Hrishikesh Tailor - Portfolio 2015

Page 1

HRISHIKESH TAILOR Ryerson University DAS B.Arch.Sci 2017 Architectural Portfolio 2015



CONTENTS

Resume 4 Little Portugal Library I 6 Little Portugal Library II

18

Dalseong Citizen’s Gymnsium 30 Kortright Visitor’s Centre 38 Portlands Housing 46 Portlands Townhouse 50


HRISHIKESH TAILOR Mississauga, Ontario T: 647 716 7833 E: hrishikesh.tailor@gmail.com

www.issuu.com/hrishikesh.tailor http://ahrishitekt.com/

EDUCATION 2012 - Present

Bachelor in Architectural Science, 2017 Candidate Third Year Ryerson University, Toronto

WORK EXPERIENCE

4

May 2015 - Present

Ryerson University - Toronto, Ontario, Canada Undergraduate Research Assistant - Professor Vincent Hui

May 2014 - Aug 2014

Design TWG - Mississauga, Ontario, Canada Architectural Intern - Created architectural visalizations, presentations, building permit drawings, variance applications and Interior Design Construction Documents -Assisted in schematic design phase

June 2013 - Aug 2013

TAES Architects Inc. - Toronto, Ontario, Canada Architectural Intern - Prepared design proposals for clients , architectural visualizations and presentations - Assisted in schematic design phase by providing individual proposals and precedent research - Actively participated in client meetings - Assisted during design development on varied scale and type of projects (residential, institutional, recreational, commercial)


AWARD September 2014

Third Prize- Daegu International Architectural Competition UIA Approved International Competition - Daleseoung Citizen`s Gymnasium Daegu, South Korea A 4 persons team was awarded $5000 US. The team was invited to the Award Ceremony and the Architecture Biennale in Daegu, South Korea. Ryerson University funded the 5-day trip to receive the award and visit the site.

TECHNICAL SKILLS

- AutoCAD 2010-2015 - Revit Architecture - Rhinoceros - Sketchup - V-Ray - Adobe Suite: Photoshop, Illustrator, InDesign - MS Office and MS Project - Digital Fabrication: Laser Cutting

REFERENCES Vincent Hui

Associate Chair and Experiential Learning Director Associate Professor Department of Architectural Science, Ryerson University B.E.S., C.U.T., M.Arch, M.B.A. LEED AP, MRAIC, Assoc. AIA 350 Victoria Street, Toronto, Ontario T: 416 979 5000 ext. 7962 E: vincent.hui@ryerson.ca

Dr. Shenshu Zhang

Principal TAES Architects Inc., Toronto Dr-Ing, OAA, MRAIC, LEED-AP/BD+C E: info@taesarchitects.com T: 416 800 3284 ext. 203 Web: www.taesarchitects.com 5


LITTLE PORTUGAL LIBRARY I

Dundas Ave. W & Sheridan St. Toronto, Canada ASC 620 - Integration Studio II | 01.2015 - 02. 2015 | Instructor - Vis Ramasubraniam | Year Three There are two major given programs- Library and Centre of Social Interaction (CSI) style office. The first step was to identify two volumes which would house the two programs. This division of mass was further applied vertically to create “floating” volumes. Such compartmentalization was carried further in plan by dividing porgrams into various rooms with interstitial space in between for collaboration. These compartments are brought together by a central “greenhouse” which acts as a focal point. The scale was brought down on the north side to associate it with the residential fabric of the site thereby helping, domesticating and otherwise a relatively a “large-scale” project.

6


7


A

5

4 6

7 3

8 2

up

9

up

10

up 12 11

b

b

1

A

N

LEVEL 1 1. Cafe 2. Reading Area 3. Child drop-Day care 4. Senior Centre 5. Loading 6. Storage

8

7. Break0out space 8. CSI Office Reception 9. CSI Reception Office 10. Librarian office 11. Computer-Self check out area 12. Library Reception


6

3

5

4

7

4

up

up 2

3 up up

up up

5

1

8 2

1

LEVEL 2

LEVEL 3

1. Reading Area 2. Fiction stacks 3. Stacks 4. Study Space

5. Seating Area 6. Artist Studio 7. Common Printer space 8. CSI Office

4. Kitchennete for Office 5. CSI Office

1. Reading Area with Stacks 2. Stacks 3. Seating Area

dn up 3

up

up 2

2 up

1

up

4 5 1

N LEVEL 5

LEVEL 4 1.Reading Area with Stacks 2. Stacks 3. Digital Office

4. CSI Office 5.Collaboration Space

1. Reading Area with Stacks 2. CSI Office

9


6 5

7 4 11

3

12

2 8 9 up

1

10 1

LEVEL -1 1. M-E room 2. Storage 3. Audio-Video room 4. Maker Space-Digital Fabrication Lab

5. Computer room 6. Multi-purpose space 7. Server Room 8. Book Processing

9. Elevator room 10. Wood Workshop 11. Work Area 12. Stacks

ve nA

rida

She

Dundas St W

SITE PLAN 10

N


SOUTH ELEVATION

WEST ELEVATION

NORTH ELEVATION

11


SECTION A-A

12


SECTION B-B

13


PARAPET DETAIL

SOFFIT CONDITION 14


WINDOW HEAD DETAIL

FLOOR TO WALL DETAIL 15


16


17


LITTLE PORTUGAL LIBRARY II

Dundas Ave. W & Sheridan St. Toronto, Canada ASC 620 - Integration Studio II | 02.2015 - 04. 2015 | Instructor - Vis Ramasubraniam | Year Three Group Members: Hrishikesh Tailor, Nick Callies A different version of the library project in Little Portugal was chosen to take the project from Schematic Design Phase to design developement. The main concept here is the division of two programs - Library and CSI Office is distinguished by the different orientation of structural grid and facade application. An Aluminum ring mesh acts as a screen for the two programs. Wrapping the building all over with strategically placed openings and punched out windows give a sculptural quality to an otherwise orthographic design. The Office part of the building is characterized by a simple curtain wall with

18


a regular grid which supports a secondary steel structure on the exterior. This structure in turn holds the aluminum ring mesh. The library part of the building is characterized by a more complex facade with windows that punch out into the mesh acting as a “frame� to capture exterior views.

19


20


5

6

4 3

H

UP

2

1 G 5

4

E UP

6

3

D

eet n Str rida She

UP

8

OTB

1. Cafe 2. Storage for Cafe 3. Storage 4. Multipurpose space 5. Storage 6. Library Office 7. Library 8. Reception

2

UP

C

DN

B

7 1

A

Dundas Street Floor 1 - 1:100

LEVEL 1

5

B

6

4

H

3

8. Seating 10. CSI O 11. Stack 13. Period

2

1

8

G 11

A

E 11

UP

UP

D

13

A

C

UP 8

B 10

A

Floor 3 - 1:200

LEVEL 3

N

B 5

6 H

UP

10. CSI Offic

G

E

UP

D

C B 10

N LEVEL 5 Floor 5 - 1:200

A

N

21


5

6

4

H

3 2

1

8

8. Seating Area 10. CSI Office 11. Stacks 13. Periodical Stacks

G 11

E 11

UP

UP 13

D

C

UP 8

B 10

A

Floor 3 - 1:200

SECTION PERSPECTIVE

22

N


23


1 D1 2 3

4

5 6 7 8 9 10

25 26 27 28

11 12 29

13 14 15 16 D2 17 19

18

D3

20 21 22 D4

PARTIAL ELEVATION

5

6

4

H

3 2

23

1

8

8. Seating A 10. CSI Offic 11. Stacks 13. Periodic

G 11

E 11

UP

UP 13

C

UP

24

D

8

B 10

A

Floor 3 - 1:200

WALL SECTION 24

N


Wall Section: Section W-W [Scale 1:20] 30 36 31 32 33 34

PARTIAL FLOOR PLAN

35

36

33 34

PARTIAL REFLECTED CEILING PLAN- TYPICAL

1. Roof Assembly: Foliage Growth Medium Drainage Mat Waterproofing membrane Rigid Insulation (175mm) Vapor Barrier Concrete slab (190mm) Steel Deck 2. Parapet Wall: Air Barrier Rigid Insulation Plywood Sheathing Mineral Wool Insulation 120mm Steel Studs Backer Wall Plywood Sheathing 3. 190mm Floor Slab 4. Catwalk on Secondary Steel Structure 5. Ring Aluminum mesh holder 6. Ring Aluminum Mesh 7. Secondary Vertical Steel element 8. Aluminum Spandrel Panel with Glass Wool Insulation 9. Horizontal Steel Member 10. Horizontal Mullion 11. Glazing Curtain Wall 12.Vertical Mullion 13. Floor Assembly: Raised hardwood Flooring Concrete Slab on Steel Deck (190) Fire proofed Steel I-Beams

PARTIAL INTERIOR ELEVATOIN - TYPICAL

14. Supply Air 15. Horizontal Mullion 16. Aluminum Steel Panel 17. Lighting 18. Steel Columns 19. Metal Screen Ceiling

20. Horizontal Mullion 21. Drain 22. Sidewalk 23. Foundation Wall Assembly: Drainage Frabric Drainage Layer Waterproofing Membrane Rigid Insulation Vapor Barrier Cast in place ConcFourete Wall Rigid Insulation Drywall 24. Foundation Slab: Raised Flooring Rigid Insulation Concrete Slab Vapour Barrier Rigid Insulation Waterproofing Membrane Gravel 25. Flashing 26. Aluminum Spandrel Panel 27. Catwalk 28.Secondary Steel Horizontal Element 29. Curtain Wall Glazing 30. Rainscreen Wall Aluminum Panel Air Space Air Barrier Rigid Insulation Sheathing Cavity Insulation 120mm Steel Stud Wall Cavity Insulation Vapor Barrier PLywood Sheathing Drywall 31. Curtain Wall Glazing 32. Horizontal Steel Elements 33. Catwalk 34. Ring Aluminum Mesh 35. Metal Screen Ceiling

25


1 2 3 4 5 6 7 8 9

10 11

12

PARAPET DETAIL - D1 1. Roof Assembly: Foliage Growth Medium Drainage Mat Waterproofing membrane Rigid Insulation (175mm) Vapor Barrier

Concrete slab (190mm) Steel Deck 2. Gravel 3. Aluminum Coping 4. Blocking 5.Compoite Aluminum Spandrel Panel

6.Parapet Wall Assembly: Aluminum Flashing Waterproofing Membrane Air Barrier Rigid Insulation Plywood Sheathing Mineral Wool Insulation 120mm Steel Studs

Backer Wall Plywood Sheathing 7. Spandrel Cavity Insulation 8. Vapor Barrier 9. Aluminum Grille Catwalk

10. Secondary Steel Element connection to I beam 12. Horizontal Mullion

13 14 15 16 17 18 19 20 21 22 23 24

FLOOR TO WALL - D2 13. Vertical Mullion 14. Horizontal Mullion 15. Supply Air 16. Raised Hardwood

26

Flooring 17. Concrete topping on Steel Deck 18. Steel Deck

19. Ceiling Hanger 20. Steel I-Beam 21. Fire Proofed [Spray Foam] I- beam

22. Fire Proofing Foam main structure 23. Angle Connections 24. Steel Column Connecting Vertical mullions of curtain wall to


27


25 26 27 28

29

MESH TERMINATION - D3 25. Steel Secondary Structure- Vertical Element 26. Steel Secondary Structure- Horizontal Element 27. Aluminum Ring Mesh 28. Pin connecting Mesh to the Secondary Structure 29. Terminating Connection Pin

28

SECTION A-A

SECTION B-B

SOUTH ELEVATION

WEST ELEVATION


1 2 3 4 5 6 7 26 8 25 9 24 10 11

GRADE CONDITION - D4 1. Raised Hardwood Flooring 10. Aluminum Screen Suspended Cast in place Concrete Wall 2. Curtain Wall Glazing Ceiling Rigid Insulation [50mm] 3. Supply air 11. Foundation Wall Assembly: Drywall 4. Horizontal Terminal Mullion Drainage Frabric 24. 60 mm crushed stone 5. Aluminum Flashin Drainage Layer 25. Concrete Retaining Wall 6. Foundation Wall Concrete Face 26. Sidewalk 7. Aluminum Grille Catwalk Waterproofing Membrane 8. Earth Rigid Insulation [100mm] Idea Store 9. Spray foamed fire proof I - Beam Vapor Barrier -Nick Callies & Hrishikesh Tailor

29


BREAK IN NATURE

Dalseong-Gun, Daegu, South Korea UIA Approved Dalseong Citizen`s Gymnasium International Competition 2014 | 3rd Prize Group Members: Hrishikesh Tailor, John Han, Ruslan Ivanutskyy, Daniel Bassakyros With the construction of Techno-polis and Daegu National Industrial park, Dalseong-gun is recently going through a shift in identity from a quiet country district into an exciting cultural hub. In this context, we see an interesting potential in proposing a gymnasium that provides a break space, where the citizens relax and exercise alongside nature. In our proposal, people will be guided to interact with nature using all of their senses. They will feel the diffused green light, hear trees sway and birds chirp, smell flowers, and see green shadow seeping through the glazing. Break in Nature provides the current and the future citizens with exactly what its name suggests--a break from their daily hectic lives, engaging with peaceful nature of Dalseong-gun.

30


     

     

     

31


32


b a

a

B

LEVEL 1 N

33


N SITE PLAN

     

EAST ELEVATION



NORTH ELEVATION

LAYERED VIEW 34

    

    


WALL SECTION 35


SECTION A-A

SECTION B-B

36


37


KORTRIGHT VISITOR’S CENTRE

Woodbridge, Ontario ASC 520 - Integration Studio I | 09. 2014 | Instructor - Maria Denegri | Year Three Group Members: Hrishikesh Tailor, Zac Topp, Kiennte Sanipe The requirement for this project was to create a highly environmentally sustainable visitor centre for Korttright Centre for Conservation. The design was conceived by various passive strategies. First, the volume was stretched into the envornment to have a large south facade and then two double height spaces were added to provide a focal point.

38


39


SITE PLAN

LEVEL -1

b

A

A

b LEVEL 1

LEVEL 2 40

N


41


SOUTH ELEVATION

SECTION A-A

42


Cross Ventilation

EAST ELEVATION Summer Sun: Atrium

Stack Effect

SECTION B-B

Winter Sun: Atrium

PASSIVE STRATEGIES

43


44


45


PORTLANDS HOUSING

Portlands, Toronto ASC 401 - Design Studio III | 02. 2014 - 03.2014 | Instructor - Olena Kobets-Singkh | Year Two The main intent of this project was to be a part of the larger fabric of the Portlands community and also create a community within it. This was achieved through providing a podium which houses a theatre space while the roof of the podium creates a large multipurpose open space while the volumes are arranged in a manner to creat open spaces within the apartment block. These spaces encourage social interactions while providing a space for impromptu performances could take place.

46


47


Scale

Checked by

A136

1 : 200

Checker

Author

0001

Unnamed

Issue Date

Drawn by

Date

Project number

Owner

1 : 200

No. Scale

Checked by

Drawn by

Description

Checker

A135

0001

Author

Issue Date

Unnamed

Consultant Address Address Phone Fax e-mail

Date

Project number

Consultant Address Address Phone Fax e-mail

Consultant Address Address Phone Fax e-mail

Owner

Project Name

Consultant Address Address Phone Fax e-mail

Consultant Address Address Phone Fax e-mail

No.

Consultant Address Address Phone Fax e-mail

Consultant Address Address Phone Fax e-mail

Consultant Address Address Phone Fax e-mail

Consultant Address Address Phone Fax e-mail

Description

www.autodesk.com/revit

Date

www.autodesk.com/revit

10/04/2014 7:57:09 PM Consultant Address Address Phone Fax e-mail

Project Name

Date

10/04/2014 8:10:20 PM -

-

-

PROGRAM DISTRIBUTION

www.autodesk.com/revi

Consultant Address Address Phone Fax e-mail

CANAL

D A

B

B

A

E

D

C

E

A

B

D

C

A

E

B

D

C

E

C

1

1

D

C

Consultant Address Address Phone Fax e-mail

E

1

1

2b

B

A

1

UP

DNUP

UP

Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail

UP

UP

DN

DN

UP DN

UP DN

UP DN UP

-

2

DN

2

-

UP

2

Room

2

2

3

3

Consultant Address Address Phone Fax e-mail

DN

Room -

3

-

-

3

3

4

4

-

-

SERVICE LANE

UP

-

PEDESTRIAN STREET

DN

-

4

No.

-

4

4

5

5

Description

-

UP

DN

-

-

-

-

-

-

Room

5

5

5

ASHBRIDGE'S STREET www.autodesk.com/revit

Owne

www.autodesk.com/revit

www.autodesk.com/revit

www.a

A

C

D

A

E

B

C

Consultant Address Address Phone Fax e-mail

Consultant Address Address Phone Fax e-mail

LEVEL 3

D

E

1

1

-

LEVEL 2

B

Consultant Address Address Phone Fax e-mail

-

LEVEL 1

PARK

Consultant Address Address Phone Fax e-mail

Consultant Address Address Phone Fax e-mail A

B

UP DN

Consultant Address Address Phone Fax e-mail

1

2

1

2

-

E

Consultant Address Address Phone Fax e-mail

UPDN

-

D

C

Consultant Address Address Phone Fax e-mail

Consultant Address Address Phone Fax e-mail

LEVEL 4 A

B

C

LEVEL 5

Consultant Address Address Phone Fax e-mail

D

E

Consultant Address Address Phone Fax e-mail

B

Consultant Address Address 1 Phone Fax e-mail

Consultant Address Address Phone Fax e-mail

Consultant Address Address Phone Fax e-mail

-

Level 4

DN UP

UP DN

1 : 200

C

D

E

-

-

3

-

Checked by

1

Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail

A137

-

Scale

2

2

Consultant Address Address Phone Fax e-mail

-

Description

Date -

-

3

3

3

No.

No.

Description

No.

Date

Description

Date No.

-

-

-

-

4

4

4

5

5

5

5

Owner

LEVEL 8 Unnamed Checker

Checked by

A132 -

-

Scale

1 : 200

A131 Scale

-

-

Level 7 1 200

1 : 200

-

-

1

Level 9 1 : 200

Unn Project number Date

Checker

A130 -

Ow

Projec

0001

Author

Checked by

Scale

LEVEL 10

Issue Date

Drawn by

Checker

Checked by

Unnamed Date

Author

Drawn by

Project Name

Project number

Issue Date

Date

Author

Drawn by

0001

Project number

Issue Date

Date

10/04/2014 3:58:15 PM

0001

Project number

-

LEVEL 9 Unnamed

Project Name

10/04/2014 4:05:23 PM

LEVEL 7

Owner

Owner

Project Name

1 : 200

Drawn by

10/04/2014 3:41:35 PM

5

LEVEL 6

Desc

-

-

4

4

1

Drawn by

UP DN

2

3

48

Unname Project number

-

-

Le el 6

Consultant Address Address Phone Fax e-mail

Date

Consultant Address Address Phone Fax e-mail

-

Project Na

Checked by

A Scale


NORTH - SOUTH SECTION

EAST ELEVATION

EAST - WEST SECTION

49


PORTLANDS TOWNHOUSE

Portlands, Toronto ASC 401 - Design Studio III | 01. 2014 - 02.2014 | Instructor - Olena Kobets-Singkh | Year Two The intent is to design a live/work townhouse that separates the professional and private life of the client in a way that it facilitates both aspects of his life smoothly.

50


The main issue was addressed with the help of a central courtyard. This courtyard separates the professional and private life of the architect. This duality is further reinforced by limiting access of the employees to the more private spaces. Similarly, archi-tectonic dualities are explored in the elevations of the townhouse. (Exterior and interior elevations). The architect’s preferred design sensibilities are used as an inspiration to achieve the aesthetic of the spaces and the townhouse overall. The work spaces have been designed in a way that future expansion is possible. This house provides essential spaces required to live and the luxury to work efficiently from the home-office eliminating the hassles of everyday commute.

51


Scale 0m

LEVEL -1

LEVEL 1

LEVEL 4

1:100 2m

LEVEL 3 Living Work Courtyard

ZONING REQUIREMENTS

SCHEMATIC DESIGN

Public

DESIGN RESPONSE

52

Semi- Private

HEIRARCHY OF SPACES

Private

4m


53


SECTION B-B

54

SECTION A-A


55


56


57




Hrishikesh Tailor hrishikesh.tailor@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.