276

Page 1

Features & Specifications of K-FORM Screed Rails Integral expansion and contraction joint Enables adjoining bays to be poured simultaneously ‘Click-together’ ease Pre-drilled holes for dowel bars Pre-drilled holes in base for anchoring Manufactured in durable uPVC Removable top strip to allow joint sealing No removal after use Designed for pours of 50mm-225mm thick

Concrete Formwork Systems

UPVC Screed Rail

MORE THAN

80%

LIGHTER THAN STEEL FORMS

Agrément Certificate 11/4863

Example of K-FORM being set up for a 150mm slab

K-FORM stays in place when the job is done

Cross Section of K-FORM Top Strip

Dowel Bar

Concrete

Concrete

Bedding Mortar

Bedding Mortar

Hardcore

www.kform.co.uk

www.kform.co.uk

www.kform.co.uk

enquiries@kform.co.uk

enquiries@kform.co.uk

enquiries@kform.co.uk


K-FORM K85 Screed Rail for Slab thickness 100mm - 140mm

About K-FORM Screed Rails K‐FORM UPVC Screed Railing provides the construction industry with an economical, efficient and environmentally friendly alternative to steel and timber formwork.

K-FORM Screed Rail 25mm Extension Strip

15 mm 15mm

Removable top strip

3000 mm

Standard K-FORM Removable top strip

25mm 50mm

Made from recycled materials, K‐FORM is lightweight, durable and does not require removal after placement of concrete. It is easily cut to length on site and has pre‐drilled holes in the vertical face for placing steel dowels bars and in the base for anchoring. Furthermore, K‐FORM’s patented design features a built in expansion joint, endclips for joining and a removable top strip for joint sealing. Intended to be used with all types of screeds including; twin beams, bunyan rollers, vibro strikes, etc. K‐FORM’s K135, K85 and K35 sacrificial railing replaces steel forms where joints are needed.

K-FORM K35 Screed Rail for Slab thickness 50mm - 100mm

20 mm holes pre-drilled at 300 mm centres for dowel bars.

85 mm

25mm Extension Strip

3000 mm 155 mm

- (2.8m in length for export outside of UK)

Eight holes drilled at 800 mm intervals (four per side) to aid anchoring with mortar.

Allows increase in height of 25mm

K-FORM K135 Screed Rail for Slab thickness 150mm - 255mm

Integrates seamlessly with K‐FORM Screed Rails Compatible with K‐FORM top strip Fast and easy clip on design

15 mm Removable top strip

K-FORM Screed Rail Top Strip Angle Joint 15 mm

Removable top strip

135 mm 35 mm

3000 mm 155 mm

24 mm holes pre- drilled at 300 mm centres for dowel bars to suit 150 mm -225 mm depth pours of concrete

3000 mm - (2.8m in length for export outside of UK)

155 mm Eight holes drilled at 800 mm intervals (four per side) to aid anchoring with mortar.

Eight holes drilled at 800 mm intervals (four per side) to aid anchoring with mortar.

- (2.8m in length for export outside of UK)

Top Strip Angle Joints integrate seamlessly with K‐FORM K85 and K135 Screed Rails. They provide a clean and tidy joint detail at intersections and should be used when it is intended to leave the topstrip in place after pouring.

www.kform.co.uk

www.kform.co.uk

www.kform.co.uk

enquiries@kform.co.uk

enquiries@kform.co.uk

enquiries@kform.co.uk


Concrete Formwork Systems

K-FORM is ideal for concrete slabs of various thicknesses. The rail is simply laid on a lean mix or mortar bed to the required finished height. 1. Set up your string line 2. Cut the first top strip in half, attach to the first rail and fit joint clips 3. Place spots of bedding mortar on the sub-base at intervals of 800mm to correspond with holes in the base 4. Place the rail on the bed and gently tap down with a rubber mallet until the top of the wear strip is at the desired level 5. Place bedding for next rail as in step 3 6. Join the second rail to the first with the joint clips 7. Fit the full length of the top strip across rails 8. Tap down the rail as in step 4 9. Each 3m K-FORM rail has pre drilled 24mm holes for dowel bars 10. Once the bedding mortar has cured you can start pouring concrete 11. K-FORM rails stay in place, therefore adjoining bays can be poured one after the other 12. Once the concrete has cured, the top strip can either be left in place or removed. The gap can subsequently be filled with a joint sealant

✗ With K-FORM’s removable top strip there is no need to diamond cut joints for sealant.

With K-FORM you can pour more concrete: Just set out your shuttering and pour bay after bay.

www.kform.co.uk

K-FORM’s patented design allows concrete to set without any need to use additional expansion joints.


Concrete Formwork Systems

How K-FORM Works: 1

2

3

4

5

6

7

8

9

10

11

12

www.kform.co.uk


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.