A
DW
K-A-2
107"
B
72"
1
Unit 1 Kitchen 1/2" = 1'-0"
Note:
2
All Shop Drawing MUST be Signed Prior to Production Approved. Proceed With Production Revise and Resubmit Make Corrections Noted & Proceed
Signature: ______________ Date:______________
R
Unit 1 Kitchen
Revision Date
Item Type Top Finish Millwork Finish Pull Style Item Misc. Item Qty.
Project #
Project Number
Project Name AM \ PM
Project Name Author
K-A-1
72"
108" 9" 18"
12 3/4"
33"
36"
3/4" 3/4"
42"
18"
3/4"
36"
3"
18"
3"
12"
30"
Fillers to be Cut on Site
3"
Fillers to be Cut on Site
34 1/2"
3/4"
End Panel
3/4"
4" 3"
DW 3/4"
24 1/2"
30"
3/4"
18"
3/4"
9"
38"
23 3/4"
76"
A
Unit 1 Kitchen A 1/2" = 1'-0"
Note:
B
All Shop Drawing MUST be Signed Prior to Production Approved. Proceed With Production Revise and Resubmit Make Corrections Noted & Proceed
Signature: ______________ Date:______________
R
Revision Date
Unit 1 Kitchen B 1/2" = 1'-0"
Item Type Top Finish Millwork Finish Pull Style Item Misc. Item Qty.
Project #
Project Number
Project Name AM \ PM
Project Name Author
K-A-2
3 15" 2"
3"
4 K-A-3
5
Lower Cabinet 3D
Note:
Lower Cabinet Front 1/2" = 1'-0"
2
6
1/4"
3"
3/4"
23 3/4"
30"
Lower Cabinet Side 1/2" = 1'-0"
1/4" 1/4"
21 1/2"
1
1/8"
34 1/2" 30 1/2"
3"
3"
4"
4"
2"
34 1/2" 30 1/2"
2"
2"
1/4"
K-A-3
3
Detail 0 1/2" = 1'-0"
4
Detail 1 3" = 1'-0"
Lower Cabinet Assembly
All Shop Drawing MUST be Signed Prior to Production Approved. Proceed With Production Revise and Resubmit Make Corrections Noted & Proceed
Signature: ______________ Date:______________
R
Revision Date
Item Type Top Finish Millwork Finish Pull Style Item Misc. Item Qty.
Project #
Project Number
Project Name AM \ PM
Project Name Author
K-A-3
3 1/4"
K-A-4
3/4"
3" 3"
18"
4 K-A-4 16 1/2"
1
5
Upper Cabinet Side 1/2" = 1'-0"
Upper Cabinet 3D
Note:
2
6
3/4"
16 1/2"
Upper Cabinet Front 1/2" = 1'-0"
3
1/4"
1/4"
12" 3/4"
1/8"
1/4" 33"
Detail 2 1/2" = 1'-0"
4
Detail 3 3" = 1'-0"
Upper Cabinet Assembly
All Shop Drawing MUST be Signed Prior to Production Approved. Proceed With Production Revise and Resubmit Make Corrections Noted & Proceed
Signature: ______________ Date:______________
R
Revision Date
Item Type Top Finish Millwork Finish Pull Style Item Misc. Item Qty.
Project #
Project Number
Project Name AM \ PM
Project Name Author
K-A-4
33" End Panel
DW
A
18"
18"
Fillers to be Cut on Site
K-A-2
K-A-2
42"
30"
108"
B
Fillers to be Cut on Site
23 3/4"
76"
B
A
30"
30"
30"
9"
Unit 1 Lower Cabinets 1/2" = 1'-0" Note:
All Shop Drawing MUST be Signed Prior to Production Approved. Proceed With Production Revise and Resubmit Make Corrections Noted & Proceed
Signature: ______________ Date:______________
9"
72"
69"
1
30"
2 R
Revision Date
Unit 1 Upper Cabinets 1/2" = 1'-0" Item Type Top Finish Millwork Finish Pull Style Item Misc. Item Qty.
Project #
Project Number
Project Name AM \ PM
Project Name Author
K-A-5
A
K-B-2
DW 108"
B
72"
1
Unit 1-1 Kitchen 1/2" = 1'-0" Note:
2
All Shop Drawing MUST be Signed Prior to Production Approved. Proceed With Production Revise and Resubmit Make Corrections Noted & Proceed
Signature: ______________ Date:______________
R
Unit 1-1 Kitchen
Revision Date
Item Type Top Finish Millwork Finish Pull Style Item Misc. Item Qty.
Project #
Project Number
Project Name AM \ PM
Project Name Author
K-B-1
108" 30"
30"
30" 18"
12"
18"
36"
36"
18"
30"
18"
9"
Fillers to be Cut on Site 3"
Fillers to be Cut on Site
3"
30 1/2"
34 1/2"
3"
End Panel
4" 3"
DW
21 1/2"
9"
23 3/4"
A
30"
3/4"
18"
8"
23 3/4"
3/4"
Kitchen A 1/2" = 1'-0" Note:
30"
B All Shop Drawing MUST be Signed Prior to Production Approved. Proceed With Production Revise and Resubmit Make Corrections Noted & Proceed
Signature: ______________ Date:______________
R
Kitchen B 1/2" = 1'-0"
Revision Date
Item Type Top Finish Millwork Finish Pull Style Item Misc. Item Qty.
Project #
Project Number
Project Name AM \ PM
Project Name Author
K-B-2
3 K-B-3 30" 15"
3"
3"
4"
3"
34 1/2" 30 1/2"
3/4"
3"
15"
21 1/2" 23 3/4"
1
Elevation 1 - b 1/2" = 1'-0"
2
4 Note:
All Shop Drawing MUST be Signed Prior to Production Approved. Proceed With Production Revise and Resubmit Make Corrections Noted & Proceed
Signature: ______________ Date:______________
Elevation 1 - a 1/2" = 1'-0"
3
Detail 4 1/2" = 1'-0"
Unit 1-1 Lower Cabinet 3D 5 R
Revision Date
Item Type Top Finish Millwork Finish Pull Style Item Misc. Item Qty.
Lower Cabinet Project #
Project Number
Project Name AM \ PM
Project Name Author
K-B-3