A
B
C
D
E
F
G
29100 1700
5300
7000
5500
5500
4100
HUI JIE LIM VIRELIE 1900
1
900
2
13300
4900
3
2600
4
SELECTED WORK 2018-2022
3000
5
6
ARCHITECTURE PORTFOLIO
HUI J IE L IM VIR ELIE 13.09.1996 Malaysian Chinese Kuala Lumpur, Malaysia Dessau, Germany
huij.limv@gmail.com www.linkedin.com/in/huij-limv MY // +(60)17 3636822 DE // +(49)17 645265013
Hui Jie is an architectural designer born in Kuala Lumpur, Malaysia, and currently based in Dessau, Germany. She has obtained her Master’s Degree of Architecture (EU) from DIA, the Dessau International Architecture Graduate School, Anhalt University of Applied Science, Germany, and Bachelor’s Degree of Architecture (RIBA Part l / LAM Part l) from the University of Malaya, Malaysia. Hui Jie’s passion lies among the various aspects of architecture design to improve the world, especially with Humanity Architecture. As she believes architecture is one of the keys to improving the life qualities of people. Even though she explored mainly cultural and community projects in school, she thinks all types of good architecture should be able to convey a narrative to people with architectonic and spatial planning and design responding to the context. In the belief that architecture is subjective and is constant progress of realization rather than a mere product, Without a strong foundation of practical experience, her vision in architecture would only be her dream, therefore, Hui Jie is eager to involve in different types and scale project, seeking opportunity in practicing from conceptual design to construction realizing.
E D U C A T ION 2020 - 2022
+ Master’s Degree of Architecture (DIA) (M.A.) - EU Anhalt University of Applied Science (Hochshule Anhalt) | Germany 1.1 German grading (conversion CGPA~ 3.93)
2015 - 2018
+ Bachelor’s Degree of Science in Architecture - RIBA Part 1 / LAM Part 1 University of Malaya | Malaysia CGPA 3.69 (conversion ~1.4 German grading)
E X P E R I E NCE 2015 - Recent
+ Freelancer Designer Job mainly from Malaysia - CAD Drawing // Sketchup Modelling // Lumion Rendering - Wedding Planning // Wedding Decoration
2021 - 2022
+ Assistant Tutor Assistant to Prof. Vesta Nele Zareh | DIA Assisting in class organization and management
Tutor for CadLogic Generative Design to Marco Mondello | DIA Guiding and assisting student in learning and using Grasshopper
2018 - 2020
+ Assistant Architect N O T Architecture | Malaysia - Assist architect on Tender, Construction &presentation Drawing Preparation. - Conduct and coordinate client-consultant meetings and site meeting. - Join architecture competitions on behalf of the office team. - Illustrate schematic design to 3D model and prepare architecture presentation. - communicate with supplier on behalf of client.
2018
+ Intern StudioBase Architect | Taiwan - Assist architect on prepare Tender, Construction &presentation Drawing. - Assist in the production of the Architecture Competition. - Physical Model Making. - Report Documentation. - Illustrate schematic design to 3D model and prepare architecture presentation.
A C H I E V EM ENT 2021, 2022
STIBET Sholarship Award
2020
Bauhaus Campus 2021
2018
RIBA President’s Award from UM
2018
UTP Student Hub Master Planning Competition
2017
KUOK Foundation Award
Awardee Finalist Nominee 4th Place Award Awardee
SKILL Language Software Other
English (Professional), Cantonese (Mother tongue), Mandarin (Native) , Malay (Intermediate), French (Beginner) AutoCAD, Sketchup, Rhinoceros 3D, Grasshopper, Lumion, Adobe Photoshop, Illustrator, InDesign, MS Office, IWork Physical Modelling, Hand-sketching, Digital Art, Calligraphy
CONTENTS
01 MEMORY-MAKING CITY Urban Plan - Master Plan - Architecture (Master Thesis)
02 CONNECTING POINTS Inhabited Infrastructure
03 ADAPTIVE SHELTER Computational Design + 3D Printing Fabrication (Group Work)
04 NEUE BAUHAUS Bauhaus Campus 2020 Competition (Group Work)
05 THE CIRCLES Community Centre (Bachelor Thesis)
06 PROFESSIONAL PRACTICE Individual housing design and built Schematic design (Mix-development Masterplan, Universal Bus station Design, Agriculture land Master Plan, Private Villa)
Fire escape layout design review (Offices)
Competition (Residential, Memorial)
01 MEMORY-MAKING CITY URBAN CORRIDOR AND ARCHITECTURE FOR PUBLIC MEMORY
ACADEMIC PROJECT TYPE: MASTER THESIS INFRASTRUCTURAL URBANISM SITE: KUALA LUMPUR, MALAYSIA SUPERVISOR: VESTA NELE ZAREH DR. YAT MING LOO TOOL: SKETCHUP, AUTOCAD, LUMION, ADOBE PHOTOSHOP, ILLUSTRATOR, INDESIGN
INTRODUCTION
It is a project aim to improved the multi-cultural nation of Malaysia. It explores an infrastructural program and structure designed inspired by the understanding of the cemetery in Malaysia as an urban archive to the people. The main concept is to provide the possibility to connect people for public memory-making. Public memory can be also understood as collective memory, the shared pool of memories, knowledge and information of a social group that is significantly associated with the group’s identity. It helps to form the urban narratives on why things in the past happen and how things in present and future can be solved. By building the public memory of the people, the cultural background understanding of one and other of the multi-ethnic community could be enhance. This is in a way not only to foster the relationship of the people but also to build the urban identity. The site chosen to experiment with the project idea is Kuala Lumpur city center along the Klang and Gombak River (River of Life). It includes three different scales of design in the project: 1. Proposal of facilities and program zoning on an Urban scale. 2. Examplaries of facilities and zone design in Master plan scale. 3. Design focus on one architecture for public memory. The urban scale planning focuses more on designing the concept of an urban corridor with strategies to create the opportunities and possibilities of memory making. The master plan zooms into a central zone to demonstrate the design idea of the urban corridor as well as the schematic design of the new structure proposed to connect people, and the existing historical and cultural space. Lastly. one of the proposed structures is further developed in program and architecture concept design.
Before colonial generation
No conflux of culture
PAST
After colonial generation
Interrelated cultural influence
PRESENT
With Public memory enhancement
Shared cultural understanding
FUTURE
2
URBAN ANALYSIS
bak
Gom Kla
ng
Riv
er
er
Riv
JALAN AMPANG MUSLIM CEMETERY
5K 1H M R WA LK
3
EXISTING HISTORICAL AND CULTURAL SITE
RIVER OF LIFE (ROL)
Bridging with River of Life is not only metaphorically but also physically connect the segregated land and people.
NIRVANA CEMETERY CENTRE KWONG TONG FUNERAL PARLOUR
LEGENDS CHINESE POPULATIONS
MALAYS POPULATIONS
KWONG TONG CEMETERY
INDIAN POPULATIONS
SPATIAL STRATEGY
APPROACHABLE & REACHABLE
DANG WANGI TRANSIT
DANG WANGI TRANSIT
APPROACHABLE & REACHABLE
MASJID JAMEK TRANSIT
CONTINUOUS SPINE IN THE FORM OF URBAN CORRIDOR
Connect
PASAR SENI TRANSIT
SEAMLESS APPROACHABLE & REACHABLE
TRANSIT HUB AS THE FORMAL ENTRY POINT TO THE URBAN CORRIDOR
SEAMLESS URBAN CORRIDOR MAXIMISE VISUAL AND PHYSICAL ACCESIBILITY
01
02
OFFICE & HOTEL ZONE
Comfort
COMMERCIAL & CULTURAL ZONE
INTRODUCTION OF CULTURAL WALK
HISTORICAL & CULTURAL ZONE
COMMERCIAL & CULTURAL ZONE
INTRODUCTION OF LANDSCAPE AND CEMETERY WALK
Create
03
04
4
5
PROJECT OVERVIEW
Multipurpose Common Space
HISTORICAL CULTURAL
r rrido ory n Co Urba blic Mem u P for
COMMERCIAL + CULTURAL ZONE
Central Market Kwong Tong Chinese Cemetery
The oldest and biggest Chinese Cemetery in Kuala Lumpur.
Brickfield (Little India)
It was an open field where the brick was made, and it is a vibrant place dominated by Indian commercials.
It was a wet market in 1888, now it is a center for Malaysian culture.
URBAN PLAN ISOMETRIC
Living Memory Platforms Tower
Urban History Archive
L+ ZONE
Jamek Mosque
One of the oldest mosques in Kuala Lumpur.
Dataran Merdeka
Independence Square where the Union Flag was lowered and the Malaysian flag raise
Overview of the design of Memory-making city: Urban corridor design connecting to existing historical and cultural sites. Other than the zoning of program along the Urban Corridor, proposition and the positioning of architecture sfor public memory making are included for the enrichment of the urban corridor.
6
7
URBAN CORRIDOR DESIGN
Walking at the edge of the water
Cemetery Walk
Side of Commercial buildings
Section A-A’ River of Life
Back of Commercial shoplots
Link Bridge
Program evolving space setback from the river
Linked Bridge
Section B-B’ River of Life
Existing inactive Cascading Landscape
Cultural Walk
Program evolving space setback from the river
Cultural Canopy Walk
Existing inactive Cascading Landscape
Section C-C’ River of Life
DBKL Sqaure (Kuala Lumpur City Hall)
B’
MASTER PLAN
C’
B
C
Urban History Archive and Living Memory Tower
A A’
Multipurpose Common Space
8
9
ARCHITECTURE FOR PUBLIC MEMORY ILLUSTRATION
Multipurpose Common Space
Living Memory Tower
Urban History Archive
ARCHITECTURE DETAIL
10
11
SECTION
Viewing platform (Panorama view to KL) Main organic
Bridging structure (view to CBD area) Memory object displaying space
Oral history space
Floating Cafe (view to closer Historical and Cultural site)
Lobby + Administration
Dato Onn Roundabout (Existing public space)
Green lawn in front of D’Terbing Foodcourt
INTERIOR ILLUSTRATION
burial space
y sharing
Memory object displaying space
River of Life
Monumental zone
12
02 CONNECTING POINTS ACTIVISM ARCHITECTURE COMMUNITY BRIDGE ACADEMIC PROJECT TYPE: INFRASTRUCTURE TO ARCHITECTURE: DESIGNING AN INHABITED BRIDGE IN PARIS, FRANCE SITE: PARIS, FRANCE SUPERVISOR: CLEMENT BLANCHET TOOL: SKETCHUP, AUTOCAD, ADOBE PHOTOSHOP, LUMION
INTRODUCTION
DESIGN CONCEPT
Notion that architecture have the capacity for political intervention, to redirect focus, redistribute predominance and making space for marginal, architecture should not impose specific opinion to influence the society, but rather creating elements to expand the audience and leaving more element for judgement. - Andres Jaque
It has been a norm to encounter a protest movement in France. This brings significant influences to the society whenever there are any irrational protest actions. This project is aiming to promote the idea of activism could be also a harmonious movement as well as cultural to the city. Therefore, the design of the inhabited bridge is to provide a platform where the community can bridge, speak and listen, express thought, gather opinions, observe different stands and accept different identities and opinions.
CHAOS
SEPARATION
HARMONY PART OF THE SOCIETY
14
15
URBAN RESPONSIVE
SITE ANALYSIS AND SYNTHESIS
Sunpath study
Wind rose study
Accessibility study
Services accessibility
Visibility study
Macro circulation study
FORM MANIPULATION
ARCHITECTURAL DETAIL
16
17
PLANS & SECTIONS
CROSS-SECTION & INTERIOR ILLUSTRATION
Activism program space
Market activities space (Mid-bridge)
18
19
CONSTRUCTION DETAIL
INTERIOR ILLUSTRATION
20
03 ADAPTIVE SHELTER SCISSOR STRUCTURE TEMPORARY HABITAT RESEARCH & DESIGN ACADEMIC PROJECT TYPE: COMPUTATIONAL ADAPTIVE SKELETON GRASSHOPPER PROCESS DESIGN FOR ROBOTIC MANUFACTURING SITE: UNIVERSAL SUPERVISOR: JUANFRA GARCIA GUILLEN PARTNER : ALISA, JIYANN, STANISLAVA
TOOL: GRASSHOPPER, RHINO, ADOBE PHOTOSHOP
INTRODUCTION Every year, millions of people are affected by both human-caused and natural disasters. Disasters cause people lose their habitat, possessions, and community. This project explores in designing an emergency habitat to accommodate different type of community. The design idea of the shelter is inspired by biometrics. The idea of scissor structure from the vertebrae of African Egg-eating snake, the idea of expandable structure from the locomotion of earthworm, the water harvesting skin from spider web and cactus as well as joint connector from human body shoulder joint. The structure of the shelter is designed precisely with grasshopper and fabricated with KUKA robot in the end.
DESIGN INTENTION
22
23
SCISSOR STRUCTURE DESIGN THEORY
EXPERIMENTAL DETAIL
24
25
IMAGINATION
COMPUTATIONAL & FABRICATION
26
04 NEUE BAUHAUS NEW PEDAGOGY BAUHAUS COMPETITION: THE 2021 BAUHAUS CAMPUS SITE: DESSAU, GERMANY PARTNER: TEH SIN YING, NG JI YANN TOOL: SKETCHUP, LUMION, ADOBE ILLUSTRATION, PHOTOSHOP
CONCEPT
28
29
SPATIAL DESIGN
CROSS-SECTION & INTERIOR ILLUSTRATION
30
05 THE CIRCLES A CLUBHOUSE FOR THE ONCE YOUNG AND THE YOUNG ONE ACADEMIC PROJECT TYPE: COMMUNITY ELDERLY CLUBHOUSE SITE: PENANG, MALAYSIA SUPERVISOR: AR. EDDIE CHOI TOOL: AUTOCAD, REVIT, LUMION, ADOBE PHOTOSHOP, MICROSOFT WORD
DESIGN STRATEGY
32
The growth rate of aging population has been impacting the politics, economy and social wellbeing of modern community. Hence, this
CONNECTION OPEN, BREAK & TRANSPARENT
inspired the Elderly Clubhouse purposed to rejuvenate them to contribute back to the community while maintaining their selfsustainability. The programs are designed to create interaction and narrow the social gap between the old and young via knowledge
SITE ZONING
Social health zone will be seated at the center supporting the physical health zone that placed opposite shophouses which reflecting the local economical activities that inviting people and also psychological core facing inward to the greenery that need own private space.
The circular ring form is then broken after courtyard is formed, for context connectivity according to site analysis. The breakages are formed responding to surrounding such as the source of visitor as well as greenery area.
The central core is started with a basic circular form.
Physical health core is opened to bring visitor from opposite of the residential area. Social health core is open to invite Sri Saujana apartment residents and psychological health core is opened for outdoor wellness and recreational activities.
exchange in and integration of technology trend (by the young) and traditional skills (by the old). This may not only preserve local traditions and culture, but also revolutionize them for modern adaptation. The self-sustaining architecture of traditional Chinese Hakka Tulou is adapted for exploring the space zoning. The defensive wall in the architecture is modified to circular-formed courtyard for experimenting on continuous flow of dynamic path. The massing and the form of the architecture are used to explore the basics circular form of Tulou. By discarding the Tulou wall originally meant for defense and create openings, permeability, transparency for urban responsiveness and sustainable strategy are achieved. The experimenting circular form of space creates dynamic and continuous path. This resulted the design with circular-formed
CONTINUITY OF SPACE
courtyard which enables the continuous flow of dynamic path. Other circles are added based on the core capacity activities according to the zoning.
The broken circular rings are then filled with green in between the spaces and also the courtyard bring green from exteriors.
33
FORM MANIPULATION
COURTYARD DESIGN APPROACH
ACCESSIBILITY
(HAVING OUTDOOR SHARED SPACE)
Courtyard design is one of the sustainable design approach bringing in natural light and ventilation. Each of the circular courtyard has its own function which respond to the site zoning.
Three cores of the circular rings is played with different level of height but showing a smooth flow of exterior look. The spaces volume is designed to have solid and void integrated with façade design that shows the open, break and transparency.
CONNECTIVITY
The façade strategy of the building will be more to permeability and transparency to achieve either natural ventilation or visual communication.
The whole building form is intended to have continuous flow from the outlook. The roof design will be playing in terms of height according to the vertical site analysis that have been done and yet still have a smooth form to cover the underneath solid and void spaces.
URBAN PLAN ISOMETRIC
SITE PLAN
GROUND FLOOR PLAN
FIRST FLOOR PLAN
SECOND FLOOR PLAN
BASEMENT FLOOR PLAN
34
35
SECTIONAL PERSPECTIVE
SECTIONAL PERSPECTIVE
36
37
MAIN WALL SECTION
SPATIAL DESIGN
38
39
SERVICES DETAIL
Water Supply System
Telecommunication
Fire Hose Reel System
Vertical Trasnport
Solid Water Dsposal Layout
Fire Escape Route
Active Mechanical machine
Electrical Distributing System
ILLUSTRATION
40
06 PROFESSIONAL PRACTICE ASSISTANT ARCHITECT DURATION: 2 YEARS COMPANY N O T ARCHITECTURE SITE: KUALA LUMPUR, MALAYSIA SUPERVISOR: AR. EDDIE CHOI AR. JEE EE KHOR
TASK: ASSIST ARCHITECT ON TENDER, CONSTRUCTION &PRESENTATION DRAWING PREPARATION. CONDUCT AND COORDINATE CLIENTCONSULTANT MEETINGS AND SITE MEETING. JOIN ARCHITECTURE COMPETITIONS ON BEHALF OF THE OFFICE TEAM. ILLUSTRATE SCHEMATIC DESIGN TO 3D MODEL AND PREPARE ARCHITECTURE PRESENTATION. COMMUNICATE WITH SUPPLIER ON BEHALF OF CLIENT.
TOOL: AUTOCAD, SKETCHUP, LUMION, ADOBE PHOTOSHOP, IWORK
CEMENT SCREED R.C. SLAB TO ENGR'S DETAILS
CEMENT SCREED
SKIM COAT
R.C. SLAB TO ENGR'S DETAILS
1
43
TYPICAL TILE FINISH DETAIL
PROFESSIONAL PRACTICE // INDIVIDUAL HOUSING DESIGN & BUILT GATE • Design SCALE 1 : 5
TO BE CONFIRMED
POSITION OF DOOR TO REFER PLAN
LIVING SPACE
19MM THK. MARBLE
BATHROOM
150
5
4
3
2
1
13300 3000
2
2600
4900
900
1900
TYPICAL DROP SECTION AT BATHROOM SCALE 1 : 5
2460
3490
2750
BEDROOM / GYM FFL
ADHESIVE
1045
ROOF LEVEL
FFL
15550
ADHESIVE
CEMENT SCREED 2ND LEVEL FFL +109.245
3
W12
CEMENT SCREED WATERPROOFING (CEMENTITIOUS SYSTEM) TO ARCH'S APPROVAL
TYPICAL DROP SECTION AT BATHROOM SCALE 1 : 5
N O T ARCHITECTURE SDN BHD (1013164-H) Block D-28-12, MyLof t (Menara D), E m p i r a C i t y D a m a n s a r a , J a l a n D a m a n s a r a , P J U 8 , 4 7 8 20 P et a l i n g J ay a, S el a ng o r , M a l a y s i a .
Project:
FFL +105.595
BEDROOM / GYM FLOOR DETAIL
W1a
4575
W1
W30
W1a
W1
W1
W1
Tel : +603 7620 5234 Email : not.arch.2018@gmail.com
19MM THK. MARBLE
W1
Copyright © N O T Architecture Sdn. Bhd. All rights reserved.
FFL
D1
00
GRD LEVEL
SCALE 1 : 5
Client Signing Off:
AS SHOWN @ A3
8MM / 5MM THK. LAMINATED TIMBER FLOORING
Drawing No:
EDDIE
D04-002
NOTA 1720
ADHESIVE CEMENT SCREED
CEMENT SCREED
R.C. SLAB TO ENGR'S DETAILS
CEMENT SCREED
SKIM COAT
R.C. SLAB TO ENGR'S DETAILS
1
Checked by:
Project No:
LED LIGHT
Date:
10 Dec 19
Drawn by:
VIRELY 19MM THK. MARBLE
Do not scale drawing. All dimensions must be verified by contractor prior to construction. Any discrepanties must be reported to Architec t.
FFL +101.02
Date:
Scale:
FOR CONSTRUCTION
TRANSISTION 10-12MM EXPANSION GAP
55
ADHESIVE
DAN PERUBAHAN SERTA TAMBAHAN TINGKAT PADA SEBUAH RUMAH BANGLO 2 TINGKAT YANG SEDIADA KEPADA 3 TINGKAT DI ATAS LOT 46507, NO.74, JALAN SETIAJAYA, BUKIT DAMANSARA, 50490 WP KUALA LUMPUR UNTUK TETUAN EN.LOW WEI LOON DAN PN. GAN SIEW CHOO.
TYPICAL REFLECTIVE POOL TILE FINISH DETAIL
POSITION OF DOOR TO REFER Rev. Notes: PLAN
Title:
CADANGAN COMMON SPACETAMBAHAN
1ST LEVEL
5
25 X 25 ANGLE FILLET
3650
W18
LED LIGHT SKIM COAT
PORCELAIN / CERAMIC TILES (THICKNESS VARIES)
5MM/7MM THK. MOSAIC TILES
D5
3650
W25
BATHROOM
150
55
FFL +112.895
W19
CEMENT SCREED R.C. SLAB TO ENGR'S DETAILS
50
3675
8MM / 5MM THK. LAMINATED TIMBER FLOORING 2745
ADHESIVE
WATERPROOFING (CEMENTITIOUS SYSTEM) TO ARCH'S APPROVAL 25 X 25 ANGLE FILLET
∠
55
∠
CEMENT SCREED
POSITION OF DOOR TO REFER PLAN
TOP OF ROOF LEVEL FFL +116.570
19MM THK. MARBLE MITER JOINT
CEMENT SCREED
6
SCALE 1 : 5
ADHESIVE
55
FFL
TYPICAL STAIRCASE TILE FINISH DETAIL
50
55
ADHESIVE
4
PORCELAIN / CERAMIC TILES (THICKNESS VARIES)
FFL
TYPICAL TILE FINISH DETAIL SCALE 1 : 5
POSITION OF DOOR TO REFER PLAN
BATHROOM
150
00
FRONT ELEVATION
Client Signing Off:
Scale:
FOR CONSTRUCTION_20181019
Date:
1 : 150 @A3
ADHESIVE 10 OCT 2019
01 FOR CONSTRUCTION_20181126 Drawn by: Checked by: PROPOSED RENOVATION OF AN EXISTING BUNGALOW AT NO. 74, JALAN 02 FOR CONSTRUCTION_20181218 03 FOR CONSTRUCTION_20190417 FOR CONSTRUCTION_20190517 SETIA 0405JAYA, BUKIT DAMANSARA 50490 KUALA LUMPUR. Project No: Drawing No: FOR CONSTRUCTION_20190911 EDDIE
VIRELY
Do not scale drawing. All dimensions must be verified by contractor prior to construction. Any discrepanties must be reported to Architec t.
06
Date:
FOR CONSTRUCTION_20190110
FFL
13
NOTA 1720
G3-002
CEMENT SCREED
2
25 X 25 ANGLE FILLET
FFL
3
BEDROOM / GYM
TRANSISTION 10-12MM EXPANSION GAP 8MM / 5MM THK. LAMINATED LED LIGHT TIMBER FLOORING
PORCELAIN / CERAMIC TILES (THICKNESS VARIES)
SKIM COAT
5MM/7MM THK. MOSAIC CEMENT SCREED TILES LAMINATED 8MM / 5MM THK. TIMBER FLOORING R.C. SLAB TO ENGR'S DETAILS CEMENT SCREED
ADHESIVE
55
55
FFL
5550
150
ADHESIVE CEMENT SCREED
BATHROOM
CEMENT SCREED
SECOND SECOND FLOOR FLOOR • Master • Master Bedroom Bedroom : cabinet : cabinet
ADHESIVE
CEMENT SCREED TRANSISTION POSITION OFR.C. DOOR TO REFER SLAB TO ENGR'S 10-12MM EXPANSION GAP DETAILS PLAN
POSITION OF DOOR TO REFER PLAN
55
ADHESIVE / GYM BEDROOM 19MM THK. MARBLE
FFL
BEDROOM / GYM
CEMENT SCREED
COMMON SPACE
19MM THK. MARBLE
FFL
POSITION OF DOOR TO REFER PLAN
WATERPROOFING (CEMENTITIOUS SYSTEM) TO ARCH'S APPROVAL
SCALE 1 : 5
ADHESIVE
19MM THK. MARBLE MITER JOINT
N O T Architecture Sdn Bhd SPACE COMMON
TYPICAL DROP SECTION AT BATHROOM
8MM / 5MM THK. LAMINATED TIMBER FLOORING
SCALE 1 : 5
ADHESIVE
55
DANGAN TAMBAHAN DAN PERUBAHAN SERTA BAHAN TINGKAT PADA SEBUAH RUMAH GLO 2 TINGKAT YANG SEDIADA KEPADA 3 GKAT DI ATAS LOT 46507, NO.74, JALAN IAJAYA, BUKIT DAMANSARA, 50490 WP KUALA MPUR UNTUK TETUAN EN.LOW WEI LOON DAN GAN SIEW CHOO.
Notes:
TYPICAL STAIRCASE TILE FINISH DETAIL
50
Rev.
Title:
55
ect:
4
PORCELAIN / CERAMIC TILES (THICKNESS VARIES)
FFL
CEMENT SCREED
CEMENT SCREED TYPICAL DROP1SECTION AT BATHROOM TYPICAL TILE SCALE 1 : 5
WATERPROOFING (CEMENTITIOUS SYSTEM) TO ARCH'S APPROVAL
FINISH DETAIL
1
Project:
TYPICAL TILE FINISH DETAIL CADANGAN TAMBAHAN DAN PERUBAHAN SERTA
N O T ARCHITECTURE SDN BHD (1013164-H) Block D-28-12, MyLof t (Menara D), E m p i r a C i t y D a m a n s a r a , J a l a n D a m a n s a r a , P J U 8 , 4 7 8 20 P et a l i n g J ay a, S el a ng o r , M a l a y s i a .
TAMBAHAN TINGKAT PADA SEBUAH RUMAH 2 TINGKAT YANG SEDIADA KEPADA 3 TINGKAT DI ATAS LOT 46507, NO.74, JALAN SETIAJAYA, BUKIT DAMANSARA, 50490 WP KUALA LUMPUR UNTUK TETUAN EN.LOW WEI LOON DAN PN. GAN SIEW CHOO.
5
25 X 25 ANGLE FILLET
SCALE 1 : 5
Rev.
Title:
00
FLOOR DETAIL
TYPICAL REFLECTIVE POOL TILE FINISH DETAIL
R.C. SLAB TO ENGR'S DETAILS
SCALE 1 : 5
Notes:
Client Signing Off:
AS SHOWN @ A3
Drawn by:
SCALE 1BANGLO :5
LIVING SPACE FFL
55
3
4
150
3050
2135
5
3050
3875
6
7
8
BATHROOM 3650
2895
3650
SCALE 1 : 5
5 93
2
1850
C
450
1400
B
BEDROOM 2
MASTER BATH
MASTER BEDROOM
55
CEMENT SCREED
05 316° 37' 12'' 18.293 ADHESIVE
A
LIVING ROOM
WATERPROOFING 04 (CEMENTITIOUS 03 SYSTEM) TO ARCH'S APPROVAL Existing Drain JALANSCREED SEDIA ADA CEMENT 25 X 25 ANGLE FILLET ( JALAN 12/17 ) WATERPROOFING (CEMENTITIOUS SYSTEM) TO ARCH'S APPROVAL
CAR PORCH
810
D8
SCALE 1:50
TYPICAL DROP SECTION SECTION D-D AT BATHROOM 2 1:150
Project:
: +603 7620 5234
PETALING JAYA, DAERAH PETALING 2050(NO.9), JALAN
900
Project:
09
300
450
4575
BANGLO 2 TINGKAT YANG SEDIADA KEPADA 3 TINGKAT DI ATAS LOT 46507, NO.74, JALAN SETIAJAYA, BUKIT DAMANSARA, 50490 WP KUALA LUMPUR UNTUK TETUAN EN.LOW WEI LOON DAN D C B 800 PN. GAN SIEW CHOO. 1700
Tel : +603 7620 5234 Email : not.arch.2018@gmail.com
1100
Rev.
Title: Rev.
3650
Notes:
E
F
FLOOR DETAIL 00 FOR TENDER
E
Copyright © N O T Architecture Sdn. Bhd. All rights reserved.
O T Architecture Sdn. Bhd. All rights reserved.
00
Title:
H
Date: FOR CONSTRUCTION
Scale:
1:150 @ A3
3050
16 Dec 2019
Drawn by:
950
Checked by: EDDIE
VIRELY
Rev.
Notes:
400
Project No:300
Drawing No:
NOTA 1877
00
A Do not scale drawing. All dimensions must be verified by contractor prior to construction. Any discrepanties must be reported to Architec t.
ALUMN. FRAME GLASS DOOR REFER TO DOOR SCHEDULE D8 ALUMN. FRAME GLASS DOOR REFER TO DOOR SCHEDULE D5 M.S RHS FRAME EXPANDED METAL DOOR REFER TO DOOR SCHEDULE D11
ALUMN. LETTERBOX CAP
Title: RCP _ ELECTRICAL LAYOUT
Rev. 00
Notes:
Client Signing Off:
Scale:
Date:
Drawn by:
Checked by:
1:100 @ A3
FOR TENDER
VIRELY Do not scale drawing. All dimensions must be verified by contractor prior to construction. Any discrepanties must be reported to Architec t.
Date:
Project No: NOTA 1877
18 Dec 19 EDDIE
Drawing No: D01-002
FRONT ELEVATION SCALE 1:50
N O T ARCHITECTURE SDN BHD (1013164-H) Block D-28-12, MyLof t (Menara D), E m p i r a C i t y D a m a n s a r a , J a l a n D a m a n s a r a , P J U 8 , 4 7 8 20 P et a l i n g J ay a, S el a ng o r , M a l a y s i a . Tel : +603 7620 5234 Email : not.arch.2018@gmail.com
Copyright © N O T Architecture Sdn. Bhd. All rights reserved.
Project: CADANGAN MEROBAH DAN MEMBINA SEMULA RUMAH SESEBUAH 1 TINGKAT SEDIA ADA KEPADA 1 TINGKAT DI ATAS LOT 9, MUKIM BANDAR PETALING JAYA, DAERAH PETALING (NO.9), JALAN 12/17, SEKSYEN 12, 46000 PETALING JAYA, SELANGOR UNTUK ENCIK YAP KIM SING.
Title: DETAIL OF FENCING, GATE & COMPARTMENT
Rev. 00
Notes:
Client Signing Off:
Scale:
AS SHOWN @ A3
FOR TENDER
Drawn by: VIRELY
Do not scale drawing. All dimensions must be verified by contractor prior to construction. Any discrepanties must be reported to Architec t.
Date:
G2-001
FOR CONSTRUCTION
R.C POST TO ENGR'S DETAIL
BLACK METAL PLATE LETTERING BRACKET FIXED (DETACHED FROM WALL) ALUMN. LOUVRE DOOR REFER TO DOOR SCHEDULE D4
2
Tel : +603 7620 5234 Email : not.arch.2018@gmail.com
G
1825
WEATHERPROOF DOOR BELL EXPANDED METAL DOOR REFER TO DOOR SCHEDULE D10
CADANGAN MEROBAH DAN MEMBINA SEMULA RUMAH SESEBUAH 1 TINGKAT SEDIA ADA KEPADA 1 TINGKAT DI ATAS LOT 9, MUKIM BANDAR PETALING JAYA, DAERAH PETALING (NO.9), JALAN 12/17, SEKSYEN 12, 46000 PETALING JAYA, SELANGOR UNTUK ENCIK YAP KIM SING.
Notes:
25 X 25 ANGLE FILLET
Client Signing Off:
1825 1000
1100
OUTDOOR TERRACE
Project:
20
920
WEATHERPROOF LED STRIP C/W CASING
N O T ARCHITECTURE SDN BHD (1013164-H) Block D-28-12, MyLof t (Menara D), E m p i r a C i t y D a m a n s a r a , J a l a n D a m a n s a r a , P J U 8 , 4 7 8 20 P et a l i n g J ay a, S el a ng o r , M a l a y s i a .
SEPTIC TANK
19
08
50
A WATER METER TNB METER
D7
Xref /Volumes/NOT-1/1 Projects/NOTA1877 SS12 Bungalow/2 Correspondence/2.2 Incoming/2.2.1 Client/Architectural/Building Plan/A.02.5 GATE & WALL DETAILS.dwg
800
1260
750
H
3300
550
1800
200
800
1790
1750
1200
550
750
H
200
2625
FLOOR PLAN
Tel
1285
450
BATH 2 55 sqft
PORCELAIN / CERAMIC TILES (THICKNESS VARIES) ADHESIVE 14
950
750
785
BATH 3
4575
Water Tank
1200 1400
BATH 3 55sqft
B
300
600
450
1650
B LETTER BOX REFUSE CHAMBER
WATER FILTER
11257
50
B
900
55
1285
C
3650
1000
ROOF D LEVEL
1050
900
450
1750
600
200 400
LIVING ROOM 530.6sqft
1000
900
2850
2775
750 2690
6100
TINGKAT DI C ATAS LOT 46507, NO.74, JALAN Email : not.arch.2018@gmail.com 12/17, SEKSYEN 12, 46000 PETALING JAYA, Tel : +603 7620 5234 B A SELANGOR UNTUK ENCIK YAP KIM SING. N O T: ARCHITECTURE SDN BHD (1013164-H) Do not scale drawing.50490 All dimensions must be verified by contractor prior Email not.arch.2018@gmail.com SETIAJAYA, BUKIT DAMANSARA, WP KUALA 450 100 Date: D to construction. Any discrepanties must be reported to Architec t. Copyright N OcTk Architecture B©l o D - 2 Sdn. 8 - Bhd. 1 2All, rights M reserved. yLof t (Menara D), E CADANGAN TAMBAHAN PERUBAHAN SERTA LUMPUR UNTUK TETUANDAN EN.LOW WEI LOON DAN E m p i r a C i t y D a m a n s a r a , FLOOR Do not scale DETAIL drawing. All dimensions must be verified by contractor prior TAMBAHAN PADA SEBUAH RUMAH J a l a n D a m a n s a r a , P J U 8 , PN. GAN SIEWTINGKAT CHOO. to construction. Any discrepanties must be reported to Architec t. Copyright © N O T Architecture Sdn. Bhd. 4 7 8All 20rights P et areserved. l i n g J ay a, S el a ng o r , M a l a y s i a .
H
BEDROOM 2 176.5sqft
EQ
300 900
A/C
A/C
750
MASTER BATH 71.9sqft
700
10
PORCELAIN POSITION OF/ CERAMIC DOOR TO TILES REFER (THICKNESS VARIES) PLAN
4575
BATHROOM
N O T ARCHITECTURE SDN BHD (1013164-H) A B C D Block D-28-12, MyLof t (Menara D), PERUBAHAN SERTA Project: CADANGAN TAMBAHAN DAN Title: 18290 (1013164-H) E m p i r a CBN lOoi cT ktARCHITECTURE y D a SDN mf tBHD a( M n s a r a , D - 2 8 - 1 2 , M y L o3050 enara D), 2210 3680 CADANGAN MEROBOH DAN MEMBINA SEMULA TAMBAHAN TINGKAT PADA SEBUAH SECTION A-A & SECTION D-D RUMAH J a l a n D a Emm pai rna sC ai t yr aD a, m a Pn s Ja rUa , 8RUMAH , SESEBUAH 1 TINGKAT SEDIA ADA KEPADA J a l a n D a m a n s a r a , P J U 8 , 4 7 8 20 P et a l i n g4 7 8J20ayP eta,a l i nS a ng g Jel ay a, S el ao ngro,r , M M a la a ylsa i ay . sia 1 .TINGKAT DI ATAS LOT 9, MUKIM BANDAR BANGLO 2 TINGKAT YANG SEDIADA KEPADA 34475 2100 800 400
1000
200
600
1480
2000
2075
600
800
2200
600
3
800
1000
EQ
800
1480
2895
900
1000
D
1750
2340 1160
1000
550
625
FFL +104.67
1
450 550
500
EQ
1160
FFL
SCALE 1 : 5 EQ
450
1725
3650
1500
450
EQ
EQ 800
FFL +108.58
SCALE 1 : 5
WASH AREA 62.2sqft
450
550
150
FFL +109.78
LOWER ROOF LEVEL
4125
FFL +101.02
EQ
750
BEDROOM 3 190.3sqft
940
1100 650
4930
600
800
EQ
A/C
1000
TOP OF ROOF LEVEL
3875
100
WET KITCHEN 161.5sqft
1400
2200
FAMILY AREA 121.6sqft
750
ALM
2730
2625
MASTER BEDROOM 292.7sqft
EQ
200
EQ
1800 1305
1000
650
1725
A/C
600
EQ
BEDROOM / GYM
Existing Monsoon Drain DROP SECTION AT BATHROOM 3 TYPICAL CEMENT SCREED
1395 2325
1200
DRY KITCHEN 226.0sqft
1600
875
2050
ALM
CAR PORCH
OUTDOOR DRYING YARD
FFL FFL
GRD LEVEL
DINING 242.2sqft 2025
FOYER 77.7sqft
875
850
700
550
955
200
1150
450
650
955
1250
450
450
2315
CEMENT SCREED
500
BATH 4 47.5sqft
1145
550
450
ADHESIVE
985
1000
550 1600
2200
EQ
450
750 600
200
200 700
500
200 700
750
1150
2850
1750
600 1650
2025
1210
EQ
525
EQ
1450
550
525
700
550
535
550
500
1450
N O TN Architecture O T Architecture Sdn Bhd Sdn Bhd EQ
H
30.7sqft
A/C
525
750
6 PROPOSED PROPOSED RENOVATION RENOVATION OF ANOF EXISTING AN EXISTING BUNGALOW BUNGALOW AT NO.AT74, NO. JALAN 74, JALAN SETIA JAYA, SETIA BUKIT JAYA, DAMANSARA BUKIT DAMANSARA 50490 50490 KUALAKUALA LUMPUR. LUMPUR. STORE
450
450
950
550
300
400 200
750
895
A/C
1200
450
GUEST BEDROOM
H
GUEST BATH 50.6sqft
9
33455 3050
D11
450
260
-
6
2135
6
46° 4' 12''
8MM / 5MM THK. ADHESIVE LAMINATED TIMBER FLOORING
21
12
ONDITIONAL INDOOR EVAPORATOR)
150
BATHROOM 7 8
5
D10
OOR FLOODLIGHT
K LIGHT
NG FAN
3050
FFL
4
900
8
3
100
5
BEDROOM / 1GYM 2
400 150
5
1:150
1000
77
TROUGH
OOR FLOODLIGHT
25 X 25 ANGLE FILLET POSITION OF DOOR TO REFER PLAN
SECTION A-A
1
8MM / 5MM THK. LAMINATED TIMBER FLOORING
50
OWN LIGHT
ANT LIGHT
CAR PORCH
D6
D9
-
19
-
GENCY LIGHT
1200
ER SHUTTER SWITCH
N ON TO Architecture T Architecture Sdn Sdn Bhd Bhd
3910
-
CEMENT SCREED 12
14 ADHESIVE WATERPROOFING (CEMENTITIOUS SYSTEM) TO ARCH'S APPROVAL 05 CEMENT SCREED 04 25 X 25 ANGLE FILLET 03 WATERPROOFING (CEMENTITIOUS SYSTEM) TO ARCH'S APPROVAL
920
33.453
3
FOYER
LIVING ROOM
SCALE 1 : 5
PROPOSED PROPOSED RENOVATION RENOVATION OF AN OFEXISTING AN EXISTING BUNGALOW BUNGALOW AT NO. AT 74, NO.JALAN 74, JALAN SETIASETIA JAYA,JAYA, BUKITBUKIT DAMANSARA DAMANSARA 5049050490 KUALA KUALA LUMPUR. LUMPUR.
3
AIN SWITCH
D1
WASH AREA
FFL +101.02
5
ORK POINT
PHONE POINT
D1
D7 FAMILY AREA
TYPICAL DROP SECTION AT BATHROOM
55
M SWITCH
OINT
W5
WET KITCHEN
GRD LEVEL
2
55
5
8760
4 5
33.453
OOR POWER POINT
D1 WASH AREA
D4
WAY SWITCH
ER SWITCH
ON SWITCH
PORCELAIN / CERAMIC TILES (THICKNESS VARIES) ADHESIVE
900
ROOF LEVEL
TYPICAL DROP SECTION AT BATHROOM
CEMENT SCREED
46
WAY SWITCH
ER POINT
DOOR UNIT DENSOR)
2
NOS
6100
55
625
900
FFL +104.67
GEND
4575
55
1200
LOWER ROOF LEVEL
4
33455 4125
FFL +109.78
FFL +108.58
FFL
4
POSITION OF/ CERAMIC DOOR TO TILES PORCELAIN REFER PLAN VARIES) (THICKNESS 10
9
TOP OF ROOF LEVEL
8760
ADHESIVE CEMENT SCREED
2
LIVING SPACE
FFL FFL
55
ADHESIVE 19MM THK. MARBLE
BATHROOM
150
1
50
19MM THK. MARBLE
SECOND SECOND FLOOR FLOOR • Master • Master Bedroom Bedroom : cabinet : cabinet
EDDIE
POSITIONProject OF DOOR TODrawing No: No: D04-002 REFER PLAN NOTA 1720
Date:
50
Copyright © N O T Architecture Sdn. Bhd. All rights reserved.
10 Dec 19
Checked by:
VIRELY
Do not scale drawing. All dimensions must be verified by contractor prior to construction. Any discrepanties must be reported to Architec t.
3910
Tel : +603 7620 5234 Email : not.arch.2018@gmail.com
Date:
Scale:
FOR CONSTRUCTION
1550
LIVING SPACE
19MM THK. MARBLE
Project No: NOTA 1877
Date:
18 Dec 19
Checked by: EDDIE
Drawing No: G4-001
5
5
PROFESSIONAL PRACTICE // SCHEMATIC DESIGN OPTION 1 : PERSPECTIVE BUS STOP WITH KIOSK
14
SC
Unit s
AHRICULTURE LAND 467 AC SUBDIVISION TO 401 LOTS
18
Units SC
17
Units
Units SC
18
SC
Unit s
16
SC
15
Unit
s
SC
17 Units
15
Units SC
SC
16 Units SC
18 Units
15
12
Units SC
13
SC
Units SC
Units
SC
15 Units
9 Units Units SC
SC
SC
Units SC
SC
15
Units
18
14
22 Units SC
Area B1
Area B1
B1 Area
N O T Architecture Sdn Bhd
13 Units
Area B1
B1 Area
SC
Area B1
B1 Area
B1 Area
B1 Area B1 Area
Units SC
Area B1
15
Area B1
Area B1
B1 Area B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area B1 Area
B1 Area
Units 14 AreaB1
B1 Area
B1 Area B1 Area B1 Area
B1 Area
B1 Area B1 Area
B1 Area
B1 Area B1 Area B1 Area
B1 Area
B1 Area B1 Area B1 Area
B1 Area
B1 Area
Area B1 Area B1
B1 Area
B1 Area
B1 Area
Area B1
B1 Area B1 Area
B1 Area
B1 Area
Area B1
Area B1
B1 Area
Area B1
Area B1
B1 Area
Area B1
B1 Area
B1 Area B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
Area B1
Area B1
B1 Area
B1 Area
B1 Area
B1 Area
Area B1
Area B1
B1 Area
B1 Area
B1 Area
B1 Area
Area B1
B1 Area
B1 Area B1 Area
B1 Area
B1 Area
Area B1
B1 Area
B1 Area
Area B1
B1 Area
B1 Area
Area B1
B1 Area
Area B1
Area B1
Area B1
B1 Area
B1 Area
Area B1
Area B1
B1 Area
Area B1
Area B1
Area B1
B1 Area
Area B1
Area B1
Area B1
B1 Area
B1 Area
LEGEND
B1 Area
B1 Area B1 Area
B1 Area
B1 Area
Area B1
Area B1
B1 Area
B1 Area
B1 Area
B1 Area
Area B1
Area B1
B1 Area
RESIDENTIAL LOTS 865 SUBDIVIDED TO 867 BUNGALOW UNITS
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
Area B1
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
Area B1
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
Area B1
B1 Area
B1 Area
Area B1
OPENABLE AS PART OF SHELTER TWO CONTAINERS AS PART OF SHELTER + KIOSK
B1 Area
Area B1
Area B1
TWO CONTAINERS
B1 Area
Area B1
SINGLE CONTAINER
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area
B1 Area
B1 Area B1 Area B1 Area B1 Area
B1 Area B1 Area B1 Area
B1 Area B1 Area
OPTION 1 : DESIGN IDEA FROM COMBINATION OF TWO CONTAINERS
OPTION 1 : DESIGN IDEA FROM SINGLE CONTAINER
B1 Area
B1 Area
B1 Area
B1 Area B1 Area B1 Area
B1 Area
B1 Area
B1 Area
Area B1
Area B1
B1 Area
B1 Area B1 Area B1 Area B1 Area B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area
Area B1 Area B1
Area B1
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area
B1 Area
Area B1 Area B1
B1 Area B1 Area
B1 Area
B1 Area B1 Area B1 Area B1 Area B1 Area
Area B1 Area B1
B1 Area
B1 Area
B1 Area
B1 Area
Area B1
B1 Area
B1 Area
Area B1
Area B1
B1 Area
B1 Area
KIOSK
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
Solid mass is carvedin to create openings and terraces at various levels.
B1 Area
B1 Area
B1 Area B1 Area
B1 Area
AFFORDABLE HOUSING
B1 Area
B1 Area
B1 Area B1 Area
B1 Area
KIOSK
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
LED ADVERTISING BOARD
LED ADVERTISING BOARD
B1 Area B1 Area B1 Area B1 Area
B1 Area B1 Area B1 Area
Sdn Bhd
B1 Area B1 Area
B1 Area B1 Area B1 Area
B1 Area B1 Area B1 Area B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area B1 Area B1 Area
AreaB1 B1 Area
B1 Area
B1 Area B1 Area
B1 Area
B1 Area B1 Area B1 Area
B1 Area
B1 Area
B1 Area B1 Area
B1 Area
B1 Area B1 Area
B1 Area B1 Area
B1 Area
B1 Area B1 Area B1 Area B1 Area
B1 Area
B1 Area
ALL RIGHTS RESERVED BY
N O T A rchitecture
B1 Area
B1 Area
B1 Area
APARTMENT
B1 Area B1 Area
B1 Area
B1 Area
B1 Area B1 Area B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area B1 Area
B1 Area
AreaB1
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area
AreaB1
B1 Area
B1 Area
21 SEPTEMBER 2019
SMART POLE ANTENNA
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
N O T Architecture Sdn Bhd SMART POLE ANTENNA
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
PRIMARY SCHOOL 10AC
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
Scattering of balconies and windows through varying cantilevered depths and alternative window placements.
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
DESIGN PROPOSAL OF UNIVERSAL BUS STOP
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
FACADE STRATEGIES • APPROACH AND LANGUAGE
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
AreaB1
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
OPTION 1 : DESIGN IDEA FROMCONTAINERS COMBINATION OF TWO CONTAINERS 1 : DESIGN IDEA FROM COMBINATION OF TWO OPTION 1 : DESIGN IDEA FROM SINGLE OPTION CONTAINER
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area
B1 Area
B1 Area
AreaB1
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
AreaB1
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
PHASE 1 PODIUM • Elevated Carpark
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
Area B1
B1 Area
B1 Area
Area B1
B1 Area
Area B1
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
AreaB1
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
AreaB1
Area B1
B1 Area
Area B1
B1 Area
Area B1
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area
AreaB1
B1 Area
B1 Area
B1 Area
B1 Area
AreaB1
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area Area B1
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
Area B1
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area
B1 Area
PARK + DETENTION POND 26.9AC
Area B1
B1 Area
B1 Area
B1 Area
B1 Area B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
MASJID 2.5AC
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
PHASE 1
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
Area B1
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
SC
B1 Area
B1 Area
B1 Area
Units
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
13
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
SC
Area B1
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
CUBHOUSE + FACILITY
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area
2 BLOCKS OF AFFORDABLE HOUSING
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
PHASE 2
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
s Unit SC
18
s
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
Unit
SHOP 5AC
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area
Area B1
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area
14 SC
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
Area B1
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
Area B1
Area B1
B1 Area
B1 Area
B1 Area
B1 Area
PHASE 2 PODIUM • Shoplex & Business Suites • Elevated Carpark
Units SC
B1 Area
B1 Area
B1 Area B1 Area
B1 Area
B1 Area
B1 Area B1 Area
2 BLOCKS OF APARTMENT
16
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
B1 Area
Area B1
B1 Area
B1 Area
B1 Area
B1 Area
Area B1
B1 Area
Area B1
21 SEPTEMBER 2019
B1 Area
B1 Area
B1 Area
Area B1
B1 Area
Area B1
DESIGN PROPOSAL OF UNIVERSAL BUS STOP
MASTER PLAN
Area B1
B1 Area
OPTION 1 : PERSPECTIVE BUS STOP WITHOUT KIOSK
SITE BOUNDARY TNB SUBSTATION WATER TANK AGRICULTURE LOT
BUS WAITING AREA
BUS WAITING AREA
AS PART OF SHELTER + KIOSK
ROAD ENTRANCE GATEWAY
SMART POLE ANTENNA
NE R TO TG A r c h i t e c t u r e N S dOn TB hAdr c h i t e c t u r e S d n B h d N OPROPOSAL T A r cBUS h i t e cSTOP t u r UNIVERSAL e S d n BL EhD dA D VBUS DESIGN OF STOP DESIGN OF UNIVERSAL DESIGN PROPOSAL OF UNIVERSAL BUSPROPOSAL STOP ISIN 2 1 S E P T E M B E R 2 0 1 9B O A R D
21 SEPTEMBER 2019
21 SEPTEMBER 2019
KIOSK
PODIUM TWO CONTAINERS OPENABLE AS PART OF SHELTER
SINGLE CONTAINER
AS PART OF SHELTER + KIOSK
BUS WAITING AREA
ALL RIGHTS RESERVED BY
DESIGN PROPOSAL OF UNIVERSAL BUS STOP N O T Architecture Sdn Bhd
N O T Architecture Sdn Bhd 21 SEPTEMBER 2019
21 SEPTEMBER 2019
01
01
UP
02
UP
02 03
03 04
04 05
05 06
06 07
07 08
08 09
09
10 11
11 12
12 13
13 14
14 15
16
12
12
13
13
14
14
15
15
16
16
17
17
UP
16
11
11
LAUNDRETTE
10 09
8.68sqm
08
CH -0.05
07
WET KITCHEN
06
33.84sqm
05
CH -0.05
04 03 02 01
UP
DRY KITCHEN 9.77sqm
DINING AREA 23.53sqm
LIVING SPACE
POWDER ROOM
37.56sqm CH +3.24
4.48sqm
09 08 07 06 05 04 03
03
CH -0.15
OUTDOOR BBQ AREA
01
30.37sqm
01
CH -0.15
UP
02
01
CH +0.18
02 03
03 04
04
05
05
UP
06
06
07
07
08
08 09
09 10
10
11
11
12
12 13
13 14
14 15
15 16
16
LIVING SPACE 37.56sqm CH +0.00
CH -0.15
CH -3.15
CH -1.65
CH -0.15
01
02
30.37sqm
02
OUTDOOR BBQ AREA
CH -0.15 CH +0.18
14
17
16
13 11
07 06 05 04
72.49sqm
15
17
16
13
15
12
14
CH +2.34
11 10 09 08
OUTDOOR TERRACE
18
DN
CH -0.05
12
10
UP
Sdn Bhd
10
N O T A rchitecture
DESIGN PROPOSAL OF UNIVERSAL BUS STOP
15
The carpark mass is covered with angled metal fins
44
45
PROFESSIONAL PRACTICE // INTERIOR BOMBA LAYOUT AUDIT REPORT
1
2
E
3
2a
10980
5708
LOCKERS
LOCKERS
5272
LOCKERS
BENCH SEATING
TV
TV
MEETING ROOM 6 PAX
MEETING ROOM 6 PAX
TV
TV
LOCKERS 20 NOS
5
5708
Roof Terrace
LOCKERS
VP OFS APAC LEADER'S ROOM
4
3a
43920
5272
LOCKERS
10980
LOCKERS
LOCKERS
LOCKERS
LEADER'S ROOM
WRITING UNIT
WRITING UNIT
WRITING UNIT
WRITING UNIT
10980
LEADER'S ROOM
L1
ACOUSTIC WALL 3548
LOCKERS
FIRE RATED WALL
COMPRESSOR ROOM
Roof Terrace
PRINTING AREA
SURAU
HR
BEACON ROOM 18 PAX
Building Design Provision
TV
K
MOTHER'S ROOM
PHONE BOOTH
1800
F
PHONE BOOTH
FILING
K
K
K
K
GRAPHIC STICKER/SIGNAGE
The entrance to the Chill Out Bar should be easily located by the guest. WRITING GLASS 3168
MNC 17 PAX
Floor to floor height is 6000mm. No issue
F
CONFERENCE ROOM 8 PAX
TV
K
TV
MEETING ROOM 12 PAX
MEETING ROOM 12 PAX
TV
Complied. The bar setting is located right in front of the hotel lift lobby. MEETING ROOM 6 PAX
DIGITAL WALL
TELEPRESENCE
iCENTRE 15 PAX
BIN
K
Complied. TV
BOARDROOM 16 PAX
LIBRARY / STORAGE
S
ACOUSTIC WALL / LCD SCREENS
MANAGER 1 PAX
Guest washrooms should be provided within the restaurant area. CA
CA
TV
MEETING ROOM 6 PAX
MEETING ROOM 6 PAX
ET
ET
S
LOCKERS
MEETING ROOM 6 PAX
TV TV
BENCH SEATING
K
The spatial proportion should be as follows: - Guest FOH Seating area : 85% - BOH kitchen, washing : 15% BIN
2070
K
K
WRITING GLASS
PHONE PHONE BOOTH BOOTH
LOCKERS
1700
ELEC
ENTRANCE
SHOE RACK
Complied. Area is 25.2 m2. LOCKERS
PHONE BOOTH
Min clear height 3500mm.
Chill Out Bar
Floor to floor heights is 5400mm. Subject to ID for final ceiling height. No issue to comply. LOCKERS
H5Technical Due Diligence of Tower 2 Hotel, Oxley Towers KL Architectural
WRITING GLASS
PRINTING AREA
LOCKERS
ABLUTION
S
S
ET
except baggage store SCALE 1 : 200 @ A3 located near the luggage delivery room has no direct connection to the entrance door next to the main guest tower BOH lifts. This can be entrance. And with direct connection resolved by having a new door to to the Tower BOH lifts. link to BOH corridor directly. This shall have cost implication. (refer diagram below)
ET
BIN
Complied.
CA
LCD
LCD LCD
LCD
Bar kitchen must be connected Bar setting has no direct connection directly to the BOH lifts leading to the to BOH lifts. See diagram below main preparation kitchen usually located in the BOH floor.
Diagram 5: Bar area has no direct connection to the BOH service area. Any services to be carried out have to pass through FOH common area as indicated.
Existing
Space must be allowed inside the Baggage Storeroom to store the Bell Carts when they are not in used.
JOINERY
K
TPS 28 PAX
JA19080_20190930_BHGE_LV11@MenaraTan&Tan(Sic)_IDComment The Baggage store room should be Complied
New proposed No direct line of sight from the public area into the luggage room is allowed.
TENDER ROOM 7 PAX
H3
PHONE BOOTH
MEETING ROOM 12 PAX
PHONE BOOTH
Building Design Provision
LOCKERS 12 NOS
A.H.U.
BENCH SEATING
LOCKERS
A
H4
Langham’s Design Requirement
DN 300 UP 300
LOCKERS
2500mm x 2000mm. (5 m2)
L3
H.C.
Aspects
3
LOCKERS
10980
Min clear height 2400mm.
H1
MALE
BIN
Main Baggage Storage
L2
H2
PHONE BOOTH
CA
4
NOT IN SCOPE
A.H.U.
LOCKERS
5272 5708
No.
STATIONARY
Langham’s Design Requirement
NOTE:
LOCKERS 7 NOS
K
LIFT LOBBY
L4
Architectural B Technical Due Diligence of Tower 2 Hotel, Oxley Towers KL
Aspects
OFS 24 PAX
ST-6A
LOCKERS 15 NOS
No.
M
HUB
S1
TOTAL FLOOR AREA = 1737SQM
B1
M
FEMALE
LOCKERS
ACOUSTIC WALL 1649
TPS 48 PAX
F W CM
(BOMBA)
ST-6
Roof Terrace
DOCUMENT FILING
LOCKERS
1705
1900
C
43920
1HR FIRE RATED DOOR
K
LIFT LOBBY
HR
LOCKERS
5272
2HR FIRE RATED DOOR
PHONE BOOTH PANTRY
ENTRANCE
ACOUSTIC WALL 3208
2368
C1
STATIONARY
M
CAFE
K
LOCKERS
1HR FIRE RATED PARTITION
LOCKERS 9 NOS
K
STORAGE CABINETS
K
LOCKERS
5708
2HR FIRE RATED PARTITION / MASONRY TYPE WALL
WRITING UNIT
OFS 50 PAX
K
COMPACTOR ROOM
DOCUMENT STORE / LOCKERS 10 NOS
WRITING GLASS 7200
2HR FIRE RATED COMPARTMENT WALL (MASONRY TYPE)
LEADER'S ROOM
MEETING ROOM 6 PAX
K PRINTING AREA
MAGNETIC WALL 2000
D
KELUAR SIGN
MAGNETIC WALL 2275
900
OFS 30 PAX
1500
WRITING UNIT
LEADER'S ROOM PHONE BOOTH
LOCKERS
K
MEETING ROOM 6 PAX
WRITING UNIT
LEGENDS
LEADER'S ROOM
1000
LEADER'S ROOM
Complied.
Office for the restaurant manager should be located in the BOH area.
Not indicated / provided.
No issue to comply.
The bar counter seating area should be located near the restaurant entrance.
Complied.
PROFESSIONAL PRACTICE // COMPETITION
46
嬀崀 吀䠀䔀 䴀伀一唀䴀䔀一吀 伀䘀 吀䠀䔀 䘀伀刀䜀伀吀吀䔀一
嬀㘀崀 吀䠀䔀 唀倀䰀䤀䘀吀䔀䐀 倀伀䐀䤀唀䴀
吀栀攀 猀甀戀琀氀攀 最攀猀琀甀爀攀 漀昀 甀瀀氀椀昀琀椀渀最 戀爀椀渀最椀渀最 戀愀挀欀 琀栀攀 洀攀洀漀爀椀攀猀 琀漀 琀栀攀 瀀爀攀猀攀渀琀 攀爀愀⸀ 吀栀攀 猀甀瀀瀀漀爀琀椀渀最 挀漀氀甀洀渀猀 猀礀洀戀漀氀椀猀攀猀 琀栀攀 䘀漀甀渀搀攀爀猀 眀栀漀 漀渀挀攀 猀愀挀爀椀昀椀挀攀搀 昀漀爀 琀栀攀 猀甀挀挀攀猀猀 渀漀眀愀搀愀礀猀⸀
䰀䔀䜀䔀一䐀匀 ⸀ 吀伀䤀䰀䔀吀 ㈀⸀ 匀吀䄀䘀䘀 吀伀䤀䰀䔀吀 ㌀⸀ 䴀䔀䔀吀䤀一䜀 刀伀伀䴀 㐀⸀ 䌀伀一䘀䔀刀䔀一䌀䔀 刀伀伀䴀 㔀⸀ 䈀䄀䜀 䐀刀伀倀 ⼀ 䰀伀䌀䬀䔀刀匀 ⼀ 匀吀伀刀䄀䜀䔀 㘀⸀ 吀伀䤀䰀䔀吀 ㈀ 㜀⸀ 䰀䤀䜀䠀吀 䘀☀䈀 䌀伀唀一吀䔀刀 㠀⸀ 䌀伀一匀䔀刀嘀䄀吀䤀伀一 刀伀伀䴀 㤀⸀ 䘀唀刀一䤀吀唀刀䔀 匀吀伀刀䔀 ⸀ 䔀堀䠀䤀䈀䤀吀䤀伀一匀 匀吀伀刀䔀 ⸀ 吀刀䄀一匀䤀吀 匀吀伀刀䔀 ㈀⸀ 倀刀伀䜀刀䄀䴀䴀䤀一䜀 匀吀伀刀䔀 ㌀⸀ 匀䔀䌀唀刀䤀吀夀 伀䘀䘀䤀䌀䔀 㐀⸀ 吀伀䤀䰀䔀吀 ㌀ 㔀⸀ 䔀堀䠀䤀䈀䤀吀䤀伀一匀 䴀唀䰀吀䤀䴀䔀䐀䤀䄀 䌀伀一吀刀伀䰀 刀伀伀䴀 㘀⸀ 䐀刀䔀匀匀䤀一䜀 刀伀伀䴀 㜀⸀ 䌀䰀䔀䄀一䔀刀匀ᤠ 刀伀伀䴀 㠀⸀ 䜀䔀一䔀刀䄀䰀 匀吀伀刀䔀 㤀⸀ 䌀刀䄀吀䔀 匀吀伀刀䔀 ㈀ ⸀ 䄀嘀 匀吀伀刀䔀 ㈀⸀ 匀䔀刀嘀䔀刀 刀伀伀䴀 ㈀㈀⸀ 匀吀䄀䘀䘀 吀伀䤀䰀䔀吀 ㈀ ㈀㌀⸀ 吀伀䤀䰀䔀吀 㐀 ㈀㐀⸀ 吀伀䤀䰀䔀吀 㔀
TECHNICAL DESIGN BRIEF ( DIGITAL + IBS )
嬀㌀崀 吀䠀䔀 䠀唀䴀䈀䰀䔀 䜀䄀吀䔀圀䄀夀
圀愀氀欀椀渀最 琀漀眀愀爀搀猀 愀 洀椀渀椀洀愀氀 礀攀琀 栀甀洀戀氀攀 攀渀琀爀愀渀挀攀 眀椀琀栀 最椀最愀渀琀椀挀 眀愀氀氀 戀攀栀椀渀搀Ⰰ 爀攀挀愀氀氀椀渀最 琀栀攀 椀渀渀攀爀 猀甀戀搀甀攀搀渀攀猀猀 漀昀 琀栀攀 瘀椀猀椀琀漀爀猀⸀
IBS COMPONENTS CONSIDERATION
䌀愀爀瘀攀搀 渀愀洀攀猀Ⰰ 漀渀攀 漀昀 琀栀攀 椀渀琀攀爀椀漀爀 昀攀愀琀甀爀攀猀⸀ 䐀漀挀甀洀攀渀琀椀渀最 琀栀攀 渀愀洀攀猀 漀昀 琀栀攀 䘀漀甀渀搀攀爀猀Ⰰ 最椀瘀椀渀最 愀 猀攀渀猀攀 漀昀 爀攀猀瀀攀挀琀 愀渀搀 爀攀洀攀洀戀攀爀愀渀挀攀⸀
嬀㔀崀 匀吀䄀䤀刀圀䄀夀 伀䘀 䠀伀倀䔀
䄀 匀琀愀椀爀眀愀礀 氀攀搀 戀礀 椀渀昀椀渀椀琀攀 猀欀礀氀椀最栀琀Ⰰ 猀甀爀爀漀甀渀搀攀搀 戀礀 瀀椀攀挀攀猀 漀昀 洀攀洀漀爀礀Ⰰ 椀渀猀瀀椀爀攀 愀渀搀 攀洀瀀漀眀攀爀 琀栀攀 瀀攀漀瀀氀攀猀 琀漀眀愀爀搀猀 琀栀攀 䘀漀甀渀搀攀爀猀ᤠ 瘀椀猀椀漀渀⸀
25
huij.limv@gmail.com
MY/ +60173636822 DE / +4917645265013