1-1 : How the building is formed by human can be defined in 2 ways ; new construction and renovation.
1-2 :
Both process have critical and inevitable limitations.
In new construction no matter how deeply they care about the surroundings, the overall shape is defined by the architect’s imagination
Each limitations are actually in complimentary relationship!
Which then leads me to the new concept of building
NEW CONSTRUCTION
copying
the orignial obeject of same silhouette but in different materials
1-3 : Reversed process to pick the building that could show the previous method visually and mindsobjects.
While searching for the proper building for this experiment, I found this mysterious building, SUN PLAZA. It’s an old building proposed as a luxury shopping mall in 1982. As modern department store appears, however, Sun Plaza lost it’s position and became just a normal shopping arcade. The surrounding town is now developed into a huge residential area with high rise apartments. Sun Plaza is lost in time, looking for change.
It’s a whole new building, but inside the boundary with clear reason to start designing.
ARCHITECTURE
ARCHITECT
RENOVATION provides reason for design In the perspective of NEW CONSTRUCTION
2021 sch DIE IN FORM LIVE BY FORM
somewhere between rennovation & new-construction graduation
1: 250 MODEL
ADULT, OLD, PAST CHILDREN, NEW, PRESENT STATIC
(contained in the styrofoam box) DYNAMIC
The previous building exist and not exist at the same time. Now free from the limitation of remaining piece.
Interesting part of this project is that the shape of reversed part is totally untouched by an architect. It’s just a simple result of flipping the given mass! This gave me better condition to keep on free/reasonable design.
new
construction and renovation at the same time!
WHAT’S THE MAIN IDEA? WHERE TO GO... LOOK HERE!
HOW THE METHOD APPLIED?
WHEN YOU’RE DONE THIS PAGE WHY I START THIS PROJECT?
1-3 : To sepcify this abstract statement, I’m going back to the start: Relationship between human and building. Both being under control of time, human life is shorter than the building. This makes...
...‘building preservation’ worthy by extending our memory of experience
1-4 : Pick the memory of a single day. Without visiting areas, majority of spaces and buildings are just acting as a background. We would never have chance to see what’s going on there!
MEMORY
stage
DYNAMIC IMAGES
experience inactivities moments
passing by FACADE existing buiilding room nextdoor, other floor dream place, comic background
IMAGES
When applied to the actual building...
Curves of original form follows given rules. Geometry of structure is now reversed in various ways. Each trials challenges the hidden potentials.
...space of ‘dynamic’ memory is substituted to atrium. disappearing by making new boader 1. While ‘static’ facade is continued inside, reconfigured as a new space until the new boarder 2
DYNAMIC IMAGES RECONFIGURE ATRIUM SUBSTITUTION PREVIOUS PLAN ANALYZE AXIS VISUALIZE REVERSE
SUN PLAZA ITSELF
Unique form draws people’s attention with imagination
COLLAPSED RUINS
pillars lose their funtion and symmetrical mass is formed
THE OTHER SIDE
FLOATING BRIDGE
OUTDOOR GRAND STAIR
INDOOR
NEW &
voids towards underground and functional connectivity of core architect’s playing playgound for everyone
Truss bridge highlights new role of pillar with necessary link
1-2 : However disconnection somehow helps forming new ecosystem. The trains crossing from all over the Europe carries different kinds of seeds and insects on the wagons. These creatures and plants sometimes drop on the site, starting their own life in this un-disturbed land. Foreign species are now the new actors of Schaelbaek formation.
1-3 : Let’s look with some broader perspectives. There are now FACTORIES along the SEINE RIVER which leads to BUDA and HAREN. Bridges over the water_♣ and railways_♦ play crucial roles of binding these split neighborhood together. But still there’s a huge untouched blank_♥, with abandoned train deopot surrounded in railways.
It’s quite hard to reach this building since there’s only one way to reach the site.
1-1 : The project began with the site visit of Schaelbaek region in Brussel. What’s clearly seen on the whole area is the disconnection of South and North. Railways cut the ground-level into 2 part. Huge land is totally left behind, isolated.
2020
After listing all the actors in the site, he noticed that bees are playing vital role in its ecosystem. Then he categorized each flowers based on bee type and their different ways of nesting!
POP-UP NEW RAILWAY
NOAH’S TRAIN
train depot rennovation (4TH GRADE) sch
RESUSED WAGONS
♦
1-4 : This builiding would be a good start to make changes based on its given advantages. Long term plan of large land will need imagination ...To see ahead of time.
Huge building, park with the pond can be seen upon the arrival.
Pond continues inside, to glass house with preserved structures.
GLASS HOUSE LAB
ANDRES (UNUSED) RAILWAYS BEE HOTEL PROGRAMS NEW STATION
Meanwhile, I was listing up the alien species brought by the trains. Thinking “what if we reuse the wagons into a pop-up market to introduce this unique ecosystem?” Each project seems to have a lot of meeting points!
♣ ♥ SEED BANK
Reimagined wagons and railways are also keeping the past scent.
Huge mass is then divided with various functions towards future.
Potentials of nature will be rediscovered as more and more species are discovered ...with huge collection.
Reminds me of the Noah’s Ark. Borrowing its concept of future prediction + assembling species, old station is now reimaginfind further potentials for both human and non-humans with combined technologhy and imagination!
Sharing the strategy of reusing the wagon, each vision is now combined cycle of program along the nature. By using the given condition of nature, its time four us to introduce new future potentials towards co-existence.
TOURIST
moving stage
team is looking for the name of the flower on the installed kiosk
Andres is recording a video of skateboadring Jacob and Lily went up to see the better view of performance
NEIGHBOR
Billy brought his dog for a walk, now going for a lunch
RAPPER
WILD BEE RESEARHCER
creative office maintanence office seed bank
Cooper is fixing the railways TRAIN ENGINEER
Laura is checking the humidity inside the glass house
Emma, Noah and Ethan is working on team project of nature and human
COLLECTOR Tom is on his way home after donating some of his seeds
LOCAL ARTIST
Zoe is examining the old ticket booth machine
YOUTUBER pop-up
MAINTANENCE MANAGER
INSECT EXPERT
Olivia and Andrew is passing the glass house towards the honey workshop
SEED SCIENTIST
Jack is checking on sprinklers hanging on the ceiling Sara is checking the condition of bee hotel
food court honey workshop laboratory
Ye is about to perform his song ‘touch the sky’ Tom is collecting samples of seeds
To gain access to this departed site.., new station of indivisual train line is connected from nearby station(L). Green barrier makes extra layer of protection from moving trains(M). Island of re-used building and various species is now the future vision of human and non-human(S)
LEGEND OF GROUND FLOOR
How to gain ACCESSABILITY. For better accessability, pedestrian road must be in first step to consider. By adjusting the floor heights, the building now have 2 ENT. (in the
Next, why DIAGONAL AXIS? The axis is suggested as a solution for truck access underground the building. Same language is continued above in structure, space, and flow of the building.
KEY WORDS??
1-1 : What needs to be rescued is the regional cow market, while the old fashioned market is not welcomed to everyone. Dying space was now in the center of controversy, waiting for change along the new ‘trend’ and revival of the ‘lost’ memory of conventional market at the same time.
1-2 : Trucks are essential to the marketplace in order to transport various goods. However without a loading dock, they were just using the edge of the road as temporary loading. Traffic disorder surrounding the site blocks the entrance which causes bad condition in accessability. The building needs an extra space for truck! Luckily solution can be found in the shape of land. Diagonal axis of shape provides enough length for truck to go inside.
1-3 : Crossing axis splits the building in half, seperating front and back from the previous mass. Inside the divided mass, however, axis plays vital role of leading continuous circulation of programs.
MID : In order to re-organize the overall flow, the main focus was underground area where NEW COW MARKET SYSTEM is located in. Following 1/200 model then shows the mass formation based on the diagonal line.
3RD : As a linkage space for new market, stairway is expanded to RECIPE LIBRARY This part is specified in the 1/50 model with the structural detail of old and new.
FINAL : Co-existing relationship between the upper existing program is completed by various ARCADE. Circluating programs are now connected back-to-back, categroized in color through the 1/200 transparent model.
The elevation of huge mass is now split in various angles of changing transparency, covered up with FRP GRATING panels. The building not only keeps its original grid, but also slice down the huge chunk into balanced form.
TRANSPARENCY...
...is controlled by the inner glass of different types. (translucent / clear)
C_MARKET FLOOR
1 MARKET(28)
2 CAFE 2
3 CAFE 3
B_GROUND FLOOR
1 MARKET(28)
1-4 : Target residents are middle-aged near retirement and young rookies who just began their careers.
In support of Water Resources Corporation(ICHNP) and Housing Coummunities Corporation(SH), residents now have affordable dwelling with discounted water bill.
1-3 : Designated site is Dasan-dong, one of the aging old towns in Seoul. Residential area of hilly land is mainly housings of 4-5 floors. Since most of them are built near 70s, the town lack of major facilities. We picked ‘mirae building’ as renovation. As located in the lowest point in the site, this makes it easier to operate sustainable system for the new pool, sauna and farm.
1-1 : In response to increasing demand of city life, Seoul is now full of apartments built over the previous old land. In this competition, we propose the FUTURE housing in slightly diffrent angle in combinatinon of facilities and housing.
1-2 : Water storage is main infrastructure of city, but also one of the unwanted public facilities. Our goal is to build a house with water storage inside, by providing better condition to residents with water-related spaces.
-IDEA DISCUSSION
-PROCESS DIAGRAM
-SECTION
-SHOTS & COLOR VARIATION
Water is controlled through the new core
1)Rainwater is collected by rain gutter installed on the facade of the new part. Then 2)Filtered through the funnel-shaped filter surrounding the existing pillars.
3)Transported and applied to each part.
black water drink water grey/service water
Penetrating flow opens up underground and backyard Limited accessability due to the steep slope ground.
Voids and mass based on existing pillars
Upper part formation with specified residence spaces
Renovation along previous form and material Convenience facilities for residents and neighbors
Senior home type is based on elder people near retirement. Larger module of 42m2(6*7) is composed of seperated bedroom, bathroom with built-in bathtub, and living room of suitable size.
Youth home type offers minimal layout for beginners in society of unstable income. Kitchen and bedroom are sharing one space, but instead providing small terrass