portfolio . Hugo Barros
portfolio - works of Hugo Barros - 2007 to 2012
Private house for an art colletionist in Mantova . Mixed use building (housing, commerce and offices) in London . School for the refugees in Thailand
.
Living-module for Ponte de Lima .
Rehabilitation of a two bedroom tipology in P贸voa de Varzim E-learning center for the Oporto University . Private House in Rates Masterplan and collective housing in Aldoar . Housing for teachers and day-center for the elderly . Housing for 5 Drama Students
Contacts tel. +351917777945 h u g o. b a r r o s f e r r e i r a @ g m a i l . c o m
Pe r s o n a l D e t a i l s B o r n i n Po r t o o n S e p t e m b e r 1 9 8 9 . Studies in Architecture.
Dates S u m m e r 2 0 1 2 _ C o l l a b o r a t i o n w i t h s t u d i o A r m a z e n a r Id e i a s 2 0 1 1 / 2 0 1 2 _ U S I Ac c a d e m i a d i A r c h i t e t t u r a d i Me n d r i s i o _ M A S T E R 2 - o n e y e a r e r a s m u s S P S e m e s t e r : Tu t o r s h i p u n d e r a r c h . A i r e s M a t e u s S A S e m e s t e r : Tu t o r s h i p u n d e r a r c h . Jo n h a t h a n S e r g i s o n 2 0 1 0 / 2 0 1 1 _ FAU P _ M A S T E R 1 Tu t o r s h i p u n d e r a r c h . C a m i l o R e b e l o 2 0 0 9 / 2 0 1 0 _ FAU P _ BAC H E L O R 3 Tu t o r s h i p u n d e r a r c h . Ru i R a m o s 2 0 0 8 / 2 0 0 9 _ FAU P _ BAC H E L O R 2 Tu t o r s h i p u n d e r a r c h . A l b e r t o L a g e 2 0 0 7 / 2 0 0 8 _ FAU P _ BAC H E L O R 1 Tu t o r s h i p u n d e r a r c h . A n a A l v e s C o s t a
Software Skills
Language Skills
_ Wi n d o w s a n d M a c O S
_ Po r t u g u e s e ( m o t h e r t o n g u e ) _English (C2)
_Archicad
_ It a l i a n ( C 1 )
_ Ve c t o r Wo r k s ( i n i t i a t i o n )
_Spanish (B1)
_Artlantis
_French (A1- reading)
_ Ad o b e P h o t o s h o p _ Ad o b e I n D e s i g n _Rhinoceros _Grasshopper (initiation) _Sketchut _Office
Master 2 . atelier Aires Mateus at Accademia di Mendrisio <
DESENHO ASSISTIDO POR COMPUTADOR - LICENÇA ARCHICAD SN 2-1503088 TODOS OS DIREITOS DE COPYRIGHT SÃO RESERVADOS - CADA VIOLAÇÃO SERÁ LEVADA A TERMOS DE LEI
Rua Avelino Barros, 303 4490-479 Póvoa de Varzim Tlm 913 586 846 | Tlf. Fax 252 683 337 www.armazenarideiasarquitectos.com www.armazenarideiasarquitectos.blogspot.com armazenarideias@sapo.pt
House for an art collecionist in Mantova 2012 0.
piso 1
The house to be projected in “bosco della fontana” needed an exterior space which could contain its vastity. To achieve it the project begun on the idea of a patio house so used during all italian architectural history. It was decided to implant the house in a great void of the forest where the design of the house could dialogue with the existing limits. Once fixed the geometry of the plan in the plot, the focus was put on the design of the roof. When arriving, it can be perceived an archetipal house facade but when getting inside the patio, the roof’s geometry is distorced to reveal the limit of a bigger “patio”- the profile of the trees. The route around the patio proposes a specific living style where a sucession of exterior and interior spaces - living spaces and exposition spaces (one space for one piece - happens.
1:5268,32
1
2
3
7
6 1
4 1 5
>Axonometry
1- external portico
5- room for
2-room for Van Eyckâ&#x20AC;&#x2122;s painting
Mark Rothkoâ&#x20AC;&#x2122;s painting
3- living room
6-bedroom
4- bathroom
7-kitchen
C-20 C-20
D06
Pormenor
1:1300
7
5
6
4
8
9
7 8
9
10
10
Section < Hugo Barros
Master 2 . atelier Jon
nhatan Sergison at Accademia di Mendrisio .project In collaboration with Filipe Ferreira<
Housing, Commerce and Offices Complex 2011 The challenge of occupying a big plot -of ten thusand square meters- made us think with some deepness in the urban impact of the complex. We found a solution which increases the facade surface facing the street , allowing more apartments to have the view both to the public space and the private courtyard. These penetrations in the mass also create some public spaces where there is public programme. The adopted urban solution with the specifique treatment of the interior of the block was intended to contrast with the environment of â&#x20AC;&#x153;the busy Londonâ&#x20AC;?. The very special condition of London city was theme of reflexion , influencing the chosen architectural language.
GROUND FLOOR PLAN 1.200
groundfloor plan <
TYPICAL FLOOR PLAN 1.200
>first floor plan
FACADE SECTIONS 1.50
C-20 C-20
D06
Pormenor
1:1300
SECTION AA´
Section<
C o m p e t i t i o n . i n c o l l a b o r a t i o n w i t h M a rc o s Ve i g a <
da2
Pormenor 1:22,45
International Competition -selected among “best designs” by the jury School for the refugees in Thailand 2011 In order to deal with the climacteric conditions of Thailand it was proposed to do a facade inspired by the concept of “brisesoleil”. This would also function as a playground for the children. As the refugee condition obligates,
it was intended to use lo-
cal materials which would be modulated wood and bamboo, giving a movable condition to the construction and allowing a spacial evolutionary organization for what would be a temporary building.
1
3
4
2
3
3
a
1- administrative area 2-dining hall 3-classroom 4- public bathroom
>plan and section
b
C-20
b
C-20
C-20
C-20
a
C-20
C-20
c
c
sections <
First study project by request<
Living-module for Ponte de Lima 2011 The idea was to put a modular and removable volume in a plot where already exists a holiday home. The scale of the garden compared with the dimensions of the required program made me rethink about the initial rectangular shape plan. In order to make a flexible volume that could fit well in different points of the garden and one that would not divide so much the space around it. For that I decided to design a triangular plan.
0.
Piso
>plan and section
P03
Pormenor
rehabilitation of an appartment In collaboration with arch.Pedro Matos <
backside - parking
Seaside
Rehabilitation of a two bedroom typology in P贸voa de Varzim 2010-2012 Built The inicial design presented an orientation of the living room to the backside of the building while one room had the only view to the seaside imediatly in front. Beside that the old plan harmed the dimension of the social spaces in relation to the others, not differentiating them and releasing too much area for circulation.The project intended to switch this logic putting the living room an kitchen as one unique social spacew oriented to the best side.
>Plan of the appartment - before and after
Bachelor 4. project supervised by arch.Camilo Rebelo<
47 53
Finalist at Secil Students Prize (competing at final phase) E-learning center for Porto University 2010/2011 The public character of this program (auditorium, cafe, a multipurpose room,reading room, etc) and the urban conditions that this forgotten green mass causes, required a building that values and conects all the urban surrounding area. So that idea relates to the routes which cross in diferent ways (one aerial -a bridge-, and the other terraneous following the ground) and break the volumes . Broken in three volumes it was easier to soften the implantation in an hard topography. The relation of the whole building with topography varies between its adaption and its affirmation,opening the interior spaces for landscape direction and crowning the routes started outside with the sloping roofs. The building フ《 position on the eastside provides to open some of its program to the suitable physical and social sorrounding environment.
B
4 0,10
LEGENDA :
42,90
42,90
//
//
43,20
//
E RT DO 4
DO CORTE ALÇA
RA
7
E1 CORT
E RT CO
6
6 E RT s CO rte Co
P R O J E C T O P A CO R RTAE
DO ALÇA
3
DO
ÇA AL
4
CENTRO DO
CONHECIMENTO
J U N H O D E 2 0 11
E S C A L A S 1/ 5 0 0 1/ 10 0
1/ 10
N
HUGO BARROS
E RT
PA CTA
ÇA AL DIRE ADA O TÓRI ENTR AUDI
CO 8
PROJECTO PARA
CENTRO DO
CO
B- Z O N A DE P A S S A GE M DE C O ND UT A S
5
E RT
38,05
4 A- EL EV A D O R E M V IDR O
//
DO 7 CORTE ALÇA
A
P L A NT A PISO 1 - C OR T E HO R IZ O NT A L C OT A 42
6 8
6 7
1 2 3
1- office’s area
5-auditorium
2-ateliers
6-foyer
3-caffe bar
7-reading room
4- reception
8 - public bathroom
plans of public floors < CORTE 5
CO
D06
Pormenor
1:1300
55,000
53,372
55,000
53,372
51,938
49,604
47,786
C-20
C-20
47,786
C-20
c 40,000
C-20 C-20
C-20
34,000
a
b
CORTE ALÇADO 4
55,000
55,000
53,327
53,327
50,684
50,684
49,604
A 46,400
47,084
47,084
46,400
PROJECT
55,056
CENTRO
53,331
Á REA T ÉCNICA
CONHEC PROJECT CENTRO
40,100
40,000
CONHEC ESCALAS
49,604
1/ 10 JUNHO D
CORTE 6
JUNHO D ESCALAS 1/ 10 HUGO B
43,200
Co
CO R rt TE 6 es
TURMA A HUGO B
40,100
40,000
N 38,052
a CORTE 5
34,000
CORTE ALÇADO 7
PROJEC CENTR 4 0,10
CONHE PROJEC
//
// //
A
38,05
46,400
CENTR
//
43,200
ECTA
CONHE ESCALA
A PAR
IR 42,900 A D RADRIO ENTDITÓ AU
42,900
1/ 10 JUNHO
40,100
JUNHO ESCALA 1/ 10 HUGO
B
TURMA HUGO 34,000
N
b
CORTE 8
P L A NT A PISO 1 - C OR T E HO R IZ O NT A L C OT A 42
LEGENDA :
A- EL EV A D O R E M V IDR O
B- Z O N A DE P A S S A GE M DE C O ND UT A S
PROJEC CENTR
CONHE PROJEC CENTR
CONHE ESCALA
1/ 10 JUNHO 46,400
46,050
JUNHO ESCALA
45,300
45,150
42,900
1/ 10 HUGO
42,900
TURMA HUGO
A
N
CORTE 1
c
L E GE ND A : A- ESP A Ç O P A R A P A S S A GEM DE C O ND UT A S DE A R
sections <
In collaboration with arch.Pedro Matos and Pedro Santos <
House in Rates . 2010 - 2011 under construction The area where a gable roof house was already implanted is especially rural altough it is leaning against a very high volume. The project reinterprets the existing mass extending it to give privacy to the exterior spaces between the new forms. The form that hosts the social areas of the house and makes the front of the set could be shaped differently because there was none built environment conditioning. The infinity of those farmlands around asked architecture some closure of each compartiment views.
corte 4
corte 5
alçado muro de vedação 2
g
f
h
i
e'
b
50,60
50,15 2,961
1,400 V.e. 01
a
1,400 1,617
50,19
3,651
cozinha área:9,376 m2 P: 12,27 m
V.i. 06
0,140
corte 2
1,482 0,850 2,197
2,748
V.i. 01
c
1,482 2,197
0,140
quarto de banho área:5,402 m2 P: 9,68 m 0,615
10 9 8 7 6 5 4 3 2 1
d
2
V.i. 01
2,008
7,619
50,19 4,645
quarto área:12,531 m2 P: 15,20 m
quarto área:12,531 m2 P: 15,20 m
0
50,19 2,272
sala área:37,819 m2 P: 28,99 1,344 m
V.e. 01
e
V.e. 01
50,03
1,841
1,292
1,998
1,479
2,496
2,400 V.e. 01
V.e.
50,03
0,850
1,998
5,75
0,215
1,38 5 3,45 5
2,708
0,850 2,400
0,140 0,850 2,400
2,633
V.e. 01
corte 7
0,215
1,292 2,400
quarto área:16,142 m2 P: 22,79 m
0,902
5,034
4,266
50,19
1,893
1,14 2 2,49 3 1,93 8
2,46
V.i. 01
1,208
1,200 2,400
0,850 2,400
0,040
1,349
quarto de banho área:4,547 m2 P: 8,75 m
2,577
0,850 2,400
V.i. 04
0,850
V.i. 01
0,850 2,400
0,140
1,656
0,850
2,622
1,174
02
50,03 1,55
1
50,65
3,075
a' corte alçado 2
50,20
c' b'
g
h
corte 5
corte 4
f
50,20
j
i
corte 3
dação ro de ve alçado mu
ado 1 corte alç
alçado muro de vedação 2
'
l
k j
d'
50,60
50,15 3,176
1
1,181
a
2,027 1,398
V.e. 01
0,931 3,825
V.e. 02
0,917
0,84
corte 2
2,746
3
sala de jantar área:9,465 m2 P: 12,52 m
50,17
6
pátio área:12,827 m2 P: 17,28 m 0,962
hall área:5,605 m2 50,19 P: 10,18 m
1,05 4 2,00 0
2,995
94 1,8 00 2,0
V.i. 01
5 1,87
2
c
6
94 1,8 00 2,0
1,19
3
0 V.i.
16
d
1,3
50,15
3 2,49
V.e.
01
b 49,85 49,81
a'
área técnica área:3,415 m2 P: 8,15 m
50,15
b'
3,383
2,804
49,89 01 V.i. 0,933 3,463
0,797
0,840 2,398
49,91
0,264
garagem área:16,021 m2 P: 16,68 m
corte alçado 2
3,015 03 V.i.
3,079
3,052 2,100
49,91
corte 7
e
0,230
3,002
c'
5,661
d'
k e'
l
corte 3
5,73
4
2,125
Execution project - groundfloor plan<
Bachelor 3. project supervised by arch.Rui Ramos<
55
59,5
60,5
59,5
55
63,5
58
61
B
masterplan and collective housing for Aldoar 2009/2010 The urban treatment had in mind the hierarchy of the new streets, trying to solve carefully transitions areas like streets corners. The scale of the bulidings always refers to the streets Ě dimensions. There was develop the building that makes one of those transitions and its housing design thinks the relation of openness with the public garden. The urban project for Aldoar required the introduction of housing program in an expectant forest with a varied sorrounding (a cemetery, a school, housing estate ). It was designed the nonexisting urban axes and the principles of occupation. It had to be predicted a large green public space which final location intends to dissolve with the tree mass the presence of the cemetery.
63,7
67 64,3
63,8
61
61
59,5
8
58,5
56
56
57,3
FINAL1.200 3ยบ
Pormenor FINAL1.200 2ยบ
FINAL1.200 2ยบ
1:200 Pormenor
Pormenor
1:200 1:200
plans of groundfloor and first floor (2 bedroom tipology), second and third floor (4 bedroom tipology-duplex) <
> plan of a double room tipology appartment.
> perspectived constructive section
Bachelor 2. project supervised by arch.Alberto Lage<
Urban project (including new tennis facilities) and housing for teachers/day-center for the elderly 2008/2009 The plot represents an important public space that urges an intervention - it is located in the convergence of the mouth of Douro river and the sea.The space between the XIX century garden and the XVI fortress was undefined and the requirement of reposition of the tennis club (previously too close from that monument) was used to design that transition and that relation. The full range of public space was redesigned and the traffic rethought in order to anchor the spaces with the sea and the river (previously the streets surrounding all the way around the garden and the other spaces). The building for visiting professors and for the day-center for the elderly was design on the northwestern side of the intervenion area . It concludes the pre-existant block. The need for a natural solarium protected from the north winds promoted a fracture in the front volume, opening up the sea views to the volume behind, and qualifying the inner courtyard.
P04
>Section
Pormenor
C-43
C-43
1:184,65
>axonometry of the building
groundfloorâ&#x20AC;&#x2122;s plan
P02
Pormenor
1:100
> proposal for requalification of the tennis courts - plans: before and after - reposition of the tennis courts regarding the fortress.
Bachelor 1. project supervised by arch.Ana Alves Costa<
five drama students residence 2007/2008 It has been requested a residence for drama students to be implanted in a misused public garden. The place had complex geometries and made the relation between the diferent heights of the surronding streets. To soften the implantation of the building in these conditions, it was decided to break the program in two floors, and to distibute it through three volums that conect and relate in different ways to each other.
1:1300 Pormenor C-20
D06
1- kitchen
5- drama studio
2- laundry
6- study room
3- dining room
7- bedroom
4- living room
8- bathroom
C-20