Psc450 week 7 project planning assignment

Page 1

PSC450 Week 7 Project Planning Assignment https://hwguiders.com/downloads/psc450-week-7-project-planning-assignment/

PSC450 Week 7 Project Planning Assignment

Details:

When looking at the life of a project plan, it is useful to graph and outline the cost variance (CV), and schedule variance (SV). Determining progress, or lack of progress, provides essential information to assess a given project. Complete exercise 2 in chapter 13 of the textbook. Given the data provided, in an excel spreadsheet, PowerPoint, or other appropriate method of delivery, determine the following: 1. 1. Schedule Variance (SV) 2. 2. Cost Variance (CV) 3. 3. Schedule Performance Index (SPI) 4. 4. Cost Performance Index (CPI)

In 250-300 words, answer the questions provided with the exercise. Reflect on the assessment of this project assessment. Should the project continue to improve? APA format is not required, but solid academic writing is expected. You are not required to submit this assignment to Turnitin, unless otherwise directed by your instructor. If so directed, refer to the Student Success Center for directions. Only Word documents can be submitted to Turnitin.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.