idilkoรง idilkoc
Idil Koç | interior architect & designer Idil is an Izmir based interior designer. Being raised in various international backgrounds including; Izmir, Naples, Lisbon has enabled her to experience different cultures and perspectives starting at a very young age. She considers design to be a medium through which we can shape society; create better experiences for users, that improve their quality of living and facilitate their aimed tasks. idilkoc.com idylkoc@gmail.com
tr.linkedin.com/in/idilkoc flickr.com/photos/idilk
Work Experience ‘I-AM’ Associates Istanbul, TURKEY Intern Interior Designer (Graduate) Johnson Controls Tokyo, JAPAN Intern Interior Designer (Tokyo Sasazuka Office)
August 2015
Chiba University Chiba-shi, JAPAN Intern Interior Designer & Cultural Exchange
August 2015
Bitez Construction Izmir, TURKEY Intern Interior Designer (‘NLoft’ Construction Site)
June 2015
Helios Automation San Salvo, ITALY Trilingual Customer Service (Marble Fair of Izmir)
Honours & Scholarships High Honour Student (All semesters) Granted by Izmir University of Economics
2013 - 2017
Undergraduate Semi Scholarship (All semesters) Granted by ÖSYM
2013 - 2017
Kordon Restoration Izmir, TURKEY Intern Interior Designer (Wood Workshop at the Historic Flour Factory of Izmir )
Erasmus Exchange Scholarship Granted by Turkish National Agency
2016
Education
JASSO Scholarship Granted by Japan Student Services Organization
2015
Izmir University of Economics Izmir, TURKEY Bachelor’s Degree - Interior Architecture and Environmental Design GPA: 3.85 / 4.00 Design Thinking & Service Design Master Course Amsterdam, Netherlands By Ozlem Siegers
Software Knowledge AutoCAD 2016 Adobe Photoshop CC6
Vray 2.0 Microsoft Office 2016 Adobe InDesign CC Adobe Illustrator CC
March 2015
August 2014
2013 - 2017
October 2017
Politecnico di Milano (Erasmus) Milan, Italy Bachelor’s Degree - Interior Design 28.2 / 31
2016 Spring
M.E.V. Anatolian High School Izmir, TURKEY High School GPA: 4.35 / 5.00
2009 - 2013
St.Julian’s International School Lisbon, Portugal Secondary School
2007 - 2009
Rhinoceros 5.0 SketchUP 8.0 Pro
December 2017Present
Volunteer Experiences
Revit 2016
DATUMM (Documenting and Archiving Turkish Modern Furniture)
Languages
Turkish
English
Italian
native
expert C2
advanced B2
French
Spanish
Portuguese
advanced B2
intermediate
elementary
TÜRGÖK ( Turkish Library for the Visually Impaired)
2016 - Present
IEU Social Responsibility Project Unit
January 2017 Present
Interests Photography Travelling Art History
Certificates
Foreign Languages Graphic Design
IELTS (International English Language Testing System) 8.0/9.0 CILS B2 (Certificazione di Italiano come Lingua Straniera) DELF B2 (Diplôme d’études en langue française )
2015
Watercolour Painting
*References will be given upon request.
Contents
01 02 03 04 05 06 07 08 09
Impact Hub Izmir
04
Cabin in Oliveyard
07
AI Research Base
10
Urban Installation at L’aquila
14
Rebranding of Metro Izmir
16
Communi-bench
20
Excavation House
22
International Student Centre
25
Neo Zone Gym & Spa
28
2015 Fall
Impact Hub Izmir User Profile
Inspiration Source
Innovative young minds; architects, interior designers, industrial designers, graphic designers, engineers. These people will work together to develop the current district. By making this hub a meeting point the discrict might even regain its prestige and popularity.
The areas have been designed to work as a part of a whole as gears do, each one affects the next.
3rd Year Studio Project Izmir University of Economics
Softwares Used
mezzanine
Location & Site The neighbourhood used to be a an industrial area for tobacco and fig factories which were owned by the French and Italian leventines of Izmir who have left their trace in the architectural style. Curently the area is a district of furniture and automative industries.
Plan & Sections
Design Goal - To preserve the authentic architecture while designing the interior.
City Centre
- Creating an informal athmosphere is to trigger the communication, productivity and creatity.
Materials
Colour Scheme
Entrance - meeting and lounge
4
Building Analysis The building used to be the roof tile factory of Alsancak, like many pre-republican buildings, was designed with conventional architectural elements.
Kitchen
Individual working spaces
Small group working tables
5
Private reading-working nooks
Detail Examples
Seminars can be watched from upstairs
Group presentation / discussion area
Kitchen
6
2017 Spring
Oliveyard Cabin User Profile
Construction & Management Coursework Izmir University of Economics In collaboration with Irem Akbas
Inspiration Source
Location & Site
What gives the Aegean region it’s soul and characteristic, the olive. It is reflected in the interior through the usage of colour and the design provides the user visual interaction with his/her surroundings in nature.
A middle aged single design instructor who would like to spend the weekends in nature but not too far away from the city centre at a low construction and overall annual cost.
Colour Scheme s
inute
30 m Oliveyard in Güzelbahçe
Materials Softwares Used
Hand Sketches
7
City Centre
Construction Drawings TIPOLOGY / ITEM C
D
1
3
2
240
6
50
114
50
A
+3.00 154
60
+3.00
107
E
E
+2.52
W2 42/42
W1 42/42
68
W1 42/42
+2.52
+2.30 ceramic tile
A3 Bathroom D
D
W3 101/80 plywood
A B
A5 Terrace
A1 Kitchen
219
D1 75/200
90
237
A B
D2 60/200 20x20x40 cm
C
C
E
547
246
1
2
+1.73
+1.67 W3 101/80
C
W3 101/80
3
plywood
plywood A2 Living
B 124
B
plywood
+0.93
W3 101/80
+0.58
W2 97/80 6
W2 97/80
A 246
107
107
316
240
A
10
+0.13
546 1
2
3
4
C
5
D
+0.13
±0.00
6
±0.00
E
Timber Stud - Kayalar kereste 10x10 cm Stone Wool 50 DNS 5 cm 5,76 m2
1 m3
750 TRY
70 m2
81,42 TRY
Plywood (Wall) 12x1700x2000 mm Plywood (Floor) 12x1700x2000 mm Door 1 - custom 75 x 200 cm STRAHLE - Flush-bonded glazing door Door 2 - custom 60x200 cm STRAHLE - pocket sliding door Window 1 - fixed window FIRATPEN - custom 41x41cm Window2 FIRATPEN - custom 97x80cm Window 3 FIRATPEN - custom 101x80 cm MDF 12x2100x2800mm
15 units
60 TRY
900 TRY
7 units
60 TRY
420 TRY
1
210 TRY
210 TRY
1
Waste Tank
750 TRY 985 TRY
140 TRY
140 TRY
3
90 TRY
270 TRY
3
160 TRY
2
160 TRY
5
80 TRY
KITCHEN
A1 Kitchen
+1.00
68
A4 Bedroom
W2 97/80
UNITS / m2 PRICE PER UNIT / m2 TOTAL
STRUCTURE
E 5
4
480 TRY 480 TRY 400 TRY TOTAL
Kitchen Cabinet - MDF LAM Nejat Tezoloğulları 2800x2100x12 mm Ceramic Wall Tile 5x5 cm VITRA: K5089824, yeşil-mavi parlak Counter top Oasis Çimstone code:306, beige Sink TEKA: KEA 60 B-TG, 31259 Faucet GROHE: Zedra Touch 30219000 Oven BEKO AOME 32200 Handles - storage Çebi Design: 946
2
140 TRY
1 m2
142 TRY
142 TRY
2 m tül
330 TRY
660 TRY
1
74,99 TRY
74,99 TRY
1
85 TRY
85 TRY
1
363 TRY
363 TRY
9
9,99 TRY
89,91 TRY TOTAL
PLAN 1/20
C
E
5035 TRY
70 TRY
1554,9 TRY
LIVING
A
Mattress 58x173 cm Hanedan Mobilya & Döşeme - custom Cushion IKEA: Slan 102.698.04 Cushion Cover IKEA: Dvala 701.500.48 Chair IKEA: TOBIAS 603.347.22
SECTION CC' 1/20
1
90 TRY
90 TRY
2
7,49 TRY
7,49 TRY
1
14,90 TRY
14,90 TRY
2
199 TRY
398 TRY TOTAL
510,39 TRY
BATHROOM +3.00
5
C
E
6
A
+3.00
+3.00
+2.75
+2.75
4 3 2 1
+2.40
+2.42 A1 Kitchen
+2.22 D2 60/200
+2.12 +1.92
plywood
W1 42/42
+1.82
+1.73
A3 Bathroom W3 101/80
A4 Bedroom
W1 42/42
W1 42/42
W3 101/80
W3 101/80
plywood
plywood
+1.05 +0.93
+0.77
+0.58
+0.13 ±0.00
+0.13
+0.13
±0.00
±0.00
3
4
+0.13
5
159 TRY
159 TRY
1
49 TRY
49 TRY
1
95 TRY
95 TRY
1
40 TRY
40 TRY
1
12,99 TRY
12,99 TRY
1
90 TRY
90 TRY
1
29,99 TRY
29,99 TRY
1
345,29 TRY
1
14,99 TRY
345,29 TRY 14,99 TRY
C
951,96 TRY
BEDROOM Mattress YATAŞ: Rina - DHY yaylı seri Pillows IKEA : Hampdan 202.697.28 Handles - storage Çebi Design: 946 Shelves, storage and bed Plywood: 12x1700x2000 mm
1
340 TRY
340 TRY
2
15,99 TRY
15,99 TRY
6
9,99 TRY
59,94 TRY
2
60 TRY
120 TRY TOTAL
535,93 TRY
SUMTOTAL
8588,18 TRY
A
6
SECTION DD' 1/20
SECTION AA' 1/20
6
C
E
PREFABRICATED HOUSE
A
5
+3.00
115,7 TRY
1
±0.00
E 2
89 TRY
Waste Tank
Waste Tank
1
1,3 m
TOTAL
A3 Bathroom
+0.92
WC Pan (Including siphon) VITRA: T4 4470B003-0610 Mirror KOÇTAŞ: 1000179824 - Orka Roza Shower tray siphon KOÇTAŞ: 1000166292 - Hydromix Shower screen Ankara Duşakabin - 75 x 200 cm Handshower KOÇTAŞ: 1000135002 - Tema / Arya Clean water and waste tank denizdukkani.com : GRP5048 / 45 L Bathroom Brush KOÇTAŞ: Primanova 1000157810
2
Construction Method
W2 97/80
plywood
A5 Terrace
Ceramic Floor Tile 25x70 cm VITRA: K917852R Koyu Yeşil Mat Sink VITRA: 5466B003-0001 Faucet VITRA: A42305
4 3
+2.90
+2.90
+2.40
+2.40
2
SHEET NO
1
SHEET NAME
PLAN & SECTIONS AA' BB' CC' DD' EE'
SCALE
1/20
1 W2 97/80
+2.40
+2.00
W3 101/80
D1 75/200
W3 101/80
W2 97/80
W2 97/80
+1.73
+2.40
+2.40
+1.73
plywood
plywood
A4 Bedroom
A4 Bedroom
DATE
2017-05-17
COURSE INFO
IAED 306 - CONSTRUCTION MANAGEMENT 2016/2017 SPRING TERM IZMIR UNIVERSITY OF ECONOMICS FACULTY OF FINE ARTS AND DESIGN DEPARTMENT OF INTERIOR ARCHITECTURE AND ENVIRONMENTAL DESIGN
plywood
A5 Terrace
+0.92
+0.92
+0.92
TUTOR
STEFANO PUGLIESE
DESIGN TEAM
İREM AKBAŞ İDİL KOÇ
CONTACT
irem.akbas@std.ieu.edu.tr idil.koc@std.ieu.edu.tr
A2 Living
+0.13
+0.13
+0.13
±0.00
±0.00
±0.00
+0.13 ±0.00 Water Tank
6
5
4
3
2
1
E
SECTION BB' 1/20
C
A
SECTION EE' 1/20
SIGNATURE
THIS PROJECT IS COPYRIGHTED. IT CANNOT BE COPIED, EXHIBITED AND PUBLISHED WITHOUT THE OFFICIAL PERMISSION OF THE OWNER.
8
Drawers for clothes
Physical Model
Dining and working zone
Storage and guest bed
9
2017
AI Research Laboratory
4 Year Futuristic & Visionary Interior Architecture Studio / Graduation Project Izmir University of Economics th
Movie poster design for the scenario User Profile
Scenario
The building is designed as a research laboratory where the AI work as technicians in the research & production projects of the new settlement being carried out by scientists who control their every move from upstairs and also inhabit there. The building is designed to make the androids carry out a loop of hibernation, work and maintenance everyday.
After WW3 the radioactivity makes earth inhabitable, thus a mass-migration project is lead by scientists at NASA. For those who are not scientists, the only way to migrate is through the transfer of their minds into androids. They have no choice but to accept it. What they are not aware of is that the goal of the scientists is to create an infinite labour force out of them by controling their minds, while a new civilisation is being built on Mars.
x4
x10
Inspiration
Location
A lifetime supply of hollywood sci-fi movies, a personal interest in dystopian novels and concern about the future.
Mars (The original building is situated in NarlÄądere, Izmir TURKEY
Softwares Used
Designed by Boran MimarlÄąk )
Materials
Colour Scheme
Hibernation room
10
Kitchen Hibernation Units
Bedrooms
Brainwashing Seats
Bathrooms
Maintenance Pools Circulation Laboratory
Interaction Booths
Working Zone Circulation
Circulation
Circulation
Circulation
Circulation
Basement Floor Plan
Lounge
Ground Floor Plan
zones
daily android loop
Section AA’
Interaction zone
11
Section BB’
Circulation down
Bubble Diagrams
brainwashing
hibernation
lounge research lab.
utilities
maintenance pool
working zone
hibernation
research lab.
utilities
interaction zone
circulation
Circulation up
bedrooms maintenance pool
kitchen
bathroom bedrooms
lounge
working zone
lounge
maintenance pool hibernation
circulation circulation
AI circulation path
Control zone and other facility rooms
Control zone
12
Lounge
A7 Circulation up HVAC OUT
HVAC IN
HVAC IN
Electrical Tray
WL3
+0.00
HVAC OUT
Electrical Tray
49 m2
CEILING FINISHES (CL1, CL2, ...)
CLx
15
Sprinkler
Sprinkler WL1
75
WL1
Exit
WL3
h: open
WL3
FL2, WL3-4
+0.00
FL2
LED Ceiling Installation
HVAC Tubes Sprinkler System Suspenders Panel Profiles Gypsum Panel Plaster Aluminium Composite Panels
258
160
LED D1
14
LED
Fx
FURNITURES (F1, F2, ...)
Bx
BATHROOM EQUIPMENT (B1, B2, ...)
F11 WL1 LED
WL1
13
LED Furniture Installation F11
F1
WL1
WL4
Glass Screen
F1
F2
271
F2
WL3
101 12
N
F1
1 cm Glue 0.4 cm Plywood Panelling 7x7 Metal Profile Grid System 30 cm Concrete + Screed
N
0.5 cm Epoxy 2 cm Mortar 0.5 cm Water Insulation Corner Prick 30 cm Concrete + Screed
h: 210
246 0.5 cm Epoxy Pavement
LED Floor Installation
50
HVAC IN
306
56
1
11 10
216 30
HVAC OUT
45
(-1.01)
Air Flow
D1
10
LED Ceiling Installation
F6
30
Sprinkler
Sprinkler
Sprinkler
F6
F6
(-1.16)
883
883
F6
9 HVAC Tubes Sprinkler System Suspenders Panel Profiles Gypsum Panel Plaster 250 Aluminium Composite Panels
264
WL4
SPRINKLER
1012
71
288
8
164
D HVAC PIPE SIDE VIEW
FL2
WL2
87
92
66
FL1
92
WL1
7
274
(-3.41)
POWER BOX
6
84
66
61 WL1
F7
121
127 1449
150mm Drain Pipe 101
50
306
- 4cm Protection Concrete - 0.5cm Water Insulation - 6cm Slope Concrete - 10cm Grobeton - 20cm Blockage
1
56
597
0.5 cm Epoxy 0.5 cm Interval Layer 106 1 110 cm Under-Coat 30 cm Concrete + Screed
38
WL2
64
64
124
2
1
4
263
391 52
BUILDING INFO: 102
2
71
D
Fire Extinguisher
288 WL2
87
92
66
FL1
92
118
189
Section AA' Scale 1/50
133
B4
-2.92
150
18x60 RxT
Maintenance Pools
382
160
F10
523
75
20
64
373 61
HVAC Tubes Sprinkler System Suspenders Panel Profiles Gypsum Panel Plaster Aluminium Composite Panels
128
205
514
FL1
Sprinklers
Sprinklers
83
348 65
h: 2.75
40m2
WL4
37
89
149 WL1
HVAC Tubes Sprinkler System F1 Suspenders Panel Profiles F6 Gypsum Panel Plaster Aluminium Composite Panels
54 F6
35464
0.5 cm Epoxy 2 cm Mortar 0.5 cm Water Insulation Corner Prick 30 cm Concrete + Screed
Section
48
10
35
WL2
F1
F1
F1
F1
F1
65
F9
WL1 F1
F1
0.5 cm Epoxy 0.5 cm Interval Layer 1 cm Under-Coat 30 cm Concrete + Screed
D1
25
117
305
(-3.41)
FL3
+0.00 +3.26 HVAC Tubes Sprinkler System Suspenders Panel Profiles Gypsum Panel Plaster 250 Aluminium Composite Panels
265
375
WL1
WL2
38 610
F6
F6
WL1 -3.30
117
-3.30
313
ALEPH - AI Research Laboratory
103
h: 2.75
FL2, WL4, CL3
+0.10 +3.26
F4
0.5 cm Epoxy 0.5 cm Interval Layer 1 cm Under-Coat 30 cm Concrete + Screed
0.5 cm Epoxy 0.5 cm Interval Layer 1 cm Under-Coat 30 cm Concrete + Screed
-3.41 -0.75
F1
347
WL4
968
F3
393
105
571
132
A9 Cyrotubes
FL4
-0.32
79 m2
93
134
h: 2.75
92
WL1
TUTORS:
WL1
+0.10 +3.26
FL2
B
572
231
227
A'
245
A5
WL1
58 WL3
209 F2
-3.30
117
-3.30
D3
F6 WL1 -3.30
117
POWER BOX
103
BUILDING INFO:
-3.41
Total Area: 637 m2
-0.32
118
-3.41
375
220
116
105
132
WL1
B
117
-3.30
F6
118
A'
Fire Extinguisher F2
-3.30
75
F4 WL1
A
HVAC OUT
HVAC IN
(3.95)
A
A4 WL1
27m2
313
h: 3.26
FL1, WL1, CL1 W2
HVAC OUT
HVAC IN
79
SHE
110
Sprinklers
Sprinklers
83
Sprinklers
Sprinklers
Sprinklers
Sprinklers
WL3
Brainwashing room
WL3
WL4
D2
236
235
213
F1
F2
AI ResearchFO Lab
FL2
FL2
FL2
FL2
FL2
269
-1.34
-1.34
-1.34
-1.34
WL1
WL1
Electrical Tray
WL1
Sprinklers
LED Ceiling Installation
54 F6
Electrical Tray
-1.34
30
+0.00
61
10
310 221
LED Ceiling Installation
Sprinklers
Sprinklers
LED Ceiling Installation
WL4 WL2
107
35
Sprinklers
Sprinklers
HVAC Tubes Sprinkler System Suspenders Panel Profiles Gypsum Panel Plaster Aluminium Composite Panels
2
SC
230
372
-1.34
-1.34
-1.34
-1.34
LED Wall Installation
FL2
09.05.2017 - IA 4
FOLDER:
ALEPH - AI Resea
265
FL2
FL2
FL2
FL2
INTERIOR ARCHITECT:
Idil Koรง - 20130
CO
-1.34
WL2 WL1
F9
DATE / COURSE:
(- 0.75)
Electrical Tray
LED Ceiling Installation
WL2
123
45
928
90
F6
WL1
0.5 cm Epoxy 2 cm Mortar
Floating Glass Screen
FL2
92
Electrical Tray
45 Sprinklers
HVAC Tubes Sprinkler System Suspenders Panel Profiles Gypsum Panel Plaster Aluminium Composite Panels
SECTION AA' AN INT
LED Floor Installation
(0.00)
9 39
75 Electrical Tray
134
WL1
SHEET NUMBER:
F1
F1
838 39
134
SHEET NAME: 375
235
LED Floor Installation
(-1.28)
DA
ALEPH
WL3
WL4
WL4
F2
37
SHE
MECHANICAL R
58
0.5 cm Epoxy Pavement 0.4 cm Plywood Panelling 7x7 Metal Profile Grid System 30 cm Concrete + Screed
WL4
(0.00)
PROJECT:
Sprinklers
58
207
30 cm Concrete + Screed
1 2
HVAC OUT
WL4
83
375
0.5 cm Coin Grip Rubber Floor 1 cm Under-Coat
HVAC IN
(3.26)
20
WL4
1
1379
HVAC Tubes Sprinkler System -0.32 Suspenders -3.41 Panel Profiles Gypsum Panel Plaster Aluminium Composite Panels
2
157
83
Sprinklers
(3.02)
Bedrooms
+0.00
(3.95) 133
Slope
WL1
A11: Brainwashing U
A13: Interaction Boo
A
F11
11
HVAC system unit
(1.98)
13
F6
Lounge Area
125
-0.32 -3.41
MECHANICAL ROOM
WL4
A10: Laboratory, 51 A12: Circulation 39
509
WL4
A9: Cyrotubes, 79 m
25
331
179
PR
A8: Circulation Down
168
25
1
A7: Circulation Upsta
-3.30
-3.30
72 375
F2
A3: Kitchen, 2392m2
A6: Maintenance Po 107
F6 WL1
425
FL2
134
A5: Bedrooms, 33 m2
185
273
358
A9
FL4 A2: Bathrooms, 18 m
79 m2
93
A4: Lounge, 27 m2
F12
131
A1: Working Area, 7 571
-0.32
648
+0.37 +3.26
80 +0.10 +3.26
F6
-3.30
HVAC PIPE SIDE VIE 225
idylkoc@gmail.com
13
FL3
F3
118
40
C
Fire Extinguisher
WL3
119
-3.30
25
F6 -3.30
90
WL4
FL3, WL1, FL2, CL1
h: 3.16
33m2
F4
FL2
F6
A
COMPANY / CONTACT:
Bedrooms
WL3
117
229
-3.41
305
IA 498 GRADUATION PROJECT 2016/2017 SPRING SEMESTER IEU Glass Screen DESIGN FINE ARTS AND INTERIOR ARCHITECTURE145AND ENVIRONMENTAL DESIGN MARKUS WILSING 255 DIDEM KAN KILIC ORLIN PONTREMOLI SELIN GULDEN DIDEM YAVUZ F2
166
D4
95 x235 x15
A
WL1
222
F6
F1
D1
F3
216
107
F6
34
FL2
FL3
390
FL3
68 93
60
+0.10 +3.26
F4
185
F6
144
Plan
FL1
WL3
Fire Extinguisher
FL2, FL4, WL1, CL2
129
D4
FL2
F1
SPRINKLER
FL1
91
95x 235 x15
Section AA' Scale 1/50
-0.32 -3.41
179
WL1
-3.41
118
WL3
D3
2753
220
648
327
WL3
BATHROOM EQUIP BUI HVAC IN
170 x 253 x 25
117
COURSE INFO:
F1
3731
375
67 WL2
WL1
1/50
256
103
103
WL1
A
100
FURNITURES (F1, F2
HVAC OUT
Idil Koรง - 2013040404192 220
Fx
WL1
61 F7
161
+0.10 +3.26
CEILING FINISHES (
65
61
SCALE: F3
439
FL4
D 325
WL2
FL2
(-3.41)
10
-3.30
-0.32
Fire Extinguisher
09.05.2017 - IA 498
FOLDER:
185
Plan
448
DATE / COURSE:
CLx
Bx
132 x 220 x15
61 F7
122
+0.70 +3.26
82
WL1 375
35464
76
D2
FLOOR FINISHES (F
149
WL1
48
376
2
216
INTERIOR ARCHITECT:
Fire Extinguisher
334
189 x 260
-3.41
A
FL3, WL1-2-3, CL1
h: 3.26
195
F1
Kitchen
C
FL2 0.5 cm Epoxy 0.5 cm Interval Layer - 4cm Protection1Concrete cm Under-Coat - 0.5cm Water Insulation 30 cm Concrete + Screed - 6cm Slope Concrete 304 - 10cm Grobeton - 20cm Blockage
145
220
68
A10
75
-3.41
WL2
77
Glass Screen
585
SHEET NUMBER:
34
WL1
F1
115
F6
61
568
81
(-1.16)
Section BB' Scale 1/50
FL2
A3 23m2
30
3731
F6
A8 Circulation Down
150mm Drain Pipe
225
F6 -3.30
448
K2
K1
33
Protective Concrete 4 cm
FL1 170 x 253 x 25
- 4cm Protection Concrete - 0.5cm Water Insulation - 6cm Slope Concrete - 10cm Grobeton - 20cm Blockage
(- 0.75) F6
LED Wall Installation
F1
75
B Sprinkler
F10
WL2
WL1
3629
230
F8
46m2
WL2
50
WL3
74
161 67
LED Floor Installation
Electrical Tray
WL1
221
61
92
AI Research Lab
131
109
WL2
260
SECTION AA' AND BB'
FL2
F5 K7
D
271
F2
45
264
Section
F1
0.5 cm Epoxy 2 cm Mortar 0.5 cm Water Insulation Corner Prick 30 cm Concrete + Screed
WL4
Glass Screen
F1
DOORS (D1, D2, ...
WALL FINISHES (WL
WLx
FLx
89
WL1
(0.00)
30
Sprinkler LED Ceiling InstallationF6
F9
221
F7
A
WL1
150
63
Glass B Screen
F11 F1
F1
Electrical Tray
LED Ceiling Installation HVAC Tubes Sprinkler System Suspenders Panel Profiles Gypsum Panel Plaster Aluminium Composite Panels WL2
F1
123
63
63
1859 WL4
h: 210
Sprinklers
Sprinklers
WL4
WL1
61
D1
E
51 m2
FL1
K6
76
30
Sprinkler LED Ceiling F6 Installation
WL1
F7
ALEPH F1
SHEET NAME:
LED
9
F8 90
Sprinklers
148
61
113
224
WL2
WL1
374
49
Air Flow
185
FL1, WL1, WL, CL2
F7
F2
45
240
107
182
WL1
WL3
160
LED Floor Installation
Sprinklers
LED Ceiling Installation
65
h: 2.75
40m2
K3
235
1 cm Glue 0.4 cm Plywood Panelling 7x7 Metal Profile Grid System 30 cm Concrete + Screed
39
(-1.01)
Floating Glass Screen
A11 Brainwashing Units
WL2
AREAS (A1, A2, ...)
F12
LED
10
45
Electrical Tray
WL2
439
FL4
375
246 0.5 cm Epoxy Pavement
F1
A XX x XXX x X Dx
FL1-2, WL1, CL1
111
K5
FL1, FL4 WL3, WL1, CL1
205
61
D1
0.5 cm Epoxy Pavement 0.4 cm Plywood Panelling 7x7 Metal Profile Grid System 30 cm Concrete + Screed
WL3
h: 210
325
61 +0.00 -3.41
72
WL1
Working Area h: 3.16
77m2
+0.00 +3.26
89
K4
LED
58
WL1
81
WL2
h: 2.75
A1
95 x 235 x15
(3.26)
Exit
219
16
WL1
61
310
132 x 220 x15
61
69
108
WL1
F7
76
WL3
F8
236
50m2
Sprinklers
LED Ceiling Installation
WL1
1859
WL1
208
A13 Interaction Booths WL4
D2
F1
229
Electrical Tray
F7
131
75
75
Sprinklers
WL1
61
WL2
WL1
FL1
82
75
Electrical Tray
134 WL1
WL1
FL3
PROJECT: Electrical Tray
WL2
39
63
WL1
WL3 WL4
F1
LED Floor Installation
63
(3.95) HVAC OUT
HVAC OUT
LED Ceiling Installation
WL3
F10
WL3
235
FL, WL2, CL2
h: 2.75
260 63
50
77
Screen
EXISTING BEARING
132 x 220 x15
128
F7
499
Sprinkler Sprinklers
WL1
A10 Laboratory F2 51 m2
WL3
FL1
HVAC HVAC IN IN
110
Electrical Tray
LED Furniture Installation
WL2
185
WL1
FL1
376
FL1
-0.32
WL3
207
30 cm Concrete + Screed
148
61
77
121
F8
F7
134
435
60
58
65
HVAC IN
HVAC Tubes Sprinkler System Suspenders Panel Profiles Gypsum Panel Plaster Aluminium Composite Panels
WL4
447
0.5 cm Coin Grip Rubber Floor 1 cm Under-Coat
213FL1, WL1, WL, CL2
WL4
54
A12: Circulation 39 m2 Glass
398
54
Sprinkler
Sprinklers
F1
83
F2
B
Sprinklers
-3.41
A11 Brainwashing Units
WL2
WL4
WL1
Sprinklers
61
72 179
64
130
-0.32
132 x 220 x15 375
WL2
373 61
WL2
FL3, WL2, CL1
-3.41
348
157 HVAC OUT
Sprinklers
F7
WL4
141
B11
Bathrooms h: 3.26
18m2
109
83
132 x 220 x15
Sprinklers 130
-0.32
132 x 220 x15
79
166
WL1
C
188 -3.41
61
35
D5
A2
E
62
-0.32
133
77
282
B10
F1
-3.41
F7
WL2
B1 B8
B11
EXISTING BEARING
188
+0.70
+3.26 72 A11: Brainwashing Units, 40m2
114
F1
14
72
83
61
F1
WL2
FL3
B10
62
-0.32
F7 106
FL3, WL2, CL1
B6
B1 B8
WL2
WL1
61
WL2
FL3
D5
61 F7
52
h: 3.26
B6
169
69
F1
64
A10:226Laboratory, 51 m2
185
A2.1 Men 6.4m2
52
A9: Cyrotubes, 79 m2
A13: Interaction Booths, 50m2
WL3
FL1
64
FL1
B5
256
121
FL3, WL2, CL1
EXISTING BEARING
F10
14
-3.41
64
255
230
C
Women h: 3.26
WL1
65
60
96
A2.2 6.4m2
64
F
A8: Circulation Downstairs, 46 m2
B3
WL3
215 WL1
WL2
B7
B9 B2
B5
50
Kitchen
75
-0.75
F10
WL2
WL1
253 74
90 375
-3.28 FL4
73
FL2, FL4, WL1, CL2
h: 2.75
39m2
B7
B3
280
162
-3.41
61 F7
124
15
A12 Circulation
391 52
100
B9 B2
38
64
WL1
A7: Circulation Upstairs, 49WL1m2
h: 210
68
121 WL2
+0.00 +3.26
-3.10
WL1
F7
64
141
18x60
FL4
84 61
C
Fire Extinguisher
Exit h: 3.26
274 66
61 F7
A6: Maintenance Pool, 105 m2 B4
h: 210
EXISTING WALL ST 95
60
A5: Bedrooms, 33 m2
170 x 253 x 25
18x66
WL1
65 230
A4: Lounge, 27 m2
+0.00
D1
42
F
1
WL2
215 WL1
WL2
A3: Kitchen, 23 m2
95 18/60/15 R/T/ST
FL2, FL4, WL1, CL2
39m2
WL1
253 74
A2: Bathrooms, 18 m2
81
2
WL3
F7
A1: Working Area, 77 m2 Entrance
LEGEND: h: 2.75
61
Total Area: 637 m2
3
A12 Circulation
F1
5
Protective Concrete 4 cm 0.5 cm Epoxy 0.5 cm Interval Layer 1 cm Under-Coat 30 cm Concrete + Screed
FL2
375
2016 Spring
CORE, Urban Installation User Profile (Fontecchiani)
Design Goal & Function
A small town in a province of Abruzzo with a relatively high average age and a small population. The small population indicates that the villagers are familiar with each other.
- To unite people by sharing.
3 year Design & Restoration Coursework Politecnico di Milano In collaboration with Irem Akbas & Paloma Poyatos rd
CORE
- Works by exchaning something you bring for some one else’s. - Encouraging people to socialise.
0-14: 5% 15-64: 60% +65: 35% Average Age: 50.9 Female: 198 Male: 181
Inspiration Source The installation will be located in the centre of the village to provide it with life. The installation being the core (heart) and the streets being the veins that spread life.
~
Location & Site Fontecchio / L’Áquila / Abruzzo / Italy
Core
Why Fontecchio? - Still recovering from the damages of the 2011 earthquake. Cuore (Heart)
- Villagers feel uncomfortable and not ‘at home‘ living in pre-fab houses.
Softwares Used
- Lack of public social spaces. - The design could unite people and embrace their wounds together.
Where in the city? - The fountain that is located in the main square in the center, the core, of the town. Main Streets
Guidelines
- The whole city revolves around it. -Easily accessible.
14
Storyboard
Current situation.
Step 1
Installation of units.
Step 2
Painting the guidelines.
Step 3
Share and enjoy!
What To Share
15
- Clothes
- Fruits & Vegetables
- Books
- Music
- Plants
- Second hand items
2017 Spring
Rebranding of Metro Izmir Current System Policies
Process
- To meet the needs and expectations of fast, reliable, safe, comfortable travel at high efficiency levels.
- Research and analysis of the current brand identity and system.
- Providingt transportation without delay, timely service, high quality of service and passenger satisfaction. -To minimize the wastes generated as a result of the brand’s activities.
- Mindmapping and defining attributes.
Information Design (Branding) Coursework Izmir University of Economics
Defining Attributes
Dynamic
Repeating
Smooth
Dashing Dynamic
- Defining inspiration sources and initial ideas. - Logo variations and process.
+ Constructive
Constant
Guarded
Steady
- Logo and signage construction.
+
- Interior design and applications.
Visual Research
- Brand manual.
Energetic
Periodic
Cosy
Sheltered
Softwares Used Current Logos
16
Periodic
STRENGTHS
WEAKNESSES
- Punctuality - Good Service - Availability to disabled users
- No unity in colours, forms, organization in 2d and 3d designs. -Weakness of a common language. - The designs are very generic, no individuality,
OPPORTUNITIES
THREATS
- The environmental friendly aproach could be focused more on and developed. - Should reflect the city more.
- As the usage of metro becomes more common new solutions such as increasing the number of tubes should be though of.
Sheltered
Logo & Construction
Colour Inspirations
izmirmetro
Coloured
B&W
Inspiration Source
Turkey
EASTERN & WESTERN CULTURES
Izmir
Where east meets west, a bridge between the two cultures due to its westernization by its foreign heritage.
Aquaduct
- A bridgelike structure designed to transport water from a remote source.
Colour Scheme
R 240 C 0
R
85
R
0
G 83 M 83
G 135 M 35
G
0 M
0
B 64 Y 10
B 173 Y
B
0 Y
0
K Izmir Kızılçullu Aquaducts
Image used to construct the logo
A rare and neglected landmark of Izmir which once used to bring life into the city, as does the Izmir Metro.
17
0
0
C
K
20 1
C 10
K
100
White
Map
Font
Gill Sans MT PRO / Book abcçdefgğhıijklmnoöprsştuüvyz ABCÇDEFGĞHIİJKLNOÖPRSŞTUÜVYZ abcdefghijklmnopqrstuvwxyz ABCDEFGHIJKLMNOPQRSTUVWXYZ Gill Sans MT PRO / Book Italic abcçdefgğhıijklmnoöprsştuüvyz ABCÇDEFGĞHIİJKLNOÖPRSŞTUÜVYZ abcdefghijklmnopqrstuvwxyz ABCDEFGHIJKLMNOPQRSTUVWXYZ Gill Sans MT PRO / Medium abcçdefgğhıijklmnoöprsştuüvyz ABCÇDEFGĞHIİJKLNOÖPRSŞTUÜVYZ abcdefghijklmnopqrstuvwxyz ABCDEFGHIJKLMNOPQRSTUVWXYZ Gill Sans MT PRO / Bold abcçdefgğhıijklmnoöprsştuüvyz ABCÇDEFGĞHIİJKLNOÖPRSŞTUÜVYZ abcdefghijklmnopqrstuvwxyz ABCDEFGHIJKLMNOPQRSTUVWXYZ
Signage
Map Mockup
Icons
18
Arrows
Logo Mockups
Conceptual interior design and branding application
19
2016 Spring
Communi-bench
3 year 1 Week Workshop Politecnico di Milano In collaboration with Irem Akbas & Gaganjot Kaur rd
Problem
Question
Solution
What is Communi-bench?
LACK OF COMMUNICATION between the residents of the courtyard
How can we make people who are not willing to come together, INTERACT with each other?
By coming up with a design that only functions when it’s used by multiple users!
A seating unit is with a spherical base which only functions by balance when at least 2 people are sitting on opposite corners.
How to
So to enjoy the seat, you must BRING A FRIEND!
Where (Location)
Who (Users Profiles)
Via Tortona 31, Milano
- Mecanics
An old courtyard surrounded by industrial buildings
- Painter
Location
160
45
- Designer - Textile Workers - Florist
Technical Drawings - Photographer
157
160
45
Colour Scheme
Side View
157
Softwares Used
Top View
20
Bottom View
Plan of the courtyard - marked with possible locations for the bench
21
Excavation House User Profile
Inspiration Source
13 archaeologists and their 3 supervisors who will excavate, process their findings, eat, sleep, socialise; basically will be living and working in the excavation house for a couple of months.
The material choices and layout design have been inspired by earth itself to enhace the connection between the users and the building.
2015 Spring
2nd year studio project at IEU
2 Year Studio Project Izmir University of Economics nd
Design Goal - Providing the users with the most efficient and cosy environment considering their schedule. - Reflecting the qualities of the site & the building within the interior.
Daily Schedule of Archaeologists
- To create a design that would make the archa eologists feel more connected to earth and devoted to their work.
Waking up around 5:30 Post - process table
Excavation starts around 6:00
Location & Site Yesilova Barrow is the oldest settlement area in Izmir and one of the oldest in western Anatolia. The building consists of one main part being the museum & and excavation house. The design belongs to STEB and was opened to the public in 2014.
Break at 10:00 Lunch at 13:00 Continue to work on the excavated goods in the pottery compound (workshop)14:30 - Processing the objects consists of dusting, washing, sketching, photographing, restoring and documenting
izmir city centre
The shift ends around 18:30 in the afternoon. *Occasional seminars are held in the building for archaeologists or visitors. Post - process table and mezzanine lounge
Colour Scheme
Materials Softwares Used
22
Site Visit - Building
Ground Plan circulation paths
Mezzanine Plan
e ce to th g buildin
entran
bathroom
23
Cross Section
Kitchen
Presentation and leisure room - circulation
Mezzanine floor and double height
Staircase
24
Presentation and leisure room
2015 Summer
International Student Centre User Profile & Scenario One of the old buildings at Chiba University will be renovated and converted into an international student centre where students from all over the world can share cultures, socialise, eat, study, rest etc.
Collaborative 1 Week Workshop Project Chiba University / Japan In collaboration with Zeynep E. Erdem & Kohei Oba
Location & Site Chiba University Campus in Chiba / Japan (Building NO.3)
Inspiration Source The soothing quality of Japanese architecture which masters in the elegant combination of nature and concrete as seen in the works of the great architects. The design goal is to create an interior that reflects the cultural differences of building’s users and create comfortable areas for both Japanese and international students.
Chiba
Softwares Used
Studying and socialising area
Inspirational Images Colour Scheme
Materials
25
amphitheatre
The seats are designed for providing both the Japanese and Westerner / International students comfort while eating.
resting/studying indoor zen garden
café
cultural exhibition
Ground Floor Plan
café
lounge
library
storage
library
private meeting
lecture room
café / bar café
traditional
cultural exhibition
tatami
gallery space
amphitheatre café / bar
Section
First Floor Plan lounge
26
Café / Kitchen
Zen Garden
27
Upstairs lounge & bar
Café seats
2017 Fall
Neo Zone Gym & Spa User Profile
Inspiration Source
High-end people who reside in the vicinity of the most popular street of Denizli, and those whom are in the search of a classy, elite, gender-bias-free and unprecedented gym and spa atmosphere.
The city has been known as a centre of healing, owing to the nearby hotsprings for many centuries.
Freelance commission In collaboration with Alp Pesteli
Neo-zone aims to create an environment which can pursue the town’s historical fame in healing/ therapy through a contemporary design language.
Location & Site Konakk Hotel - Denizli / Turkey
Cleopatra’s Pool (Hot Springs) / Denizli (Inspiration for the vivid colour choices)
Café, Cardio and Body-Building
Materials
Design Goal - To create a visual impact through a striking and unique design, making sure the customers are left with an interior to remember. - To differentiate Neo-Zone from other gyms through design, accessibility, experience and facilities.
Colour Scheme
Entrance, Admissions Office
Softwares Used
28
Spinning Studio
Café, Cardio and Body-Building
Café
Studios
Yoga-Pilates Studio
Front Desk
29
thank you Idil Koรง - Interior Architect & Designer idilkoc.com idylkoc@gmail.com
tr.linkedin.com/in/idilkoc flickr.com/photos/idilk