Ian Leung Architecture Portfolio 2015

Page 1

IAN LEUNG Selected Work LEED AP ND M.Arch (UPenn) B.Arch (Tsinghua)


Professional Experiences

Education

CALLISON, ARCADIS Shanghai Oct 2013 - Jul 2015 Design Architect (Mixed-use Development Planning and Design) - Involved in various mixed-use development projects from land acquisition planning to design development - Optimized retail strategies and quantify the impact of different design hypotheses and approaches by using scenario simulations - Developed the plans and facade to detailed drawings for shopping malls and lifestyle retail - Led 3D-modeling and rendering colleagues to produce models and renderings for clients presentation - Conducted 50+ researches and analysis for CR Land and set up a reference database with 150+ projects with their relevant analysis for team use - Projects included Xiamen Mix-C, Changsha Joyful City, Foshan land acquisition of CR Land, etc.

University of Pennsylvania, Philadelphia Master of Architecture 2011 Tsinghua University, Beijing Bachelor of Architecture (With concentration in urban planning) 2010 -Multiple scholarships winner including the top student scholarship 2009 AA Summer School, Shanghai 2009 University of Hong Kong Summer School 2004

AECOM Shenzhen Oct 2011 - Sep 2013 Project Architect / Manager of Shenzhen Employee Engagement Committee As an architect, - Directly involved in 20+ planning and design projects with an average of 90-hour workweek - Assisted designer director to develop design ideas and took the role of project architect in serval projects - Communicated with clients and external consultant for project management and to enhance design quality conducting a series of 50+ lectures for colleagues with ~30 attendances in average - Assisted designer director to negotiate projects’ contract and schedule As the manager of Shenzhen EE Committee, (May - Sep 2013) collaboration in the Shenzhen district

400,000/yr

Software Skill

BEIJING TSINGHUA TONGHENG PLANNING & DESIGN INSTITUTE Beijing Sep 2009 - Jun 2010 Urban Designer at the Department of Urban Heritage redevelopment projects in Beijing and Hebei; collected, processed and visualized data from researches and interviews for design development P&T GROUP Hong Kong/ Beijing Jan - Mar/ May - Aug 2009 Intern Architect - Involved in the Shanghai IFC and Tianjin 117 Tower and Polo Club Project, mainly responsible for the construction documentation and project coordination

Adobe: Ps, ID Ai, Pr 2D: AuutoCAD 3D: Rhino, Maya, Sketchup, Geomagic Studio Parametric: Grashopper, RhinoScript, Maya Mel, Maya Hair System Analysis: Ecotect, Radiance Bim: Revit


IAN LEUNG M.Arch (U.Penn) B.Arch (Tsinghua) LEED Accredited Professional in Neighborhood Development China National Registered Architect Examination candidate CFA Level 2 candidate Email: ianleung@126.com Mobile: 86 181 0165 6105 CN

Resume

Ian Leung Architecture Portfolio



Professional WOrk

Ian Leung Architecture Portfolio


Xiamen City-Crossing Mix-C 厦门华润万象中心 万象城 Latest development of the luxury brand “Mix-c” of CR Land

Location: Xiamen, Fujian Status: In Construction (2017) Company: Callison Client: China Resources Land

Mixed-Use Development Ian Leung Architecture Portfolio

The luxury mixed-use development includes a shopping mall (100,000+50,000 sqm), two office towers (100,000 sqm), lifestyle retail (15,000 sqm) and an Andaz hotel (35,000 sqm). Located in the city centre of Xiamen with two metro lines, the project is built to become the commercial icon of the city.

6


Participation Period: 2013.12 - 2015.06 Phases: Planning, Concept, Schematic Design, Design Development, Construction Doc. Review Role: Design Architect Planning and Concept: Responsible for the planning and concept of the whole development. Conducted scenario simulation for different planning hypotheses and approaches with adjusted weight of functions. Schematic Design: Developed plans for the shopping mall, lifestyle retail and hotel. Retail Strategies: Adapted retail strategies from external consultants and optimized them during implementation

7

Mixed-Use Development

Ian Leung Architecture Portfolio


Mixed-Use Development Ian Leung Architecture Portfolio

8


Facade Design Development: Designed and developed the facades of the shopping mall, hotel, offices and lifestyle retail, from ideas generation to detailed wall section drawings. External Consultant Collaboration: Integrated comments from external consultants (traffic, interior, landscape, facade, etc) and provided architects’ feedbacks. Research Studies: Conducted 50+ research studies and analysis for clients to enhance project decision processes. Set up a reference database with more than 100+ mixed-use projects at the same time. Design Deliverable: Led the 3D-modelling and rendering team colleagues and external rendering consultants to produce models and images for presentations.

9

Mixed-Use Development

Ian Leung Architecture Portfolio


Shenzhen Yabao CoCo World 深圳星河雅宝综合体项目 Key urban redevelopment project of Shenzhen city

Location: Shenzhen, Guangdong Status: In Construction (2016) Company: AECOM Client: Shenzhen Galaxy Group

Mixed-Use Development Ian Leung Architecture Portfolio

As the key redevelopment project of Shenzhen, COCO World phase 1 has a 100,000 sqm shopping mall with two office towers. Located near the Yabao rereservoir in Longgang district, the project aims to become a sustainable neighbourhood and is certificated with LEED Gold in Neighbourhood Development.

10


Participation Period: 2011.12 - 2013.09 Phases: Schematic Design, Design Development, Construction Document Role: Design Architect (Shopping Mall) Plan Optimization: Developed and optimized the plans of the shopping mall, including reorganization of different functions Facade Design Development: Designed and developed the facades of the shopping mall Interior and landscape Concept: Generated interior and landscape ideas before related external consultants joined the project

11

Mixed-Use Development

Ian Leung Architecture Portfolio


Mixed-Use Development Ian Leung Architecture Portfolio

12


 Neighbourhood Development Project Name: Date of Evaluate: Project

2012-1-10

Target:

(Smart Location and Linkage) 1 Prereq 1

Smart Loaction

Required

Imperiled Species and Ecological Communities

Required

Wetland and Water Body Conservation

Required

Agricultural Land Conservation

Required

Floorplain Avoidance

Required

2 Prereq 2 3 Prereq 3 4 Prereq 4 5 Prereq 5 1 Credit 1 2 Credit 2 3 Credit 3 4 Credit 4 5 Credit 5 6 Credit 6 7 Credit 7 8 Credit 8

Preferred Locations Brownfield Redevelopment Locations with Reduced Automobile Dependence Bicycle Network and Storage Housing and Jobs Proximity Steep Slope Protection Site Design for Habitat or Wetland and Water Body Conservation Restoration of Habitat or Wetlands and Water Bodies

9 Credit 9

Long-Term Conservation Management of Habitat or Wetlands and Water Bodies

1 - 10

Y Y Y Y Y 10

1-2 1 -7

7

1

1

1 -3

1

1 1 1

1 1

1

1

27

22

(Neighborhood Pattern and Design) 1 Prereq 1

Walkable Streets

Required

Compact Development

Required

Connected and Open Community

Required

2 Prereq 2 3 Prereq 3 1 Credit 1 2 Credit 2 3 Credit 3 4 Credit 4 5 Credit 5 6 Credit 6 7 Credit 7 8 Credit 8 9 Credit 9 10 Credit 10 11 Credit 11 12 Credit 12 13 Credit 13 14 Credit 14 15 Credit 15

Walkable Streets Compact Development Mixed-Use Neighborhood Centers Mixed-Income Diverse Communities Reduced Parking Footprint Street Network Transit Facilities Transportation Demand Management Access to Civic and Public Spaces Access to Recreation Facilities Visitability and Universal Design Community Outreach and Involvment Local Food Production Tree-Lined and Shaded Streets Neighborhood Schools

1 - 12 1-6 1-4

Y Y Y 7 6 2

1

1-7 1

1

1-2 1

1

1-2

1

1

1

1

1

1 1-2

2

1 1 -2

2

1 44

24

1

External Consultant Collaboration: Integrated comments from external consultants (interior, landscape, facade, etc) and provided architects’ feedbacks LEED Certification: Collaborated with LEED consultants to apply for LEED pre-certification Clients Coordination: Constantly communicated with clients for project update Design Deliverable: Led the 3D-modelling and rendering team colleagues and external rendering consultants to produce models and images for presentations

13

Mixed-Use Development

Ian Leung Architecture Portfolio


Shanghai IFC Ritz-Carlton Hotel 上海国金中心 丽思卡尔顿酒店 One of the most luxury development projects in mainland China

Location: Shanghai Status: Built Company: P&T Group Client: SHK

Mixed-Use Development Ian Leung Architecture Portfolio

The IFC is now not only one of the most luxury development in Pudong district of Shanghai, but also one of China. Besides a shopping mall, the project has two office towers with a 5-star hotel Ritz-Carlton and a serviced apartment IFC Residence.

14


Participation Period: 2009.01-03 Phases: Construction Document Role: Intern Architect (Hotel) Construction Documentation: Assisted project architects to prepare construction drawings and documentation of the back-of-house area of the Ritz-Carlton hotel and the IFC Residence (original W hotel) Project Management: Visited construction sites and assisted project architects in management and administration

15

Mixed-Use Development

Ian Leung Architecture Portfolio


Sanya Visun Shuijuxiang

三亚鸿洲水居巷

Location: Sanya, Hainan Status: In Construction Company: AECOM Client: Visun Real Estate Co. Ltd

Mixed-Use Development Ian Leung Architecture Portfolio

As one of the largest yacht clubs in China, Visun is now developing its first mixed-use project in order to integrate with its recreational industry. The project contains a luxury hotel, a yacht clubhouse, a shopping mall, lifestyle retails, a office building and three residential towers.

16


Participation Period: 2011.09-2012.02 Phases: Planning and Concept Role: Project Architect/ Design Architect Planning: Responsible for the planning and concept of the whole development Architectural Design: Led colleagues to develop architectural massing and design Clients Coordination: Constantly communicated with clients for project update Government Submittal: Responsible for planning submittal to the government Design Deliverable: Led the 3D-modelling and rendering team colleagues and external rendering consultants to produce models and images for presentations

17

Mixed-Use Development

Ian Leung Architecture Portfolio


Changsha Joyful City 长沙华悦城 Participation Period: 2013.10-2014.01 Phases: Planning and Concept Role: Design Architect

Location: Changsha, Hunan Status: Ceased Company: Callison Client: Huasheng Century

Mixed-Use Development Ian Leung Architecture Portfolio

Planning and Concept: Responsible for the planning and concept of the whole development. Conducted scenario simulation for different planning hypotheses and approaches with adjusted weight of functions. Retail Strategies: Optimized the ratio between retail for sales and retail for hold, above ground and below ground Concept Design: Developed design ideas for the shopping mall, lifestyle retails, hotels and offices

18


Tianrun Shopping Plaza, Xinji 辛集天润购物中心 Largest development project in Xinji

Participation Period: 2011.09-2012.02 Phases: Planning and Concept Role: Project Architect/ Design Architect

Location, Xinji, Hebei Status: Ceased Company: AECOM Client: Xinji Renhe Group

Retail Planning: Responsible for the retail planning of the development Architectural Design: Developed the architectural design of the shopping mall and lifestyle retail Clients Coordination: Constantly communicated with clients for project update Government Submittal and Presentation: Responsible for the government submittal and assisted the design director to prepare for the presentation to government Design Deliverable: Led the 3D-modelling and rendering team to produce models and images

19

Mixed-Use Development

Ian Leung Architecture Portfolio


Wuhu Wanda Hotel Facade Competition 万达芜湖嘉华酒店立面竞赛

Location: Wuhu, Anhui Status: Competition Ceased Company: AECOM Client: Wanda Group

Hospitality

Ian Leung Architecture Portfolio

20


Participation Period: 2012.05-2012.09 Phases: Design Competition Role: Project Manager/ Design Architect Project Management: Managed the schedule and submittal for the competition Architectural Design: Led a team of 5 to develop design ideas from the design director Clients Coordination: Constantly communicated with clients for project update Construction Cost Estimation: Coordinated with the cost department of client to calculate the cost of each design proposal Design Deliverable: Led the 3D-modelling and rendering team to produce models and images

21

Hospitality

Ian Leung Architecture Portfolio


Haikou RiTz-carlton and Renaissance Hotels 海口观澜湖丽思卡尔顿与万丽酒店

Location: Haikou, Hainan Status: In Construction Company: AECOM Client: Mission Hills

Hospitality

Ian Leung Architecture Portfolio

22


Participation Period: 2012.09-2013.01 Phases: Schematic Design, Design Development Role: Design Architect Plan Optimization: Optimized the plans and resolved the conflicts between the two hotels (two different brands of Marriott) sharing the same site Facade Design: Designed the facade of the two hotels External Consultant Collaboration: Collaborated with interior consultants with regards of the plan and facade of the hotels Clients Presentation: Presented facade design proposals in clients headquarter

23

Hospitality

Ian Leung Architecture Portfolio


Shenzhen Yuercun Redevelopment 深圳招商渔二村重建项目 Competition Winning Proposal

Location: Shenzhen, Guangdong Status: Suspended at Schematic Design Company: AECOM Client: CMPD

Condominium

Ian Leung Architecture Portfolio

24


Participation Period: 2012.09-2013.01 Phases: Competition, Schematic Design Role: Project Architect/ Design Architect Planning: Developed the plan by maximizing the sea view of the towers and resolving the conflicts between the developer’s condominium and relocated community’s housing Lifestyle Retail Introduction: Replaced client’s idea of shopping mall by lifestyle retail to increase the commercial value of the site Facade Design: Designed the facade of the towers Clients Coordination: Clients coordination during competition phase

25

Condominium

Ian Leung Architecture Portfolio


Guangzhou National Music Industry Park

广州国家音乐产业基地

One of the three national music industry parks in China

Location: Guangzhou, Guangdong Status: In Construction Company: AECOM Client: Guangdong Face Investment Group

Cultural

Ian Leung Architecture Portfolio

26


Participation Period: 2012.01-2013.08 Phases: Planning, Schematic Design, Design Development, Construction Documentation Role: Project Architect/ Design Architect Planning: Developed the plan of the industry park by its relationship with the nature and the residential development Facade Design: Designed the facade of the towers and the music centre Clients Coordination: Responsible for constant communication with clients for project update and project presentation Design Deliverable: Led the 3D-modelling and rendering team to produce models and images

27

Cultural

Ian Leung Architecture Portfolio


Hengqin Mixed-use Development Planning

珠海横琴岛综合发展规划

Location: Zhuhai, Guangdong Status: Ended Company: AECOM Client: Guangdong Hakka Commerce Group

Master Planning

Ian Leung Architecture Portfolio

28


Participation Period: 2013.06-2013.08 Phases: Master Planning Role: Design Architect Master Planning: Responsible for the master planning of the commercial portion of the project Urban Design Guidelines: Modified the original governmental urban design guidelines of the site Architectural Design: Designed the super-highrise tower and the office blocks

29

Master Planning

Ian Leung Architecture Portfolio


Fuzhou Outlet Commercial Planning 福州奥特莱斯商业综合规划

Location: Fuzhou, Fujian Status: Ended Company: AECOM Client: Confidential

Master Planning

Ian Leung Architecture Portfolio

30


Participation Period: 2012.09-2012.11 Phases: Master Planning Role: Design Architect Master Planning: Responsible for the master planning of the retail portion of the project Retail Strategies : Developed retail planning strategies for the outlet and the shopping mall with such a large volume of retail area Architectural Design: Led colleagues to design different portions of the outlet Landscape Coordination: Cooperated with the landscape team to integrate the landscape and the outlet

31

Master Planning

Ian Leung Architecture Portfolio


Beijing Moshikou Reservation & Revitalization 北京模式口古道保护与发展规划

Location: Beijing Status: Ended Company: Beijing Tsinghua Tongheng Planning & Design Institute Client: Beijing Shjijingshan District Government

Master Planning

Ian Leung Architecture Portfolio

32


Participation Period: 2010.02-2010.07 Phases: Master Planning Role: Intern Urban Designer Field Study: Conducted field studies and researches and measured data for site analysis Site Interviews: Conducted 20+ interviews with local on site for first-handed materials Site Revitalization: Proposed different functions including retail and leisure to achieve revitalization Gentrification: Redeveloped the facade of the main street of the site in order to achieve an effect of gentrification

33

Master Planning

Ian Leung Architecture Portfolio


Jilin City Urban Design

吉林市城市中心设计

Participation Period: 2011.10-11 Phases: Master Planning Role: Design Architect

Location: Jilin City, Jilin Status: Ended Company: AECOM Client: Shenzhen Nepstar

Master Planning

Ian Leung Architecture Portfolio

Master Planning: Responsible for the master planning of the commercial and public area of the project Landscape Coordination: Cooperated with the landscape team to integrate the landscape and the urban area of the site Clients and Government Presentation: Assisted the design director to prepare for the presentation to the government and clients

34


Ruihe Residential Redevelopment, Shenzhen

深圳瑞和重建项目

Participation Period: 2013.06-2013.08 Phases: Planning and Schematic Design Role: Design Architect

Location: Shenzhen, Guangdong Status: In Construction Company: AECOM Client: Shenzhen Galaxy Group

Master Planning: Responsible for the master planning of the project based on land use and daylight condition Housing Unit Design: Designed different housing units based on the comments of sales consultant

35

Residential

Ian Leung Architecture Portfolio


Shenzhen Yian City Sales Centre

深圳市颐安都会售楼中心

Participation Period: 2011.10-11 Phases: Concept, Schematic Design, Construction Documentation Role: Design Architect

Location: Shenzhen, Guangdong Status: Built Company: AECOM Client: Shenzhen Honghe Real Estate Co.

Sales Centre

Ian Leung Architecture Portfolio

Whole Design Cycle: Responsible for the whole design cycle from concept to built Architectural Design: Designed the centre including the facade pattern Consultants Coordination: Cooperated with the interior and facade consultants

36


Tianjin Metropolitan CBD Development

天津高银中央商务区发展项目 Largest development in Tianjin with the 2nd tallest building in China

Participation Period: 2009.05-2009.08 Phases: Construction Documentations Role: Intern Architect

Location: Tianji Status: Built/ In Construction Company: P&T Group Client: Goldin Properties

Construction Documentation: Assisted project architects to prepare construction drawings and documentation (mainly the residential part) Construction Management: Attended weekly construction meetings on site and assisted project architects to conduct project management

37

Construction Management

Ian Leung Architecture Portfolio



Academic

Ian Leung Architecture Portfolio


San Juan Waterfront Redevelopment Project exhibited publicly in “Green, Urban, Global” Exhibition in Philadelphia Centre for Architecture in 2011.02

Teammate: Erwei Yi Instructor: Ferda Kolatan, Hart Marlow Software: Maya, Geomagic Studio, Metal Ray

Academic Study

Ian Leung Architecture Portfolio

40


Green

Water

The proposal seeks an innovative systematic approach to redevelop the relationship between architecture and landscape and explores their non-linear interaction. Emergent architecture has always been considered lack of consideration of the site factors; yet the proposal tries to develop a series of generative methodologies that challenge this notion and generate a interactive feedback loop between the various system that operate within architecture and landscape system, and propose a new kind of combination of mixed land use scenario. Situated in the northern boundary of the master plan, the site is located by the southern side of Laguna del Condado (the “water�). By suppressing the highway, redevelops the accessibility of the water from the inner city, and provides new public spaces interactive with the water and a small amount of commercial and residential units.

41

Academic Study

Ian Leung Architecture Portfolio


Form and Algorithm: Wind Erosion Simulation

Teammates: Yohei Yamada, XIaotian Huang Instructors: Cecil Balmond, Roland Snooks Software: Rhino, Rhino Scripting, Geomagic Studio

Academic Study

Ian Leung Architecture Portfolio

42


The course investigates the generation of form from non-linear systems by using Rhino scripting. By using a generative design methodology, this project tries to explore possible geometry by simulating the effect of wind and erosion towards a rigid body. The formation process includes recursion, agent codes and evolutionary optimization. Such logic and also be applied to simulate traffic flows within a building for open space formation.

43

Academic Study

Ian Leung Architecture Portfolio


Bricks: A CBD Blending Typology Selected project in article “From AA workshops in China to the study of experimental teaching under globalization”, Urban Flux Magazine 2009.11

Teammates: Xiwei Zhang, Norine Chu Instructor: Yan Gao, Andrew Tirta Software: Rhino, Rhino Scripting, Grasshopper

Academic Study

Ian Leung Architecture Portfolio

44


Shanghai is divided into two by Huangpu River. The two parts contrast with distinct difference as the one and the new. Pudong (river east) has become such a warm bed for investment. It is a district envisioned for the future. However, due to the lack of social places and activities, many residents need to travel to Puxi (river west), the old city, for entertainment and socializing. Pudong is becoming solely a living machine. The project learns from the context of old Puxi and pick up what can balance Pudong to any extent in order to improve its situation, in particular the paradox between investment and local community, commercial return and public realm, economic growth and environmental preserve. The methodology we use is sampling an architectural element from an existing typology available in Puxi and evolving into new urban prototypes tested on a given site.

45

Academic Study

Ian Leung Architecture Portfolio


Performance and Parametric Design: Towers Based on Daylight

Instructor: Yun Kyu Yi Software: Ecotect Analysis, Radiance, Energy Plus, Rhino Grasshopper, MatLab

Academic Study

Ian Leung Architecture Portfolio

46


The course investigates the techniques for integrating environmental performance analysis and the design of buildings with an emphasis on parametric method. This project tries to explore how high-rise buildings can respond to different daylight condition in different climate zone. By using analytical tools to examine the environmental situation of the site, different decision-making and parametric from control methods are used to develop a highperformacne design in response to the environment. Due to different daylight condition, the towers will have different shape and openings which are optimized to specific site.

47

Academic Study

Ian Leung Architecture Portfolio


Haiti Post-Earthquake Redevelopment Rebuilding In-site Project exhibited publicly in the centre of Architecture for Humanity in Prince au Port 2011.03

Teammate: William Heyer Instructor: Brian Phillips, Julie Beckman

Academic Study

Ian Leung Architecture Portfolio

48


More than a year after the January 2010 earthquake, 90% of the total rubble generated during the disaster—a staggering 706 million cubic feet remains unmoved. To get rid of the remaining rubble at the current rate would cost $1.5 billion and would take over a decade of constant hauling from scattered sites throughout Port-au-Prince to dump sites on the outskirts the city. A more effective alternative is to do something radical and historically unprecedented for cities that have suffered such devastation: leave the rubble and fragments in place. Rebuilding in-site proposes both a decentralized, crowd-sourced approach as well as a more organized top-down planning methodology. The two separate methods will encourage both the government and Haitians to contribute to the redevelopment of Haiti with appropriate solutions.

49

Academic Study

Ian Leung Architecture Portfolio


Ian Leung LEED AP ND Master of Architecture, University of Pennsylvania Bachelor of Architecture, Tsinghua University

梁键玮 美国能源及环境设计先锋认证 美国宾夕法尼亚大学 建筑硕士 清华大学建筑学士

Email: ianleung@126.com Mobile: +86 181 0165 6105 (CN) +852 6123 1276 (HK)


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.