SUMMARY REPORT Q1/2014


Index of Contents:       

Supplier uptake update Comments on program progress (Q1 ’14) Progress status overview on supplier uptake Work-plan completion vs work-plan agreed timelines by supplier Program trend analysis KPI’s Worker satisfaction index Worker management dialogue maturity index

2


Supplier Uptake Progress Overview of Supplier On-boarding Status by Brands Program

Dell

HP

Philips

Apple

Nokia

TOTAL

48 + 7

11

7

15 + 7

12

3

Contract signed (Move to implementation)

48 + 7

11

7

15 + 7

12

3

Pending

0

0

0

0

0

0

EPA in implementation

0

0

0

0

0

0

EPA in preparation (newly onboard)

0

0

0

0

0

0

Philips

Apple

Nokia

Number of Fast Track Program suppliers is in blue lettering

Geographic Location by Brands Program

Dell

HP

TOTAL

48 + 7

11

7

15 + 7

12

3

Guangdong Area

37 + 4

11

6

8+4

9

3

Shanghai Area

10 + 3

0

1

6+3

3

0

1

0

0

1

0

0

Other

Number of Fast Track Program suppliers is in blue lettering

3


Total Factories on board (by Mar. 31)

Geographic location, total factories (by Mar. 31)

Total=55

Total=55 3

12

11

13

1

7 41

22 Dell

HP

Philips

Apple

Nokia

South

Shanghai Area

Other

Comment on Progress Over the last three months, the program has continued to progress, with 47 suppliers implementing Work Plans and 8 suppliers conducting/preparing Entry Point Assessments. However, due to the Chinese New Year seasonal holidays at the end of January, some training activities had to be rescheduled after holiday, when the workers returned in February. There now are currently 55 suppliers in total in the program, including the new ‘Fast Track’ factories. IDH launched the ‘Fast Track’ program which will be conducted as a condensed program in 12 months (vs 18 months), and this has extended the availability window for factories to join the program into Q2’14. Among the current 55 suppliers, there are 7 suppliers enrolled in the ‘Fast Track’ program.

Impact Review Meeting During Q1 IDH focused on following up from the ‘IMPACT’ event, held at the supplier meeting in Shenzhen in Dec ’13. The IDH team prepared and distributed a summary of the best practices and impact report, showing where we have currently been able to identify the emerging signs of impact at the factories as a result of the IDH program and curriculum. The impact analysis is focused on measuring performance improvement in areas related to improving worker satisfaction, worker / management dialogue maturity and overall productivity (related to the ROI model produced in 2013). The report also focuses on analysis & correlation of data collected from the factories, showing comparative benchmarking and identifying outliers amongst the IDH member factories. The initial impact report was shared with the IDH steering group and reflection group during Q1. Key Focus Points: 1) The program will close for new factories to join (including the Fast Track) during Q2’14. We are now engaged in the final push for new entrants to the Fast Track program. 2) Several of the brands in the IDH program expressed an interest in developing the impact assessment report and building on the data analysis to understand the potential for further improvements.

4


Progress Status – Summary of the status of the active suppliers in the program and the WMD service providers they are working with. No.

By Brand

1

D1

2

D2

3

D3

4

D4

5

D5

6

D6

7

D7

8

D9

9

D10

10

D11

11

D12

12

H1

13

H2

14

H4

15

H5

16

H8

17

H9

18

H10

19

P3

Status

EPA

Implementation Starting Point

Work Plan

KPI Collection

Involving WMD SPs

On Track

Completed

Jan. 2013

On Track

Submitted by Mar. 2014

TUV, TIMELINE

On Track

Completed

Jan. 2013

On Track

Submitted by Dec. 2013

TIME LINE

On Track

Completed

Jan. 2013

On Track

NOT SUBMITTED

CLSN, TIMELINE

On Track

Completed

Jan. 2013

On Track

Submitted by Jan. 2014

TIMELINE

On Track

Completed

Jan. 2013

On Track

NOT SUBMITTED

LESN, TIMELINE

On Track

Completed

Mar. 2013

On Track

Submitted by Dec. 2013

TIMELINE

On Track

Completed

Oct. 2013

On Track

NOT SUBMITTED

TIMELINE

Move to new location On Track

Re-doing EPA

May 2014

To be revised

-

TBD

Completed

Jan. 2014

On Track

NOT SUBMITTED

Taos

On Track

Completed

Jan. 2014

On Track

NOT SUBMITTED

Taos

On Track

Completed

Jan 2014

On Track

NOT SUBMITTED

TUV

On Track

Completed

Jan. 2013

On Track

Submitted by Mar. 2014

TUV

On Track

Completed

Jan. 2013

On Track

Submitted by Mar. 2014

Timeline

On Track

Completed

Sep. 2013

On tract

Submitted by Mar. 2014

Timeline

On Track

Completed

Jun. 2012

On track

NOT SUBMITTED

TUV

On Track

Completed

Oct. 2013

On track

Submitted by Mar. 2014

TUV

On Track

Completed

Jan. 2014

On track

NOT SUBMITTED

Taos

On Track

Completed

Jan 2014

On track

NOT SUBMITTED

TBD

Re-joined

Completed

Aug. 2013

On Track

Submitted by Mar. 2014

TAOS

5


20

P5

21

P6

22

P7

23

P8

24

P9

25

P10

26

P11

27

P12

28

P13

29

P14

30

P15

31

P16

32

P17

33

P18

34

A1

35

A2

36

A3

37

A4

38

A5

39

A6

40

A7

41

A9

On Track

Completed

Jan. 2013

On Track

Submitted by Mar. 2014

Timeline

On Track

Completed

Mar. 2013

On Track

Submitted by Feb. 2014

TUV

On Track

Completed

Mar. 2013

On Track

Not Submitted

TUV

On Track

Completed

Mar. 2013

On Track

Submitted by Feb. 2014

LESN

On Track

Completed

Sep. 2013

On Track

Submitted by Feb. 2014

TUV

On Track

Completed

Oct. 2013

On Track

Submitted by Mar. 2014

TUV

On Track

Completed

Oct. 2012

On Track

Submitted by Feb. 2014

SUSA

On Track

Completed

Oct. 2013

On Track

Not submitted

TUV

On Track

Completed

Oct-. 2013

On Track

Submitted by Mar. 2014

E&T

On Track

Completed

Nov. 2013

On Track

Not Submitted

BLC

On Track

Completed

Oct. 2013

On Track

Submitted by Mar. 2014

BLC

On Track

Completed

Oct. 2013

On Track

Not Submitted

TAOS

Withdrawn

Completed

Pending

-

-

E&T

On Track

Completed

Mar. 2014

On Track

Submitted by Mar. 2014

E&T

On Track

Completed

Mar. 2013

On Track

Submitted by Mar. 2014

LESN

On Track

Completed

Mar. 2013

On Track

Submitted by Mar. 2014

LESN

On Track

Completed

Mar. 2013

On Track

Submitted by Mar. 2014

CLSN

On Track

Completed

Mar. 2013

On Track

Submitted by Mar. 2014

LESN

On Track

Completed

Aug. 2013

On Track

Submitted by Mar. 2014

TAOS

On Track

Completed

Oct. 2013

On Track

Submitted by Mar. 2014

Timeline

On Track

Completed

Oct. 2013

On Track

Not submitted

Timeline

On track

Completed

Oct. 2013

On Track

Submitted by Mar. 2014

Taos

6


42

A10

43

A11

44

A12

45

A13

46

N1

47

N2

48

N3

On Track

Completed

Jan. 2014

On Track

Submitted by Mar. 2014

E&T

On Track

Completed

Jan. 2014

On Track

Submitted by Feb. 2014

BLC

On Track

Completed

Jan. 2014

On Track

Not submitted

Timeline

On Track

Completed

Mar. 2014

On Track

Submitted by Mar. 2014

BLC

On Track

Completed

Completed

On Track

Not submitted

TBD

On Track

Completed

Completed

On Track

Submitted by Mar. 2014

Taos

On Track

Completed

Completed

On Track

Not submitted

Timeline

7


Program Status Overview: Work Plan Completion VS Work Plan Timeline Summary showing the progress of each supplier on their WMD and Non-Dialogue WP (work plan) vs the agreed project timeline from the EPA (Entry Point Assessment).

N1 A10 A9 A7 A6 A5 A4 A3 A2 A1 D12 D11 D10 D9 D7 D6 D5 D4 D3 D2 D1 H10 H9 H8 H5 H4 H3 H2 H1 P17 P16 P15 P14 P13 P12 P11 P10 P9 P8 P7 P6 P5 P3

Nok ia

Apple

Dell

HP

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline WP Timeline

W-M Dialogue

Non-Dialogue

WP Timeline

8


Trend Analysis - KPI’s measuring worker and productivity data to indirectly link social factors with business performance. Worker Turnover (%)

Program trend overall is relatively flat, however the average turnover peak in Q1’14 (CNY) reduced compared to Q1’13. Underlying (seasonally adjusted) turnover is decreasing slightly overall, if we adjust out the peaks in CNY.

Worker Turnover

Program Average

Rework Rate (%)

Program Leader

Mar-14

Feb-14

Jan-14

Dec-13

Nov-13

Oct-13

Sep-13

Aug-13

Jul-13

Jun-13

May-13

Apr-13

Mar-13

Feb-13

Jan-13

Dec-12

Oct-12

Nov-12

Sep-12

Aug-12

Jul-12

Jun-12

May-12

Apr-12

Mar-12

Feb-12

Jan-12

35 30 25 20 15 10 5 0

Linear (Program Average)

Program trend is reducing overall. However, there is a spike in Q1’14, possibly related to increased worker turnover in Jan (CNY).

Rework Rate (%)

Program Average

Program Leader

Mar-14

Feb-14

Jan-14

Dec-13

Nov-13

Oct-13

Sep-13

Aug-13

Jul-13

Jun-13

May-13

Apr-13

Mar-13

Feb-13

Jan-13

Dec-12

Nov-12

Oct-12

Sep-12

Aug-12

Jul-12

Jun-12

May-12

Apr-12

Mar-12

Feb-12

Jan-12

3.50 3.00 2.50 2.00 1.50 1.00 0.50 0.00

Linear (Program Average)

9


Average Monthly Net Wages (RMB)

Program trend is increasing slowly which mostly reflects the adjustments of legal minimum wage. Q1’14 wages are lower due to the seasonal reduction in working hours, as in previous years, but on average wages flat vs 2H’13.

Average Monthly Net Wages

Program Average

Average Weekly Working Hour (Hours)

Program Leader

Mar-14

Jan-14

Feb-14

Dec-13

Nov-13

Oct-13

Sep-13

Jul-13

Aug-13

Jun-13

May-13

Apr-13

Feb-13

Mar-13

Jan-13

Dec-12

Nov-12

Oct-12

Sep-12

Aug-12

Jul-12

Jun-12

May-12

Apr-12

Mar-12

Feb-12

Jan-12

5,300 4,800 4,300 3,800 3,300 2,800 2,300 1,800 1,300

Linear (Program Average)

Program working hours are showing a marginally increasing trend. Q1’14 reflects the seasonal reduction for the CNY holiday, but the adjusted Q1 working hours are flat compared to 2H’13.

Average Weekly Working Hours 60 50 40 30 20 10

Seasonal Adjusted Average

Program Average

Program Leader

Linear (Program Average)

Mar-14

Feb-14

Jan-14

Dec-13

Nov-13

Oct-13

Sep-13

Aug-13

Jul-13

Jun-13

May-13

Apr-13

Mar-13

Feb-13

Jan-13

Dec-12

Nov-12

Oct-12

Sep-12

Aug-12

Jul-12

Jun-12

May-12

Apr-12

Mar-12

Feb-12

Jan-12

0

10


Program average and leader KPI data points KEY PERFORMANCE INDICATORS – Comparative Analysis *Compared to last quarter data in bracket Factory Name

Program Average

Leader

WMD Benchmarks (Non-rep comm systems) in EPA

6.08

9.20

WMD Benchmarks (Rep systems) in EPA

4.29

6.50

6.44

8.44

# of work-related injuries

0.59

0.00

# of days lost due to work-related injuries

16.72

0.00

Average weekly working hours in the calendar month

48.60

29.70

Average # of rest days

6.83

17.00

307,535.60

N/A

17.45

0.00

Average monthly net wage (RMB)

2,579.54

3,784.00

Average monthly gross wage (RMB)

2,786.25

4,102.00

Ratio of OT Premium to Gross Wages

1,631.42

N/A

1st quartile of monthly net wage (RMB)

2,233.74

4,495.50

2nd quartile of monthly net wage (RMB)

2,626.93

3,938.00

1st quartile of monthly gross wage (RMB)

2,398.51

4,455.00

2nd quartile of monthly gross wage (RMB)

2,822.71

4,450.00

303.21

0.00

28533.36

506448.48

Rework Rate (%)

2.92

0.00

Turnover (%)

16.89

5.57

Worker-Management Dialogue

Worker Satisfaction Worker Satisfaction Indicator from EPA Working Condition

Total monthly working hours in the calendar month % of workers working more than 60h in the week

Environmental Condition Kilowatts used per product unit Business Impact Unit Produced Per Hour (UPPH)

11


Worker Satisfaction Index Comparison by Supplier: Measured at Entry Point Assessment & repeated at Exit Point Assessment (no suppliers completed exit point as yet). Directly measuring program impact on worker satisfaction before & after.

Factory Name

Below Average Above Average 1 A1 2 3 4 5 6 7

A2 A3 A4 A5 A6 A7

8 9 10 11 12 13

A8 A9 A10 A11 A12 A13

14 15 16 17 18 19

D2 D3 D4 D5 D6 D7

20 21 22 23 24 25

D8 D10 D11 D12 H1 H2

26 27 28 29 30 31

H3 H4 H5 H6 H8 H9

32

H10

Overall Scale (1-10)

Working Relationships (0-100)

Wage Fairness and Transparency (0-100)

Working Hours (0-100)

Facilities (0-100)

Health and Safety (0-100)

Career/Personal Development (0-100)

6.44

68.59

63.07

41.01

57.76

65.49

63.35

6.34

64.53

63.67

59.93

56.09

56.22

57.55

5.67 6.33 6.30 6.87 6.46 6.72 6.88

63.18 68.08 67.59 66.22 65.07 68.65

63.92 67.81 60.22 67.52 58.09 63.94

23.40 37.09 24.95 64.75 53.19 46.79

46.57 58.94 65.44 61.85 51.23 55.53

59.08 60.23 69.91 67.76 66.93 70.14

55.00 64.09 65.27 63.16 64.24 73.02

65.16 62.74 65.91 63.01 67.38 68.92

64.75 60.70 57.50 52.56 66.58 59.97

44.92 54.30 60.08 15.47 27.74 18.41

59.79 46.64 51.85 31.41 60.36 59.75

70.75 67.19 64.18 64.07 57.91 61.81

65.50 58.02 52.05 59.73 61.76 66.24

77.88 62.87 69.84 64.40 68.47 64.67

77.76 54.49 70.50 54.23 73.58 54.55

58.23 31.70 45.38 29.25 46.17 36.55

69.59 51.42 61.80 49.32 59.81 44.07

82.46 57.82 71.74 45.56 70.08 50.78

72.09 55.00 59.78 52.46 62.33 59.04

63.01 66.70 67.00 65.76 65.37 66.65

51.36 59.74 64.12

41.54 45.87 48.46 56.02 49.82 60.33

61.92 63.46 57.35 60.68 45.31 74.90

58.28 59.31 64.07

56.34 54.09 60.48

27.24 33.33 20.41 18.29 31.48 28.14

65.69 62.70 63.08 66.59 79.48 62.73 69.36

72.33 57.77 57.64 70.02 72.83 64.17

48.45 59.64 33.67 41.89 64.80 13.78

66.57 56.87 56.27 62.65 71.12 43.65

60.71 59.87 61.18 73.20 81.50 58.04

51.46

25.73

39.59

43.85

53.91 52.70 45.23 64.38 80.41 53.11 62.85

6.70 6.27 5.31 6.12 6.03 7.55 5.71 6.70 5.40 6.70 5.68 5.53 5.95 5.83 5.71 5.55 6.22 6.53 6.21 5.68 6.70 7.73 5.44 5.37

56.66 57.72 57.80

12


33

N1

6.83

67.39

59.71

60.31

65.09

65.19

62.99

34

N2

6.02

63.84

57.56

51.99

36.45

63.11

58.58

35 36 37 38 39 40

N3 P3 P4 P5 P6 P7

7.36

75.86 78.62 83.73 66.39 67.32 70.20

70.79 77.24 83.05 65.29 65.92 71.44

50.43 77.25 67.11 10.26 28.97 59.06

71.64 72.29 80.70 64.51 61.34 60.51

82.54 85.56 90.84 67.88 64.49 77.69

76.43 70.55 77.97 61.66 58.33 63.41

41 42 43 44 45 46

P8 P9 P10 P11 P12 P13

65.26 78.41 69.91 67.91 70.67 67.80

48.72 71.11 40.65 53.38 67.11 47.05

17.89 38.33 30.08 31.08 37.74 36.86

46.52 85.65 50.97 64.38 62.04 41.49

41.99 66.11 62.97 49.62 79.21 48.44

63.03 79.17 66.55 65.56 67.74 61.14

47 48 49 50 51

P14 P15 P16 P17 P18

65.60 77.96 85.78 73.89 73.00

61.50 77.20 83.47 68.63 62.22

39.47 57.74 68.13 35.74 67.87

45.74 67.57 92.41 62.27 74.07

63.68 74.78 90.41 71.03 77.78

64.33 77.62 86.74 66.51 69.63

8.00 8.27 6.04 6.20 7.04 5.26 7.33 6.06 7.01 6.74 6.23 6.23 7.48 8.44 6.55 7.38

Worker Management Dialogue Maturity Index Comparison by Supplier: Measured at Entry Point Assessment & repeated at Exit Point Assessment (no suppliers completed exit point as yet). Directly measuring program impact on WMD before & after.

Supplier/Factory Name

Above Average Below Average

Non-rep comm systems overall (1~10)

Rep systems System & roles (0~20)

Representation & participation (0~20)

6.08

16%

32%

16%

4.29

Resources (0~20)

Overall (1~10)

1

A1

4.80

15%

50%

15%

5.25

2

A2

5.60

25%

30%

25%

6.00

3

A3

5.60

15%

45%

15%

4.75

4

A4

6.00

10%

15%

10%

3.00

5

A5

6.40

15%

15%

15%

4.25

6

A6

5.20

15%

35%

15%

4.00

7

A7

6.40

15%

35%

15%

4.50

8

A8

6.80

15%

40%

15%

4.75

9

A9

5.60

10%

20%

10%

2.75

10

A10

6.80

15%

35%

15%

4.00

13


11

A11

4.00

25%

55%

25%

5.75

12

A12

6.80

20%

50%

20%

6.50

13

A13

6.00

10%

25%

10%

3.75

14

D6

6.40

15%

60%

15%

5.25

15

D7

4.40

20%

45%

20%

6.25

16

D8

4.00

15%

30%

15%

3.50

17

D9

4.40

20%

20%

20%

3.25

18

D10

5.20

15%

30%

15%

4.50

19

D11

5.60

15%

40%

15%

4.50

20

D12

4.40

15%

40%

15%

4.75

21

H6

6.40

20%

45%

20%

6.00

22

H7

5.20

15%

40%

15%

4.75

23

H8

8.80

15%

30%

15%

3.75

24

H9

5.20

10%

20%

10%

2.50

25

H10

4.80

15%

15%

15%

2.75

26

N1

7.20

20%

50%

20%

5.75

27

N2

4.80

15%

40%

15%

4.25

28

N3

8.40

25%

40%

25%

5.50

29

P3

8.40

15%

20%

15%

3.25

30

P5

6.40

10%

20%

10%

2.75

31

P6

6.00

10%

15%

10%

3.25

32

P7

6.40

10%

20%

10%

3.00

33

P8

4.80

10%

20%

10%

3.00

34

P9

8.00

20%

50%

20%

5.50

35

P10

5.60

15%

30%

15%

4.25

36

P11

5.60

20%

15%

20%

3.50

37

P12

6.40

25%

35%

25%

6.00

38

P13

4.80

15%

50%

15%

5.00

39

P14

5.20

10%

25%

10%

3.75

40

P15

8.40

15%

20%

15%

3.75

41

P16

9.20

20%

30%

20%

4.75

42

P17

7.60

10%

20%

10%

2.75

43

P18