Daveschwarz

Page 1

A Review of a Real, Functioning SDI/IP Hybrid Facility Dave Schwarz Managing Engineer Diversified


Introduction Diversified is an industry leader in the design and installa8on of a broad spectrum of custom engineered and integrated audiovisual media delivery solu8ons. They specialize in the use of audiovisual technology for complex and scalable professional broadcast, corporate communica8ons and digital signage networks providing businesses with the enhanced capability of crea8ng, managing and mone8zing original digital content. Dave Schwarz has been in television for nearly 40 years. He has worked as grip, audio engineer, TD, editor, and engineer. He started specializing in broadcast engineering over 20 years ago. Some of Dave’s recent projects include: United Na8ons Headquarters, New York, Al Jazeera Washington, DC Bureau and AP Headquarters, New York. Dave has designed or consulted on several IP rou8ng systems. He’s currently working on the design of the New York offices of a major news organiza8on. Although this project will not be his first IP-­‐based video router, it will be his first one that will be based on SMPTE ST-­‐2110.


A Little Background Info •  The Associated Press was moving their headquarters from midtown to downtown ManhaYan. •  As a 24/7 news provider, the move had to be without interrup8on of newsgathering or supply to subscribers. •  It was clear to the AP’s management that the industry was headed down the IP path.


Why IP? •  The AP wanted to “dip a toe” in the IP waters. •  The New York facility would be a proof-­‐of-­‐concept system •  Lessons would be learned for next facility. The expecta8on is that the next build MUST be full IP.


Why IP? •  The AP wanted to “dip a toe” in the IP waters. •  The New York facility would be a proof-­‐of-­‐concept system •  Lessons would be learned for next facility. The expecta8on is that the next build MUST be full IP.

•  IP is resolu8on/frame rate independent. •  Future formats would be routable.


Why IP? •  The AP wanted to “dip a toe” in the IP waters. •  The New York facility would be a proof-­‐of-­‐concept system •  Lessons would be learned for next facility. The expecta8on is that the next build MUST be full IP.

•  IP is resolu8on/frame rate independent. •  Future formats would be routable.

•  IP infrastructure is extensible.


Why IP? •  The AP wanted to “dip a toe” in the IP waters. •  The New York facility would be a proof-­‐of-­‐concept system •  Lessons would be learned for next facility. The expecta8on is that the next build MUST be full IP.

•  IP is resolu8on/frame rate independent. •  Future formats would be routable.

•  IP infrastructure is extensible. •  More and more devices were na8ve IP connected.


Why IP? •  Geographic spread •  The facility is in a New York office tower. •  Edi8ng, shoo8ng posi8ons, a studio, and the newsroom are on the 5th floor. •  The broadcast core, MCR, studios, control rooms and equipment room are on the 18th floor. •  Administra8ve offices and large mee8ng/presenta8on spaces are on the 19th and 20th floors.


Why IP? •  Geographic spread •  The facility is in a New York office tower. •  Edi8ng, shoo8ng posi8ons, a studio, and the newsroom are on the 5th floor. •  The broadcast core, MCR, studios, control rooms and equipment room are on the 18th floor. •  Administra8ve offices and large mee8ng/presenta8on spaces are on the 19th and 20th floors.

•  An IP system would allow for distributed rou8ng.


Why SDI? •  Facility design started in December, 2015 •  In 2015, a 24/7/365 all IP facility was a liYle scary.


Why SDI? •  Facility design started in December, 2015 •  In 2015, a 24/7/365 all IP facility was a liYle scary.

•  SDI is proven.


Why SDI? •  Facility design started in December, 2015 •  In 2015, a 24/7/365 all IP facility was a liYle scary.

•  SDI is proven. •  All of the live inbound and outbound feeds were handed off as SDI.


Why SDI? •  Facility design started in December, 2015 •  In 2015, a 24/7/365 all IP facility was a liYle scary.

•  SDI is proven. •  All of the live inbound and outbound feeds were handed off as SDI. •  Real8me compressed feeds were delivered in formats that were not directly compa8ble with any standards for SVIP (Studio Video over IP). •  The devices that supplied the real8me compressed feeds all had SDI I/O.


Why SDI? •  The AP has to be able to receive and ingest every frame rate and format of video imaginable. •  There was plenty of conversion equipment available, from a variety of vendors, with BNCs on the back. Only a few products had IP I/O.


Why SDI? •  The AP has to be able to receive and ingest every frame rate and format of video imaginable. •  There was plenty of conversion equipment available, from a variety of vendors, with BNCs on the back. Only a few products had IP I/O.

•  Decommissioned gear, from the old facility, could be reused.


How to Hybrid the System? •  Op8ons •  Facility I/O as SDI and core as IP •  Facility core as SDI with IP islands


How to Hybrid the System? •  Op8ons •  Facility I/O as SDI and core as IP •  Facility core as SDI with IP islands

•  Considera8ons •  Growth •  Cost


How to Hybrid the System? •  Op8ons •  Facility I/O as SDI and core as IP •  Facility core as SDI with IP islands

•  Considera8ons •  Growth •  Cost •  Fear!






The Path to Expansion Cisco Nexus 9396PX

1

BCN

1

STS ACT

2

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48


The Path to Expansion Cisco Nexus 9396PX

BCN STS

N9K-X9636PQ

1

BCN

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

1

STS ACT

2

SUP 1

SUP 2

Cisco Nexus 9504

BCN

SUP

FAB

IOM

PSU

FAN

PWR MGMT


The Path to Expansion Cisco Nexus 9396PX

BCN STS

N9K-X9636PQ

1

BCN

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

1

STS ACT

2

SUP 1

SUP 2

Cisco Nexus 9504

BCN

SUP

FAB

IOM

PSU

FAN

PWR MGMT


The Path to Expansion Cisco Nexus 9396PX

BCN STS

N9K-X9636PQ

1

BCN

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

1

STS ACT

2

SUP 1

Cisco Nexus 9396PX

SUP 2

Cisco Nexus 9504

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

BCN BCN

1

STS ACT

2

SUP

FAB

IOM

PSU

FAN

PWR MGMT


The Path to Expansion Cisco Nexus 9396PX

BCN STS

N9K-X9636PQ

1

BCN

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

1

STS ACT

2

SUP 1

Cisco Nexus 9396PX

SUP 2

Cisco Nexus 9504

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

BCN BCN

1

STS ACT

2

SUP

FAB

IOM

PSU

FAN

PWR MGMT


Thank You


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.