager deemed “iconic architectural landmarks for the City of Atlanta.”
To make this possible, HOK structural engineers generated parametric structural models integrated with the architectural models to verify viability, performance, and minimize load applied to the existing structures. This provided continual feedback to the design team and shortened the design process from months to three weeks. Geometric optimization and lightweight ETFE cladding decreased the weight of the structure enough to allow it to rest upon the existing building without additional columns. The sweeping form of the diagrid canopy emerged from the most efficient structural load path found by the team’s algorithm, finessed by creative decisions to simplify construction.
241 | HOK
S P E C IA LT I E S Pe de st ri an b rid g es
HOK | 242
243 | HOK
HOK | 244
of green space near downtown Hous ton. Two separate branches of thi s bri dge draw pedestrians over Memori al parkway and the ri ver b efore adj oi ni ng together i nto a des cendi ng loop at the scul pture park on the oppos i te s ide. The bri dge bel ongs to a famil y of five recreational structures featuri ng l ong spans and dramatic canti levers des i gned by the s tructural group to create spaces for outdoor performance, rel axati on and ri ver sports .
Ros emount Bri dge, Buffalo Bayou Park, Houston TX
SPECIALTIES Pede stria n bridg es
The Buffalo Bayou ri ver wi nds through 160 acres
245 | HOK
S PE CIA LT I E S Sta irs
HOK | 246
Stairs become sculptural centerpieces encouranging interaction between programs, people, and spaces. H OK engineers stairs that appear to float while conforming to deflection and vibration criteria so stringent, they can be clad in glass (and covered by its warranty).
247 | HOK
SPE CIALTI ES Sta irs HOK | 248
T he HOK str uctural team collaborated with the inter iors group to deliver a striking feature staircase for the Nor folk Southern Head quarters project in downtown Atlanta. While the shape of the stair is a set of concentr ic spirals from levels 2-4, the shap e unravels into a surrealist, sculptural ribbon.To suppor t the Cor ian cladding an d shape, curved steel plates were used to for m the stair stringers as well as the hand rail s upports. This improves the structural efficiency by increasing the cross-section moment of inertia.
Ribbon below the stair is a made up of a series of frames linked together by curved steel edge members and joins seamlessly with the steel plate stair at level 2. For this to be successful, an iterative process between the inter iors and str uctural design was imperative. Further, camber was applied to counter the un-raveling effect gravity loads wield on spiral geometr y.
249 | HOK
SPEC IALTIES
Vi b rati on anal ys i s
Successful, proven strategies for addressing structural vibration per for mance and cutting unnecessar y project costs.
T he architecture and engineering team developing options on an integrated approach for the structural framing and mechanical distribution. T his system increased plenum depth by 20%, dramatically increasing energy per for mance while maintaining d esired ceiling height and a wide ar ray of location-sp ecific vibration cr iter ia.
HOK | 250
Vibration criteria can b e major drivers of project cost when ad dressed in an overly conservative way, or a major source of risk if they were to not be addressed sufficiently.
HOK’s Engineering team has
extensive experience in desig ning cost-effective structures for strict vib ration performance on a wi de range of structural systems and types, includ ing laboratories, healthcare facilities, stadia, traini ng centers, bridges, stairs, and renovations. We use advanced analysis techniques to accurately model and op timize structural systems for location-specific vibration criteria and forcing functions, for occupants and for equipment.
We work with the design team
to develop integrated systems solutions that delive r structural p erformance while maintaining sufficient space for services distribution.
251 | HOK
SPECIALTIES
Displacement venti l ati on
Displacement air systems take ad vantage of ther mal stratification to move air through the sp ace at very low velocities. The cooler supply air is introd uced low in the space and is attracted to the warmer surfaces throughout the space. As the air being supplied is warmed a natural draft is created as air is collected and removed at the ceiling level. This design approach lowers the quantity of airflow need ed to condition only the occupied zone of the sp ace. Because supply air is introduced into the sp ace at an elevated temperature when compared to traditional overhead H VAC systems displacement air systems increase the hours that airside economizer cycles can be used to effectively provide free cooling and red uce H VAC cooling energy. Ventilation effectiveness is increased with displacement air systems by supp lying air directly to the occupied zone with less mixing than a traditional overhead system thus improving indoor air quality and occupant comfort. H OK’s engineering team has imp lemented displacement air systems in projects with large volume spaces where conditioning the entire volume of the space would not be efficient, as well as projects where the design teams goal was to minimize or hide the ap pearance of the HVAC system by integrating it into architectural features. On some projects, like the Salt Lake City I nternational Airport, displacement air systems were coupled with evaporative cooling systems to further increase the hours that do not require mechanical cooling.
HOK | 252
SPEC IALTIES
Radiant heati ng and cool i ng
Radiant heating and cooling systems can improve occupant comfort and increase energy savings versus trad itional HVAC strateg ies through better control over operative temperature of the sp ace and the lower transp ort energy inherent to waterbased systems. H igh mass rad iant systems can store energy that can be re-charg ed d uring off hours to offset operational cost. H OK’s mechanical engineering team has extensive experience with radiant heating and cooling systems through our work on past projects in Aviation, Science and Technolog y and Corporate markets. H OK’s radiant system d esigns have utilized both in-slab , panel systems and chilled beams. On some projects, like the Salt Lake City I nternational Airport, the rad iant systems were coup led with displacement air systems to maximize energy savings. Through H OK’s collaborative team approach and close integration with our fellow architectural and structural engineering team members radiant floor slabs are designed to op timize appearance, performance and cost.
253 | HOK
SPECIALTIES C entral utili ty p lants HOK | 254
The C ummins concrete cooling towers, the NASA B-48 C UP and the BP High Performance Commuting C enter CUP. The Cummins cooling tower was a collaboration with the struct ural team. HOK designed CUPs have served everything from NASA’s mission control, data centers, universities, laboratories, air ports, justice complexes, manufacturing facilities, office buildings and various other type of mission critical spaces.
C entral Utility Plants (C UPs) are the beating heart of heating and cooling systems in build ings as CUPs provide chilled water, heating water and/or steam to buildings and camp uses. We focus on issues like future expansion, operational flexibility, cost, controllab ility, simplicity, energy-efficiency, plant opti mization, turndown, resiliency, uninterruptable operation, fail-safe operation, continuity of building operations, maintainability and serviceab ility. Pulling from our vast and extensive experience allows us to efficiently tailor designs to Project specifi c requirements while providing coordinated and multi-di scipline solutions to common issues such as maintainability, serviceability and resiliency. H OK desig ned C UPs have incorporated a variety of technologies to meet the varying project needs including therm al ice storage, field-fabricated custom cooling towers, low temperature cond enser water op eration, commercialgrade D DC controls, industrial-grade PLC controls, central plant optimization software and make-up water storage.
255 | HOK
SPEC IALTIES (
!!+
Und erfl oor ai r sys tems ) . (
! %
Displacement Ventilation systems are able to save energy in a number of ways. While they use air for cooling and heating like VAV systems, they usually only need to supply about 60% as much air to provide the same amount of cooling, which reduces the fan energy. The systems are designed to cool the occupied space only, so space heat loads from items at the ceiling (like lighting) do not necessarily need to be cooled, also saving energy.
HOK | 256
Supplying air at about 68°F/19°C instead of 58°F/14°C can affect the energy both ways – it depends on the climate and what sort of recovery systems are used at the central plant. But in very cold climates or climates with high humidity, this may actually increase energy consumption.
12
6+!!
.1+).
! ?$
! ?%
257 | HOK
SPEC IALTIES
Pas s i ve op ti cal networks
New networ k technologies enable d esigners to create buildings that suppor t communications requirements with less space, power, cooling and infrastr ucture. Passive optical networks (PONs) use fiber optic cables that transmit signals more effectively than traditional copper cable-based networks. For the past several years, PON technology has been used to deliver phone, data and television services into homes. Today, PON equipment is being repackaged into devices appropriate for installation in many building types. Integrating PONs into a building design can generate sig nificant first-cost and long-ter m operational savings.
HOK | 258
Intermediate Distribution Frame (IDF) for a Traditional LAN: Power required: 6-8 kVA for active network equipment Dedicated HVAC required Approximate room area: 120 sf per every 10,000 sf
IDF for a Passive Optical LAN : No power requirements or cooling equipment for passive equipment Approximate Room area: 28sf per every 10,000sf
259 | HOK
HOK | 260
SPEC IALTIES IT security systems
The security automation systems for justice complexes is an innovative design process, minimizing the number and use of traditional control rooms.
Campusus often include a
dedicated security LAN that centralizes the video security system in a single area, making it easier to manage. The security system LAN includes an array of edge, aggregation and core Ethernet switching appliances that provide recording and playback functionality throughout the campus.
261 | HOK