Igor Draskovic Portfolio

Page 1

IGOR DRASKOVIC PROFESSIONAL WORK | FALL 2018


IGOR DRASKOVIC, ASSOCIATE AIA ARCHITECTURAL DESIGNER

CONTACT INFORMATION LOCATION : DALLAS, TEXAS PHONE : (817) 929 - 1219 EMAIL : igordrask@gmail.com IG : igloreous

ALL WORK IN THIS PORTFOLIO WAS DONE BY BRW ARCHITECTS INC. THE TEAMS INCLUDED BUT NOT LIMITED TO: LISA LAMKIN, ANNE HILDENBRAND, ANDREW EVERTSON, DOUG HANKINS, CHRIS SANO, ABBY HILES, CHUCK HELMER, DENISSE TSE, AMELIA NGUYEN, CLAUDIA VARELA, AARON FISHER, AND JUSTIN ZUMEL

2


PROJECTS

PHASE PARTICIPATION

DATES

STATUS

PG

TEXAS TECH VISUAL ARTS GALLERY

FUND RAISER

2015

-

3

DALLAS ARBORETUM CHILDREN’S GARDEN

COMPETITION

2015

-

5

DHA LAKEWEST RETAIL

CA

2014

COMPLETE

7

ANNE FRANK EARLY CHILDHOOD CENTER

SD, DD, CD, CA

2016

COMPLETE

9

TEXAS A&M - MUSIC ACTIVITIES CENTER

CD

2017

CA

11

TEXAS A&M KINGSVILLE - ADMINISTRATIVE SERVICES BUILDING

CD

20172018

CA

13

WOODROW WILSON HIGH SCHOOL GYM AND CLASSROOM ADDITION

SD, DD, CD, CA

20162017

CA

15

AMON CARTER RIVERSIDE HIGH SCHOOL ADDITION AND RENOVATION

SD, DD, CD

2015

COMPLETE

17

GENTLE CREEK COUNTRY CLUB POOL AND ACTIVITY CENTER

SD

2015

-

19

WORKMAN JUNIOR HIGH SCHOOL ADDITION AND RENOVATION

SD, DD, CD, CA

20142015

COMPLETE

21

FORT WORTH ISD - STEM CENTER

COMPETITION

2014

-

23

AISD ELEMENTARY SCHOOL

GRAD SCHOOL

2014

-

25

SKETCHES AND MISC. WORK

ALL

2018

-

2732

CURRICULUM VITAE

-

-

33

3


VIEW FROM GALLERY (SKP + PODIUM + PS)

TEXAS TECH UNIVERSITY - VISUAL ARTS GALLERY LOCATION: LUBBOCK, TEXAS DESIGN: BRW ARCHITECTS IGOR’S ROLE: DESIGN ASSIST AND VISUALIZATION MEDIA: SKETCHUP, PODIUM, PHOTOSHOP PROJECT DESCRIPTION: BRW worked with Texas Tech University to develop a Master Plan that established a facility needs program and phasing of projects to support the College of Visual and Performing Arts (CVPA) on the Lubbock campus. The design team and University administration prioritized the CVPA opportunities, developed alternative funding options and strategies and created marketing collateral for the initial phases of a $45M expansion and renovation of the Maedgen Theatre and a $85M new music building.

4


VIEW FROM ENTRY (SKP + PODIUM + PS)

5


White Rock Lake

Dallas Arboretum

N

LOCATION IN ARBORETUM

EXPLODED AXON

SITE PLAN

DALLAS ARBORETUM CHILDRENS GARDEN - COMPETITION LOCATION: DALLAS, TEXAS DESIGN: BRW ARCHITECTS IGOR’S ROLE: CONCEPTUALIZATION, GRAPHICS QC, 3D MODELING, SCALE MODELS MEDIA: SKETCHUP, PHOTOSHOP, ILLUSTRATOR PROJECT DESCRIPTION: The Garden Education Center, as part of a Design Competition held by the Dallas Arboretum, is envisioned as a multipurpose facility focused on educational field trips, family science demonstrations, and teacher training, all within the setting of a well-established botanical garden. The site location is ideal to become the primary park entry for groups, including school bus drop-off. Special consideration is given to the organization of pre-function spaces for efficiency and safety, while maintaining an emphasis on the visitor garden experience. Flexible learning environments are created with individual STEM labs that open to outdoor decks with demonstration exhibits. Nature is immersed throughout the design of the Center, acting as a teaching tool for both Facilitated and FreeChoice learning opportunities.

6


ENTRY (SKP + PODIUM + PS)

LABORATORY CANOPY (SKP + PODIUM + PS)

SITE SECTION (SKP + PS + IL)

7


WOOD CLAD VERTICAL BREAKS ALONG FACADE

AREA OF PAUSE

DALLAS HOUSING AUTHORITY - LAKEWEST RETAIL LOCATION: DESIGN: IGOR’S ROLE: PHASES WORKED:

DALLAS, TEXAS BRW ARCHITECTS A.I.T. CA

PROJECT DESCRIPTION: BRW Architects joined a team of visionary members of the Dallas Housing Authority to create a Master Plan for the remaining open parcels of land, expansion of park and recreation opportunities and improvements of existing facilities. The design included a series of wood clad vertical elements to give strong visual presence along the two major vehicular thoroughfares. Another positive change was to provide areas of pause in small park-like settings that allowed the local patrons to sit in shaded areas under steel trellis frames on natural stone benches within the surrounding of drought tolerant landscaping. The large expanses of horizontal concrete surfaces were broken down in scale, pattern and proportion and replaced in varied colors and sizes of paver systems. Better signage, lighting, parking control, and site amenities have had a positive impact on the redefined center in a neighborhood surrounded by continual change and improvement.

8


NEW COVERED PLAZA IN PARKING LOT

VIEW OF NEW SIGNAGE AND CLADDING ALONG FACADE

9


MAIN ENTRY RENDERING (SKP + LUMION + PS) KEYNOTES

D 0720.10

00

0770.01

0720.08

0340.06

0610.28 0510.01

0510.01

19 A1.3

0740.03 0920.18

0760.03

0725.03 0920.27 0770.04 0760.07

0740.03

0750.07 0720.08

0770.29

0510.01

0920.18

SIM. O.H.

HIGH ROOF T.O.S. 120' - 6"

0760.06

2

0840.01

A1.3

4' - 11"

0840.05

7 A3.3

0920.07 0770.18 0750.07

SIM. O.H.

0720.10

0510.01 ROOF T.O.S. 115' - 0"

.

0750.01

5 A3.3

0750.01

0720.08 0520.01

0510.02

3 A1.3

0720.10

0920.28

0610.07 0610.08

ROOF T.O.S. 115' - 0"

0750.07

0920.27

0610.28

0720.08

0725.03

0510.01

0720.04

0720.04

2650.04

0725.03

(TYP.)

0720.02

T.O. WALL 15' - 10"

0760.35

0920.04

0720.02

0610.01 0610.03 0610.04

0770.01

(BEYOND)

2650.05 0540.02

0405.01 0420.03 0510.01 0510.02 0510.04 0510.05 0520.01 0530.04 0540.01 0540.02 0540.06

0760.35

TOP OF STEEL 119' - 0"

0720.04

0310.05 0320.01 0330.01 0330.06

3 A3.3

3' - 4"

0750.07

02

0720.01 0720.02 0720.04 0720.08 0720.10 0720.20

0740.03 0725.04

0920.27

0610.07

0510.05

0540.01

0720.21

0740.03

4 A3.3

0720.21 0725.01 0725.02

0420.03

(TYPE B)

0950.01

6 A3.3

0920.17 0920.28

B.O. CEILING 110' - 0"

0725.03 0725.04 0740.03 0750.01 0750.02

0920.17 0950.10

(TYP)

0930.01

0950.10

0880.13

0920.17

0840.01

0750.03 0750.07

0950.01 1010.05

FLEX. CLASSROOM 118

0930.01

PLAY AREA 117B

0760.02 0760.03 0760.06 0760.07 0760.13 0760.35

0510.02 0760.02

0770.01 0770.03

0790.01 0320.01 3210.09 3160.01 3120.03

0770.04

0310.05

SLOPE

0770.14

3210.09 0790.01

FIRST F.F. 100' - 0"

0770.18 0770.24 0770.29

0330.01 3120.03 0320.01

FIRST F.F. 100' - 0"

0790.01 0840.01 0840.05 0880.13 0920.02

0340.06 0720.20

0920.03 0330.06

0920.04

0725.01 0310.05

SLOPE

3120.01

0340.06

3160.01

0720.20

(BEYOND)

0920.07 CRAWL SPACE 96' - 0"

0920.15

0725.01

(CRAWL SPACE)

0920.17

0330.06 3120.01

SLOPE

0920.18

3160.01

0920.27 0920.28 0920.35 0930.01 0950.01 0950.10 1010.05 2650.04 2650.05 3120.01 3120.03 3160.01 3210.09

1/2" = 1'-0"

ANNE FRANK EARLY CHILDHOOD CENTER 02'

RE: PLAN

0750.07

0510.01

0760.35

0720.10

0610.08

0750.02

0720.08

0610.07

LOCATION: DESIGN: IGOR’S ROLE: PHASES WORKED: MEDIA:

D

0610.01 0790.01

RE: PLAN

0540.06 0840.05

0840.01 0405.01 0920.35 0920.35 0510.02 0540.02 0720.02

0840.01

0610.03

WALL SECTION AT CLERESTROY

1 WALL SECTION

1/2" = 1'-0"

0760.13

SLOPE

0770.14 0725.02 0770.04 0750.01 0920.27

T.O. SILL

0720.04 0610.04

117' - 4"

0920.28

0750.03

0920.03

0720.10 0610.04

DALLAS, TEXAS BRW ARCHITECTS DESIGN ASSIST AND VISUALIZATION 7 SECTION DETAIL 6 SECTION DETAIL 5 SECTION DETAIL DD, CD, CA SKETCHUP, LUMION, PHOTOSHOP, REVIT 0720.04

0510.04

0725.03 0920.27

0790.01

0720.01

0540.01 0610.07

0510.05

0725.04

0750.07 0720.08 0530.04

0760.35 0750.07 0720.10

12" MIN. FLASHING HEIGHT

2 WALL SECTION

SITE PLAN

0740.03 0725.04 0610.07

0750.02 0610.03 0760.13

0720.08 0610.07

0510.04

0610.28

0760.03

0510.01

HIGH ROOF T.O.S. 120' - 6"

(BEYOND)

0540.02 0920.15

0610.01

HIGH ROOF T.O.S. 120' - 6"

0840.01

0770.24

8" TYP.

0610.07

0740.03

0725.04

0770.03

0510.01

8" TYP.

0920.02

1 1/2" = 1'-0"

1 1/2" = 1'-0"

1 1/2" = 1'-0"

4

SECTION DETAIL 1 1/2" = 1'-0"

0740.03 0770.24

3 SECTION DETAIL 1 1/2" = 1'-0"

100% CONSTRUCTION DOCUMEN

PROJECT DESCRIPTION: The Anne Frank namesake inspired the design concept of Color and Light. Understanding that young children learn experientially, BRW planned the school around active learning spaces, with ample views to the outdoors. The exterior façade uses color and form to greet students each day. The drop-off canopy is accented by cheery-yellow pylons, while a large front porch trellis creates playful shadows. A bright orange tower flanks the entry door and serves as a sky lit reading nook within the collaborative classroom. With various types of learning spaces, both inside and outside, the children at Anne Frank ECC will have a great jumpstart towards elementary school.

10

VOID FORMS DOWEL INTO CONCRETE SLAB CONCRETE (RE: STRUCTURAL) CONCRETE GRADE BEAM ON VOID FO (RE: STRUCTURAL) 8" PRECAST CONCRETE HOLLOW COR PLANK WITH 2" TOPPING SLAB (RE: STRUCTURAL) FLASHING END DAM 4" FACE BRICK STEEL STRUCTURE (RE: STRUCTURAL STEEL COLUMN (RE: STRUCTURAL) STEEL ANGLE (RE: STRUCTURAL) STEEL CHANNEL (RE: STRUCTURAL) STEEL JOIST (RE: STRUCTURAL) METAL ROOF DECK (RE: STRUCTURAL COLD-FORMED METAL FRAMING 6" METAL STUDS AT 16" O.C. 2" COLD-FORMED METAL CHANNELS A O.C. SHIM AS REQUIRED 2X WOOD BLOCKING 2X PRESSURE TREATED FIRE RETARD WOOD BLOCKING 3/4" EXTERIOR GRADE PLYWOOD 2 LAYERS 3/4" EXTERIOR GRADE PLYW BLOCKING 3" SOUTHERN PINE LAMINATED WOOD DECKING WITH EXPOSED WESTERN R CEDAR 3 1/2" BATT INSULATION 6 1/4" BATT INSULATION 1 1/2" RIGID CONTINUOUS INSULATION 4" RIGID INSULATION 3/4" RIGID INSULATION COVERBOARD SPRAYED INSULATION (CONTINUOUS R OF 8.3) 1 1/2" SPANDREL INSULATION UNDERSLAB VAPOR BARRIER SELF ADHERING MODIFIED BITUMINOU SHEET AIR BARRIER PLASTIC FILM AIR BARRIER FLUID-APPLIED MEMBRANE AIR BARRI PREFINISHED METAL WALL / SOFFIT P ROOFING BASE FLASHING SYSTEM EXTEND ROOFING MEMBRANE TO OUT FACE OF BLOCKING 4" CANT 2-PLY MODIFIED BITUMEN MEMBRANE ROOFING SYSTEM THROUGH-WALL FLASHING (WITH WEE 2'-0" O.C.) PREFINISHED METAL GUTTER (5" X 5") PREFINISHED METAL DOWNSPOUT (4" HOT-DIPPED GALVANIZED METAL OVE SCUPPER (8" H X 12" W CLEAR) WITH PREFINISHED METAL FACING PREFINISHED METAL FASCIA PREFINISHED METAL FASCIA FLASHIN SYSTEM PREFINISHED METAL COPING SYSTEM PREFORMED PREFINISHED METAL FLA WITH ALL SEAMS WELDED WATERTIGH PREFINISHED METAL REGLET WITH SE AND COUNTERFLASHING PRESSURE BAR WITH MECHANICAL FASTENERS CONCRETE SPLASH BLOCK VENTED SCREED (F-MOLDING) DAYLIGHT TUBE WITH INTEGRAL SECU WIRE GUARD SEALANT WITH BACKER ROD AS REQU ALUMINUM STOREFRONT CONTINUOUS ALUMINUM SILL FLASHIN GLASS TYPE #13 (1/4" SPANDREL) 2 1/2" METAL STUDS (20 GAUGE MINIM 16" O.C. 3 5/8" METAL STUDS (20 GAUGE MINIM 8" O.C. 3 5/8" METAL STUDS (20 GAUGE MINIM 16" O.C. 6" METAL STUDS (20 GAUGE MINIMUM) O.C. SUSPENDED 2 1/2" METAL STUDS AT 2 (WITH UPLIFT BRACING AT EXTERIOR LOCATIONS) SUSPENDED GYPSUM BOARD ON MET FRAMING 7/8" PORTLAND CEMENT STUCCO SYS WITH REINFORCING MESH ON METAL L 1/2" GYPSUM SHEATHING 5/8" GYPSUM BOARD (TYPE X) CORNER BEAD, TYPICAL CERAMIC TILE SUSPENDED ACOUSTICAL LAY-IN TILE (2' X 2') CEILING EDGE TRIM 2" HIGH TACKSTRIP PENDANT LIGHT FIXTURE COVE-MOUNTED LIGHT FIXTURE GRADE COMPACTED SUBGRADE CONCRETE PIER (RE: STRUCTURAL) 4" CONCRETE SIDEWALK WITH #3'S AT O.C.E.W.


TRELLIS

0770.18 0750.07

SIM. O.H.

0720.10 0720.08 0520.01

0510.02

3 A1.3

0720.10

0920.28

0720.02

0720.08

0725.03

0510.01

0720.04

0720.04

2650.04

0725.03

0610.07 0610.08

ROOF T.O.S. 115' - 0"

0750.07

0920.27

(TYP.)

0720.02

T.O. WALL 15' - 10"

0760.35

0920.04

0540.02

0610.01 0610.03 0610.04

0770.01

(BEYOND)

2650.05

0610.28 0720.01 0720.02 0720.04 0720.08 0720.10 0720.20

0740.03 0725.04

0920.27

0610.07

0510.05

0540.01

0720.21

0740.03

4 A3.3

0720.21 0725.01 0725.02

0420.03

(TYPE B)

0950.01

6 A3.3

0920.17 0920.28

B.O. CEILING 110' - 0"

0725.03 0725.04 0740.03 0750.01 0750.02

0920.17 0950.10

(TYP)

0930.01

0950.10

0880.13

0920.17

0840.01

0750.03 0750.07

0950.01 1010.05

FLEX. CLASSROOM 118

0930.01

PLAY AREA 117B

0760.02 0760.03 0760.06 0760.07 0760.13 0760.35

0510.02 0760.02

0770.01 0770.03

0790.01 0320.01 3210.09 3120.03

0770.04

0310.05

3160.01

SLOPE

0770.14

3210.09 0790.01

FIRST F.F. 100' - 0"

0770.18 0770.24 0770.29

0330.01 3120.03 0320.01

FIRST F.F. 100' - 0"

0790.01 0840.01 0840.05 0880.13 0920.02

0340.06 0720.20

0920.03 0330.06

0920.04

0725.01 0310.05

SLOPE

3120.01

0340.06

3160.01

0720.20

(BEYOND)

0920.07 CRAWL SPACE 96' - 0"

0920.15

0725.01

(CRAWL SPACE)

0920.17

0330.06 3120.01

SLOPE

0920.18

3160.01

0920.27 0920.28 0920.35 0930.01 0950.01

CLERESTORY CORNER DETAIL

1 WALL SECTION 1/2" = 1'-0"

D 02'

0760.35 0750.02

0720.10

0610.08

0720.08

0610.07

0540.06 0840.05

0920.35 0920.35 0510.02 0540.02 0720.02

0840.01

0760.13

0720.04

0510.04

0725.03 0920.27 0790.01

0720.01

0540.01 0610.07

0510.05

0725.04

SLOPE

0770.14 0725.02 0770.04 0750.01 0920.27

T.O. SILL

0720.04 0610.04

117' - 4"

0920.28

0750.03

0920.03

0720.10 0610.04 0750.07 0720.08 0530.04

0760.35 0750.07 0720.10

0740.03 0725.04 0610.07

0750.02 0610.03 0760.13

0720.08 0610.07

0510.04

0610.28

0760.03

0510.01

HIGH ROOF T.O.S. 120' - 6"

(BEYOND)

0540.02 0920.15

0610.01 HIGH ROOF T.O.S. 120' - 6"

0840.01 0770.24

8" TYP.

PERMITTING, OR PERMITTING, PERMITTING,OR OR PERMITTING, OR CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION LISA W. LAMKIN LISA LISAW. W.LAMKIN LAMKIN LISA W. LAMKIN TX REG. NO. 12494 TX TXREG. REG.NO. NO.12494 12494 TX REG. NO. 12494

0790.01

0405.01 0510.01

0610.03

0610.01

RE: PLAN

0840.01

RE: PLAN 0750.07

REVISION

1/2" = 1'-0"

12" MIN. FLASHING HEIGHT

WALL SECTION READING NOOK 2 WALL SECTION

DALLAS ISD ANNE FRANK EARLY CHILDHOOD CENTER

0950.10 1010.05 2650.04 2650.05 3120.01 3120.03 3160.01 3210.09

21508900

0920.07

BRW PROJECT NUMBER

0750.01

5 A3.3

0510.01 ROOF T.O.S. 115' - 0"

.

AH, LWL

0920.18

0770.29

4' - 11"

ID, CV, DD

0750.01

0510.01

A1.3

AUGUST 19, 2016

0740.03

0750.07 0720.08

2

0840.01

CHECKED BY

0760.07

HIGH ROOF T.O.S. 120' - 6"

0760.06 0840.05

7 A3.3

SIM. O.H.

DRAWN BY

0760.03

0725.03 0920.27 0770.04

0405.01 0420.03 0510.01 0510.02 0510.04 0510.05 0520.01 0530.04 0540.01 0540.02 0540.06

0760.35

TOP OF STEEL 119' - 0"

0720.04

DATE

0920.18

DATE

19 A1.3

0740.03

VOID FORMS DOWEL INTO CONCRETE SLAB CONCRETE (RE: STRUCTURAL) CONCRETE GRADE BEAM ON VOID FORMS (RE: STRUCTURAL) 8" PRECAST CONCRETE HOLLOW CORE PLANK WITH 2" TOPPING SLAB (RE: STRUCTURAL) FLASHING END DAM 4" FACE BRICK STEEL STRUCTURE (RE: STRUCTURAL) STEEL COLUMN (RE: STRUCTURAL) STEEL ANGLE (RE: STRUCTURAL) STEEL CHANNEL (RE: STRUCTURAL) STEEL JOIST (RE: STRUCTURAL) METAL ROOF DECK (RE: STRUCTURAL) COLD-FORMED METAL FRAMING 6" METAL STUDS AT 16" O.C. 2" COLD-FORMED METAL CHANNELS AT 16" O.C. SHIM AS REQUIRED 2X WOOD BLOCKING 2X PRESSURE TREATED FIRE RETARDANT WOOD BLOCKING 3/4" EXTERIOR GRADE PLYWOOD 2 LAYERS 3/4" EXTERIOR GRADE PLYWOOD BLOCKING 3" SOUTHERN PINE LAMINATED WOOD DECKING WITH EXPOSED WESTERN RED CEDAR 3 1/2" BATT INSULATION 6 1/4" BATT INSULATION 1 1/2" RIGID CONTINUOUS INSULATION 4" RIGID INSULATION 3/4" RIGID INSULATION COVERBOARD SPRAYED INSULATION (CONTINUOUS R-VALUE OF 8.3) 1 1/2" SPANDREL INSULATION UNDERSLAB VAPOR BARRIER SELF ADHERING MODIFIED BITUMINOUS SHEET AIR BARRIER PLASTIC FILM AIR BARRIER FLUID-APPLIED MEMBRANE AIR BARRIER PREFINISHED METAL WALL / SOFFIT PANEL ROOFING BASE FLASHING SYSTEM EXTEND ROOFING MEMBRANE TO OUTSIDE FACE OF BLOCKING 4" CANT 2-PLY MODIFIED BITUMEN MEMBRANE ROOFING SYSTEM THROUGH-WALL FLASHING (WITH WEEPS AT 2'-0" O.C.) PREFINISHED METAL GUTTER (5" X 5") PREFINISHED METAL DOWNSPOUT (4" X 4") HOT-DIPPED GALVANIZED METAL OVERFLOW SCUPPER (8" H X 12" W CLEAR) WITH PREFINISHED METAL FACING PREFINISHED METAL FASCIA PREFINISHED METAL FASCIA FLASHING SYSTEM PREFINISHED METAL COPING SYSTEM PREFORMED PREFINISHED METAL FLASHING WITH ALL SEAMS WELDED WATERTIGHT PREFINISHED METAL REGLET WITH SEALANT AND COUNTERFLASHING PRESSURE BAR WITH MECHANICAL FASTENERS CONCRETE SPLASH BLOCK VENTED SCREED (F-MOLDING) DAYLIGHT TUBE WITH INTEGRAL SECURITY WIRE GUARD SEALANT WITH BACKER ROD AS REQUIRED ALUMINUM STOREFRONT CONTINUOUS ALUMINUM SILL FLASHING GLASS TYPE #13 (1/4" SPANDREL) 2 1/2" METAL STUDS (20 GAUGE MINIMUM) AT 16" O.C. 3 5/8" METAL STUDS (20 GAUGE MINIMUM) AT 8" O.C. 3 5/8" METAL STUDS (20 GAUGE MINIMUM) AT 16" O.C. 6" METAL STUDS (20 GAUGE MINIMUM) AT 16" O.C. SUSPENDED 2 1/2" METAL STUDS AT 2'-0" O.C. (WITH UPLIFT BRACING AT EXTERIOR LOCATIONS) SUSPENDED GYPSUM BOARD ON METAL STUD FRAMING 7/8" PORTLAND CEMENT STUCCO SYSTEM WITH REINFORCING MESH ON METAL LATH 1/2" GYPSUM SHEATHING 5/8" GYPSUM BOARD (TYPE X) CORNER BEAD, TYPICAL CERAMIC TILE SUSPENDED ACOUSTICAL LAY-IN TILE CEILING (2' X 2') CEILING EDGE TRIM 2" HIGH TACKSTRIP PENDANT LIGHT FIXTURE COVE-MOUNTED LIGHT FIXTURE GRADE COMPACTED SUBGRADE CONCRETE PIER (RE: STRUCTURAL) 4" CONCRETE SIDEWALK WITH #3'S AT 18" O.C.E.W.

5201 CELESTIAL ROAD DALLAS, TX 75254

0340.06

0610.28

COPYRIGHT © 2016 BROWN REYNOLDS WATFORD ARCHITECTS, INC.

0720.08 0510.01

0510.01

0310.05 0320.01 0330.01 0330.06

3 A3.3

3' - 4"

0720.10

00

0770.01

INTERIM REVIEW INTERIM INTERIMREVIEW REVIEW INTERIM REVIEW DOCUMENTS DOCUMENTS DOCUMENTS DOCUMENTS NOT FOR REGULATORY NOT NOTFOR FORREGULATORY REGULATORY NOT FOR REGULATORY APPROVAL, APPROVAL, APPROVAL, APPROVAL,

KEYNOTES

D 0750.07

02

0610.07

0740.03

0725.04

0770.03 0510.01

8" TYP.

0740.03 0770.24

NO.

0920.02

7

SECTION DETAIL 1 1/2" = 1'-0"

6

SECTION DETAIL 1 1/2" = 1'-0"

5

SECTION DETAIL 1 1/2" = 1'-0"

4

SECTION DETAIL 1 1/2" = 1'-0"

3 SECTION DETAIL 1 1/2" = 1'-0"

A3.3 100% CONSTRUCTION DOCUMENTS

WALL SECTIONS & SECTION DETAILS

MAIN ENTRY BUILT VIEW

11


SOUTH FACADE AT WEST ENTRY (rendering by HGA Architects)

AGGIE BAND HALL (rendering by HGA)

LOBBY MEZZANINE (rendering by HGA)

TEXAS A&M - MUSIC ACTIVITIES CENTER LOCATION: COLLEGE STATION, TEXAS ASSOCIATE ARCHITECT: HGA ARCHITECTS ARCHITECT OF RECORD: BRW ARCHITECTS IGOR’S ROLE: DESIGN DETAIL AND LEAD PROJECT COORDINATOR: STRUCTURAL, MEP, CIVIL, LANDSCAPE, ACOUSTICAL PHASES WORKED: CONSTRUCTION DOCUMENTS MEDIA: REVIT PROJECT DESCRIPTION: From football games to formal concerts, Texas A&M has a rich musical tradition, one that includes a wide variety of performances and covers a diverse set of genres. The new Music Activities Center will accommodate more than 1,300 student musicians who participate in the bands, choirs, and orchestras at Texas A&M University. It contains a practice field that is a mirror image of Kyle Field for the band to perform and practice on. The new Music Activities Center will contain the following musical activities: The Fightin’ Texas Aggie Band, Wind Symphony, Symphonic Winds, Symphonic Band, Concert Band, Sponsored Student Music Ensembles, Jazz Ensemble I and II, Aggieland Orchestra, Singing Cadets, Century Singers, Women’s Chorus, Chamber Orchestra, and Philharmonic Orchestra.

12


NORTH FACADE FROM PRACTICE FIELD (rendering by HGA)

1

1 1

1

2' - 3"

2' - 3"

0610.05

0610.01

0740.15 (BEYOND) 0840.12

1' - 1"

11' - 4"

11' - 4" 11' - 4"

11' - 4"

1' - 1"

1' - 1"

0540.02

NOTE: REFERENCE 5/A502 FOR BASE WALL CONDITION

0920.02 0920.02 0510.01 0510.01 0740.11

MP-1 0740.11 0920.02

0740.11

0510.01 0740.11

PLAN DETAIL 3 PLAN DETAIL 33PLAN DETAIL 0920.04 PLAN DETAIL 30720.02 1" = 1'-0"

0920.02 0510.01

1" = 1'-0"

MP-1 MP-1

0790.01

MP-1

0610.01

1 1

5' - 3"

2' - 3"

1' - 1"

0740.15

5' - 4"

8"

T.1 MP-1 0740.11 0610.07 MP-1 0610.07 0725.02

8"

8"

0725.02

PLAN DETAIL PLAN DETAIL 6 0920.02 66PLAN DETAIL PLAN DETAIL 60510.01 0740.11 MP-1

0920.02 T.1 0920.02 0510.01 0510.01 0740.11

T.1 T.1

NOTE:

8"

11' - 4"

0920.02 0510.01 0920.02MP-1 0740.11 0610.07 0510.01 0725.02 0740.11 MP-1 0740.15 MP-2 0610.07

1" = 1'-0"

1' - 2"

8" BRICK LEDGE

0420.14 8" BRICK 0420.14 LEDGE 0420.10 0420.14 0420.10 (CHEVRON 0420.10 (CHEVRON 0420.14 REFERENCE 5/A502 FOR PATTERN) PATTERN) (CHEVRON 0420.10 PATTERN) (CHEVRON PATTERN) 0420.01

0720.05 (BELOW) 0420.01

1" = 1'-0"

BASE SLL WALL C1

0920.04

0920.04 0920.04 0720.02 0720.02 0790.01

2' - 0"

0720.02 0790.01 0920.04 0610.01

1

1' - 1"

MP-1

5

0725.02 0740.15

4' - 11"

2

3

3.3

3.8 3.9 4

0770.01 0750.09 0980.11

4.8 5

2 A302

5.8

6

6.8 7

1 A302

0760.35 FB-1

0770.24 0420.04

0510.01 0920.28 (2 LAYERS)

14

0980.06

BUILDING SECTION

RE:1 / A305

SHELF

1' - 1"

0330.02

1010.02

13

12

11

10.3 10.1

1 A301

10

9

2 A301

RE:2 / A306

10' - 4"

0770.01

SLOPE RE: STRUCT.

FIRST F.F. 100' - 0"

8" CMU 8" CMU 19' - 5" 19' - 5"

8" CMU

19' - 5" 19' - 5"

8" CMU 7" 7"

6' - 4" 6' - 4"

6' - 4"

7"

6' - 4"

0920.04 0980.14

LEDGE

0920.28 (3 LAYERS) 0510.03

1.00°

9

1' - 2"

MKBD

8"

1 A301

8"

10

MP-1

10.1 10.3

0540.02 0720.02

0420.03 0420.13 11 0720.05 (BELOW) 0420.01

12

14 BAND T.O.S. 151' - 0"

0750.09 0950.08

8

"

CONCERT REHEARSAL 157

REHEARSAL T.O.S. 139' - 0"

0950.01

ROOF T.O.S. 132' - 0" 0770.01 0420.03 0740.15

CORRIDOR 212

SECOND F.F. 116' - 0"

CHORAL ENSEMBLE 164

CHORAL ENSEMBLE 165

CORRIDOR 163

CHORAL ENSEMBLE 166

0840.12 0880.05 GLS-21

2740.05

13

0920.27

CORRIDOR 162

F

0420.03

0920.28 (2 LAYERS) 0790.01 DIR BANDS 0840.12 212C CORRIDOR 163

5 PLAN DETAIL

8 7.8

1 A302

7 6.8

6

5.8

2 A302

5 4.8

1" = 1'-0"

0980.11 0750.09

STAIR 167 FIRST F.F. 100' - 0"

8" BRICK LEDGE

4 3.9 3.8

3.3 3 A311

SIM

4 PLAN DETAIL 3

1"

STAIR 212J

STAIR 167

0950.01

CON STORAGE 212K

AGGIE BAND SUPPLY STORAGE 212L

CHORAL ENSEMBLE 166

GENERAL EQUIP STORAGE 212M

CHORAL ENSEMBLE 165

CORRIDOR 212

SLL E3 168E

0980.05

4 BUILDING SECTION

1

0.5 BAND T.O.S. 151' - 0"

0770.01

LOW ROOF 143' - 5" REHEARSAL T.O.S. 139' - 0"

0750.09

0550.39 0750.09

ROOF T.O.S. 132' - 0" 0740.15

BUSINESS COORD 212B

WOMEN'S CHORUS STORAGE 174F

2

1'-0"

0550.33

0570.03 0950.08 0750.09

0550.26

WALL SECTION

11 1/2"

8" BRICK LEDGE 8" BRICK

1'-0"

0950.08

0960.01 0330.02 0725.01 0310.05

"

3/32" = 1'-0"

AGGIE BAND 160

3120.01

0790.01 0610.01

SHELF

AB CHAIR RACK 160F

3

0810.04

0330.01

1"

0725.04 0720.05

AGGIE BAND 160

0760.01 0510.04 0720.05

MECHANICAL 202S

CONCERT REHEARSAL 157

B.O. SHELF 111' - 4" 0920.17

RE:1 / A306

0920.14 0610.07

0725.04

2 A301

1.00°

0720.02

0510.01 0610.05 0740.15

CW-2

0920.04

0510.01

0510.04

CONCERT REHEARSAL CONCERT REHEARSAL 157 157

"

0725.04 0920.27

8" BRICK LEDGE

0770.01 0750.09

0510.02

SLOPE 1/4" PER FT.

CONCERT REHEARSAL 157 CONCERT REHEARSAL 157

DETAIL PLAN0540.02 DETAIL 4 PLAN 1" 1'-0" 1" 1'-0" DETAIL 44PLAN 1" 1'-0" 0720.02 PLAN DETAIL

7.8 8

CW-2

0920.04

0610.04

0720.11 0530.05

0980.05 0950.08

0920.28

0510.04

0920.27

MP-2

8" BRICK LEDGE

4

1

F F

CANOPY TURNDOWN ABOVE

0750.09

1' - 0"

1' - 8"

0760.16 0720.02

F

PLAN DETAILS AT BRICK CHEVRON BRICK

0840.05 0740.11 0730.04

F

1

1' - 2"

RE:2 / A305

1

0920.28 (3 LAYERS) 0510.03

2' - 3"

FB-1 FB-2 0920.07

0920.28 (3 LAYERS) 0510.03 (3 LAYERS) 0510.03

1.00°

1.00°

0420.01 0720.05

1' - 2"

1" = 1'-0"

0720.05 (BELOW)

1" = 1'-0"

0720.20

0920.04 0920.04 0980.14

(3 1.00° LAYERS) 0980.14 0510.03

1.00°

8 8

11 1/2"

"

SLL C1 157C

1' - 2"

LEDGE

1/4" = 1'-0" 1/4" = 1'-0"

0420.01

MP-2

PLAN DETAILS AT METAL PANEL 6 PLAN DETAIL

1' - 4"

1' - 1"

A5108" BRICK LEDGE 8" BRICK

11 1/2"

0980.14

FB-1 0420.03 FB-1 0420.03 FB-2 0420.03 FB-2 0420.03 0420.13 0420.13 0720.05 (BELOW) 0720.05 0420.01 (BELOW) 0420.01

8

1

SHELF

SHELF

MECHANICAL 202S SECOND F.F. 116' - 0"

AGGIE BAND 160 CONCERT PERCUSSION STORAGE 160E

CORRIDOR 163

0550.26

0740.11

MP-1

0960.13

CONCERT REHEARSAL 157

SLL D1 157D

1230.01

6' - 0"

4' - 6"

163

1' - 1"

PLAN DETAIL 5 1" = 1'-0" DETAIL 1" = 1'-0" DETAIL 55PLAN 1" = 1'-0" PLAN DETAIL

8"

4' - 11"

0740.11 0610.07

1' - 2"

1

8" BRICK LEDGE

0920.04

1" = 1'-0"

(20920.28 LAYERS) 1.00° 0790.01 (2 LAYERS) 0920.28 0840.12 0790.01 0840.12 CORRIDOR (2 LAYERS) CORRIDOR0840.12 0790.01 163 CORRIDOR 163 0840.12 163 CORRIDOR

1' - 1"

0420.14 0420.10 (CHEVRON PLAN PATTERN)

T.1

0510.01

1

A510

PLAN DETAIL 1 PLAN DETAIL 11PLAN DETAIL 1 PLAN DETAIL

1.00°

0610.01

8" BRICK LEDGE

0920.02

1.00°

0790.01 0610.01 2' - 3"

0720.02 0790.01 0610.01

S 3 SIM A502 3 A502

SIM 1

0920.28 FOR BASE 0980.14 NOTE: REFERENCE 4/A502 WALL 0920.28 CONDITION 0920.04

CANOPY TURNDOWN CANOPY ABOVE TURNDOWN ABOVE

0420.03 0420.13 FB-1 0420.03 0720.05 0420.03 FB-2(BELOW) 0420.13 0420.01 0540.02 0540.02 0720.05 0720.02 (BELOW) 0720.02 0920.27 0420.01 0920.27 0725.04 8 " 0725.04 0720.05 0720.05 0920.28

1 1

2' - 3"

2' - 3" 11 1/2"

2 PLAN DETAIL

FB-2

0920.27 0540.02 0725.04 0720.02 0720.05 0920.27 0920.28 0725.04 (2 LAYERS) 1.00° 0720.05 0790.01

1

0540.02 0720.02 0720.02

CANOPY TURNDOWN ABOVE CANOPY TURNDOWN ABOVE FB-1 0420.03

0540.02 0720.02

11 1/2"

0725.04 0725.04 0920.27 0920.27 0540.02

0540.02 0720.02

1" = 1'-0"

3 A502 8" BRICK LEDGE

1/4" = 1'-0"

1 0420.01 2' - 3" 0420.01 0720.05 0720.05

0725.04 0420.01 0920.27 0720.05 0540.02 0725.04 0720.02 0920.27

157C

J

CONCERT REHEARSALSIM 3 157 A502

1/4" = 1'-0"

2' - 3"

0420.01 0720.05

SLL C1 SLL C1 157C 157C CONDITION

J

1

8"

A510

45.0 0°

2' - 3"

0420.01 0720.05 0720.05 (BELOW) (BELOW)

0720.05 (BELOW)

DETAIL PLAN DETAIL 1" = 1'-0" DETAIL 22PLAN 1" = 1'-0" DETAIL

2' - 3"

SLL C1 157C

0420.01

3 PLAN DETAIL

0725.02 0740.15 MP-2 0740.15 MP-2

MP-2

1" = 1'-0" 1" = 1'-0"

0725.04 PLAN 0720.05 1" = 1'-0"

LEDGE 8" BRICK LEDGE

45.00 ° 45.00 °

0420.10 (BELOW) NOTE: REFERENCE 4/A502 FOR BASE WALL CONDITION 0420.01 NOTE: REFERENCE 4/A502 FOR BASE WALL CONDITION

0920.28 PLAN 1.00° 1" = 1'-0" (2 LAYERS) 0790.01 0840.12 CORRIDOR 163 1 1

8" BRICK

2' - 3"

3 5/8"

1

2 2

1" = 1'-0" 1" = 1'-0"

F

NOTE: REFERENCE 4/A502 FOR REFERENCE BASE WALL CONDITION 1 NOTE: 4/A502 FOR BASE WALL CONDITION

NOTE: REFERENCE 5/A502 FOR BASE WALL0920.27 CONDITION

5' - 3"

1

1' - 2"

1' - 2"

0720.02 NOTE: REFERENCE 5/A502 FOR REFERENCE BASE WALL CONDITION NOTE: 5/A502 FOR BASE WALL CONDITION

4 4 A510 A510

4

CONCERT REHEARSAL CONCERT REHEARSAL 157 157

4" CMU 4" CMU

0720.02 0790.01 0920.04 0610.01 0720.02 0790.01

MP-1

4 A510

CONCERT REHEARSAL 157 CONCERT REHEARSAL 157

13' - 0" 13' - 0"

0920.04

0980.14

F F

4" CMU

0420.10 (BELOW)

0725.04 MP-2

F

FB-1 0420.03 3 5/8" FB-2 0420.05 3 5/8" FB-1 0420.05 FB-2 0420.03 3 5/8" FB-2 0420.04 FB-2 0420.04 FB-2 0420.05 FB-1 0420.03 FB-1 0420.03 FB-2 0420.03 3 5/8" 0420.04 FB-1 FB-2 0420.05 (CHEVRON CANOPY FB-1 0420.03 (CHEVRON 0420.04 FB-2 PATTERN) PATTERN) (CHEVRON FB-1 0420.03 TURNDOWN 45.00 PATTERN) 45.00 ° ° (CHEVRON ABOVE 0540.02 45.00 0540.02 PATTERN) ° 0420.10 0420.10 0720.02 0540.02 0720.02 45.00 (BELOW) (BELOW) 0420.10 ° 0920.27 0720.02 0420.01 0920.27 0540.02 (BELOW) 0420.01 0420.10 0725.04 0920.27 0725.04 0720.02 0420.03 FB-10420.01 (BELOW) 8 0720.05 0725.04 " 8" 0720.05 0920.27 0420.01 0920.28 FB-2 0420.05 8" 0720.05 0920.04 0920.28 0725.04 1.00° (2 LAYERS) 1.00° 0920.04 (20920.28 LAYERS) 0720.02 8" FB-2 0420.04 0720.05 0790.01 1.00° 0790.01 (2 LAYERS) 45.00 0720.02 0790.01 0920.28 ° 0840.12 0790.01 FB-1 0420.03 0840.12 0790.01 1.00° 0610.01 CORRIDOR (2 LAYERS) CORRIDOR0840.12 0790.01 0610.01 (CHEVRON 163 45.00 CORRIDOR 163 ° 0840.12 PATTERN) 163 CORRIDOR 1' - 2"45 1' - 2" .00° 1' - 1" 163 1

0920.04

0920.28 (3 LAYERS) 0510.03

1.00°

F

CMU 13'4" - 0"

0790.01 0740.11

0920.28 (3 LAYERS) 0510.03

1.00°

0540.02 0720.02

5

13' - 0"

FB-2

1.00°

0725.04 0920.27

CANOPY TURNDOWN CANOPY ABOVE TURNDOWN ABOVE

F

A510

7"

MP-1

0420.03

0720.05 0540.02 0720.02 0720.02

0540.02 0720.02

CANOPY TURNDOWN ABOVE CANOPY TURNDOWN ABOVE FB-1 0420.03

0420.10 (BELOW) (BELOW)

0420.01

0610.05

0610.05

0725.04 0720.05

SLL C1 157C

1.00°

0980.14 0920.28 0920.28 (3 LAYERS) 0510.03 (3 LAYERS) 0510.03

7"

0790.01 0740.11 MP-1 0740.11 0725.04 MP-1 0725.04 0610.05

0725.04

0725.05

0420.10

0420.03 (BELOW) 0420.01 (CHEVRON 0420.10 PATTERN) (BELOW)

FB-1

SLL C1 157C

0420.01 0420.01 0420.10

0920.28 0920.04 (3 1.00° LAYERS) 0980.14 0510.03

1

2 S A502 2 A502

7"

MP-1 0420.03 FB-2 0725.04 0790.01 0720.05 MP-1 0740.11 MP-1 0420.03 FB-2 0725.04 0790.01 0610.05 0740.11 MP-1

0725.05

0725.04 0725.04 0720.05 MP-1 0720.05 0420.03 MP-1 FB-2 0420.03 0790.01 FB-2

0420.03 (CHEVRON PATTERN) 0420.01

FB-1

SLL C1 SLL C1 157C 157C

5

11 1/2" 0920.04 0920.04 0980.14

0980.14

0725.04 0920.27 0420.01 0920.27 0540.02

1

F

SIM A510

1

11 1/2" 11 1/2"

0920.04 2' - 3"

7"

0420.01

0420.03 FB-1 FB-2 0420.05 (CHEVRON 0420.04 FB-2 PATTERN)

0420.05 0420.04

FB-2 FB-2

0725.04 0420.01 0920.27 0720.05 0540.02 0725.04 0720.02 0920.27

1 1

2' - 3"

2' - 3" 11 1/2"

7"

0725.04 0720.05

0420.01 0420.01

SLL C1 157C

11 1/2"

1

0420.01 2' - 3" 0420.01 0720.05 0720.05 0725.04

7"

0610.01 0790.01

0510.02 0510.01

S

2' - 3"

0420.01 0720.05

1 SIM 2 A502

7"

0610.01 0610.01 0790.01 0790.01 0725.05

0420.01

0980.20

0510.01 0840.12

0420.01

S

0725.05

0720.01 0920.28 0840.13 0510.04

0720.01 0920.03

0540.02 0920.27

0725.05 0610.01 0790.01

0920.28 (4 LAYERS) 2 0530.03

0920.02

0720.02

0610.01 0790.01

1

FB-2 1 0420.05 FB-2 0420.04 FB-2 0420.05 FB-2 0420.03 1FB-1 0420.04 (CHEVRON FB-1 0420.03 PATTERN) (CHEVRON PATTERN)

1

1 1 2' - 3"

2' - 3"

1

8"

0760.35 0720.20

3' - 8"

0720.01 0920.03

0720.11 0720.08

S S

2' - 3"

2' - 3"

0420.05 0420.04

FB-2 FB-2

1

1

8"

0790.01 0840.12

0720.09

1 2' - 3"

1

8"

BAND T.O.S. 151' - 0"

0720.02 0540.02 0540.02 0920.27 0920.27

8"

0920.14 0740.15 0770.24

3' - 8"

0770.24 0725.04

0840.12

0720.01 0920.03

0920.28 0920.28 (2 LAYERS) (2 LAYERS) 0920.03 0920.03 0920.28 0920.28 0720.02

8"

MP-2

0510.01

0510.01

0920.03 0920.28 0920.28 (2 LAYERS) 0720.02 0920.03 0540.02 0920.28 0920.270720.01 0720.02 0720.01 0920.03 0540.02S 0920.03 0920.27

2' - 3"

2 A502

8"

0740.15 0760.35

0610.05 0750.09

0920.28 0920.07 0920.07 0920.280920.28 0510.03 0920.07 0510.03 0920.28 0510.01 (2 LAYERS) 0510.03 0510.01 0920.07 0790.01 0510.01 0790.01 0510.03 0920.03 0840.12 0790.01 0840.12 0510.01 0920.28 0840.12 0790.01

0920.07 0510.03

0920.04

0610.05

0920.28 (2 LAYERS)

0920.28

0920.28

0720.01

0510.04 MP-2

0770.28 0790.02

8"

A

8"

1

SLOPE 1/4" PER FT.

1' - 6" 1' - 6"

5' - 10"

1' - 6"

0720.11

1' - 6"

2 A511 0770.28 0610.04

0530.04 0510.04

1' - 6"

0750.09 0720.09

2' - 3"

1

FIRST F.F. 100' - 0"

0960.13

3/32" = 1'-0"

BUILDING SECTIONS

13


LOBBY (SKP + LUMION + PS) E

2 A333

1' - 0"

1' - 0"

28' - 10"

8"

1/2"

19 TREADS @ 11" = 16' - 5 1/4"

SECOND F.F. 116' - 0"

1/2"

3' - 6" T.O. GUARDRAIL 2' - 10" T.O. HANDRAIL

EQ.

EQ.

1/2"

EQ.

1/2"

5' - 0" LANDING EQ.

1/2"

EQ.

8 TREADS @ 11" = 7' - 4"

1/2"

2' - 9 1/2"

1/2"

3' - 11 1/2"

0640.54

1/2"

10 1/2"

1/2"

EQ.

1/2"

EQ.

1/2"

1' - 0 1/2"

0570.24 (TYP.)

0550.29

B.O. SOFFIT 113' - 6" 3 A335

4 A335

0640.10 0550.77 0510.01 0920.02

1"

0620.19

(TYP.)

0570.13 0570.18 (TYP.) 0640.62 0570.24 0640.54

0330.02 FIRST F.F. 100' - 0"

0550.29

3 A333

2' - 10" T.O. HANDRAIL

0420.03 0960.01

3' - 6" T.O. GUARDRAIL

LOBBY 100

0620.23 0550.72 0740.28

1' - 7"

9 EQ. OPEN RISERS @ 7" MAX = 5' - 2"

19 EQ. OPEN RISERS @ 7" MAX = 10' - 10"

11"

0725.01 3120.03

COURTYARD (SKP + LUMION + PS)

2 A335

LOBBY STAIR SECTION

TEXAS A&M KINGSVILLE - ADMINISTRATIVE SERVICES BUILDING LOCATION : KINGSVILLE, TEXAS ARCHITECT OF RECORD : BRW ARCHITECTS IGOR’S ROLE : DESIGN DETAIL & LEAD PROJECT COORDINATOR: STRUCTURAL, MEP, CIVIL, LANDSCAPE PHASES WORKED : CONSTRUCTION DOCUMENTS MEDIA: SKETCHUP, LUMION, PS, REVIT PROJECT DESCRIPTION: The TAMU Kingsville Adminstrative staff needed a building that was reflective of the historic mission-style architecture of the campus, as well as a denoting an entry for the school. BRW designed a hub to house the administrative staff, the campus police department, and spaces to host events for alumni and staff alike. The design challenges include marrying the mission style architecture with contemporary materials by using clay tile roofing, soft brick colors, and darker, more rustic accents. Along with this, the code required the building to have a hurricane-rating, resulting in heavier structural requirements across the entire facility.

14


ENTRY PLAZA (SKP + LUMION + PS) SIM

12 A512

AA

9' - 4"

3"

8' - 0 1/2"

12"

1' - 3 1/2" 12"

3"

1"

0730.07 0730.05 0770.04 T.O. MASONRY 144' - 8" 0420.03 0420.01 0920.27

14 A512

21

0510.01

SIM

0540.01 0510.02 0725.04

1' - 10" RE: PLAN AT SIM.

0420.04 0510.01

0720.02 0760.01

12" 6"

6"

15 A510

0920.18 SIM 1 A623 0720.02 0540.03 0620.19 0510.05

SHELL SPACE (FUTURE OFFICE) 2SH1

0760.02 0840.20

0720.02 0540.03 0620.19 0510.05

P4 P4

6 A512

0920.18 0725.04

0725.04 0920.27 0725.04 0720.07 0540.03

0420.03 0420.01 0720.04 0725.04

5 A512

0770.24

0770.24

6 A512

0920.18 0725.04

0720.02

0725.04

0920.28

0920.27

0360.03 3120.01

0330.02

3120.03

0725.01 FIRST F.F. 0330.05 100' - 0" 3120.03

RE: STRUCT.

3160.01

0920.28

0720.02

0640.10 0920.02 0620.19

0510.01

0510.02

0920.28

P4

12"

0610.01

0510.01 0540.03

0720.02 0510.01

3"

0840.05 0740.29 0725.02 0770.04 0510.06

0510.01

0640.10 0920.02 0620.19 3 A521

12 A510

0880.03

0920.28

0920.28

SECOND F.F. 116' - 0"

0610.01

2' - 5 1/2" 1' - 3 1/2"

0730.05 0730.04 0530.02 0610.07

3 A521

0840.19 0840.05 0960.01 0330.02

SLOPE RE: CIVIL

0920.18 0740.29 0720.04 0920.27 0760.36 0510.01

0510.04 0760.34

LOBBY 100

0920.27

P4 B.O. DECK 110' - 8" 9 A510

SECOND F.F. 116' - 0"

2' - 5 1/2" 1' - 3 1/2" 12"

3"

0840.19 0840.05

FIRST F.F. 100' - 0"

0880.04 3210.09 3210.09 3120.03 0790.01 0320.01

0960.01 0330.02

0725.01

SLOPE 3120.03 RE: CIVIL

0330.05 3160.01

0510.04 0760.34

0420.03 0420.04

1"

B.O. DECK 110' - 8"

0760.36 0510.01

9 A510

2650.03 0880.03

0760.38 0920.27 0920.18 0760.35

0880.04 3210.09 3210.09 3120.03 0790.01 0420.03 0320.01 0420.04 0330.05 3290.10

0420.03 0725.04

0530.02 0610.07

0920.27 0920.18 0740.29 0720.04 0920.27

0420.01

0730.05 0730.04

0540.01

0760.38 0920.27 0920.18 0760.35

2650.03 0880.03

0725.01 3120.03

RE: STRUCT.

0360.03 3120.01

SLOPE RE: CIVIL

0510.01

8' - 3"

0960.13 0960.01

3290.10

3120.03

0530.01 0510.01

0510.01 0540.03

3' - 9"

0760.02

3290.10

P4

12 A510 0530.01 0510.01 0840.05 0740.29 0725.02 0770.04 0510.06

0880.03

LOBBY 100

0420.01

0760.02

0960.01 0330.02 0570.26

P4

0420.01 0720.04

3' - 9"

0420.01

0960.01 0330.02 0570.26

0420.03

OFFICE 103B

0920.27

0920.14 0920.27

B.O. SOFFIT 112' - 0"

0510.02

0570.13

SIM

0840.05 SECOND F.F. 116' - 0" 0920.18 0720.04

0950.01 0540.03

0920.01

0540.01

0920.27 0760.01 0760.37 0760.36 0730.05 0730.04

0610.07 0530.02 0920.27 0920.18 0510.04 0790.01 0510.01

8' - 3"

0770.24

B.O. SOFFIT 112' - 0" 5 A512 B.O. CEILING 108' - 8" 0770.24

2650.03

0420.01

0840.20

0840.20 0510.04 0920.27

0540.03 0920.14 0920.27

0725.04

P4

0720.07

B.O. CEILING 128' - 8"

SIM

0840.05 0470.05 (TYPE CS4)

B.O. CEILING 128' - 8"

0570.13

0840.05 0530.01 F.F. SECOND 116' - 0" 0790.03 0920.18 0510.01 0720.04 0510.03 0725.04 (BEYOND) 0920.27 0725.04

13 A500

0420.03 0920.27

4' - 5"

0840.20 0510.04 0920.27

ROOF T.O.S. 132' - 0"

0840.27

15 A512

2330.01 0620.18 2330.17 0610.25 0510.01

0510.01

0760.02

3 A623

3 A623

P4

2330.01 0620.18 2330.17 0610.25 0510.01

P4

0510.03 0330.02 SIM

ROOF T.O.S. 132' - 0"

0840.22 0840.13 0840.27

10 A510 0920.27 0510.01 0920.18 SIM 1 A623

10 A510 B.O. CEILING 0920.27 124' - 8" P4 0510.01

0510.01

0530.02

0510.01

0725.04

4" MIN.

12"

0720.07

0880.03 0840.19 T.O. PARAPET 0540.02 134' - 2" 0720.20 0840.22 0840.13

0530.02

0920.20 0920.18

14' - 8"

ROOF T.O.S. 132' - 0" 0730.05 0530.02 0730.04 0610.07 0760.38

0880.03 0840.19 0540.02 0720.20

0920.27

T.O. PARAPET 134' - 2"

8"

0510.03

4' - 9"

0760.37

0720.07

0750.03 0610.04

0720.10 SLOPE 1/4" PER FT.

ROOF T.O.S. 132' - 0" 0730.05 0530.02 0730.04 0610.07 0760.38

0750.03 0610.04

0720.10 SLOPE 1/4" PER FT.

4' - 5"

0720.02 0760.01

0720.02 0750.01

0750.14

4' - 9"

0760.37

0720.07 0530.02 0510.01

0540.03 0510.04

0750.02 0610.08

0610.07

0750.14

20

0920.04

0920.18 0880.09

12' - 0" M.O.

0920.27

0920.27

0770.01

1' - 7"

0720.02 0750.01

0920.27

12' - 0"

0540.03 0510.04

19

0920.14

5' - 4"

0750.01 0750.03 0610.04

0610.07

0750.02 0610.08

4' - 5"

0720.04 0725.02

0770.04

14 A510

8' - 3"

T.O. MASONRY 0750.14 137' - 4" 0720.10

0720.04 0725.02

20 0840.19 0770.01

4' - 5"

0540.01 0720.01

0510.06

19 1' - 7"

T.O. MASONRY 137' - 4"

8' - 3"

0610.07

0730.05 0510.05 0770.04 0420.03 0420.01

14 A510

0730.05 0510.05 0770.04 0420.03 0420.01

0740.03 0725.02

SIM

1 A510

5' - 4"

1 A510

10" N AT SIM.

0420.04 0760.01

SIM

0510.01 0540.01

SLOPE RE: CIVIL

0420.03

0920.27

0420.04 0330.05 3290.10

0725.04 0420.03

FIRST F.F. 100' - 0"

FIRST F.F. 100' - 0"

0420.01 0760.01 0360.03 0420.04 0790.01 FIRST F.F. 100' - 0"

SLOPE RE: CIVIL

3210.09 0330.05 3120.03

0330.05 3160.01

3160.01 14 A511

13 A511

13 A511

SIM 14 A511

SIM

1 WALL SECTION

2 WALL SECTION

3 WALL SECTION 3 TOWER SECTION 1/2" = 1'-0"

0

1'

2'

4'

15


ENTRY AT CONNECTION TO HISTORIC WWHS (SKP + LUMION + PS)

SITE

BIM SECTION (REVIT)

WOODROW WILSON HS - GYM AND CLASSROOM ADDITION LOCATION: ARCHITECT OF RECORD: IGOR’S ROLE: PHASES WORKED: MEDIA:

DALLAS, TEXAS BRW ARCHITECTS PROJECT COORDINATOR, VISUALIZATION, DESIGN ASSIST SD, DD, CD, CA SKETCHUP, LUMION, PS, REVIT

PROJECT DESCRIPTION: BRW retained ground area by eliminating part of the incompatible one story 1953 and 1979 additions and constructing a three story addition saving campus area and solving egress issues of the original 1926 building. The addition blends with the 2012 wing and takes architectural cues from and remain sensitive to the historic original structure, while providing a modern counterpoint. The three story classroom addition provides 24 teaching spaces and a new competition Gym with 1,500 seating capacity, competition court, two practice courts and support locker rooms and storage for Athletics. The overall condition of the facility is functioning, however the number and size of most classrooms and program spaces are undersized in comparison to the current DISD Educational Standards and also do not meet the needs of the Board Approved International Baccalaureate application. In addition to general classrooms, Art, Ceramics and Engineering classrooms will be added.

16


T

0725.02 0540.02

1' - 10"

1 A3.6

0770.01 0610.08

(FIRE RETARDANT) 0610.06 0740.03

0420.01

0770.04

SIM

T.O. MASONRY 144' - 3"

0420.03

0750.03

0720.05

0610.04

0725.02

0750.07

0920.27

0720.10

0760.02

0720.11

0770.04

0720.08 0530.02

SLOPE 1/4" PER FT.

0750.07

0530.02

0720.11

0760.39 ROOF T.O.S. 139' - 6" SOFFIT FRAMING 138' - 8 1/2"

0720.08

0720.02 0920.08

0720.02

0920.14

0920.14

0610.05 (FIRE RETARDANT)

1220.09

0725.03

0920.38

0740.28

0920.17

0770.24

0920.28

0760.02

0920.35

0520.01

0880.04 0740.28 (BEYOND)

0950.01

ENGINEERING CLASSROOM 3308

8' - 8"

0510.05

0840.12 0880.06 0720.20 0840.03 0920.04 0980.03 0960.13 0960.01

0780.07

4' - 8"

0920.30

0840.15

THIRD F.F. 126' - 7"

0720.20 0840.17

0920.14 0920.17

0330.02

1220.09

0530.07

0920.38

0510.01

0920.28

0920.08

0920.35

8' - 8"

0950.01

0880.04 0840.12 0880.06 0720.20

CLASSROOM 2311

0330.01 0725.02

0920.04

0310.06

0920.30

0740.29 0725.03

2' - 0"

0770.04 0840.03

2 A3.6

SIM

0840.05 0920.27

0530.02

0960.01

0720.11

0760.39

2' - 8"

0960.13

0960.13

SECOND F.F. 113' - 3 1/2" SOFFIT FRAMING 112' - 0 1/2"

0330.02 0610.04

0510.01

0720.08

0920.14

0980.15

0840.13 1220.09

0610.05 (FIRE RETARDANT)

0920.28

1' - 8"

0530.07 0920.17 0920.28 (2 LAYERS) 0980.07

0840.12

0920.08

0725.03 0740.28

0920.35

0950.09

10"

0880.04

8' - 8"

0510.01

0420.03

MAT ROOM 1412

0840.05

2' - 8"

0920.27 1 A3.5

0725.04 0720.05 0360.03 0760.01

0840.03 0510.05 0540.02 0720.02

3120.01 0310.06 0710.02 0710.06

0920.30 0960.19

0330.03

0725.01 3120.03

FIRST FLOOR 97' - 10"

0725.01 0330.06

0725.06 0340.06

SLOPE RE: CIVIL

3340.13 (CRAWL SPACE) 3340.12 SLOPE RE: CIVIL

3340.11

3160.01

1 WALL SECTION WALL SECTION 1/2" = 1'-0"

COURTYARD

SECTION THROUGH COURTYARD (SKP + LUMION + PS)

17


SECOND FLOOR PLAN

FIRST FLOOR PLAN

SITE

AERIAL OF CAMPUS (SKP + PODIUM + PS)

AMON CARTER RIVERSIDE HIGH SCHOOL - ADDITION LOCATION: DESIGN: IGOR’S ROLE: PHASES WORKED: MEDIA:

FORT WORTH, TEXAS BRW ARCHITECTS A.I.T., CONCEPTUALIZATION, VISUALIZATION PD, SD, DD, CD, CA SKETCHUP, PODIUM, PHOTOSHOP, REVIT

PROJECT DESCRIPTION: BRW added a new dining facility that includes a collegiate-like lounging area for students, and a new kitchen with brand new loading dock. This project also includes an expansion of the existing athletics program to maximize capacity of the school’s growing student and teacher population as well as the renovation of restrooms on campus. The specific project design was created to maintain the historical features currently on campus. It continues the original facade proportions while introducing new materials. Contextually it continues the facade wall while wrapping itself around the baseball field in the back where we had more freedom to introduce new design elements and proportions.

18


SOUTH EAST FACADE FROM THE EXISTING BASEBALL FIELD (SKP + PODIUM + PS)

SOUTH FACADE AT LEARNING STAIR AND CAFETERIA ENTRY

SECOND FLOOR CLASSROOM CORRIDOR

WEST ELEVATION ARTICULATES HISTORIC BUILDING AND COVERED EATING AREA AT DINING HALL

19


ACTIVITY AREAS AND CANOPIES (SKP + LUMION)

GENTLE CREEK COUNTRY CLUB POOL AND ACTIVITY CENTER LOCATION: PROSPER, TEXAS DESIGN: BRW ARCHITECTS IGOR’S ROLE: A.I.T., DESIGN ASSIST AND VISUALIZATION PHASES WORKED: SD MEDIA: SKETCHUP, LUMION

20

OFF COURSE ENTRY (SKP + LUMION)


CABANA AND POOL (SKP + LUMION)

AERIAL OF FACILITY (SKP + LUMION)

21


SOUTH ELEVATION RENDERING (SKP + PODIUM + PS) CLASSROOM ADDITION PROPOSED ENTRY AND PROMENADE

N

SITE PLAN AERIAL AND MASSING (SKP + PS)

WORKMAN JR HIGH SCHOOL - ADDITION AND RENOVATION LOCATION: ARLINGTON, TEXAS DESIGN: BRW ARCHITECTS IGOR’S ROLE: A.I.T. PHASES WORKED: PD, SD, DD, CD, CA MEDIA: SKETCHUP, PODIUM, PHOTOSHOP, REVIT PROJECT DESCRIPTION: The complex site was designed to provide clear separation to accommodate teacher parking, separate bus lanes, hard-scaped edges for parent drop off and a promenade entry plaza for a defined entry point to the large campus. The major classroom addition is sited to enhance the public elevations along the main roadway, Arbrook Street. A large expansive curtain wall façade is in contrast to the 1970’s brick massing, allowing natural light to enhance the daily experience within the new classroom addition. The new design gives the Workman campus a new public identity and a visual connection to the community around the campus. The new facilities include 12 new flexible classrooms, two new science labs, a number of collaboration spaces, a secured central administration entry, and an enlarged Dining and Kitchen facility to address the student population consolidation.

22


BUILDING SECTION AT SOUTH INTERVENTION (SKP)

PROMENADE RENDERING (SKP + PODIUM + PS)

PROMENADE TOWARD RELOCATED ENTRY

SOUTH ELEVATION

23


LOBBY

FORT WORTH ISD - STEM COMPETITION LOCATION: DESIGN: IGOR’S ROLE: MEDIA:

FORT WORTH, TEXAS BRW ARCHITECTS, DLR GROUP CONCEPTUALIZATION, 3D MODELING, SCALE MODELS SKETCHUP, WATERCOLOR BY OTHERS

PROJECT DESCRIPTION: BRW Architects designed a new STEM High School facility for a large school district in North Texas. Our journey begins with listening; the early murmurs of inspiration well up to give voice to your vision: delivering a whole new school for a whole new mind. Collaborative teamwork environments building a solid foundation for the success of generations to come in making our world a better place. Student scientists, artists, musicians, engineers who are heroes of their own story. Let us draw the curtain, rise up and enter this world of imagination, art and soul. Let us take refreshment at the nexus on our journey to the mountaintop. We invite you to build the opportunity for each of our children to go where no student has gone before: the wonderful possibilities of their future.

24


VIEW LOOKING EAST: SOUTH FACADE AND DOWNTOWN IN THE BACKGROUND

ENTRY

25


SITE PLAN

ORGANIZATIONAL DIAGRAMS

ARLINGTON ISD ELEMENTARY SCHOOL LOCATION: DESIGN: YEAR: MEDIA: PROFESSOR:

ARLINGTON, TEXAS IGOR DRASKOVIC UTA CAPPA GRADUATE SCHOOL COMPREHENSIVE STUDIO SKETCHUP, CAD, PODIUM, PS HEATH MACDONALD

PROJECT DESCRIPTION: The elementary school is situated on the site by anchoring the the wedge of the L-shaped site. As the creek flows through the wedge the buildings long axis hug it, articulating the creek and the North-South axis of the site. The two bar buildings surrounding the creek form a courtyard with the creek flowing through it becoming a place for the students to play and learn. The entry of the school is celebrated by a formal park as the orientation of the bar is formal in nature while the west bar is acknowledged by a recreational field, a less formal park.

26


NORTH ELEVATION

BUILDING SECTION THROUGH COURTYARD LOOKING EAST

WALL SECTION AT LOBBY

BUILDING SECTION THROUGH LOBBY LOOKING SOUTH

LOBBY RENDERING

27


SKETCHES AND PRECEDENTS

28


29


FROM A4 SKETCHBOOK (PEN)

30

FROM A4 SKETCHBOOK (PEN)

FROM A4 SKETCHBOOK (PEN)

FROM A4 SKETCHBOOK (PEN)


FROM A4 SKETCHBOOK (PEN)

FROM A4 SKETCHBOOK (PEN)

31


MAP TO SCHOOL COLLAGE (PENCIL)

STUDIES AND EXTRA CURRICULAR

32

GUT HOUSES

EXPEDIENT FUNCTIONALITY (PEN AND HIGHLIGHTER ON POST-IT)


DCPA AND MIKE CRUZ ALBUM ART (PS)

VARIOUS FROM A4 SKETCHBOOK

MIKE CRUZ EP ART (PENCIL)

33


CURRICULUM VITAE

34


IGOR DRASKOVIC ASSOC. AIA CONTACT P: (817) 929 - 1219 E: igordrask@gmail.com A: Dallas, TX IG: igloreous

ARCHITECTURAL DESIGNER

Architectural Designer with 6+ years experience in design and construction of public, civic, and residential projects. Seeking a full time position at an architectural firm.

WORK EXPERIENCE

04|2014 - Present BRW ARCHITECTS | Project Coordinator (A.I.T.) • Focus on K-12 and Higher Education for various clients including Dallas ISD, Arlington ISD, Fort Worth ISD, and Texas A&M University System • Roles and Responsibilities: Team leader and project coordinator from conceptualization to close-out including: program assessment and execution, site analysis and design, graphics for client presentations and business development, building design and programming, code analysis, interior design, acoustical design, and material selection including vendor communication, BIM lead, and construction administration. • Consultant coordinator for all disciplines including Structural, MEP, Civil, Landscape, and Interior Designers and drawing coordination. Projects : Polytechnic High School Additions, Texas A&M Administration Building, Texas A&M Music Activities Center, Woodrow Wilson High School Addition, Lamar High School Renovation, Polytechnical Senior High School Addition and Renovation, Anne Frank Early Childhood Learning Center, Workman Jr HS Addition and Renovation. 04|2012 - 08|2014 MAESTRI STUDIO | Architectural Intern • Focus on High-End Residential. • Roles: Assisted the architect from schematic design to construction. Worked on construction documents for multiple projects at any given time, as well as site analysis and material spec. Built digital models, drew façade renderings, and built physical models for client presentations.

EDUCATION

AXP Hours complete. Currently taking ARE’s. 08|2012 - 05|2014 UNIVERSITY OF TEXAS at ARLINGTON Master of Architecture 02|2013 - 07|2013 UNIVERSITY OF INNSBRUCK - Austria Master of Architecture Study Abroad 08|2007 - 08|2011 UNIVERSITY OF TEXAS at ARLINGTON Bachelor of Science in Architecture

PROFICIENCY

BIM 3D 2D RENDER

AFFILIATIONS

American Institute of Architects: Ken Roberts Delineation Competition - 2018 Social Media Lead Ken Roberts Delineation Competition - 2017 Committee Chair Ken Roberts Delineation Competition - 2016 Vice Chair Other: Hearts and Hammers, CANstruction, Bark N Build

EXTRA

BRW BIM Team and BRW Mentorship Team

Revit Sketchup + Cinema 4D + Rhino Bluebeam + Photoshop + CAD + InDesign + Illustrator + AutoCAD Lumion + Podium + Blender

35



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.