Page 1

University Of Technology

Quarantine center coivd_19

hussein maitham monther


content 1- project information 2- site plan

3- site analysis

4-site problems and space program

5- palns

6- sections

7- elevation

8- 3D render


content space program

- Studios rooms * badroom * living room * bathroom * balcony * kitchen - 2 nurse room

- 1 doctors room

- 1 store - 1 superior care room


1- project information project info: This project focuses on investigating historical works to enrich architectural design and ideas . Through the study of existing build ings , students are able to communicate and expand their own archi tectural vocabulary and develop design concepts . be developed and expanded to be creatively and innovatively integrated into their Studio Objectives 1. To introduce basic architectural theory through a consideraton of inten 2. To creatively and innovatively develop and expand the design concept de rived from the precedent study analysis Background A precedent study is one of an effective approach in leaming architec tural hisbry as well as an essential research stage to any architectural design projed . To be a good architect it is crucial that one athoroughly understand what came before a success architectural creation . Prece dent studies provide understanding of these contributing factors . The information learned from this process will give architects wisdom to create architecture that is at par or even better than what have been created before . In addition , precedent studies might also reveal rea sons for a design failure and thus gives designer the understanding so as not to repeat the same mistakes . Architecture Culture & Hsbry 1

2- site plan Broject Area

1

2

1

2

3 5

5

4

entrance

aducational building

3

laboratory

4

garage

3

CONCLUSION The main entrance to the university of technology is close to the project, and there is always noise in the morning, and when you exit also at the entrance to the university and the entrance is very close to the project, so it is preferable that the entrance to the health center be from the second side of the project


3- site analysis - DIMENTION AND AREA CHART A- The distance between the site and the laboratory is about 10 meters

A 10 m

B 6m

15 m

30 m

B- The distance between the site and the building is about 6 meters

- Circulation analysis Key element

vehicle access

public access


- Environmental Performance

4-site problems and space

N

E

S



5- palns


6- sections


7- elevation

front elevation

left elevation

right elevation


8- 3D render


thank you


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.