PROFESSIONAL EXPERIENCE IAIN BLAMPIED PALM BEACH HOUSE
COLLEGE PARK SCHOOL PACIFIC ROAD HOUSE
DAGENHAM LIBRARY BONDI HOUSE
NAOMI MEDICAL CENTRE
ELIZABETH COTTAGE
IAIN BLAMPIED + KATRINA PASSER
(Sydney)
WIGRAM HOUSE
(UK)
RIVA ARCHITECTS PYMBLE HOUSE
(UK)
ARCHITECTURE PLB (Sydney)
ANNABELLE CHAPMAN ARCHITECTS
A30
Embankment
Embankment
ting to the Existing plan of the A34 embankment
ting to the Existing plan of the A34 embankment
in enlarged tree planting e zone landscap
of parking kerb to rearmin 100mm space to be surface above
el bonded grav + 82.525
ting evergreen plan maybe (max height by restricted es) OH power cabl
+ 83.525
es to be parking spac a granite delineated with set or simil ar
el bonded grav + 83.525
ting evergreen plan maybe (max height by restricted es) OH power cabl
tarmac + 83.525
of parking kerb to rearmin 100mm space to besurface above
top of wall + 83.925
+ 82.825
in enlarged tree planting e zone landscap
generator
ting evergreen plan maybe (max height by restricted es) OH power cabl
el bonded grav + 83.525
el
of parking kerb to rearmin 100mm space to be surface above
bonded grav + 83.525
ting evergreen plan maybe (max height by restricted es) OH power cabl
es to be parking spac a granite delineated with set or simil ar
el
in enlarged tree planting e zone landscap
bonded grav + 83.525
tarmac + 83.525
tarmac + 83.525
tarmac + 83.525
tarmac + 83.525
tarmac + 83.525
+ 83.525 paving
wash
+ 83.525
tarmac + 82.525
window seat
root protection zone
Store
Drug store
Sluice
+ 83.525
Visitors suite
Stair
Treatment room
Bathroom
WC
Laundry room
Linen store
Oxygen store
Bin store
Delivery bay
Cold and dry store
Cleaners store
Nurse station + 83.525
Manager s office
Record store
Handover room + 83.525
tree planting species tbc
tarmac 1:12 ramp
tarmac + 82.525
rwp
rwp
rwp
rwp
WC
+ 83.525 Bereavement suite
ction in the root prote tarmac withbe porous and laid zone to or simi lar on cellweb
wheelchair accessible route
el within bonded grav ction the root protelaid zone to be or simi lar on cellweb
+ 82.525
plant + 82.525
tarmac + 82.525
+ 82.525
chemical store
chemical store
store
+ 82.525
5 x 5.5 m 1000mm deep
+ 82.525 hydro pool
rwp
planting + 83.325
planting + 83.325
rwp
rwp
planting + 83.325
planting + 83.325
rwp
rwp
Hub e Communal spac + 83.525
Lobby + 83.525
computer room
kitchen + 83.525
Quiet room
En-suite
En-suite
Bedroom
En-suite
Bedroom
planting + 83.325
Bedroom
En-suite
Bedroom
En-suite
Bedroom
Bedroom
En-suite
Lift
paving + 83.525
+ 82.525
1:12
1:12
bonded gravel path
1:12
+ 83.525
tarmac + 83.525
Admin office
+ 83.525
+ 83.525
+ 83.525
+ 83.525
el bonded grav + 83.525
rwp
WC
+ 83
WC
staff support zone
p
1:12 ra
tarmac + 82.141
+ 83.525
Stair
+ 83.525
paving + 83.525
top of wall + 84.525
PALM BEACH HOUSE RY
1975
2775
1530
2775
200
2775
835
SITE
LINE OF EX STRUCTURE
BOU NDA
185
11050
ANNABELLE CHAPMAN ARCHITECTS 100
3550
3550
100
BEDROOM 3 Project: Alterations and additions to beach house; 3 new bedrooms, laundry, and balcony. Role: Construction certificate drawings, specification, consultant Aco-ordination, client meeting minutes. D
3550
100
BEDROOM 4
100
100 SET IN FROM EXISTING
BEDROOM 5
TIMBER DECKING TO BALCONY AS SPECIFIED, TO BE OPENED SLATED BALUSTRADE AS SPECIFIED
BALCONY RL 31.17
9 W
RW DP
8 D
10 W
11 W
RW DP
9 D
10 D
12 W
WEATHERBOARD TRIM EDGE TO MANUFACTURERS DETAIL
13 W
KING SINGLE
975
18 W
4145
RL 31.17
18 D
QUEEN BED KING SINGLE
975
4155 BEDROOM 5
14 W
CARPET FINISH
RL 31.17
RL 31.17
535
BEDROOM 5
CARPET FINISH
CARPET FINISH
WEATHERBOARD AS SPECIFIED ON TIMBER FRAME
KING SINGLE
LINE OF GREEN ROOF OVER
19 W
1135
7355
100
100
14 D
15 D
1900
RL 31.17
16 D
3010
7 D 2
WC 2
RUMPUS ROOM CARPET FINISH
3
BATHROOM 2
RL 31.17
17 W
EXTERNAL TAP 1200
LINE O BALC F EXISTING ONY OVER
LANDING RL 32.39
6 D
STAIR 2 8
100
1110
230
7
6
5
4
3
2
PLASTERBOARD LINING TO EXISTING STRUCTURE
RL 31.17
3
2
FC BOARD ON TIMBER FRAME PACKED WITH INSULATION
ACCESS DOOR TO UNDERCROFT AREA
1
9
1
EXISTING UNDERCROFT AREA
10
900
APPROX CHECK ON SITE
WS
CHANGE IN CEILING HEIGHT OVER
100
1905
WS
21 W
11 D
NEW METAL VENT GRILL
11
LINE OF EX SANDSTONE WALL
485
WS - CONNECT TO EXISTING
RL 30.00
975
1
17 D
1845 BATHROOM 2
EXTERNAL SHOWER - SEALED TIMBER DECKING TO FALL TO DRAIN CONNECTED TO EXISTING
485
RL 31.17
1050
16 W
CARPET FINISH
100
HALL
20 W
1050 HALL
100
ROBE
13 D
BALUSTRADE AS SPECIFIED
100
ROBE
7355
ALL DOWNPIPES TO CONNECT TO ON SITE DETENTION TANKS
RW DP ROBE
2408
B
B
720
BEDROOM 4
BEDROOM 3
WEATHERBOARD AS SPECIFIED ON TIMBER FRAME
KING SINGLE
1225
100
100
535
8 W
1200
1200
WEATHERBOARD TRIM EDGE TO MANUFACTURERS DETAIL
12 13 14
STAIR 2 NEW TIMBER STAIR, TO BE CLOSED TREAD, CARPET FINISH.
15
EXISTING SANDSTONE WALL
ACCESS DOOR TO UNDERCROFT AREA
370
900
100
3170
DARY
20 RISERS @ 176mm 19 GOINGS @ 270mm ROUNDED NOSING @ 25mm TOTAL TREAD DEPTH @ 295mm
RUMPUS ROOM
100
4890
STAIR TO LOWER GROUND LEVEL TO BE CARPET FINISH
DEMOLISH TOP SECTION OF EXISTING SAND STONEWALL FOR STAIR OVER, MAKE GOOD AROUND STAIR.
100
WC 2
1100
100
BATHROOM 2
3300
100
SITE B OUN
WEATHERBOARDS AS SPECIFIED ON TIMBER FRAME PACKED WITH INSULATION, TO BE RECESSED FROM EXISTING MASONARY STRUCTURE
11050
A
D NOTES The builder is responsible for setting out the works, checking all imensions and levels on site. Report any discrepencies to the Architect prior to the commencement of work. Do not scale drawings. Check boundary distance on survey.
ISSUE DATE
ANNABELLE
CHAPMAN
ARCHITECT
PTY
LTD
Level 5 69 Regent Street Chippendale NSW 2008 PH: 02 9698 8148 M: 0412 665 412 F: 9310 1088 W: www.achapmanarchitect.com.au ABN 66095399518 ARCHITECTS REGISTRATION No. 4921 E: info@achapmanarchitect.com.au
NOTE
DWN BY
PROJECT Alterations + Additions FOR Jane Buckley, Robert Barry + John Barry
DATE #
CLIENT ADDRESS
PROJECT #
10 FLORIDA ROAD, PALM BEACH
1103
01.06.12
SCALE @ A2
DWG #
DWG
BASEMENT PLAN
1:50
DRAWN CHKD
104 IB ISSUE AC
A
STAGE
CC
APPROXIMATE POSISTION OF EXISTING BEAM NEW PLASTERBOARD LINING ON TIMBER BATERNS
LOUVRED SHADE STRUCTURE
OPEN SECTION OF BALUSTRADE
FCL 37.02
DRESSED TIMBER CAPPING WITH DRIP
2640 2500
1 AW
BALCONY HANDRAIL AS SPECIFIED
UNDER SIDE OF AW 1 RL 35.62
FAMILY ROOM
TOP OF RAIL RL 35.62
KITCHEN
LAUNDRY
1100
DETAIL 1
FFL 34.52
20
UNDER SIDE OF AW 2 RL 33.89
830
19
2 AW
18 17 16 15 14
FCL 33.69
13
2900
12 11
2700
18 W
19 W
20 W
7 D
1100
TOP OF RAIL RL 32.09
FFL 30.99
10
STAIR 2 RL 32.39
9 8 7 6 5 4 3 2 1
NEW TIMBER FLOOR BOARDS AS SPECIFIED TO BE LAID ON TOP OF EXISTING DETAIL 2 HANDRAIL AS SPECIFIED
LINING TO RUN FLUSH WITH LOW WALL TO ACT AS BALUSTRADE BALCONY HANDRAIL AS SPECIFIED
ZONE OF EXISTING SANDSTONE WALL TO BE DEMOLISHED
TOP OF SANDSTONE WALL TO BE CAPPED AND MADE GOOD, TO ENGINEERS DETAIL
STEEL BRACING TO ENGINEERS DETAIL
STEEL POSTS ON CONCRETE PEIRS TO ENGINEERS DETAIL
DOUBLE STUD TIMBER WALL, FACED WITH WEATHERBOARDS, PACKED WITH INSULATION INTERNAL LINING TO RUN FLUSH WITH FLOOR OPENING ABOVE.
CARPET FINISH WRAP OVER NOSING TIMBER TREAD
TIMBER RISER FC BOARD TO UNDERSIDE OF FLOOR JOISTS, PACKED WITH INSULATION FC BOARD TO UNDERSIDE NEW STEEL BALUSTRADE AS SPECIFIED
176
DRESSED TIMBER CAPPING WITH DRIP
STAIR 2 NEW TIMBER STAIR, TO BE CLOSED TREAD, CARPET FINISH.
OPEN SLATED DECK AS SPECIFIED.
20 RISERS @ 176mm 19 GOINGS @ 270mm ROUNDED NOSING @ 25mm TOTAL TREAD DEPTH @ 295mm
WEATHERBOARD TRIM STRIP
270
WEATHERBOARD AS SPECIFIED
DETAIL 1
25
295
DETAIL 2
NOTES The builder is responsible for setting out the works, checking all imensions and levels on site. Report any discrepencies to the Architect prior to the commencement of work. Do not scale drawings. Check boundary distance on survey.
ISSUE DATE
ANNABELLE
CHAPMAN
ARCHITECT
PTY
LTD
Level 5 69 Regent Street Chippendale NSW 2008 PH: 02 9698 8148 M: 0412 665 412 F: 9310 1088 W: www.achapmanarchitect.com.au ABN 66095399518 ARCHITECTS REGISTRATION No. 4921 E: info@achapmanarchitect.com.au
NOTE
DWN BY
A
23.08.11 DA
RM
B
10.10.11 RESUBMITTED DA AMENDED DECK
RM
PROJECT Alterations + Additions FOR Jane Buckley, Robert Barry + John Barry
DATE #
CLIENT ADDRESS
PROJECT #
10 FLORIDA ROAD, PALM BEACH
1103
01.06.12
SCALE @ A2
DWG #
DWG
SECTION A-A
1:50
108
DRAWN
RM ISSUE
CHKD
AC
A
STAGE
CC
PACIFIC ROAD HOUSE
100
1000
CLEAR GLASS BALLUSTRADE, TO BE ENGINEERED GLASS 1100 HIGH
C 105
NEW STEEL POST TO ENGINEERS DETAIL
250
8540
NEW TIMBER SLIDING DOORS , SEE WINDOW SCHEDULE
700
1150
1760
250
A 103
10900
A 103
C 105
Project: Alterations and additions to beach house; re-configuring of internal layout, including new stair and roof. Role: Development application drawings and documentation, Construction certificate drawings, Specification, consultant co-ordination. NEW WEATHERBOARD ON TIMBER FRAME PACKED WITH INSULATION
REMOVE EXISTING WALLS
DECK WINDOW SEAT
W 28
160
1490
W 26
STORAGE (UNDER SEAT)
W 29
DETAIL TO BE CHECKED ON SITE
DP
BEAM OVER
TIMBER FLOOR
REMOVE EXISTING BRICK PIER
LINE OF DECK OVER
W 27
LINE OF EAVES OVER
2260
JOINERY
1940
BAR REF: VINTEC (UNDER)
350
BBQ
1900
3000
3650
LINE OF EXTENT OF EXISTING DECK
250
250
ANNABELLE CHAPMAN ARCHITECTS 700
NEW WEATHER BOARDS TO LOWER SECTION OF EXITING WINDOW.
660
BEDROOM 2 3950
100
2340 EXISTING DECK WIDTH
ENSUITE 2150
100
PROPOSED DECK WIDTH
MASTER BEDROOM 4100
250
STK
STK
400
EXISTING BEAM OVER
LIVING
W 31
DW (UNDER)
KITCHEN
700
100
L
DINING
W 6
TILES 15
D 106
7
8
9
10
11
13
FW
14
ID 13
ID 12
ID 14
FFL 79.59 TILES
FFL 79.59 WP
ENTRY HALL
TIMBER FLOOR
W 5
250
190
3954
100
1045
800
900
100
815
760
595
EXTERNAL SHOWER WITH DRAINAGE BELOW DECK WETSUIT RACK
L
W 22
335
WINDOW SEAT
W 23
L
W 4
L
W 19
W 24
WHOLE BRICK WIDTH
DEMOLISH EXSTING BRICK PIER, TO ENGINEERS DETAILS NEW CONCRETE FLOOR SLAB TO ENGINEERS DETAILS
NEW TIMBER FENCE AND GATE
DP
SOLID TIMBER TREAD
DP
1100
3000
400
NEW EXTERNAL STUDWORK BELOW WINDOW, INTERNAL FINISH TO BE FLUSH WITH EXISTING.
RECESSED MAT TO BE FULL WIDTH OF PORCH AREA, PAVERS TO STEP EDGE. MAT DEPTH TO BE CHECKED TO ENSURE FLUSH FLOOR LEVEL WITH ENTRY HALL
A 103
C 105
NEW DOOR AND WINDOW, REMOVE EXISTING BRICKWORK AND MAKE GOOD FOR WINDOW SURROUND, INSTALL NEW LINTEL TO ENGINEERS DETAIL
NEW STEEL COLUMN TO ENGINEERS DETAIL 620
765
1660
900
950
760
695
100 600
900
150
100
2200
DAY BED
HALL 570 BEDROOM 4 250
2900
100
765
BATH 2 1400
65
1400
100
1140
DOOR HEAD 2340?
100
ENTRY DOOR 230
DOG DOOR TO DETAIL
D 2
NEW EXTERNAL TIMBER DECK TO BE LEVEL WITH INTERNAL FLOOR FINISH
BEDROOM 3
230
4400
D 1
W 2
250
250
250 JOINERY UNIT TO DETAIL
BATH 1 / WC
STK
2410 WP
2410
250
BATHROOM 4
W 3
FFL 76.01 TILES
3050
10900
RUMPUS
NEW INTERNAL TIMBER FLOOR BOARDS ON BATTENS
FW
FFL 76.01
STK
ID 1
TIMBER FLOOR
GENERAL NOTES 1. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, SPECIFICATIONS AND DOCUMENTATION.
4. FIGURED DIMENSIONS TAKE PRECEDENCE OVER THOSE SCALED FROM THE DRAWINGS. 5. THIS DRAWING HAS BEEN PRODUCED ONLY FOR ITS AGREED INTENDED USE ONLY. 6. REFER TO BASIX CERTIFICATE #A118152 DATED 28 JULY, 2011 FOR ALL BASIX INFORMATION.
DEMOLISH EXISTING STAIR AND MAKE GOOD.
LEGEND / ANNOTATIONS AC AS APP CBD COL CONC COS CR CT D DP DR DW EX F FB FC FCL FFL FGB FS
AIR CONDITIONING ADJUSTABLE SHELF APPLIANCES CUPBOARD COLUMN CONCRETE CHECK ON SITE CEMENT RENDER COOK TOP DRAWER DOWN PIPE DRYER DISH WASHER EXISTING FIXED FACE BRICK FIBRE CEMENT SHEET FINISHED CEILING LEVEL FINISHED FLOOR LEVEL FRAMELESS GLASS BALUSTRADE FIXED SHELF
FW GO GPO GSS GD H HTR HWU L LN M NGL OF OBS OV P PB PLB R REF RB
FLOOR WASTE GAS OUTLET GENERAL PURPOSE OUTLET (DOUBLE) GLAZED SHOWER SCREEN GRATED DRAIN HEIGHT HEATED TOWEL RAIL HOT WATER UNIT LOUVRES LINEN MIRROR NATURAL GROUND LINE OVERFLOW OBSCURED GLAZING OVEN PANTRY PAINTED BRICKWORK PLASTERBOARD RELOCATE REFRIDGERATOR ROBE
RT RWT SHR SK SL STK TBC TIM TUB TYP VP WP WC WM WPM
ROOF TILE RAIN WATER TANK SHOWER SINK SKYLIGHT STONEWORK TO BE CONFIRMED TIMBER TUB (LAUNDRY) TYPICAL VENT PIPE WASTE PIPE TOILET WASHING MACHINE WATERPROOF MEMBRANE
ID 3
STORE
D 106
STORAGE EXISTING PAVING
1
2
3
4
5
6
7
8
9
10
STORE UNDER STAIR
100
2200
LAUNDRY
B 104
TILES
ID 4
FFL 76.01
D 106
W 1
REF WM: TOP LOADER
DR (UNDER)
ACCESS DOOR TO UNDER CROFT AREA
WP
EXTENT OF EXISTING RESIDENCE TO BE DEMOLISHED
ID 5
GAS
ID 2
865
B 104
WP
LINE OF EXISTING BEAM OVER
COL
DROPPED CEILING FOR WASTE PIPE ABOVE ? WP
900
EXTENT OF EXISTING BUILDING TO BE RETAINED (CONSTRUCTION TYPE EITHER DOUBLE BRICK OR BRICK VENEER)
A 103
3. ALL DESIGN, MATERIALS AND WORKMANSHIP MUST BE IN ACCORDANCE WITH ALL RELEVANT AUSTRALIAN STANDARDS AND BUILDING CODES.
GROUND FLOOR PLAN
WP
TIMBER SLATS
C 105
2. ANY DISCREPANCY, ERROR OR OMISSION FOUND BETWEEN THIS DOCUMENT AND OTHER RELEVANT DOCUMENTATION MUST BE IMMEDIATELY REFERRED TO ANNABELLE CHAPMAN ARCHITECT FOR CLARIFICATION PRIOR TO ANY FURTHER ACTION.
A
LINE OF DECK OVER
DAY BED
C
OPEN SHELVES
OPEN SHELVES
WP
7265
DP
3510
760
L
STEP UP
DP
UPPER FLOOR PLAN
250
10900
2400
W 21
10400
100
W 20
250
1100
L
2070
4550
WINDOW SEAT L
5210
A 103
800
SINGLE D 4 D 5
L
100
C 105
PORCH
L
STK
3020
525
STK
10 11 12 13 14 15 16
BEDROOM 3
TILES
BEDROOM 3
140
W 15
W 18
NEW WEATHERBOARD ON TIMBER FRAME PACKED WITH INSULATION
AC
FW
BATHROOM 2
QUEEN SIZE W 16
WP
SINGLE
NEW TIMBER FLOOR
9
FW
ID 15
D 3
BEDROOM 4
8
NEW STAIR
250
100
WP
STK
W 14
7
10900
TIMBER FLOOR ID 11
WC
ID 10
AC
6
LINE OF EXISTING WASTE PIPE
6
5
2310
5
250
NEW BRICKWORK TO BLOCK UP EXISTING OPENING BACKED WITH INSULATION - R 1.16, TO BE KEYED INTO EXISTING
700
100
4
1700
WP 3
4
600 NEW WINDOW TO MIRROR EXITING
BATH 1 2400
FFL 78.60
16
2
3
EXISTING ROOF WINDOW OVER
BATHROOM 1
B 104
WC
1300
JOINERY
2650 NEW STAIR REFER TO DRAWING 106
ID 16
WALK IN W' ROBE 1
2
100
WALKING ROBE
100
WP
ID 6
GAS
TIMBER FLOOR
D 106
1
100
WP
ID 7
FFL 78.60
NEW BRICKWORK TO BLOCK UP EXISTING OPENING, TO BE KEYED INTO EXISTING
BEDROOM 4
D 106 W 25
A 103
100
ID 8 AC
B 104
AC
ROBE
NEW TIMBER FLOOR
2435
PANTRY
ROBE
2450 L
W 13
KITCHEN WASTE RISER
NEW EXTERNAL STUDWORK BELOW WINDOW, INTERNAL FINISH TO BE FLUSH WITH EXISTING.
B 104
REF
1040
1400
600
STK
WALK IN C'BOARD
525
GAS STK
D 106 4650
TIMBER FLOOR DEMOLISH EXISTING STAIR AND MAKE GOOD WITH NEW FLOOR, TO ENGINEER'S DETAIL
B 104
TIMBER FLOOR
3235
100 2550
BEDROOM 2 BEDROOM 1
DECK
4235
STK
QUEEN SIZE NEW WINDOW, REMOVE EXISTING BRICKWORK AND MAKE GOOD FOR WINDOW SURROUND
BEAM OVER
FW
C 105
1800
KING SIZE
TILES
ID 17
ID 9
3115
BEDROOM 2 4480
ENSUITE
NEW WEATHERBOARD ON TIMBER FRAME PACKED WITH INSULATION
860
MASTER BEDROOM
2750
5000
3850
5500
FFL 81.27 TIMBER FLOOR
1815
W 12
1100
1945
600
W 7
7250
L
WP
1100
STK
L
FP
100
L
W 30
700
L
EXACT DIMENSIONS OF FIREPLACE TO BE CHECKED ON SITE LOCATION OF NEW FLUE TBC
DP
5900
W 8
W 9
W 10
W 11
100
900
250
1350
D 6
NEW STAIR
TIMBER FRAMED EXTERNAL AND INTERNAL STUDWORK. ALLOW FOR LINING & INSULATION AS SHOWN AND SPECIFIED. NEW BRICK WALLS. ALLOW TO FINISH WALL TO MATCH ADJACENT SURFACES
LOWER FLOOR PLAN
NEW ACOUSTIC BARRIER AS SPECIFIED NEW SELECTED STONE NEW JOINERY
NOTES The builder is responsible for setting out the works, checking all dimensions and levels on site. Report any discrepencies to the Architect prior to the commencement of work. Do not scale drawings. Check boundary distance on survey.
ISSUE B
ANNABELLE
CHAPMAN
ARCHITECT
PTY
LTD
Level 5 69 Regent Street Chippendale NSW 2008 PH: 02 9698 8148 M: 0412 665 412 F: 9310 1088 W: www.achapmanarchitect.com.au ABN: 66095399518 ARCHITECTS REGISTRATION No. 4921 E: info@achapmanarchitect.com.au
DATE
NOTE
24.07.12
REMOVAL OF BATHROOM 3 AND INTORDUCTION OF WC
DWN BY PROJECT IB
ALTERATIONS + ADDITIONS
CLIENT ADDRESS
PROJECT #
DATE #
81A PACIFIC ROAD, PALM BEACH
1111
19.09.12
SCALE @ A1
DWG #
FOR
DWG
ANDREW + SUSIE MAIN
PROPOSED FLOOR PLANS
101
1:50 DRAWN CHECKED
IB ISSUE AC
B
STAGE
CC
TIMBER SLATS TO LANDING LEVEL
NEW TIMBER FLOOR BOARDS TO BE FLUSH WITH TIMBER EDGE TRIM
HORIZONTAL SLATS TO BE RECESSED INTO TIMBER COLUMNS
ENTRY HALL
25
GLASS BALUSTRADE
44
13
12
11
10
9
8
7
125
25
80
256
4
80
1240
2075
5
86
281
6
3
2
281
1370
25
910
800
1
50
14
LINE OF FLOOR ABOVE
35
15
GLASS GATE TO TOP OF STAIR
GROUND FLOOR
TIMBER TREADS
20 95
UPPER FLOOR LEVEL
TIMBER STRINGER
256
GLASS GATE TO TOP OF STAIR
1535
GROUND TO UPPER LEVEL STAIR (1:20)
825
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
LOWER GROUND FLOOR
GLASS TO BE POINT FIXED TO TIMBER STRINGER OR FLOOR TRIMMER, TO BE FLAT CAP FINISH TO POINT FIXING 16
85
TIMBER TO EDGE TRIMMER, MITRE JOINT TO CORNERS 17
GROUND FLOOR
EDGING DETAIL
825
(1:5)
TIMBER GATE TO BOTTOM OF STAIR TO BE HORIZONTAL TIMBER SLATS
1375
80
1240
LOWER TO GROUND LEVEL STAIR
80
1105
3880
(1:20) 5265 1095
GLASS BALUSTRADE TO RUN FULL HEIGHT FROM UPPER LEVEL TO LOWER LEVEL
10
1325
10
80
1240
80
10
1415
10
1000
GATE GATE
16
FFL 81.27 230
16 15
15
14
14
13 NOSING TO TOP TREAD TO TIE INTO NEW TIMBER FLOOR BOARDS
OPENING TO BE NO LESS THAT 125MM
10
168
11
SOLID TIMBER TREADS
BULHEAD TO ENGINEERS DETAIL
ENTRY HALL 9
295 12
43
12
25
270 3670
13
11 10 9
8 LANDING TO BE TIMBER SLATS
8 GAP BETWEEN OPEN TREAD TO STAIR TO BE NO GREATER THAT 125MM
7
295 7
25
6
FFL 79.59
2440
GLASS FIXED TO OUTSIDE OF TIMBER STRINGER
125
FFL 81.27
270
6
FFL 79.59
GATE GATE
GATE GATE
5
165
RESSED WALL LIGHTS, SEE ELECTRICAL PLAN FOR FURTHER DETAIL
125 40
4 GAP BETWEEN OPEN TREAD TO STAIR TO BE NO GREATER THAT 125MM
3 2 1
FFL 78.60
16
15
15
14
14
13
13 MATCH EDGE DETAIL ABOVE
HORIZONTAL TIMBER SLATS BETWEEN SOLID TIMBER POST
FFL 78.60
16
12
12
DOOR TO UNDER STAIR STORAGE
11
4080 11 10
10
TIMBER GATE TO BOTTOM OF STAIR TO BE HORIZONTAL TIMBER SLATS
9
9
8
8
7
7
6 1765
6 5
5
CLOSED TEAD TIMBER STAIR 4
1260
4 3
3
2
FFL 76.01
2
STAIR SECTION A-A
STAIR SECTION D-D
(1:20)
(1:20)
1
245
1
FFL 76.01
NOTES The builder is responsible for setting out the works, checking all dimensions and levels on site. Report any discrepencies to the Architect prior to the commencement of work. Do not scale drawings. Check boundary distance on survey.
ISSUE
ANNABELLE
CHAPMAN
ARCHITECT
PTY
LTD
Level 5 69 Regent Street Chippendale NSW 2008 PH: 02 9698 8148 M: 0412 665 412 F: 9310 1088 E: info@achapmanarchitect.com.au W: www.achapmanarchitect.com.au ABN: 66095399518 ARCHITECTS REGISTRATION No. 4921
DATE
NOTE
DWN BY PROJECT
CLIENT ADDRESS
PROJECT #
DATE #
ALTERATIONS + ADDITIONS
81A PACIFIC ROAD, PALM BEACH
1111
19.09.12
FOR
DWG
SCALE @ A1
DWG #
ANDREW + SUSIE MAIN
SECTION D: STAIR
1:20 DRAWN CHECKED
106 IB ISSUE AC
A
STAGE
CC
BONDI HOUSE SITE BOUNDARY
PROPOSED GABLE TO VERANDAH WITH REFENCE TO ANNEXURE D1-1 IN WAVERLY DCP 2010 NEW FRENCH DOORS AND PROPOSED SIDELIGHT WINDOWS TO VERANDAH TO MATCH EXISTING VICTORIAN PROPORTION WINDOWS TO LOWER LEVEL
ANNABELLE CHAPMAN ARCHITECTS PROPOSED TIMBER FRIEZE
PROPOSED WROUGHT IRON PALISADE FENCE
Project: Alterations and additions of a heritage terrace. PROPOSED WROUGHT IRON BALLUSTRADE Role: Development application drawings, design statement, survey of existing building. MAXIMUM BUILDING HEIGHT (PITCHED) 8.5M
NEW TIMBER 4 PANEL DOOR WITH HIGHLIGHT WINDOW
STOP CHAMFER TO TIMBER POST
MAXIMUM BUILDING HEIGHT (FLAT) 7.5M 1ST CFL 94.24
4 D
4 W
300
2730
5 W
1ST FFL 91.51
3130
GR CFL 91.21
300
GR FFL 88.08
3150
LO GR CFL 87.78
LO GR FFL 84.63 NOTES The builder is responsible for setting out the works, checking all dimensions and levels on site. Report any discrepencies to the Architect prior to the commencement of work. Do not scale drawings. Check boundary distance on survey.
ISSUE A
ANNABELLE
CHAPMAN
ARCHITECT
PTY
LTD
Level 5 69 Regent Street Chippendale NSW 2008 PH: 02 9698 8148 M: 0412 665 412 F: 9310 1088 W: www.achapmanarchitect.com.au ABN: 66095399518 ARCHITECTS REGISTRATION No. 4921 E: info@achapmanarchitect.com.au
DATE
NOTE
27.04.12 DA SUBMITTED
DWN BY PROJECT IB
CLIENT ADDRESS
PROJECT #
DATE #
ALTERATIONS AND ADDITIONS
16 PARK PARADE BONDI
1203
27.04.12
FOR
DWG
SCALE @ A3
DWG #
ARTHUR AND MARINA ALEXIOU
WEST ELEVATION
1:50
DRAWN CHECKED
204 IB ISSUE AC
A
STAGE
DA
PROPOSED 3M WIDTH OF DRIVEWAY, IN ACCORDANCE WITH AS 2890.1:2004 PARKING FACILITES, PART 1 OFF STREET PARKING
PROPOSED STEP IN FROM EXISTING DWELLING TO MAINTAIN A CLEAR DEFINITION BETWEEN OLD AND NEW
No.15 ONE &TWO STOREY BRICK COTTAGE TILE ROOF
PROPOSED TIMBER DECK
SILL RL 88.00
SILL RL 85.50
SILL RL 88.00 SILL RL 85.55
500
84 6250
3670
2630
LINE OF STRUCTURE BELOW RL 84.25
UP
STORE
1000L RWT
STORAGE
4 5 6 7 8 9
SILL RL 87.50 SILL RL 90.80
2930
270
5930
SILL RL 87.80 SILL RL 90.80
SILL RL 90.80
270
2200
7400
SILL RL 89.10
SILL RL 90.80
No.17 TWO STOREY BRICK COTTAGE TILE ROOF
A
PROPOSED STAIRS TO GROUND FLOOR LEVEL
2760 100
GATE + STEP UP
UP
SITE BOUNDARY
1700
4705
GARAGE
400 910
1500
SITE BOUNDARY
LEVEL GRAVEL AREA RL 84.05
1 D
LAUNDRY
3
585
5500
BATHROOM
1 2
POOL
270
PR. FFL 84.18
84.05
UP
40.285 42'
350
3 W
EX. FFL 84.63
RUMPUS ROOM
SIDE SETBACK
3000
LINE OF WALL ABOVE 2 W
HALL BEDROOM 3
33 00
500
PROPOSED SLOPED DRIVEWAY
REA RS
LINE OF BALCONY ABOVE
1100
85
86
3000
9째
8.38
575
1100
EXISTING SLOPED DRIVEWAY
2535
189째
2325
575
40.285
1 W
A
REA R SE
42'
SILL RL 85.35
8.38
1500
SITE BOUNDARY
GR OU ND FLO OR
SILL RL 88.00
SILL RL 85.50
ET B AC K
SILL RL 88.00 SILL RL 85.50
FIRS T FL OO
SILL RL 88.10
T BA CK
SILL RL 88.10
SIDE SETBACK
PROPOSED POOL FENCE
R
EXISTING WIDTH OF DRIVEWAY
SITE BOUNDARY
PROPOSPED BOUNDARY FENCE
PROPOSED LOW WALL TO END OF POOL
STEP
PROPOSED CONCRETE WHEEL STRIPS WITH SOFT LANDSCAPING BETWEEN
EXISTING STRUCTURE TO BE DEMOLISHED TO CREATE A CLEAR 3M WIDE DRIVE WAY ACCESS TO THE REAR
900
EXISTING LINE OF BOUNDARY FENCE TO BE REMOVED
LOCATION OF WASTE AND RECYCLING BINS UNDER STAIR
SILL RL 90.80
LENGTH OF PROPOSED RETAINING WALL, RETAING HEIGHT OF 0M TO 0.23M FROM EAST TO WEST
EASEMENT AREA, ALL CONSTRCUTION TO BE EXCLUDED FROM THIS AREA, CALCULATED USING WAVERLEY COUNCIL WATER MANAGMENT, TECHNICAL GUIDELINES (4.6)
1000 LITRE RAINWATER TANK (575W x 1400L x 1540W)
NOTES:
APPROXIMATE POSITION OF NEIGHBOURING POOL
THE WALLS, FLOORS, CEILING AND ROOF IS TO BE CONSTRUCTED ACCORDING TO BASIX CERTIFICATE #A137262_03 SUSPENDED FLOOR ABOVE GARAGE: FRAMED (R0.7) NIL FLOOR ABOVE EXISTING DWELLING OR BUILDING NIL EXTERNAL WALL: FRAMED (WEATHERBOARD, FIBRO, METAL CLAD) R1.30 (OR R1.70 INCLUDING CONSTRUCTION) EXTERNAL WALL: BRICK VENEER R1.16 (OR R1.70 INCLUDING CONSTRUCTION) INTERNAL WALL SHARED WITH GARAGE: SINGLE SKIN MASONRY (R0.18) NIL RAKED CEILING, PITCHED/SKILLION ROOF: FRAMED CEILING: R1.76(UP), ROOF: FOIL/SARKING , LIGHT (SOLAR ABSORPTANCE < 0.475) NOTES The builder is responsible for setting out the works, checking all dimensions and levels on site. Report any discrepencies to the Architect prior to the commencement of work. Do not scale drawings. Check boundary distance on survey.
APPROXIMATE POSTION OF SEWER PIPE (SYDNEY WATER) APPROXIMATE POSTION STORM WATER PIPE (COUNCIL)
ISSUE A
ANNABELLE
CHAPMAN
ARCHITECT
PTY
LTD
Level 5 69 Regent Street Chippendale NSW 2008 PH: 02 9698 8148 M: 0412 665 412 F: 9310 1088 W: www.achapmanarchitect.com.au ABN: 66095399518 ARCHITECTS REGISTRATION No. 4921 E: info@achapmanarchitect.com.au
DATE
NOTE
27.04.12 DA SUBMITTED
DWN BY PROJECT IB
CLIENT ADDRESS
PROJECT #
DATE #
ALTERATIONS AND ADDITIONS
16 PARK PARADE BONDI
1203
27.04.12
FOR
DWG
SCALE @ A3
DWG #
ARTHUR AND MARINA ALEXIOU
PROPOSED LOWER GROUND FLOOR
1:100
DRAWN CHECKED
105 IB ISSUE AC
A
STAGE
DA
PYMBLE HOUSE
1020
2905
SELF CLOSING HINGES TO ALL DOORS
18
SOFT CLOSING DRAWERS
30
900
30
870
705
900
EQ
EQ
18
ANNABELLE CHAPMAN ARCHITECTS Project: Alterations and Additions of existing detached 4 bedroom family home. QASAIR FEDERATION RANGE 880 Role: Construction certification package; drawings, consultant co-ordination. Product sourcing and selection, HOODspecification, (900MM WIDE) weekly site meetings, meeting minutes, full joinery drawings to construction detail. 110 660 110
CROWN MOLDING TO LINE IN WITH ARCHITRAVE OF W1 AND D2, ARCHITRAVE TO MATCH EXISTING
SELECTED CROWN MOLDING TO TOP OF CUPBOARDS, JOINER CO-ORDINATE WITH ARCHITECT
PANTRY TO HAVE ADJUTABLE SHELVING
TO MATCH EXISTING ARCHITRAVE
EQ
90 90
EQ
90
90 110
900
635
110
90
90
360
90
RANGE HOOD
FINISHES CEDAR or MDF FACTORY PRIMED OR POLYURETHANE SATIN FINISH
675 60 POT DRAWER
POT DRAWER
POT DRAWER
POT DRAWER
290 290
925 BENCH TOP
POT DRAWER
180
POT DRAWER
DRAWER
110
HARDWARE POSITION OF HARDWARE TO BE DETERMINED ON SITE
NOTES The builder is responsible for setting out the works, checking all dimensions and levels on site. Report any discrepencies to the Architect prior to the commencement of work. Do not scale drawings. Check boundary distance on survey.
DRAWER
MITRED CORNER TO SKIRTING 90
FISHER PAYKEL RF619ADUX STAINLESS STEEL 1790H X 900W X 730D
END ELEVATION
DRAWER
100
100
130
1865
2160
2400
SELECTED GLASS SPLASHBACK
ANNABELLE
EQ
BENCH TOP RECYCLED TIMBER BENCH TOPS TO BE SOURCED FROM: AUSTRAILAN ARCHITECTURAL HARDWOODS PTY LTD TO BE BLACK BUTT SOLID 60MM
CHAPMAN
ARCHITECT
90 90
EQ
90 25
830
PTY
LTD
Level 5 69 Regent Street Chippendale NSW 2008 PH: 02 9698 8148 M: 0412 665 412 F: 9310 1088 W: www.achapmanarchitect.com.au ABN: 66095399518 ARCHITECTS REGISTRATION No. 4921 E: info@achapmanarchitect.com.au
652
25
700
ISSUE
DATE
A
07.06.12
NOTE CONSTRUCTION CERTIFICATE
BELLING CLASSIC 90DFT CHECK DIMENSION WITH MANUFACTURER
STAINLESS STEEL BENCH TOP TO RUN FLUSH WITH TOP SIDE OF WINDOW FRAME
900
DWN BY PROJECT RM
B
13.07.12
APPLIANCE AND JOINERY STYLE UPDATE
C
30.07.12
JOINERY SYLE UPDATE
RM
IB
D
29.08.12
COOK TOP, END ELEVATION
RM
E
05.09.12
JOINERY RE-PRICING
IB
700
600
CLIENT ADDRESS
PROJECT #
DATE #
ALTERATIONS + ADDITIONS
10 CARSON STREET, PYMBLE
1204
05.09.12
FOR
DWG
SCALE @ A3
DWG #
JEREMY + MICHELE HARRIS
KITCHEN ELEVATION A
401
1:20 DRAWN CHECKED
IB ISSUE AC
E
STAGE
CD
GLASS SCREEN TO SHOWER
MICO CUBE 500 BENCH MOUNTED BASIN
BRODWARE, NEU SHOWER (B80.25.T3) PUMBLER TO ADJUST HEIGHT OF UNIT, SUPPLIER BY CONFIRMED (PAM FROM BRODWARE)
BRODWARE, NEU ENGLAND, WALL SET, 200mm SPOUT AND LEVERS WITH WHITE PORCELAIN HANDLES
SELECTED METAL HANDEL TO MIRROR DOORS
140
GLASS SCREEN TO SHOWER
ADJ SHELF
ADJ SHELF
ADJ SHELF
ADJ SHELF
ADJ SHELF
ADJ SHELF
FIXED SHELF
FIXED SHELF
FIXED SHELF
980
ADJ SHELF
ADJ SHELF
20
EQ
435
60 25 155 25 155
DRAWER
EQ
EQ
150
400
MICO CUBE 500 BENCH MOUNTED BASIN
BETTE STARLET BATH
TILED FINISH TO FRONT OF VANITY UNDER STRUCTURE
25
550
ROCA KYO WC
ELEVATION B
90 110
340
ELEVATION A
60
BRODWARE, NEU ENGLAND, WALL SET, 200mm SPOUT AND LEVERS WITH WHITE PORCELAIN HANDLES
540
NEW TRADITIONAL SILL TO EXISTING WINDOW
25
DRAWER
300
300
75
700
DRAWER
SET DOWN TO SHOWER FLOOR
DRAWER
25
600
1150
390
DRAWER
1150
2280
75
DRAWER
155
STONE
STONE
600
STONE
60
400
2280
FIXED SHELF
FINISHES MDF FACTORY PRIMED, SITE PAINTED OR POLYURETHANE SATIN FINISH
HARDWARE POSITION OF HARDWARE TO BE DETERMINED ON SITE
NOTES The builder is responsible for setting out the works, checking all dimensions and levels on site. Report any discrepencies to the Architect prior to the commencement of work. Do not scale drawings. Check boundary distance on survey.
ANNABELLE
FFL TO BE RAISED 50MM APPROX TO ALLOW FOR TILES ON HEATED FLOOR ON MEMBRANE, FC
CHAPMAN
ARCHITECT
90
200
90
380
PTY
LTD
Level 5 69 Regent Street Chippendale NSW 2008 PH: 02 9698 8148 M: 0412 665 412 F: 9310 1088 W: www.achapmanarchitect.com.au ABN: 66095399518 ARCHITECTS REGISTRATION No. 4921 E: info@achapmanarchitect.com.au
ISSUE
DATE
A
07.06.12
NOTE CONSTRUCTION CERTIFICATE
DWN BY PROJECT RM
B
13.07.12
CD UPDATE, INTRODUCE SECOND SHOWER SCREEN
C
02.08.12
PC ITEMS UPDATED, SILL
D
29.08.12
VANITY CUPBOARD
IB
E
05.09.12
JOINERY RE-PRICING
IB
IB RM
20
CLIENT ADDRESS
PROJECT #
DATE #
ALTERATIONS + ADDITIONS
10 CARSON STREET, PYMBLE
1204
05.09.12
FOR
DWG
SCALE @ A3
DWG #
JEREMY + MICHELE HARRIS
BATHROOM 2 ELEVATIONS A+B
416
1:20 DRAWN CHECKED
IB ISSUE AC
E
STAGE
CD
SELECTED FLUORESCENT LIGHTING
80
18
40
18
CORNERS TO BE MITRED
560
950
DETAIL A
560
SCALE 1:5
40
18
560
60 18
300
300
18 SELECTED FLUORESCENT LIGHTING
A 421
CL
18
SELECTED FLUORESCENT LIGHTING
500
ADJ SHELF
18
ADJ SHELF
1025
ADJ SHELF
EQ
ADJ SHELF
18
FIXED SHELF
185
DRAWER
275
ADJ SHELF ADJ SHELF
EQ
DRAWER
18
1000
520
ADJ SHELF ADJ SHELF
275
ADJ SHELF
TROUSER PRESS 500w x 1100h x 380d
ADJ SHELF
ADJ SHELF
DRAWER
FIXED SHELF
FIXED SHELF
50
30
18
FIXED SHELF
50
1025
FIXED SHELF ADJ SHELF
ADJ SHELF
EQ
FIXED SHELF
18
185
DRAWER
18
FIXED SHELF
ADJ SHELF
ADJ SHELF
ADJ SHELF
FIXED SHELF
EQ
2175
FIXED SHELF ADJ SHELF
2050
25
ADJ SHELF
CL
2050
ADJ SHELF
ADJ SHELF
EQ
18
18
EQ
18
EQ
18
CL 560
FINISHES MELAMINE - CARCASSES, SHELVING, DRAWER BACKS
950
540
18
560
ELEVATION C
POLYURETHANE SATIN FINISH - DRAWER FRONTS NOTES The builder is responsible for setting out the works, checking all dimensions and levels on site. Report any discrepencies to the Architect prior to the commencement of work. Do not scale drawings. Check boundary distance on survey.
1510
ELEVATION D
HARDWARE POSITION OF HARDWARE TO BE DETERMINED ON SITE
ANNABELLE
CHAPMAN
ARCHITECT
PTY
LTD
Level 5 69 Regent Street Chippendale NSW 2008 PH: 02 9698 8148 M: 0412 665 412 F: 9310 1088 E: info@achapmanarchitect.com.au W: www.achapmanarchitect.com.au ABN: 66095399518 ARCHITECTS REGISTRATION No. 4921
ISSUE
DATE
A
07.06.12
CONSTRUCTION CERTIFICATE
NOTE
DWN BY PROJECT RM RM
B
01.08.12
JOINERY UPDATE
C
09.08.12
HANGING ROD + LIGIHTING
IB
D
29.08.12
TROUSER PRESS
IB
E
05.09.12
SHELVING ALTERATION REMOVED + JOINERY RE-PRICING
IB
CLIENT ADDRESS
PROJECT #
DATE #
ALTERATIONS + ADDITIONS
10 CARSON STREET, PYMBLE
1204
05.09.12
FOR
DWG
SCALE @ A3
DWG #
1:20
421
JEREMY + MICHELE HARRIS
WALK IN ROBE ELEVATIONS C + D
DRAWN CHECKED
IB ISSUE AC
E
STAGE
CD
WIGRAM HOUSE Iain Blampied + Katrina Passer
Project: Sketch design to restore a typical Sydney terrace to a modern family home. Role: Co-designer, client meetings, fee proposal, survey of existing, sketch design drawings, 3D model.
COLLEGE PARK SCHOOL ARCHITECTURE PLB Project: Extension of a central London school for special needs Role: Site and options models, client and consultant meetings, teacher and parent discussion evening, existing drawings.
DAGENHAM LIBRARY ARCHITECTURE PLB
Project: Mixed use scheme, 82 apartments and community library Role: All floor plans, elevations, apartment layouts for tender stage. Co-ordination with consultants, consultant meetings, design of model for exhibition, window and door schedules
do not scale. © architecture plb Notes
25.01.08 - J Construction issue For Comment
P
D
21270
See drawing 0634_GAD_420007
8100 2300
Stair 7 0634_GAD_480012
5585
External Access for maintenance to roof level and plant
2515
1400
For Comment Trees removed Rooflight AOV removed Risers updated Flat Layouts updated
E
C
B
-H
25.04.08 - J For Comment 13.05.08 - K All windows dlush with inside face. 21.05.08 - L For comment
H
A
11.03.08
GAD_ 4 5 600 W u 900 h
IDR_ 2 _ 103
Timber Clad roof light 1500mm high
SSL +14.545
EW _ 2 _ 111
00
EW _ 2 _ 60
500 0 8
esh to 20
h to 2000
750 x 600
540 x 190
F GAD__4
fencing/m
washing machine
EW _ 2 _ 112
600 x 500
_110006
Plant Area - size tbc
cing/mes
600 Bu
ROOF 1
540 x 190
h plant h wall wit
dish washing machine space (650)
1
IDR_ 2 _ 102
BLK _A_ 2 _ 60
0634_ASD
EW _ 2 _ 113
FLAT 26_2BED_4P_67.9 sq.m
400 Bu
Lift A
Apartment Entrance A
EW _ 2 _ 59
600 Bdu
b
500 Bu
600 W u 900 h
Stair 1
rwp
00
11 00 hig
600 x cup'd
600 Oven/Ho
1000 Bcu
2300 tall
h plant fen h wall wit
m
300 Bu
Service riser
AOV
esh to 20
11 00 hig
ED _ 2 _ 101
** * F/F
800 W u 900 h
V
800 C Wu 900 h
fencing/m
rwp
0006
Stair core 1 0634_GAD_481001 Mesh Screen 1 0634_COM_200103
nt ll with pla
1
C h wa 11 00 hig
9250
IDR_ 2 _ 104
RL1
FLAT 17_1BED_2P_45.8 sq.m
** *
2
750 x 600
F/F
1000 Bcu
600 Bu 650 Oven/Ho Space
Unit
500 Bu
b
400 W u 900 h
m
V
400 W u 900 h
500 W u 900 h
washing machine b
600 Bu
EW _ 2 _ 110
540 x 190
400 Bu
2000
rwp
Service risers
J
600 W u 900 h F/F
** *
3
L
Q
P
** *
FLAT 27_1BED_2P_46.4 sq.m
F/F
5
600 W u 900 h
FLAT 18_1BED_2P_46.4 sq.m
800 Bu
600 Oven/Ho
400 Bu 600 Bu
500 Draw
6100
Unit
6100
500 W u 900 h
400 W u 900 h
m
V
400 W u 900 h
500 W u 900 h
V
600 x 500
800 C Wu 900 h
m
600 x 2300 cup'd
600 Oven/Ho
1000 Bcu
tall
6100
6205
Timber Clad roof light 1500mm high
** * F/F
540 x 190
600 Bdu
b
EW _ 2 _ 108
300 Bu
600 W u 900 h washing machine
600 x 500 540 x 190
b
washing machine
1000 Bcu
800 C Wu 900 h
EW _ 2 _ 63
O
RL2
EW _ 2 _ 109
750 x 600
GAD_ 4 5 0 0 0 4
N
IDR_ 2 _ 106
IDR_ 2 _ 107
6100
Flat 17 - 0634_GAD_460013 Flat 18 - 0634_GAD_460023 Flat 19 - 0634_GAD_460023 Flat 20 - 0634_GAD_460010 Flat 21 - 0634_GAD_460023 Flat 22 - 0634_GAD_460012 Flat 23 - 0634_GAD_460023 Flat 24 - 0634_GAD_460021 Flat 25 - 0634_GAD_460004 Flat 26 - 0634_GAD_460021 Flat 27 - 0634_GAD_460023 Flat 28 - 0634_GAD_460014 Flat 29 - 0634_GAD_460023 Flat 30 - 0634_GAD_460022 Flat 31 - 0634_GAD_460006 Flat 32 - 0634_GAD_460004
Timber Clad roof light 1500mm high
BLK _A_ 2 _ 61
750 x 600
EW _ 2 _ 62
B
h wall
g/mesh to
800 Bu
600 Oven/Ho
Unit
11 00 hig
800 C Wu 900 h
1000 Bcu
m
500 Draw
SSL +14.665
400 W u 900 h
V
400 W u 900 h
800 C Wu 900 h
washing machine
fencin with plant
1100 high wall
500 Draw
600 x 500
_200101
Key
4
ED _ 2 _ 105 600 x 500
500 Bu
EW _ 2 _ 61
800 W u 900 h
0634_ASD
0008
tall
GAD_ 4 5
600 x 2300 cup'd
F
RL3
FLAT 28_1BED_2P_46 sq.m 600 Bu 400 Bu
EW _ 2 _ 233 750 x 600
6
EW _ 2 _ 106
EW _ 2 _ 107
EW _ 2 _ 105
EW _ 2 _ 104
EW _ 2 _ 103
EW _ 2 _ 102
EW _ 2 _ 101
EW _ 2 _ 99
9
EW _ 2 _ 64
EW _ 2 _ 100
rwp
IDR_ 2 _ 108
FLAT 19_1BED_2P_46.4 sq.m IDR_ 2 _ 109 750 x 600
F/F
** *
FLAT 29_1BED_2P_46.4 sq.m
FLAT 30_1BED_2P_46.4 sq.m
FLAT 32_1BED_2P_46.4 sq.m
FLAT 31_1BED_2P_46.4 sq.m
8
600 W u 900 h
6100
FD 540 x 190
800 Bu
400 Bu
1000 Bcu
IDR_ 2 _ 110
600 x 500
washing machine
AOV
500 Draw Unit
400 W u 900 h m
V
650 Oven/Hob Space 300 Bu
400 W u 900 h
washing machine 600 Bu
F
x 23 0 d 60 p' cu
u
W C 0 h 80 0 90
60
10
00
Bc
0
O
ve
n/
Ho
4m
5m
1750
Plan Icon
1000 Bcu 600 Bu washing machine 300 Bu
400 W u 900 h
V
650 Oven/Hob Space
B
m
400 W u 900 h
00
* 30
m
EW _ 2 _ 69
3m
A 8100
F/
**
Flat roof area (accessable)
0
2m
500 Bu
ll ta
V
1m
1000 Bcu
600 x 500 600 x 500
***
F/F Space
***
F/F Space
600 x 2300 tall cup'd
750 x 600
600 x 500
600 x 2300 tall cup'd
300 Bu
540 x 190
600 Bu
Service riser
IDR_ 2 _ 124
10
F/F Space
750 x 600 540 x 190
540 x 190
750 x 600
1000 Bcu
800 C Wu 900 h
750 x 600
1000 Bcu
800 C Wu 900 h 800 W u 900 h 400 W u 900 h
Vm
Apartment Entrance B
rwp AOV
500 Draw Unit
V
400 W u 900 h
m
750 x 600
0
500 Bu
BLK _A_ 2 _ 66
500 W u 900 hwashing machine
dish washing machine space (650)
u W 0 h 40 0 90
***
400 W u 900 h
Vm
650 Oven/Hob Space 600 Bu
F/F
** *
washing machine
400 W u 900 h
400 Bu
500 Draw Unit
Lift 2
N
ED _ 2 _ 125
IDR_ 2 _ 123
IDR_ 2 _ 121
500 Draw Unit
800 C Wu 900 h
1000 Bcu
540 x 190
Bu
V
u W 0 h 40 0 90
EW _ 2 _ 68
IDR_ 2 _ 122
600 x 2300 tall cup'd
650 Oven/Hob Space
m
600 x 500
600 Bu
0
b
F/F
600 x 500
400 Bu
Ho
800 Bu
** *
washing machine
n/
u
W C 0 h 80 0 90
Bu
ne
400 W u 900 h
ve
600 W u 900 h
***
IDR_ 2 _ 119
400 Bu
O
500 W u 900 h
600 Oven/Hob
0
00
u
600 W u 900 h
FD
500 Draw Unit
it
0
BLK _A_ 2 _ 65
FD Service riser
Un
hi
600 x 500
Bu
w
ac
500 W u 900 h
800 W u 900 h
0
ra
m
Bc
F/F Space
800 Bu
400 Bu
80
D
g
600 x 2300 tall cup'd
u W 0 h 50 0 90
0
in
600 Oven/Hob
400 W u 900 h
u W 0 h 60 0 90
* 40
60
50
sh
300 Bu
Vm
F
10
60
wa
500 Bu
IDR_ 2 _ 120
IDR_ 2 _ 118 IDR_ 2 _ 116
IDR_ 2 _ 115
EW _ 2 _ 67
600 x 500
IDR_ 2 _ 117
**
GAD_
F/F
F/
Bu
b
FLAT 33_2BED_4P_67.2 sq.m
u
G
25.01.08
H
Construction
AL MS MS
For Comment
AL MS MS
J
25.04.08
For Comment
AL MS MS
K
11.03.08 13.05.08
Financial Close Drawing
AL MS MS
L
21.05.08
Financial Close Drawing
AL MS MS
W 0 60 0 90 u h wa sh in g m ac hi ne 60
FLAT 22_1BED_2P_45 sq.m
0 Bu
FLAT 24_2BED_4P_70.3 sq.m
FLAT 23_1BED_2P_46.4 sq.m
FLAT 25_1BED_2P_46.4 sq.m
REV
DATE
REVISION HISTORY
Drn
Chk
App
80 0 Bu
EW _ 2 _ 70
rwp EW _ 2 _ 81
Stair 3
EW _ 2 _ 82
15
rwp EW _ 2 _ 73 EW _ 2 _ 71
EW _ 2 _ 74
BOUYGUES UK
14
A
600 W u 900 h
IDR_ 2 _ 114
x 0 75 00 6
FLAT 21_1BED_2P_46.4 sq.m
4 500 0 3
400 W u 900 h
500 W u 900 h
50 00 3 GAD_ _4
** *
540 x 190
IDR_ 2 _ 113
800 Bu
540 x 190
Cleaner's Cupboard
A EW _ 2 _ 66
BLK _A_ 2 _ 64
750 x 600
IDR_ 2 _ 112
0
washing machine
19
600 x 500
x
800 C Wu 900 h
0
600 Bu
x 0 60 00 5
8
54
Mesh Screen 2 0634_COM_200103
400 W u 900 h
7 BLK _A_ 2 _ 62
washing machine
Meter Room
IDR_ 2 _ 111
FLAT 20_1BED_2P_47 sq.m
600 Bu
1
1000 Bcu
x
540 x 190
0
540 x 190
54
F/F
500 Draw Unit
BLK _A_ 2 _ 63 90
750 x 600
400 Bu
750 x 600
b
600 Bu
400 W u 900 h
600 Oven/Ho
machine
500 Draw Unit
washing 600 Bdu
Vm
600 Bu
600 W u 900 h
V
m
x 0 60 00 5
tall
500 W u 900 h
8100
EW _ 2 _ 98
x 0 75 00 6
600 x 2300 cup'd
** *
750 x 600
800 C Wu 900 h 400 W u 900 h
600 Oven/Hob
V
400 Bu
m
1000 Bcu
b
Unit
400 W u 900 h
600 x 500
600 Bu 600 Oven/Ho 500 Draw
500 W u 900 h
EW _ 2 _ 65
EW _ 2 _ 75
EW _ 2 _ 76
EW _ 2 _ 77
EW _ 2 _ 78
EW _ 2 _ 79
EW _ 2 _ 80
Elizabeth House 39, York Road LONDON, SE1 7NQ Tel. 020 7401 0020
EW _ 2 _ 72 St Thomas Street Winchester
GAD_ 4 5
61 00
6100
F
0 00 6
Mesh Screen 3 0634_COM_200103
Hampshire SO23 9HD T 01962 842200
Dagenham Library 0634 6100
3700
8900
6205
F 01962 840962 E mail@architectureplb.com
8905 Second Floor Plan Block A, +02
G
K
16 C
Stair core 3 0634_GAD_ 481004
M
O
Q
Sheet 1 of 2 Name
See drawing 0634_GAD_420007
Signature
Date
Designed
AL
28.03.07
Drawn By
AL
25.01.08
Checked
MS
21.05.08
Approved
MS
21.05.08
AREA
R E S
LEVEL
0 2
TRADE
A 3
SCALE + FORMAT
1:100
PROJECT SITE
D L
STATUS
@ A1
DATE 1st ISSUE
ISSUER
A P L
FOR COMMENT FILE NAME
25.04.07
0634_GAD_420006 TYPE
SEQUENCE No.
G A 4 2 0 0 0 6
REV
L
do not scale. © architecture plb Notes
25.01.08 11.03.08
P
- G - H
Construction issue For Comment For Comment Risers updated Flat layout updated
25.04.08 - J For Comment
See drawing 0634_GAD_420005
13.05.08 - K All windows flush with inside face 21.05.08 - L For Comment
H D C
B
A
21270
E 8100 2300
5585
Stair core 7 0634_GAD_480012
2515
1400
WC layout 0634_GAD_480027
1
C
rwp Secure access to roof plant level
ED _ 1 _ 69
EW _ 1 _ 55
GAD_ 4 5
Mesh Screen 1 0634_COM_200103
EW _ 1 _ 57
rwp
000 6
Stair core 1 0634_GAD_481001
ED _ 1 _ 70
Wheelchair Refuge
FE
EW _ 1 _ 56 BLK _A_ 1 _ 50 BLK _A_ 1 _ 49 Female w.c BLK _A_ 1 _ 48 Community Meeting Room No.1
BLK _A_ 1 _ 47
Male w.c
BLK _A_ 1 _ 40 Store Room
Lift 1
BLK _A_ 1 _ 46
Stair 1
F
Fire Escape
IDL _ 1 _ 79
IDR_ 1 _ 71
GAD__4
Staff Office
Staff Meeting Room
BLK _A_ 1 _ 25
BLK _A_ 1 _ 45
IDL _ 1 _ 81 IDL _ 1 _ 76
IDL _ 1 _ 75
Server Room (4m x 3m)
Staff meeting room
2
E
9250
IDL _ 1 _ 74
BLK _A_ 1 _ 41
BLK _A_ 1 _ 52
Key
BLK _A_ 1 _ 53
4
00 GAD_ 4 5
BLK _A_ 1 _ 51 Cleaners cup'd with sink
IDL _ 1 _ 83
IDL _ 1 _ 82
_110005 IDL _ 1 _ 72
F
Accessible WC
500 0 8
IDL _ 1 _ 77
Community Meeting Room No.2
0634_ASD
IDL _ 1 _ 80
IDL _ 1 _ 78
BLK _A_ 1 _ 44
_ 43 BLK _A_ 1
08
Service risers
rwp Library zones
450 00 7
1
EW _ 1 _ 23
Apartment Entrance A
EW _ 1 _ 54
A - LIBRARY ARCHIVE STORE IDL _ 1 _ 73
B - I.T SPACE
CW_ 1 _ 6 A
D
J
L
N
B
O
C - I.T DESK AREA
Q
D - ALL OTHER AREAS
3
P CW_ 1 _ 7
5
0634_ASD
6100
CW_ 1 _ 6 B
6100
6100
_110007
6100
6205
Overhang
B
Flat 07 - 0634_GAD_460008 Flat 08 - 0634_GAD_460006 Flat 09 - 0634_GAD_460009 Flat 10 - 0634_GAD_460004 Flat 11 - 0634_GAD_460004
GAD_ 4 5 0 0 0 4
ve of flats abo
CW_ 1 _ 6 C Stair core 2 0634_GAD_481010
6
ID _ 1 _ 84 VOID
library layout door
CW_ 1 _ 6 D
rwp
EW _ 1 _ 53
9
IDL _ 1 _ 85
BLK _A_ 1 _ 54
rwp Lift 5
8
6100
Library Archive / Store
EW _ 1 _ 52
Lift 4 FLAT 11_1BED_2P_46.4 sq.m
400 W u 900 h m
500 Draw Unit
rwp ED _ 1 _ 95
AOV
BLK _A_ 1 _ 59 Service riser
800 W u 900 h 800 W u 900 h
1000 Bcu 600 Bu
8100
washing machine
400 W u 900 h
FLAT 10_1BED_2P_46.4 sq.m
FLAT 12_2BED_4P_67.2 sq.m
25.01.08
H
Construction
AL MS MS
For Comment
AL MS MS
J
25.04.08
For Comment
AL MS MS
K
11.03.08 13.05.08
Financial Close Drawings
AL MS MS
L
21.05.08
Financial Close Drawings
AL MS MS
REV
DATE
15
Canopy EW _ 1 _ 28
EW _ 1 _ 29
EW _ 1 _ 30
EW _ 1 _ 31
EW _ 1 _ 32
REVISION HISTORY
Drn
Chk
App
BOUYGUES UK
EW _ 1 _ 34
EW _ 1 _ 27
G
rwp
Stair 3
EW _ 1 _ 35
rwp EW _ 1 _ 26
B
V
300 Bu
FLAT 09_2BED_4P_70.4 sq.m
300 W u 900 h
300 Bu
m
650 Oven/Hob Space
800 Bu 600 W u 900 h
FLAT 08_1BED_2P_46.4 sq.m
V
m
650 Oven/Hob Space
A
C FLAT 07_1BED_2P_51.8 sq.m
5m
500 Bu
400 W u 900 h
600 x 500
***
F/F Space
F/F Space
600 x 2300 tall cup'd
750 x 600
600 x 500
600 x 2300 tall cup'd
300 Bu
540 x 190
750 x 600 600 Bu
***
800 C Wu 900 h
1000 Bcu washing machine
800 W u 900 h
Vm
400 Bu 650 Oven/Hob Space
Apartment Entrance B
600 Bu
800 C Wu 900 h
300 Bu
500 Draw Unit
400 W u 900 h
400 W u 900 h
washing machine
600 Bu
Lift 2
500 Draw Unit
600 x 500
540 x 190
500 W u 900 h
650 Oven/Hob Space
F/F Space
540 x 190
***
750 x 600
800 C Wu 900 h
800 Bu 1000 Bcu
***
600 W u 900 h
500 Draw Unit
500 Draw Unit
400 W u 900 h m
V
650 Oven/Hob Space
400 W u 900 h
800 Bu
600 W u 900 h
V
F/F Space
540 x 190
m
400 Bu 600 Bu dish washing machine space (650)
750 x 600
1000 Bu
500 W u 900 h
500 W u 900 h
CW_ 1 _ 6 E
500 W u 900 h
Service riser
600 x 500
0003 GAD_ 4 5
IDR_ 1 _ 93
IDR_ 1 _ 92
IDR_ 1 _ 87
Elizabeth House 39, York Road LONDON, SE1 7NQ Tel. 020 7401 0020
EW _ 1 _ 33 St Thomas Street Winchester
EW _ 1 _ 24
F 01962 840962
61
GAD_ 4 5
E mail@architectureplb.com
00
0634
6100
0006
F
Hampshire SO23 9HD T 01962 842200
Dagenham Library
EW _ 1 _ 25
6100
3700
G
K
16 C
Stair core 3 0634_GAD_481004
8900
M
6205
O
8905
Q See drawing 0634_GAD_420005
First Floor Plan Block A, +01 45 0 0 0 7
CW_ 1 _ 6 F
Sheet 1 of 2 Name
Signature
Date
Designed
AL
25.01.08
Drawn By
AL
25.01.08
Checked
MS
21.05.08
Approved
MS
21.05.08
AREA
L I B
E
A
1000 Bcu
IDR_ 1 _ 91
SSL + 10.995
4m
12
BLK _A_ 1 _ 56
3m
1000 Bu
IDR_ 1 _ 88
BLK _A_ 1 _ 55
2m
Plan Icon
500 Bu
14
IDR_ 1 _ 86
V
650 Oven/Hob Space washing machine 600 x 2300 tall cup'd
IDR_ 1 _ 94
50 00 3
1m
600 Bu
***
1000 Bcu
Wheelchair Refuge
1750
GAD_ _4
IDL _ 1 _ 90
BLK _A_ 1 _ 57
A
N 0
600 x 500
IDL _ 1 _ 89
750 x 600
SSL - TBC pending raised floor detail
540 x 190
0008
F/F Space
300 Bu
7
8 _11 0634_ASD
EW _ 1 _ 51 400 W u 900 h
A
10
BLK _A_ 1 _ 58
8100
Stair 2 Main adult library
LEVEL
0 1
TRADE
A 3
SCALE + FORMAT
1:100
STATUS
@A1
DATE 1st ISSUE
PROJECT SITE
ISSUER
D L A P L
FOR COMMENT FILE NAME
25.01.08
0634_GAD_420004 TYPE
SEQUENCE No.
REV
G A 4 2 0 0 0 4 L
NAOMI MEDICAL CENTRE ARCHITECTURE PLB
Project: Care centre for terminally ill children, a charitable organization. Role: Elevations, window and door schedule door tender package, tender meetings with client and contractor, perspectives for exhibition.
do not scale. © architecture plb revisions A - First issue B - 12/03/2008
Revised inline with window schedule
C - 18/06/2008 Coordination for contract
Ridge Level: +95.520
do not scale. © architecture plb revisions A - First issue B - 12/03/2008
Revised inline with window schedule
C - 18/06/2008 Coordination for contract
key
Building material key
Ridge Level: +95.520
01. 02. 03. 04. 05. 06. 07. 08. 09. 10. 11. 12. 13. 14. 15. 16. 17. 18.
1 12
Eves Level: +89.825
1
11 12
EW _ 1 _ 18
13
Internal FFL: +87.060 Eves Level: +89.825
3
29
11 EW _ 1 _ 18
2 1 Internal FFL: +87.060 Internal FFL: +83.525
13
3
29
T
EW _ 0 _ 15
EW _ 0 _ 16
Red brick Vertical oak boarding PPC aluminium windows (grey) PPC aluminium capping (grey) Coloured glazing PPC aluminium louvred doors White rendered wall for graffiti Yellow render Entrance canopy Steel column PPC aluminium rainwater goods Clay roof tile key Profiled aluminium roof system BrisesoleilBuilding material key Timber windows 01. Red brick Timber panel 02. Vertical oak boarding Glazed roof 03. PPC aluminium windows (grey) Timber element (including 04. PPC aluminium capping (grey) door and windows) 05. Coloured glazing 19. Timber gate 06. PPC aluminium louvred doors 20. Parking Bollard 07. White rendered 21. PPC aluminium roller shutter wall for graffiti 08. Yellow render 22. PPC aluminium louvres canopy 23. Stainless 09. steelEntrance flue 10. Steel column 24. Glazed door 11. PPC aluminium rainwater goods 25. Brick retaining wall 12. Clay roof tile 26. Timber shed 13. Profiled aluminium roof system 27. Single flat roof 28. Green roof14. Brisesoleil 15. Timber windows 29. Aluminium cladding 16. Timber panel 17. Glazed roof notes 18. Timber element (including door and windows) 19. Timber gate 20. Parking Bollard 21. PPC aluminium roller shutter 22. PPC aluminium louvres 23. Stainless steel flue 24. Glazed door 25. Brick retaining wall 26. Timber shed 27. Single flat roof 28. Green roof 29. Aluminium cladding notes
ED _ 0 _ 12
2 1 6687
5782
T
EW _ 0 _ 16
ED _ 0 _ 12
A
B
C 0
6687
5782
1
2
3m
project
Naomi House Sutton Scotney drawing
A
B
C
Bedroom Block South Elevation scale @ A3
date
1: 100
18/12/07 0
status
1
2
CONTRACT drawn by
project checked by
approved by
House OWNaomiAPLB Sutton Scotney job nº_type_series_revision IB
drawing
0619 _GADBedroom _ 4 40005Block _C St Thomas Street Winchester Hampshire SO23 9HD
South Elevation scale @ A3
date
1: 100
18/12/07
T: +44 (0) 1962 842200 F: +44 (0) 1962 840962
53 Great Suffolk Street status London SE1 0DB T: +44 (0) 20 7922 0500 F: +44 (0) 20 7922 0550 drawn by E: mail@architectureplb.com W: www.architectureplb.com
CONTRACT IB
checked by
approved by
OW
APLB
job nº_type_series_revision
0619 _GAD_ 4 40005_ C
3m
architecture plb
EW _ 0 _ 15
architecture plb
Internal FFL: +83.525
do not scale. © architecture plb revisions A: First Issue B: 12/3/08 - Revised inline with window schedule C: 18/06/08 - Coordination for contract 23
Ridge Level: +95.520
12
key Eves Level: +89.825
EW _ 1 _ 32
EW _ 1 _ 34
EW _ 1 _ 36
EW _ 1 _ 38
EW _ 1 _ 40
EW _ 1 _ 42
EW _ 1 _ 44
EW _ 1 _ 46
EW _ 1 _ 48
EW _ 1 _ 50
EW _ 1 _ 51
EW _ 1 _ 53
EW _ 1 _ 55
EW _ 1 _ 57
15
15
EW _ 1 _ 59
EW _ 1 _ 61
EW _ 1 _ 63
EW _ 1 _ 65
11
EW _ 1 _ 67
EW _ 1 _ 69
Building material key
15 a
b
EW _ 1 _ 33
Internal FFL: +87.060
EW _ 1 _ 35
EW _ 1 _ 37
EW _ 1 _ 39
EW _ 1 _ 41
EW _ 1 _ 43
EW _ 1 _ 45
EW _ 1 _ 47
1
EW _ 1 _ 49
1
EW _ 1 _ 52
1
EW _ 1 _ 56
EW _ 1 _ 58
EW _ 1 _ 60
EW _ 1 _ 62
EW _ 1 _ 64
EW _ 1 _ 66
EW _ 1 _ 68
1 T
11
EW _ 1 _ 54
a
T
T
T
T
T
P
P
T
T
T
P
11
15
18 19
24
19
Internal FFL: +83.525
EW _ 0 _ 25
EW _ 0 _ 26
EW _ 0 _ 27
EW _ 0 _ 28
16 T
ED _ 0 _ 13
5381.5
18
2700
ED _ 0 _ 14
5227.3
17
4131.8
16
5161.8
15
2827.5
14
13
T
T
ED _ 0 _ 15
ED _ 0 _ 16
5227.8
3690
12
11
T
ED _ 0 _ 17
5069.2
10
ED _ 0 _ 19
ED _ 0 _ 18
2827.5
9
5161.8
8
4290
7
T
ED _ 0 _ 20
01. 02. 03. 04. 05. 06. 07. 08. 09. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29.
Red brick Vertical oak boarding PPC aluminium windows (grey) PPC aluminium capping (grey) Coloured glazing PPC aluminium louvred doors White rendered wall for graffiti Yellow render Entrance canopy Steel column PPC aluminium rainwater goods Clay roof tile Profiled aluminium roof system Brisesoleil Timber windows Timber panel Glazed roof Timber element (including door and windows) Timber gate Parking Bollard PPC aluminium roller shutter PPC aluminium louvres Stainless steel flue Glazed door Brick retaining wall Timber shed Single flat roof Green roof Aluminium cladding
5227.8
6
5
notes
Ridge Level: +95.520 Ridge Level: +94.901
13
12
EW _ 1 _ 67
EW _ 1 _ 69
EW _ 1 _ 70
EW _ 1 _ 72
EW _ 1 _ 74
EW _ 1 _ 76
9
Eves Level: +89.825
15 a
b
N.B. For sectional information refer to 0619_GAD_450005
b
a
EW _ 1 _ 68
EW _ 1 _ 71
EW _ 1 _ 73
EW _ 1 _ 75
EW _ 1 _ 77
Internal FFL: +87.060
3 T
T
P
P
T
P
T
P
0
1
2
3
4
5m
10 15
project EW _ 0 _ 29 T
ED _ 0 _ 19
T
T
Internal FFL: +83.525
T
ED _ 0 _ 20
Naomi House Sutton Scotney drawing
Bedroom Block East Elevation scale @ A1
date
1: 100
11/12/07
status
3690
5000
6018
CONTRACT
9142
drawn by
checked by
approved by
IB
OW
APLB
job nº_type_series_revision
5
4
3
2
1
0619 _GAD_ 440001_C St Thomas Street Winchester Hampshire SO23 9HD T: +44 (0) 1962 842200 F: +44 (0) 1962 840962 53 Great Suffolk Street London SE1 0DB T: +44 (0) 20 7922 0500 F: +44 (0) 20 7922 0550 E: mail@architectureplb.com W: www.architectureplb.com
architecture plb
EW 1 66
ELIZABETH COTTAGE RIVA ARCHITECTS
Project: New seafront 5 bedroom house Role: Development application drawings package and 3D perspective renders.
Beach
Sea Wall
B-B
A-A
Promenade
Ocean Room
Terrace
Living Room
GROUVILLE NUMBER 2 KEPPEL TOWER Breakfast Room
MAISON DU ROC
Dinning Room
Lift
Utility Room
Access to beach Access ramp to Basement
Wine Store Pantry Cloakroom Study
Pool Changing
Pool
Indicative Landscaping
Pool
REV DESCRIPTION
Parking
DATE
A
Beach side Render reduction
July 2008
B
TV room omitted
26.06.09
JOB TITLE
PROPOSED ALTERATIONS
ELIZABETH COTTAGE La Grande Route des Sablons, Grouville
A-A
B-B
Mr & Mrs Beslievre DRAWING TITLE
La Grande Route
des Sabions
PROPOSED GROUND FLOOR PLAN DATE
July 2008 SCALE
1:100 DRAWN
GROUND FLOOR PLAN
IB
DRAWING NO
(A1)
RIVA
ARCHITECTS
CHECKED
15.587.08
1ST FLOOR, INDUSTRIA HOUSE,
REV
B
RED HOUSES, ST. BRELADE, JERSEY, JE3 8LD. TEL: (01534) 499383 FAX: (01534) 499938 Email: rivarchitects@jerseymail.co.uk
Existing buildin
Approved Dwe
Existing road s
5
1.
Granite, horizo
2.
Coloured rende
3.
Horizontal clad
4.
PPC aluminium
5.
Stainless steel
6.
Louvres
2 4 3
1
West Elevation
ROAD SIDE ELEVATION
5
REV DESCRIPTION A
4
2
Top floor removed and massin
Roof
JOB TITLE
PROPOSED ALTE
3
East Elevation
1st Floor
Ground Floor
Basement Floor
ELIZABETH C
La Grande Route des Sab
Mr & Mrs Besli DRAWING TITLE
PROPOSED R WEST ELEVAT EXISTING OVERLAID DATE
July 2008 Roof level
WEST ELEVATION
SCALE
1:100 DRAWN
IB
(A1) CHECKED 1ST
1st Floor level
DRAWING NO
20.587.08
REV
RE
A
Email Ground Floor level
Basement Floor level
Section A - A SECTION A-A / NORTH ELEVATION