prof. d’anjo
macro context influence
spring 2015
-
prof. d’anjou
miami cent
linier park for downtown
vehicle traffic
metro & train
TRAFFIC DROP OFF
mass transit systemsmass transit systems
existing bus routes
ian monday
CONNECTING ART COMMUNITIES
SITE ANALYSIS
june 21
art connection community walkability
a s i t h u b &t r la i nsiietr hpuab miami central miami station centralt rstation
TRANSIT HUB & LINER PARK COMMUNITIES WITH NEW DEVELOPMENT annual composite 7 hrs of sun -
prof. d’anjou
grand central station
Union Station
AAF Central Station
new york, ny
Denver, CO
Miami, FL
PROGRAM
E. forwilliam downtown
always shaded
aaf proposed design
miami central station
Taylor & som
miami, fl
SOM
ian monday
AXIS DIAGRAM
march 20
Spring 2015 ian design 10 prof. d’a2 monday Spring
MUSEUM OF ART
9 hrs of sun
precedent analysis john B. Snook linier park
ian monday
Owls’ Gateway is a shared street urban plaza located at the intersection of East University Drive and Indian River Street at Florida Atlantic University Boca Campus. The p l a z a c o n ta i n s a h o t e l , conference center, mixed use parking garage, welc o m e c e n t e r , r e s ta u ra n t s & leasable spaces. The site for this gateway complex was developed off of a Master Plan that proposed three large urban plazas strategically l o c a t e d a t t h e m a j o r e n t r a n c e s t o FA U . T h e s e three plazas serve the dual p urpose of creating a sense of arrival and extending the walkability of Robert Law Weed’s historic campus core to the racetrack of parking that surrounds it.
vehicle traffic
metro & train
existing bus routes
spring 2015
december 20
9:00amsolar to 6:00pm solar analysis 9:00am to 6:00pm analysis art connection linier park for downtownlinier park for downtown
mass transit systems
-
vehicle traffic
METRO CONNECTIONS
CREATING URBAN PARK DOWNTOWN
september 20
macro context influence macro context influence
community walkability
vehicle metro traffic & train
6:00pm
CONNECTING WALKABLE DISTRICTS
march 20
metro & train existing bus routes
t ra s i t h u b & l i n i e r pa r k
ian monday BUILDING USAGE
june 21 20 march
Spring 2015
design 10 prof. d’anjou
september 20 21 june
BUS DIAGRAM
december 20 20 september
dec
solar analysis 9:00am to 6:00pm
METRO CONNECTIONS
150,000
Passengers / Day
10,000
Passengers / Day
11,000
AMI CENTRAL STATION Ticket Concourse
38,700sqft
Ticket Concourse
18,400sqft
mass transit systemsmass transit systems
existing bus routes
metro & train existing bus routes
Ticket Concourse 3,000sqft
vehicle metro traffic & train
+
11,400sqft
CREATING URBAN PARK DOWNTOWN
Ticket Concourse
11,000 11,400sqft
18,700 sq ft vehicle traffic 8,4000sqft
ONDAY - CINDY CORTES - PROF. D’ANJOU CONNECTING ART COMUNITIES
Passengers / Day
150'
13,300 sq ft 140'
80
Passengers / Day
150'
hub trasit
-
art connection
community walkability
solar analysis 9:00am to
i central station
design 10
macro context influence
existing bus routes
TRAFFIC DROP OFF
PASSIVE DESIGN
- SUN to 6:00pm solar analysis 9:00amsolar to 6:00pm analysis 9:00am sun of sun annual composite hrs of sun OVERHANG june 21 annual composite march 20 december 20 9 hrs7of september 20 7 hrs
metro & train
Located in the middle of downtown district. the p design for miami central sta connections to local commu cultural districts, while offe to the city in the form of a the schematic massing is in solar analysis of the surro place the building in a shad while offering light for new other passive design strateg fins for collecting se coas 2ndary shading facades, r Retail corridors, and op Northern light wel
N
design 10
-
Spring 2015
pa r linier &
ian monday
mass transit systems
art connection
mi
linier park for downtown
TRANSIT HUB & LINER PARK CONNECTING COMMUNITIES WITH NEW DEVELOPMENT
i cental station
e
art connection linier park for downtownlinier park fo
miami central station art connection
community walkability
design 10
art connection community walkability
community walkability
vehicle traffic MUSEUM OF ART BUILDING USAGE
PRECEDENT
-WOVEN EXTERIOR SKIN -ROOF SOLAR PANELS
- VENTILATION
precedent analysis precedent analysis
9 hrs of sun always shaded
alway
Northern light wells.
central station
t r a s i t h u b & l i n i e r p a r k t ra s i t h u b & l i n i e r pa r k ian monday ian monday
Spring 2015 Spring 2015
design 10 prof. d’anjou design 10 prof. d’anjou
e traffic e traffic
N N
n i e r p a r k a s i t h u b & l i n i e r p a r k nsiietrSpring ab2015 r k& design aonday hpud’anjou l i n 10 ier p a r k gn 10 prof. prof. d’anjou
gn 10 prof. d’anjou onday Spring 2015
N N
december 20 december 20
N N
always shaded always shaded
N
N
N
N
1000'-0" 1000'-0"
sign sign
design 10 prof. d’anjou
GROUND FLOOR PLAN GROUND FLOOR PLAN SCALE: 75’ = 1” SCALE: 75’ = 1”
SECOND FLOOR PLAN SECOND FLOOR SCALE: 75’ = 1” PLAN SCALE: 75’ = 1”
THIRD FLOOR PLAN THIRD FLOOR PLAN SCALE: 75’ = 1” SCALE: 75’ = 1”